1. CURRICULUM VITAE
PRASATH.V.R
e-mail: vr_prasath@yahoo.co.in
Phone: +65-86793493
Skype : prasathravanan
CAREER OBJECTIVE:
My primary intent is to effectively utilize my technical knowledge towards
achieving company objectives. I am dedicated and highly motivated to
accept challenges and pursue perfection in work.
CERTIFICATIONS:
Certified as a welding inspector AWS-CWI (Certificate# 09032841)
Certified as a Authorized Piping Inspector API 570 (Certificate# 59824)
Certified as a Authorized Pressure Vessel Inspector API 510 (Certificate#
64045)
Certified as a NDT ASNT Level-II (PT,MT,RT,UT) as per SNT- TC 1A
Certified as a IRCA QMS Lead Auditor (ISO 9001-2008)
Singapore-MOM approved signatory for pressure vessel inspection.
SAUDI ARAMCO & Singapore Welding Society (SWS) Approved Welding
Inspector.
Safety Certification:
Certified as a Supervise Workplace Safety & Health in Process Plant.
Certified as a Supervise work in Confined Space Operation.
Certified as a Work at Height supervisor.
WORK EXPERIENCE (TOTAL): (10.8 years)
Experience in India : 3.5 Years
Experience in Saudi Arabia : 2 Years
2. Experience in Myanmar : 1.5 Years
Experience in Singapore : From June 2013 to till now
Shutdown/Turnaround Projects:
Client Name Petrochemical corporation of Singapore
Designation API 510 & 570 Inspector
Project Olefin I & II Turnaround Project
Duration 4th
July 2016 to 30th
Aug. 2016
Client Name Stepan Singapore
Designation API 570 & API 510 Inspector
Project Methanol Plant
Duration 13th
June 2016 to 28th
June 2016
Client Name Shell Eastern Petroleum (Refinery) Singapore
Designation API 570 & API 510 Inspector
Project 2016 Turnaround
Duration 14th
September 2015 to 25th
December 2015
Client Name 3M Singapore
Designation API 510 & 570 Inspector
Project Chemical Unit1 – Pressure vessel & Piping Shutdown
Duration 2nd
May 2016 to 20th
May 2016
Client Name 3M Singapore
Designation API 510 & 570 Inspector
Project Chemical Unit2 – Pressure vessel & Piping Shutdown
Duration 10th
Dec 2015 to 4th
Jan. 2016
Client Name Daewoo Corp. (HHI) Myanmar
Designation Plant Inspector
Project Gas Terminal (OGT)
Duration 10th
July 2012 to 26th
Apr. 2013
Client Name Saudi Aramco
Designation Welding/Piping Inspector
Project Shedgum Sulfur gas plant-3 Area (In-service &
Modification of Piping)
Duration Dec 2009 to Jan 2009
Projects Other than Shutdown/Turnaround:
New Gas Plant (OGT) Piping, tanks, Structure Construction & Ø32” Pipeline
Offshore & Onshore – SHWE Project, Myanmar (HHI).
Well head booster compressor package Phase IV & VI – Arthit wellhead
platform long term contract for the EPCI (PTTEP).
3. Well Head Equipment Manufacturing in FMC, GE, Cameron (ADCO).
Chemical Injection packages for Rumaitha/Shanayel facilities phase III (ADCO)
Onshore oil & Water Injection Pipeline: Worked as a Welding Inspector in
Water Injection Pipeline Project from August 2010 to June 2011 (SAUDI
ARAMCO).
36ӯ Offshore Gas Pipeline Onshore Works Khursaniyah / Abu Ali.
Fix the Structure pipe supports and cable trays at Utilities – Steam let down-
SHP- in Shedgum plant ( SAUDI ARAMCO)
42” & 36” Pipelines internal Coating Project (SAUDI ARAMCO).
20” Pipeline Marker Coating Project in Offshore Manifa (SAUDI ARAMCO).
Worked as a Painting QC in Pipeline Marker Coating Project.
Modification SO2 storage tank construction (SAUDI ARAMCO).
Line Pipe (API 5L) Fabrication (26 Kilometers) & 3LPE Coating- Welspun
India.
