SlideShare a Scribd company logo
1 of 11
Download to read offline
Severn Estuary SMP2 โ€“ Part B - Policy Statements
CARDIFF
This Theme area contains the Policy Units CAR 1, CAR2 and CAR 3.
It starts at Penarth Head on the west shoreline of the Severn Estuary, in the Vale of Glamorgan,
Wales and end at Lamby Way Landfill Site drain/outfall.
The Key Policy Drivers in this area are:
โ€ข International nature conservation sites โ€“ Severn Estuary SAC, SPA and Ramsar;
โ€ข Critical infrastructure โ€“ railway line, electricity substations, docks;
โ€ข Residential developments โ€“ Cardiff;
โ€ข Industrial and commercial developments โ€“ Cardiff Bay, docks;
โ€ข All Wales Coastal Path routes.
Severn Estuary SMP2 โ€“ Part B - Policy Statements
Severn Estuary SMP2 โ€“ Part B - Policy Statements
Policy Unit: CAR 1 โ€“ Cardiff Bay Barrage
Severn Estuary SMP2 โ€“ Part B - Policy Statements
Preferred Policies to Implement the Plan:
Epoch
Preferred
Policy
Comments
0 to 20
years
(2025)
HTL
The short term policy for this unit is Hold The Line
The Cardiff Bay Barrage would remain in place with some maintenance.
HTL does not guarantee funding to build or maintain current or future
defences or to counter sea level rise.
20 to 50
years
(2055)
HTL
The medium term policy for this unit is Hold The Line
The Cardiff Bay Barrage would remain in place with some maintenance.
HTL does not guarantee funding to build or maintain current or future
defences or to counter sea level rise.
50 to 100
years
(2105)
HTL
The long term policy for this unit is Hold The Line
The Cardiff Bay Barrage would remain in place with some maintenance.
HTL does not guarantee funding to build or maintain current or future
defences or to counter sea level rise.
Economics
Policy
Unit
Existing
SMP1
Policy
Time Period
(epoch)
SMP2 Assessment
0-
20
20-
50
50-
100
Preferred Plan Present Value
Damages
Preferred Plan Present Value
Defence Costs
CAR 1 HTL HTL HTL HTL
ยฃ568m
(CAR1-3, WEN1-2 total)
ยฃ24m
(CAR1-3, WEN1-2 total)
The preferred policy is economically viable.
There are no cost estimates available for the maintenance or replacement of a structure like the Cardiff
Bay Barrage. Standard โ€˜hard defencesโ€™ costs have been used for the Cardiff Bay Barrage (see Part A
Section 3.6). It should be noted that this underestimates
The preferred policy is economically viable for the linked Policy Units of CAR 1, CAR 2, CAR 3, WEN 1,
and WEN 2. The costs and damages of the preferred policy in the table above relate to actions taken in all
linked policy units.
the costs of maintaining the Cardiff Bay Barrage.
An increase in costs would not alter the policy option.
Severn Estuary SMP2 โ€“ Part B - Policy Statements
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review โ€“ Final Report
5
Predicted Implication of the Preferred Plan for the CAR 1 Policy Unit
Time
Period
Management Activities
Property, Land Use and
Human Health
Nature Conservation โ€“
including Earth
Heritage, Geology and
Biodiversity
Landscape Character
and Visual Amenity
Historic Environment
Amenity and
Recreational Use
0 โ€“ 20
years
The Cardiff Bay Barrage
is expected to remain in
place and functional with
minimal maintenance.
Defences will manage the
risk of flooding on existing
property, land use or
human health.
Maintaining the Cardiff
Bay Barrage, the harbour
and navigable channels
will also be maintained.
A HTL policy will not
impact the nature
conservation sites during
this time period. Works
should take account of
possible environmental
impacts and the need for
an EIA.
Maintaining existing
defences will not impact
on existing landscape and
visual amenity.
Defences will manage the
risk of flooding on the
historic environment.
Defences will manage the
risk of flooding on n the
amenity value of the land
or recreational use.
20 โ€“ 50
years
The Cardiff Bay Barrage
is expected to remain in
place and functional with
minimal maintenance.
Defences will manage the
risk of flooding on existing
property, land use or
human health.
Maintaining the Cardiff
Bay Barrage, the harbour
and navigable channels
will also be maintained.
Some coastal squeeze
will occur which will result
in loss of intertidal
habitats within N2K sites
and SSSI. Works should
take account of possible
environmental impacts
and the need for an EIA.
Maintaining existing
defences will not impact
on existing landscape and
visual amenity.
Defences will manage the
risk of flooding on the
historic environment.
Defences will manage the
risk of flooding on the
amenity value of the land
or recreational use.
50 โ€“ 100
years
The Cardiff Bay Barrage
is expected to remain in
place and functional with
minimal maintenance.
Defences will manage the
risk of flooding on existing
property, land use or
human health.
Maintaining the Cardiff
Bay Barrage, the harbour
and navigable channels
will also be maintained.
Some coastal squeeze
will occur which will result
in loss of intertidal
habitats within N2K sites
and SSSI. Works should
take account of possible
environmental impacts
and the need for an EIA.
Maintaining existing
defences will not impact
on existing landscape and
visual amenity.
Defences will manage the
risk of flooding on the
historic environment.
Defences will manage the
risk of flooding on the
amenity value of the land
or recreational use.
Severn Estuary SMP2 โ€“ Part B - Policy Statements
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review โ€“ Final Report
6
Policy Unit: CAR 2 โ€“ Western end of Cardiff Bay Barrage to mouth of
River Rhymney at Rover Way
Severn Estuary SMP2 โ€“ Part B - Policy Statements
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review โ€“ Final Report
7
Preferred Policies to Implement the Plan:
Epoch
Preferred
Policy
Comments
0 to 20
years
(2025)
HTL
The short term policy for this unit is Hold The Line
The earth embankments will require repair and maintenance during this
epoch. Some sections may need to be replaced.
HTL manages the risk of impacts from flooding and erosion to industrial and
residential areas of Cardiff. It is part of 5 linked Policy Units (CAR 1, CAR 2,
CAR 3, WEN 1 and WEN 2). Actions should take account of potential
impacts in all linked areas.
HTL does not guarantee funding to build or maintain current or future
defences or to counter sea level rise.
20 to 50
years
(2055)
HTL
The medium term policy for this unit is Hold The Line
The existing defences will come to the end of their serviceable life in this
epoch. HTL recommends that defences are replaced. HTL manages the risk
of impacts from flooding and erosion to industrial and residential areas of
Cardiff. It is part of 5 linked Policy Units (CAR 1, CAR 2, CAR 3, WEN 1 and
WEN 2). Actions should take account of potential impacts in all linked areas.
HTL does not guarantee funding to build or maintain current or future
defences or to counter sea level rise.
50 to 100
years
(2105)
HTL
The long term policy for this unit is Hold The Line
HTL manages the risk of impacts from flooding and erosion to industrial and
residential areas of Cardiff. It is part of 5 linked Policy Units (CAR 1, CAR 2,
CAR 3, WEN 1 and WEN 2). Actions should take account of potential
impacts in all linked areas.
HTL does not guarantee funding to build or maintain current or future
defences or to counter sea level rise.
Economics
Policy
Unit
Existing
SMP1
Policy
Time Period
(epoch)
SMP2 Assessment
0-
20
20-
50
50-
100
Preferred Plan Present Value
Damages
Preferred Plan Present Value
Defence Costs
CAR 2 HTL HTL HTL HTL
ยฃ568m
(CAR1-3, WEN1-2 total)
ยฃ24m
(CAR1-3, WEN1-2 total)
The preferred policy for this unit is economically viable.
The preferred policy is economically viable for the linked Policy Units of CAR 1, CAR 2, CAR 3, WEN 1 and
WEN 2. The costs and damages of the preferred policy in the table above relate to actions taken in all
linked policy units.
