ANALYSIS AND DESIGN OF STEEL
FLYOVER
AT VANDALUR JUNCTION
BATCH MEMBERS
J.LOKSUNDAR (412714103030)
J.NISHA JANU (412714103043)
S.PEER MOHIDEEN (412714103044)
V.VIGNESH (412714103307)
PROJECT SUPERVISED
BY
Mr. S.E KAARTHIC M.E.
ASSISTANT PROFESSOR
CONTENTS
• Introduction
• Aim and Objective
• Scope
• Literature review
• Methodology
• Materials used
• Design
• Conclusion
INTRODUCTION
A flyover is a overpass, a high level road bridge that crosses over
a highway interchange or intersection.
It is a grade separated structure connects a road at different levels
for the purpose of reducing vehicle congestion.
NEED FOR STUDY
 To overcome the traffic congestion caused due to institutional, infrastructural and
industrial growth in that area, the location has been changed as one of the most
congested area.
 This locality needs a suitable remedy to overcome this problem. Therefore, we
have planned to design and provide the flyover in this locality.
AIM
To analyze and design of Steel flyover at Vandalur Junction
OBJECTIVE
Analysis and designing of flyover :
• STAAD pro for analysis.
• IRC and IS code books for designing .
• Design of deck slab, longitudinal girder , cross girder, piers and pile foundation.
SCOPE
• It will play a major role in streamlining the traffic control system.
• It will reduce the risk of accidents.
• Through flyover plenty of time can be saved avoiding congestion
LITERATURE REVIEW
AUTHOR TITLE DESCRIPTION
K. Kreislova Evaluation of corrosion protection
of steel flyover bridges
In this research, it helps to know about corrosion protection of steel
flyover including evaluation of microclimate corrosivity and
critical areas of bridge steel constructions during their service life.
Causes of corrosion in the steel flyover are described very well in
this research.
Sudhir Yadav Supply Chain Management in
Flyover Projects in India
In this research, paper explores the application of supply chain
management (SCM) in the Indian construction industry . A case
study approach was followed for the research work. Structured
interviews were conducted to understand the SCM practices in
flyover projects in India.
B.Sankar Evaluation and Design of Flyover
using Staad pro
In this research , Grillage analogy methodology and style the
foremost effective skew bridge by victimization STAAD
professional software package.
AUTHOR TITLE DESCRIPTION
Abdulkadhar bin ayat Analysis and design of hammerhead
flyover
In this research, learnt about the focus on comparison the
reinforcement detail drawing produce previously
designed using the strength method and reinforcing
requirement using strut-and-tie model.
G.T.Webb Analysis of structural health
monitoring data from Hammersmith
flyover
In this paper aims to show that value can be derived
from detailed analysis of measurements from a number
of different sensors, including acoustic emission
monitors, strain, temperature and displacement gauges.
Ioannis G. Raftoyiannis Strengthening of steel flyover bridge In this research, it helps to know about to ensure the
strength and load carrying capacity of the and also
estimating of the remaining life of the bridge against
fatigue has been discussed very well.
METHODOLOGY
SELECTION OF SITE
 Vandalur junction is one of the adversely affecting traffic congested area.
This is because of growth of population and industrial development area.
 There are large numbers of educational institutions, universities, IT
companies in nearby circumstances.
 Vandalur junction is proposed site that we had chosen for the design of
flyover.
LOCATION
DESCRIPTION OF MATERIALS
CEMENT
 We use OPC grade 53 for constructing bridge structures like piers and deck slab etc.
CONCRETE:
 We use M20 grade of concrete for designing the abutment and piers.
REINFORCED STEEL:
 We prefer HYSD reinforced bars Fe415 for bridge structures.
FOUNDATION:
 We use pile foundation due to the safe bearing capacity of soil .
DESIGN OF DECK SLAB
Panel dimensions = 2m x 4.75 m
Dead weight of slab = (0.3×1x 24)
