SlideShare uma empresa Scribd logo
1 de 28
Baixar para ler offline
First peak on the next generation propellant systems
Royex
Generation II
Thomas Gustavsson
Etken Teknologi Sweden
+46 739 38 18 96
Thomas.Gustavsson@etken.se
Deflagration is a rapid high energy release combustion event that propagates
through a gas or an explosive material at subsonic speeds, driven by the transfer of
heat.
Deflagration, or Combustion, is different from detonation, which is supersonic and
propagates through shock.
Propellant powders have long been used as a rock breaking tool
Deflagration
Any application where rock and ground vibrations must be kept to an absolute minimum
Breaking oversize 
rock and secondary 
blasting over and 
underground.
Oversize
Break rock without 
closing down traffic 
or re‐routing to 
protect from fly rock. 
Spare road 
infrastructure from 
vibrations.
Close to roads
Break concrete or 
rock in urban areas 
and spare sensitive 
structures and 
conform to local 
requirements.
In urban areas
To conventional
explosives in areas 
where legislation to 
manage explosives is 
complicated. 
As an alternative
Current applications
- Breaking of over size under and over ground with minimal gas risk
- Controlled vibration allowes for better wall control
- Lowers dilution in gold, platinum and dimond mining
- Complete 1.4S solution lowers storage and transport costs
Possible Advantages in mining –
Achievable goals
What are the issues we have to address?
To inspire the industry to change, we need to 
address the old issues and present realistic 
solutions. 
What advancements has Etken
Teknologi achieved in propellant
powder technology?
Introducing the Royex Generation II rock breaking cartridge
Introducing Royex Generation II
‐ New propellant formula – Stronger, 
fully oxygen balanced propellant 
mix
‐ New modular initiation system with 
timing – Only available 
pyrotechnical shock tube system 
worldwide. 
‐ New cartridge design – New design 
allows for cable protection in hole
‐ Significantly improved unit pricing –
Improvements in production 
capacity gives better pricing
Introducing the Royex Generation II rock breaking cartridge
Solution to Issue 1: Introducing complete 1.4S world class timing system
IntroducingtheMaxclip1.4Ssystem–separationofcartridgeandigniter
‐ NO DETONATORS – in hole and out 
of hole igniters are 1.4S
‐ BUILT IN TIMING – Only available 
pyrotechnical shock tube system 
worldwide. 
‐ VERY SIMPLE TO USE – Connecting 
the initiation circuit is just following 
color coding
‐ ELECTRICAL AND SHOCK TUBE 
AVALIABLE 
Solution to Issue 1: Introducing complete 1.4S world class timing system
Designed for underground and open cast operations
‐ Modular – Use up to four cartridges 
on the same cable with the 6‐way 
clip
‐ Timing designed for deflagrating 
cartridges – Timing designed to 
work optimal with Royex 
deflagrating cartridge
‐ System fully waterproof – Use in 
damp or wet environments without 
issues.
Tie up and application
First complete pyrotechnical
shock tube / electric system with timing 
designed for PP cartridges. 
Solution to Issue 1: Introducing complete 1.4S world class timing system -
The Maxfire igniter.
‐ Maxclip Maxfire igniter
‐ Very hot ignition coupled with a 
strong cascading flame effect 
enables close to optimal propellant 
initiation. The Maxfire igniter is the 
foundation to the Royex generation 
II system. 
Click on image to show video controls.
Solution to Issue 1: Introducing complete 1.4S world class timing system -
Burning front and timing
20 holes burning front
The Maxclip timing enables for a 20 
hole burning front to ensure no 
interference with the initiation circuit. 
This is sufficient for both surface and 
underground operations
Click on image to show video controls.
Tie up and application
First time ever – pyrotechnical bench 
blasting with timing
Tie up and application
Maxclip allows for pyrotechnical 
decking – individual timing of each deck
Trials and performance – Quarry trials
Timing trial
Click on image to show video controls.
System CE approved and 1.4S classified
Mixture
Solution to Issue 2: Introducing new formula and quality of mix
Introducing the Royex gen II mix
‐ HIGER DENSITY– Old density max 
0.86, new density 0.98 to 1.0 g /cm³
‐ PERFECT OXGYGEN BALANCE – 70% 
AN, 30% NC gives 100% oxygen 
balanced mix, no noxious gases on 
initiation. Ideal for under ground.
‐ COMPONENT DENSITY AND SIZE 
BALANCE – Both the AN and NC prill
are of the same size (0.5 mm) and of 
same density. No separation.
Production plant built in China
Optimizing resources and production capabilities
‐ Abundance of propellant –
Propellant powder mix in surplus in 
china
‐ Factory built in partnership with 
large explosive supplier
Volume production lowers prices. 
Factory ISO9000 certified. EU quality 
standards in place. CE approval 
granted
‐ Unit price reduced considerably 
Volume and fast production means 
unit price has been reduced 
significantly
Production plant built in China
MaxClip produced in largest detonator factory in the world –
Qinghua – Xian under Etken license
Produces over 300 million shock tube 
detonators per year (2014)
Employs over 5000 people
Operates own train network and 
airport
Outstanding quality processes in place
Trials and performance – Quarry trials
Trial 1
Click on image to show video controls.
Trials and performance – Quarry trials
Trial 2
Click on image to show video controls.
Trials and performance – Quarry trials
Trial 3
Click on image to show video controls.
Taking propellant rock breaking to the next level
Ultimate solution for underground gold and platinum
Drill 0.9m at 70ᵒ - CONTINOUSLY
No blowing out holes. Place cartridge system in
hole - connect and fire
Complete 1.4S system capable of
sequentially firing
No noxious gasses. Most powerful PP
available. Simple to use.
Minimal dilution and dust losses
What is the impact of
these changes?
&
ETKEN TEKNOLOGI’S
SOLUTIONS?
• No working timing system
• The Maxclip system eliminates this problem
• Electric Fuse heads used for timing - 360ºC
•
• The Maxfire igniter burns vigorously at + 900ºC
• Local R&D has gone as far as it can
• PP’s and AN have been sized and sieved before mixing
• Technical formulation issues
• Royex Gen 2 perfectly oxygen balanced – no noxious gasses
• Unit cost mentality
• Cartridges made in China – Unit cost reduced considerably
• Inadequate stemming technique
• Cartridge loader and stemming material extensively tested
• Mechanical solutions in final testing phase
• Safety issues
• Complete 1.4S system, safest system available today
Thank you!
Questions or inquiries, please email info@Etken.se
The greatest danger in times of turbulence is not the turbulence – it is to act with
yesterdays logic”
– Peter Drucker