Severn Estuary SMP2 โ€“ Part B - Policy Statements
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review โ€“ Final Report
8
Predicted Implication of the Preferred Plan for the CAR 2 Policy Unit
Time
Period
Management Activities
Property, Land Use and
Human Health
Nature Conservation โ€“
including Earth
Heritage, Geology and
Biodiversity
Landscape Character
and Visual Amenity
Historic Environment
Amenity and
Recreational Use
0 โ€“ 20
years
The shoreline will remain
stable. Earth
embankments will require
maintenance. Flood risk
is limited in this period.
Defences will manage the
risk of flooding on existing
property, land use or
human health.
An HTL policy will not
impact the nature
conservation sites during
this time period. Works
should take account of
possible environmental
impacts and the need for
an EIA.
Defences will manage the
risk of flooding on existing
landscape and visual
amenity
Defences will manage the
risk of flooding on the
historic environment
Defences will manage the
risk of flooding on the
amenity value of the land
or recreational use.
20 โ€“ 50
years
The shoreline will remain
stable. Defences will
need to be replaced in
this period. The majority
of this unit benefits from
high ground.
Defences will manage the
risk of flooding on existing
property, land use or
human health.
Coastal squeeze will
occur which will result in
loss of intertidal habitats
affecting Severn N2K and
SSSI. Works should take
account of possible
environmental impacts
and the need for an EIA.
Defences will manage the
risk of flooding on existing
landscape and visual
amenity
Defences will manage the
risk of flooding on the
historic environment
Defences will manage the
risk of flooding on the
amenity value of the land
or recreational use.
50 โ€“ 100
years
The shoreline will remain
stable. Defences should
be monitored and
maintained.
Defences will manage the
risk of flooding on existing
property, land use or
human health.
Coastal squeeze will
occur which will result in
loss of intertidal habitats
affecting Severn N2K and
SSSI. Works should take
account of possible
environmental impacts
and the need for an EIA.
Defences will manage the
risk of flooding on existing
landscape and visual
amenity
Defences will manage the
risk of flooding on the
historic environment
Defences will manage the
risk of flooding on the
amenity value of the land
or recreational use.
Severn Estuary SMP2 โ€“ Part B - Policy Statements
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review โ€“ Final Report
9
Policy Unit: CAR 3 โ€“ Both banks of the River Rhymney from the mouth
at Rover Way to the Lamby Way landfill site drain
Severn Estuary SMP2 โ€“ Part B - Policy Statements
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review โ€“ Final Report
10
Preferred Policies to Implement the Plan:
Epoch
Preferred
Policy
Comments
0 to 20
years
(2025)
HTL
The short term policy for this unit is Hold The Line
HTL manages the risk of flooding and erosion impacts to industrial and
residential areas of Cardiff, including transport links and Lamby Way landfill
site. Flooding at the landfill site could be harmful to water quality. Flood risk
is localised. High ground limits flood risk in some areas. HTL would require
defence structures in only some areas. Actions should take account of
potential impacts in linked Policy Units (CAR 1, CAR 2, WEN 1 and WEN 2).
HTL does not guarantee funding to build or maintain current or future
defences or to counter sea level rise.
20 to 50
years
(2055)
HTL
The medium term policy for this unit is Hold The Line
HTL manages the risk of flooding and erosion impacts to industrial and
residential areas of Cardiff, including transport links and Lamby Way landfill
site. Flooding at the landfill site area could be detrimental to the water
quality. Flood risk is localised - HTL would only require defence structures in
some places. In other areas, high ground limits the risk. Actions should take
account of potential impacts in linked Policy Units (CAR 1, CAR 2, WEN 1
and WEN 2).
HTL does not guarantee funding to build or maintain current or future
defences or to counter sea level rise.
50 to 100
years
(2105)
HTL
The long term policy for this unit is Hold The Line
HTL manages the risk of flooding and erosion impacts to industrial and
residential areas of Cardiff, including transport links and Lamby Way landfill
site. Flooding at the landfill site area would be detrimental to the water
quality. Flood risk is localised - HTL would only require defence structures in
some places. In other areas, high ground limits the risk. Actions should take
account of potential impacts in linked Policy Units (CAR 1, CAR 2, WEN 1
and WEN 2).
HTL does not guarantee funding to build or maintain current or future
defences or to counter sea level rise.
Economics
Policy
Unit
Existing
SMP1
Policy
Time Period
(epoch)
SMP2 Assessment
0-
20
20-
50
50-
100
Preferred Plan Present Value
Damages
Preferred Plan Present Value
Defence Costs
CAR 3 HTL HTL HTL HTL
ยฃ568m
(CAR1-3, WEN1-2 total)
ยฃ24m
(CAR1-3, WEN1-2 total)
The preferred policy is economically viable for the linked Policy Units of CAR 1, CAR 2, CAR 3, WEN 1 and
WEN 2. The costs and damages of the preferred policy in the table above relate to actions taken in all
linked policy units.
Severn Estuary SMP2 โ€“ Part B - Policy Statements
The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan
document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein.
Severn Estuary SMP2 Review โ€“ Final Report
11
Predicted Implication of the Preferred Plan for the CAR 3 Policy Unit
Time
Period
Management Activities
Property, Land Use and
Human Health
Nature Conservation โ€“
including Earth
Heritage, Geology and
Biodiversity
Landscape Character
and Visual Amenity
Historic Environment
Amenity and
Recreational Use
0 โ€“ 20
years
The shoreline will remain
stable and flood risk is
limited in this period, and
as a result management
activities will be limited.
Defences will manage the
risk of flooding on existing
property, land use or
human health.
An HTL policy will not
impact the nature
conservation sites during
this time period. Works
should take account of
possible environmental
impacts and the need for
an EIA.
Limited erosion and flood
risk will not impact on
existing landscape and
visual amenity
Defences will manage the
risk of flooding on the
historic environment.
Defences will manage the
risk of flooding on the
amenity value of the land
or recreational use.
20 โ€“ 50
years
The shoreline will remain
stable. The defences will
need to be replaced in
this epoch. High ground
in most of this policy unit
limits flood risk.
Defences will manage the
risk of flooding on existing
property, land use or
human health.
Coastal squeeze will
occur which will result in
loss of intertidal habitats
affecting Severn N2K and
SSSIs in the area. Works
should take account of
possible environmental
impacts and the need for
an EIA.
Limited erosion and flood
risk will not impact on
existing landscape and
visual amenity
Defences will manage the
risk of flooding on the
historic environment.
Defences will manage the
risk of flooding on the
amenity value of the land
or recreational use.
50 โ€“ 100
years
The shoreline will remain
stable. Defences should
be maintained in the long
term.
Defences will manage the
risk of flooding on existing
property, land use or
human health.
Coastal squeeze will
occur which will result in
loss of intertidal habitats
affecting Severn N2K and
SSSIs in the area. Works
should take account of
possible environmental
impacts and the need for
an EIA.
Limited erosion and flood
risk will not impact on
existing landscape and
visual amenity
Defences will manage the
risk of flooding on the
historic environment.
Defences will manage the
risk of flooding on the
amenity value of the land
or recreational use.

