Ⅰ. The kinds and structure of the main equipment
Ⅱ. Manufacturing process of the Evaporator
Ⅲ. Transportation of the main equipment
Ⅰ. The kinds and structure of the main equipment
Ⅱ. Manufacturing process of the Evaporator
Ⅲ. Transportation of the main equipment
Contents
▣▣ EQUIPMENT OF THE DESALINATION PLANTEQUIPMENT OF THE DESALINATION PLANT
- Main equipment : equipment to make water directly
- Subsidiary equipment : equipment to keep the quality of the equipment
and to help making water efficiently
Evaporator
Deaerator
Brine Heater
① Evaporator
Power Plant
Desalination Plant
(MSF)
Storage Tank
①
②
④
② Brine Heater
Subsidiary
Equipment
③ Seawater Screening
Equipment
④ Remineralization
Equipment
③
▣▣ COMPOSITION OF THECOMPOSITION OF THE
FACILITIESFACILITIES Main Equipment
Process to make waterProcess to make water
Equipment that produces fresh
water from heated brine through
continuous evaporation and
condensation.
①① EvaporatorEvaporator
②
Equipment that heats the
brine using boiler steam.
②② Brine HeaterBrine Heater
Equipment that removes dissolved
carbon dioxide and oxygen which
are included in the seawater. That
is, Deaerator is used to prevent
the corrosion of evaporator.
③
③③ DeaeratorDeaerator
①
Steam inlet
Brine inlet
heated Brine inlet
②
③
Seawater
inlet
▣▣ Kinds of Main EquipmentKinds of Main Equipment
Steam
Distillate
Sea water
Sea water
▣▣ Principle of the EvaporatorPrinciple of the Evaporator
Flow of the Evaporator insideFlow of the Evaporator inside
Cross Section of the Evaporator insideCross Section of the Evaporator inside
110 ℃ 105 ℃ 100 ℃ 95 ℃ 42 ℃
35 ℃

