EFFECTIVE AIRPORT MANAGEMENT
-Requirements ,Difficulties & Preparedness-
PSRK Sudhakar
APD Pune
SLIDE NO. EFFECTIVE AIRPORT MANAGEMENT
Requirements ,Difficulties &Preparedness
- CONTENTS-
1 Welcome- Pune Airport Photo
2 & 3. Contents of Presentation
4. Airport Management by APD & Team overall View
5. Aerodrome Licensing- Civil Aviation Requirements
6 &7. MOU Parameters
8. ASQ Parameters
9. Pune Airport Brochure
10. Pune Air Traffic during the last 8 years
11 Pune Airport -City Connectivity
12 Pune Airport Master Plan
13 Financial Figures
14 Financial Performance 2
SLIDE NO.
EFFECTIVE AIRPORT MANAGEMENT
Requirements ,Difficulties &Preparedness
- CONTENTS-
15 ASQ - Pune Team Photo
16 Type of Security Plans
17 Type of meetings conducted
18 Type of Drills held
19 Constraints faced at Pune Airport
20 Constraints faced at Pune Airport
21 Main Focus Areas Needing daily Inspection & Monitoring
22 Air side operations area
23 Terminal Building-Civil components
24 Electrical Components
25 CNS Eqpts
26 City side Infrastructure
27 Inspection Schedule –Apron
28 Inspection of Terminal Building Departure Flow
29 Inspection of Terminal Building Arrival Flow
30 THANK YOU
3
AAI RHQ/CHQ
Operational &Financial Performance as
per Manuals ,SOP & DOP
PASSENGERS
(4000 departing daily and 2 hrs spent by each passenger
at the Airport unless delay
Flight as per schedule
 Safety ,Security
Comfort &Quality Facilities
Courtious Service
 Value for full Money Paid in advance
CONCESSIONAIRES
( Period 3 to 10 years )
Business with out competetion Maximizing
Revenue to pay rent through contract period.
Only Hired Representative at site Not serious in
timely meeting contract terms & payments.
Partial Defaulter Status
ENFORCEMENT INSPECTIONS VIGILANCE
AUDITS AGENCIES
AAI ,DGCA,BCAS ,CISF , IAF, POLICE ,LABOUR &PF
,Water,Power,Pollution,Public Health &others
VIPs & DIGNITARIES PRESS,MEDIA & CITIZENS
APD & Team
SCHE.AIRLINES (7 Station Managers)
NON-SCHE.OPERATORS (9)
Safe ,Secure and on time processing of
aircrafts and passengers thru available
infrastructure, equipments &Man Power..
Not serious in timely meeting contract
terms & payments.
Partial Defaulter Status
GROUND HANDLING AGENCIES
4
6. PHYSICAL CHARACTERSTICS
Designation,Length,Width,End
Elevation,Surface,ACN/PCN,
Frictional Value,Slopes,Shoulders,
Turn Pad, Basic Strip, RESA, Clearances
Stopway,TORA,TODA,ASDA
Runway 6.1 To 6.17
Taxiway 7.1 To 7.4
Apron 8.1 To 8.6
9. VISUAL AIDS FOR NAVIGATIONAL MARKINGS
Runway 9.1 (A) To (K)
Taxiway 9.2 (A) To (E)
Apron 9.3 (A) To (C)
10.4 Landing T
10.5 Wind Direction Locator
10.6 Approach Lighting
( a ) Runways
( b) Lead Lights
10.7 Emergency Lighting
/Secondary Power Supply
to meet the type of operation
13.1 OBSTACLE LIMITATION
SURFACE
13.1 (a) to (d) Objects in
Operational Are
a & their Frangible Type
13.2 -Obstacles
9.4 OTHER MARKINGS
(a) Road holding position
(b) VOR Aerodrome Check Point
(c ) Altimeter Check Point
9.5 Landing T Location
9.6 Wind Direction Indicator
9.7 Signal Square
9.8 Aerodrome Beacon
9.9 Aerodrome Identification Beacon
12. SIGNAGES
12.1 ( a) to (f) Mandatory Instructions
Signs
12.2 (a) to (d) Information Signs
12.3 Aerodrome Identification Sign
12.4 Aerodrome Stand Identification Sign
11. VASI INDICATOR SYSTEM
RUNWAY 11.1 to 11.30
14 .1 to 14.5 -RESCUE AND FIRE
FIGHTING
15. GENERAL
INFORMATION
15.1 Boundary Wall
as per BCAS.
15.2 No of Access
Gates
15.3 Drainage
15.4 Terminal
Building Capacity
16. DOCUMENTS
16.1 Aerodrome Manual
16.3 Aerodrome Emergency Plan
16.4 Bird Hazard Reduction Plan
16.5 Apron Management Service
16.6 Aerodrome Vehicle Operations
16.7 Surface Movement & control
COMPLIANCE STATUS OF CIVIL AVIATION REQUIREMENTS (CAR)
5
S.No MOU PARAMETERS Unit Wtg
% age
Target
2012-13
Targets on 5
Point Scale 1
1.
a)
STATIC FINANCIAL PARAMETERS
Financial Indicators-Profit
i) Gross margin/Gross Sales
ii) Operating Turnover/Employee
%age
Rs in lakhs
10
12
45.01
34.64
47.26
36.37
b) Financial Indicators –Size Related
i) Gross Margin
ii) Gross Sales
Rs in crores 8
4
2833.49
6295.17
2975.16
6609.93
c) Financial Returns –Productivity
Related
i) PBDIT/Total Employment
ii) Added value/sales
Rs.in lakhs
% age 7
9
16.06
35.74
16.86
37.53
2. DYNAMIC PARAMETERS
d)
e)
f)
g)
Customer Satisfaction
HRM
Project Implementation
Submission of Data for PE Survey
% age
Date
10
5
5
1
h)
g)
i)
Corporate Governence
Compliance of New Guidelines
Land encroachment –Filing of land
eviction
% of cases
filed
1
1 90%
100%
k) Implementation of Web based
Grievance Redressal Mechanism
Date 2 90% by
March,13
MOU Parameters 6
S.No PARAMETERS Unit Wtg
% age
Target
2012-13
Targets on 5 Point
Scale 1
1.
g)
SECTOR SPECIFIC PARAMETERS
Birds Strikes Rate
Per 10 K
A/C M
0.5 0,5 0.48
h) Aircraft Seperation Infringement Per 100k
A/C M
0.5 1.00 0.95
i) Availability of Navigation &
Surveillance Aids
% age 0.5 99.80 99.85
j) Runway Incursion /Excursion Per 10 k
A/C M
0.5 1.0 0.95
4. ENTERPRISE SPECIFIC PARAMETERS
k) Non Aeronautical Revenue Cargo Rs in
crores
2 272.73 286.36
l) Non Aeronautical Revenue
Commercial
Rs in
crores
2 1687.47 1771.84
m) Research and Development - 5 Details as per Annexure
n) Sustainable Development 5
o) Corporate Social Responsibility 5
MOU Parameters 7
1.Ground Transportation to/from Airport
2.Parking facilities
3.Parking facilities value for money
4.Availability of baggage trolleys
5.Waiting Time in check in queue /line
6.Efficiency of check in staff
7.Courtesy and help fullness of check in staff
8.Waiting time for passport /personal ID inspection
9.Courtesy and help fullness of inspection staff
10.Courtesy and help fullness of security staff
11.Thoroughness of security inspection
12.Waiting Time for security inspection
13.Feeling of being safe and secure
14.Ease of finding your way through airport
15.Flight information screens
16.Walking distance inside the terminal
17.Ease of making connections with other flights
18. Courtesy and help fullness of airport staff
19. Restaurant / eating facilities
20. Restaurant facilities value for money
21.Availability of Bank/ATM facilities/money changers
22.Shopping facilities
23. Shopping facilities value for money
24.Internet access/value for money
25.Business /Executive Lounges
26.Availability of wash Rooms /toilets
27.Cleanliness of wash Rooms /toilets
28.Comfort of waiting /gate areas
29.Cleanliness of terminal
30.Ambiance of airport
31.Arrivals passport & Visa inspection
32.Speed of baggage delivery service
33. Customs inspection