More Related Content

What's hot

Smp2 part a main report final
Smp2 part a main report finalSmp2 part a main report final
Smp2 part a main report finalSevern Estuary
ย 
Smp2 part b policy statements intro sections_final
Smp2 part b policy statements intro sections_finalSmp2 part b policy statements intro sections_final
Smp2 part b policy statements intro sections_finalSevern Estuary
ย 
Appendix d theme review final_dec2010a
Appendix d theme review final_dec2010aAppendix d theme review final_dec2010a
Appendix d theme review final_dec2010aSevern Estuary
ย 
Appendix f policy development and appraisal final_dec2010
Appendix f policy development and appraisal final_dec2010Appendix f policy development and appraisal final_dec2010
Appendix f policy development and appraisal final_dec2010Severn Estuary
ย 
Smp2 part b policy statements glos-sharpness only_final
Smp2 part b policy statements glos-sharpness only_finalSmp2 part b policy statements glos-sharpness only_final
Smp2 part b policy statements glos-sharpness only_finalSevern Estuary
ย 
Appendix i part b _hra_final_dec2010
Appendix i part b _hra_final_dec2010Appendix i part b _hra_final_dec2010
Appendix i part b _hra_final_dec2010Severn Estuary
ย 
Appendix g preferred management approach testing final_dec2010
Appendix g preferred management approach testing final_dec2010Appendix g preferred management approach testing final_dec2010
Appendix g preferred management approach testing final_dec2010Severn Estuary
ย 
Appendix c baseline understanding final_dec2010
Appendix c baseline understanding final_dec2010Appendix c baseline understanding final_dec2010
Appendix c baseline understanding final_dec2010Severn Estuary
ย 
Appendix i part a sea annexes_final_dec2010
Appendix i part a sea annexes_final_dec2010Appendix i part a sea annexes_final_dec2010
Appendix i part a sea annexes_final_dec2010Severn Estuary
ย 
Smp2 part c action plan final
Smp2 part c action plan finalSmp2 part c action plan final
Smp2 part c action plan finalSevern Estuary
ย 
Appendix j wfd assessment final_dec2010
Appendix j wfd assessment final_dec2010Appendix j wfd assessment final_dec2010
Appendix j wfd assessment final_dec2010Severn Estuary
ย 
Appendix a development of the smp2 final_dec2010
Appendix a development of the smp2 final_dec2010Appendix a development of the smp2 final_dec2010
Appendix a development of the smp2 final_dec2010Severn Estuary
ย 
Appendix h economics final dec2010
Appendix h economics final dec2010Appendix h economics final dec2010
Appendix h economics final dec2010Severn Estuary
ย 
Appendix k metadata and bibliographic database final_dec2010
Appendix k metadata and bibliographic database final_dec2010Appendix k metadata and bibliographic database final_dec2010
Appendix k metadata and bibliographic database final_dec2010Severn Estuary
ย 
FEMA Policy Barring FEMA Money to Buy Out Flooded Properties with Shale Leases
FEMA Policy Barring FEMA Money to Buy Out Flooded Properties with Shale LeasesFEMA Policy Barring FEMA Money to Buy Out Flooded Properties with Shale Leases
FEMA Policy Barring FEMA Money to Buy Out Flooded Properties with Shale LeasesMarcellus Drilling News
ย 
Cleaning Up Munitions
Cleaning Up MunitionsCleaning Up Munitions
Cleaning Up MunitionsBill Frank
ย 
US Public law - Research on effects of Ocean Disposal of Munitions
US Public law - Research on effects of Ocean Disposal of MunitionsUS Public law - Research on effects of Ocean Disposal of Munitions
US Public law - Research on effects of Ocean Disposal of MunitionsGeoffrey Carton
ย 
CLME Indicators
CLME IndicatorsCLME Indicators
CLME IndicatorsIwl Pcu
ย 
Land Surveyors, FEMA and Other Flood Zone Issues
Land Surveyors, FEMA and Other Flood Zone IssuesLand Surveyors, FEMA and Other Flood Zone Issues
Land Surveyors, FEMA and Other Flood Zone Issuesgfquinn
ย 

What's hot (20)

