1. Dealing with Steam Turbine, Gas Turbine, Nuclear, Industrial and Generator
overhauling & commissioning and also Erection & commissioning
Dealing with Special Repair of critical components – Rotors & HP-IP casings & CV,
ESV and also Non-Critical components - Diaphragms, HP-LP-By Pass Valves, Gland
Box, LP casing & All kind of Pumps
Dealing with Condition Assessment of Critical and Non-Critical components
Dealing with Trouble shoots for governing issues.
Played a key role in streamlining processes through measures such as Modifying
Steam flow path through machining of stages and blade modification of the
turbine rotors
Escalated Overall Operating Efficiency (OEE) by 15%
Recognized for increasing in-plant capability by 30-40%
MAPS TURBINE AND GENERATOR SERVICES
2. MAPS TURBINE AND GENERATOR SERVICES EXECUTIVES
S.N.O NAME DESIGNATION YEAR OF
RTD
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
P MOSHE RAO
VASANTH SRIKANDHE
AMITHAB KUMAR MITHRA
P BHUSHAN KUMAR
SUBRAMANIYAM
K.V.RAO
B. PANDIAN
S. Elangoan
Ramnad Mandli
P.V. SITARAMAYYA (Consultant)
Y. V. Ramana
RAMU SINGH
B.L.SINGH
G.CH. KOTESHWAR RAO
KISHORE RAJAN
RAMA RAO
B. PADMA RAO
LAKSHMAN RAO
Overhauling Team of 120 No’s
Erection Team of 200 No’s
CEO/MANAGING DIRECTOR(B.H.E.L)
GENERAL MANAGER (ALSTOM)
SENIOR PROJECT MANAGER (ALSTOM)
PROJECT MANAGER cum M.D. (G.E.)
RESOURCE MANAGER
VALVE SPECIALIST
ENGINEER (ALSTOM)
MANAGER (B.H.E.L)
GENERAL MANGER (G.E.)
GENERAL MANGER (B.H.E.L)
VALVE SPECIALIST (B.H.E.L)
GOVERNING SPECIALIST (B.H.E.L)
BLADE SPECIALIST (B.H.E.L)
ENGINEER (B.H.E.L)
ENGINEER (B.H.E.L)
FOREMAN (B.H.E.L)
FOREMAN (B.H.E.L)
FOREMAN (B.H.E.L)
Skilled, Semi skilled, Rigger, EOT operators, Helpers,.Etc.
Skilled, Semi skilled, Rigger, EOT operators, Helpers,.Etc.
2013
2013
2012
2016
2015
2004
2016
2017
2016
2011
2017
2013
2013
2015
2016
2015
2009
2008
3. MAPS TURBINE AND GENERATOR SERVICES
P MOSHE RAO EX ENGINEER FROM BHEL
SATPURA SARANI Unit # 1,2,3,4,5 & 6/210 MW LMW – O/H
TUTICORIN TURBINE ERECTION Unit # 1,2,3,4 & 5/210 MW LMW/KWU – O/H
VISAKHA STEELS BOILER – ROTATING Equipment B.H.E.L – O/H
NORTH CHENNAI THERMAL POWER STATION Unit # 1,2&3/210 MW KWU – O/H
NTPC RAMAGUNDAM 500 MW KWU BHEL MAKE – O/H
NTPC TALCHAR 500 MW KWU Unit #3to6 BHEL MAKE – O/H
NTPC SIHMADHRI 500 MW KWU BHEL MAKE – O/H
NPCL KUDANKULAM 1000 MW LMW Unit # 1 BHEL MAKE – ERECTION & COMMISSIONING
N.L.C NEYVELI 210 MW Unit # 1&3 4 &7 KWU & Frankotosia Italy – O/H
AP STATE PALAVANCHU Unit #4,5&6 T.G 110 MW SKODA – O/H
RAICHUR THERMAL POWER PLANT 210 MW KWU
AMITHAB KUMAR MITHRA EX ENGINEER FROM ALSTOM
Plant expansion / modification / upgradation projects such as 110MW (SKODA), 120MW (ZAMECH), 210MW (LMW), 1000MW (LMZ)
RATHNAGIRI 300 MW SHANGAI ELECTRIC
ERECTION/TESTING/COMMISSIONING AT RENUSAGAR POWER PLANT HINDALCO
ENGLISH ELECTRIC/ GEC ALSTOM Maintenance and R&M PROJECTS 120 MW/236 MW/135 MW,.Etc.,
P BHUSHAN KUMAR ENGINEER FROM G.E ALSTOM
18.68 MW – O/H
STCMS NEYVELI 250 MW ALSTOM
NTPC TALCHAR ANGUL 500 MW Unit # 1&2 ALSTOM
4. MAPS TURBINE AND GENERATOR SERVICES
BHUSHAN KUMAR P STEAM TURBINE SPECIALIST FROM G.E-ALSTOM
RTPP 210 MW KWU
BELLARY THERMAL POWER PLANT 500 MW KWU
RATHNAGIRI 300 MW SHANGAI ELECTRIC
ERECTION/TESTING/COMMISSIONING AT RENUSAGAR POWER PLANT HINDALCO
ENGLISH ELECTRIC/ GEC ALSTOM Maintenance and R&M PROJECTS 120 MW/236 MW/135 MW,.Etc.,
Major Overhauling of Steam Turbine & Generator and its auxiliaries at North Chennai TPS, Chennai (3X210MW) KWU design.
