What is pointing?
• It is the art of finishing the mortar joints in
exposed brick or stone masonry with suitable
cement or lime mortar, in order to protect
the joints from weather effects and also to
improve the appearance of building structure.
• Often an entire wall, or even a whole
structure, is pointed because defective points
cannot easily be detected, and adjacent joints
may also be in need of repair. The mortar is
packed tightly in thin layers and tooled to a
smooth, concave, finished surface.
Scope of pointing
• Maintaining the joints of the structures.
• Pointing being cheap can be adopted in places
of low rainfall.
• Where the natural beauty of materials, viz.,
stone blocks, bricks etc, is desired to be
exhibited.
• Gives resisting power to the bricks and stones
used in construction towards weather
conditions.
Method of pointing
• All the mortar joints (on the masonry face required to be
pointed) are raked out by a special pointing tool to a depth
of 15 to 20 mm, so as to provide an adequate key for the
fresh mortar used for pointing.
• All the loose mortar and dust are removed by brushes
• The joints and wall surface are washed with clean water,
and then kept wet for few hours.
• The joints so prepared, are filled with suitable mortar with
a small trowel. The mortar is well pressed into the joints to
form a close contact with the old interior mortar joints. All
excess mortar sticking to the sides is scraped away.
• The finished pointing work is kept wet for about 3 days
when lime mortar is used for pointing and for 10 days
when cement mortar is used for pointing.
What is plastering?
• Plastering is the process of covering rough walls and
uneven surfaces in the construction of houses and
other structures with a plastic material, called plaster
or mortar.
Objective of plastering
• To provide an even, smooth, regular, clean and
durable finished surface with improved appearance.
• To preserve and protect the surface.
• To cover up the use of inferior quality and porous
materials of the masonry work.
• To conceal defective workmanship.
Requirement of the good
plaster
• It should be hard and durable.
• It should be possible to apply it during all weather
conditions.
• It should adhere to the background and should remain
adhered during all climatic changes.
• It should be cheap and economical.
• It should offer good insulation against sound and high
resistance against fire.
• It should effectively check the entry or penetration of
moisture from the surfaces.
Method of plastering
(general)
• The plaster may be applied in one or more coats, but the
thickness of a single coat should not exceed 12 mm.
• In the case of inferior or cheaper type of construction,
the plaster may usually be one coat. For ordinary type of
construction, the plaster is usually applied in two coats,
whereas for superior type of works it is applied in three
coats.
• The final setting coat should not be applied until the
previous coat is almost dry.
• The previous surface should be scratched or roughened
before applying the next coat of plaster.
• In plastering, the plaster mix is either applied by
throwing it with great force against the walls or by
pressing it on the surface.
Types of plasters
• Lime plaster
 Lime plaster is a mixture of calcium hydroxide and sand
(or other inert fillers) in 1: 1 ratio.
 Carbon dioxide in the atmosphere causes the plaster to
set by transforming the calcium hydroxide into calcium
carbonate (limestone).
 In order to improve building properties of lime plaster ,
gugal (a kind of fragrant gum) @ 1.6 kg/m3 of mortar , is
added when the mortar is being ground.
 In order to improve adhesive and tensile properties of
lime mortar, sometimes, small quantities of chopped
hemp (i.e., vegetable fibres) @ 1kg/m3 are added to the
lime mortar.
 The lime mortar thus prepared is usually kept for 2 days
before use.
• Cement plaster:
 Cement and sand in required proportions ( 1:3 or 4) are first
thoroughly mixed in dry conditions and then water is added to
form a paste of required consistency.
 Generally it is mixture sand, portland cement and water mixed in a
suitable proportion.
 This prepared mortar for plastering should be consumed within 30
minutes after the addition of water.
• Gypsum plaster (plaster of Paris)
 Gypsum plaster, or plaster of Paris, is produced by heating
gypsum to about 300 °F (150 °C).
2CaSO4·H2O + Heat → 2CaSO4·½H2O + H2O (released as steam)
 When the dry plaster powder is mixed with water, it re-forms
into gypsum. The setting of unmodified plaster starts about
10 minutes after mixing and is complete in about 45 minutes
but not fully set for 72 hours.
• Water proof plaster of Mortar:
 This mortar consists of 1 part of cement, 2 parts of sand and
pulverised alum @ 12 kg/m3 of sand. To this dry mix , the soap
water containing about 75 g of soft soap/L of water , is added to
obtain the waterproof mortar.
• Heat resistant plasters
 It's purpose is to replace conventional gypsum plasters in cases
where the temperature can get too high for gypsum plaster to
stay on the wall.
 Heat resistant plaster should be used in cases where the wall is
likely to exceed temperatures of 50°C .
 Heat resistant plaster is a building material used for coating
walls and chimney breasts.
Defects in plastering
The following defects may arise in the plaster work:
 Blistering of plastered surface: This is the
formation of small patches of plaster swelling out
beyond the plastered surface, arising out of late
slaking of lime particles in the plaster.
 Cracking: it is the formation of cracks in the plaster
work due to the following reasons:
 Structural defects in building
 Movements in the background due to its thermal
expansion or rapid drying
 Movements in the plaster surface itself, either due
to expansion or shrinkage.
• Efflorescence: It is the whitish crystalline substance which
appears on the surface due to presence of salts in plaster
making materials. It affects the adhesion of paint with wall
surface. Efflorescence can be removed to some extent by
dry brushing and washing the surface repeatedly.
