SlideShare a Scribd company logo
1 of 2
16 Embroidery
17 Material Inward
18 Packing and Unpacking
19 Connector
20 Unloading Bay
First Floor Plan
1 Dining
2 Terrace
3 Foyer
4 Meeting Room
5 Conference Room
6 Changing Rooms
Key Plan
1 Administrative Building.
2 Showcase warehouse
3 Landscaped Recreational Area.
4 Main warehouse.
1
2
3
4
6
7
5
9
8
10
11
12
1314
15
16
17
18
19
20
1
2`3
4
1
2
3
4
5
6
INDUSTRIAL – 01 - KARLE GARMENT
FACTORY
EXTENT OF INVOLVEMENT
• Concept Design, Study models, presentation
drawings, Sanction Drawings and on site
Development.
• Research on Garment factory requirements.
• Working Drawings and detailing.
• Co ordination with consultants.
SITE
• Situated 25km from Bangalore City.
• The total area of the site is 37,100 Sq.m.
• As per the bye – laws applicable, a sufficient
portion of the plot was reserved for future road
widening since it was located adjacent to a national
highway.
REQUIREMENT AND PROGRAM
• The client had already developed a prefabricated
warehouse as shown in the key plan (Block 4).
• Our brief was to develop a front office building
(Block 1) and a showcase warehouse (Block 2) in
front of this existing warehouse as a new facade
between the highway and the warehouse, which has
a bleak elevation.
•The front office building is to house facilities such
as private offices for the senior managers,
orientation and seminar rooms, meeting rooms and
an exhibition space.
• The show case warehouse is to house facilities for
presentation of garments to clients.
DESIGN RESOLUTION
• The structure rises in response to the height of the
warehouse in the rear thus minimizing the view of
the mundane rear warehouse from the highway.
• Since floor areas are large and uninterrupted, we
used double height spaces and greater floor to
ceiling heights proportional to the horizontal
spaces.
• The buildings are a combination of simple
geometric forms interlocking to form a complex
interplay of spatial volumes.
CONSTRUCTION TECHNOLOGY
• RCC construction with exposed form finished
concrete and glass is used for the front office.
• Prefabricated steel portal frames were used for
the showcase garment factory with aluminum sheet
siding.
• Mild Steel box section pergolas.
GROUND FLOOR PLAN FIRST FLOOR PLAN
NORTH WEST ELEVATION
Ground Floor Plan
1 Double ht. atrium.
2 Reception Desk.
3 Lobby.
4 Private Cabins
5 Connector.
6 Exhibition Space
7 Seminar Rooms
8 Storage Racks
9 Sub Store
10 Storage Racks
11 Cabins
12 Fabric Inspection
13 Trim Inspection
14 Laboratory
15 Fabric Relax
1 Aerial view of the study model showing the front
office building and garment display ware house.
2 Rear view of the study model showing goods
vehicles dropping off deliverables.
2
1
2
NKARLE GARMENT FACTORY
0 5 20m
0 15 60ft
A
B
A
B
A
B
A
B
NORTH ELEVATION SOUTH WEST ELEVATION
SECTION A SECTION B
SECOND FLOOR PLAN THIRD FLOOR PLAN
3 2
1
4
1 Northern side perspective towards entrance.
2 Aerial sketch view of facilities from west side of
the site.
3 Southern side perspective from the showcase
warehouse. 4 Aerial sketch view of administrative
facilities.
5 View of Entrance and Meeting Rooms
1
3
2
4
Second Floor Plan
1 Audio and Lighting Room
2 Terrace
3 Terrace Below
4 Double Height Space
Third Floor Plan
1 Services Room.
2 Terrace
3 Terrace Below
4 Double Height Space
5 Catwalk.
Key Plan
1 Administrative Building.
2 Showcase warehouse
3 Landscaped Recreational Area.
4 Main warehouse.
12
3
4
4 1
2
3
3
4
4
5
4
5
NKARLE GARMENT FACTORY
0 5 20m
0 15 60ft
A
B
A
B
A
B
A
B
2
5

