SlideShare a Scribd company logo
1 of 15
Aspects and Impacts, Impact Assessment,
Social Assessment, Mitigation, Institutional
Setup, Preparation of EIA,
Presented by,
Saad Farooqi, FA18-R07-004
Izhar Aziz, FA18-R07-006
MS-Environmental Science
Department of Environmental Science
COMSATS University Islamabad, Abbottabad Campus 1
Contents
โ€ข Aspects and Impacts
โ€ข Impact Assessment
โ€ข Techniques
โ€ข Kinds
โ€ข Prediction
โ€ข Social Assessment
โ€ข Mitigation
โ€ข Institutional Setup
โ€ข Preparation of EIA report
2
Aspects and Impacts
Aspects:
โ€ข The elements of projectโ€™s activities, products or services which interact
with the environment.
Impacts:
โ€ข Any change to the environment, whether adverse or beneficial, wholly or
partially resulting from a projectโ€™s activities, products or services.
3
Kinds and Prediction of Impact
โ€ข Direct Impact:
- Directly relating to the project.
โ€ข Indirect Impact:
- Less obvious.
- Not directly relate.
โ€ข Cumulative Impact:
- combinedly effect more then individual.
โ€ข Prediction of Impacts:
- Qualitative (experts, reasoning).
- Quantitative (simulation, modeling, statistics).
4
Determination of Significance of Potential Impact
Some Key Factor:
โ€ข Public health and safety, risk (high or unknown).
โ€ข Aesthetics and recreation, other unique characteristics.
โ€ข Resources availability, farmland, forests, wildlife.
Some Key Elements:
โ€ข Public concern/controversy/precedent-setting.
โ€ข Disturbance of protected/valued habitats.
โ€ข Disruption of local customs
Inherently a Value Judgement:
โ€ข Needs and sustainability.
โ€ข Law, policy and regulation.
5
Impact Assessment Techniques
โ€ข Professional Expert Opinion
โ€ข Questionnaires/ Case studies
โ€ข Checklists
-Advantages (simple to understand and use, good for site selection)
-Disadvantages (it doesnโ€™t distinguish, do not link action and impact)
โ€ข Matrices
-Advantages (link action to impact, good method for displaying EIA result)
-Disadvantages (difficult to distinguish)
โ€ข Networks
- Advantages (link action to impacts, handles direct and indirect impacts)
-Disadvantages (can become very complex if used beyond simplified version)
6
Contdโ€ฆ
โ€ข Overlays
-Advantages (easy to understand, good display method, good sitting tools)
-Disadvantages (address only direct impact, do not address impact duration)
โ€ข GIS
-Advantages (excellent for impact analysis and identification, good for experimet)
-Disadvantages (heavy reliance on knowledge and data, often complex)
โ€ข Carrying Capacity
โ€ข Modeling
7
Social Assessment (SA)
โ€ข Approach to ensure that the social dimension of development or fully
address through out the project life cycle.
โ€ข Tools for SA.
- desk review
- household interview
- group discussion
- case study
- stakeholder workshop
- social mapping
8
Contdโ€ฆ
๏ƒ˜Level of public involvement
โ€ข Informing: One way flow from proponent in public.
โ€ข Consulting: Two way flow of information opportunities for public to
express views.
โ€ข Participating: proponent and public share analysis and agenda
setting, public involvement in decision maker through consensus.
9
Mitigation
โ€ข Finding better ways of doing things.
โ€ข Minimizing or eliminating the negative impacts.
โ€ข Enhancing the project benefits.
โ€ข How to mitigate?
โ€ข For example: alternative ways of meeting the needs.
โ€ข Changes in planning and designing.
โ€ข Improving monitoring and management.
โ€ข Through monitory compensation.
10
Institutional Setup
โ€ข PEPC (Pakistan Environmental Protection Council)
โ€ข Ministry of Environment
โ€ข Federal EPA.
โ€ข Provincial EPA.
โ€ข Environmental Tribunal
- Three judges in each headquarters.
- Environmental magistrate
- Environmental inspectors
11
Preparation And Review EIA Report
โ€ข Format (organization of content).
โ€ข Preparation and description of EIA draft.
โ€ข Circulation (agencies, experts, private groups, stakeholders).
โ€ข Review of EIA report
โ€ข Preparation of final EIS discuss and incorporate the comments, file
the EIA with EPA.
โ€ข Follow format as recommended by EPA.
12
Sample of Checklist
13
As pects of EIA Checklist Q uestions
Will the proje ct:
Ye s No Additiona l
Da ta ne eds
Sourc es of Impacts 1. Re qui re the a cqu isi ti on o r co nve rsi on of si gni ficant areas
of la nd for reservoi r/treatmen t works etc. (e .g . > 50 ha
rural , > 5 ha urba n)?
2. Re sul t i n sig nifi ca nt qu anti ti es of e ro ded materi al , efflu ent
or sol i d wastes?
3. Re qui re si gni ficant accommod atio n or servi ce a meni ties to
suppo rt th e workforce d urin g con structi on (eg > 10 0
man ual worke rs)?
Re ceptors of Impacts 4. Fl oo d or o th erwise affe ct areas whi ch su ppo rt
co nservati on worthy terre stria l or aqu ati c e cosyste ms,
flo ra o r faun a (eg p ro te cted area s, wil de rn ess areas,
forest re se rves, cri ti ca l ha bi ta ts, en dan gered speci es); o r
that con ta in sites of h isto ri cal or cu ltural i mpo rtan ce?
5. Fl oo d or o th erwise affe ct areas whi ch wi ll affe ct the
l ivel ih ood s of l ocal peop le (eg req ui re p opu la ti on
resettl emen t; affe ct l ocal i nd ustry, agri cul ture, l i vestock
or fi sh stocks; re duce th e avai lab il i ty of na tu ra l resource
go ods a nd servi ces)?
6. Invo lve si tin g san itati on tre atment fa ci li tie s cl ose to
hu man se ttl emen ts (pa rti cu la rl y whe re l ocatio ns a re
suscepti bl e to fl ood in g)?
7. Affect sou rces o f wa ter extracti on ?
Env ironmental Impa cts 8. Ca use a n oticeab le p ermane nt or se aso nal re ducti on i n
the vo lu me of g ro und or su rface water sup pl y?
9. Present a si gni fican t pol l utio n ri sk th ro ugh l i qui d or sol i d
wa stes to hu ma ns, source s of water e xtra ctio n,
co nservati on worthy aq uati c ecosystems and specie s, or
co mmerci al fi sh sto cks?
10 . Ch ange the l ocal h ydrol og y of surface water-b odi es (eg
streams, ri vers, l ake s) such that con serva ti on -worth y or
co mmerci al ly si gni ficant fi sh stocks a re affecte d?
11 . Increa se the risk o f di se ases i n areas of hi gh p opu la ti on
de nsi ty (eg oncho cerci asi s, fi la ri asi s, ma la ri a, hep atiti s,
ga stro in te sti nal di sea se s)?
12 . Indu ce seco nda ry d eve lo pmen t, eg al ong a ccess ro ads,
or in the form o f en trep re neu ri al services for constru ctio n
an d ope ra ti ona l activiti es?
Mitiga tion Mea sures 13 . Be l ikel y to re qui re miti gati on measures tha t may resul t i n
the proj ect be in g fi nan ci al l y or socia ll y un acceptab le ?
Comme nts
I recommend tha t the programme be a ssigned to
Ca tegory
Si gna tu re : De le gati on.........................................De sk...................................
Sample of Matrix
14
15