• Flaking: It is the formation of very loose mass of plastered
surface, due to poor bond between successive coats.
• Peeling: It is the complete dislocation of some portion of
plastered surface, resulting in the formation of a patch. This
also results from imperfect bond.
• Popping: It is the formation of conical hole in the plastered
surface due to presence of some particles which expand on
setting.
Brick masonry
 Brick masonry is built with bricks bonded
together with mortar. For temporary sheds mud
mortar may be used but for all permanent
buildings lime or cement mortars are used.
 The various types of bonds generally used in
brick masonry are:
1. Stretcher bond
2. Header bond
3. English bond and
4. Flemish bond.
Stretcher bond
• A stretcher is the longer face of the brick as seen
in the elevation. In the brick of size 190 mm ×
90 mm × 90 mm, 190 mm × 90 mm face is the
stretcher. In stretcher bond masonry all the
bricks are arranged in stretcher courses.
• However care
should be taken to
break vertical
joints. This type of
construction is
useful for the
construction half
brick thick
partition wall.
Header bond
• A header is the shorter face of the brick as seen
in the elevation. In a standard brick it is 90 mm ×
90 mm face. In header bond brick masonry all
the bricks are arranged in the header courses as
shown in Fig. This type of bond is useful for the
construction of one brick thick walls.
English bond
• In this alternate courses consist of headers and
stretchers. This is considered to be the strongest
bond. Hence it is commonly used bond for the
walls of all thicknesses. To break continuity of
vertical joints a brick is cut lengthwise into two
halves and used in the beginning and end of a wall
after first header. This is called queen closer.
Figure shows typical one brick and one and half
brick thick wall with English bond.
Flemish bond
• In this type of bond each course comprises of alternate header
and stretcher figure. Alternate courses start with stretcher and
header. To break the vertical joints queen closers are required, if
a course starts with header. Every header is centrally supported on
the stretcher below it.
• Flemish bonds may be further classified as:
I. Double Flemish Bond
II. Single Flemish Bond.
• In case of double flemish bond, both faces of the wall have
flemish look, i.e. each course consist of alternate header and
stretcher, whereas single flemish bond outer faces of walls have
flemish look whereas inner faces have look of English bond [Fig
(a), (b)].
• Construction of flemish bond needs greater skill. It gives more
pleasing appearance. But it is not as strong as English bond. If
only pointing is to be used for finished wall, flemish bond may be
used to get good aesthetic view. If plastering is going to be used, it
is better to use English bond.
Advantages and Disadvantages of
Brick Masonry Over Stone Masonry
Advantages:
1. Since shape and size of bricks are uniform, it do not need skilled labour
for the construction.
2. Bricks are light in weight and hence handling them is easy.
3. Bricks are easily available around cities and their transportation cost is
less because their weight is less. Stones are to be brought from quarries
which are located only at few places.
4. It is possible to use all types of mortar in brick masonry. For
unimportant buildings even mud mortar can be used.
5. Thinner walls can be constructed with bricks but it is not so with stones.
6. It is easy to form openings for doors and windows.
7. Dead load of brick masonry is less.
8. In brick masonry mortar joints are thin and hence construction cost is
reduced considerably.
9. Brick masonry has better fire and weather resistance compared to
stone masonry.
Disadvantages:
1. Strength of brick masonry is less than that of stone masonry.
2. Durability of brick masonry is less.
3. Brick masonry needs plastering and plastered surface needs
colour washing. Stone masonry don’t need them and hence
maintenance cost is more in brick masonry.
4. Brick masonry absorbs water and there are possibility of
dampness. There is no such problem in stone masonry.
5. More architectural effects can be given in stone masonry
compared to that in brick masonry.
6. Stone masonry gives massive appearance and hence monumental
buildings are built in stone masonry.
Some points
• Reinforcement masonry
does not require
expensive element of
concreting.
• Reinforcement masonry is
capable of taking tensile
and shear loads.
• Reinforcement masonry is
a cheap, durable, fire
proof and easy to
construct.
• Reinforcement masonry is
used for construction of
walls, columns, lintels and
slabs.
Important points
• Concrete Association of India recommends face
thickness should be less than 5 cm and net area
should be minimum of 55 to 60% of the gross area.
• The holes in the block should be at least two in
number and they should preferably be oval shaped.
• The common sizes generally adopted for building
blocks are: 39x 19x 30 cm; 39x19x20 cm and
39x19x10 cm.
• The blocks are manufactured by using the mixture of
fine aggregates 60% and 6 to 12 mm size coarse
aggregate 40%. The fine modulus of the mixture
should range between 2.9 to 3.6. The 1:6 (cement to
combined aggregate) concrete mix should be used.
• The strength of block should be 30 kg/cm2
• For the construction of walls, only well dried blocks
should be used. Blocks should have less than 10% water
absorption for external walls and less than 15% for
internal walls. Blocks with higher water absorption should
be painted with water proof material.
• The joints should be 5 mm to 10 mm in thickness and
cement, lime and sand mortar of 1:1: 10 should be used.
• When two walls of different heights meet each other, they
should be separated by a joint.
• In order to avoid cracks , hollow blocks filled with
concrete should be used at the junction of walls.
• When used in columns, the hollows within the blocks
may be filled with concrete.
• Lintels should be made of hollow channel-shaped blocks
filled with concrete having steel reinforcement at their
bottom.
For more presentations
Please visit
www.slideshare.net/RAHULSINHA1993