More Related Content

What's hot

GROUP HOUSING-Case study-CLEO COUNTY
GROUP HOUSING-Case study-CLEO COUNTYGROUP HOUSING-Case study-CLEO COUNTY
GROUP HOUSING-Case study-CLEO COUNTYShivamSuman
 
Woodsville Residences at Merville Paranaque City
Woodsville Residences at Merville Paranaque CityWoodsville Residences at Merville Paranaque City
Woodsville Residences at Merville Paranaque CityRobinsons Land Corporation
 
Manila rivercity residences june 2012
Manila rivercity residences june 2012Manila rivercity residences june 2012
Manila rivercity residences june 2012Divine Diaz
 
HBC group housing project Citadelle
HBC group housing project CitadelleHBC group housing project Citadelle
HBC group housing project CitadelleHomeBuyers Combine
 
residential riyadh
residential riyadhresidential riyadh
residential riyadhDina Ahmed
 
Our Burbank Plus Package
Our Burbank Plus Package Our Burbank Plus Package
Our Burbank Plus Package PatriciaTewaaka
 

What's hot (11)

Manila Condo
Manila CondoManila Condo
Manila Condo
 
Manila Rivercity Residences
Manila Rivercity ResidencesManila Rivercity Residences
Manila Rivercity Residences
 
GROUP HOUSING-Case study-CLEO COUNTY
GROUP HOUSING-Case study-CLEO COUNTYGROUP HOUSING-Case study-CLEO COUNTY
GROUP HOUSING-Case study-CLEO COUNTY
 
Gulshan Botnia
Gulshan BotniaGulshan Botnia
Gulshan Botnia
 
Woodsville Residences at Merville Paranaque City
Woodsville Residences at Merville Paranaque CityWoodsville Residences at Merville Paranaque City
Woodsville Residences at Merville Paranaque City
 
Manila rivercity residences june 2012
Manila rivercity residences june 2012Manila rivercity residences june 2012
Manila rivercity residences june 2012
 
Blossom
BlossomBlossom
Blossom
 
Mrr ppt aug2011
Mrr ppt aug2011Mrr ppt aug2011
Mrr ppt aug2011
 
HBC group housing project Citadelle
HBC group housing project CitadelleHBC group housing project Citadelle
HBC group housing project Citadelle
 
residential riyadh
residential riyadhresidential riyadh
residential riyadh
 
Our Burbank Plus Package
Our Burbank Plus Package Our Burbank Plus Package
Our Burbank Plus Package
 

Similar to Projects handled at Mistry Architects - - Industrial - 01.

2224_GIDC_GIFT_PPT_00_R1.pptx
2224_GIDC_GIFT_PPT_00_R1.pptx2224_GIDC_GIFT_PPT_00_R1.pptx
2224_GIDC_GIFT_PPT_00_R1.pptxssuser98d50d
 
Job layout of cinstruction site
Job layout of cinstruction siteJob layout of cinstruction site
Job layout of cinstruction siteraj balar
 
JAT4 Kick off Introduction - UAE Navy
JAT4 Kick off Introduction - UAE NavyJAT4 Kick off Introduction - UAE Navy
JAT4 Kick off Introduction - UAE NavyMike Bisland
 
Centrepoint presentation
Centrepoint presentationCentrepoint presentation
Centrepoint presentationMuhammad Umar
 
Slides Transcription.docx
Slides Transcription.docxSlides Transcription.docx
Slides Transcription.docxbrian157854
 
Inter Active Corp Building, New york.
Inter Active Corp Building, New york.Inter Active Corp Building, New york.
Inter Active Corp Building, New york.Mayur Waghulde
 
Aldar Headquarters Dubai
Aldar Headquarters DubaiAldar Headquarters Dubai
Aldar Headquarters DubaiNeha Rampuria
 
Mohamed Salah Ibrahim
Mohamed Salah IbrahimMohamed Salah Ibrahim
Mohamed Salah IbrahimMohamed Salah
 
Case study on Leadenhall Building KUET BECM 2k15
Case study on Leadenhall Building KUET BECM 2k15Case study on Leadenhall Building KUET BECM 2k15
Case study on Leadenhall Building KUET BECM 2k15Arafat Akash
 