118 ℃
Tube Demister
Distillate
Brine Side Wall
Tube Bundle
DemisterDemister
Heated Brine
Distillate Trough
Demister
Vapor
Cold Sea Water
Cold Sea water Cold Sea water
evaporated
vapor
Tube
Tube Tube
Tube
Producing distillate from
brine through heat
exchange
Tube
Producing distillate from
brine through heat
exchange
Distillate Trough
Trough to gather
condensed distillate inside
stage
Distillate Trough
Trough to gather
condensed distillate inside
stage
Tube Support Plate
Plate to support tubes and
to prevent vibration
Tube Support Plate
Plate to support tubes and
to prevent vibration
Weir Gate
Gate to control pressure
difference between stages and
flow rate of the brine
Weir Gate
Gate to control pressure
difference between stages and
flow rate of the brine
TubeTube
Waterbo
x
Waterbo
x
Tube
Support
plate
Tube
Support
plate
Distillate
Trough
Distillate
Trough
Pass
Patition Wall
Pass
Patition Wall
▣▣ Structure of the EvaporatorStructure of the Evaporator
▣▣ Structure of the Brine HeaterStructure of the Brine Heater
Impingement Plate
plate to protect tubes
from high pressure and
full speed steam and to
distribute steam evenly
Impingement Plate
plate to protect tubes
from high pressure and
full speed steam and to
distribute steam evenly
Tube Support Plate
Plate to prevent Tube
vibration and to
support tube
Tube Support Plate
Plate to prevent Tube
vibration and to
support tube
Tube
Body to exchange heat
Tube
Body to exchange heat
Tube sheet
Plate to fix tubes
Tube sheet
Plate to fix tubes
Steam
inlet
Condensate
Outlet Brine
inlet
Brine Outlet
▣▣Structure of the DeaeratorStructure of the Deaerator
① Seawater Flow
② Stripping Steam Flow
③ Non-Condensable Gas
Packing Zone
Pall Ring loading space
* Pall Ring : make contact
area of sea water larger
Packing Zone
Pall Ring loading space
* Pall Ring : make contact
area of sea water larger
PallRing
Steam
CO2
O2
N2
Purpose of the Pall Ring
Outline of Evaporator Manufacturing ProcedureOutline of Evaporator Manufacturing Procedure
▣▣ Evaporator Manufacturing procedureEvaporator Manufacturing procedure
One-Module Manufacturing
Method
Block Manufacturing
Method
One-Module Manufacturing Method is to ship Eva. with complete
assembling condition after manufacturing and assembling each bundle in
the shop.
Keep quality of the Evaporator and prevent problems from taking to the
pieces and assembling in the site.
Reduce construction time over 5 months and decrease amount of work in
the site
Divide the Evaporator into 2~4 blocks after manufacturing each bundle in
the shop.
Amount of work increases unless we use one-module manufacturing
method in the site
Make use of overseas manufacturing companies in the site
Distinctive manufacturing process of Doosan’s EvaporatorsDistinctive manufacturing process of Doosan’s Evaporators
Bottom Plate
Assembly
Bundle AssemblyBundle Assembly
◆ Structure assemblyStructure assembly Bottom plate assemblyBottom plate assembly
◆ Bundle assemblyBundle assembly Turn-over (Rotation of 180Turn-over (Rotation of 180 oo
))
Evaporator Manufacturing Procedure
BundleBundle
AssemblyAssembly
◆ Bundle loadingBundle loading Bundle assemblyBundle assembly
◆ Deaerator assemblyDeaerator assembly Tube sheet assemblyTube sheet assembly Waterbox assemblyWaterbox assembly
배관 설치
Specification of Evaporator
- Length : 87 m
- Width : 27 m
- Height : 16 m
- Empty weight : 3500 ton
▣▣ TransportationTransportation
Transportation SizeTransportation Size
Equipment : Modular Transporter
(32EA)
(156 Axlelines, 1072 Wheels)
Size of Transportation Equipment (Modular Transporter - TYPE 2400)
Loading BeamLoading Beam
Procedure of Evaporator Transportation
JettyJetty
◆ InstallationInstallation Base Plate Land Transportation Seafastening Marine Transportation
Procedure of Evaporator Transportation
Fujairah
ChangwonTransportation Route Korea / Fujairah : 5,900 Miles
at 7.5 KNOT : 32.8 Days
8.0 KNOT : 30.7 Days
COLOMBO
(20 Miles)
BOMBAY
(96 Miles)
SINGAPORE
(8 Miles)
: SHELTERING PORT
Marine Transport RouteMarine Transport Route
Routing to site & installation on foundations
AL-TAWEELAH PJT UMM AL NAR PJT
FUJAIRAH PJT
AZ-ZOUR PJT
6/7.2MIGD x 4Units = 24/28.8MIGD (2001)12.5MIGD x 4Units = 50MIGD (2001) 12.5MIGD x 5Units = 62.5MIGD (2002)
12.5MIGD x 5Units = 62.5MIGD (2004)
Experience with One-Module
Transportation
Sabiya St. 1&2 PJT (Kuwait)
12.5MIGD x 4Units = 50.0MIGD
(under construction))
Ras Laffan ‘B’ PJT (Qatar)
15.0 MIGD x 4Units = 60.0MIGD
(under construction))
Question / Answer

More Related Content

What's hot

L 12 contaminent concentration reduction
L 12  contaminent concentration reductionL 12  contaminent concentration reduction
L 12 contaminent concentration reduction
Dr. shrikant jahagirdar
 
Oil & Gas industry Waste Management
Oil & Gas industry Waste ManagementOil & Gas industry Waste Management
Oil & Gas industry Waste Management
mamdouh sabour
 

What's hot (20)

1 Geosynthetics&Geosystems Pilarczyk Pres Final
1 Geosynthetics&Geosystems  Pilarczyk Pres Final1 Geosynthetics&Geosystems  Pilarczyk Pres Final
1 Geosynthetics&Geosystems Pilarczyk Pres Final
 
Effluent Treatment Plant Design, Operation And Analysis Of Waste Water
Effluent Treatment Plant Design, Operation And Analysis Of Waste Water Effluent Treatment Plant Design, Operation And Analysis Of Waste Water
Effluent Treatment Plant Design, Operation And Analysis Of Waste Water
 
Zero liquid discharge
Zero liquid dischargeZero liquid discharge
Zero liquid discharge
 
