SlideShare a Scribd company logo
1 of 25
Lucknow Metro
Introduction
oThe Lucknow Metro is a Mass Rapid Transit System (MRTS) .
oAfter completion it will be the fastest and most economical project in India.
oThe metro project will be the most expensive public transport system in the
state of Uttar Pradesh.
oLucknow Metro will be having two routes, from North to South and East to
West.
History
oThe Lucknow Metro Rail Project was planned to include two corridors:
• North-South and East-West.
• The Gomti Nagar Link.
oThe North-South corridor was to cover a distance of 23 kilometres.
o The East-West corridor was planned to have a total length of 11 km.
o The designed speed of metro would be 90 km/h while the scheduled speed would be
34 km/h (21 mph) for North-South corridor and 32 km/h for East-West corridor.
One of the most important projects –why?
oLucknow Metro Rail project is the fastest and most economical such project in
India.
oLucknow, the capital of most populous state of India.
oLucknow is an important service and trading centre.
oRapidly growing city.
o So government of U.P. decided to implement LMRC to meet the mobility and
accessibility needs of people of Lucknow.
Timeline
• 2008 September: Papers for Lucknow metro rail project was submitted to
Uttar Pradesh Government by DMRC
• 2008 October: The LDA (Lucknow Development Authority) cleared the
project
• 2009 February: LDA and DMRC entered into an agreement
• 2009 June: Lucknow traffic pattern was analyzed by a Bangalore company
as per the requirement of DMRC
• 2009 July: DMRC initiated a Geo-technical survey
• 2010 April: DMRC submitted the transportation and traffic report
• 2010 May: The traffic issues were consulted between the committee
formed by Chief Secretary of UP Government and DMRC
• 2010 June: The plan of route alignment was submitted by DMRC. The
related departments were coordinated by Lucknow Divisional
commissioner
• 2010 August: Detailed plan of the route was presented by DMRC
• 2010 September: The route was once again consulted between the DMRC
and committee of Divisional Commissioner
• 2011 July: The DPR (detailed project report) was submitted
• 2013 June: Chief Minister Akhilesh Yadav cleared the metro rail network
• 2013 August: The revised DPR prepared by DMRC was approved by UP
government
• 2013 October: The Lucknow Metro Rail Corporation came into existence.
The construction was planned to start during December
• 2013 November: DMRC initiated to work on Lucknow Metro and assure
to complete the first phase before February 2017
• 2013 December: The project was approved by Indian Government
• 2014 February: E. Sreedharan, the Metro man took the charge as Chief
adviser for Lucknow metro
• 2014 March: Lucknow Metro project was initiated with foundation stone
• 2014 July 10: Union Budget allocate 100 crore rupee towards Lucknow
Metro by Arun Jaitley, Indian Finance Minister
• 2014 September 27: Lucknow Metro construction was initiated
• 2015 August 6: PIB cleared the Lucknow Metro
Initialisation
OBJECTIVE
oAnalyse the strength and weakness of lucknow metro from socio-economic
perspective.
oModel demand supply curve and various revenue functions.
oEstimate the breakeven for lucknow metro.
Initialisation
REQUIREMENTS
oExtensive data.
oDetailed surveys.
oProfile of settlement topography.
Initialisation
FUNDING
oTo be built at an estimated cost of Rs 6,928 crore.
oOut of this, the Centre will fund Rs 1,300 crore in the form of equity and
subordinate debt and rest by state government.
Route
Phase 1 & 2
oTotal nearly 34 kilometers, will be laid across the city at an estimated cost of
Rs 6,928 crores.
oThe East-West corridor will be from Amausi to Indiranagar
oA 3.4-km elevated track connecting Inter college(GomtiNagar) to Patrakarpuram
be the first to be completed.
oThe North-South corridor will connect Gautam Buddha Marg to Vasant Kunj.
Implementation
COST ESTIMATES
oNorth-South Corridor
• Works out to Rs. 4992Crores excluding taxes and duties.
• Estimated total taxes & duties are Rs. 729 Crore.
oCharbagh Railway Station – Vasantkunj
• Works out to Rs. 3723Crores excluding taxes and duties.
• Estimated total taxes & duties are Rs. 572Crore.
Cost Estimates
oEstimated cost of Rs 9786.00 Crore with central taxes and land cost.
Sr. No. Name of Corridor Distance
(KMs)
Estimated cost
without taxes
(Rs/Crore)
Estimated cost
with Central taxes & land cost
(Rs/Crore)
1. N-S Corridor
(CCS Airport-Munshipulia)
22.878 4,992.00 5,590.00
2. E-W Corridor
(Charbagh-Vasant Kunj)
11.098 3,723.00 4,196.00
Status
oApril 2015 : Work of placing of caps on pillars started.
oMay 2015 : Placing of U-Girders began.
oDecember 2015 : Approximately 56% of the civil work had been completed.
oApril 2016 : 80% of construction work completed.
oDecember 2016 : The first line of Lucknow Metro (Transport Nagar to Charbagh)
is expected to get operational.
oThe trial of metro train at priority section is scheduled to be started in August 2016
and final operation will be started in December 2016.
Effects on Environment
oEIA- to predict and qualify the magnitude of impacts, evaluate and asses
the importance of identified changes.
oMain Aim- to decongest the road traffic.
oReduce vehicles on roads and vehicular pollution.
Positive Impacts
oEmployment Opportunities.
oEnhancement of economy.
oReduced traffic.
oReduced Pollution.
oIt is actually a Mass Rapid Transit.
Conclusion
oLucknow Metro was awarded the “Best Metro for Excellence in Innovative
Designs”.
oLucknow Metro project competes with the upcoming Kochi Metro Rail
project to be the fastest completing project.
oMetro systems are more reliable,comfortable and safer than roads based
systems.
oMethodology and arguments used to satisfy these systems needs careful
analysis.
Bibliography
owww.digialm.com/lmrc
owww.lmrcl.com
owww.sarkariresult.com/page/lmrc2016
ohttps://en.wikipedia.org/wiki/Lucknow_Metro
owww.slideshare.net/ravindra_24/lucknow-metro
owww.alstom.com
Thank You