AIRPORT SERVICE QUALITY(ASQ) Parameters 8
9
10
Pune Airport – Aircraft Traffic During Last 8 Years
Pune Airport – Passenger Traffic During Last 8 Years
PUNE
INDORE
BANGALORE
MUMBAI
AHMEDABAD
DELHI
NAGPUR
HYDERABAD
CHENNAI
GOA
KOCHI
CITIES CONNECTED TO PUNE (13 nos)
FRANKFURT(2,5,6,7
)
DUBAI(1,4,6)
11
JAIPUR
Airlines(7) : AI,AI Xp,
Lufthansa, Indigo,Jet,Spice,Go
Av.daily Sch flt. ops: 86 (43+43)
Av daily Pax ; 9000
No of Pax during 2011-12 : 3.32 millions
No of acft ops during 11-12: 30,968
Pax incresae frm 10-11 to 11-12: 17.98 %
1
12
PROPOSED MASTER PLAN FOR PUNE AIRPORT
FINANCIAL PERFORMANCE : FOR SIX YEARS
14
( Rs In Lakhs)
PARTICUL
ARS
2005-06
2006-
07
2007-08 2008-09 2009-10 2010-11
2011-
March 12
2012-13
1 3 4 5 6 7 8 9 10
REVENUE 2039.38 3201.49 3667.74 4414.22 5598.06 6583.74 7784.46 8380.24
EXPENDIT
URE
511.74 1216.82 3361.97 2057.82 3053.66 3325.00 3896.01 5030.47
OP.
PROFI
T
1527.64 1984.67 305.77 2356.40 2544.40 3258.74 3888.45 3349.77*
* Provisional Subject to final reconciliation
with RHQ records.
FINANCIAL PERFORMANCE : OVERALL-
PUNE AIRPORT
TERMINAL MANAGEMENT
1.TRIPLE ISO CERIFICATION –.QUALITY MANAGEMENT SYSTEM-QMS-(ISO 9001- 2008) –CERTIFICATE FOR
UPGRADED FROM ISO 9001-2000 RECEIVED ON 07-03-11
- ENVIRONMENTAL MANAGEMENT SYSTEM- EMS(ISO 14001-2004).
-OPERATIONAL HEALTH AND SAFETY ASSESSMENT SERIES-OHSAS(ISO 18001-2007)-
2.AS PER ASQ SURVEY FOR OCTOBER-DECEMBER-2011 PUNE AIRPORT WITH A SCORE OF 4.17 (Terminal
Management Conservancy &Upkeep by our redeployed AAI staff with out any outsourcing)) HAS BEEN
DECLARED AS THE BEST AMONG AAI AIRPORTS 15
TYPES OF PLANS
NAME OF THE PLAN PREPARED BY STATUS
Contingency plan to deal with
Hijacking and unlawful
interference with civil
aviation
IAF IAF has forwarded updated
plan to BCAS for approval.
Bomb Threat Contingency
Plant
AAI Approved by BCAS vide letter
No. CAS- 607/Trg/GP ‘E’
dated 11.3.2010.
Disabled aircraft removal
plan
AAI and submitted to IAF Presentation given by IAF to
AAI and Airlines operating at
Pune Airport and same is
forwarded by them to IAF
Hqrs., for consideration.
Airport Emergency Plan AAI and submitted to IAF Presentation given by IAF to
AAI and Airlines operating at
Pune Airport and same is
forwarded by them to IAF
Hqrs., for consideration.
Crisis Management Plan CISF Approved by Collector, Pune.
Airport Security Programme AAI Approved by BCAS vide letter
No. CAS-6/(6)/2008-
Div.IIIB(ASP PUNE) dated
11.9.2009.
16
TYPES OF MEETINGS HELD
NAME OF THE
MEETING
CHAIRPERSON SCHEDULED
FREQUENCY
LAST MEETING
HELD ON
NEXT MEETING
PROPOSED
Aerodrome
Committee
Meeting
AOC, IAF Once in 06
months
03.01.2013 --
Airport Advisory
Committee
Meeting
Member of
Parliament of
Airport
constituency
Once in 06
months
09.03.2012 --
Flying
Environmental
safety Committee
Meeting
AOC, IAF Once in 03
months
28.01.2013 --
Airport Security
Committee
Meeting
Airport Director,
AAI
Once in a month 16.1.2013 20.2.2013
Airport
Coordination
Committee
Meeting
Airport Director,
AAI
Once in a month 23.1.2013 27.2.2013
17
TYPES OF DRILLS CARRIED OUT
NAME OF THE
EXERCISE
RESPONSIBILITY
OF CONDUCTING
EXERCISE
FREQUENCY LAST EXERCISE
HELD ON
NEXT EXERCISE
PROPOSED ON
Anti Hijacking
Mock up exercise
IAF Once a year 17.9.2012 --
Airport Emergency
exercise :-
evacuation of
terminal in
emergencies such
as Fire, bomb
threat.
AAI/ BDDS Once a year 26.5.2012
Full scale
emergency exercise
involving an aircraft
IAF Once a year -- --
Bomb threat to
aircraft (in the
event an actual
bomb threat
situation has not
occurred during a
period of one year)
IAF Once a year -- --
18
CONSTRAINTS FACED AT PUNE AIRPORT
Pune Airport is the 10 th busiest with 3.4 million annual pax traffic & daily handling 86 aircrafts & 8000
passenger movements round the clock and it has recorded an annual growth of 17 % .it is an IAF
controlled Civil Enclave & operating in 26 acres of land only.
1. UN AVAILABILITY OF LAND FOR FURTHER EXPANDING INFRASTRUCTURE
on apron side for additional Parking for Aircrafts ,GHA ,Office & Cargo & additional facilities for Passengers in
Terminal Building & City side
 Housing for Employees of AAI (307)& CISF(316) &offices
2.Restrictions by IAF on civil operations during prime morning and evening hours & on Saturdays from 10 30 hrs
to 17 00 hrs and some times continuing IAF fighter training during civil operations also. Dependence on IAF for
various clearances.
3. FACTORS AFFECTING OPERATION OF COMMERCIAL /CONCESSIONAIRES CONTRACTS FOR PASSENGER
FACILITATION.
i) Security
Pune Airport is a major IAF base and categorized as hyper sensitive & mostly on high alert , for meeting
security observations of BCAS,CISF, Police some times frequent /sudden shifting or complete removing AAI
Concessionaires is required
For Starting New Concessionaires /Shops in SHA BCAS Clearance is inordinately delayed/ not given due to
some reasons.
It results in premature cancellation of time bound contract agreements , revenue loss & unnecessary
compensation demands from contractors, arbitration , poor response to future NITs discontent from
passengers and users of airport and fall in ratings of airport.
19
 Initial Delay in handling over location , shifting of location due to modification and expansion of
building , change of passenger flow for decongesting & other reasons.
Concessionaires want monopoly business , rivalry with other similar operators and seek for
maximizing profits , discounts and less serious in fully meeting the time bound performance and
financial terms of Contract Agreements.
Brewing protests & disputes from contractors, indecision and penal actions by AAI affect smooth
conduct of existing contracts , result in poor /no response in future NITs and fall in passenger and
airport rating.
 Loss of revenue & opportunities due non clearing of short term promotional proposals.
4. Maintaining and Improving with in the Available Infrastructure &Facilities thru our own 116 House
keeping staff, Cordial HR ,Proper Prioritization , Participation ,Preventive and Swift Corrective
Action by all the concerned
5. Passenger facilitation and Responding promptly and courteously to their grievances by being
available at the passenger at toilets, SHA & May I Help You Counters. Positioning.
6. Tackling Crisis situations ,Cordial and Tactful Interaction with Press ,Media and Citizens protect
functioning of AAI in specific and over all image of all others associated with airport operations.
20
AIRPORT MANAGEMENT
MAIN FOCUS AREAS NEEDING DAILY