Mais conteúdo relacionado

Mais procurados

SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)I'mMiss Lily
 
Finishing works (Building Construction)
Finishing works (Building Construction)Finishing works (Building Construction)
Finishing works (Building Construction)Zairul Zaiky
 
Chapter 10 wall finishes ( plastering,pointing & painting)
Chapter 10 wall finishes ( plastering,pointing & painting)Chapter 10 wall finishes ( plastering,pointing & painting)
Chapter 10 wall finishes ( plastering,pointing & painting)KHUSHBU SHAH
 
Ground and upper floor
Ground and upper floorGround and upper floor
Ground and upper floorDivya Vishnoi
 
What is wall? Different types of wall.
What is wall? Different types of wall.What is wall? Different types of wall.
What is wall? Different types of wall.Syed Raja
 
Timber - A Construction Material
Timber - A Construction MaterialTimber - A Construction Material
Timber - A Construction MaterialAadîl Khåñ
 
PREFABRICATED TIMBER FRAMING SYSTEM
PREFABRICATED TIMBER FRAMING SYSTEMPREFABRICATED TIMBER FRAMING SYSTEM
PREFABRICATED TIMBER FRAMING SYSTEMFarah Sham
 
Chapter 4 (d) hollow concrete block masonry
Chapter 4 (d) hollow concrete block masonryChapter 4 (d) hollow concrete block masonry
Chapter 4 (d) hollow concrete block masonryKHUSHBU SHAH
 
Group Assignment:IBS System
Group Assignment:IBS SystemGroup Assignment:IBS System
Group Assignment:IBS System마 이환
 
Plastering Process (Cement/Masonry/Finishing Layer)
Plastering Process (Cement/Masonry/Finishing Layer)Plastering Process (Cement/Masonry/Finishing Layer)
Plastering Process (Cement/Masonry/Finishing Layer)Zelkhan
 

Mais procurados (20)

Wall finishes
Wall finishesWall finishes
Wall finishes
 
SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)SITE REPORT (PAD FOOTING)
SITE REPORT (PAD FOOTING)
 
Finishing works (Building Construction)
Finishing works (Building Construction)Finishing works (Building Construction)
Finishing works (Building Construction)
 
Chapter 10 wall finishes ( plastering,pointing & painting)
Chapter 10 wall finishes ( plastering,pointing & painting)Chapter 10 wall finishes ( plastering,pointing & painting)
Chapter 10 wall finishes ( plastering,pointing & painting)
 
Window topic 8
Window topic 8Window topic 8
Window topic 8
 
Brick masonary
Brick masonaryBrick masonary
Brick masonary
 
Ground and upper floor
Ground and upper floorGround and upper floor
Ground and upper floor
 
What is wall? Different types of wall.
What is wall? Different types of wall.What is wall? Different types of wall.
What is wall? Different types of wall.
 
Plastering
PlasteringPlastering
Plastering
 
Timber - A Construction Material
Timber - A Construction MaterialTimber - A Construction Material
Timber - A Construction Material
 
Plastering and pointing
Plastering and pointingPlastering and pointing
Plastering and pointing
 
Damp proofing
Damp proofingDamp proofing
Damp proofing
 
PREFABRICATED TIMBER FRAMING SYSTEM
PREFABRICATED TIMBER FRAMING SYSTEMPREFABRICATED TIMBER FRAMING SYSTEM
PREFABRICATED TIMBER FRAMING SYSTEM
 
Chapter 4 (d) hollow concrete block masonry
Chapter 4 (d) hollow concrete block masonryChapter 4 (d) hollow concrete block masonry
Chapter 4 (d) hollow concrete block masonry
 
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATIONINDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
INDUSTRIALISED BUILDING SYSTEMS & MODULAR COORDINATION
 
Group Assignment:IBS System
Group Assignment:IBS SystemGroup Assignment:IBS System
Group Assignment:IBS System
 
Building finishes
Building finishesBuilding finishes
Building finishes
 
Earthwork support
Earthwork supportEarthwork support
Earthwork support
 
Plastering
PlasteringPlastering
Plastering
 
Plastering Process (Cement/Masonry/Finishing Layer)
Plastering Process (Cement/Masonry/Finishing Layer)Plastering Process (Cement/Masonry/Finishing Layer)
Plastering Process (Cement/Masonry/Finishing Layer)
 

Destaque

building services project 1
building services project 1building services project 1
building services project 1Baddy Peigun
 
Plumbing_architecture_corporate interiors
Plumbing_architecture_corporate interiorsPlumbing_architecture_corporate interiors
Plumbing_architecture_corporate interiorsAkshay Bhatia
 
Industrial case study report (Final)
Industrial case study report (Final)Industrial case study report (Final)
Industrial case study report (Final)pranay kumar
 
Joukowski's airfoils, introduction to conformal mapping
Joukowski's  airfoils, introduction to conformal mappingJoukowski's  airfoils, introduction to conformal mapping
Joukowski's airfoils, introduction to conformal mappingRAHUL SINHA
 
Building Services Report
Building Services ReportBuilding Services Report
Building Services ReportJoanne Yunn Tze
 
Ventilation/Roofing
Ventilation/RoofingVentilation/Roofing
Ventilation/RoofingRAHUL SINHA
 
Folds and foldings
Folds and foldingsFolds and foldings
Folds and foldingsRAHUL SINHA
 
The cost of production/Chapter 7(pindyck)
The cost of production/Chapter 7(pindyck)The cost of production/Chapter 7(pindyck)
The cost of production/Chapter 7(pindyck)RAHUL SINHA
 
Joints and unconformity
Joints and unconformityJoints and unconformity
Joints and unconformityRAHUL SINHA
 
Topik 1 sanitary appliances
Topik 1 sanitary appliancesTopik 1 sanitary appliances
Topik 1 sanitary appliancesInazarina Ady
 

Destaque (11)

building services project 1
building services project 1building services project 1
building services project 1
 
Plumbing_architecture_corporate interiors
Plumbing_architecture_corporate interiorsPlumbing_architecture_corporate interiors
Plumbing_architecture_corporate interiors
 
Industrial case study report (Final)
Industrial case study report (Final)Industrial case study report (Final)
Industrial case study report (Final)
 
Joukowski's airfoils, introduction to conformal mapping
Joukowski's  airfoils, introduction to conformal mappingJoukowski's  airfoils, introduction to conformal mapping
Joukowski's airfoils, introduction to conformal mapping
 
Building Services Report
Building Services ReportBuilding Services Report
Building Services Report
 
Ventilation/Roofing
Ventilation/RoofingVentilation/Roofing
Ventilation/Roofing
 
Folds and foldings
Folds and foldingsFolds and foldings
Folds and foldings
 
The cost of production/Chapter 7(pindyck)
The cost of production/Chapter 7(pindyck)The cost of production/Chapter 7(pindyck)
The cost of production/Chapter 7(pindyck)
 
Joints and unconformity
Joints and unconformityJoints and unconformity
Joints and unconformity
 
Topik 1 sanitary appliances
Topik 1 sanitary appliancesTopik 1 sanitary appliances
Topik 1 sanitary appliances
 
Surveying
Surveying Surveying
Surveying
 

Semelhante a pointing, plastering, bonding

Finishing and other methods of construction, scaffolding, shoring, underpinning
Finishing and other methods of construction, scaffolding, shoring, underpinningFinishing and other methods of construction, scaffolding, shoring, underpinning
Finishing and other methods of construction, scaffolding, shoring, underpinningANURAG KASHYAP
 
Bricks & Plastering
Bricks & PlasteringBricks & Plastering
Bricks & PlasteringTanvir Araf
 
MODULE 4 PART 1.pdf
MODULE 4 PART  1.pdfMODULE 4 PART  1.pdf
MODULE 4 PART 1.pdfAnoHossey
 
Floor finishes - flooring and finish types
Floor finishes - flooring and finish typesFloor finishes - flooring and finish types
Floor finishes - flooring and finish typesAnqaParvez
 
Introduction brickwall-report-yf (1)
Introduction brickwall-report-yf (1)Introduction brickwall-report-yf (1)
Introduction brickwall-report-yf (1)Chan Yifung
 
Presentation on Brick Masonry, Paint and Plastering
Presentation on Brick Masonry, Paint and PlasteringPresentation on Brick Masonry, Paint and Plastering
Presentation on Brick Masonry, Paint and PlasteringAbontee
 
Building Materials & Construction Module - 5
Building Materials & Construction Module - 5Building Materials & Construction Module - 5
Building Materials & Construction Module - 5Abhilash B L
 
types of Flooring in construction
types of Flooring in constructiontypes of Flooring in construction
types of Flooring in constructionUdisha15
 
Materials & Methods of Construction - CE145
Materials & Methods of Construction - CE145Materials & Methods of Construction - CE145
Materials & Methods of Construction - CE145Saqib Imran
 
Brickwork & Plaster 26.02.22.pdf
Brickwork & Plaster 26.02.22.pdfBrickwork & Plaster 26.02.22.pdf
Brickwork & Plaster 26.02.22.pdfAbhinavSahu45
 
tiles-170905215425 (1).pdf
tiles-170905215425 (1).pdftiles-170905215425 (1).pdf
tiles-170905215425 (1).pdfOmGudghe
 

Semelhante a pointing, plastering, bonding (20)

Finishing and other methods of construction, scaffolding, shoring, underpinning
Finishing and other methods of construction, scaffolding, shoring, underpinningFinishing and other methods of construction, scaffolding, shoring, underpinning
Finishing and other methods of construction, scaffolding, shoring, underpinning
 
Bricks & Plastering
Bricks & PlasteringBricks & Plastering
Bricks & Plastering
 
MODULE 4 PART 1.pdf
MODULE 4 PART  1.pdfMODULE 4 PART  1.pdf
MODULE 4 PART 1.pdf
 
Plaster of paris
Plaster of parisPlaster of paris
Plaster of paris
 
Building construction materials - brick
Building construction materials  - brick Building construction materials  - brick
Building construction materials - brick
 
Floor finishes - flooring and finish types
Floor finishes - flooring and finish typesFloor finishes - flooring and finish types
Floor finishes - flooring and finish types
 
Cons122
Cons122Cons122
Cons122
 
Plastering
PlasteringPlastering
Plastering
 
Introduction brickwall-report-yf (1)
Introduction brickwall-report-yf (1)Introduction brickwall-report-yf (1)
Introduction brickwall-report-yf (1)
 
Presentation on Brick Masonry, Paint and Plastering
Presentation on Brick Masonry, Paint and PlasteringPresentation on Brick Masonry, Paint and Plastering
Presentation on Brick Masonry, Paint and Plastering
 
Building Materials & Construction Module - 5
Building Materials & Construction Module - 5Building Materials & Construction Module - 5
Building Materials & Construction Module - 5
 
Plastering
PlasteringPlastering
Plastering
 
types of Flooring in construction
types of Flooring in constructiontypes of Flooring in construction
types of Flooring in construction
 
Materials & Methods of Construction - CE145
Materials & Methods of Construction - CE145Materials & Methods of Construction - CE145
Materials & Methods of Construction - CE145
 
Module 2
Module 2Module 2
Module 2
 
Masonry
MasonryMasonry
Masonry
 
Lecture 02
Lecture 02Lecture 02
Lecture 02
 
Brickwork & Plaster 26.02.22.pdf
Brickwork & Plaster 26.02.22.pdfBrickwork & Plaster 26.02.22.pdf
Brickwork & Plaster 26.02.22.pdf
 
Tiles
TilesTiles
Tiles
 
tiles-170905215425 (1).pdf
tiles-170905215425 (1).pdftiles-170905215425 (1).pdf
tiles-170905215425 (1).pdf
 

Mais de RAHUL SINHA

Rahul sinha foundation engineering
Rahul sinha foundation engineeringRahul sinha foundation engineering
Rahul sinha foundation engineeringRAHUL SINHA
 
Rahul sinha soil mech. basics
Rahul sinha soil mech. basicsRahul sinha soil mech. basics
Rahul sinha soil mech. basicsRAHUL SINHA
 
Rahul sinha geotechnical engineering
Rahul sinha geotechnical engineeringRahul sinha geotechnical engineering
Rahul sinha geotechnical engineeringRAHUL SINHA
 
Maths and apti rahul sinha
Maths and apti rahul sinhaMaths and apti rahul sinha
Maths and apti rahul sinhaRAHUL SINHA
 
Transportation engineering rahul sinha
Transportation engineering rahul sinhaTransportation engineering rahul sinha
Transportation engineering rahul sinhaRAHUL SINHA
 
Seepage through soil
Seepage through soilSeepage through soil
Seepage through soilRAHUL SINHA
 
BASIC OF PERMEABILITY OF SOIL
BASIC OF PERMEABILITY OF SOILBASIC OF PERMEABILITY OF SOIL
BASIC OF PERMEABILITY OF SOILRAHUL SINHA
 
Open channel flow rahul sinha
Open channel flow rahul sinhaOpen channel flow rahul sinha
Open channel flow rahul sinhaRAHUL SINHA
 
Fluid mechanics rahul sinha
Fluid mechanics rahul sinhaFluid mechanics rahul sinha
Fluid mechanics rahul sinhaRAHUL SINHA
 
Structural analysis rahul sinha
Structural analysis rahul sinhaStructural analysis rahul sinha
Structural analysis rahul sinhaRAHUL SINHA
 
Mechanics of materials rahul sinha
Mechanics of materials rahul sinhaMechanics of materials rahul sinha
Mechanics of materials rahul sinhaRAHUL SINHA
 
Compass surveying
Compass surveyingCompass surveying
Compass surveyingRAHUL SINHA
 
Levelling in Surveying
Levelling in SurveyingLevelling in Surveying
Levelling in SurveyingRAHUL SINHA
 
cost of production / Chapter 6(pindyck)
cost of production / Chapter 6(pindyck)cost of production / Chapter 6(pindyck)
cost of production / Chapter 6(pindyck)RAHUL SINHA
 
Dams, Types of dams
Dams, Types of damsDams, Types of dams
Dams, Types of damsRAHUL SINHA
 