More Related Content

What's hot

Jaipur metro rail project
Jaipur metro rail projectJaipur metro rail project
Jaipur metro rail project
DocumentStory
 
Mahatma gandhi setu Bihar
Mahatma gandhi setu BiharMahatma gandhi setu Bihar
Mahatma gandhi setu Bihar
chauhansunny
 
Hyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable cityHyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable city
Pramod Kumar
 
Seminar
SeminarSeminar
Seminar
JNTU
 

What's hot (20)

Jaipur Metro Project
Jaipur Metro ProjectJaipur Metro Project
Jaipur Metro Project
 
Training report on JMRC
Training report on JMRCTraining report on JMRC
Training report on JMRC
 
Jaipur metro rail project
Jaipur metro rail projectJaipur metro rail project
Jaipur metro rail project
 
doubling project synopsis
doubling project synopsisdoubling project synopsis
doubling project synopsis
 
JMRC TRAINING FINAL REPORT
JMRC TRAINING FINAL   REPORT JMRC TRAINING FINAL   REPORT
JMRC TRAINING FINAL REPORT
 
Doubling progress report
Doubling progress reportDoubling progress report
Doubling progress report
 
Sky bus
Sky busSky bus
Sky bus
 
Mahatma gandhi setu Bihar
Mahatma gandhi setu BiharMahatma gandhi setu Bihar
Mahatma gandhi setu Bihar
 
Sky bus technology
Sky bus technologySky bus technology
Sky bus technology
 
Sky bus technology
Sky bus technologySky bus technology
Sky bus technology
 
Skybus ppt
Skybus pptSkybus ppt
Skybus ppt
 
Hyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable cityHyderabad metro rail – for a better livable city
Hyderabad metro rail – for a better livable city
 
Sky bus
Sky busSky bus
Sky bus
 
Sky Bus
Sky Bus Sky Bus
Sky Bus
 
Skybus an emerging technology
Skybus   an emerging technologySkybus   an emerging technology
Skybus an emerging technology
 
Sky bus an emerging technology
Sky bus an emerging technologySky bus an emerging technology
Sky bus an emerging technology
 
sky bus
sky bussky bus
sky bus
 
Seminar
SeminarSeminar
Seminar
 
Skybus
SkybusSkybus
Skybus
 
Skybus metro as a mode of transportation
Skybus metro as a mode of transportationSkybus metro as a mode of transportation
Skybus metro as a mode of transportation
 

Similar to LMRC summer training

Bangalore metro rail project
Bangalore metro rail projectBangalore metro rail project
Bangalore metro rail project
Saravanan rulez
 
Metro rail in india
Metro rail in indiaMetro rail in india
Metro rail in india
Sourav Paul
 
Infrastructure and aviation - Business environment
Infrastructure and aviation - Business environmentInfrastructure and aviation - Business environment
Infrastructure and aviation - Business environment
Prabhat Taneja
 

Similar to LMRC summer training (20)

Bangalore metro rail project
Bangalore metro rail projectBangalore metro rail project
Bangalore metro rail project
 