= 7.20 kN/𝑚2
Dead weight of W.C =(0.08×1x 22)
= 1.76 kN/𝑚2
Total load = 9kN/𝑚2
Live load bending moment
Short span moment MB =31 kNm
Long span moment ML = 10.5 kNm
Dead load bending moment
Short span moment MB =34.15kNm
Long span moment ML =11.34 kNm
Depth of the deck slab
Overall depth =300mm
Effective depth =260mm
Short span
Area of reinforcement = 722 mm2
Diameter bars = 12 mm
Numbers of bars = 20 nos
Spacing = 140 mm c/c
Long span
Area of reinforcement = 250 mm2
Diameter bars = 10 mm
spacing = 150 mm c/c
Number of bars = 15 nos
CROSS SECTION OF DECK SLAB
MOVING LOAD ON DECK SLAB
Influence Surface Group = 1
Design code = IRC Chapter3
Design effect = Node 70: Displacement (Y);
Loading Class = Class AA Loading
Impact factor : 1
Max. Effect = -3.85488 mm
RESULT
The correspondent 1 effect = -0.645556 mm
The correspondent 3 effect = 0.0363094 mm
The correspondent 4 effect = -0.000486124 rad
The correspondent 5 effect = 2.79581e-005 rad
The correspondent 6 effect = 0.000631681 rad
DESIGN OF STEEL PLATE GIRDER
Spacing of main girders = 2m
Spacing of cross girders = 4.5m
Dead load on girder =(9x2) = 18kN/m
Self weight of girder (0.2L +1) = 4 kN/m
Total load W = 22 kN/ m
Self-weight of main girders = (2x1) =2kN
Dead load moment
The maximum dead load moment is computed as
Mmax = [(22 x 182)/8 + (2 x 18)/4 + (2 x 4.5)] = 909kNm
Live load moment
The maximum live load moment is computed as
Mmax = [(350 x 9)/2- (350 x 0.9/2] = 1418kN
SHEAR FORCES
Dead load shear = [(22 x 18)/2+2/2] = 210kN
Live load shear with impact factor
= 1.1[(350x16.2)/18] = 347kN
Total design shear = V = (201 + 347 ) =548kN.
proportioning of I section girder
Web plate = 1000mm x 10 mm
Flange area required =13303mm2
Flange plates = 500 mm x 30 mm
check for maximum stresses
allowable average shear stress is 87N/mm2
Hence the average shear stress is with in safe permissible limits.
connection between flange and web
Use 5mm fillet weld, continuous on either side.
intermediate stiffness
Spacing of stiffeners = 1000 mm
Intermediate stiffeners = 10 mm x 80 mm
connection of vertical stiffness to web
Use 100mm long, 5mm fillet welds alternately on either side.
connection between bearing stiffener and web
Use 100mm long 5mm welds alternately.
PROPERTIES OF PLATE GIRDER
pitch of shear connectors
Hence adopt a pitch of 400 mm in the
longitudinal direction.
CROSS SECTION OF STEEL PLATE GIRDER
DESIGN OF PIER
Length of the column L = 5.2m
Total loads from deck slab as 25 kN/m = 25x 20=500kN
we taken100 % of deck slab load i.e 1000 kN
Grade of concrete M20
Grade of steel Fe415
Size of column calculation
Provide the diameter of the column = 350 mm
Check for eccentricity
Emin =
𝑙
500
+
𝐷
30
=
5200
500
+
350
30
= 29 mm
Emin ≤
0.05x350 = 19 mm
Emin= 29 mm > 0.05D
Try 750 mm size column diameter
Emin =
𝑙
500
+
𝐷
30
=
5200
500
+
750
30
= 36 < 20 mm
Hence emin = 36 mm
Also check, Emin ≤
0.05x750 = 37.5 mm
Emin= 36mm < 0.05D
Now it is axially loaded column
Le/D =
3676.4
750
= 4.90 < 12, also it is short column
Longitudinal reinforcement calculation
Area of longitudinal reinforcement Asc = 2782.53 mm2
diameter bar = 20 mm
No of bars = 30 nos
Provide minimum Asc = 30 nos- 25 mm diameter bars.
Design of ties
From clause 26.5.3.2, IS456 – 2000
Dia of ties >
1
4
x largest dia of longitudinal bar =
1
4
x 25 = 6.25 mm ≈ 8 mm
Provide 8 mm diameter spiral of ties
design of pier cap
effective depth = 500 mm and overall depth= 550 mm
area of reinforcement Ast =
300×106
230×0.9×500
= 2890mm2
diameter bar = 20 mm
No of bars 30 nos
Provide 30 Nos of bar at 20 mm dia bar
spacing of bar = 200mm
adopt 20 mm diameter bars at 200 mm centres
Distribution reinforcement= 1990 mm2
diameter bar = 16 mm
No of bars = 15 nos
Provide 15 Nos of bars at 16mm dia bar
Adopt 16mm diameter bars at 250 mm centres as distribution steel
Maximum shear force = V = 500 KN
Shear stress = τv =
𝑣
𝑏𝑑
=
500×103
1500×500
= 0.40 N/𝑚𝑚2
Using 10 mm diameter stirrups (8 legged), spacing is given by
Sv=
8×79×230×500
500×103 = 242.5 mm
