Facilities Engineering
    Presentation

  M3 Engineering &
Technology Corporation
Overall Site Plan
Facilities Engineering Scope of Work

 §  Process Facilities
 §  Ancillary Facilities
 §  Civil Infrastructure
 §  Power Supply
 §  Fresh Water Supply & Distribution
Facilities Plan
Process Facilities
§  Sulfide Processing Plant
     §  75,000 DSTPD of Sulfide Ore
     §  1,350 DSTPD of Copper Concentrate
     §      15 DSTPD of Molybdenite Concentrate

§  Sulfide Circuit
     §  Primary Gyratory Crusher, Overland Conveyor, Stockpile
     §  SAG Mill & 2 Parallel Ball Mill Circuits
     §  Copper Flotation with Molybdenum Separation Circuit
     §  Concentrate Dewatering / Filtration
     §  Flotation Tailing dewatering, filtration, convey.
     §  Dry Stack Tailing Area
     §  Reagent Area
Process Facilities
§  Oxide Facility
     §  17,000 DSTPD of Oxide Ore by Leach
     §  Approx. 76,800 Pounds Per Day High Purity Cathode Copper

§  Oxide Circuit
     §  Leach Pad for Run of Mine Ore
     §  Raffinate and PLS Ponds
     §  Storm Water Pond
     §  Two Extraction and One Stripper Solvent Extraction Circuit
     §  Electro-winning Facility
     §  Reagent Area
Ancillary Facilities
            (Support Process & Mine)
§    Warehouse Facilities
§    Administration Building
§    Change Room
§    Analytical Laboratory
§    Mine Truck Shop with Tire Shop
§    Mine Truck Wash and Lubrication Facility
§    Gasoline & Diesel Fuel Storage & Dispensing Facilities
§    Ammonium Nitrate Silos and Explosives Magazines
§    Guard Facility with Truck Scale
Civil Infrastructure
§  Modifications to State Route 83 at Intersection with Mine East
       Access Road
§    East Access Road
§    Upgrades to USFS roads and private roads
§    New USFS connecting roads around Plant
§    Perimeter Road around Waste Rock & Dry Stack Tailing
       Facility
§  Overall Site Grading and Drainage
§  In-plant Roads
§  Initial Mine Haul Roads
Civil Infrastructure
§  North Storm Water Diversion Structure
§  Storm Water Diversion to Process Water Temporary Storage
   (PWTS)
§  Storm Water Diversions around Open Pit
§  Dry Stack Tailing Facility water management
§  Compliance – Point Water Management Structure
Power Supply and Distribution
§  Coordination with Tucson Electric Power (TEP)
§  Substation at TEP connection to step down voltage for Fresh
    Water System
§  Rosemont Substation (138 KV to 34.5 KV)
§  Distribution to Process Motor Control Rooms and other
    Facilities
Fresh Water Supply and Distribution
§    Well field
§    20 inch Water Delivery Line with Booster Stations
§    Fresh Water and Fire Water Tank at Process Facilities
§    Potable Water System with Water Treatment Package
§    Fresh Water System
§    Process Water System
§    Fire Water System
§    Pit Dewatering System
M3 EPCM Scope of Work
§  Project Management
§  Basic Engineering
§  Detail Engineering
§  Procurement
§  Construction Management
§  Commissioning
§  Start-Up Assistance
EPCM Status
§  Currently in Basic Engineering Phase
§  Started in May 2008, finish in April 2009
§  Basic Engineering Effort
    §  Update Deliverables with Better Scope Delineation
    §  Improve Quality of Information for update of Capital
        Estimate and Operating Estimate
    §  Finalize Criteria for Detailed Design Effort
§  Effort Currently Supported by Other Consultants:
    §    Geotechnical Services                 Tetra Tech
    §    Geotechnical Drilling Contract        Tetra Tech
    §    Dry Stack Tailings Facility           AMEC
    §    Heap Leach Facility                   Tetra Tech
Basic Engineering Deliverables
§    Project Procedures
§    Drawing, Specification, and Equipment Lists
§    Discipline Design Criteria
§    Major Equipment and Material Specifications
§    Flowsheets
§    General Arrangement Drawings
§    P&IDs
§    Electrical One-Lines
§    Civil Site Plan and Rough Grading Drawings
§    Architectural Drawings
§    Major Concrete Foundation Drawings (Mills)
§    Updated Capital Estimate and Operating Estimate
§    EPCM Schedule
Detail Engineering Phase
§  Planned start in February 2009
§  Engineering effort linked to forecasted availability of vendor
   information
§  Substantial Complete in July 2010
§  Engineering support will continue through construction

More Related Content

What's hot

Basics Of Electrical Wires & Cables - Residential & Commercial Projects
Basics Of  Electrical  Wires & Cables  - Residential & Commercial Projects Basics Of  Electrical  Wires & Cables  - Residential & Commercial Projects
Basics Of Electrical Wires & Cables - Residential & Commercial Projects
SSudhaVelan
 

What's hot (20)

Electrical services
Electrical servicesElectrical services
Electrical services
 
Basics Of Electrical Wires & Cables - Residential & Commercial Projects
Basics Of  Electrical  Wires & Cables  - Residential & Commercial Projects Basics Of  Electrical  Wires & Cables  - Residential & Commercial Projects
Basics Of Electrical Wires & Cables - Residential & Commercial Projects
 
CLADDING AND GLAZING.pptx
CLADDING AND GLAZING.pptxCLADDING AND GLAZING.pptx
CLADDING AND GLAZING.pptx
 
Water Supply
Water SupplyWater Supply
Water Supply
 
Design and Engineering-Module 6:Modular Design, Design Optimization, Internet...
Design and Engineering-Module 6:Modular Design, Design Optimization, Internet...Design and Engineering-Module 6:Modular Design, Design Optimization, Internet...
Design and Engineering-Module 6:Modular Design, Design Optimization, Internet...
 
Hot water-supply-system-presentation-slides(1)
Hot water-supply-system-presentation-slides(1)Hot water-supply-system-presentation-slides(1)
Hot water-supply-system-presentation-slides(1)
 
Moment of inertia of plane figures
Moment of inertia of plane figuresMoment of inertia of plane figures
Moment of inertia of plane figures
 
Air conditioning system
Air conditioning systemAir conditioning system
Air conditioning system
 
Ch03
Ch03Ch03
Ch03
 
Fire presentation
Fire presentationFire presentation
Fire presentation
 
Pipe materials and types of joints [autosaved]
Pipe materials and types of joints [autosaved]Pipe materials and types of joints [autosaved]
Pipe materials and types of joints [autosaved]
 
01 Water Resources, Water supply and Distribution system of water
01 Water Resources, Water supply and Distribution system of water01 Water Resources, Water supply and Distribution system of water
01 Water Resources, Water supply and Distribution system of water
 
Fans and blowers
Fans and blowersFans and blowers
Fans and blowers
 
Steel
SteelSteel
Steel
 
Plumbing system updated ppt
Plumbing system updated pptPlumbing system updated ppt
Plumbing system updated ppt
 
Pulley design
Pulley designPulley design
Pulley design
 
Cables and Cable Termination.docx
Cables and Cable Termination.docxCables and Cable Termination.docx
Cables and Cable Termination.docx
 
Design of Springs
Design of SpringsDesign of Springs
Design of Springs
 
ppt of thermal insulating materials
ppt of thermal insulating materialsppt of thermal insulating materials
ppt of thermal insulating materials
 
System of wiring
System of wiringSystem of wiring
System of wiring
 

Similar to Facilities Engineering Presentation

4.BLC IPOP -7th August 2014 - Post Session Update -8.8.14
4.BLC IPOP -7th August 2014 - Post Session Update -8.8.144.BLC IPOP -7th August 2014 - Post Session Update -8.8.14
4.BLC IPOP -7th August 2014 - Post Session Update -8.8.14
Kristipoom R-khubut
 
Zach Maddox - CV 2016 May 01
Zach Maddox - CV 2016 May 01Zach Maddox - CV 2016 May 01
Zach Maddox - CV 2016 May 01
Zachary Maddox
 
Capabilities and resources
Capabilities and resourcesCapabilities and resources
Capabilities and resources
Martin de Beer
 
Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012
Richard Turnbull
 
Natural Gas an Inside Propective 2-19-14
Natural Gas an Inside Propective 2-19-14Natural Gas an Inside Propective 2-19-14
Natural Gas an Inside Propective 2-19-14
James M. Bright, P.E.
 