Erection and commissioning of Steam Turbine & Generator and its auxiliaries at JSPL, Angul, Orissa (6X135MW, Shangai design).
Erection and commissioning of Steam Turbine & Generator and its auxiliaries at JSPL, Raighar, Chatisgarh (2X135MW, Shangai design).
Major Overhauling of Steam Turbine & Generator and its auxiliaries at ETPS, Ennore, T.N (3X110MW, 2X60MW Skoda design)
Major Overhauling of Steam Turbine and its auxiliaries LANCO KONDAPALLI POWER LTD (1X330MW, Combined cycle. Alstom design).
Major Overhauling of Steam Turbine and its auxiliaries NTPC KHANEYA ODHISSA (2X500 MW) UNIT 1 (ALSTOM design)
Major Overhauling of Steam Turbine and its auxiliaries TANGEDCO / TNEB (5X210 MW) PHASE 1 3X210 MW LMW & PHASE II 2X210 MW KWU.
C-Inspection of Gas Turbine at NTPC, Anta Gas Power Project Rajasthan (3X88.2MW) 13D2-DM BBC design.
C-Inspection of Gas Turbine at NTPC, Ghandhar (3X112MW, Gas Turbine-13E1, ALSTOM design).
Repair-Overhauling & commissioning of Steam Turbine at Terra Energy, A.Chittur (1X18.68 MW, GEC ALSTHOM design).
Repair-Overhauling & commissioning of Steam Turbine at Terra Energy, Thirumandakudi (1X18.68 MW, GEC ALSTHOM design). High Speed Balancing of HP Rotor.
Repair of HPCV & IPCV Valves of Steam Turbine at STCMS, Neyveli (1X250 MW, ALSTOM design).
Repair-Overhauling & commissioning of Steam Turbine at Sabarmati, Ahmedabad (1X120MW).
Successfully executed plant expansion / modification / upgradation projects such as 110MW (SKODA), 120MW (ZAMECH), 210MW (LMW), 1000MW (LMZ)
5. MAPS TURBINE AND GENERATOR SERVICES WORK EXECUTED
TNEB 210 MW KWU BHEL UNIT# 4&5 OVERHAULING & COMMISSIONING SUPPORT
TNEB 210 MW KWU BHEL UNIT# 3 OVERHAULING & COMMISSIONING SUPPORT
TERRA ENERGY 18.68 MW OVERHAULING & COMMISSIONING SUPPORT
RATHNAGIRI 300 MW SHANGAI ELECTRIC OVERHAULING & COMMISSIONING SUPPORT
IP BLADE CARRIER MACHINING FOR RENUSAGAR 65 MW G.E. SUPERVISORY/ENGINEERING CONSULTANCY
TDBFP ROTOR SHAFT MACHINING ALSTOM 10.2 MW SUPERVISORY/ENGINEERING CONSULTANCY
IP BLADE CARRIER REPAIR OF RENUSAGAR 65 MW G.E ENGINEERING CONSULTANCY
HIGHLIGHTS
Maintenance and troubleshooting of various designs of turbines i.e.; GEC ALSTHOM, SKODA, ZM55 (BRABB), ABB Croatian, AEI,
Zamech, LMW, LMZ, KWU, Frankotosia, Siemens Germany, Nuovopignone Italy, Voith, Germany, Ansaldo Italy, Shangai Electric Co,
Dongfang, HEC, HTC, Jieneg and GE from (18.68 MW to 500 MW) located in different parts of India.
Successfully executed plant expansion / modification / upgradation projects such as 110MW (SKODA), 120MW (ZAMECH), 210MW