Bongkot Field development project – Finned tube cooler (PTTEP)
PDO SNCP GRE/GRP Product manufacturing and testing project (PDO, AMEC,
HHI).
Repair & Refurbishment Piping, Structure project for the Indian navy ships.
Conducted WPS, PQR & WQR qualification for the Major Clients Keppel,
Singapore Airlines, Saudi Aramco, DAEWOO etc.,
WORK EXPERIENCE I:
Name of the organization: CSS Pte Ltd, Singapore
Experience: May 2013 to Present
Designation: Inspection Engineer / API Inspector
Duties and Responsibilities:
Perform internal and external Visual inspections of pressure vessels, towers, heat
exchangers, piping, tanks, strainers, heaters and other miscellaneous equipment to
determine the condition of the refinery asset.
Prepared Field inspection reports and issuing recommendations based on findings.
Reviewed NDT reports & Witnessed for NDT during Turn Around.
Coordinated with the contractors to ensure the integrity of the equipment after
repair and follow up the work progress. Prepared daily status report for Stationary
equipment inspection team.
Prepared the anomaly and defect tracking register including all defects detected
during the time of inspection and which remedial actions should be taken to
maintain these defects.
Managed the asset anomaly register and inspection deferral process.
Prepared the final summary report, after completion of Turn Around to maintain the
plant History.
4. Identification of the corrosion loops of the pressure system of the refinery based on
the PID, PFD, MSD and all related technical data.
Preparing Corrosion Circuits based on the Corrosion Sectors for individual pipe
lines and Equipment’s.
Identification of the degradation mechanisms based on the API 571.
Used the API RBI for the risk evaluation and criticality analysis of the pressure
system of Refineries.
Assisted in the integrity projects and to carry out a base line survey for all vessels
and pipe work.
Confirmed the degree of conformity with design wall thickness, and provide
baseline measurements against which subsequent loss of wall thickness may be
assessed.
Aligned procedures and integrity management strategies based on local legislative
requirements.
Performed Life Extension Survey of Static Equipment
Publish and maintain the long-term inspection plan for associated pipework,
pipeline components, vessels and structures.
Manage the input of inspection results into the Inspection Data and review for
accuracy and completeness.
Carryout inspection on plant’s steel structure (pipe rack), process piping in a
schedule inspection basis.
Supervise implementing NDT contractor for both scheduled interval inspection and
maintenance and also Corrosion Monitoring.
Establish calculation for pressure piping and pressure vessels retirement thickness.
Estimate useful life of equipment in assist in establishing schedule for repairs,
replacement and/or inspection.
Witnessing ,re-certificate for overhaul of pressure safety valves, pipe work,
structural work, fabrications etc. including hardness testing, crack detection &
radiographic examinations as quality control and witnessing ,re-certificate lifting
equipment.
Identified, reported and assessed anomalies for further action or monitoring.
Supported Plant Inspectors by providing technical guidance on every day issues.
During shutdown campaigns / modification projects, monitored contractors'
repair / modification work on behalf of client.
Carried out Inspection of various types and sizes of Valves, Actuators and
Regulators right from casting/forging, assembly to testing.
5. Witness and preparation of WPS/PQR and WPQR in Keppel Benoi as per ASME Sec
IX/B31.3 Specification and the process SMAW, GTAW, FCAW, GMAW, SAW
(Automatic welding).
Performed dimension inspection on machined parts like valve bodies, Christmas
tree casings, Adaptor body slip on drive lock, casing hanger bodies, casing head
bodies, Riser assembly
Undertaken all the QA/QC activities of the Booster compressor packages for the
Major FPSO Project (PTTEP & TNS).
Witnessed from raw MTC’s review & all the like activities like NDE activities, hydro-
test, dimensional, visual inspection for X-mas tree in FMC Technologies.
Witnessed FAT for the Choke & Kill Manifold in Forum industries & WOM Sea.
Witnessed risers pipe, buoyancy joints repair & rerating in AUS Group, GE Oil & Gas
& RMES.