INSPECTION AND MONITORING
21
Civil Electrical ATM &CNS
Boundary Wall Power Supply DVOR,Localiser ,Glide Path
Antenas & NAV AID Equipments
Basic Strip UG cables
RESA Approach Lights
Drainage PAPI
Under Ground Culverts /crossings Runway ,Taxiway &Apron Edge
&Insert Lights
Perimeter Road Apron High Mast Lights
Aircraft Pavements
Runway, Taxiway, Apron & Isolation Bay
Perimeter Lighting
NAV Aid Buildings (DVOR,Glide Path , Localiser )
ATC Tower & Technical Block, Apron Control Tower
Fire &Rescue Station
Airside Operational Area
22
1. Availability of all details and drawings of Architectural ,Structural , water supply ,Drainage features & maintenance procedures and
precautions for specialized items of work & on site identified water and drainage distribution pipes
2, General Structural Condition of RCC/Steel support columns ,Beams & Slab ,Truss members , joints , seating plates and bolts etc
3. Roofing sheet & False Ceiling Grid , ,Tiles, ACP cladding grid and sheeting
4. . Structural Glazing doors, partition frame work and glazing
5. Guard /Safety railing of Staircases & higher floors
6. Flooring condition for non slipperiness
7. . Drainage & Waste Disposal
8. .Status of dispersal of Rain water & Water Proofing of slab ,profile roofing ceiling façade on all sides, doors and glazing
9. Water Supply Suffiency , quality adequacy & Reliability
10. Toilets -Location ,Lay out ,Size , Number of Urinals , models ,drainage ,floor slope ,traps , WCs , waste disposal , Wash basins , Flushing
cisterns ,sensors, soap dispensers, Hand driers , Partitions, Doors , Exhaust , Odour improving and fresheners
11. Finishing of walls, columns, glazing
12. Retiring Room s & Reserved Lounge Location, Lay out and furniture
Terminal Building- Civil Components
23
1. Physical on site markers and drawings for Identifying layout and routing of power & data cables connecting all Electrical ,CNS
instalations in Operational area & ATC, Technical Block , Equipment Room & Terminal Building
2. Power Supply suffiicency , adequacy , Reliability & back up
3. Electrical Protections like Earthing, Lightening & surge Protection
4. Status & Condition of incoming from Substation in to Terminal Building
and out going
distribution cables , conduits in slab, false ceiling and floor trenches
5. Switch Room s, Pannels , Distribution boards MCBS & AHU s
6. Water Supply pipes for Chilled water & Fire Protection, AC Ducts
7. Control of Water & Booster Pumps for A/C ,Fire fighting
8. AC functioning , comfort levels ,zoning control , air curtains, Fresh air and return air diffusers
9. Signages
10. Lighting fixtures
11.Status of Fire hydrants , smoke detectors ,alarms ,water sprinklers
12. Functioning and Safety mechanism of Escalators , Lifts
13. Functioning and Safety mechanism of Passenger Boarding Bridges
Electrical Components
24
1.Physical on site markers and drawings for Identifying layout and routing of power & data cables
connecting all CNS instalations in Operational area & ATC, Technical Block , Equipment Room & Terminal
Building
2. CNS Equipment Room AOCC Room Location ,Lay out and equipments
3. EPBAX and Telephones ,Mobiles & RTs
4. Computer Net Works
5. X- Ray Machines &Monitors
6. DFMD &HHMDS
7. PA System
8. Flight Information Display System (FIDS)
9. Surveillance Cameras & CCTV System
(CNS) Equipments
25
1. Information Directions, Speed Limit , Cautionary Signages from City Road to Airport Terminal & Pedestrian Crossings ,
signals
2. Approach Road to Airport Parking Areas for Vehicles & walk ways for pedestrians
3. Horticulture and greenary
4. Parking Areas for different types of vehicles (passengers, visitors, staff etc)
5. Access Control to area near Terminal Building by Police , CISF
6. Water Cooler ,Toilets & snack bar & other facilities Covered Waiting place for Passengers & Visitors
7. Alighting locations for vehicles , buses
8 .Gates & areas for airline enquiry ,ticketing counters for departing and Arriving passengers.
9. Flight Information, PA and Lighting
10. Electrical Substation CCR, A/C Plant Room, Chillers , water softening plant ,Fire Pump Room, UG & OH Water Tanks &
Fire water Tanks
11. UG water Supply lines for general use and fire protection and drainage Route till STP
City side Infrastructure
26
APRON AREA
• Structural Condition ( any holes, damage etc)
• Cleanliness of Apron (FODs, Waste etc)
• Cleanliness of Walking area used by passengers from
departing side to aircraft parking bay and from parking
bays to arriving hall
• Movement of Ground handling vehicles affecting
passenger movement
• Lighting
PUNE TERMINAL APRON AREA INSPECTION CHECK LIST
27
Check-in Area
•I-SYSTEMS
•Lighting
•AC
•FIDS
•PA System
• X-ray
•Conveyor -belt
•Weigh scale
•Snack bar &shops
service
•Water cooler
•Toilet Water
supply, flush,
sensor, tap
working &od0ur
•II-CLEANING
•Floor
•False Ceiling
•Glass
•Seating
Sec.Hold –I-
G’Floor
•I-SYSTEMS
•Lighting
•AC
•DFMD
•X-ray
•FIDS
•PA SYSTEM
•Escalator & Lift
•Water cooler
•Snack bar &shops
service
•Toilet Water
supply, flush,
sensor, tap
working &od0ur
•II-CLEANING
•Floor
•False Ceiling
•Glass
•Seating
Sec Hold-I
F.’Floor
•I-SYSTEMS
•Lighting
•AC
•FIDS
•PA SYSTEM
•Water cooler
•Snack bar &shops
service
•Toilet Water
supply, flush,
sensor, tap
working &od0ur
•II-CLEANING
•Floor
•False Ceiling
•Glass
•Seating
Air side
Corridor to
apron &aircraft
/Boarding
Bridge
•I-SYSTEMS
•Lighting
•AC
•FIDS
•PA SYSTEM
•Escalator &Lift
•II-CLEANING
•Floor
•False ceiling
•Glass
PUNE TERMINAL DEPARTING FLOW/AREA INSPECTION CHECK LIST
28
Old Arrival
Hall
•I-SYSTEMS
•Lighting
•AC
•FIDS
•PA System
•Conveyor -belt
•Water cooler
•Toilet Water
supply, flush,
sensor, tap
working &od0ur
•II-CLEANING
•Floor
•False Ceiling
•Glass
•Seating
New Arrival
Hall
(F’.Floor)
•I-SYSTEMS
•Lighting
•AC
•X-ray
•FIDS
•PA SYSTEM
•Water cooler
•Toilet Water
supply, flush,
sensor, tap
working &od0ur
•II-CLEANING
•Floor
•False Ceiling
•Glass
•Seating
New Arrival
(G.’Floor)
•I-SYSTEMS
•Lighting
•AC
•Conveyor-belt
•FIDS
•PA SYSTEM
•Water cooler
•Car Rentals
•Shops & Services
•Toilet Water
supply, flush,
sensor, tap
working &od0ur
•II-CLEANING
•Floor
•False Ceiling
•Glass
•Seating
Exit of Arriving
Passngrs from
Terminal to City side
•I-SYSTEMS
•Lighting
•FIDS
•Pre-paid Taxi, Auto
Services/behaviour
&passngrs difficulties
observed
•Snack bar ,shops
&services
•II-CLEANING
•Floor
•False ceiling
•Glass
•Garbage &waste
PUNE TERMINAL ARRIVAL FLOW/AREA INSPECTION CHECK LIST
29
THANK YOU !
30
1 de 30