Thinking like an economist
Thinking like an economistThinking like an economist
Thinking like an economistRAHUL SINHA
 
construction material and technology
construction material and technologyconstruction material and technology
construction material and technologyRAHUL SINHA
 
business case in green computing
business case in green computingbusiness case in green computing
business case in green computingRAHUL SINHA
 
Virtualization in green computing
Virtualization in green computingVirtualization in green computing
Virtualization in green computingRAHUL SINHA
 

Mais de RAHUL SINHA (20)

Rahul sinha foundation engineering
Rahul sinha foundation engineeringRahul sinha foundation engineering
Rahul sinha foundation engineering
 
Rahul sinha soil mech. basics
Rahul sinha soil mech. basicsRahul sinha soil mech. basics
Rahul sinha soil mech. basics
 
Rahul sinha geotechnical engineering
Rahul sinha geotechnical engineeringRahul sinha geotechnical engineering
Rahul sinha geotechnical engineering
 
Maths and apti rahul sinha
Maths and apti rahul sinhaMaths and apti rahul sinha
Maths and apti rahul sinha
 
Transportation engineering rahul sinha
Transportation engineering rahul sinhaTransportation engineering rahul sinha
Transportation engineering rahul sinha
 
Seepage through soil
Seepage through soilSeepage through soil
Seepage through soil
 
BASIC OF PERMEABILITY OF SOIL
BASIC OF PERMEABILITY OF SOILBASIC OF PERMEABILITY OF SOIL
BASIC OF PERMEABILITY OF SOIL
 
Open channel flow rahul sinha
Open channel flow rahul sinhaOpen channel flow rahul sinha
Open channel flow rahul sinha
 
Fluid mechanics rahul sinha
Fluid mechanics rahul sinhaFluid mechanics rahul sinha
Fluid mechanics rahul sinha
 
Structural analysis rahul sinha
Structural analysis rahul sinhaStructural analysis rahul sinha
Structural analysis rahul sinha
 
Mechanics of materials rahul sinha
Mechanics of materials rahul sinhaMechanics of materials rahul sinha
Mechanics of materials rahul sinha
 
Compass surveying
Compass surveyingCompass surveying
Compass surveying
 
Levelling in Surveying
Levelling in SurveyingLevelling in Surveying
Levelling in Surveying
 
cost of production / Chapter 6(pindyck)
cost of production / Chapter 6(pindyck)cost of production / Chapter 6(pindyck)
cost of production / Chapter 6(pindyck)
 
Faults
FaultsFaults
Faults
 
Dams, Types of dams
Dams, Types of damsDams, Types of dams
Dams, Types of dams
 
Thinking like an economist
Thinking like an economistThinking like an economist
Thinking like an economist
 
construction material and technology
construction material and technologyconstruction material and technology
construction material and technology
 
business case in green computing
business case in green computingbusiness case in green computing
business case in green computing
 
Virtualization in green computing
Virtualization in green computingVirtualization in green computing
Virtualization in green computing
 

Último

Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadaditya806802
 
DM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in projectDM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in projectssuserb6619e
 
BSNL Internship Training presentation.pptx
BSNL Internship Training presentation.pptxBSNL Internship Training presentation.pptx
BSNL Internship Training presentation.pptxNiranjanYadav41
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONjhunlian
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating SystemRashmi Bhat
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - GuideGOPINATHS437943
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Coursebim.edu.pl
 
Configuration of IoT devices - Systems managament
Configuration of IoT devices - Systems managamentConfiguration of IoT devices - Systems managament
Configuration of IoT devices - Systems managamentBharaniDharan195623
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdfHafizMudaserAhmad
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptNarmatha D
 
Risk Management in Engineering Construction Project
Risk Management in Engineering Construction ProjectRisk Management in Engineering Construction Project
Risk Management in Engineering Construction ProjectErbil Polytechnic University
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating SystemRashmi Bhat
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptMadan Karki
 

Último (20)

Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasad
 
DM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in projectDM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in project
 
BSNL Internship Training presentation.pptx
BSNL Internship Training presentation.pptxBSNL Internship Training presentation.pptx
BSNL Internship Training presentation.pptx
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
 
Designing pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptxDesigning pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptx
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating System
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - Guide
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Course
 
Configuration of IoT devices - Systems managament
Configuration of IoT devices - Systems managamentConfiguration of IoT devices - Systems managament
Configuration of IoT devices - Systems managament
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.ppt
 