Zero Liquid Discharge System
Zero Liquid Discharge SystemZero Liquid Discharge System
Zero Liquid Discharge System
 
Coagulation and Flocculation
Coagulation and FlocculationCoagulation and Flocculation
Coagulation and Flocculation
 
L 12 contaminent concentration reduction
L 12  contaminent concentration reductionL 12  contaminent concentration reduction
L 12 contaminent concentration reduction
 
Sedimentation Tanks: Design and Working
Sedimentation Tanks: Design and WorkingSedimentation Tanks: Design and Working
Sedimentation Tanks: Design and Working
 
Material separation and processing techniques in waste management (1)
Material separation and processing techniques in waste management (1)Material separation and processing techniques in waste management (1)
Material separation and processing techniques in waste management (1)
 
L 10 sedimentation
L 10  sedimentationL 10  sedimentation
L 10 sedimentation
 
Sanitary landfill
Sanitary landfill Sanitary landfill
Sanitary landfill
 
Sludge handling and disposal
Sludge handling and disposalSludge handling and disposal
Sludge handling and disposal
 
Zero Liquid Discharge Technology - UPL
Zero Liquid Discharge Technology - UPLZero Liquid Discharge Technology - UPL
Zero Liquid Discharge Technology - UPL
 
L 7 waste volume reduction
L  7 waste volume reductionL  7 waste volume reduction
L 7 waste volume reduction
 
Water softening methods
Water softening methodsWater softening methods
Water softening methods
 
Oil & Gas industry Waste Management
Oil & Gas industry Waste ManagementOil & Gas industry Waste Management
Oil & Gas industry Waste Management
 
Eia report
Eia report  Eia report
Eia report
 
Sludge Dewatering
Sludge DewateringSludge Dewatering
Sludge Dewatering
 
Mechanical unit operations 19_09.pptx
Mechanical unit operations 19_09.pptxMechanical unit operations 19_09.pptx
Mechanical unit operations 19_09.pptx
 
WATER & WASTE WATER ENGINEERING - water treatment process & units
WATER & WASTE WATER ENGINEERING -  water treatment process & unitsWATER & WASTE WATER ENGINEERING -  water treatment process & units
WATER & WASTE WATER ENGINEERING - water treatment process & units
 
Primary sedimentation
Primary sedimentationPrimary sedimentation
Primary sedimentation
 

Viewers also liked

SEA WATER DESALINATION
SEA WATER DESALINATIONSEA WATER DESALINATION
SEA WATER DESALINATION
Soham Sen
 
Desalination of seawater
Desalination of seawaterDesalination of seawater
Desalination of seawater
morrison2816
 
Amr fadlelmawla desalination-kuwait (1)
Amr fadlelmawla desalination-kuwait (1)Amr fadlelmawla desalination-kuwait (1)
Amr fadlelmawla desalination-kuwait (1)
Nidaa Majali
 
Midterm Presentation
Midterm PresentationMidterm Presentation
Midterm Presentation
Jacob Sanchez
 

Viewers also liked (20)

Water desalination
Water desalinationWater desalination
Water desalination
 
SEA WATER DESALINATION
SEA WATER DESALINATIONSEA WATER DESALINATION
SEA WATER DESALINATION
 
Water Desalination
Water DesalinationWater Desalination
Water Desalination
 
Desalination
DesalinationDesalination
Desalination
 
Torishima Seawater Desalination Pumps Venezuela, Ecuador, Central America & C...
Torishima Seawater Desalination Pumps Venezuela, Ecuador, Central America & C...Torishima Seawater Desalination Pumps Venezuela, Ecuador, Central America & C...
Torishima Seawater Desalination Pumps Venezuela, Ecuador, Central America & C...
 