Recomendados

Aeronautical Information In the Future Air Traffic Management System por
Aeronautical Information In the Future Air Traffic Management SystemAeronautical Information In the Future Air Traffic Management System
Aeronautical Information In the Future Air Traffic Management SystemAmr SABER
2.1K visualizações31 slides
Reducing Weather Related Accidents por
Reducing Weather Related AccidentsReducing Weather Related Accidents
Reducing Weather Related AccidentsMandy Love
4 visualizações44 slides
Training Report por
Training ReportTraining Report
Training ReportSauradeep Paul
507 visualizações36 slides
Design & application of cdo for ahmedabad airport within ahmedabad tma por
Design & application of cdo for ahmedabad airport within ahmedabad tmaDesign & application of cdo for ahmedabad airport within ahmedabad tma
Design & application of cdo for ahmedabad airport within ahmedabad tmaARVIND KUMAR SINGH
631 visualizações30 slides
India Aviation ICT Forum 2013 - Manish Sinha, Deputy COO, Hyderabad Internati... por
India Aviation ICT Forum 2013 - Manish Sinha, Deputy COO, Hyderabad Internati...India Aviation ICT Forum 2013 - Manish Sinha, Deputy COO, Hyderabad Internati...
India Aviation ICT Forum 2013 - Manish Sinha, Deputy COO, Hyderabad Internati...SITA
1.7K visualizações25 slides
Business Continuity Management for Airports por
Business  Continuity  Management for Airports Business  Continuity  Management for Airports
Business Continuity Management for Airports Continuity and Resilience
3K visualizações22 slides

Mais conteúdo relacionado

Similar a EffectiveAirportManagement-Diffs-Sols-191213.ppt

Airport Planning and Design por
Airport Planning and Design Airport Planning and Design
Airport Planning and Design Jetline Marvel
786 visualizações14 slides
Railtel por
RailtelRailtel
RailtelPeeyush Verma
190 visualizações63 slides
Airport Seminar - Federal Aviation Administration por
Airport Seminar - Federal Aviation Administration Airport Seminar - Federal Aviation Administration
Airport Seminar - Federal Aviation Administration Fiesp Federação das Indústrias do Estado de SP
2.1K visualizações32 slides
AIRPORT PLANNING AND DESIGN por
AIRPORT PLANNING AND DESIGNAIRPORT PLANNING AND DESIGN
AIRPORT PLANNING AND DESIGNNiranjan Varma
18.2K visualizações220 slides
AIRPORT PLANNING AND DESIGN BY NIRANJAN por
AIRPORT PLANNING AND DESIGN BY NIRANJANAIRPORT PLANNING AND DESIGN BY NIRANJAN
AIRPORT PLANNING AND DESIGN BY NIRANJANNiranjan Varma
7.5K visualizações220 slides
DHEERAJ BALODIA(LNMIIT) por
DHEERAJ BALODIA(LNMIIT)DHEERAJ BALODIA(LNMIIT)
DHEERAJ BALODIA(LNMIIT)Dheeraj Balodia
988 visualizações94 slides

Similar a EffectiveAirportManagement-Diffs-Sols-191213.ppt(20)

Airport Planning and Design por Jetline Marvel
Airport Planning and Design Airport Planning and Design
Airport Planning and Design
Jetline Marvel786 visualizações
Railtel por Peeyush Verma
RailtelRailtel
Railtel
Peeyush Verma190 visualizações
AIRPORT PLANNING AND DESIGN por Niranjan Varma
AIRPORT PLANNING AND DESIGNAIRPORT PLANNING AND DESIGN
AIRPORT PLANNING AND DESIGN
Niranjan Varma18.2K visualizações
AIRPORT PLANNING AND DESIGN BY NIRANJAN por Niranjan Varma
AIRPORT PLANNING AND DESIGN BY NIRANJANAIRPORT PLANNING AND DESIGN BY NIRANJAN
AIRPORT PLANNING AND DESIGN BY NIRANJAN
Niranjan Varma7.5K visualizações
DHEERAJ BALODIA(LNMIIT) por Dheeraj Balodia
DHEERAJ BALODIA(LNMIIT)DHEERAJ BALODIA(LNMIIT)
DHEERAJ BALODIA(LNMIIT)
Dheeraj Balodia988 visualizações
overview on airport operation por AiDY
overview on airport operationoverview on airport operation
overview on airport operation
AiDY20K visualizações
Airport planning - Railways, airports, docks and harbour engineering (RAHE) por Shanmugasundaram N
Airport planning - Railways, airports, docks and harbour engineering  (RAHE)Airport planning - Railways, airports, docks and harbour engineering  (RAHE)
Airport planning - Railways, airports, docks and harbour engineering (RAHE)
Shanmugasundaram N1K visualizações
Batangas Airport.pdf por ssuser553bbc
Batangas Airport.pdfBatangas Airport.pdf
Batangas Airport.pdf
ssuser553bbc352 visualizações
PPPon airport sector in india por Anupam Jena
PPPon airport sector in indiaPPPon airport sector in india
PPPon airport sector in india
Anupam Jena1.1K visualizações
Mlat ads-b-reference-guide por Sergio Llugdar
Mlat ads-b-reference-guideMlat ads-b-reference-guide
Mlat ads-b-reference-guide
Sergio Llugdar1.3K visualizações
Final report on CNS por Piyush Thakur
Final report on CNSFinal report on CNS
Final report on CNS
Piyush Thakur760 visualizações
Batangas Airport Philippines.pdf por ssuser553bbc
Batangas Airport Philippines.pdfBatangas Airport Philippines.pdf
Batangas Airport Philippines.pdf
ssuser553bbc332 visualizações
AAI Report NSCBI Airport Kolkata por Aliah University
AAI Report NSCBI Airport KolkataAAI Report NSCBI Airport Kolkata
AAI Report NSCBI Airport Kolkata
Aliah University39 visualizações
Airport Layout Plan For Efficient Airport Design por Allison Thompson
Airport Layout Plan For Efficient Airport DesignAirport Layout Plan For Efficient Airport Design
Airport Layout Plan For Efficient Airport Design
Allison Thompson26 visualizações
Augusto Macedo - IT & AUTOMATION WORKSHOP - PANEL 2: Technology in favor of t... por IBAS International Brazil Air Show
Augusto Macedo - IT & AUTOMATION WORKSHOP - PANEL 2: Technology in favor of t...Augusto Macedo - IT & AUTOMATION WORKSHOP - PANEL 2: Technology in favor of t...
Augusto Macedo - IT & AUTOMATION WORKSHOP - PANEL 2: Technology in favor of t...
Airport planning por Sonali99999
Airport planning Airport planning
Airport planning
Sonali999992.7K visualizações
Presentasi new equipment persiapan eu audit aoc 135(1) por Em Muslih
Presentasi new equipment persiapan   eu audit aoc 135(1)Presentasi new equipment persiapan   eu audit aoc 135(1)
Presentasi new equipment persiapan eu audit aoc 135(1)
Em Muslih480 visualizações
Using Airport Collaborative Decision Making (A-CDM) Network to Improved Aviat... por AIRCC Publishing Corporation
Using Airport Collaborative Decision Making (A-CDM) Network to Improved Aviat...Using Airport Collaborative Decision Making (A-CDM) Network to Improved Aviat...
Using Airport Collaborative Decision Making (A-CDM) Network to Improved Aviat...
AIRCC Publishing Corporation5 visualizações