Adopt 10 mm diameter stirrups at 250 mm centres.
REINFORCEMENT DETAIL OF PIER AND PIER CAP
Grade of concrete = M20
Grade of steel = Fe415 (HYSD BARS)
Length = 5200 mm
Cross section = 1500 mm
Cover = 40 mm
Required steel area = 2769.74 sq.mm
Required concrete area = 1766951.75 sq.mm
Main Reinforcement : provide 25-12 dia (0.16% 2827.43 sq.mm)
Ties Reinforcement : provided 8 mm dia helical ties @ 55 mm c/c
Section capacity based on reinforced required (K)
PUZ = -1020.84 kN; Interaction ratio = 0.063 (as per CL.39.6, IS456:2000)
PROPERTIES AND REINFORCEMENT DETAILING OF PIER COLUMN
DESIGN OF PILE FOUNDATION
proportioning of pile arrangements
Length of pile above the ground level = 0.5 m
Length of pile below ground level = 5 m
Total length of pile = (5 +0.5) = 5.5 m
Size of pile = 300x300 mm
Length of pile = 5.5 m
Width of pile = 0.3 m
Ratio (L/B) = 5.5/0.3 = 19 > 12
Hence the pile is design as a long column
Longitudinal reinforcements
Adopt 8 bars of 20mm diameter providing an area of Asc = 2200𝑚𝑚2 with a clear cover of 40 mm.
Lateral reinforcements
Hence provide 8 mm diameter ties at 150 mm centres in the main body of the pile.
Lateral reinforcement near pile head
clear cover of 40 mm to the main longitudinal reinforcement of 20 mm diameter bars and using 8 mm
diameter spiral ties inside the main reinforcements
Adopt 8 mm diameter spirals at a pitch of 50 mm for a length of 900 mm at the top of pile.
Lateral reinforcement near pile ends
Adopt 8 mm diameter ties at 80 mm centres for a length of 900 mm from the end of the pile both at top
and bottom
design of pile cap
The maximum bending moment in the pile cap Mzz = 375 kNm
effective depth = 600 and overall depth= 650 mm
area of reinforcement Ast =
375×106
230×0.9×500
= 3020 mm2
diameter bar = 25 mm, spacing = 250 mm
adopt 25 mm diameter bars at 250 mm centres
Distribution reinforcement = 780 mm2
Adopt 16mm diameter bars at 250 mm centres as distribution steel
Maximum shear force = V = 500 KN
Shear stress = τv =
𝑣
𝑏𝑑
=
600×106
1500×600
= 0.40 N/mm2
From table 17 of IS 456- 2000,τc = 0.28 N/mm2
Adopt 10 mm diameter stirrups at 200 mm centres in a width of 1500 mm.
REINFORCEMENT DETAIL OF PILE CAP
REINFORCEMENT DETAIL OF PILE
CONCLUSION
• In this project we designed a road over bridge elements in order to avoid traffic
congestion in our proposed project site.
• In this grade separator, the main components consist of deck slab, longitudinal
girders, cross girders, pier and pile foundation. The geometric design of the grade
separator was done by using IRC Code books.
• The deck slab was designed as using IRC 6-2000 codal provisions. The deck slab
was supported by the steel girder (I section) was design by using IS800 codal
provisions.
• The geometric dimension of the separator was designed by considering
the future traffic density.
• Finally, all the elements are designed for the purpose of reducing the
traffic density and avoiding accidents.
REFERENCES
• Abdul kadhar bin ayat “Analysis and design of hammerhead flyover” vol 2 issue 3
(2017)
• B.Sankar “Evaluation and Design of Flyover using Staad pro” international journal
of professional engineering studies volume vii /issue 2 / sep (2016)
• Pichai Taneerananon “A Study of a Flyover-Bridge - Improved Intersection”
ENGINEERING JOURNAL Volume 19 Issue 1 30 January (2015)
• Akhilesh Kumar Maurya “Performance-based intersection layout under a flyover for
heterogeneous traffic” (2015)
BIBLOGRAPHY
• IS 456-2000 Indian standards - Plain and Reinforced concrete – code of practice.
• IRC 6-2000 Specification for Road bridges – Section - 2- Code of practice.
• IRC 78:2000 Standard speciation and code of practice for road Bridges
• IS: 800-2007 Indian Standard Specifications General Construction in Steel-Code of
Practice, Bureau of Indian Standards, 2007
• Ponnuswamy.S, “Bridge Engineering” publisher, Tata MeGraw-Hill, New Delhi.
• Krishna Raju. N, “DESIGN OF BRIDGE ENGINEERING”, CBS publishers and
distributors Delhi, 2006
THANK YOU