Mais conteúdo relacionado

Destaque

Wifimotion, Wi-Fi en Movilidad para hoteles
Wifimotion, Wi-Fi en Movilidad para hoteles Wifimotion, Wi-Fi en Movilidad para hoteles
Wifimotion, Wi-Fi en Movilidad para hoteles Diego López-Salazar
 
Inspiron 14r-5420 setup guide2-es-mx
Inspiron 14r-5420 setup guide2-es-mxInspiron 14r-5420 setup guide2-es-mx
Inspiron 14r-5420 setup guide2-es-mxPeter Urizar Lopez
 
Charging with out_wires.
Charging with out_wires.Charging with out_wires.
Charging with out_wires.Manohar Reddy
 
TSA luggage lock master passkeys
TSA luggage lock master passkeysTSA luggage lock master passkeys
TSA luggage lock master passkeysCarter Cole
 
Innowacje w eCommerce 2
Innowacje w eCommerce 2Innowacje w eCommerce 2
Innowacje w eCommerce 2Divante
 
Uca informe anual argentina diciembre 2010
Uca informe anual argentina  diciembre 2010Uca informe anual argentina  diciembre 2010
Uca informe anual argentina diciembre 2010germanciceri
 
Profesiones universitarias (1)
Profesiones universitarias (1)Profesiones universitarias (1)
Profesiones universitarias (1)paullette-pardo
 
The Value Of Corporate Image
The Value Of Corporate ImageThe Value Of Corporate Image
The Value Of Corporate Imagecosmicrhythmunit
 
Comunicacion tactica en seguridad
Comunicacion tactica en seguridadComunicacion tactica en seguridad
Comunicacion tactica en seguridadoswaldo chomba
 
SpeedCore Infografiken
SpeedCore InfografikenSpeedCore Infografiken
SpeedCore InfografikenLMT_Group
 
Salmo 63 un alma en busca de dios (a)
Salmo 63 un alma en busca de dios (a)Salmo 63 un alma en busca de dios (a)
Salmo 63 un alma en busca de dios (a)Robert Batista
 
Las 10 Leyes de la Entregabilidad en el Email Marketing (adSalsa)
Las 10 Leyes de la Entregabilidad en el Email Marketing (adSalsa)Las 10 Leyes de la Entregabilidad en el Email Marketing (adSalsa)
Las 10 Leyes de la Entregabilidad en el Email Marketing (adSalsa)Joan Llácer García
 
Automating the User Provisioning Process
Automating the User Provisioning ProcessAutomating the User Provisioning Process
Automating the User Provisioning ProcessHelpSystems
 

Destaque (20)

Msdcesa hidropractica
Msdcesa hidropracticaMsdcesa hidropractica
Msdcesa hidropractica
 
Wifimotion, Wi-Fi en Movilidad para hoteles
Wifimotion, Wi-Fi en Movilidad para hoteles Wifimotion, Wi-Fi en Movilidad para hoteles
Wifimotion, Wi-Fi en Movilidad para hoteles
 
Folleto informativo RADES
Folleto informativo RADESFolleto informativo RADES
Folleto informativo RADES
 
Inspiron 14r-5420 setup guide2-es-mx
Inspiron 14r-5420 setup guide2-es-mxInspiron 14r-5420 setup guide2-es-mx
Inspiron 14r-5420 setup guide2-es-mx
 
Charging with out_wires.
Charging with out_wires.Charging with out_wires.
Charging with out_wires.
 
N8
N8N8
N8
 
TSA luggage lock master passkeys
TSA luggage lock master passkeysTSA luggage lock master passkeys
TSA luggage lock master passkeys
 
Innowacje w eCommerce 2
Innowacje w eCommerce 2Innowacje w eCommerce 2
Innowacje w eCommerce 2
 
Uca informe anual argentina diciembre 2010
Uca informe anual argentina  diciembre 2010Uca informe anual argentina  diciembre 2010
Uca informe anual argentina diciembre 2010
 
Profesiones universitarias (1)
Profesiones universitarias (1)Profesiones universitarias (1)
Profesiones universitarias (1)
 
The Value Of Corporate Image
The Value Of Corporate ImageThe Value Of Corporate Image
The Value Of Corporate Image
 
Only in Digital
Only in DigitalOnly in Digital
Only in Digital
 
Comunicacion tactica en seguridad
Comunicacion tactica en seguridadComunicacion tactica en seguridad
Comunicacion tactica en seguridad
 
SpeedCore Infografiken
SpeedCore InfografikenSpeedCore Infografiken
SpeedCore Infografiken
 
Salmo 63 un alma en busca de dios (a)
Salmo 63 un alma en busca de dios (a)Salmo 63 un alma en busca de dios (a)
Salmo 63 un alma en busca de dios (a)
 
Tragao de municiones
Tragao de municionesTragao de municiones
Tragao de municiones
 
Vol.1 issue4
Vol.1 issue4Vol.1 issue4
Vol.1 issue4
 
Las 10 Leyes de la Entregabilidad en el Email Marketing (adSalsa)
Las 10 Leyes de la Entregabilidad en el Email Marketing (adSalsa)Las 10 Leyes de la Entregabilidad en el Email Marketing (adSalsa)
Las 10 Leyes de la Entregabilidad en el Email Marketing (adSalsa)
 
Sop blaubrand es
Sop blaubrand esSop blaubrand es
Sop blaubrand es
 
Automating the User Provisioning Process
Automating the User Provisioning ProcessAutomating the User Provisioning Process
Automating the User Provisioning Process
 

Semelhante a Royex - generation 2 introduction

Blasting concepts
Blasting conceptsBlasting concepts
Blasting conceptsSafdar Ali
 
Blasting concepts (1)
Blasting concepts (1)Blasting concepts (1)
Blasting concepts (1)Safdar Ali
 
Corporate presentation
Corporate  presentationCorporate  presentation
Corporate presentationsabusingh
 
Dafo FORREX - Conveyor Belt Proactive Fire Protection System
Dafo FORREX - Conveyor Belt Proactive Fire Protection SystemDafo FORREX - Conveyor Belt Proactive Fire Protection System
Dafo FORREX - Conveyor Belt Proactive Fire Protection SystemPedro Perim
 
Minimax power plant
Minimax power plantMinimax power plant
Minimax power plantFaiz Husein
 
Understanding Nanocoating Technology
Understanding Nanocoating TechnologyUnderstanding Nanocoating Technology
Understanding Nanocoating TechnologyCheryl Tulkoff
 
Smoke Rated Curtains - PerthWA
Smoke Rated Curtains - PerthWASmoke Rated Curtains - PerthWA
Smoke Rated Curtains - PerthWAlyndaflintof
 
Mill-Pro-XS-hot-cure-LongKey-process-Jan-2014-rev2
Mill-Pro-XS-hot-cure-LongKey-process-Jan-2014-rev2Mill-Pro-XS-hot-cure-LongKey-process-Jan-2014-rev2
Mill-Pro-XS-hot-cure-LongKey-process-Jan-2014-rev2Daniel Chen
 
Roxtec Cable and Pipe Transits for Marine Applications
Roxtec Cable and Pipe Transits for Marine ApplicationsRoxtec Cable and Pipe Transits for Marine Applications
Roxtec Cable and Pipe Transits for Marine ApplicationsAnnaAbdiel
 
Roxtec_Cable_and_pipe_transits_for_Marine_applications_EN
Roxtec_Cable_and_pipe_transits_for_Marine_applications_ENRoxtec_Cable_and_pipe_transits_for_Marine_applications_EN
Roxtec_Cable_and_pipe_transits_for_Marine_applications_ENdavepettit17
 
Medium Voltage Terminations- up to 42kV.| AKBAR TRADING EST.| mail@akbartradi...
Medium Voltage Terminations- up to 42kV.| AKBAR TRADING EST.| mail@akbartradi...Medium Voltage Terminations- up to 42kV.| AKBAR TRADING EST.| mail@akbartradi...
Medium Voltage Terminations- up to 42kV.| AKBAR TRADING EST.| mail@akbartradi...AKBAR TRADING
 
Explosives and accesories
Explosives and accesoriesExplosives and accesories
Explosives and accesoriesSafdar Ali
 
Both 2016 shanghai development of innovative ultra high temperature coatings ...
Both 2016 shanghai development of innovative ultra high temperature coatings ...Both 2016 shanghai development of innovative ultra high temperature coatings ...
Both 2016 shanghai development of innovative ultra high temperature coatings ...Yuguo Cui
 
Both 2016 shanghai development of innovative ultra high temperature coatings ...
Both 2016 shanghai development of innovative ultra high temperature coatings ...Both 2016 shanghai development of innovative ultra high temperature coatings ...
Both 2016 shanghai development of innovative ultra high temperature coatings ...Yuguo Cui
 
Inspection of Fire Fighting Equipments | NFPA Regulations | Gaurav Singh Rajput
Inspection of Fire Fighting Equipments | NFPA Regulations | Gaurav Singh RajputInspection of Fire Fighting Equipments | NFPA Regulations | Gaurav Singh Rajput
Inspection of Fire Fighting Equipments | NFPA Regulations | Gaurav Singh RajputGaurav Singh Rajput
 
20141008 intro eera shale gas_technical seminar_sp2
20141008 intro eera shale gas_technical seminar_sp220141008 intro eera shale gas_technical seminar_sp2
20141008 intro eera shale gas_technical seminar_sp2Pomcert
 

Semelhante a Royex - generation 2 introduction (20)

Royex_Gen2_broschure_A3_web
Royex_Gen2_broschure_A3_webRoyex_Gen2_broschure_A3_web
Royex_Gen2_broschure_A3_web
 
Blasting concepts
Blasting conceptsBlasting concepts
Blasting concepts
 
Blasting concepts (1)
Blasting concepts (1)Blasting concepts (1)
Blasting concepts (1)
 
Corporate presentation
Corporate  presentationCorporate  presentation
Corporate presentation
 
Dafo FORREX - Conveyor Belt Proactive Fire Protection System
Dafo FORREX - Conveyor Belt Proactive Fire Protection SystemDafo FORREX - Conveyor Belt Proactive Fire Protection System
Dafo FORREX - Conveyor Belt Proactive Fire Protection System
 
Minimax power plant
Minimax power plantMinimax power plant
Minimax power plant
 
Understanding Nanocoating Technology
Understanding Nanocoating TechnologyUnderstanding Nanocoating Technology
Understanding Nanocoating Technology
 
Smoke Rated Curtains - PerthWA
Smoke Rated Curtains - PerthWASmoke Rated Curtains - PerthWA
Smoke Rated Curtains - PerthWA
 
Mill-Pro-XS-hot-cure-LongKey-process-Jan-2014-rev2
Mill-Pro-XS-hot-cure-LongKey-process-Jan-2014-rev2Mill-Pro-XS-hot-cure-LongKey-process-Jan-2014-rev2
Mill-Pro-XS-hot-cure-LongKey-process-Jan-2014-rev2
 