More Related Content

What's hot

Developing Guidelines for Public Participation on Environmental Impact Assess...
Developing Guidelines for Public Participation on Environmental Impact Assess...Developing Guidelines for Public Participation on Environmental Impact Assess...
Developing Guidelines for Public Participation on Environmental Impact Assess...Ethical Sector
ย 
Environment impact assessment
Environment impact assessmentEnvironment impact assessment
Environment impact assessmentBimal Antony
ย 
EIA practice: a global review
EIA practice: a global reviewEIA practice: a global review
EIA practice: a global reviewMichael Asigbaase
ย 
Emerging Requirements for Environmental and Social Impact Assessment in Myanmar
Emerging Requirements for Environmental and Social Impact Assessment in MyanmarEmerging Requirements for Environmental and Social Impact Assessment in Myanmar
Emerging Requirements for Environmental and Social Impact Assessment in MyanmarEthical Sector
ย 
Envirornment Impact Assessment
Envirornment Impact AssessmentEnvirornment Impact Assessment
Envirornment Impact AssessmentRJ
ย 
Eia methods for transportation project
Eia methods for transportation projectEia methods for transportation project
Eia methods for transportation projectKushal Patel
ย 
Principles of environmental impact assessment
Principles of environmental impact assessmentPrinciples of environmental impact assessment
Principles of environmental impact assessmentAnirban Mandal
ย 
Environmental impact assessment in nepal
Environmental impact assessment in nepalEnvironmental impact assessment in nepal
Environmental impact assessment in nepalBhim Upadhyaya
ย 
Eia (2)
Eia (2)Eia (2)
Eia (2)Shah Nawaz
ย 
Environmental impact assessment (EIA)
Environmental impact assessment (EIA)Environmental impact assessment (EIA)
Environmental impact assessment (EIA)KASHYAP V
ย 
environmental impact assesment
environmental impact assesment environmental impact assesment
environmental impact assesment Nisha Jindal
ย 
Environmental Impact Assessment (EIA) in Project Management
Environmental Impact Assessment (EIA) in Project ManagementEnvironmental Impact Assessment (EIA) in Project Management
Environmental Impact Assessment (EIA) in Project ManagementJoy Bhattacharjee
ย 
Eia requirements
Eia requirementsEia requirements
Eia requirementsMOHTISHIM CH
ย 
Assessing proposed project development under EIA
Assessing proposed project development under EIAAssessing proposed project development under EIA
Assessing proposed project development under EIAKisesa Hamis
ย 
ENVIRONMENT IMPACT ASSESSMENT
ENVIRONMENT IMPACT ASSESSMENTENVIRONMENT IMPACT ASSESSMENT
ENVIRONMENT IMPACT ASSESSMENTgoswamikusum
ย 
E2.KEY_ELEMENTS_OF_EIA_PROCESS-1
E2.KEY_ELEMENTS_OF_EIA_PROCESS-1E2.KEY_ELEMENTS_OF_EIA_PROCESS-1
E2.KEY_ELEMENTS_OF_EIA_PROCESS-1hirencd
ย 
ENVIRONMENT IMPACT ASSESSMENT: CONCEPT & CHALENGES
ENVIRONMENT IMPACT ASSESSMENT:  CONCEPT & CHALENGESENVIRONMENT IMPACT ASSESSMENT:  CONCEPT & CHALENGES
ENVIRONMENT IMPACT ASSESSMENT: CONCEPT & CHALENGESAnamika Rana
ย 
Eia prediction, evaluation & mitigration
Eia prediction, evaluation & mitigrationEia prediction, evaluation & mitigration
Eia prediction, evaluation & mitigrationMizanur R. Shohel
ย 

