1. Scott McKeen
3804 Columbus Dr., McKinney, Texas 75070
(214) 945-9810
Richmond Communications, Dallas, Texas
Estimator May 2015-December 2016
Responsible for managing man power and costs to stay on budget and schedule.
o Estimated and designed structured cabling infrastructure
o Designs included copper, fiber optic cable, A/V, and backbone installations
o Worked to build and maintain customer relations
o Estimated costs for new projects and change orders
o Working with upper management to maintain profit requirements for new bids.
o Worked with Project Managers to hand project off to the installation team.
o Projects include new construction, remodels, secured government areas, office relocations, and hotels
Operations Manager October 2015-April 2016
Responsible for managing man power and costs to stay on budget and schedule.
o Worked to build and maintain customer relations
o Responsible for hiring and firing of workforce
o Designed digital schedule that resided on the company server
o Scheduled man power to complete projects
o Worked with Project Manager and lead Technicians for initiation of projects
o Conferenced with and advised individual Technicians to address concerns with their job performance
o Collaborated with Technicians to adjust and refine schedules to support more productivity
o Reviewed all job packets after project completion for submission to accounting for billing
o Scheduled Vendor/Manufacture training for the Technicians
ComNet Communications, Irving, Texas
Project Manager October 2012 – May 2015
Responsible for managing man power and costs to stay on budget and schedule.
o Estimated and designed wireless networks
o Worked hands on in the field with technicians to ensure quality
o Worked to build ongoing customer relations
o Estimated costs for new projects and change orders
o All traditional Project Manager responsibilities
o Projects include new construction, remodels, secured government areas, casinos and banks ranging from
$5,000 to $400,000
Quinco Electrical, Winter Park, Florida
Project Manager for Engineered Services October 2010 – January 2012
Responsible for coordinating all aspects of low voltage on a number of projects simultaneously across the southeast,
including voice, data, fiber, fire alarm, security, access control, CCTV and CATV
Duties include:
o Reviewing current project and proposal project bids
o Reviewing job specifications and drawings for project management
o Following budget guidelines and estimating costs for changes and new scopes
Objective: To utilize my vast experiences and knowledge in the low voltage industry to continue the company’s
profitability, marketability, and growth.
Experience:
2. o Generating RFI’s and reviewing RFI responses for cost impact
o Maintaining all necessary project paperwork
o Participate in weekly Project Managers’ update conference calls
o Coordinating with Engineered systems staff on assigned projects
o Coordinating all information flow with Project Manager and Project Engineers for the Electrical Division
o Hiring, firing, managing and scheduling in house employees as well as subcontractors
o Ordering materials
o Job site visits and quality control
o Creative problem solving for any project issues that arise
Projects include airports, schools, universities and government buildings with low voltage packages ranging from
$300,000 to $900,000
Custom Cable Industries, Orlando, Florida
WCD Project Foreman
Bay County International Airport Project January 2010 – June 2010
Responsible for managing 10 technician crew to install the airport’s entire voice and data network in multiple
buildings
Coordinating installation with the electrical contractor
Daily project status reports to the low voltage project manager
Responsible for certification and asbuilts
Disney Projects October 2007 – October 2010
Responsible for all wireless, fiber optic, and category 5e and 6 projects for Walt Disney World Company.
Attend potential project walk throughs with project engineers to provide pertinent bid information.
Review and analyze upcoming projects from project engineers.
Work together with Disney management for optimal project efficiency.
Facilitate coordination of projects with local contacts.
Manage technicians’ schedules, job performance, and conflict resolution.
Walk technicians through projects and provide necessary materials.
Provide technicians with feed back upon project completion.
Over see and review project paperwork throughout projects and submit to Operations Branch Manager upon project
completion.
Continue to assist current Product Line Specialist with pre and post wireless site surveys and analyze wireless data.
Product Line Specialist April 2007 – October 2007
Performed pre and post installation wireless surveys.
Created bids and proposals for Walt Disney World and ACS wireless projects.
Supervised technicians for all Walt Disney World and ACS wireless projects.
Responsible for meeting all Walt Disney World and ACS wireless project budgets.
Custom Cable representative for ACS wireless meetings.
Continued to build and maintain strong relationships between Custom Cable, Walt Disney World, and ACS.
Certified Technician October 2002 – January 2003, March 2004–April 2007
Lead Technician for MAC crew assigned to Walt Disney World. Projects include: fiber, data, voice, and coax
cabling throughout theme parks, resorts, and business offices.
Trouble shooting, problem solving and repair of customer’s previously installed Category 5e and Category 6 cable
networks.
Install Category 5e and Category 6 cable for new projects.
Responsibilities as Lead Technician included: coordinating project with the site contact; effectively communicating
with the project manager, installers and the customer; making sure technicians had all necessary supplies; job
accuracy; and completing all necessary paperwork.
Project Coordinator February 2003 – February 2004
Met with potential customers to find out their needs, engineered projects to meet their specifications, and created
project estimates.
Modified estimates into projects, created contract documents, submitted material lists for purchasing, and scheduled
projects.
3. Communicated all necessary job information to Lead Technician and maintained open communication.
Delivered necessary materials to jobs and completed site inspections.
Assisted Lead Technician with: communication with customer; problems with the job or staff; and processing
project completion paperwork.
Telecom Engineering Inc., Orlando, Florida
Lead Technician January 2000 – October 2002
Supervised and organized installation crew.
Responsible for determining necessary job supplies and completing projects with in budget.
Termination experience includes: Category 5e jacks and patch panels, Fiber Optics (ST and SC), Coax (RG6 and
RG11) and installation of Code Blue safety products.
American Telephone Company, Tallahassee, Florida
Telephone Technician/Cable Installer February 1997 – May 1999
Installed, programmed, and maintained a variety of brands of telephone systems.
Installed Category 5 data wiring and Category 3 telephone wiring for commercial clients.
Large projects included: complete wiring of Fox 49 Television Studios and Russell Dodge car dealership.
Telecom Engineering Inc., Tampa, Florida
Wire Technician June1997 – August 1997
Installed Category 5 cable.
Competed termination of jacks and patch panels.
Florida State University, Tallahassee, Florida 1999
Bachelors of Science Degree
Major: Psychology, Minor: Criminology
Hillsborough Community College, Tampa, Florida 1996
Associate of Arts Degree
Fiber optic and copper installation, termination, and troubleshooting
Computers: AirMagnet Surveyor, Wirescope 350 and Fluke DTX; Windows XP; Word; and Excel
BICSI Technician (since 2006)
BICSI Member (since 2016)
AirMagnet Surveyor
CommScope Certified Installer Copper and Fiber
Certified Leviton Installer
Panduit Grounding & Bonding
Confined Space Training
Advanced Scuba Certified (NAUI)
State of Texas Notary
Currently studying for the RCDD Exam
Education:
Technical Skills:
Certifications: