SPOOL TRACKING SYSTEM

  1. 1. KHURAIS-GOSP PROJECT SPOOLS TRACKING SYSTEM
  2. 2. Programmed by : Renee Gatdula Spool Tracking System“Special Kind of Tool” Gathered Data’s from: SPOOLGEN – Master Listing of Plan Spools PTS – Master File of Plan/Done, PK/PF (Shop/Field Weld) in Dia-inch. GEMAPI – Master file of Issued Material TEDFLOW – Master file of Hydrotest Status (Testpack/Laid-up/Re-ins.) Gives Information and Data’s of: QC Fabrication – Date Released from the Fabrication. Material Controller – Date’s/Ref. of Spools for FBE(Liquid Coating),NDT QC/Painting Department – Date Released from Painting Department Testpack – Status of testpack per Line Number on Weld done/ Test Date Re-Instated – Date Re-ins. Material Issuance – Date release to site for installation LAID-UP – Date Laid-up Author by : Nicola Negri
  3. 3. This is the Main Screen HEADER’S DESCRIPTION 1. TEST PACKAGE NO 2. P.I.D NO 3. LINE NUMBER 4. SPOOL NO 5. LINE Dia. (Average Diameter of the Spool) 6. PIPING CLASS (Base Material of the Spool) 7. Fab PK Plan (Dia-inch Plan as per Welding Map –Shop Welding) 8. Fab PK Done (Fabrication status if shop weld is done) 9. Fab QC Date Release 10. FBE Ref No (Document Reference for Internal FBE Coating) 11. FBE Date Send (Date of the Spool send fro FBE Coating) 12. FBE Date Received (Date of the Spool received from FBE Coating) 13. QC Paint Rel. Date (Date of the Spool Released from Painting Department) 14. LAYDOWN/ISS DATE (Date Issued/Received to WORKSITE) 15. SITE PF PLAN (Plan Field Welding as per Welding Map) 16. SITE PF DONE (Actual Field Welded Done as per PTS – Pipe Trucking System) 17. PTS Progress (Status of Weld done) 18. FAB SOP (Fabrication SCOPE OF WORK – if/or send to SUBCON)
  4. 4. FILTER DATA BY TEST PACKAGE DATAS: ALL OF THE LINE NUMBER/SPOOL NO UNDER TESTPACK NO 0123 WILL BE FILTERED AND SHOWN ON SCREEN. FROM THIS POINT OF VIEW YOU CAN SEE/ANALYSE THE STATUS OF YOUR TESTPACK NO 0123 PER LINE NUMBER BY SPOOL NO.
  5. 5. PRINTING SUMMARY REPORT BY TESTPACK
  6. 6. SUMMARY REPORT OF TESTPACK (TESTED, LAID-UP, RE-INSTATED) ON SCREEN WILL APPEAR THE SUMMARY REPORT LAID-UP DATE RE-INSTATED DATE And some Info’s TESTED DATE
  7. 7. SAMPLE ON SCREEN AND PRINT-OUT OF THE SUMMARY REPORT BY TESTPACK
  8. 8. FILTER DATA BY LINE NUMBER ALL OF THE INFORMATION REGUARDING LINE NUMBER B32-SR-0378 WILL BE DISPLAY ON SCREEN. TAKE NOTE OF THE TESTPACK NUMBER- IN ONE LINE NUMBER THERE MAYBE 2 OR 3 TESTPACK NO.
  9. 9. SAMPLE ON SCREEN AND PRINT-OUT OF THE SUMMARY REPORT BY LINE NUMBER
  10. 10. SAMPLE ON SCREEN AND PRINT-OUT OF THE SUMMARY REPORT BY LINE NUMBER

×