What's hot (20)

Esia
EsiaEsia
Esia
ย 
Developing Guidelines for Public Participation on Environmental Impact Assess...
Developing Guidelines for Public Participation on Environmental Impact Assess...Developing Guidelines for Public Participation on Environmental Impact Assess...
Developing Guidelines for Public Participation on Environmental Impact Assess...
ย 
Environment impact assessment
Environment impact assessmentEnvironment impact assessment
Environment impact assessment
ย 
EIA practice: a global review
EIA practice: a global reviewEIA practice: a global review
EIA practice: a global review
ย 
Emerging Requirements for Environmental and Social Impact Assessment in Myanmar
Emerging Requirements for Environmental and Social Impact Assessment in MyanmarEmerging Requirements for Environmental and Social Impact Assessment in Myanmar
Emerging Requirements for Environmental and Social Impact Assessment in Myanmar
ย 
Envirornment Impact Assessment
Envirornment Impact AssessmentEnvirornment Impact Assessment
Envirornment Impact Assessment
ย 
Eia methods for transportation project
Eia methods for transportation projectEia methods for transportation project
Eia methods for transportation project
ย 
Principles of environmental impact assessment
Principles of environmental impact assessmentPrinciples of environmental impact assessment
Principles of environmental impact assessment
ย 
Environmental impact assessment in nepal
Environmental impact assessment in nepalEnvironmental impact assessment in nepal
Environmental impact assessment in nepal
ย 
Eia (2)
Eia (2)Eia (2)
Eia (2)
ย 
Environmental impact assessment (EIA)
Environmental impact assessment (EIA)Environmental impact assessment (EIA)
Environmental impact assessment (EIA)
ย 
environmental impact assesment
environmental impact assesment environmental impact assesment
environmental impact assesment
ย 
Environmental Impact Assessment (EIA) in Project Management
Environmental Impact Assessment (EIA) in Project ManagementEnvironmental Impact Assessment (EIA) in Project Management
Environmental Impact Assessment (EIA) in Project Management
ย 
Eia requirements
Eia requirementsEia requirements
Eia requirements
ย 
EIA process
EIA processEIA process
EIA process
ย 
Assessing proposed project development under EIA
Assessing proposed project development under EIAAssessing proposed project development under EIA
Assessing proposed project development under EIA
ย 
ENVIRONMENT IMPACT ASSESSMENT
ENVIRONMENT IMPACT ASSESSMENTENVIRONMENT IMPACT ASSESSMENT
ENVIRONMENT IMPACT ASSESSMENT
ย 
E2.KEY_ELEMENTS_OF_EIA_PROCESS-1
E2.KEY_ELEMENTS_OF_EIA_PROCESS-1E2.KEY_ELEMENTS_OF_EIA_PROCESS-1
E2.KEY_ELEMENTS_OF_EIA_PROCESS-1
ย 
ENVIRONMENT IMPACT ASSESSMENT: CONCEPT & CHALENGES
ENVIRONMENT IMPACT ASSESSMENT:  CONCEPT & CHALENGESENVIRONMENT IMPACT ASSESSMENT:  CONCEPT & CHALENGES
ENVIRONMENT IMPACT ASSESSMENT: CONCEPT & CHALENGES
ย 
Eia prediction, evaluation & mitigration
Eia prediction, evaluation & mitigrationEia prediction, evaluation & mitigration
Eia prediction, evaluation & mitigration
ย 