Witnessed fit-up, welding, NDE activities for Wellhead assembly, Swage assembly in
Oilstates.
Witnessed and preparation of WPS, PQR & WPQR as per AWS D17.1 (aerospace) for
Stainless Steel, Titanium, Inconel, aluminum, copper alloy materials – Singapore
Airlines.
Witnessed 1000 hours test, STB test, Sealing test, Cyclic test, bolt torque test, glass
content test, hydro-test, raw material testing (roving, resin, hardener) for the GRE
products.
Witnessed impact testing for the Duplex & super-duplex materials.
Witnessed PMI inspection for Stainless, Duplex, Super-duplex, copper nickel,
titanium, Inconel and etc., Review the PMI report based on code & project
requirements.
Witnessed thread inspection (API, ACME) according to project requirements.
Carried out stage and final inspection of various mechanical products, pressure
vessels, heat exchangers and boilers, API pipelines etc. from raw material to final
dispatch.
Performing Welder Qualification Tests for various welding procedure specifications as
per ASME section IX & ASME B31.3, API 1104, AWS D1.1, AWS D17.1 & etc for Carbon steel,
Stainless Steel, duplex stainless steel, super-duplex stainless steel, copper nickel,
aluminum, titanium, Inconel materials.
Witnessed FAT inspection for pneumatic shut-off damper for the DSME project.
Familiar with the code ASME 31.3, ASME B31.1, API 1104, ASME SEC IX, ASME
SEC II PART A, B, C, D, ASME SEC V, AWS D1.1 Std, AWS D1.6, AWS D10.1, AWS
6. D17.1, ASME B16.5, ASME 16.25, ASME B16.47, ASME SEC VIII, API 5L, API 16C,
API 6A, API 570, API 571, API 574, API 577, API 510, API 572, API 576, API 578,
API 650 & other codes depends upon Projects.
WORK EXPERIENCE II:
Name of the organization: Hyundai Heavy Industries (Main-con Daewoo) E & C, Myanmar
Experience: November 2011 to July 2012
Designation: Inspection Engineer
Duties and Responsibilities::
To Performing material traceability inspection inprocess fitup & inprocess welding
inspection, Dimensional inspection & Final inspection as per the approved drawings
and specifications.
Monitor the quality control functions/activities of a project, including quality
control inspection schedules and the review and approval of all topside quality
controls.
Performed dimensional inspection for the incoming materials, in-process assembly
& final construction for pressure vessel, piping in accordance with approved
drawings.
Supervise implementing NDT contractor for both scheduled interval inspection and
maintenance and also Corrosion Monitoring.
Performed dimensional inspection for structural parts in accordance with approved
drawings & meet with API 661 standard.
Prepared the as built dimensional dossier relevant to final assembly in line with
project requirements.
Preparing welding Procedure Specification (WPS) with relevant qualified PQR for the
particular projects.
Selecting the suitable filler metal for the base metal qualification of Carbon steel,
Stainless Steel, duplex stainless steel, super-duplex stainless steel, copper nickel,
Inconel materials.
Preparing and implementing Inspection Test Plan and Method Statement for various
activities involved in the construction of Piping, Pipeline as project specification &
relevant International Standards and getting approvals from the client.
Carrying of dimensional and material review of Compact ball valves, globe valve,
gate valve, butterfly valve, check valve, needle valve, PS valve.
7. Performed inspection of all the piping components of stainless steel, duplex
stainless steel, super-duplex stainless steel, carbon steel, titanium, Inconel and etc.,
To Initiating and controlling NCR & DCR for the fabricated items.
To visually inspect the liquid penetrant testing, Magnetic Particle testing, of the
fabricated items.
Maintain the Welder’s Performance & Updating Repair Rate report to the Client.
Prepared daily & weekly fit-up, dimension, welding, painting reports in accordance
with ITP requirements.
To review RT film as per the code with Acceptance criteria.
Review & Witnessing Heat Treatment (PWHT) for stress relieving.
Witnessed for PWHT, UT, MPI, DPT, Tensile test, Bend Test, Impact Test, Micro,
Hardness test, Water proof test, Corrosion Pitting test, Dust proof test and etc.,
based on project requirements.