More Related Content

What's hot

Analysis & design of T-Beam bridge
Analysis & design of T-Beam bridgeAnalysis & design of T-Beam bridge
Analysis & design of T-Beam bridgeElamathy Murugan
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concreteRajesh Burde
 
Design & Analysis of G+2 Residential Building Using STAAD Pro
Design & Analysis of G+2 Residential Building Using STAAD ProDesign & Analysis of G+2 Residential Building Using STAAD Pro
Design & Analysis of G+2 Residential Building Using STAAD ProPARAS TANEJA
 
Eccentric connection(Design of Steel Strucuture)
Eccentric connection(Design of Steel Strucuture)Eccentric connection(Design of Steel Strucuture)
Eccentric connection(Design of Steel Strucuture)Vikas Kumar Kushwaha
 
PRESTRESSED CONCRETE
PRESTRESSED CONCRETEPRESTRESSED CONCRETE
PRESTRESSED CONCRETEghildiyal8811
 
Analysis and design of a multi storey reinforced concrete
Analysis and design of a multi storey reinforced concreteAnalysis and design of a multi storey reinforced concrete
Analysis and design of a multi storey reinforced concreteSurat Construction PVT LTD
 
Axially loaded columns
Axially loaded columnsAxially loaded columns
Axially loaded columnsYash Patel
 
Design of Reinforced Concrete Structure (IS 456:2000)
Design of Reinforced Concrete Structure (IS 456:2000)Design of Reinforced Concrete Structure (IS 456:2000)
Design of Reinforced Concrete Structure (IS 456:2000)MachenLink
 
Lacing, battening
Lacing, battening Lacing, battening
Lacing, battening Yash Patel
 
Lassing and Battering system
Lassing and Battering systemLassing and Battering system
Lassing and Battering system9033124117
 
Chapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONSChapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONSKHUSHBU SHAH
 
Multi story building construction training report anshul
Multi story building construction training report anshulMulti story building construction training report anshul
Multi story building construction training report anshulAnshul Shakya
 
Structural analysis 2
Structural analysis   2Structural analysis   2
Structural analysis 2R VIJAYAKUMAR
 

What's hot (20)

Analysis & design of T-Beam bridge
Analysis & design of T-Beam bridgeAnalysis & design of T-Beam bridge
Analysis & design of T-Beam bridge
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
Design of staircases
Design of staircasesDesign of staircases
Design of staircases
 
Design & Analysis of G+2 Residential Building Using STAAD Pro
Design & Analysis of G+2 Residential Building Using STAAD ProDesign & Analysis of G+2 Residential Building Using STAAD Pro
Design & Analysis of G+2 Residential Building Using STAAD Pro
 
Eccentric connection(Design of Steel Strucuture)
Eccentric connection(Design of Steel Strucuture)Eccentric connection(Design of Steel Strucuture)
Eccentric connection(Design of Steel Strucuture)
 
Segmental bridge construction
Segmental bridge constructionSegmental bridge construction
Segmental bridge construction
 