Similar to Environmental Impact Assessment

Mwalyosi-ImpactIdentificationPrediction-1999.pdf
Mwalyosi-ImpactIdentificationPrediction-1999.pdfMwalyosi-ImpactIdentificationPrediction-1999.pdf
Mwalyosi-ImpactIdentificationPrediction-1999.pdfvijayaRaghavank10
ย 
WAAPP-Nigeria Environmental and Social Screening presentation
WAAPP-Nigeria Environmental and Social Screening presentationWAAPP-Nigeria Environmental and Social Screening presentation
WAAPP-Nigeria Environmental and Social Screening presentationwaapp-nigeria
ย 
Concept of Environmental impact assessment - Stages, Parameters, and Benefits...
Concept of Environmental impact assessment - Stages, Parameters, and Benefits...Concept of Environmental impact assessment - Stages, Parameters, and Benefits...
Concept of Environmental impact assessment - Stages, Parameters, and Benefits...Jagriti Agarwal
ย 
Eia - environmental impact assessment
Eia - environmental impact assessmentEia - environmental impact assessment
Eia - environmental impact assessmentParth Patel
ย 
Hydropower Siting, Design, Operations in Changing Climate
Hydropower Siting, Design, Operations in Changing ClimateHydropower Siting, Design, Operations in Changing Climate
Hydropower Siting, Design, Operations in Changing ClimateWater, Land and Ecosystems (WLE)
ย 
Environment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in UgandaEnvironment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in Ugandakayondo alex
ย 
EIA
EIAEIA
EIAKirui Ben
ย 
Planning in eco tourism
Planning in eco tourismPlanning in eco tourism
Planning in eco tourismAlam S M Mujahidul
ย 
Environmental impact assessment m5
Environmental impact assessment m5Environmental impact assessment m5
Environmental impact assessment m5Bibhabasu Mohanty
ย 
a-i3959e
a-i3959ea-i3959e
a-i3959eAndrew Bam
ย 
1. Workshop for EIA Consultants - Vicky Bowman
1. Workshop for EIA Consultants - Vicky Bowman1. Workshop for EIA Consultants - Vicky Bowman
1. Workshop for EIA Consultants - Vicky BowmanEthical Sector
ย 
BasConcept of Eic nvironmental Impact Assessment-pages-2-13,18-65.pdf
BasConcept of  Eic nvironmental Impact Assessment-pages-2-13,18-65.pdfBasConcept of  Eic nvironmental Impact Assessment-pages-2-13,18-65.pdf
BasConcept of Eic nvironmental Impact Assessment-pages-2-13,18-65.pdfTausifAhmad53
ย 
A Dominican Republic Case: Demonstrating Sustainable Land Management in the U...
A Dominican Republic Case: Demonstrating Sustainable Land Management in the U...A Dominican Republic Case: Demonstrating Sustainable Land Management in the U...
A Dominican Republic Case: Demonstrating Sustainable Land Management in the U...Iwl Pcu
ย 
ENVIRONMENTAL-IMPACT-ASSESSMENT (E I A )
ENVIRONMENTAL-IMPACT-ASSESSMENT (E I A )ENVIRONMENTAL-IMPACT-ASSESSMENT (E I A )
ENVIRONMENTAL-IMPACT-ASSESSMENT (E I A )sandeepprasad87
ย 
Unit 6 environmental_impact_assessment
Unit 6 environmental_impact_assessmentUnit 6 environmental_impact_assessment
Unit 6 environmental_impact_assessmentHarish kumar Lekkala
ย 
World bank and adb safeguard policies for infrastructure projects
World bank and adb safeguard policies for infrastructure projectsWorld bank and adb safeguard policies for infrastructure projects
World bank and adb safeguard policies for infrastructure projectsBhim Upadhyaya
ย 
Impact prediction, evaluation and mitigation in eia
Impact prediction, evaluation and mitigation in eiaImpact prediction, evaluation and mitigation in eia
Impact prediction, evaluation and mitigation in eiaMizanur R. Shohel
ย 

Similar to Environmental Impact Assessment (20)

Mwalyosi-ImpactIdentificationPrediction-1999.pdf
Mwalyosi-ImpactIdentificationPrediction-1999.pdfMwalyosi-ImpactIdentificationPrediction-1999.pdf
Mwalyosi-ImpactIdentificationPrediction-1999.pdf
ย 
WAAPP-Nigeria Environmental and Social Screening presentation
WAAPP-Nigeria Environmental and Social Screening presentationWAAPP-Nigeria Environmental and Social Screening presentation
WAAPP-Nigeria Environmental and Social Screening presentation
ย 
Concept of Environmental impact assessment - Stages, Parameters, and Benefits...
Concept of Environmental impact assessment - Stages, Parameters, and Benefits...Concept of Environmental impact assessment - Stages, Parameters, and Benefits...
Concept of Environmental impact assessment - Stages, Parameters, and Benefits...
ย 
Eia - environmental impact assessment
Eia - environmental impact assessmentEia - environmental impact assessment
Eia - environmental impact assessment
ย 
Hydropower Siting, Design, Operations in Changing Climate
Hydropower Siting, Design, Operations in Changing ClimateHydropower Siting, Design, Operations in Changing Climate
Hydropower Siting, Design, Operations in Changing Climate
ย 
Environment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in UgandaEnvironment impact Assessment (EIA) in Uganda
Environment impact Assessment (EIA) in Uganda
ย 
EIA Methods
EIA MethodsEIA Methods
EIA Methods
ย 
EIA
EIAEIA
EIA
ย 
Planning in eco tourism
Planning in eco tourismPlanning in eco tourism
Planning in eco tourism
ย 
Environmental impact assessment m5
Environmental impact assessment m5Environmental impact assessment m5
Environmental impact assessment m5
ย 
a-i3959e
a-i3959ea-i3959e
a-i3959e
ย 
1. Workshop for EIA Consultants - Vicky Bowman
1. Workshop for EIA Consultants - Vicky Bowman1. Workshop for EIA Consultants - Vicky Bowman
1. Workshop for EIA Consultants - Vicky Bowman
ย 
BasConcept of Eic nvironmental Impact Assessment-pages-2-13,18-65.pdf
BasConcept of  Eic nvironmental Impact Assessment-pages-2-13,18-65.pdfBasConcept of  Eic nvironmental Impact Assessment-pages-2-13,18-65.pdf
BasConcept of Eic nvironmental Impact Assessment-pages-2-13,18-65.pdf
ย 
IV Seminario Regional de Agricultura y Cambio Climรกtico - Francisco Meza
IV Seminario Regional de Agricultura y Cambio Climรกtico - Francisco Meza IV Seminario Regional de Agricultura y Cambio Climรกtico - Francisco Meza
IV Seminario Regional de Agricultura y Cambio Climรกtico - Francisco Meza
ย 
A Dominican Republic Case: Demonstrating Sustainable Land Management in the U...
A Dominican Republic Case: Demonstrating Sustainable Land Management in the U...A Dominican Republic Case: Demonstrating Sustainable Land Management in the U...
A Dominican Republic Case: Demonstrating Sustainable Land Management in the U...
ย 
ENVIRONMENTAL-IMPACT-ASSESSMENT (E I A )
ENVIRONMENTAL-IMPACT-ASSESSMENT (E I A )ENVIRONMENTAL-IMPACT-ASSESSMENT (E I A )
ENVIRONMENTAL-IMPACT-ASSESSMENT (E I A )
ย 
Unit 6 environmental_impact_assessment
Unit 6 environmental_impact_assessmentUnit 6 environmental_impact_assessment
Unit 6 environmental_impact_assessment
ย 
World bank and adb safeguard policies for infrastructure projects
World bank and adb safeguard policies for infrastructure projectsWorld bank and adb safeguard policies for infrastructure projects
World bank and adb safeguard policies for infrastructure projects
ย 
Question
QuestionQuestion
Question
ย 
Impact prediction, evaluation and mitigation in eia
Impact prediction, evaluation and mitigation in eiaImpact prediction, evaluation and mitigation in eia
Impact prediction, evaluation and mitigation in eia
ย 

