624, McCall | Oxbow, SK S0C 2B0 | 306.485.9123 | ghosh.satyajit39@gmail.com
CAREER PROFILE
Dynamic, qualified, and highly ethical welder with over 15 years’ extensive experience providing
welding services. Proven awareness of the importance of health and safety standards, while using logic
and reasoning to identify the strengths and weaknesses of alternative solutions, conclusions or
approaches to problems. Excellent leadership, interpersonal, and written and verbal communications
skills; innate ability to build rapport with clients and colleagues and succeed in high-pressure,
challenging, and deadline-driven environments.
AREAS OF STRENGTH AND EXPERTISE
 Welding & Fitting
 Visual Inspection
 Magnetic Particle
Inspection Level 2 (ASNT)
 Liquid Penetrant
Inspection Level 2 (ASNT)
 Planning & Organization
 Producing ITP’s
 Site Specific Procedure
 Confined Space
Welding And
Inspection
 Fall Arrest Protection
 Arial Man lift
Operator
 Coating Inspection
 Develop Turnover
Packages
 Venders Surveillance
 Report Writing
 Parts Inspection
 Surveying
 Quality
Assurance/Control
 Interpersonal Skills
 Documentation
 Construction Safety
EXPERIENCE
Ray NDT.
Quality Assurance and Quality Control Technician. (Sub-Contractor). 2014 Nov to April 2015
 Mosaic K1 100 Ton Storage barn Conveyor and Tripper Project.
 Performed Inspection and documentation on structural steel installation and welding,
reporting.
 Performed Inspection on mechanical installation on motors, pulley, conveyor, tripper,
conveyor pulleys, belt alignments on motors, conveyor belt installation and alignment,
documentation of all installation performed on the tripper and conveyor.
 Electrical document control and turnover package.
 Generated ITP as per scope of work, Maintained Welder’s log, MTR’s, Sub-Contractor’s
documentation, NCR and CAR documentation, Update client document control and
representative on project status, Maintained and update Turnover package as per project.
Ray NDT.
Quality Assurance and Quality Control Technician. (Sub-Contractor) April to Nov 2014
 Performed inspection and Quality surveillance for Suncor on Pump box project.
 Articulated crane visual and magnetic particle inspection.
 Magnetic particle testing on lifting lugs on bins for Mosaic.
 QA/QC on Rocanville West Pipeline project (B31.3) for PCS. Performed LPI testing, Visual
inspection, documentation, ITP, Material receiving and reporting, Weld mapping, NCR and
CAR, Turnover Package, Maintaining Welder’s Log and Qualification,
D Smith ENT Inc. Bigger, SK 2013 Dec to April 2014
Quality Assurance and Quality Control Technician. (Sub-Contractor)
 Performed inspection and documentation on SaskPower Boundary dam CO2 injection well site and
Lake power station main pipe line project. (B31.3 and Z662)
 Generated ITP, weld mapping, site specific hydrostatic procedure, monitoring low hydrogen
electrode and control distribution of electrode, maintaining welders qualification and updating
welders log. Material receiving, tracking, and storage as per client’s specification. Documentation
of heat numbers, pre heat monitoring, PWHT instruction and records, NDT records. Hydro test
records, inspection record, RFI’s and maintaining RFI’s logs, NCR’s and CAR logs, visual
inspection on the welding, fabrication and reporting. Update documents on the project and update
client’s document controller.
 Coordinate inspection with client inspectors.
 Final Turn over package as per SDRL/VDL.
World Spec, Regina, SK 2012 to 2013
Quality Assurance Technician (Sub-Contractor)
 Perform inspection of various operations activities, and generate reports of conditions found,
notifying operations and Quality Assurance/Quality Control management of significant problems.
 Completes documentation necessary to attest to satisfactory completion of inspection or test
activities.
 Generated ITP as per project requirement.
 Generated QA/QC program and procedure for the site specific projects.
 Conduct magnetic particle and liquid penetrant inspection under surveillance of CGSB Level 2 and
Level 3 and initiate and process non-conformance reports.
 Responsible for producing Inspection & Test Plans as per projects requirements.
 Worked as QA/QC for South East Construction in PCS Rocanville West Expansion Project.
 Generated NCR to contractor and audit the CAR for NCR.
 Welding Inspector on Storage Bin in Mosaic K1 site for South East Construction.
 QA/QC for South East Construction in Mosaic K3 Site.
 Visual Inspection on welding on Sask Power, Power Poles project for Saskarc Industries.
 Witness Hydro-Testing on API 650, 653 tanks.
Saskarc Industries, Oxbow, SK 2006 to 2012
QA Manager/Quality Control Assurance/Fabricator / Welder
 QA Manager / QC: Performed quality check on welding, fabrication, painting, incoming raw
material red line drawing, as built drawings for all projects and finished product supplied by
subcontractor. Audited subcontractor quality program. Provided all the documentation on projects
required as per client requirement. Generated ITP as per client’s requirements, provided turn over
documents as per client’s VDR/SDRL. Provided CAR for NCR generated by the client
representative. Worked with client’s Inspector. Worked with CWB rep for weld testing for
welders, PQR, wilding procedure data sheet. Keep track and updated welder qualification,
company certification renewal. Keep track on distribution on low hydrogen electrodes.
 Worked on CSA, ASME, API projects
 Worked side by side with production department to solve problem and increase productivity.
 Provided training to new welders and provided all kind of information to increase their education
and ability to work fast and efficiently.
 Fabricate and assemble metal structures and equipment through the use of welding process
(SMAW,FCAW, MCAW, SAW), cutters, shapers and measuring tools, using proper safety
measures and operating within all applicable regulations.
 Produce metal products according to customer or employer specifications through reading and
interpreting diagrams, sketches and blueprints to determine operations, required materials and
timeframes for projects.
 Set up, operate and maintain welding equipment.
 Conduct magnetic particle and liquid penetrant inspection and initiate and process non-
conformance reports.
Fabcon India, Kolkata, West Bengal, India 2005 to 2005
Fabricator / Welder
 Fabricate and assemble metal structures and equipment through the use of welders, cutters, shapers
and measuring tools, using proper safety measures and operating within all applicable regulations.
 Produce metal products according to customer or employer specifications through reading and
interpreting diagrams, sketches and blueprints to determine operations, required materials and
timeframes for projects.
 Set up, operate and maintain welding equipment.
Sangita Engineering Work, Kolkata, West Bengal, India 1998 to 2002
Fabricator / Welder
 Fabricate and assemble metal structures and equipment through the use of welders, cutters, shapers
and measuring tools, using proper safety measures and operating within all applicable regulations.
 Produce metal products according to customer or employer specifications through reading and
interpreting diagrams, sketches and blueprints to determine operations, required materials and
timeframes for projects.
 Set up, operate and maintain welding equipment.
EDUCATION & TRAINING
Welding Certificate – ESAB India
Welding Supervisor Certification from CWB
W178.2: Certified level 1 CWB Visual Inspector, CSA W47.1-W59
Level 2 Magnetic Particle Inspector Completion Certificate - RayNDT
Level 2 Liquid Penetrant Inspector Completion Certificate - RayNDT
Safety Construction Orientation Training
Confined Space Course
Arial Man lift Operator
Fall Arrest Course
Perusing For CWB Level 2 Exam