Presentation for Dhaka Metro Rail.pptx
Presentation for Dhaka Metro Rail.pptxPresentation for Dhaka Metro Rail.pptx
Presentation for Dhaka Metro Rail.pptx
 
Presentation on Bangladesh Metro Rail - Md Rajib Hossain.pptx
Presentation on Bangladesh Metro Rail - Md Rajib Hossain.pptxPresentation on Bangladesh Metro Rail - Md Rajib Hossain.pptx
Presentation on Bangladesh Metro Rail - Md Rajib Hossain.pptx
 
A_detailed_training_report_on_JAIPUR_ME.pdf
A_detailed_training_report_on_JAIPUR_ME.pdfA_detailed_training_report_on_JAIPUR_ME.pdf
A_detailed_training_report_on_JAIPUR_ME.pdf
 
Metro rail seminor
Metro rail seminor Metro rail seminor
Metro rail seminor
 
Bullet train in India
Bullet train in IndiaBullet train in India
Bullet train in India
 
BMRCL In-Plant Training Report
BMRCL In-Plant Training ReportBMRCL In-Plant Training Report
BMRCL In-Plant Training Report
 
Railway
RailwayRailway
Railway
 
BULLET TRAIN - A Preview on India's FIRST fastest High-Speed Railway Corriodor
BULLET TRAIN - A Preview on India's FIRST fastest High-Speed Railway CorriodorBULLET TRAIN - A Preview on India's FIRST fastest High-Speed Railway Corriodor
BULLET TRAIN - A Preview on India's FIRST fastest High-Speed Railway Corriodor
 
Metro rail in india
Metro rail in indiaMetro rail in india
Metro rail in india
 
Infrastructures in City of Kolkata & West Bengal
Infrastructures in City of Kolkata & West BengalInfrastructures in City of Kolkata & West Bengal
Infrastructures in City of Kolkata & West Bengal
 
CET 206(Transportation Engineering)_Module1_Part 1 - st .pdf
CET 206(Transportation Engineering)_Module1_Part 1 - st .pdfCET 206(Transportation Engineering)_Module1_Part 1 - st .pdf
CET 206(Transportation Engineering)_Module1_Part 1 - st .pdf
 
Dhaka metro rail
Dhaka metro railDhaka metro rail
Dhaka metro rail
 
Introduction to Tranporation Engineering.pptx
Introduction to Tranporation Engineering.pptxIntroduction to Tranporation Engineering.pptx
Introduction to Tranporation Engineering.pptx
 
Infrastructure and aviation - Business environment
Infrastructure and aviation - Business environmentInfrastructure and aviation - Business environment
Infrastructure and aviation - Business environment
 
Metro project
Metro project Metro project
Metro project
 
Presentation1
Presentation1Presentation1
Presentation1
 
Metro rail status in india
Metro rail status in indiaMetro rail status in india
Metro rail status in india
 
Railway engineering By T.Ravi Prakash/Kongu Engineering College
Railway engineering By T.Ravi Prakash/Kongu Engineering CollegeRailway engineering By T.Ravi Prakash/Kongu Engineering College
Railway engineering By T.Ravi Prakash/Kongu Engineering College
 
Highway Development and Planning Transportation Engineering
Highway Development and Planning Transportation EngineeringHighway Development and Planning Transportation Engineering
Highway Development and Planning Transportation Engineering
 

Recently uploaded

Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
dharasingh5698
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 

Recently uploaded (20)

Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086Minimum and Maximum Modes of microprocessor 8086
Minimum and Maximum Modes of microprocessor 8086
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 