More from Saad Farooqi

Soil conservation
Soil conservationSoil conservation
Soil conservationSaad Farooqi
ย 
BTEX in the production of insulation bituminous
BTEX in the production of insulation bituminousBTEX in the production of insulation bituminous
BTEX in the production of insulation bituminousSaad Farooqi
ย 
Heavy Metals in Foodstuffs
Heavy Metals in FoodstuffsHeavy Metals in Foodstuffs
Heavy Metals in FoodstuffsSaad Farooqi
ย 
Water problems in Balochistan, Pakistan
Water problems in Balochistan, PakistanWater problems in Balochistan, Pakistan
Water problems in Balochistan, PakistanSaad Farooqi
ย 
Health safety laws and regulations (laboratory)
Health safety laws and regulations (laboratory)Health safety laws and regulations (laboratory)
Health safety laws and regulations (laboratory)Saad Farooqi
ย 
Air Pollution Control Technology (Marble Industry)
Air Pollution Control Technology (Marble Industry)Air Pollution Control Technology (Marble Industry)
Air Pollution Control Technology (Marble Industry)Saad Farooqi
ย 
Environment
EnvironmentEnvironment
EnvironmentSaad Farooqi
ย 
Sustainable and non sustainable energy
Sustainable and non sustainable energySustainable and non sustainable energy
Sustainable and non sustainable energySaad Farooqi
ย 
Urban soil
Urban soilUrban soil
Urban soilSaad Farooqi
ย 
Urban noise pollution
Urban noise pollutionUrban noise pollution
Urban noise pollutionSaad Farooqi
ย 
Urban land pollution and usage
Urban land pollution and usageUrban land pollution and usage
Urban land pollution and usageSaad Farooqi
ย 
Soil Profile
Soil ProfileSoil Profile
Soil ProfileSaad Farooqi
ย 
Urban flora of pakistan
Urban flora of pakistanUrban flora of pakistan
Urban flora of pakistanSaad Farooqi
ย 
Ecological function in urban enivronment
Ecological function in urban enivronmentEcological function in urban enivronment
Ecological function in urban enivronmentSaad Farooqi
ย 
Hypothesis
HypothesisHypothesis
HypothesisSaad Farooqi
ย 
Urban Landscape
Urban LandscapeUrban Landscape
Urban LandscapeSaad Farooqi
ย 
ISO Certification
ISO CertificationISO Certification
ISO CertificationSaad Farooqi
ย 
detect and identify common human bacterial pathogens in high purity water.
detect and identify common human bacterial pathogens in high purity water.detect and identify common human bacterial pathogens in high purity water.
detect and identify common human bacterial pathogens in high purity water.Saad Farooqi
ย 
Climatic zones of pakistan
Climatic zones of pakistanClimatic zones of pakistan
Climatic zones of pakistanSaad Farooqi
ย 

More from Saad Farooqi (20)

Soil conservation
Soil conservationSoil conservation
Soil conservation
ย 
BTEX in the production of insulation bituminous
BTEX in the production of insulation bituminousBTEX in the production of insulation bituminous
BTEX in the production of insulation bituminous
ย 
Heavy Metals in Foodstuffs
Heavy Metals in FoodstuffsHeavy Metals in Foodstuffs
Heavy Metals in Foodstuffs
ย 
Water problems in Balochistan, Pakistan
Water problems in Balochistan, PakistanWater problems in Balochistan, Pakistan
Water problems in Balochistan, Pakistan
ย 
Health safety laws and regulations (laboratory)
Health safety laws and regulations (laboratory)Health safety laws and regulations (laboratory)
Health safety laws and regulations (laboratory)
ย 
Air Pollution Control Technology (Marble Industry)
Air Pollution Control Technology (Marble Industry)Air Pollution Control Technology (Marble Industry)
Air Pollution Control Technology (Marble Industry)
ย 
Environment
EnvironmentEnvironment
Environment
ย 
Sustainable and non sustainable energy
Sustainable and non sustainable energySustainable and non sustainable energy
Sustainable and non sustainable energy
ย 
Urban soil
Urban soilUrban soil
Urban soil
ย 
Urban noise pollution
Urban noise pollutionUrban noise pollution
Urban noise pollution
ย 
Urban land pollution and usage
Urban land pollution and usageUrban land pollution and usage
Urban land pollution and usage
ย 
Soil Profile
Soil ProfileSoil Profile
Soil Profile
ย 
Urban flora of pakistan
Urban flora of pakistanUrban flora of pakistan
Urban flora of pakistan
ย 
Ecological function in urban enivronment
Ecological function in urban enivronmentEcological function in urban enivronment
Ecological function in urban enivronment
ย 
Hypothesis
HypothesisHypothesis
Hypothesis
ย 
Urban Landscape
Urban LandscapeUrban Landscape
Urban Landscape
ย 
ISO Certification
ISO CertificationISO Certification
ISO Certification
ย 
detect and identify common human bacterial pathogens in high purity water.
detect and identify common human bacterial pathogens in high purity water.detect and identify common human bacterial pathogens in high purity water.
detect and identify common human bacterial pathogens in high purity water.
ย 
Drought
DroughtDrought
Drought
ย 
Climatic zones of pakistan
Climatic zones of pakistanClimatic zones of pakistan
Climatic zones of pakistan
ย 