Mais conteúdo relacionado

Destaque

progetti, difficoltà, speranze
progetti, difficoltà, speranzeprogetti, difficoltà, speranze
progetti, difficoltà, speranzeAcisjf Parma
 
talent_voor_ov omslag werkboek
talent_voor_ov omslag werkboektalent_voor_ov omslag werkboek
talent_voor_ov omslag werkboekMarlies Mulder
 
card2_cert2_Rita_Partin_03.20.15[1]
card2_cert2_Rita_Partin_03.20.15[1]card2_cert2_Rita_Partin_03.20.15[1]
card2_cert2_Rita_Partin_03.20.15[1]Rita Partin
 
Refuerza coahuila acciones de transparencia. rubén moreira
Refuerza coahuila acciones de transparencia.  rubén moreiraRefuerza coahuila acciones de transparencia.  rubén moreira
Refuerza coahuila acciones de transparencia. rubén moreiraRubén Moreira
 
QAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTORQAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTORMurugan Pillai
 
FARMACODINAMIA DE LAS BENZODIACEPINAS
FARMACODINAMIA DE LAS BENZODIACEPINASFARMACODINAMIA DE LAS BENZODIACEPINAS
FARMACODINAMIA DE LAS BENZODIACEPINASjuankmd07
 

Destaque (12)