Último

DESIGN OF SPRINGS-UNIT4.pptx por
DESIGN OF SPRINGS-UNIT4.pptxDESIGN OF SPRINGS-UNIT4.pptx
DESIGN OF SPRINGS-UNIT4.pptxgopinathcreddy
21 visualizações47 slides
dummy.pptx por
dummy.pptxdummy.pptx
dummy.pptxJamesLamp
5 visualizações2 slides
Plant Design Report-Oil Refinery.pdf por
Plant Design Report-Oil Refinery.pdfPlant Design Report-Oil Refinery.pdf
Plant Design Report-Oil Refinery.pdfSafeen Yaseen Ja'far
7 visualizações10 slides
Pitchbook Repowerlab.pdf por
Pitchbook Repowerlab.pdfPitchbook Repowerlab.pdf
Pitchbook Repowerlab.pdfVictoriaGaleano
6 visualizações12 slides
Renewal Projects in Seismic Construction por
Renewal Projects in Seismic ConstructionRenewal Projects in Seismic Construction
Renewal Projects in Seismic ConstructionEngineering & Seismic Construction
5 visualizações8 slides
REACTJS.pdf por
REACTJS.pdfREACTJS.pdf
REACTJS.pdfArthyR3
37 visualizações16 slides

Último(20)

DESIGN OF SPRINGS-UNIT4.pptx por gopinathcreddy
DESIGN OF SPRINGS-UNIT4.pptxDESIGN OF SPRINGS-UNIT4.pptx
DESIGN OF SPRINGS-UNIT4.pptx
gopinathcreddy21 visualizações
dummy.pptx por JamesLamp
dummy.pptxdummy.pptx
dummy.pptx
JamesLamp5 visualizações
Plant Design Report-Oil Refinery.pdf por Safeen Yaseen Ja'far
Plant Design Report-Oil Refinery.pdfPlant Design Report-Oil Refinery.pdf
Plant Design Report-Oil Refinery.pdf
Safeen Yaseen Ja'far7 visualizações
Pitchbook Repowerlab.pdf por VictoriaGaleano
Pitchbook Repowerlab.pdfPitchbook Repowerlab.pdf
Pitchbook Repowerlab.pdf
VictoriaGaleano6 visualizações
REACTJS.pdf por ArthyR3
REACTJS.pdfREACTJS.pdf
REACTJS.pdf
ArthyR337 visualizações
Ansari: Practical experiences with an LLM-based Islamic Assistant por M Waleed Kadous
Ansari: Practical experiences with an LLM-based Islamic AssistantAnsari: Practical experiences with an LLM-based Islamic Assistant
Ansari: Practical experiences with an LLM-based Islamic Assistant
M Waleed Kadous9 visualizações
Web Dev Session 1.pptx por VedVekhande
Web Dev Session 1.pptxWeb Dev Session 1.pptx
Web Dev Session 1.pptx
VedVekhande17 visualizações
AWS A5.18 A5.18M-2021.pdf por ThinhNguyen455948
AWS A5.18 A5.18M-2021.pdfAWS A5.18 A5.18M-2021.pdf
AWS A5.18 A5.18M-2021.pdf
ThinhNguyen4559487 visualizações
sam_software_eng_cv.pdf por sammyigbinovia
sam_software_eng_cv.pdfsam_software_eng_cv.pdf
sam_software_eng_cv.pdf
sammyigbinovia10 visualizações
BCIC - Manufacturing Conclave - Technology-Driven Manufacturing for Growth por Innomantra
BCIC - Manufacturing Conclave -  Technology-Driven Manufacturing for GrowthBCIC - Manufacturing Conclave -  Technology-Driven Manufacturing for Growth
BCIC - Manufacturing Conclave - Technology-Driven Manufacturing for Growth
Innomantra 15 visualizações
Module-1, Chapter-2 Data Types, Variables, and Arrays por Demian Antony D'Mello
Module-1, Chapter-2 Data Types, Variables, and ArraysModule-1, Chapter-2 Data Types, Variables, and Arrays
Module-1, Chapter-2 Data Types, Variables, and Arrays
Demian Antony D'Mello6 visualizações
Global airborne satcom market report por defencereport78
Global airborne satcom market reportGlobal airborne satcom market report
Global airborne satcom market report
defencereport786 visualizações
Proposal Presentation.pptx por keytonallamon
Proposal Presentation.pptxProposal Presentation.pptx
Proposal Presentation.pptx
keytonallamon67 visualizações
CPM Schedule Float.pptx por Mathew Joseph
CPM Schedule Float.pptxCPM Schedule Float.pptx
CPM Schedule Float.pptx
Mathew Joseph6 visualizações
MongoDB.pdf por ArthyR3
MongoDB.pdfMongoDB.pdf
MongoDB.pdf
ArthyR349 visualizações
Integrating Sustainable Development Goals (SDGs) in School Education por SheetalTank1
Integrating Sustainable Development Goals (SDGs) in School EducationIntegrating Sustainable Development Goals (SDGs) in School Education
Integrating Sustainable Development Goals (SDGs) in School Education
SheetalTank19 visualizações
Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc... por csegroupvn
Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc...Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc...
Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc...
csegroupvn8 visualizações
Design_Discover_Develop_Campaign.pptx por ShivanshSeth6
Design_Discover_Develop_Campaign.pptxDesign_Discover_Develop_Campaign.pptx
Design_Discover_Develop_Campaign.pptx
ShivanshSeth649 visualizações
2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptx por lwang78
2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptx2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptx
2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptx
lwang78180 visualizações