Recently uploaded

Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation AreasProposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas๐Ÿ’ฅVictoria K. Colangelo
ย 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...AICCRA
ย 
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
ย 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayGeorgeDiamandis11
ย 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...AICCRA
ย 
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
ย 
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...MOHANI PANDEY
ย 
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
ย 
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...SUHANI PANDEY
ย 
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...SUHANI PANDEY
ย 
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
ย 
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...SUHANI PANDEY
ย 
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
ย 
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756dollysharma2066
ย 
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...Call Girls in Nagpur High Profile
ย 
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...SUHANI PANDEY
ย 
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...SUHANI PANDEY
ย 
Book Sex Workers Available Pune Call Girls Kondhwa 6297143586 Call Hot India...
Book Sex Workers Available Pune Call Girls Kondhwa  6297143586 Call Hot India...Book Sex Workers Available Pune Call Girls Kondhwa  6297143586 Call Hot India...
Book Sex Workers Available Pune Call Girls Kondhwa 6297143586 Call Hot India...Call Girls in Nagpur High Profile
ย 
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...tanu pandey
ย 

Recently uploaded (20)

Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation AreasProposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
ย 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
ย 
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Budhwar Peth Call Me 7737669865 Budget Friendly No Advance Booking
ย 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting Day
ย 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
ย 
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
ย 
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
ย 
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
ย 
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
ย 
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
VIP Model Call Girls Viman Nagar ( Pune ) Call ON 8005736733 Starting From 5K...
ย 
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
ย 
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
VIP Model Call Girls Chakan ( Pune ) Call ON 8005736733 Starting From 5K to 2...
ย 
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Moshi Call Me 7737669865 Budget Friendly No Advance Booking
ย 
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
GENUINE Babe,Call Girls IN Chhatarpur Delhi | +91-8377877756
ย 
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
ย 
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
ย 
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
VVIP Pune Call Girls Vishal Nagar WhatSapp Number 8005736733 With Elite Staff...
ย 
Deforestation
DeforestationDeforestation
Deforestation
ย 
Book Sex Workers Available Pune Call Girls Kondhwa 6297143586 Call Hot India...
Book Sex Workers Available Pune Call Girls Kondhwa  6297143586 Call Hot India...Book Sex Workers Available Pune Call Girls Kondhwa  6297143586 Call Hot India...
Book Sex Workers Available Pune Call Girls Kondhwa 6297143586 Call Hot India...
ย 
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
ย 