Presentation1.PPTX
Presentation1.PPTXPresentation1.PPTX
Presentation1.PPTX
 
progetti, difficoltà, speranze
progetti, difficoltà, speranzeprogetti, difficoltà, speranze
progetti, difficoltà, speranze
 
talent_voor_ov omslag werkboek
talent_voor_ov omslag werkboektalent_voor_ov omslag werkboek
talent_voor_ov omslag werkboek
 
card2_cert2_Rita_Partin_03.20.15[1]
card2_cert2_Rita_Partin_03.20.15[1]card2_cert2_Rita_Partin_03.20.15[1]
card2_cert2_Rita_Partin_03.20.15[1]
 
Refuerza coahuila acciones de transparencia. rubén moreira
Refuerza coahuila acciones de transparencia.  rubén moreiraRefuerza coahuila acciones de transparencia.  rubén moreira
Refuerza coahuila acciones de transparencia. rubén moreira
 
5 10%
5 10%5 10%
5 10%
 
Sw3 7 10
Sw3 7 10Sw3 7 10
Sw3 7 10
 
Army Values
Army ValuesArmy Values
Army Values
 
QAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTORQAQC MEP HVAC INSPECTOR
QAQC MEP HVAC INSPECTOR
 
FARMACODINAMIA DE LAS BENZODIACEPINAS
FARMACODINAMIA DE LAS BENZODIACEPINASFARMACODINAMIA DE LAS BENZODIACEPINAS
FARMACODINAMIA DE LAS BENZODIACEPINAS
 