EffectiveAirportManagement-Diffs-Sols-191213.ppt

  • 1. EFFECTIVE AIRPORT MANAGEMENT -Requirements ,Difficulties & Preparedness- PSRK Sudhakar APD Pune
  • 2. SLIDE NO. EFFECTIVE AIRPORT MANAGEMENT Requirements ,Difficulties &Preparedness - CONTENTS- 1 Welcome- Pune Airport Photo 2 & 3. Contents of Presentation 4. Airport Management by APD & Team overall View 5. Aerodrome Licensing- Civil Aviation Requirements 6 &7. MOU Parameters 8. ASQ Parameters 9. Pune Airport Brochure 10. Pune Air Traffic during the last 8 years 11 Pune Airport -City Connectivity 12 Pune Airport Master Plan 13 Financial Figures 14 Financial Performance 2
  • 3. SLIDE NO. EFFECTIVE AIRPORT MANAGEMENT Requirements ,Difficulties &Preparedness - CONTENTS- 15 ASQ - Pune Team Photo 16 Type of Security Plans 17 Type of meetings conducted 18 Type of Drills held 19 Constraints faced at Pune Airport 20 Constraints faced at Pune Airport 21 Main Focus Areas Needing daily Inspection & Monitoring 22 Air side operations area 23 Terminal Building-Civil components 24 Electrical Components 25 CNS Eqpts 26 City side Infrastructure 27 Inspection Schedule –Apron 28 Inspection of Terminal Building Departure Flow 29 Inspection of Terminal Building Arrival Flow 30 THANK YOU 3
  • 4. AAI RHQ/CHQ Operational &Financial Performance as per Manuals ,SOP & DOP PASSENGERS (4000 departing daily and 2 hrs spent by each passenger at the Airport unless delay Flight as per schedule  Safety ,Security Comfort &Quality Facilities Courtious Service  Value for full Money Paid in advance CONCESSIONAIRES ( Period 3 to 10 years ) Business with out competetion Maximizing Revenue to pay rent through contract period. Only Hired Representative at site Not serious in timely meeting contract terms & payments. Partial Defaulter Status ENFORCEMENT INSPECTIONS VIGILANCE AUDITS AGENCIES AAI ,DGCA,BCAS ,CISF , IAF, POLICE ,LABOUR &PF ,Water,Power,Pollution,Public Health &others VIPs & DIGNITARIES PRESS,MEDIA & CITIZENS APD & Team SCHE.AIRLINES (7 Station Managers) NON-SCHE.OPERATORS (9) Safe ,Secure and on time processing of aircrafts and passengers thru available infrastructure, equipments &Man Power.. Not serious in timely meeting contract terms & payments. Partial Defaulter Status GROUND HANDLING AGENCIES 4
  • 5. 6. PHYSICAL CHARACTERSTICS Designation,Length,Width,End Elevation,Surface,ACN/PCN, Frictional Value,Slopes,Shoulders, Turn Pad, Basic Strip, RESA, Clearances Stopway,TORA,TODA,ASDA Runway 6.1 To 6.17 Taxiway 7.1 To 7.4 Apron 8.1 To 8.6 9. VISUAL AIDS FOR NAVIGATIONAL MARKINGS Runway 9.1 (A) To (K) Taxiway 9.2 (A) To (E) Apron 9.3 (A) To (C) 10.4 Landing T 10.5 Wind Direction Locator 10.6 Approach Lighting ( a ) Runways ( b) Lead Lights 10.7 Emergency Lighting /Secondary Power Supply to meet the type of operation 13.1 OBSTACLE LIMITATION SURFACE 13.1 (a) to (d) Objects in Operational Are a & their Frangible Type 13.2 -Obstacles 9.4 OTHER MARKINGS (a) Road holding position (b) VOR Aerodrome Check Point (c ) Altimeter Check Point 9.5 Landing T Location 9.6 Wind Direction Indicator 9.7 Signal Square 9.8 Aerodrome Beacon 9.9 Aerodrome Identification Beacon 12. SIGNAGES 12.1 ( a) to (f) Mandatory Instructions Signs 12.2 (a) to (d) Information Signs 12.3 Aerodrome Identification Sign 12.4 Aerodrome Stand Identification Sign 11. VASI INDICATOR SYSTEM RUNWAY 11.1 to 11.30 14 .1 to 14.5 -RESCUE AND FIRE FIGHTING 15. GENERAL INFORMATION 15.1 Boundary Wall as per BCAS. 15.2 No of Access Gates 15.3 Drainage 15.4 Terminal Building Capacity 16. DOCUMENTS 16.1 Aerodrome Manual 16.3 Aerodrome Emergency Plan 16.4 Bird Hazard Reduction Plan 16.5 Apron Management Service 16.6 Aerodrome Vehicle Operations 16.7 Surface Movement & control COMPLIANCE STATUS OF CIVIL AVIATION REQUIREMENTS (CAR) 5
  • 6. S.No MOU PARAMETERS Unit Wtg % age Target 2012-13 Targets on 5 Point Scale 1 1. a) STATIC FINANCIAL PARAMETERS Financial Indicators-Profit i) Gross margin/Gross Sales ii) Operating Turnover/Employee %age Rs in lakhs 10 12 45.01 34.64 47.26 36.37 b) Financial Indicators –Size Related i) Gross Margin ii) Gross Sales Rs in crores 8 4 2833.49 6295.17 2975.16 6609.93 c) Financial Returns –Productivity Related i) PBDIT/Total Employment ii) Added value/sales Rs.in lakhs % age 7 9 16.06 35.74 16.86 37.53 2. DYNAMIC PARAMETERS d) e) f) g) Customer Satisfaction HRM Project Implementation Submission of Data for PE Survey % age Date 10 5 5 1 h) g) i) Corporate Governence Compliance of New Guidelines Land encroachment –Filing of land eviction % of cases filed 1 1 90% 100% k) Implementation of Web based Grievance Redressal Mechanism Date 2 90% by March,13 MOU Parameters 6
  • 7. S.No PARAMETERS Unit Wtg % age Target 2012-13 Targets on 5 Point Scale 1 1. g) SECTOR SPECIFIC PARAMETERS Birds Strikes Rate Per 10 K A/C M 0.5 0,5 0.48 h) Aircraft Seperation Infringement Per 100k A/C M 0.5 1.00 0.95 i) Availability of Navigation & Surveillance Aids % age 0.5 99.80 99.85 j) Runway Incursion /Excursion Per 10 k A/C M 0.5 1.0 0.95 4. ENTERPRISE SPECIFIC PARAMETERS k) Non Aeronautical Revenue Cargo Rs in crores 2 272.73 286.36 l) Non Aeronautical Revenue Commercial Rs in crores 2 1687.47 1771.84 m) Research and Development - 5 Details as per Annexure n) Sustainable Development 5 o) Corporate Social Responsibility 5 MOU Parameters 7
  • 8. 1.Ground Transportation to/from Airport 2.Parking facilities 3.Parking facilities value for money 4.Availability of baggage trolleys 5.Waiting Time in check in queue /line 6.Efficiency of check in staff 7.Courtesy and help fullness of check in staff 8.Waiting time for passport /personal ID inspection 9.Courtesy and help fullness of inspection staff 10.Courtesy and help fullness of security staff 11.Thoroughness of security inspection 12.Waiting Time for security inspection 13.Feeling of being safe and secure 14.Ease of finding your way through airport 15.Flight information screens 16.Walking distance inside the terminal 17.Ease of making connections with other flights 18. Courtesy and help fullness of airport staff 19. Restaurant / eating facilities 20. Restaurant facilities value for money 21.Availability of Bank/ATM facilities/money changers 22.Shopping facilities 23. Shopping facilities value for money 24.Internet access/value for money 25.Business /Executive Lounges 26.Availability of wash Rooms /toilets 27.Cleanliness of wash Rooms /toilets 28.Comfort of waiting /gate areas 29.Cleanliness of terminal 30.Ambiance of airport 31.Arrivals passport & Visa inspection 32.Speed of baggage delivery service 33. Customs inspection AIRPORT SERVICE QUALITY(ASQ) Parameters 8
