Anúncio

SOP-05 FOR WORK AT HIGHT.doc

20 de Mar de 2023
Anúncio

Mais conteúdo relacionado

Anúncio

SOP-05 FOR WORK AT HIGHT.doc

  1. TATA STEEL BSL LIMITED STANDARD OPERATING PROCEDURES SOP No. TSBSL/SOP/UTL/05 Effective Date 01.01.2019 SOP DESC. Maintenance and Work At Hight Revision No. 00 Department Utility Section NCRM Prepared By Approved By Name & Designation: Rajanikant Sharma & Sr.Engineer Name & Designation:Anil Kumar Gupta & AGM Sign with date: Sign with date: Page 1 of 6 S.N. Activity (What) Associated Requirement/Hazards/Impact Responsibility (Who) Process/Tools/PPE’S (How) Remarks /Reference 1. General Safety Activities before Starting the job SAFETY: Accident due to unawareness, No use of safety appliances may cause injury. Site supervisor And Shift engineer 1. Written general clearance / work permit to be taken in form 2. All workmen will use safety shoes, safety helmets, safety goggles, and hand gloves. 3. Sop and hazards related training given to all workers. 4. Constant supervision will be there at site. 5. Availability of normal water at site ENVIRONMENT: Heavy Noise Area Site supervisor And Shift engineer Always use EAR MUF or EAR Plug Open Sitting Area Site supervisor And Shift engineer Beware of MONKEYS
  2. TATA STEEL BSL LIMITED STANDARD OPERATING PROCEDURES SOP No. TSBSL/SOP/UTL/05 Effective Date 01.01.2019 SOP DESC. Maintenance and Work At Hight Revision No. 00 Department Utility Section NCRM Prepared By Approved By Name & Designation: Rajanikant Sharma & Sr.Engineer Name & Designation:Anil Kumar Gupta & AGM Sign with date: Sign with date: Page 2 of 6 QUALITY: Site supervisor And Shift engineer 1. Clearance Form should be filled properly. 2. PPEs should be good and working condition Ensure the selection of right Tool’s as per the job . 2. Preparation before Job Startup. SAFETY: T B T Site supervisor And Shift engineer 3.Tool box training is conducted before job start. 4. Ensure All required Tools and PPE is available at Site in good condition. ENVIRONMENT: Sticky and dusty Site supervisor And Shift engineer 1. Breath Fresh Air TIME TO TIME. 2.Drink ORS if required Quality : Site supervisor And Shift engineer 1. Cordinate with the shift engineer before any adjustment in cooling water line valve to avoid any Break down. 2.Before stop the chilling machine a prior information give to the effected
  3. TATA STEEL BSL LIMITED STANDARD OPERATING PROCEDURES SOP No. TSBSL/SOP/UTL/05 Effective Date 01.01.2019 SOP DESC. Maintenance and Work At Hight Revision No. 00 Department Utility Section NCRM Prepared By Approved By Name & Designation: Rajanikant Sharma & Sr.Engineer Name & Designation:Anil Kumar Gupta & AGM Sign with date: Sign with date: Page 3 of 6 department if required. 3. Positive isolation Site supervisor And Shift engineer 1.Ensure electrical isolation If it is required. 2. Mechanical isolation = Isolate that particular air compressor from the whole system by closing the respective butterfly valve’s. 4. PRECAUTION At the time of Gas cutting work Safety: Flashback Arrestor (Flame Arrestor) Site supervisor And Shift engineer NEVER use a Gas cutting set without Flame Arrestor. FIRE EXTINGUISHER Site supervisor And Shift engineer Check Availability of required Fire extinguisher as per A B C D . Must Have to barricade the area by using barricading tape. BARRICATION Quality : HOT PASS Site supervisor And Shift engineer Always heat that surface before cutting. Quality of gas cutting depends Upon it.
  4. TATA STEEL BSL LIMITED STANDARD OPERATING PROCEDURES SOP No. TSBSL/SOP/UTL/05 Effective Date 01.01.2019 SOP DESC. Maintenance and Work At Hight Revision No. 00 Department Utility Section NCRM Prepared By Approved By Name & Designation: Rajanikant Sharma & Sr.Engineer Name & Designation:Anil Kumar Gupta & AGM Sign with date: Sign with date: Page 4 of 6 5. PRECAUTION At the time of Welding Work Safety: Earth Circuit Site supervisor And Shift engineer Always connect earth wire with same job on witch wilding is applied. NEVER make large circuit.
  5. TATA STEEL BSL LIMITED STANDARD OPERATING PROCEDURES SOP No. TSBSL/SOP/UTL/05 Effective Date 01.01.2019 SOP DESC. Maintenance and Work At Hight Revision No. 00 Department Utility Section NCRM Prepared By Approved By Name & Designation: Rajanikant Sharma & Sr.Engineer Name & Designation:Anil Kumar Gupta & AGM Sign with date: Sign with date: Page 5 of 6 6. About CRANE Operation Safety: MISS COMMUNICATIONS Site supervisor And Shift engineer 1.Never use Any Temporary lifting arrangement . 2.Alwayse only one person coordinate with the crane operator to avoid miss communications . 7. About SEAFTY BELT SAFETY: Site supervisor And Shift engineer Safety BELT MUST BEAR , AND ENSURE IT MUSEBE DOUBLE HUCKED 8. At the time of job closing ENVIRONMENT:- Cleanliness Around the Work place Site supervisor And Shift engineer No unwanted material / tool tackles shall be left over. Cleaning for the surrounding shall be done.
  6. TATA STEEL BSL LIMITED STANDARD OPERATING PROCEDURES SOP No. TSBSL/SOP/UTL/05 Effective Date 01.01.2019 SOP DESC. Maintenance and Work At Hight Revision No. 00 Department Utility Section NCRM Prepared By Approved By Name & Designation: Rajanikant Sharma & Sr.Engineer Name & Designation:Anil Kumar Gupta & AGM Sign with date: Sign with date: Page 6 of 6
Anúncio