Risk Management in Engineering Construction Project
Risk Management in Engineering Construction ProjectRisk Management in Engineering Construction Project
Risk Management in Engineering Construction Project
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating System
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.ppt
 

pointing, plastering, bonding

  • 1.
  • 2.
  • 3. What is pointing? • It is the art of finishing the mortar joints in exposed brick or stone masonry with suitable cement or lime mortar, in order to protect the joints from weather effects and also to improve the appearance of building structure. • Often an entire wall, or even a whole structure, is pointed because defective points cannot easily be detected, and adjacent joints may also be in need of repair. The mortar is packed tightly in thin layers and tooled to a smooth, concave, finished surface.
  • 4. Scope of pointing • Maintaining the joints of the structures. • Pointing being cheap can be adopted in places of low rainfall. • Where the natural beauty of materials, viz., stone blocks, bricks etc, is desired to be exhibited. • Gives resisting power to the bricks and stones used in construction towards weather conditions.
  • 5. Method of pointing • All the mortar joints (on the masonry face required to be pointed) are raked out by a special pointing tool to a depth of 15 to 20 mm, so as to provide an adequate key for the fresh mortar used for pointing. • All the loose mortar and dust are removed by brushes • The joints and wall surface are washed with clean water, and then kept wet for few hours. • The joints so prepared, are filled with suitable mortar with a small trowel. The mortar is well pressed into the joints to form a close contact with the old interior mortar joints. All excess mortar sticking to the sides is scraped away. • The finished pointing work is kept wet for about 3 days when lime mortar is used for pointing and for 10 days when cement mortar is used for pointing.
  • 6.
  • 7. What is plastering? • Plastering is the process of covering rough walls and uneven surfaces in the construction of houses and other structures with a plastic material, called plaster or mortar. Objective of plastering • To provide an even, smooth, regular, clean and durable finished surface with improved appearance. • To preserve and protect the surface. • To cover up the use of inferior quality and porous materials of the masonry work. • To conceal defective workmanship.
  • 8. Requirement of the good plaster • It should be hard and durable. • It should be possible to apply it during all weather conditions. • It should adhere to the background and should remain adhered during all climatic changes. • It should be cheap and economical. • It should offer good insulation against sound and high resistance against fire. • It should effectively check the entry or penetration of moisture from the surfaces.
  • 9. Method of plastering (general) • The plaster may be applied in one or more coats, but the thickness of a single coat should not exceed 12 mm. • In the case of inferior or cheaper type of construction, the plaster may usually be one coat. For ordinary type of construction, the plaster is usually applied in two coats, whereas for superior type of works it is applied in three coats. • The final setting coat should not be applied until the previous coat is almost dry. • The previous surface should be scratched or roughened before applying the next coat of plaster. • In plastering, the plaster mix is either applied by throwing it with great force against the walls or by pressing it on the surface.
  • 10. Types of plasters • Lime plaster  Lime plaster is a mixture of calcium hydroxide and sand (or other inert fillers) in 1: 1 ratio.  Carbon dioxide in the atmosphere causes the plaster to set by transforming the calcium hydroxide into calcium carbonate (limestone).  In order to improve building properties of lime plaster , gugal (a kind of fragrant gum) @ 1.6 kg/m3 of mortar , is added when the mortar is being ground.  In order to improve adhesive and tensile properties of lime mortar, sometimes, small quantities of chopped hemp (i.e., vegetable fibres) @ 1kg/m3 are added to the lime mortar.  The lime mortar thus prepared is usually kept for 2 days before use.
  • 11. • Cement plaster:  Cement and sand in required proportions ( 1:3 or 4) are first thoroughly mixed in dry conditions and then water is added to form a paste of required consistency.  Generally it is mixture sand, portland cement and water mixed in a suitable proportion.  This prepared mortar for plastering should be consumed within 30 minutes after the addition of water. • Gypsum plaster (plaster of Paris)  Gypsum plaster, or plaster of Paris, is produced by heating gypsum to about 300 °F (150 °C). 2CaSO4·H2O + Heat → 2CaSO4·½H2O + H2O (released as steam)  When the dry plaster powder is mixed with water, it re-forms into gypsum. The setting of unmodified plaster starts about 10 minutes after mixing and is complete in about 45 minutes but not fully set for 72 hours.
  • 12. • Water proof plaster of Mortar:  This mortar consists of 1 part of cement, 2 parts of sand and pulverised alum @ 12 kg/m3 of sand. To this dry mix , the soap water containing about 75 g of soft soap/L of water , is added to obtain the waterproof mortar. • Heat resistant plasters  It's purpose is to replace conventional gypsum plasters in cases where the temperature can get too high for gypsum plaster to stay on the wall.  Heat resistant plaster should be used in cases where the wall is likely to exceed temperatures of 50°C .  Heat resistant plaster is a building material used for coating walls and chimney breasts.
  • 13. Defects in plastering The following defects may arise in the plaster work:  Blistering of plastered surface: This is the formation of small patches of plaster swelling out beyond the plastered surface, arising out of late slaking of lime particles in the plaster.  Cracking: it is the formation of cracks in the plaster work due to the following reasons:  Structural defects in building  Movements in the background due to its thermal expansion or rapid drying  Movements in the plaster surface itself, either due to expansion or shrinkage.