  • 9. 9
  • 10. 10 Pune Airport – Aircraft Traffic During Last 8 Years Pune Airport – Passenger Traffic During Last 8 Years
  • 11. PUNE INDORE BANGALORE MUMBAI AHMEDABAD DELHI NAGPUR HYDERABAD CHENNAI GOA KOCHI CITIES CONNECTED TO PUNE (13 nos) FRANKFURT(2,5,6,7 ) DUBAI(1,4,6) 11 JAIPUR Airlines(7) : AI,AI Xp, Lufthansa, Indigo,Jet,Spice,Go Av.daily Sch flt. ops: 86 (43+43) Av daily Pax ; 9000 No of Pax during 2011-12 : 3.32 millions No of acft ops during 11-12: 30,968 Pax incresae frm 10-11 to 11-12: 17.98 % 1
  • 12. 12 PROPOSED MASTER PLAN FOR PUNE AIRPORT
  • 13. FINANCIAL PERFORMANCE : FOR SIX YEARS
  • 14. 14 ( Rs In Lakhs) PARTICUL ARS 2005-06 2006- 07 2007-08 2008-09 2009-10 2010-11 2011- March 12 2012-13 1 3 4 5 6 7 8 9 10 REVENUE 2039.38 3201.49 3667.74 4414.22 5598.06 6583.74 7784.46 8380.24 EXPENDIT URE 511.74 1216.82 3361.97 2057.82 3053.66 3325.00 3896.01 5030.47 OP. PROFI T 1527.64 1984.67 305.77 2356.40 2544.40 3258.74 3888.45 3349.77* * Provisional Subject to final reconciliation with RHQ records. FINANCIAL PERFORMANCE : OVERALL- PUNE AIRPORT
  • 15. TERMINAL MANAGEMENT 1.TRIPLE ISO CERIFICATION –.QUALITY MANAGEMENT SYSTEM-QMS-(ISO 9001- 2008) –CERTIFICATE FOR UPGRADED FROM ISO 9001-2000 RECEIVED ON 07-03-11 - ENVIRONMENTAL MANAGEMENT SYSTEM- EMS(ISO 14001-2004). -OPERATIONAL HEALTH AND SAFETY ASSESSMENT SERIES-OHSAS(ISO 18001-2007)- 2.AS PER ASQ SURVEY FOR OCTOBER-DECEMBER-2011 PUNE AIRPORT WITH A SCORE OF 4.17 (Terminal Management Conservancy &Upkeep by our redeployed AAI staff with out any outsourcing)) HAS BEEN DECLARED AS THE BEST AMONG AAI AIRPORTS 15
  • 16. TYPES OF PLANS NAME OF THE PLAN PREPARED BY STATUS Contingency plan to deal with Hijacking and unlawful interference with civil aviation IAF IAF has forwarded updated plan to BCAS for approval. Bomb Threat Contingency Plant AAI Approved by BCAS vide letter No. CAS- 607/Trg/GP ‘E’ dated 11.3.2010. Disabled aircraft removal plan AAI and submitted to IAF Presentation given by IAF to AAI and Airlines operating at Pune Airport and same is forwarded by them to IAF Hqrs., for consideration. Airport Emergency Plan AAI and submitted to IAF Presentation given by IAF to AAI and Airlines operating at Pune Airport and same is forwarded by them to IAF Hqrs., for consideration. Crisis Management Plan CISF Approved by Collector, Pune. Airport Security Programme AAI Approved by BCAS vide letter No. CAS-6/(6)/2008- Div.IIIB(ASP PUNE) dated 11.9.2009. 16
  • 17. TYPES OF MEETINGS HELD NAME OF THE MEETING CHAIRPERSON SCHEDULED FREQUENCY LAST MEETING HELD ON NEXT MEETING PROPOSED Aerodrome Committee Meeting AOC, IAF Once in 06 months 03.01.2013 -- Airport Advisory Committee Meeting Member of Parliament of Airport constituency Once in 06 months 09.03.2012 -- Flying Environmental safety Committee Meeting AOC, IAF Once in 03 months 28.01.2013 -- Airport Security Committee Meeting Airport Director, AAI Once in a month 16.1.2013 20.2.2013 Airport Coordination Committee Meeting Airport Director, AAI Once in a month 23.1.2013 27.2.2013 17
  • 18. TYPES OF DRILLS CARRIED OUT NAME OF THE EXERCISE RESPONSIBILITY OF CONDUCTING EXERCISE FREQUENCY LAST EXERCISE HELD ON NEXT EXERCISE PROPOSED ON Anti Hijacking Mock up exercise IAF Once a year 17.9.2012 -- Airport Emergency exercise :- evacuation of terminal in emergencies such as Fire, bomb threat. AAI/ BDDS Once a year 26.5.2012 Full scale emergency exercise involving an aircraft IAF Once a year -- -- Bomb threat to aircraft (in the event an actual bomb threat situation has not occurred during a period of one year) IAF Once a year -- -- 18
  • 19. CONSTRAINTS FACED AT PUNE AIRPORT Pune Airport is the 10 th busiest with 3.4 million annual pax traffic & daily handling 86 aircrafts & 8000 passenger movements round the clock and it has recorded an annual growth of 17 % .it is an IAF controlled Civil Enclave & operating in 26 acres of land only. 1. UN AVAILABILITY OF LAND FOR FURTHER EXPANDING INFRASTRUCTURE on apron side for additional Parking for Aircrafts ,GHA ,Office & Cargo & additional facilities for Passengers in Terminal Building & City side  Housing for Employees of AAI (307)& CISF(316) &offices 2.Restrictions by IAF on civil operations during prime morning and evening hours & on Saturdays from 10 30 hrs to 17 00 hrs and some times continuing IAF fighter training during civil operations also. Dependence on IAF for various clearances. 3. FACTORS AFFECTING OPERATION OF COMMERCIAL /CONCESSIONAIRES CONTRACTS FOR PASSENGER FACILITATION. i) Security Pune Airport is a major IAF base and categorized as hyper sensitive & mostly on high alert , for meeting security observations of BCAS,CISF, Police some times frequent /sudden shifting or complete removing AAI Concessionaires is required For Starting New Concessionaires /Shops in SHA BCAS Clearance is inordinately delayed/ not given due to some reasons. It results in premature cancellation of time bound contract agreements , revenue loss & unnecessary compensation demands from contractors, arbitration , poor response to future NITs discontent from passengers and users of airport and fall in ratings of airport. 19
  • 20.  Initial Delay in handling over location , shifting of location due to modification and expansion of building , change of passenger flow for decongesting & other reasons. Concessionaires want monopoly business , rivalry with other similar operators and seek for maximizing profits , discounts and less serious in fully meeting the time bound performance and financial terms of Contract Agreements. Brewing protests & disputes from contractors, indecision and penal actions by AAI affect smooth conduct of existing contracts , result in poor /no response in future NITs and fall in passenger and airport rating.  Loss of revenue & opportunities due non clearing of short term promotional proposals. 4. Maintaining and Improving with in the Available Infrastructure &Facilities thru our own 116 House keeping staff, Cordial HR ,Proper Prioritization , Participation ,Preventive and Swift Corrective Action by all the concerned 5. Passenger facilitation and Responding promptly and courteously to their grievances by being available at the passenger at toilets, SHA & May I Help You Counters. Positioning. 6. Tackling Crisis situations ,Cordial and Tactful Interaction with Press ,Media and Citizens protect functioning of AAI in specific and over all image of all others associated with airport operations. 20