Smp2 part a main report final
Smp2 part a main report finalSmp2 part a main report final
Smp2 part a main report final
ย 
Smp2 part b policy statements intro sections_final
Smp2 part b policy statements intro sections_finalSmp2 part b policy statements intro sections_final
Smp2 part b policy statements intro sections_final
ย 
Appendix d theme review final_dec2010a
Appendix d theme review final_dec2010aAppendix d theme review final_dec2010a
Appendix d theme review final_dec2010a
ย 
Appendix f policy development and appraisal final_dec2010
Appendix f policy development and appraisal final_dec2010Appendix f policy development and appraisal final_dec2010
Appendix f policy development and appraisal final_dec2010
ย 
Smp2 part b policy statements glos-sharpness only_final
Smp2 part b policy statements glos-sharpness only_finalSmp2 part b policy statements glos-sharpness only_final
Smp2 part b policy statements glos-sharpness only_final
ย 
Appendix i part b _hra_final_dec2010
Appendix i part b _hra_final_dec2010Appendix i part b _hra_final_dec2010
Appendix i part b _hra_final_dec2010
ย 
Appendix g preferred management approach testing final_dec2010
Appendix g preferred management approach testing final_dec2010Appendix g preferred management approach testing final_dec2010
Appendix g preferred management approach testing final_dec2010
ย 
Appendix c baseline understanding final_dec2010
Appendix c baseline understanding final_dec2010Appendix c baseline understanding final_dec2010
Appendix c baseline understanding final_dec2010
ย 
Appendix i part a sea annexes_final_dec2010
Appendix i part a sea annexes_final_dec2010Appendix i part a sea annexes_final_dec2010
Appendix i part a sea annexes_final_dec2010
ย 
Smp2 part c action plan final
Smp2 part c action plan finalSmp2 part c action plan final
Smp2 part c action plan final
ย 
Appendix j wfd assessment final_dec2010
Appendix j wfd assessment final_dec2010Appendix j wfd assessment final_dec2010
Appendix j wfd assessment final_dec2010
ย 
Appendix a development of the smp2 final_dec2010
Appendix a development of the smp2 final_dec2010Appendix a development of the smp2 final_dec2010
Appendix a development of the smp2 final_dec2010
ย 
Appendix h economics final dec2010
Appendix h economics final dec2010Appendix h economics final dec2010
Appendix h economics final dec2010
ย 
Appendix k metadata and bibliographic database final_dec2010
Appendix k metadata and bibliographic database final_dec2010Appendix k metadata and bibliographic database final_dec2010
Appendix k metadata and bibliographic database final_dec2010
ย 
FEMA Policy Barring FEMA Money to Buy Out Flooded Properties with Shale Leases
FEMA Policy Barring FEMA Money to Buy Out Flooded Properties with Shale LeasesFEMA Policy Barring FEMA Money to Buy Out Flooded Properties with Shale Leases
FEMA Policy Barring FEMA Money to Buy Out Flooded Properties with Shale Leases
ย 
Cleaning Up Munitions
Cleaning Up MunitionsCleaning Up Munitions
Cleaning Up Munitions
ย 
US Public law - Research on effects of Ocean Disposal of Munitions
US Public law - Research on effects of Ocean Disposal of MunitionsUS Public law - Research on effects of Ocean Disposal of Munitions
US Public law - Research on effects of Ocean Disposal of Munitions
ย 
CLME Indicators
CLME IndicatorsCLME Indicators
CLME Indicators
ย 
storage tanks
storage tanksstorage tanks
storage tanks
ย 
Land Surveyors, FEMA and Other Flood Zone Issues
Land Surveyors, FEMA and Other Flood Zone IssuesLand Surveyors, FEMA and Other Flood Zone Issues
Land Surveyors, FEMA and Other Flood Zone Issues
ย 

Viewers also liked

Smp2 part b policy statements kingston seymour only_final
Smp2 part b policy statements kingston seymour only_finalSmp2 part b policy statements kingston seymour only_final
Smp2 part b policy statements kingston seymour only_finalSevern Estuary
ย 
ะฑะฐั‚ะฐะตะฒ ะดะฐะผะธั€+Fc ยซpavlodarยป+ั„ัƒั‚ะฑะพะปัŒะฝั‹ะต ะฑะพะปะตะปัŒั‰ะธะบะธ
ะฑะฐั‚ะฐะตะฒ ะดะฐะผะธั€+Fc ยซpavlodarยป+ั„ัƒั‚ะฑะพะปัŒะฝั‹ะต ะฑะพะปะตะปัŒั‰ะธะบะธะฑะฐั‚ะฐะตะฒ ะดะฐะผะธั€+Fc ยซpavlodarยป+ั„ัƒั‚ะฑะพะปัŒะฝั‹ะต ะฑะพะปะตะปัŒั‰ะธะบะธ
ะฑะฐั‚ะฐะตะฒ ะดะฐะผะธั€+Fc ยซpavlodarยป+ั„ัƒั‚ะฑะพะปัŒะฝั‹ะต ะฑะพะปะตะปัŒั‰ะธะบะธะ”ะฐะผะธั€ ะ‘ะฐั‚ะฐะตะฒ
ย 
Smp2 part b policy statements holms only_final
Smp2 part b policy statements holms only_finalSmp2 part b policy statements holms only_final
Smp2 part b policy statements holms only_finalSevern Estuary
ย 
Smp2 part b policy statements lydney-glos only_final
Smp2 part b policy statements lydney-glos only_finalSmp2 part b policy statements lydney-glos only_final
Smp2 part b policy statements lydney-glos only_finalSevern Estuary
ย 
clase 15.03.16
clase 15.03.16clase 15.03.16
clase 15.03.16deny lama
ย 
Smp2 part b policy statements chepstow-wye only_final
Smp2 part b policy statements chepstow-wye only_finalSmp2 part b policy statements chepstow-wye only_final
Smp2 part b policy statements chepstow-wye only_finalSevern Estuary
ย 
Evaluation question 1
Evaluation question 1Evaluation question 1
Evaluation question 1Jessica Reeve
ย 

Viewers also liked (8)

Smp2 part b policy statements kingston seymour only_final
Smp2 part b policy statements kingston seymour only_finalSmp2 part b policy statements kingston seymour only_final
Smp2 part b policy statements kingston seymour only_final
ย 
ะฑะฐั‚ะฐะตะฒ ะดะฐะผะธั€+Fc ยซpavlodarยป+ั„ัƒั‚ะฑะพะปัŒะฝั‹ะต ะฑะพะปะตะปัŒั‰ะธะบะธ
ะฑะฐั‚ะฐะตะฒ ะดะฐะผะธั€+Fc ยซpavlodarยป+ั„ัƒั‚ะฑะพะปัŒะฝั‹ะต ะฑะพะปะตะปัŒั‰ะธะบะธะฑะฐั‚ะฐะตะฒ ะดะฐะผะธั€+Fc ยซpavlodarยป+ั„ัƒั‚ะฑะพะปัŒะฝั‹ะต ะฑะพะปะตะปัŒั‰ะธะบะธ
ะฑะฐั‚ะฐะตะฒ ะดะฐะผะธั€+Fc ยซpavlodarยป+ั„ัƒั‚ะฑะพะปัŒะฝั‹ะต ะฑะพะปะตะปัŒั‰ะธะบะธ
ย 
Smp2 part b policy statements holms only_final
Smp2 part b policy statements holms only_finalSmp2 part b policy statements holms only_final
Smp2 part b policy statements holms only_final
ย 
Smp2 part b policy statements lydney-glos only_final
Smp2 part b policy statements lydney-glos only_finalSmp2 part b policy statements lydney-glos only_final
Smp2 part b policy statements lydney-glos only_final
ย 
clase 15.03.16
clase 15.03.16clase 15.03.16
clase 15.03.16
ย 
Smp2 part b policy statements chepstow-wye only_final
Smp2 part b policy statements chepstow-wye only_finalSmp2 part b policy statements chepstow-wye only_final
Smp2 part b policy statements chepstow-wye only_final
ย 
Software Escrow Services
Software Escrow ServicesSoftware Escrow Services
Software Escrow Services
ย 
Evaluation question 1
Evaluation question 1Evaluation question 1
Evaluation question 1
ย 