Basics of Hydro power plant
Basics of  Hydro power plant Basics of  Hydro power plant
Basics of Hydro power plant
Prasad Vejendla
 
Permitting and Hydraulic Fracturing, Leslie Savage
Permitting and Hydraulic Fracturing, Leslie SavagePermitting and Hydraulic Fracturing, Leslie Savage
Permitting and Hydraulic Fracturing, Leslie Savage
TXGroundwaterSummit
 
19-07-06 Scheme Description details
19-07-06 Scheme Description details19-07-06 Scheme Description details
19-07-06 Scheme Description details
Aonghus Murray
 

Similar to Facilities Engineering Presentation (20)

Cv of mr.Jefferson Tomas Tulabot
Cv of mr.Jefferson Tomas TulabotCv of mr.Jefferson Tomas Tulabot
Cv of mr.Jefferson Tomas Tulabot
 
Dariush.resume
Dariush.resumeDariush.resume
Dariush.resume
 
4.BLC IPOP -7th August 2014 - Post Session Update -8.8.14
4.BLC IPOP -7th August 2014 - Post Session Update -8.8.144.BLC IPOP -7th August 2014 - Post Session Update -8.8.14
4.BLC IPOP -7th August 2014 - Post Session Update -8.8.14
 
Zach Maddox - CV 2016 May 01
Zach Maddox - CV 2016 May 01Zach Maddox - CV 2016 May 01
Zach Maddox - CV 2016 May 01
 
The GBHE Project Experience
The GBHE Project ExperienceThe GBHE Project Experience
The GBHE Project Experience
 
Capabilities and resources
Capabilities and resourcesCapabilities and resources
Capabilities and resources
 
Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012Richard Turnbull CV Supplement 2012
Richard Turnbull CV Supplement 2012
 
Blue mountains cascade dam- Horizontal direction drill
Blue mountains cascade dam- Horizontal direction drillBlue mountains cascade dam- Horizontal direction drill
Blue mountains cascade dam- Horizontal direction drill
 
Tushar resume
Tushar resumeTushar resume
Tushar resume
 
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
Keeping Wastewater Flowing while managing major capital works for NI Water, 9...
 
Introduction to power plant
Introduction to power plantIntroduction to power plant
Introduction to power plant
 
Ground Investigation by Horizontal Directional Drilling
Ground Investigation by Horizontal Directional DrillingGround Investigation by Horizontal Directional Drilling
Ground Investigation by Horizontal Directional Drilling
 
Tabnak Drilling Management
Tabnak Drilling ManagementTabnak Drilling Management
Tabnak Drilling Management
 
Natural Gas an Inside Propective 2-19-14
Natural Gas an Inside Propective 2-19-14Natural Gas an Inside Propective 2-19-14
Natural Gas an Inside Propective 2-19-14
 
Basics of Hydro power plant
Basics of  Hydro power plant Basics of  Hydro power plant
Basics of Hydro power plant
 
Permitting and Hydraulic Fracturing, Leslie Savage
Permitting and Hydraulic Fracturing, Leslie SavagePermitting and Hydraulic Fracturing, Leslie Savage
Permitting and Hydraulic Fracturing, Leslie Savage
 
Small Hydro Training Module
Small Hydro Training ModuleSmall Hydro Training Module
Small Hydro Training Module
 
19-07-06 Scheme Description details
19-07-06 Scheme Description details19-07-06 Scheme Description details
19-07-06 Scheme Description details
 
Cv english
Cv englishCv english
Cv english
 
 

More from Hudbay Minerals Inc.