Blake Lapthorn's green breakfast with guest speaker Keeran Jugdoyal, Faithful...
Blake Lapthorn's green breakfast with guest speaker Keeran Jugdoyal, Faithful...Blake Lapthorn's green breakfast with guest speaker Keeran Jugdoyal, Faithful...
Blake Lapthorn's green breakfast with guest speaker Keeran Jugdoyal, Faithful...Blake Morgan
 
Principles of planning and bye laws pns
Principles of planning and bye laws pnsPrinciples of planning and bye laws pns
Principles of planning and bye laws pnsPratap Shinde
 
hazem mohamed cv - Copy
hazem mohamed cv - Copyhazem mohamed cv - Copy
hazem mohamed cv - Copyhazem mansour
 
Snehansu 10110029 training
Snehansu 10110029 trainingSnehansu 10110029 training
Snehansu 10110029 trainingKumar Snehansu
 
Portfolio _Mohamed Helmi Hlioui__.pdf
Portfolio _Mohamed Helmi Hlioui__.pdfPortfolio _Mohamed Helmi Hlioui__.pdf
Portfolio _Mohamed Helmi Hlioui__.pdfMohammed Hlioui
 

Similar to Projects handled at Mistry Architects - - Industrial - 01. (20)

Karle 2
Karle 2Karle 2
Karle 2
 
2224_GIDC_GIFT_PPT_00_R1.pptx
2224_GIDC_GIFT_PPT_00_R1.pptx2224_GIDC_GIFT_PPT_00_R1.pptx
2224_GIDC_GIFT_PPT_00_R1.pptx
 
Burj al arab
Burj al arabBurj al arab
Burj al arab
 
Job layout of cinstruction site
Job layout of cinstruction siteJob layout of cinstruction site
Job layout of cinstruction site
 
JAT4 Kick off Introduction - UAE Navy
JAT4 Kick off Introduction - UAE NavyJAT4 Kick off Introduction - UAE Navy
JAT4 Kick off Introduction - UAE Navy
 
Centrepoint presentation
Centrepoint presentationCentrepoint presentation
Centrepoint presentation
 
Slides Transcription.docx
Slides Transcription.docxSlides Transcription.docx
Slides Transcription.docx
 
Inter Active Corp Building, New york.
Inter Active Corp Building, New york.Inter Active Corp Building, New york.
Inter Active Corp Building, New york.
 
Aldar Headquarters Dubai
Aldar Headquarters DubaiAldar Headquarters Dubai
Aldar Headquarters Dubai
 
Mohamed Salah Ibrahim
Mohamed Salah IbrahimMohamed Salah Ibrahim
Mohamed Salah Ibrahim
 
Case study on Leadenhall Building KUET BECM 2k15
Case study on Leadenhall Building KUET BECM 2k15Case study on Leadenhall Building KUET BECM 2k15
Case study on Leadenhall Building KUET BECM 2k15
 
Introduction to The Cylinder Service Centre
Introduction to The Cylinder Service CentreIntroduction to The Cylinder Service Centre
Introduction to The Cylinder Service Centre
 
Appendices
AppendicesAppendices
Appendices
 
Blake Lapthorn's green breakfast with guest speaker Keeran Jugdoyal, Faithful...
Blake Lapthorn's green breakfast with guest speaker Keeran Jugdoyal, Faithful...Blake Lapthorn's green breakfast with guest speaker Keeran Jugdoyal, Faithful...
Blake Lapthorn's green breakfast with guest speaker Keeran Jugdoyal, Faithful...
 
Principles of planning and bye laws pns
Principles of planning and bye laws pnsPrinciples of planning and bye laws pns
Principles of planning and bye laws pns
 
hazem mohamed cv - Copy
hazem mohamed cv - Copyhazem mohamed cv - Copy
hazem mohamed cv - Copy
 
Snehansu 10110029 training
Snehansu 10110029 trainingSnehansu 10110029 training
Snehansu 10110029 training
 
Portfolio _Mohamed Helmi Hlioui__.pdf
Portfolio _Mohamed Helmi Hlioui__.pdfPortfolio _Mohamed Helmi Hlioui__.pdf
Portfolio _Mohamed Helmi Hlioui__.pdf
 
Permanent building
Permanent buildingPermanent building
Permanent building
 
Permanent-building
Permanent-buildingPermanent-building
Permanent-building
 

Projects handled at Mistry Architects - - Industrial - 01.