Similar to Smp2 part b policy statements cardiff only_final

Appendix e issues and features final_dec2010
Appendix e issues and features final_dec2010Appendix e issues and features final_dec2010
Appendix e issues and features final_dec2010Severn Estuary
ย 
Appendix i part a sea_final_dec2010
Appendix i part a sea_final_dec2010Appendix i part a sea_final_dec2010
Appendix i part a sea_final_dec2010Severn Estuary
ย 
NAP Expo 2015 Session III, II Ecosystem-based Adaptation in the Pacific Islands
NAP Expo 2015 Session III, II Ecosystem-based Adaptation in the Pacific IslandsNAP Expo 2015 Session III, II Ecosystem-based Adaptation in the Pacific Islands
NAP Expo 2015 Session III, II Ecosystem-based Adaptation in the Pacific IslandsNAP Events
ย 
2012 06 Bristol Channel Strategic Coastal Group โ€“ Shoreline and Flood Risk Ma...
2012 06 Bristol Channel Strategic Coastal Group โ€“ Shoreline and Flood Risk Ma...2012 06 Bristol Channel Strategic Coastal Group โ€“ Shoreline and Flood Risk Ma...
2012 06 Bristol Channel Strategic Coastal Group โ€“ Shoreline and Flood Risk Ma...SevernEstuary
ย 
Lgu services amp
Lgu services ampLgu services amp
Lgu services ampAngus Proctor
ย 
Emergency Pipeline Repair Systems, A Global Overview of Best Practice
Emergency Pipeline Repair Systems, A Global Overview of Best PracticeEmergency Pipeline Repair Systems, A Global Overview of Best Practice
Emergency Pipeline Repair Systems, A Global Overview of Best PracticeJames Rowley
ย 
env_mgmt_framework_march_2016.pdf
env_mgmt_framework_march_2016.pdfenv_mgmt_framework_march_2016.pdf
env_mgmt_framework_march_2016.pdfKentThomas17
ย 
2008 04 Flooding: The Forecast Nick Lyness, Environment Agency
2008 04 Flooding: The Forecast Nick Lyness, Environment Agency 2008 04 Flooding: The Forecast Nick Lyness, Environment Agency
2008 04 Flooding: The Forecast Nick Lyness, Environment Agency SevernEstuary
ย 
Louisiana In-Lieu-Fee Wetland Mitigation Program Proposal
Louisiana In-Lieu-Fee Wetland Mitigation Program Proposal Louisiana In-Lieu-Fee Wetland Mitigation Program Proposal
Louisiana In-Lieu-Fee Wetland Mitigation Program Proposal George Howard
ย 
Enhancing Climate Resilience in African's Infrastructure
Enhancing Climate Resilience in African's Infrastructure Enhancing Climate Resilience in African's Infrastructure
Enhancing Climate Resilience in African's Infrastructure NAP Events
ย 
Flood management systems
Flood management systemsFlood management systems
Flood management systemsCKMCforstudents
ย 
Flood alleviationbrief170214
Flood alleviationbrief170214Flood alleviationbrief170214
Flood alleviationbrief170214Naoise
ย 
Moving Towards Resilience in Vermont
Moving Towards Resilience in VermontMoving Towards Resilience in Vermont
Moving Towards Resilience in VermontRPO America
ย 

Similar to Smp2 part b policy statements cardiff only_final (14)

Appendix e issues and features final_dec2010
Appendix e issues and features final_dec2010Appendix e issues and features final_dec2010
Appendix e issues and features final_dec2010
ย 
Appendix i part a sea_final_dec2010
Appendix i part a sea_final_dec2010Appendix i part a sea_final_dec2010
Appendix i part a sea_final_dec2010
ย 
NAP Expo 2015 Session III, II Ecosystem-based Adaptation in the Pacific Islands
NAP Expo 2015 Session III, II Ecosystem-based Adaptation in the Pacific IslandsNAP Expo 2015 Session III, II Ecosystem-based Adaptation in the Pacific Islands
NAP Expo 2015 Session III, II Ecosystem-based Adaptation in the Pacific Islands
ย 
2012 06 Bristol Channel Strategic Coastal Group โ€“ Shoreline and Flood Risk Ma...
2012 06 Bristol Channel Strategic Coastal Group โ€“ Shoreline and Flood Risk Ma...2012 06 Bristol Channel Strategic Coastal Group โ€“ Shoreline and Flood Risk Ma...
2012 06 Bristol Channel Strategic Coastal Group โ€“ Shoreline and Flood Risk Ma...
ย 
Lgu services amp
Lgu services ampLgu services amp
Lgu services amp
ย 
Emergency Pipeline Repair Systems, A Global Overview of Best Practice
Emergency Pipeline Repair Systems, A Global Overview of Best PracticeEmergency Pipeline Repair Systems, A Global Overview of Best Practice
Emergency Pipeline Repair Systems, A Global Overview of Best Practice
ย 
env_mgmt_framework_march_2016.pdf
env_mgmt_framework_march_2016.pdfenv_mgmt_framework_march_2016.pdf
env_mgmt_framework_march_2016.pdf
ย 
2008 04 Flooding: The Forecast Nick Lyness, Environment Agency
2008 04 Flooding: The Forecast Nick Lyness, Environment Agency 2008 04 Flooding: The Forecast Nick Lyness, Environment Agency
2008 04 Flooding: The Forecast Nick Lyness, Environment Agency
ย 
26. Floods Directive & Hydromorpholgy Measures
26. Floods Directive & Hydromorpholgy Measures26. Floods Directive & Hydromorpholgy Measures
26. Floods Directive & Hydromorpholgy Measures
ย 
Louisiana In-Lieu-Fee Wetland Mitigation Program Proposal
Louisiana In-Lieu-Fee Wetland Mitigation Program Proposal Louisiana In-Lieu-Fee Wetland Mitigation Program Proposal
Louisiana In-Lieu-Fee Wetland Mitigation Program Proposal
ย 
Enhancing Climate Resilience in African's Infrastructure
Enhancing Climate Resilience in African's Infrastructure Enhancing Climate Resilience in African's Infrastructure
Enhancing Climate Resilience in African's Infrastructure
ย 
Flood management systems
Flood management systemsFlood management systems
Flood management systems
ย 
Flood alleviationbrief170214
Flood alleviationbrief170214Flood alleviationbrief170214
Flood alleviationbrief170214
ย 
Moving Towards Resilience in Vermont
Moving Towards Resilience in VermontMoving Towards Resilience in Vermont
Moving Towards Resilience in Vermont
ย 