Mohamed Behiry CV
Mohamed Behiry CVMohamed Behiry CV
Mohamed Behiry CV
 
C. A. E. S. Texas grid and gom desalination project for central texas
C. A. E. S. Texas grid and gom desalination project for central texasC. A. E. S. Texas grid and gom desalination project for central texas
C. A. E. S. Texas grid and gom desalination project for central texas
 
Solar CSP - Investment Cost Break-up
Solar CSP - Investment Cost Break-upSolar CSP - Investment Cost Break-up
Solar CSP - Investment Cost Break-up
 
Asha fecilitrator recuritment in West Bengal
Asha fecilitrator recuritment in West BengalAsha fecilitrator recuritment in West Bengal
Asha fecilitrator recuritment in West Bengal
 
Work Areas App Ii
Work Areas App IiWork Areas App Ii
Work Areas App Ii
 
Port lavaca desalination study
Port lavaca desalination studyPort lavaca desalination study
Port lavaca desalination study
 
Carlsbad Desalination Project: Bond Financing Overview and Water Unit Price
Carlsbad Desalination Project: Bond Financing Overview and Water Unit PriceCarlsbad Desalination Project: Bond Financing Overview and Water Unit Price
Carlsbad Desalination Project: Bond Financing Overview and Water Unit Price
 
Adelaide Desalination Plant Death - Allen ONeil
Adelaide Desalination Plant Death - Allen ONeilAdelaide Desalination Plant Death - Allen ONeil
Adelaide Desalination Plant Death - Allen ONeil
 
Water desalination
Water desalinationWater desalination
Water desalination
 
Desalination of seawater
Desalination of seawaterDesalination of seawater
Desalination of seawater
 
Ppt assgn 1
Ppt assgn  1Ppt assgn  1
Ppt assgn 1
 
Amr fadlelmawla desalination-kuwait (1)
Amr fadlelmawla desalination-kuwait (1)Amr fadlelmawla desalination-kuwait (1)
Amr fadlelmawla desalination-kuwait (1)
 
Midterm Presentation
Midterm PresentationMidterm Presentation
Midterm Presentation
 
Reverse osmosis
Reverse osmosisReverse osmosis
Reverse osmosis
 
Definisi Reverse Osmosis System -- By Fujikasui Engineering Indonesia (Perusa...
Definisi Reverse Osmosis System -- By Fujikasui Engineering Indonesia (Perusa...Definisi Reverse Osmosis System -- By Fujikasui Engineering Indonesia (Perusa...
Definisi Reverse Osmosis System -- By Fujikasui Engineering Indonesia (Perusa...
 

Similar to Desalination

Similar to Desalination (20)

Steam boiler
Steam boilerSteam boiler
Steam boiler
 
Cooling Tower:-By Using More Efficient Equipment Increase Efficiency
Cooling Tower:-By Using More Efficient Equipment Increase EfficiencyCooling Tower:-By Using More Efficient Equipment Increase Efficiency
Cooling Tower:-By Using More Efficient Equipment Increase Efficiency
 
Descon Presentation
Descon PresentationDescon Presentation
Descon Presentation
 
Fermentor
FermentorFermentor
Fermentor
 
Offshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton AspelundOffshore structure design, Sigve Hamilton Aspelund
Offshore structure design, Sigve Hamilton Aspelund
 
Powder & Bulk Solids Magazine
 Powder & Bulk Solids Magazine Powder & Bulk Solids Magazine
Powder & Bulk Solids Magazine
 
Drilling Rig Operation & Fire Protection Facility I Gaurav Singh Rajput
Drilling Rig Operation & Fire Protection Facility I Gaurav Singh RajputDrilling Rig Operation & Fire Protection Facility I Gaurav Singh Rajput
Drilling Rig Operation & Fire Protection Facility I Gaurav Singh Rajput
 
Mc kenzie paper 112 2012
Mc kenzie paper 112 2012Mc kenzie paper 112 2012
Mc kenzie paper 112 2012
 
Design Calculation of Venting for Atmospheric & Low Pressure Storage Tanks
Design Calculation of Venting for Atmospheric & Low Pressure Storage TanksDesign Calculation of Venting for Atmospheric & Low Pressure Storage Tanks
Design Calculation of Venting for Atmospheric & Low Pressure Storage Tanks
 
U.S. Bellows Expansion Joint Presentation
U.S. Bellows Expansion Joint PresentationU.S. Bellows Expansion Joint Presentation
U.S. Bellows Expansion Joint Presentation
 