  • 1. 16 Embroidery 17 Material Inward 18 Packing and Unpacking 19 Connector 20 Unloading Bay First Floor Plan 1 Dining 2 Terrace 3 Foyer 4 Meeting Room 5 Conference Room 6 Changing Rooms Key Plan 1 Administrative Building. 2 Showcase warehouse 3 Landscaped Recreational Area. 4 Main warehouse. 1 2 3 4 6 7 5 9 8 10 11 12 1314 15 16 17 18 19 20 1 2`3 4 1 2 3 4 5 6 INDUSTRIAL – 01 - KARLE GARMENT FACTORY EXTENT OF INVOLVEMENT • Concept Design, Study models, presentation drawings, Sanction Drawings and on site Development. • Research on Garment factory requirements. • Working Drawings and detailing. • Co ordination with consultants. SITE • Situated 25km from Bangalore City. • The total area of the site is 37,100 Sq.m. • As per the bye – laws applicable, a sufficient portion of the plot was reserved for future road widening since it was located adjacent to a national highway. REQUIREMENT AND PROGRAM • The client had already developed a prefabricated warehouse as shown in the key plan (Block 4). • Our brief was to develop a front office building (Block 1) and a showcase warehouse (Block 2) in front of this existing warehouse as a new facade between the highway and the warehouse, which has a bleak elevation. •The front office building is to house facilities such as private offices for the senior managers, orientation and seminar rooms, meeting rooms and an exhibition space. • The show case warehouse is to house facilities for presentation of garments to clients. DESIGN RESOLUTION • The structure rises in response to the height of the warehouse in the rear thus minimizing the view of the mundane rear warehouse from the highway. • Since floor areas are large and uninterrupted, we used double height spaces and greater floor to ceiling heights proportional to the horizontal spaces. • The buildings are a combination of simple geometric forms interlocking to form a complex interplay of spatial volumes. CONSTRUCTION TECHNOLOGY • RCC construction with exposed form finished concrete and glass is used for the front office. • Prefabricated steel portal frames were used for the showcase garment factory with aluminum sheet siding. • Mild Steel box section pergolas. GROUND FLOOR PLAN FIRST FLOOR PLAN NORTH WEST ELEVATION Ground Floor Plan 1 Double ht. atrium. 2 Reception Desk. 3 Lobby. 4 Private Cabins 5 Connector. 6 Exhibition Space 7 Seminar Rooms 8 Storage Racks 9 Sub Store 10 Storage Racks 11 Cabins 12 Fabric Inspection 13 Trim Inspection 14 Laboratory 15 Fabric Relax 1 Aerial view of the study model showing the front office building and garment display ware house. 2 Rear view of the study model showing goods vehicles dropping off deliverables. 2 1 2 NKARLE GARMENT FACTORY 0 5 20m 0 15 60ft A B A B A B A B
  • 2. NORTH ELEVATION SOUTH WEST ELEVATION SECTION A SECTION B SECOND FLOOR PLAN THIRD FLOOR PLAN 3 2 1 4 1 Northern side perspective towards entrance. 2 Aerial sketch view of facilities from west side of the site. 3 Southern side perspective from the showcase warehouse. 4 Aerial sketch view of administrative facilities. 5 View of Entrance and Meeting Rooms 1 3 2 4 Second Floor Plan 1 Audio and Lighting Room 2 Terrace 3 Terrace Below 4 Double Height Space Third Floor Plan 1 Services Room. 2 Terrace 3 Terrace Below 4 Double Height Space 5 Catwalk. Key Plan 1 Administrative Building. 2 Showcase warehouse 3 Landscaped Recreational Area. 4 Main warehouse. 12 3 4 4 1 2 3 3 4 4 5 4 5 NKARLE GARMENT FACTORY 0 5 20m 0 15 60ft A B A B A B A B 2 5