Recently uploaded

Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...MOHANI PANDEY
ย 
CSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -ENCSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -ENGeorgeDiamandis11
ย 
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...SUHANI PANDEY
ย 
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...tanu pandey
ย 
VIP Model Call Girls Bhosari ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Bhosari ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Bhosari ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Bhosari ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
ย 
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
ย 
Book Sex Workers Available Pune Call Girls Kondhwa 6297143586 Call Hot India...
Book Sex Workers Available Pune Call Girls Kondhwa  6297143586 Call Hot India...Book Sex Workers Available Pune Call Girls Kondhwa  6297143586 Call Hot India...
Book Sex Workers Available Pune Call Girls Kondhwa 6297143586 Call Hot India...Call Girls in Nagpur High Profile
ย 
Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...
Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...
Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...Anamikakaur10
ย 
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...Call Girls in Nagpur High Profile
ย 
Verified Trusted Kalyani Nagar Call Girls 8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...
Verified Trusted Kalyani Nagar Call Girls  8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...Verified Trusted Kalyani Nagar Call Girls  8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...
Verified Trusted Kalyani Nagar Call Girls 8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...tanu pandey
ย 
Hot Call Girls ๐Ÿซค Malviya Nagar โžก๏ธ 9711199171 โžก๏ธ Delhi ๐Ÿซฆ Whatsapp Number
Hot Call Girls ๐Ÿซค Malviya Nagar โžก๏ธ 9711199171 โžก๏ธ Delhi ๐Ÿซฆ Whatsapp NumberHot Call Girls ๐Ÿซค Malviya Nagar โžก๏ธ 9711199171 โžก๏ธ Delhi ๐Ÿซฆ Whatsapp Number
Hot Call Girls ๐Ÿซค Malviya Nagar โžก๏ธ 9711199171 โžก๏ธ Delhi ๐Ÿซฆ Whatsapp Numberkumarajju5765
ย 
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7Call Girls in Nagpur High Profile Call Girls
ย 
Booking open Available Pune Call Girls Yewalewadi 6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Yewalewadi  6297143586 Call Hot Indian...Booking open Available Pune Call Girls Yewalewadi  6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Yewalewadi 6297143586 Call Hot Indian...Call Girls in Nagpur High Profile
ย 
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...SUHANI PANDEY
ย 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024itadmin50
ย 
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
ย 
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
ย 
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
ย 
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...Call Girls in Nagpur High Profile
ย 

Recently uploaded (20)

Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
ย 
CSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -ENCSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -EN
ย 
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
ย 
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
ย 
VIP Model Call Girls Bhosari ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Bhosari ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Bhosari ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Bhosari ( Pune ) Call ON 8005736733 Starting From 5K to ...
ย 
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
ย 
Book Sex Workers Available Pune Call Girls Kondhwa 6297143586 Call Hot India...
Book Sex Workers Available Pune Call Girls Kondhwa  6297143586 Call Hot India...Book Sex Workers Available Pune Call Girls Kondhwa  6297143586 Call Hot India...
Book Sex Workers Available Pune Call Girls Kondhwa 6297143586 Call Hot India...
ย 
(INDIRA) Call Girl Katra Call Now 8617697112 Katra Escorts 24x7
(INDIRA) Call Girl Katra Call Now 8617697112 Katra Escorts 24x7(INDIRA) Call Girl Katra Call Now 8617697112 Katra Escorts 24x7
(INDIRA) Call Girl Katra Call Now 8617697112 Katra Escorts 24x7
ย 
Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...
Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...
Call Now โ˜Ž๏ธ๐Ÿ” 9332606886 ๐Ÿ”ย Call Girls โค Service In Muzaffarpur Female Escorts ...
ย 
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
ย 
Verified Trusted Kalyani Nagar Call Girls 8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...
Verified Trusted Kalyani Nagar Call Girls  8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...Verified Trusted Kalyani Nagar Call Girls  8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...
Verified Trusted Kalyani Nagar Call Girls 8005736733 ๐ˆ๐๐ƒ๐„๐๐„๐๐ƒ๐„๐๐“ Call ๐†๐ˆ๐‘๐‹ ๐•...
ย 
Hot Call Girls ๐Ÿซค Malviya Nagar โžก๏ธ 9711199171 โžก๏ธ Delhi ๐Ÿซฆ Whatsapp Number
Hot Call Girls ๐Ÿซค Malviya Nagar โžก๏ธ 9711199171 โžก๏ธ Delhi ๐Ÿซฆ Whatsapp NumberHot Call Girls ๐Ÿซค Malviya Nagar โžก๏ธ 9711199171 โžก๏ธ Delhi ๐Ÿซฆ Whatsapp Number
Hot Call Girls ๐Ÿซค Malviya Nagar โžก๏ธ 9711199171 โžก๏ธ Delhi ๐Ÿซฆ Whatsapp Number
ย 
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
ย 
Booking open Available Pune Call Girls Yewalewadi 6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Yewalewadi  6297143586 Call Hot Indian...Booking open Available Pune Call Girls Yewalewadi  6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Yewalewadi 6297143586 Call Hot Indian...
ย 
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
ย 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024
ย 
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
ย 
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
ย 
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Talegaon Dabhade Call Me 7737669865 Budget Friendly No Advance Boo...
ย 
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
ย 