PRESTRESSED CONCRETE
PRESTRESSED CONCRETEPRESTRESSED CONCRETE
PRESTRESSED CONCRETE
 
Analysis and design of a multi storey reinforced concrete
Analysis and design of a multi storey reinforced concreteAnalysis and design of a multi storey reinforced concrete
Analysis and design of a multi storey reinforced concrete
 
Axially loaded columns
Axially loaded columnsAxially loaded columns
Axially loaded columns
 
Design of Reinforced Concrete Structure (IS 456:2000)
Design of Reinforced Concrete Structure (IS 456:2000)Design of Reinforced Concrete Structure (IS 456:2000)
Design of Reinforced Concrete Structure (IS 456:2000)
 
Lacing, battening
Lacing, battening Lacing, battening
Lacing, battening
 
Pile foundation
Pile foundationPile foundation
Pile foundation
 
Bearings in bridges
Bearings in bridgesBearings in bridges
Bearings in bridges
 
Composite construction
Composite constructionComposite construction
Composite construction
 
Lassing and Battering system
Lassing and Battering systemLassing and Battering system
Lassing and Battering system
 
Chapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONSChapter 1 PILE FOUNDATIONS
Chapter 1 PILE FOUNDATIONS
 
Stepped footing
Stepped footingStepped footing
Stepped footing
 
Multi story building construction training report anshul
Multi story building construction training report anshulMulti story building construction training report anshul
Multi story building construction training report anshul
 
Beam design
Beam designBeam design
Beam design
 
Structural analysis 2
Structural analysis   2Structural analysis   2
Structural analysis 2
 

Similar to design of steel flyover

New Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptxNew Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptxRajeshKumar25548
 
Chap-5-T-Girder Example-1.pdf
Chap-5-T-Girder Example-1.pdfChap-5-T-Girder Example-1.pdf
Chap-5-T-Girder Example-1.pdfAberaMamoJaleta
 
Hospital Building(PPT).pptx
Hospital Building(PPT).pptxHospital Building(PPT).pptx
Hospital Building(PPT).pptxRajeshKumar25548
 
Combined footings
Combined footingsCombined footings
Combined footingsseemavgiri
 
Established a relationship between weld splice length and diameter of the rei...
Established a relationship between weld splice length and diameter of the rei...Established a relationship between weld splice length and diameter of the rei...
Established a relationship between weld splice length and diameter of the rei...NUR
 
IRJET- Cost Analysis of Two-Way Slab and Post Tension Slab
IRJET-  	  Cost Analysis of Two-Way Slab and Post Tension SlabIRJET-  	  Cost Analysis of Two-Way Slab and Post Tension Slab
IRJET- Cost Analysis of Two-Way Slab and Post Tension SlabIRJET Journal
 
Design of Steel Grillage Foundation for an Auditorium
Design of Steel Grillage Foundation for an AuditoriumDesign of Steel Grillage Foundation for an Auditorium
Design of Steel Grillage Foundation for an AuditoriumIRJET Journal
 
Design of Automated Circular Pedestrian Crossing at a Road Intersection
Design of Automated Circular Pedestrian Crossing at a Road IntersectionDesign of Automated Circular Pedestrian Crossing at a Road Intersection
Design of Automated Circular Pedestrian Crossing at a Road IntersectionIRJET Journal
 
The effective width in multi girder composite steel beams with web openings
The effective width in multi girder composite steel beams with web openingsThe effective width in multi girder composite steel beams with web openings
The effective width in multi girder composite steel beams with web openingsIAEME Publication
 
Comparative study of Conventional Bridge with Innovative Bridge for Optimization
Comparative study of Conventional Bridge with Innovative Bridge for OptimizationComparative study of Conventional Bridge with Innovative Bridge for Optimization
Comparative study of Conventional Bridge with Innovative Bridge for OptimizationIJERA Editor
 
onw way slab design
onw way slab designonw way slab design
onw way slab designPalak Patel
 
A COMPARATIVE STUDY ON RIGID CONNECTION DESIGN OF FRAMED MULTI STOREYED STEEL...
A COMPARATIVE STUDY ON RIGID CONNECTION DESIGN OF FRAMED MULTI STOREYED STEEL...A COMPARATIVE STUDY ON RIGID CONNECTION DESIGN OF FRAMED MULTI STOREYED STEEL...
A COMPARATIVE STUDY ON RIGID CONNECTION DESIGN OF FRAMED MULTI STOREYED STEEL...IRJET Journal
 