Performed visual, dimension inspection for GRE & GRP products.
Performed dimension inspection for Piping Spools, Cones, fabricated elbow,
fabricated miter bend & pipe bends in accordance with approved drawings.
To prepare the NDT offer list as per the NDT requirements.
To conduct the pad pneumatic test.
To conduct the Line Inspection, prepare the punch items based on Approved ISO
Drawings, P & ID Drawings & Keyplan.
To conduct the Hydro Test & Pneumatic Test as per project requirements.
Maintaining MCCR Status & Co-ordinate with Client to Clear the MCCR.
Performing inspection of semi-finished fabricated items at vendor premises.
To educate the production people to done the job as per ITP, as per ASME Code and
Client or Project Standard Specification and regulations.
Familiar with following welding process SMAW, GTAW, FCAW, GMAW, SAW.
WORK EXPERIENCE III:
Name of the organization: Abdullah H.Al-Shuwayer Group of Companies, Saudi Arabia
Experience: November 2009 to September 2011
Designation: QA/QC Engineer (Piping, Structural, Welding, Painting, etc.,)
WORK EXPERIENCE IV:
Name of the organization: M/s. Amsa Total Solutions Pvt., Ltd., Chennai.
Experience: May 2006 to October 2009
8. Designation: QA/QC Piping, Structural, Welding, NDE
Duties and Responsibilities::
To check of corrosion occurred after several periods of services, To check welding
condition external and internal, Cleanliness after several period of service.
Preparation of shutdown inspection advice notes (IANs) and inspection reports with
all findings, abnormalities and repair recommendations.
To Performing material traceability inspection in-process fit-up & in-process
welding inspection, Dimensional inspection & Final inspection as per the approved
drawings and specifications.
Performing Welding Procedure Qualification Record (PQR) in case of variation in the
essentials variable with existing PQR, as per international standards and additional
requirement of client for Carbon steel, Stainless Steel, duplex stainless steel, super-
duplex stainless steel, copper nickel, aluminum, titanium, Inconel.
Ensure On-Stream Inspection Survey & Corrosion survey of plant facilities like
piping, equipment’s, structures & etc. Reviewing inspection reports/ Anomaly
assessment/ Analysis of inspection data & providing remedial actions & their
verification. Issuing of inspection reports & certification if applicable.
Establish calculation for pressure piping and pressure vessels retirement thickness.
Maintain the Welder’s Performance & Updating Repair Rate report to the Client.
Prepared daily & weekly fit-up, dimension, welding, painting reports in accordance
with ITP requirements.
To inspect the vessel’s Nozzles orientation marking and Opening.
To conduct Inspection in Blasting & Coating – surface preparation, Atmospheric
condition, Holiday test, Blotter, Pull-off Test, Chloride test, Hardness Test, Porosity,
CD Test, X-cut adhesion test.
Documentation & Maintaining all Inspection Reports as per ISO 9001-2008.
EDUCATIONAL QUALIFICATION:
Completed Diploma in Marine Engineering Passed in First Class with honours at
Mohamed Sathak Polytechnic College, Kilakarai
COMPUTER SKILL:
Windows 98, 2000, XP, Basics of Pro-E & AutoCAD, etc.,
PERSONAL PROFILE:
9. Name : Prasath .V.R
Sex : Male
Nationality : Indian
Father’s Name : V. Ravanan
Languages known : English, Tamil, Hindi, Burmese (LB)
Passport details:
Passport No : Z2841541
Place of issue & date: Singapore & 23-07-2014
Date of expiry : 22-07-2024
I, Prasath V.R, hereby confirm that the information given above is true to the best of
my knowledge.
Place: Singapore.
10. Name : Prasath .V.R
Sex : Male
Nationality : Indian
Father’s Name : V. Ravanan
Languages known : English, Tamil, Hindi, Burmese (LB)
Passport details:
Passport No : Z2841541
Place of issue & date: Singapore & 23-07-2014
Date of expiry : 22-07-2024
I, Prasath V.R, hereby confirm that the information given above is true to the best of
my knowledge.
Place: Singapore.