Steam boiler
Steam boilerSteam boiler
Steam boiler
 
Graduation Drilling Technology .pptx
Graduation  Drilling Technology .pptxGraduation  Drilling Technology .pptx
Graduation Drilling Technology .pptx
 
Falling Film Evaporator
Falling Film Evaporator Falling Film Evaporator
Falling Film Evaporator
 
Feed Mill Operations.pptx
Feed Mill Operations.pptxFeed Mill Operations.pptx
Feed Mill Operations.pptx
 
4.2 Offshore platform.pptx
4.2 Offshore platform.pptx4.2 Offshore platform.pptx
4.2 Offshore platform.pptx
 
An introduction to oil and gas production
An introduction to oil and gas productionAn introduction to oil and gas production
An introduction to oil and gas production
 
Tratamento e reutilização de água
Tratamento e reutilização de águaTratamento e reutilização de água
Tratamento e reutilização de água
 
Bhel ppt
Bhel pptBhel ppt
Bhel ppt
 
Boilers IN EME
Boilers IN EMEBoilers IN EME
Boilers IN EME
 
Unit i
Unit iUnit i
Unit i
 

Recently uploaded

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 

Recently uploaded (20)

XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 

Desalination

  • 1. Understanding of Main Equipment in Desalination Plant Desalination Business Group Design Team
  • 2. 1. Understand the kinds and principle of main equipment 2. Understand the manufacturing process and transportation of the Evaporator 1. Understand the kinds and principle of main equipment 2. Understand the manufacturing process and transportation of the Evaporator The aim of the Presentation Ⅰ. The kinds and structure of the main equipment Ⅱ. Manufacturing process of the Evaporator Ⅲ. Transportation of the main equipment Ⅰ. The kinds and structure of the main equipment Ⅱ. Manufacturing process of the Evaporator Ⅲ. Transportation of the main equipment Contents
  • 3. ▣▣ EQUIPMENT OF THE DESALINATION PLANTEQUIPMENT OF THE DESALINATION PLANT - Main equipment : equipment to make water directly - Subsidiary equipment : equipment to keep the quality of the equipment and to help making water efficiently Evaporator Deaerator Brine Heater
  • 4. ① Evaporator Power Plant Desalination Plant (MSF) Storage Tank ① ② ④ ② Brine Heater Subsidiary Equipment ③ Seawater Screening Equipment ④ Remineralization Equipment ③ ▣▣ COMPOSITION OF THECOMPOSITION OF THE FACILITIESFACILITIES Main Equipment Process to make waterProcess to make water
  • 5. Equipment that produces fresh water from heated brine through continuous evaporation and condensation. ①① EvaporatorEvaporator ② Equipment that heats the brine using boiler steam. ②② Brine HeaterBrine Heater Equipment that removes dissolved carbon dioxide and oxygen which are included in the seawater. That is, Deaerator is used to prevent the corrosion of evaporator. ③ ③③ DeaeratorDeaerator ① Steam inlet Brine inlet heated Brine inlet ② ③ Seawater inlet ▣▣ Kinds of Main EquipmentKinds of Main Equipment
  • 6. Steam Distillate Sea water Sea water ▣▣ Principle of the EvaporatorPrinciple of the Evaporator Flow of the Evaporator insideFlow of the Evaporator inside Cross Section of the Evaporator insideCross Section of the Evaporator inside 110 ℃ 105 ℃ 100 ℃ 95 ℃ 42 ℃ 35 ℃  118 ℃ Tube Demister Distillate Brine Side Wall
  • 9. Cold Sea Water Cold Sea water Cold Sea water evaporated vapor Tube Tube Tube
  • 10. Tube Producing distillate from brine through heat exchange Tube Producing distillate from brine through heat exchange Distillate Trough Trough to gather condensed distillate inside stage Distillate Trough Trough to gather condensed distillate inside stage Tube Support Plate Plate to support tubes and to prevent vibration Tube Support Plate Plate to support tubes and to prevent vibration Weir Gate Gate to control pressure difference between stages and flow rate of the brine Weir Gate Gate to control pressure difference between stages and flow rate of the brine TubeTube Waterbo x Waterbo x Tube Support plate Tube Support plate Distillate Trough Distillate Trough Pass Patition Wall Pass Patition Wall ▣▣ Structure of the EvaporatorStructure of the Evaporator