Environmental Impact Assessment

  • 1. Aspects and Impacts, Impact Assessment, Social Assessment, Mitigation, Institutional Setup, Preparation of EIA, Presented by, Saad Farooqi, FA18-R07-004 Izhar Aziz, FA18-R07-006 MS-Environmental Science Department of Environmental Science COMSATS University Islamabad, Abbottabad Campus 1
  • 2. Contents โ€ข Aspects and Impacts โ€ข Impact Assessment โ€ข Techniques โ€ข Kinds โ€ข Prediction โ€ข Social Assessment โ€ข Mitigation โ€ข Institutional Setup โ€ข Preparation of EIA report 2
  • 3. Aspects and Impacts Aspects: โ€ข The elements of projectโ€™s activities, products or services which interact with the environment. Impacts: โ€ข Any change to the environment, whether adverse or beneficial, wholly or partially resulting from a projectโ€™s activities, products or services. 3
  • 4. Kinds and Prediction of Impact โ€ข Direct Impact: - Directly relating to the project. โ€ข Indirect Impact: - Less obvious. - Not directly relate. โ€ข Cumulative Impact: - combinedly effect more then individual. โ€ข Prediction of Impacts: - Qualitative (experts, reasoning). - Quantitative (simulation, modeling, statistics). 4
  • 5. Determination of Significance of Potential Impact Some Key Factor: โ€ข Public health and safety, risk (high or unknown). โ€ข Aesthetics and recreation, other unique characteristics. โ€ข Resources availability, farmland, forests, wildlife. Some Key Elements: โ€ข Public concern/controversy/precedent-setting. โ€ข Disturbance of protected/valued habitats. โ€ข Disruption of local customs Inherently a Value Judgement: โ€ข Needs and sustainability. โ€ข Law, policy and regulation. 5
  • 6. Impact Assessment Techniques โ€ข Professional Expert Opinion โ€ข Questionnaires/ Case studies โ€ข Checklists -Advantages (simple to understand and use, good for site selection) -Disadvantages (it doesnโ€™t distinguish, do not link action and impact) โ€ข Matrices -Advantages (link action to impact, good method for displaying EIA result) -Disadvantages (difficult to distinguish) โ€ข Networks - Advantages (link action to impacts, handles direct and indirect impacts) -Disadvantages (can become very complex if used beyond simplified version) 6
  • 7. Contdโ€ฆ โ€ข Overlays -Advantages (easy to understand, good display method, good sitting tools) -Disadvantages (address only direct impact, do not address impact duration) โ€ข GIS -Advantages (excellent for impact analysis and identification, good for experimet) -Disadvantages (heavy reliance on knowledge and data, often complex) โ€ข Carrying Capacity โ€ข Modeling 7
  • 8. Social Assessment (SA) โ€ข Approach to ensure that the social dimension of development or fully address through out the project life cycle. โ€ข Tools for SA. - desk review - household interview - group discussion - case study - stakeholder workshop - social mapping 8
  • 9. Contdโ€ฆ ๏ƒ˜Level of public involvement โ€ข Informing: One way flow from proponent in public. โ€ข Consulting: Two way flow of information opportunities for public to express views. โ€ข Participating: proponent and public share analysis and agenda setting, public involvement in decision maker through consensus. 9
  • 10. Mitigation โ€ข Finding better ways of doing things. โ€ข Minimizing or eliminating the negative impacts. โ€ข Enhancing the project benefits. โ€ข How to mitigate? โ€ข For example: alternative ways of meeting the needs. โ€ข Changes in planning and designing. โ€ข Improving monitoring and management. โ€ข Through monitory compensation. 10
  • 11. Institutional Setup โ€ข PEPC (Pakistan Environmental Protection Council) โ€ข Ministry of Environment โ€ข Federal EPA. โ€ข Provincial EPA. โ€ข Environmental Tribunal - Three judges in each headquarters. - Environmental magistrate - Environmental inspectors 11
  • 12. Preparation And Review EIA Report โ€ข Format (organization of content). โ€ข Preparation and description of EIA draft. โ€ข Circulation (agencies, experts, private groups, stakeholders). โ€ข Review of EIA report โ€ข Preparation of final EIS discuss and incorporate the comments, file the EIA with EPA. โ€ข Follow format as recommended by EPA. 12
  • 13. Sample of Checklist 13 As pects of EIA Checklist Q uestions Will the proje ct: Ye s No Additiona l Da ta ne eds Sourc es of Impacts 1. Re qui re the a cqu isi ti on o r co nve rsi on of si gni ficant areas of la nd for reservoi r/treatmen t works etc. (e .g . > 50 ha rural , > 5 ha urba n)? 2. Re sul t i n sig nifi ca nt qu anti ti es of e ro ded materi al , efflu ent or sol i d wastes? 3. Re qui re si gni ficant accommod atio n or servi ce a meni ties to suppo rt th e workforce d urin g con structi on (eg > 10 0 man ual worke rs)? Re ceptors of Impacts 4. Fl oo d or o th erwise affe ct areas whi ch su ppo rt co nservati on worthy terre stria l or aqu ati c e cosyste ms, flo ra o r faun a (eg p ro te cted area s, wil de rn ess areas, forest re se rves, cri ti ca l ha bi ta ts, en dan gered speci es); o r that con ta in sites of h isto ri cal or cu ltural i mpo rtan ce? 5. Fl oo d or o th erwise affe ct areas whi ch wi ll affe ct the l ivel ih ood s of l ocal peop le (eg req ui re p opu la ti on resettl emen t; affe ct l ocal i nd ustry, agri cul ture, l i vestock or fi sh stocks; re duce th e avai lab il i ty of na tu ra l resource go ods a nd servi ces)? 6. Invo lve si tin g san itati on tre atment fa ci li tie s cl ose to hu man se ttl emen ts (pa rti cu la rl y whe re l ocatio ns a re suscepti bl e to fl ood in g)? 7. Affect sou rces o f wa ter extracti on ? Env ironmental Impa cts 8. Ca use a n oticeab le p ermane nt or se aso nal re ducti on i n the vo lu me of g ro und or su rface water sup pl y? 9. Present a si gni fican t pol l utio n ri sk th ro ugh l i qui d or sol i d wa stes to hu ma ns, source s of water e xtra ctio n, co nservati on worthy aq uati c ecosystems and specie s, or co mmerci al fi sh sto cks? 10 . Ch ange the l ocal h ydrol og y of surface water-b odi es (eg streams, ri vers, l ake s) such that con serva ti on -worth y or co mmerci al ly si gni ficant fi sh stocks a re affecte d? 11 . Increa se the risk o f di se ases i n areas of hi gh p opu la ti on de nsi ty (eg oncho cerci asi s, fi la ri asi s, ma la ri a, hep atiti s, ga stro in te sti nal di sea se s)? 12 . Indu ce seco nda ry d eve lo pmen t, eg al ong a ccess ro ads, or in the form o f en trep re neu ri al services for constru ctio n an d ope ra ti ona l activiti es? Mitiga tion Mea sures 13 . Be l ikel y to re qui re miti gati on measures tha t may resul t i n the proj ect be in g fi nan ci al l y or socia ll y un acceptab le ? Comme nts I recommend tha t the programme be a ssigned to Ca tegory Si gna tu re : De le gati on.........................................De sk...................................
  • 15. 15