  • 14. • Efflorescence: It is the whitish crystalline substance which appears on the surface due to presence of salts in plaster making materials. It affects the adhesion of paint with wall surface. Efflorescence can be removed to some extent by dry brushing and washing the surface repeatedly. • Flaking: It is the formation of very loose mass of plastered surface, due to poor bond between successive coats. • Peeling: It is the complete dislocation of some portion of plastered surface, resulting in the formation of a patch. This also results from imperfect bond. • Popping: It is the formation of conical hole in the plastered surface due to presence of some particles which expand on setting.
  • 15.
  • 16. Brick masonry  Brick masonry is built with bricks bonded together with mortar. For temporary sheds mud mortar may be used but for all permanent buildings lime or cement mortars are used.  The various types of bonds generally used in brick masonry are: 1. Stretcher bond 2. Header bond 3. English bond and 4. Flemish bond.
  • 17. Stretcher bond • A stretcher is the longer face of the brick as seen in the elevation. In the brick of size 190 mm × 90 mm × 90 mm, 190 mm × 90 mm face is the stretcher. In stretcher bond masonry all the bricks are arranged in stretcher courses. • However care should be taken to break vertical joints. This type of construction is useful for the construction half brick thick partition wall.
  • 18. Header bond • A header is the shorter face of the brick as seen in the elevation. In a standard brick it is 90 mm × 90 mm face. In header bond brick masonry all the bricks are arranged in the header courses as shown in Fig. This type of bond is useful for the construction of one brick thick walls.
  • 19. English bond • In this alternate courses consist of headers and stretchers. This is considered to be the strongest bond. Hence it is commonly used bond for the walls of all thicknesses. To break continuity of vertical joints a brick is cut lengthwise into two halves and used in the beginning and end of a wall after first header. This is called queen closer. Figure shows typical one brick and one and half brick thick wall with English bond.
  • 20.
  • 21. Flemish bond • In this type of bond each course comprises of alternate header and stretcher figure. Alternate courses start with stretcher and header. To break the vertical joints queen closers are required, if a course starts with header. Every header is centrally supported on the stretcher below it. • Flemish bonds may be further classified as: I. Double Flemish Bond II. Single Flemish Bond. • In case of double flemish bond, both faces of the wall have flemish look, i.e. each course consist of alternate header and stretcher, whereas single flemish bond outer faces of walls have flemish look whereas inner faces have look of English bond [Fig (a), (b)]. • Construction of flemish bond needs greater skill. It gives more pleasing appearance. But it is not as strong as English bond. If only pointing is to be used for finished wall, flemish bond may be used to get good aesthetic view. If plastering is going to be used, it is better to use English bond.
  • 22.
  • 23. Advantages and Disadvantages of Brick Masonry Over Stone Masonry Advantages: 1. Since shape and size of bricks are uniform, it do not need skilled labour for the construction. 2. Bricks are light in weight and hence handling them is easy. 3. Bricks are easily available around cities and their transportation cost is less because their weight is less. Stones are to be brought from quarries which are located only at few places. 4. It is possible to use all types of mortar in brick masonry. For unimportant buildings even mud mortar can be used. 5. Thinner walls can be constructed with bricks but it is not so with stones. 6. It is easy to form openings for doors and windows. 7. Dead load of brick masonry is less. 8. In brick masonry mortar joints are thin and hence construction cost is reduced considerably. 9. Brick masonry has better fire and weather resistance compared to stone masonry.
  • 24. Disadvantages: 1. Strength of brick masonry is less than that of stone masonry. 2. Durability of brick masonry is less. 3. Brick masonry needs plastering and plastered surface needs colour washing. Stone masonry don’t need them and hence maintenance cost is more in brick masonry. 4. Brick masonry absorbs water and there are possibility of dampness. There is no such problem in stone masonry. 5. More architectural effects can be given in stone masonry compared to that in brick masonry. 6. Stone masonry gives massive appearance and hence monumental buildings are built in stone masonry.
  • 25.
  • 26. Some points • Reinforcement masonry does not require expensive element of concreting. • Reinforcement masonry is capable of taking tensile and shear loads. • Reinforcement masonry is a cheap, durable, fire proof and easy to construct. • Reinforcement masonry is used for construction of walls, columns, lintels and slabs.
  • 27.
  • 28.
  • 29. Important points • Concrete Association of India recommends face thickness should be less than 5 cm and net area should be minimum of 55 to 60% of the gross area. • The holes in the block should be at least two in number and they should preferably be oval shaped. • The common sizes generally adopted for building blocks are: 39x 19x 30 cm; 39x19x20 cm and 39x19x10 cm. • The blocks are manufactured by using the mixture of fine aggregates 60% and 6 to 12 mm size coarse aggregate 40%. The fine modulus of the mixture should range between 2.9 to 3.6. The 1:6 (cement to combined aggregate) concrete mix should be used. • The strength of block should be 30 kg/cm2
  • 30. • For the construction of walls, only well dried blocks should be used. Blocks should have less than 10% water absorption for external walls and less than 15% for internal walls. Blocks with higher water absorption should be painted with water proof material. • The joints should be 5 mm to 10 mm in thickness and cement, lime and sand mortar of 1:1: 10 should be used. • When two walls of different heights meet each other, they should be separated by a joint. • In order to avoid cracks , hollow blocks filled with concrete should be used at the junction of walls. • When used in columns, the hollows within the blocks may be filled with concrete. • Lintels should be made of hollow channel-shaped blocks filled with concrete having steel reinforcement at their bottom.
  • 31. For more presentations Please visit www.slideshare.net/RAHULSINHA1993