Smp2 part b policy statements cardiff only_final

  • 1. Severn Estuary SMP2 โ€“ Part B - Policy Statements CARDIFF This Theme area contains the Policy Units CAR 1, CAR2 and CAR 3. It starts at Penarth Head on the west shoreline of the Severn Estuary, in the Vale of Glamorgan, Wales and end at Lamby Way Landfill Site drain/outfall. The Key Policy Drivers in this area are: โ€ข International nature conservation sites โ€“ Severn Estuary SAC, SPA and Ramsar; โ€ข Critical infrastructure โ€“ railway line, electricity substations, docks; โ€ข Residential developments โ€“ Cardiff; โ€ข Industrial and commercial developments โ€“ Cardiff Bay, docks; โ€ข All Wales Coastal Path routes.
  • 2. Severn Estuary SMP2 โ€“ Part B - Policy Statements
  • 3. Severn Estuary SMP2 โ€“ Part B - Policy Statements Policy Unit: CAR 1 โ€“ Cardiff Bay Barrage
  • 4. Severn Estuary SMP2 โ€“ Part B - Policy Statements Preferred Policies to Implement the Plan: Epoch Preferred Policy Comments 0 to 20 years (2025) HTL The short term policy for this unit is Hold The Line The Cardiff Bay Barrage would remain in place with some maintenance. HTL does not guarantee funding to build or maintain current or future defences or to counter sea level rise. 20 to 50 years (2055) HTL The medium term policy for this unit is Hold The Line The Cardiff Bay Barrage would remain in place with some maintenance. HTL does not guarantee funding to build or maintain current or future defences or to counter sea level rise. 50 to 100 years (2105) HTL The long term policy for this unit is Hold The Line The Cardiff Bay Barrage would remain in place with some maintenance. HTL does not guarantee funding to build or maintain current or future defences or to counter sea level rise. Economics Policy Unit Existing SMP1 Policy Time Period (epoch) SMP2 Assessment 0- 20 20- 50 50- 100 Preferred Plan Present Value Damages Preferred Plan Present Value Defence Costs CAR 1 HTL HTL HTL HTL ยฃ568m (CAR1-3, WEN1-2 total) ยฃ24m (CAR1-3, WEN1-2 total) The preferred policy is economically viable. There are no cost estimates available for the maintenance or replacement of a structure like the Cardiff Bay Barrage. Standard โ€˜hard defencesโ€™ costs have been used for the Cardiff Bay Barrage (see Part A Section 3.6). It should be noted that this underestimates The preferred policy is economically viable for the linked Policy Units of CAR 1, CAR 2, CAR 3, WEN 1, and WEN 2. The costs and damages of the preferred policy in the table above relate to actions taken in all linked policy units. the costs of maintaining the Cardiff Bay Barrage. An increase in costs would not alter the policy option.
  • 5. Severn Estuary SMP2 โ€“ Part B - Policy Statements The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review โ€“ Final Report 5 Predicted Implication of the Preferred Plan for the CAR 1 Policy Unit Time Period Management Activities Property, Land Use and Human Health Nature Conservation โ€“ including Earth Heritage, Geology and Biodiversity Landscape Character and Visual Amenity Historic Environment Amenity and Recreational Use 0 โ€“ 20 years The Cardiff Bay Barrage is expected to remain in place and functional with minimal maintenance. Defences will manage the risk of flooding on existing property, land use or human health. Maintaining the Cardiff Bay Barrage, the harbour and navigable channels will also be maintained. A HTL policy will not impact the nature conservation sites during this time period. Works should take account of possible environmental impacts and the need for an EIA. Maintaining existing defences will not impact on existing landscape and visual amenity. Defences will manage the risk of flooding on the historic environment. Defences will manage the risk of flooding on n the amenity value of the land or recreational use. 20 โ€“ 50 years The Cardiff Bay Barrage is expected to remain in place and functional with minimal maintenance. Defences will manage the risk of flooding on existing property, land use or human health. Maintaining the Cardiff Bay Barrage, the harbour and navigable channels will also be maintained. Some coastal squeeze will occur which will result in loss of intertidal habitats within N2K sites and SSSI. Works should take account of possible environmental impacts and the need for an EIA. Maintaining existing defences will not impact on existing landscape and visual amenity. Defences will manage the risk of flooding on the historic environment. Defences will manage the risk of flooding on the amenity value of the land or recreational use. 50 โ€“ 100 years The Cardiff Bay Barrage is expected to remain in place and functional with minimal maintenance. Defences will manage the risk of flooding on existing property, land use or human health. Maintaining the Cardiff Bay Barrage, the harbour and navigable channels will also be maintained. Some coastal squeeze will occur which will result in loss of intertidal habitats within N2K sites and SSSI. Works should take account of possible environmental impacts and the need for an EIA. Maintaining existing defences will not impact on existing landscape and visual amenity. Defences will manage the risk of flooding on the historic environment. Defences will manage the risk of flooding on the amenity value of the land or recreational use.
  • 6. Severn Estuary SMP2 โ€“ Part B - Policy Statements The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review โ€“ Final Report 6 Policy Unit: CAR 2 โ€“ Western end of Cardiff Bay Barrage to mouth of River Rhymney at Rover Way
  • 7. Severn Estuary SMP2 โ€“ Part B - Policy Statements The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review โ€“ Final Report 7 Preferred Policies to Implement the Plan: Epoch Preferred Policy Comments 0 to 20 years (2025) HTL The short term policy for this unit is Hold The Line The earth embankments will require repair and maintenance during this epoch. Some sections may need to be replaced. HTL manages the risk of impacts from flooding and erosion to industrial and residential areas of Cardiff. It is part of 5 linked Policy Units (CAR 1, CAR 2, CAR 3, WEN 1 and WEN 2). Actions should take account of potential impacts in all linked areas. HTL does not guarantee funding to build or maintain current or future defences or to counter sea level rise. 20 to 50 years (2055) HTL The medium term policy for this unit is Hold The Line The existing defences will come to the end of their serviceable life in this epoch. HTL recommends that defences are replaced. HTL manages the risk of impacts from flooding and erosion to industrial and residential areas of Cardiff. It is part of 5 linked Policy Units (CAR 1, CAR 2, CAR 3, WEN 1 and WEN 2). Actions should take account of potential impacts in all linked areas. HTL does not guarantee funding to build or maintain current or future defences or to counter sea level rise. 50 to 100 years (2105) HTL The long term policy for this unit is Hold The Line HTL manages the risk of impacts from flooding and erosion to industrial and residential areas of Cardiff. It is part of 5 linked Policy Units (CAR 1, CAR 2, CAR 3, WEN 1 and WEN 2). Actions should take account of potential impacts in all linked areas. HTL does not guarantee funding to build or maintain current or future defences or to counter sea level rise. Economics Policy Unit Existing SMP1 Policy Time Period (epoch) SMP2 Assessment 0- 20 20- 50 50- 100 Preferred Plan Present Value Damages Preferred Plan Present Value Defence Costs CAR 2 HTL HTL HTL HTL ยฃ568m (CAR1-3, WEN1-2 total) ยฃ24m (CAR1-3, WEN1-2 total) The preferred policy for this unit is economically viable. The preferred policy is economically viable for the linked Policy Units of CAR 1, CAR 2, CAR 3, WEN 1 and WEN 2. The costs and damages of the preferred policy in the table above relate to actions taken in all linked policy units.