LMRC summer training

  • 2. Introduction oThe Lucknow Metro is a Mass Rapid Transit System (MRTS) . oAfter completion it will be the fastest and most economical project in India. oThe metro project will be the most expensive public transport system in the state of Uttar Pradesh. oLucknow Metro will be having two routes, from North to South and East to West.
  • 3. History oThe Lucknow Metro Rail Project was planned to include two corridors: • North-South and East-West. • The Gomti Nagar Link. oThe North-South corridor was to cover a distance of 23 kilometres. o The East-West corridor was planned to have a total length of 11 km. o The designed speed of metro would be 90 km/h while the scheduled speed would be 34 km/h (21 mph) for North-South corridor and 32 km/h for East-West corridor.
  • 4. One of the most important projects –why? oLucknow Metro Rail project is the fastest and most economical such project in India. oLucknow, the capital of most populous state of India. oLucknow is an important service and trading centre. oRapidly growing city. o So government of U.P. decided to implement LMRC to meet the mobility and accessibility needs of people of Lucknow.
  • 5. Timeline • 2008 September: Papers for Lucknow metro rail project was submitted to Uttar Pradesh Government by DMRC • 2008 October: The LDA (Lucknow Development Authority) cleared the project
  • 6. • 2009 February: LDA and DMRC entered into an agreement • 2009 June: Lucknow traffic pattern was analyzed by a Bangalore company as per the requirement of DMRC • 2009 July: DMRC initiated a Geo-technical survey
  • 7. • 2010 April: DMRC submitted the transportation and traffic report • 2010 May: The traffic issues were consulted between the committee formed by Chief Secretary of UP Government and DMRC • 2010 June: The plan of route alignment was submitted by DMRC. The related departments were coordinated by Lucknow Divisional commissioner • 2010 August: Detailed plan of the route was presented by DMRC • 2010 September: The route was once again consulted between the DMRC and committee of Divisional Commissioner
  • 8. • 2011 July: The DPR (detailed project report) was submitted
  • 9. • 2013 June: Chief Minister Akhilesh Yadav cleared the metro rail network • 2013 August: The revised DPR prepared by DMRC was approved by UP government • 2013 October: The Lucknow Metro Rail Corporation came into existence. The construction was planned to start during December • 2013 November: DMRC initiated to work on Lucknow Metro and assure to complete the first phase before February 2017 • 2013 December: The project was approved by Indian Government
  • 10. • 2014 February: E. Sreedharan, the Metro man took the charge as Chief adviser for Lucknow metro • 2014 March: Lucknow Metro project was initiated with foundation stone • 2014 July 10: Union Budget allocate 100 crore rupee towards Lucknow Metro by Arun Jaitley, Indian Finance Minister • 2014 September 27: Lucknow Metro construction was initiated
  • 11. • 2015 August 6: PIB cleared the Lucknow Metro
  • 12. Initialisation OBJECTIVE oAnalyse the strength and weakness of lucknow metro from socio-economic perspective. oModel demand supply curve and various revenue functions. oEstimate the breakeven for lucknow metro.
  • 14. Initialisation FUNDING oTo be built at an estimated cost of Rs 6,928 crore. oOut of this, the Centre will fund Rs 1,300 crore in the form of equity and subordinate debt and rest by state government.
  • 15.
  • 16. Route
  • 17. Phase 1 & 2 oTotal nearly 34 kilometers, will be laid across the city at an estimated cost of Rs 6,928 crores. oThe East-West corridor will be from Amausi to Indiranagar oA 3.4-km elevated track connecting Inter college(GomtiNagar) to Patrakarpuram be the first to be completed. oThe North-South corridor will connect Gautam Buddha Marg to Vasant Kunj.
  • 18. Implementation COST ESTIMATES oNorth-South Corridor • Works out to Rs. 4992Crores excluding taxes and duties. • Estimated total taxes & duties are Rs. 729 Crore. oCharbagh Railway Station – Vasantkunj • Works out to Rs. 3723Crores excluding taxes and duties. • Estimated total taxes & duties are Rs. 572Crore.
  • 19. Cost Estimates oEstimated cost of Rs 9786.00 Crore with central taxes and land cost. Sr. No. Name of Corridor Distance (KMs) Estimated cost without taxes (Rs/Crore) Estimated cost with Central taxes & land cost (Rs/Crore) 1. N-S Corridor (CCS Airport-Munshipulia) 22.878 4,992.00 5,590.00 2. E-W Corridor (Charbagh-Vasant Kunj) 11.098 3,723.00 4,196.00
  • 20. Status oApril 2015 : Work of placing of caps on pillars started. oMay 2015 : Placing of U-Girders began. oDecember 2015 : Approximately 56% of the civil work had been completed. oApril 2016 : 80% of construction work completed. oDecember 2016 : The first line of Lucknow Metro (Transport Nagar to Charbagh) is expected to get operational. oThe trial of metro train at priority section is scheduled to be started in August 2016 and final operation will be started in December 2016.
  • 21. Effects on Environment oEIA- to predict and qualify the magnitude of impacts, evaluate and asses the importance of identified changes. oMain Aim- to decongest the road traffic. oReduce vehicles on roads and vehicular pollution.
  • 22. Positive Impacts oEmployment Opportunities. oEnhancement of economy. oReduced traffic. oReduced Pollution. oIt is actually a Mass Rapid Transit.
  • 23. Conclusion oLucknow Metro was awarded the “Best Metro for Excellence in Innovative Designs”. oLucknow Metro project competes with the upcoming Kochi Metro Rail project to be the fastest completing project. oMetro systems are more reliable,comfortable and safer than roads based systems. oMethodology and arguments used to satisfy these systems needs careful analysis.