Projects handled at Mistry Architects - - Industrial - 01.
1. 16 Embroidery
17 Material Inward
18 Packing and Unpacking
19 Connector
20 Unloading Bay
First Floor Plan
1 Dining
2 Terrace
3 Foyer
4 Meeting Room
5 Conference Room
6 Changing Rooms
Key Plan
1 Administrative Building.
2 Showcase warehouse
3 Landscaped Recreational Area.
4 Main warehouse.
1
2
3
4
6
7
5
9
8
10
11
12
1314
15
16
17
18
19
20
1
2`3
4
1
2
3
4
5
6
INDUSTRIAL – 01 - KARLE GARMENT
FACTORY
EXTENT OF INVOLVEMENT
• Concept Design, Study models, presentation
drawings, Sanction Drawings and on site
Development.
• Research on Garment factory requirements.
• Working Drawings and detailing.
• Co ordination with consultants.
SITE
• Situated 25km from Bangalore City.
• The total area of the site is 37,100 Sq.m.
• As per the bye – laws applicable, a sufficient
portion of the plot was reserved for future road
widening since it was located adjacent to a national
highway.
REQUIREMENT AND PROGRAM
• The client had already developed a prefabricated
warehouse as shown in the key plan (Block 4).
• Our brief was to develop a front office building
(Block 1) and a showcase warehouse (Block 2) in
front of this existing warehouse as a new facade
between the highway and the warehouse, which has
a bleak elevation.
•The front office building is to house facilities such
as private offices for the senior managers,
orientation and seminar rooms, meeting rooms and
an exhibition space.
• The show case warehouse is to house facilities for
presentation of garments to clients.
DESIGN RESOLUTION
• The structure rises in response to the height of the
warehouse in the rear thus minimizing the view of
the mundane rear warehouse from the highway.
• Since floor areas are large and uninterrupted, we
used double height spaces and greater floor to
ceiling heights proportional to the horizontal
spaces.
• The buildings are a combination of simple
geometric forms interlocking to form a complex
interplay of spatial volumes.
CONSTRUCTION TECHNOLOGY
• RCC construction with exposed form finished
concrete and glass is used for the front office.
• Prefabricated steel portal frames were used for
the showcase garment factory with aluminum sheet
siding.
• Mild Steel box section pergolas.
GROUND FLOOR PLAN FIRST FLOOR PLAN
NORTH WEST ELEVATION
Ground Floor Plan
1 Double ht. atrium.
2 Reception Desk.
3 Lobby.
4 Private Cabins
5 Connector.
6 Exhibition Space
7 Seminar Rooms
8 Storage Racks
9 Sub Store
10 Storage Racks
11 Cabins
12 Fabric Inspection
13 Trim Inspection
14 Laboratory
15 Fabric Relax
1 Aerial view of the study model showing the front
office building and garment display ware house.
2 Rear view of the study model showing goods
vehicles dropping off deliverables.
2
1
2
NKARLE GARMENT FACTORY
0 5 20m
0 15 60ft
A
B
A
B
A
B
A
B
2. NORTH ELEVATION SOUTH WEST ELEVATION
SECTION A SECTION B
SECOND FLOOR PLAN THIRD FLOOR PLAN
3 2
1
4
1 Northern side perspective towards entrance.
2 Aerial sketch view of facilities from west side of
the site.
3 Southern side perspective from the showcase
warehouse. 4 Aerial sketch view of administrative
facilities.
5 View of Entrance and Meeting Rooms
1
3
2
4
Second Floor Plan
1 Audio and Lighting Room
2 Terrace
3 Terrace Below
4 Double Height Space
Third Floor Plan
1 Services Room.
2 Terrace
3 Terrace Below
4 Double Height Space
5 Catwalk.
Key Plan
1 Administrative Building.
2 Showcase warehouse
3 Landscaped Recreational Area.
4 Main warehouse.
12
3
4
4 1
2
3
3
4
4
5
4
5
NKARLE GARMENT FACTORY
0 5 20m
0 15 60ft
A
B
A
B
A
B
A
B
2
5