  • 11. ▣▣ Structure of the Brine HeaterStructure of the Brine Heater Impingement Plate plate to protect tubes from high pressure and full speed steam and to distribute steam evenly Impingement Plate plate to protect tubes from high pressure and full speed steam and to distribute steam evenly Tube Support Plate Plate to prevent Tube vibration and to support tube Tube Support Plate Plate to prevent Tube vibration and to support tube Tube Body to exchange heat Tube Body to exchange heat Tube sheet Plate to fix tubes Tube sheet Plate to fix tubes Steam inlet Condensate Outlet Brine inlet Brine Outlet
  • 12. ▣▣Structure of the DeaeratorStructure of the Deaerator ① Seawater Flow ② Stripping Steam Flow ③ Non-Condensable Gas Packing Zone Pall Ring loading space * Pall Ring : make contact area of sea water larger Packing Zone Pall Ring loading space * Pall Ring : make contact area of sea water larger
  • 14. Outline of Evaporator Manufacturing ProcedureOutline of Evaporator Manufacturing Procedure ▣▣ Evaporator Manufacturing procedureEvaporator Manufacturing procedure
  • 15. One-Module Manufacturing Method Block Manufacturing Method One-Module Manufacturing Method is to ship Eva. with complete assembling condition after manufacturing and assembling each bundle in the shop. Keep quality of the Evaporator and prevent problems from taking to the pieces and assembling in the site. Reduce construction time over 5 months and decrease amount of work in the site Divide the Evaporator into 2~4 blocks after manufacturing each bundle in the shop. Amount of work increases unless we use one-module manufacturing method in the site Make use of overseas manufacturing companies in the site Distinctive manufacturing process of Doosan’s EvaporatorsDistinctive manufacturing process of Doosan’s Evaporators
  • 16. Bottom Plate Assembly Bundle AssemblyBundle Assembly ◆ Structure assemblyStructure assembly Bottom plate assemblyBottom plate assembly ◆ Bundle assemblyBundle assembly Turn-over (Rotation of 180Turn-over (Rotation of 180 oo )) Evaporator Manufacturing Procedure
  • 17. BundleBundle AssemblyAssembly ◆ Bundle loadingBundle loading Bundle assemblyBundle assembly ◆ Deaerator assemblyDeaerator assembly Tube sheet assemblyTube sheet assembly Waterbox assemblyWaterbox assembly
  • 18. 배관 설치 Specification of Evaporator - Length : 87 m - Width : 27 m - Height : 16 m - Empty weight : 3500 ton ▣▣ TransportationTransportation Transportation SizeTransportation Size Equipment : Modular Transporter (32EA) (156 Axlelines, 1072 Wheels)
  • 19. Size of Transportation Equipment (Modular Transporter - TYPE 2400)
  • 20. Loading BeamLoading Beam Procedure of Evaporator Transportation
  • 21. JettyJetty ◆ InstallationInstallation Base Plate Land Transportation Seafastening Marine Transportation Procedure of Evaporator Transportation
  • 22. Fujairah ChangwonTransportation Route Korea / Fujairah : 5,900 Miles at 7.5 KNOT : 32.8 Days 8.0 KNOT : 30.7 Days COLOMBO (20 Miles) BOMBAY (96 Miles) SINGAPORE (8 Miles) : SHELTERING PORT Marine Transport RouteMarine Transport Route
  • 23. Routing to site & installation on foundations
  • 24. AL-TAWEELAH PJT UMM AL NAR PJT FUJAIRAH PJT AZ-ZOUR PJT 6/7.2MIGD x 4Units = 24/28.8MIGD (2001)12.5MIGD x 4Units = 50MIGD (2001) 12.5MIGD x 5Units = 62.5MIGD (2002) 12.5MIGD x 5Units = 62.5MIGD (2004) Experience with One-Module Transportation Sabiya St. 1&2 PJT (Kuwait) 12.5MIGD x 4Units = 50.0MIGD (under construction)) Ras Laffan ‘B’ PJT (Qatar) 15.0 MIGD x 4Units = 60.0MIGD (under construction))