More from Hudbay Minerals Inc. (20)

Well Protection Program - Groundwater Modeling Presentation
Well Protection Program - Groundwater Modeling PresentationWell Protection Program - Groundwater Modeling Presentation
Well Protection Program - Groundwater Modeling Presentation
 
Rosemont Copper Cooperating Agencies - 2009
Rosemont Copper Cooperating Agencies - 2009Rosemont Copper Cooperating Agencies - 2009
Rosemont Copper Cooperating Agencies - 2009
 
Rosemont Copper - Mining Law of 1872
Rosemont Copper - Mining Law of 1872Rosemont Copper - Mining Law of 1872
Rosemont Copper - Mining Law of 1872
 
Rosemont Copper - Tailings: Reused Mine Rock
Rosemont Copper - Tailings: Reused Mine RockRosemont Copper - Tailings: Reused Mine Rock
Rosemont Copper - Tailings: Reused Mine Rock
 
Rosemont Copper Dry Stack Presentation 2009
Rosemont Copper Dry Stack Presentation 2009Rosemont Copper Dry Stack Presentation 2009
Rosemont Copper Dry Stack Presentation 2009
 
Dry Stack Tailings Overview
Dry Stack Tailings OverviewDry Stack Tailings Overview
Dry Stack Tailings Overview
 
Rosemont Reclamation Plan July 2007
Rosemont Reclamation Plan July 2007Rosemont Reclamation Plan July 2007
Rosemont Reclamation Plan July 2007
 
Reclamation Requirements
Reclamation RequirementsReclamation Requirements
Reclamation Requirements
 
Reclamation Examples - Before and After
Reclamation Examples - Before and AfterReclamation Examples - Before and After
Reclamation Examples - Before and After
 
Partial Pit Backfill Alternative
Partial Pit Backfill AlternativePartial Pit Backfill Alternative
Partial Pit Backfill Alternative
 
Regional Groundwater Flow Models
Regional Groundwater Flow ModelsRegional Groundwater Flow Models
Regional Groundwater Flow Models
 
Baseline Traffic Study
Baseline Traffic StudyBaseline Traffic Study
Baseline Traffic Study
 
Baseline Noise Study
Baseline Noise StudyBaseline Noise Study
Baseline Noise Study
 
Heap Leach Facilities
Heap Leach FacilitiesHeap Leach Facilities
Heap Leach Facilities
 
Geotechnical Study
Geotechnical StudyGeotechnical Study
Geotechnical Study
 
Mine Rock Geochemistry and Pit Lake Model
Mine Rock Geochemistry and Pit Lake ModelMine Rock Geochemistry and Pit Lake Model
Mine Rock Geochemistry and Pit Lake Model
 
Rosemont Project Orientation
Rosemont Project OrientationRosemont Project Orientation
Rosemont Project Orientation
 
Water Supply Plan & Hydrogeology "Westside Presentation"
Water Supply Plan & Hydrogeology "Westside Presentation"Water Supply Plan & Hydrogeology "Westside Presentation"
Water Supply Plan & Hydrogeology "Westside Presentation"
 
Rosemont Project Hydrogeology & Water Supply
Rosemont Project Hydrogeology & Water SupplyRosemont Project Hydrogeology & Water Supply
Rosemont Project Hydrogeology & Water Supply
 
Aquifer Protection Permitting: Rosemont Mine
Aquifer Protection Permitting:  Rosemont MineAquifer Protection Permitting:  Rosemont Mine
Aquifer Protection Permitting: Rosemont Mine
 

Recently uploaded

Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
negromaestrong
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
SanaAli374401
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
QucHHunhnh
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
heathfieldcps1
 

Recently uploaded (20)

Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
 
ICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptxICT Role in 21st Century Education & its Challenges.pptx
ICT Role in 21st Century Education & its Challenges.pptx
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writing
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 