  • 21. AIRPORT MANAGEMENT MAIN FOCUS AREAS NEEDING DAILY INSPECTION AND MONITORING 21
  • 22. Civil Electrical ATM &CNS Boundary Wall Power Supply DVOR,Localiser ,Glide Path Antenas & NAV AID Equipments Basic Strip UG cables RESA Approach Lights Drainage PAPI Under Ground Culverts /crossings Runway ,Taxiway &Apron Edge &Insert Lights Perimeter Road Apron High Mast Lights Aircraft Pavements Runway, Taxiway, Apron & Isolation Bay Perimeter Lighting NAV Aid Buildings (DVOR,Glide Path , Localiser ) ATC Tower & Technical Block, Apron Control Tower Fire &Rescue Station Airside Operational Area 22
  • 23. 1. Availability of all details and drawings of Architectural ,Structural , water supply ,Drainage features & maintenance procedures and precautions for specialized items of work & on site identified water and drainage distribution pipes 2, General Structural Condition of RCC/Steel support columns ,Beams & Slab ,Truss members , joints , seating plates and bolts etc 3. Roofing sheet & False Ceiling Grid , ,Tiles, ACP cladding grid and sheeting 4. . Structural Glazing doors, partition frame work and glazing 5. Guard /Safety railing of Staircases & higher floors 6. Flooring condition for non slipperiness 7. . Drainage & Waste Disposal 8. .Status of dispersal of Rain water & Water Proofing of slab ,profile roofing ceiling façade on all sides, doors and glazing 9. Water Supply Suffiency , quality adequacy & Reliability 10. Toilets -Location ,Lay out ,Size , Number of Urinals , models ,drainage ,floor slope ,traps , WCs , waste disposal , Wash basins , Flushing cisterns ,sensors, soap dispensers, Hand driers , Partitions, Doors , Exhaust , Odour improving and fresheners 11. Finishing of walls, columns, glazing 12. Retiring Room s & Reserved Lounge Location, Lay out and furniture Terminal Building- Civil Components 23
  • 24. 1. Physical on site markers and drawings for Identifying layout and routing of power & data cables connecting all Electrical ,CNS instalations in Operational area & ATC, Technical Block , Equipment Room & Terminal Building 2. Power Supply suffiicency , adequacy , Reliability & back up 3. Electrical Protections like Earthing, Lightening & surge Protection 4. Status & Condition of incoming from Substation in to Terminal Building and out going distribution cables , conduits in slab, false ceiling and floor trenches 5. Switch Room s, Pannels , Distribution boards MCBS & AHU s 6. Water Supply pipes for Chilled water & Fire Protection, AC Ducts 7. Control of Water & Booster Pumps for A/C ,Fire fighting 8. AC functioning , comfort levels ,zoning control , air curtains, Fresh air and return air diffusers 9. Signages 10. Lighting fixtures 11.Status of Fire hydrants , smoke detectors ,alarms ,water sprinklers 12. Functioning and Safety mechanism of Escalators , Lifts 13. Functioning and Safety mechanism of Passenger Boarding Bridges Electrical Components 24
  • 25. 1.Physical on site markers and drawings for Identifying layout and routing of power & data cables connecting all CNS instalations in Operational area & ATC, Technical Block , Equipment Room & Terminal Building 2. CNS Equipment Room AOCC Room Location ,Lay out and equipments 3. EPBAX and Telephones ,Mobiles & RTs 4. Computer Net Works 5. X- Ray Machines &Monitors 6. DFMD &HHMDS 7. PA System 8. Flight Information Display System (FIDS) 9. Surveillance Cameras & CCTV System (CNS) Equipments 25
  • 26. 1. Information Directions, Speed Limit , Cautionary Signages from City Road to Airport Terminal & Pedestrian Crossings , signals 2. Approach Road to Airport Parking Areas for Vehicles & walk ways for pedestrians 3. Horticulture and greenary 4. Parking Areas for different types of vehicles (passengers, visitors, staff etc) 5. Access Control to area near Terminal Building by Police , CISF 6. Water Cooler ,Toilets & snack bar & other facilities Covered Waiting place for Passengers & Visitors 7. Alighting locations for vehicles , buses 8 .Gates & areas for airline enquiry ,ticketing counters for departing and Arriving passengers. 9. Flight Information, PA and Lighting 10. Electrical Substation CCR, A/C Plant Room, Chillers , water softening plant ,Fire Pump Room, UG & OH Water Tanks & Fire water Tanks 11. UG water Supply lines for general use and fire protection and drainage Route till STP City side Infrastructure 26
  • 27. APRON AREA • Structural Condition ( any holes, damage etc) • Cleanliness of Apron (FODs, Waste etc) • Cleanliness of Walking area used by passengers from departing side to aircraft parking bay and from parking bays to arriving hall • Movement of Ground handling vehicles affecting passenger movement • Lighting PUNE TERMINAL APRON AREA INSPECTION CHECK LIST 27
  • 28. Check-in Area •I-SYSTEMS •Lighting •AC •FIDS •PA System • X-ray •Conveyor -belt •Weigh scale •Snack bar &shops service •Water cooler •Toilet Water supply, flush, sensor, tap working &od0ur •II-CLEANING •Floor •False Ceiling •Glass •Seating Sec.Hold –I- G’Floor •I-SYSTEMS •Lighting •AC •DFMD •X-ray •FIDS •PA SYSTEM •Escalator & Lift •Water cooler •Snack bar &shops service •Toilet Water supply, flush, sensor, tap working &od0ur •II-CLEANING •Floor •False Ceiling •Glass •Seating Sec Hold-I F.’Floor •I-SYSTEMS •Lighting •AC •FIDS •PA SYSTEM •Water cooler •Snack bar &shops service •Toilet Water supply, flush, sensor, tap working &od0ur •II-CLEANING •Floor •False Ceiling •Glass •Seating Air side Corridor to apron &aircraft /Boarding Bridge •I-SYSTEMS •Lighting •AC •FIDS •PA SYSTEM •Escalator &Lift •II-CLEANING •Floor •False ceiling •Glass PUNE TERMINAL DEPARTING FLOW/AREA INSPECTION CHECK LIST 28
  • 29. Old Arrival Hall •I-SYSTEMS •Lighting •AC •FIDS •PA System •Conveyor -belt •Water cooler •Toilet Water supply, flush, sensor, tap working &od0ur •II-CLEANING •Floor •False Ceiling •Glass •Seating New Arrival Hall (F’.Floor) •I-SYSTEMS •Lighting •AC •X-ray •FIDS •PA SYSTEM •Water cooler •Toilet Water supply, flush, sensor, tap working &od0ur •II-CLEANING •Floor •False Ceiling •Glass •Seating New Arrival (G.’Floor) •I-SYSTEMS •Lighting •AC •Conveyor-belt •FIDS •PA SYSTEM •Water cooler •Car Rentals •Shops & Services •Toilet Water supply, flush, sensor, tap working &od0ur •II-CLEANING •Floor •False Ceiling •Glass •Seating Exit of Arriving Passngrs from Terminal to City side •I-SYSTEMS •Lighting •FIDS •Pre-paid Taxi, Auto Services/behaviour &passngrs difficulties observed •Snack bar ,shops &services •II-CLEANING •Floor •False ceiling •Glass •Garbage &waste PUNE TERMINAL ARRIVAL FLOW/AREA INSPECTION CHECK LIST 29

Notas do Editor

  1. al