KULDEEP THAKUR
KULDEEP THAKURKULDEEP THAKUR
KULDEEP THAKUR
 
Benzodiazepinas
BenzodiazepinasBenzodiazepinas
Benzodiazepinas
 

Satyajit Ghosh Resume Jan, 2014

  • 1. SATYAJIT GHOSH 624, McCall | Oxbow, SK S0C 2B0 | 306.485.9123 | ghosh.satyajit39@gmail.com CAREER PROFILE Dynamic, qualified, and highly ethical welder with over 15 years’ extensive experience providing welding services. Proven awareness of the importance of health and safety standards, while using logic and reasoning to identify the strengths and weaknesses of alternative solutions, conclusions or approaches to problems. Excellent leadership, interpersonal, and written and verbal communications skills; innate ability to build rapport with clients and colleagues and succeed in high-pressure, challenging, and deadline-driven environments. AREAS OF STRENGTH AND EXPERTISE  Welding & Fitting  Visual Inspection  Magnetic Particle Inspection Level 2 (ASNT)  Liquid Penetrant Inspection Level 2 (ASNT)  Planning & Organization  Producing ITP’s  Site Specific Procedure  Confined Space Welding And Inspection  Fall Arrest Protection  Arial Man lift Operator  Coating Inspection  Develop Turnover Packages  Venders Surveillance  Report Writing  Parts Inspection  Surveying  Quality Assurance/Control  Interpersonal Skills  Documentation  Construction Safety EXPERIENCE Ray NDT. Quality Assurance and Quality Control Technician. (Sub-Contractor). 2014 Nov to April 2015  Mosaic K1 100 Ton Storage barn Conveyor and Tripper Project.  Performed Inspection and documentation on structural steel installation and welding, reporting.  Performed Inspection on mechanical installation on motors, pulley, conveyor, tripper, conveyor pulleys, belt alignments on motors, conveyor belt installation and alignment, documentation of all installation performed on the tripper and conveyor.  Electrical document control and turnover package.  Generated ITP as per scope of work, Maintained Welder’s log, MTR’s, Sub-Contractor’s documentation, NCR and CAR documentation, Update client document control and representative on project status, Maintained and update Turnover package as per project. Ray NDT. Quality Assurance and Quality Control Technician. (Sub-Contractor) April to Nov 2014  Performed inspection and Quality surveillance for Suncor on Pump box project.  Articulated crane visual and magnetic particle inspection.  Magnetic particle testing on lifting lugs on bins for Mosaic.  QA/QC on Rocanville West Pipeline project (B31.3) for PCS. Performed LPI testing, Visual inspection, documentation, ITP, Material receiving and reporting, Weld mapping, NCR and CAR, Turnover Package, Maintaining Welder’s Log and Qualification, D Smith ENT Inc. Bigger, SK 2013 Dec to April 2014 Quality Assurance and Quality Control Technician. (Sub-Contractor)
  • 2.  Performed inspection and documentation on SaskPower Boundary dam CO2 injection well site and Lake power station main pipe line project. (B31.3 and Z662)  Generated ITP, weld mapping, site specific hydrostatic procedure, monitoring low hydrogen electrode and control distribution of electrode, maintaining welders qualification and updating welders log. Material receiving, tracking, and storage as per client’s specification. Documentation of heat numbers, pre heat monitoring, PWHT instruction and records, NDT records. Hydro test records, inspection record, RFI’s and maintaining RFI’s logs, NCR’s and CAR logs, visual inspection on the welding, fabrication and reporting. Update documents on the project and update client’s document controller.  Coordinate inspection with client inspectors.  Final Turn over package as per SDRL/VDL. World Spec, Regina, SK 2012 to 2013 Quality Assurance Technician (Sub-Contractor)  Perform inspection of various operations activities, and generate reports of conditions found, notifying operations and Quality Assurance/Quality Control management of significant problems.  Completes documentation necessary to attest to satisfactory completion of inspection or test activities.  Generated ITP as per project requirement.  Generated QA/QC program and procedure for the site specific projects.  Conduct magnetic particle and liquid penetrant inspection under surveillance of CGSB Level 2 and Level 3 and initiate and process non-conformance reports.  Responsible for producing Inspection & Test Plans as per projects requirements.  Worked as QA/QC for South East Construction in PCS Rocanville West Expansion Project.  Generated NCR to contractor and audit the CAR for NCR.  Welding Inspector on Storage Bin in Mosaic K1 site for South East Construction.  QA/QC for South East Construction in Mosaic K3 Site.  Visual Inspection on welding on Sask Power, Power Poles project for Saskarc Industries.  Witness Hydro-Testing on API 650, 653 tanks. Saskarc Industries, Oxbow, SK 2006 to 2012 QA Manager/Quality Control Assurance/Fabricator / Welder  QA Manager / QC: Performed quality check on welding, fabrication, painting, incoming raw material red line drawing, as built drawings for all projects and finished product supplied by subcontractor. Audited subcontractor quality program. Provided all the documentation on projects required as per client requirement. Generated ITP as per client’s requirements, provided turn over documents as per client’s VDR/SDRL. Provided CAR for NCR generated by the client representative. Worked with client’s Inspector. Worked with CWB rep for weld testing for welders, PQR, wilding procedure data sheet. Keep track and updated welder qualification, company certification renewal. Keep track on distribution on low hydrogen electrodes.  Worked on CSA, ASME, API projects  Worked side by side with production department to solve problem and increase productivity.  Provided training to new welders and provided all kind of information to increase their education and ability to work fast and efficiently.  Fabricate and assemble metal structures and equipment through the use of welding process (SMAW,FCAW, MCAW, SAW), cutters, shapers and measuring tools, using proper safety measures and operating within all applicable regulations.  Produce metal products according to customer or employer specifications through reading and interpreting diagrams, sketches and blueprints to determine operations, required materials and timeframes for projects.  Set up, operate and maintain welding equipment.
  • 3.  Conduct magnetic particle and liquid penetrant inspection and initiate and process non- conformance reports. Fabcon India, Kolkata, West Bengal, India 2005 to 2005 Fabricator / Welder  Fabricate and assemble metal structures and equipment through the use of welders, cutters, shapers and measuring tools, using proper safety measures and operating within all applicable regulations.  Produce metal products according to customer or employer specifications through reading and interpreting diagrams, sketches and blueprints to determine operations, required materials and timeframes for projects.  Set up, operate and maintain welding equipment. Sangita Engineering Work, Kolkata, West Bengal, India 1998 to 2002 Fabricator / Welder  Fabricate and assemble metal structures and equipment through the use of welders, cutters, shapers and measuring tools, using proper safety measures and operating within all applicable regulations.  Produce metal products according to customer or employer specifications through reading and interpreting diagrams, sketches and blueprints to determine operations, required materials and timeframes for projects.  Set up, operate and maintain welding equipment. EDUCATION & TRAINING Welding Certificate – ESAB India Welding Supervisor Certification from CWB W178.2: Certified level 1 CWB Visual Inspector, CSA W47.1-W59 Level 2 Magnetic Particle Inspector Completion Certificate - RayNDT Level 2 Liquid Penetrant Inspector Completion Certificate - RayNDT Safety Construction Orientation Training Confined Space Course Arial Man lift Operator Fall Arrest Course Perusing For CWB Level 2 Exam