  • 8. Severn Estuary SMP2 โ€“ Part B - Policy Statements The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review โ€“ Final Report 8 Predicted Implication of the Preferred Plan for the CAR 2 Policy Unit Time Period Management Activities Property, Land Use and Human Health Nature Conservation โ€“ including Earth Heritage, Geology and Biodiversity Landscape Character and Visual Amenity Historic Environment Amenity and Recreational Use 0 โ€“ 20 years The shoreline will remain stable. Earth embankments will require maintenance. Flood risk is limited in this period. Defences will manage the risk of flooding on existing property, land use or human health. An HTL policy will not impact the nature conservation sites during this time period. Works should take account of possible environmental impacts and the need for an EIA. Defences will manage the risk of flooding on existing landscape and visual amenity Defences will manage the risk of flooding on the historic environment Defences will manage the risk of flooding on the amenity value of the land or recreational use. 20 โ€“ 50 years The shoreline will remain stable. Defences will need to be replaced in this period. The majority of this unit benefits from high ground. Defences will manage the risk of flooding on existing property, land use or human health. Coastal squeeze will occur which will result in loss of intertidal habitats affecting Severn N2K and SSSI. Works should take account of possible environmental impacts and the need for an EIA. Defences will manage the risk of flooding on existing landscape and visual amenity Defences will manage the risk of flooding on the historic environment Defences will manage the risk of flooding on the amenity value of the land or recreational use. 50 โ€“ 100 years The shoreline will remain stable. Defences should be monitored and maintained. Defences will manage the risk of flooding on existing property, land use or human health. Coastal squeeze will occur which will result in loss of intertidal habitats affecting Severn N2K and SSSI. Works should take account of possible environmental impacts and the need for an EIA. Defences will manage the risk of flooding on existing landscape and visual amenity Defences will manage the risk of flooding on the historic environment Defences will manage the risk of flooding on the amenity value of the land or recreational use.
  • 9. Severn Estuary SMP2 โ€“ Part B - Policy Statements The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review โ€“ Final Report 9 Policy Unit: CAR 3 โ€“ Both banks of the River Rhymney from the mouth at Rover Way to the Lamby Way landfill site drain
  • 10. Severn Estuary SMP2 โ€“ Part B - Policy Statements The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review โ€“ Final Report 10 Preferred Policies to Implement the Plan: Epoch Preferred Policy Comments 0 to 20 years (2025) HTL The short term policy for this unit is Hold The Line HTL manages the risk of flooding and erosion impacts to industrial and residential areas of Cardiff, including transport links and Lamby Way landfill site. Flooding at the landfill site could be harmful to water quality. Flood risk is localised. High ground limits flood risk in some areas. HTL would require defence structures in only some areas. Actions should take account of potential impacts in linked Policy Units (CAR 1, CAR 2, WEN 1 and WEN 2). HTL does not guarantee funding to build or maintain current or future defences or to counter sea level rise. 20 to 50 years (2055) HTL The medium term policy for this unit is Hold The Line HTL manages the risk of flooding and erosion impacts to industrial and residential areas of Cardiff, including transport links and Lamby Way landfill site. Flooding at the landfill site area could be detrimental to the water quality. Flood risk is localised - HTL would only require defence structures in some places. In other areas, high ground limits the risk. Actions should take account of potential impacts in linked Policy Units (CAR 1, CAR 2, WEN 1 and WEN 2). HTL does not guarantee funding to build or maintain current or future defences or to counter sea level rise. 50 to 100 years (2105) HTL The long term policy for this unit is Hold The Line HTL manages the risk of flooding and erosion impacts to industrial and residential areas of Cardiff, including transport links and Lamby Way landfill site. Flooding at the landfill site area would be detrimental to the water quality. Flood risk is localised - HTL would only require defence structures in some places. In other areas, high ground limits the risk. Actions should take account of potential impacts in linked Policy Units (CAR 1, CAR 2, WEN 1 and WEN 2). HTL does not guarantee funding to build or maintain current or future defences or to counter sea level rise. Economics Policy Unit Existing SMP1 Policy Time Period (epoch) SMP2 Assessment 0- 20 20- 50 50- 100 Preferred Plan Present Value Damages Preferred Plan Present Value Defence Costs CAR 3 HTL HTL HTL HTL ยฃ568m (CAR1-3, WEN1-2 total) ยฃ24m (CAR1-3, WEN1-2 total) The preferred policy is economically viable for the linked Policy Units of CAR 1, CAR 2, CAR 3, WEN 1 and WEN 2. The costs and damages of the preferred policy in the table above relate to actions taken in all linked policy units.
  • 11. Severn Estuary SMP2 โ€“ Part B - Policy Statements The above provides the local details in respect of the SMP-wide policy presented in the preceding sections of this Plan document. These details must be read in the context of the wider-scales issues and policy implications, as reported therein. Severn Estuary SMP2 Review โ€“ Final Report 11 Predicted Implication of the Preferred Plan for the CAR 3 Policy Unit Time Period Management Activities Property, Land Use and Human Health Nature Conservation โ€“ including Earth Heritage, Geology and Biodiversity Landscape Character and Visual Amenity Historic Environment Amenity and Recreational Use 0 โ€“ 20 years The shoreline will remain stable and flood risk is limited in this period, and as a result management activities will be limited. Defences will manage the risk of flooding on existing property, land use or human health. An HTL policy will not impact the nature conservation sites during this time period. Works should take account of possible environmental impacts and the need for an EIA. Limited erosion and flood risk will not impact on existing landscape and visual amenity Defences will manage the risk of flooding on the historic environment. Defences will manage the risk of flooding on the amenity value of the land or recreational use. 20 โ€“ 50 years The shoreline will remain stable. The defences will need to be replaced in this epoch. High ground in most of this policy unit limits flood risk. Defences will manage the risk of flooding on existing property, land use or human health. Coastal squeeze will occur which will result in loss of intertidal habitats affecting Severn N2K and SSSIs in the area. Works should take account of possible environmental impacts and the need for an EIA. Limited erosion and flood risk will not impact on existing landscape and visual amenity Defences will manage the risk of flooding on the historic environment. Defences will manage the risk of flooding on the amenity value of the land or recreational use. 50 โ€“ 100 years The shoreline will remain stable. Defences should be maintained in the long term. Defences will manage the risk of flooding on existing property, land use or human health. Coastal squeeze will occur which will result in loss of intertidal habitats affecting Severn N2K and SSSIs in the area. Works should take account of possible environmental impacts and the need for an EIA. Limited erosion and flood risk will not impact on existing landscape and visual amenity Defences will manage the risk of flooding on the historic environment. Defences will manage the risk of flooding on the amenity value of the land or recreational use.