1. R E S U M E
SATISH KERU PATIL
PRESENT ADDRESS:
A-32,Amarpali Tenaments,
Near Vaikunth II,New VIP Road,
Vadodara.Gujarat.
M-+918238965169
Pass Port No: J9183640
E-Mail: satish2589@gmail.com
______________________________________________________________________________
OBJECTIVE:
To build a challenging and responsible career that will expose me to new technology and will provide me with
an opportunity to utilize my skills.
CARRER SUMMARY:
As an Engineer having total 3 and half years of experience in the field of Project Planning, Scheduling &
Monitoring (Primavera-P6) in Oil & Gas Plant.
WORK EXPERIENCE:
1. Company: Mott Macdonald (MM).
Designation: Planning Engineer.
Department: Project Control.
Duration: From Oct 2014 to present.
1) Client: Adani Hazzira (AHPPL).
Project: EPCM for Adani Hazzira Terminal Phase Expansion.
Project Description: Adani Hazzira Terminal Phase Expansion project consist of total 6 no:s of Enclosure/Tank
farms with a total of 82 no. of tanks. Company scope of work consist entire Engineering, Procurement
Assistance and Construction Management. Complete Detail Engineering scope for entire plant is under MM.
Floating of queries, Sorting of Vendors of long Lead items, Technical bid evaluation and Techno Commercial
Evaluation is under MM’s scope of Procurement Assistance.
2) Client Cairn
Project: Aishwariya Infill Well Development
Project Description: Aishwariya Infill Well Development project consist of total 59 infill wells which includes
approx. 40 producer wells and 19 Injector wells. Company scope of work consist FEED and Basic Engineering
of various disciplines.
KEY RESPONSIBILITY:
Development & updation of Document Control Index (DCI) for different engineering disciplines
Development & updation of L3 Project Schedule in Primavera Project Management P6
Client invoicing
Resource Planning
2. Coordinate with Engineering departments, Process licensor, vendors, construction team and with clients
Coordination with procurement team for expediting ordering & getting vendor data
Preparing weekly & monthly progress reports for client
Generation of Look ahead Schedules
Generation of Weekly & Monthly schedule updates
Generation of Flash Reports for management review
.
2. Company: PUNJ LLOYD LIMITED.
Designation: Planning Engineer.
Department: Planning.
Duration: From April 2011 to Sep 2014.
Client: Abu Dhabi Company for Onshore Oil Operations (ADCO).
Project: EPC for Spiking Gas Compressor at Shah CDS.
Project Description: Spiking Gas Compressor project is basically a zero flaring project and purpose is to spike
gas from 3 Phase separator to Al Hoshn Gas Station. Project consist of 2 Compressor stations with 1.4mw 3
stage reciprocating compressor (Vendor: MES) in each station, Pressure vessels, KO Drums, Motor’s, Flare’s
etc. Company scope of work consist Engineering, Procurement, Construction & Commissioning of entire plant.
Mechanical scope of work consist of Installation of Piping, Pipeline, Hydrotest, Air blowing, Inerting,
Installation of various Pressure vessels, Motor’s, Heat exchanger’s and it’s Commissioning, Pipe rack’s and
various structural work erection, etc. Civil scope of work consist building various foundation’s for Compressor
& Pressure Vessel’s, Pedstal, Cable trench’s, Road, Pavement’s etc. E&I scope of work consist Installation &
Commissioning of 11kv and 415v Switchgear’s, Construction of entire Substation & Commissioning, Cable
laying, Cable glanding, Termination, Installation and Commissioning of Marshalling cabinet’s, Construction &
Commissioning of entire CCR, Hypo test, Continuity test, Functional test, Motor Solo run and load test etc.
KEY RESPONSIBILITY:
Preparation of Daily Progress Report, Weekly Progress Report, Monthly Progress Report for EPC
project.
Preparation of 3 Months Rolling Plan, 4 week look Ahead plan, Catch up plan etc.
Preparation of Man Power & Equipment mobilization schedule.
Preparation and updating of L1, L2, L3 & L4 Schedule for entire EPC Project through Primavera P-6
Active participation in Daily Progress Meeting, Project Review Meeting weekly and monthly basis with
internal & Client.
Preparation Project Meeting Calendars and Monitoring of Agenda and Minutes of Meeting.
Detail out EPC scope and release scope document.
Analysis of Critical Paths and ways of optimizing the critical paths.
Prepare, update and track commodity plan, forecast & actual progress.
Review target & current / forecast plan for EPC.
Review Plan for Construction for general suitability into overall L2/L3 schedules.
Continuous monitoring of the progress against plan.
Indicate productivity and effect on final man-hours as appropriate.
Prepare and update ‘S’ Curves.
3. EDUCATIONAL QUALIFICATION:
B.E. from Faculty of Technology and Engineering,MSU.Vadodara,Gujarat. INDIA from year 2007-
2011 passed with Distinction.
Higher Secondary Education from Bright English Medium School.GSEB Board.Vadodara.Gujarat in
March 2007.
Secondary School Education from MGM School.Gujarat in March 2005.
PERSONAL INFORMATION:
Father’s Name : Mr. Keru Layapa Patil
Date of Birth : 25-07-1989
Religion : Hindu
Nationality : Indian
Sex : Male
Marital Status : Unmarried
Nationality : Indian
Language Known : English, Marathi, Gujarati, Hindi
PASSPORT DETAILS:
Pass Port No : J9183640
Date of Issue : 05/08/2011
Date of Exp. : 04/08/2021
Place of Issue : AHMEDABAD
PERMANENT ADDRESS:
A-32,AMRAPALI TENAMENTS,
NEAR VAIKUNTH-2,
NEW VIP ROAD,VADODARA
.GUJARAT.INDIA.
PIN-390022.
DECLARATION:
I hereby solemnly declare that the above-furnished details are true to the best of my knowledge & belief.
Thanking you,
Key Skills
Proficient and familiar with array of softwares, programming languages, concepts and technologies,
including:
CADD CENTRE GEMSTART 5.4 MICOM S1 Studio
Navis Freedom Primavera(P6)
Microsoft Project (MSP)