Facilities Engineering Presentation

  • 1. Facilities Engineering Presentation M3 Engineering & Technology Corporation
  • 3. Facilities Engineering Scope of Work §  Process Facilities §  Ancillary Facilities §  Civil Infrastructure §  Power Supply §  Fresh Water Supply & Distribution
  • 5. Process Facilities §  Sulfide Processing Plant §  75,000 DSTPD of Sulfide Ore §  1,350 DSTPD of Copper Concentrate §  15 DSTPD of Molybdenite Concentrate §  Sulfide Circuit §  Primary Gyratory Crusher, Overland Conveyor, Stockpile §  SAG Mill & 2 Parallel Ball Mill Circuits §  Copper Flotation with Molybdenum Separation Circuit §  Concentrate Dewatering / Filtration §  Flotation Tailing dewatering, filtration, convey. §  Dry Stack Tailing Area §  Reagent Area
  • 6. Process Facilities §  Oxide Facility §  17,000 DSTPD of Oxide Ore by Leach §  Approx. 76,800 Pounds Per Day High Purity Cathode Copper §  Oxide Circuit §  Leach Pad for Run of Mine Ore §  Raffinate and PLS Ponds §  Storm Water Pond §  Two Extraction and One Stripper Solvent Extraction Circuit §  Electro-winning Facility §  Reagent Area
  • 7. Ancillary Facilities (Support Process & Mine) §  Warehouse Facilities §  Administration Building §  Change Room §  Analytical Laboratory §  Mine Truck Shop with Tire Shop §  Mine Truck Wash and Lubrication Facility §  Gasoline & Diesel Fuel Storage & Dispensing Facilities §  Ammonium Nitrate Silos and Explosives Magazines §  Guard Facility with Truck Scale
  • 8. Civil Infrastructure §  Modifications to State Route 83 at Intersection with Mine East Access Road §  East Access Road §  Upgrades to USFS roads and private roads §  New USFS connecting roads around Plant §  Perimeter Road around Waste Rock & Dry Stack Tailing Facility §  Overall Site Grading and Drainage §  In-plant Roads §  Initial Mine Haul Roads
  • 9. Civil Infrastructure §  North Storm Water Diversion Structure §  Storm Water Diversion to Process Water Temporary Storage (PWTS) §  Storm Water Diversions around Open Pit §  Dry Stack Tailing Facility water management §  Compliance – Point Water Management Structure
  • 10. Power Supply and Distribution §  Coordination with Tucson Electric Power (TEP) §  Substation at TEP connection to step down voltage for Fresh Water System §  Rosemont Substation (138 KV to 34.5 KV) §  Distribution to Process Motor Control Rooms and other Facilities
  • 11. Fresh Water Supply and Distribution §  Well field §  20 inch Water Delivery Line with Booster Stations §  Fresh Water and Fire Water Tank at Process Facilities §  Potable Water System with Water Treatment Package §  Fresh Water System §  Process Water System §  Fire Water System §  Pit Dewatering System
  • 12. M3 EPCM Scope of Work §  Project Management §  Basic Engineering §  Detail Engineering §  Procurement §  Construction Management §  Commissioning §  Start-Up Assistance
  • 13. EPCM Status §  Currently in Basic Engineering Phase §  Started in May 2008, finish in April 2009 §  Basic Engineering Effort §  Update Deliverables with Better Scope Delineation §  Improve Quality of Information for update of Capital Estimate and Operating Estimate §  Finalize Criteria for Detailed Design Effort §  Effort Currently Supported by Other Consultants: §  Geotechnical Services Tetra Tech §  Geotechnical Drilling Contract Tetra Tech §  Dry Stack Tailings Facility AMEC §  Heap Leach Facility Tetra Tech
  • 14. Basic Engineering Deliverables §  Project Procedures §  Drawing, Specification, and Equipment Lists §  Discipline Design Criteria §  Major Equipment and Material Specifications §  Flowsheets §  General Arrangement Drawings §  P&IDs §  Electrical One-Lines §  Civil Site Plan and Rough Grading Drawings §  Architectural Drawings §  Major Concrete Foundation Drawings (Mills) §  Updated Capital Estimate and Operating Estimate §  EPCM Schedule
  • 15. Detail Engineering Phase §  Planned start in February 2009 §  Engineering effort linked to forecasted availability of vendor information §  Substantial Complete in July 2010 §  Engineering support will continue through construction