Thorne & Derrick Process Heating Brochure 2016
Thorne & Derrick Process Heating Brochure 2016Thorne & Derrick Process Heating Brochure 2016
Thorne & Derrick Process Heating Brochure 2016
 
Roxtec Cable and Pipe Transits for Marine Applications
Roxtec Cable and Pipe Transits for Marine ApplicationsRoxtec Cable and Pipe Transits for Marine Applications
Roxtec Cable and Pipe Transits for Marine Applications
 
Roxtec_Cable_and_pipe_transits_for_Marine_applications_EN
Roxtec_Cable_and_pipe_transits_for_Marine_applications_ENRoxtec_Cable_and_pipe_transits_for_Marine_applications_EN
Roxtec_Cable_and_pipe_transits_for_Marine_applications_EN
 
Medium Voltage Terminations- up to 42kV.| AKBAR TRADING EST.| mail@akbartradi...
Medium Voltage Terminations- up to 42kV.| AKBAR TRADING EST.| mail@akbartradi...Medium Voltage Terminations- up to 42kV.| AKBAR TRADING EST.| mail@akbartradi...
Medium Voltage Terminations- up to 42kV.| AKBAR TRADING EST.| mail@akbartradi...
 
Explosives and accesories
Explosives and accesoriesExplosives and accesories
Explosives and accesories
 
Both 2016 shanghai development of innovative ultra high temperature coatings ...
Both 2016 shanghai development of innovative ultra high temperature coatings ...Both 2016 shanghai development of innovative ultra high temperature coatings ...
Both 2016 shanghai development of innovative ultra high temperature coatings ...
 
Both 2016 shanghai development of innovative ultra high temperature coatings ...
Both 2016 shanghai development of innovative ultra high temperature coatings ...Both 2016 shanghai development of innovative ultra high temperature coatings ...
Both 2016 shanghai development of innovative ultra high temperature coatings ...
 
FG-OD PPT EN_Jan 2016
FG-OD PPT EN_Jan 2016 FG-OD PPT EN_Jan 2016
FG-OD PPT EN_Jan 2016
 
ignition_devices.pdf
ignition_devices.pdfignition_devices.pdf
ignition_devices.pdf
 
Inspection of Fire Fighting Equipments | NFPA Regulations | Gaurav Singh Rajput
Inspection of Fire Fighting Equipments | NFPA Regulations | Gaurav Singh RajputInspection of Fire Fighting Equipments | NFPA Regulations | Gaurav Singh Rajput
Inspection of Fire Fighting Equipments | NFPA Regulations | Gaurav Singh Rajput
 
20141008 intro eera shale gas_technical seminar_sp2
20141008 intro eera shale gas_technical seminar_sp220141008 intro eera shale gas_technical seminar_sp2
20141008 intro eera shale gas_technical seminar_sp2
 

Royex - generation 2 introduction

  • 1. First peak on the next generation propellant systems Royex Generation II Thomas Gustavsson Etken Teknologi Sweden +46 739 38 18 96 Thomas.Gustavsson@etken.se
  • 2. Deflagration is a rapid high energy release combustion event that propagates through a gas or an explosive material at subsonic speeds, driven by the transfer of heat. Deflagration, or Combustion, is different from detonation, which is supersonic and propagates through shock. Propellant powders have long been used as a rock breaking tool Deflagration
  • 4. - Breaking of over size under and over ground with minimal gas risk - Controlled vibration allowes for better wall control - Lowers dilution in gold, platinum and dimond mining - Complete 1.4S solution lowers storage and transport costs Possible Advantages in mining – Achievable goals
  • 5. What are the issues we have to address?
  • 7. Introducing the Royex Generation II rock breaking cartridge Introducing Royex Generation II ‐ New propellant formula – Stronger,  fully oxygen balanced propellant  mix ‐ New modular initiation system with  timing – Only available  pyrotechnical shock tube system  worldwide.  ‐ New cartridge design – New design  allows for cable protection in hole ‐ Significantly improved unit pricing – Improvements in production  capacity gives better pricing
  • 8. Introducing the Royex Generation II rock breaking cartridge
  • 9. Solution to Issue 1: Introducing complete 1.4S world class timing system IntroducingtheMaxclip1.4Ssystem–separationofcartridgeandigniter ‐ NO DETONATORS – in hole and out  of hole igniters are 1.4S ‐ BUILT IN TIMING – Only available  pyrotechnical shock tube system  worldwide.  ‐ VERY SIMPLE TO USE – Connecting  the initiation circuit is just following  color coding ‐ ELECTRICAL AND SHOCK TUBE  AVALIABLE 
  • 10. Solution to Issue 1: Introducing complete 1.4S world class timing system Designed for underground and open cast operations ‐ Modular – Use up to four cartridges  on the same cable with the 6‐way  clip ‐ Timing designed for deflagrating  cartridges – Timing designed to  work optimal with Royex  deflagrating cartridge ‐ System fully waterproof – Use in  damp or wet environments without  issues.
  • 11. Tie up and application First complete pyrotechnical shock tube / electric system with timing  designed for PP cartridges. 
  • 12. Solution to Issue 1: Introducing complete 1.4S world class timing system - The Maxfire igniter. ‐ Maxclip Maxfire igniter ‐ Very hot ignition coupled with a  strong cascading flame effect  enables close to optimal propellant  initiation. The Maxfire igniter is the  foundation to the Royex generation  II system.  Click on image to show video controls.
  • 13. Solution to Issue 1: Introducing complete 1.4S world class timing system - Burning front and timing 20 holes burning front The Maxclip timing enables for a 20  hole burning front to ensure no  interference with the initiation circuit.  This is sufficient for both surface and  underground operations Click on image to show video controls.
  • 14. Tie up and application First time ever – pyrotechnical bench  blasting with timing
  • 15. Tie up and application Maxclip allows for pyrotechnical  decking – individual timing of each deck
  • 16. Trials and performance – Quarry trials Timing trial Click on image to show video controls.
  • 17. System CE approved and 1.4S classified
  • 19. Solution to Issue 2: Introducing new formula and quality of mix Introducing the Royex gen II mix ‐ HIGER DENSITY– Old density max  0.86, new density 0.98 to 1.0 g /cm³ ‐ PERFECT OXGYGEN BALANCE – 70%  AN, 30% NC gives 100% oxygen  balanced mix, no noxious gases on  initiation. Ideal for under ground. ‐ COMPONENT DENSITY AND SIZE  BALANCE – Both the AN and NC prill are of the same size (0.5 mm) and of  same density. No separation.
  • 20. Production plant built in China Optimizing resources and production capabilities ‐ Abundance of propellant – Propellant powder mix in surplus in  china ‐ Factory built in partnership with  large explosive supplier Volume production lowers prices.  Factory ISO9000 certified. EU quality  standards in place. CE approval  granted ‐ Unit price reduced considerably  Volume and fast production means  unit price has been reduced  significantly
  • 21. Production plant built in China MaxClip produced in largest detonator factory in the world – Qinghua – Xian under Etken license Produces over 300 million shock tube  detonators per year (2014) Employs over 5000 people Operates own train network and  airport Outstanding quality processes in place
  • 22.
  • 23. Trials and performance – Quarry trials Trial 1 Click on image to show video controls.
  • 24. Trials and performance – Quarry trials Trial 2 Click on image to show video controls.
  • 25. Trials and performance – Quarry trials Trial 3 Click on image to show video controls.
  • 26. Taking propellant rock breaking to the next level Ultimate solution for underground gold and platinum Drill 0.9m at 70ᵒ - CONTINOUSLY No blowing out holes. Place cartridge system in hole - connect and fire Complete 1.4S system capable of sequentially firing No noxious gasses. Most powerful PP available. Simple to use. Minimal dilution and dust losses
  • 27. What is the impact of these changes? & ETKEN TEKNOLOGI’S SOLUTIONS? • No working timing system • The Maxclip system eliminates this problem • Electric Fuse heads used for timing - 360ºC • • The Maxfire igniter burns vigorously at + 900ºC • Local R&D has gone as far as it can • PP’s and AN have been sized and sieved before mixing • Technical formulation issues • Royex Gen 2 perfectly oxygen balanced – no noxious gasses • Unit cost mentality • Cartridges made in China – Unit cost reduced considerably • Inadequate stemming technique • Cartridge loader and stemming material extensively tested • Mechanical solutions in final testing phase • Safety issues • Complete 1.4S system, safest system available today
  • 28. Thank you! Questions or inquiries, please email info@Etken.se The greatest danger in times of turbulence is not the turbulence – it is to act with yesterdays logic” – Peter Drucker