Final Paper on Study and Design of Footbridge to connect the first floor of C...
Final Paper on Study and Design of Footbridge to connect the first floor of C...Final Paper on Study and Design of Footbridge to connect the first floor of C...
Final Paper on Study and Design of Footbridge to connect the first floor of C...IRJET Journal
 
Planing,designing and analysis of HI TECH SHOPPING MALL
Planing,designing and analysis of HI TECH SHOPPING MALLPlaning,designing and analysis of HI TECH SHOPPING MALL
Planing,designing and analysis of HI TECH SHOPPING MALLArshana Anu
 

Similar to design of steel flyover (20)

New Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptxNew Microsoft PowerPoint Presentation.pptx
New Microsoft PowerPoint Presentation.pptx
 
Chap-5-T-Girder Example-1.pdf
Chap-5-T-Girder Example-1.pdfChap-5-T-Girder Example-1.pdf
Chap-5-T-Girder Example-1.pdf
 
Unit i
Unit iUnit i
Unit i
 
Hospital Building(PPT).pptx
Hospital Building(PPT).pptxHospital Building(PPT).pptx
Hospital Building(PPT).pptx
 
Combined footings
Combined footingsCombined footings
Combined footings
 
6.pptx
6.pptx6.pptx
6.pptx
 
Established a relationship between weld splice length and diameter of the rei...
Established a relationship between weld splice length and diameter of the rei...Established a relationship between weld splice length and diameter of the rei...
Established a relationship between weld splice length and diameter of the rei...
 
IRJET- Cost Analysis of Two-Way Slab and Post Tension Slab
IRJET-  	  Cost Analysis of Two-Way Slab and Post Tension SlabIRJET-  	  Cost Analysis of Two-Way Slab and Post Tension Slab
IRJET- Cost Analysis of Two-Way Slab and Post Tension Slab
 
Design of Steel Grillage Foundation for an Auditorium
Design of Steel Grillage Foundation for an AuditoriumDesign of Steel Grillage Foundation for an Auditorium
Design of Steel Grillage Foundation for an Auditorium
 
Design of Automated Circular Pedestrian Crossing at a Road Intersection
Design of Automated Circular Pedestrian Crossing at a Road IntersectionDesign of Automated Circular Pedestrian Crossing at a Road Intersection
Design of Automated Circular Pedestrian Crossing at a Road Intersection
 
BATCH 4 PPT.pptx
BATCH 4 PPT.pptxBATCH 4 PPT.pptx
BATCH 4 PPT.pptx
 
DESIGN OF STEEL STRUCTURE
DESIGN OF STEEL STRUCTUREDESIGN OF STEEL STRUCTURE
DESIGN OF STEEL STRUCTURE
 
phase 2ppt.pptx
phase 2ppt.pptxphase 2ppt.pptx
phase 2ppt.pptx
 
The effective width in multi girder composite steel beams with web openings
The effective width in multi girder composite steel beams with web openingsThe effective width in multi girder composite steel beams with web openings
The effective width in multi girder composite steel beams with web openings
 
Comparative study of Conventional Bridge with Innovative Bridge for Optimization
Comparative study of Conventional Bridge with Innovative Bridge for OptimizationComparative study of Conventional Bridge with Innovative Bridge for Optimization
Comparative study of Conventional Bridge with Innovative Bridge for Optimization
 
onw way slab design
onw way slab designonw way slab design
onw way slab design
 
bridge final ppt.pptx
bridge final ppt.pptxbridge final ppt.pptx
bridge final ppt.pptx
 
A COMPARATIVE STUDY ON RIGID CONNECTION DESIGN OF FRAMED MULTI STOREYED STEEL...
A COMPARATIVE STUDY ON RIGID CONNECTION DESIGN OF FRAMED MULTI STOREYED STEEL...A COMPARATIVE STUDY ON RIGID CONNECTION DESIGN OF FRAMED MULTI STOREYED STEEL...
A COMPARATIVE STUDY ON RIGID CONNECTION DESIGN OF FRAMED MULTI STOREYED STEEL...
 
Final Paper on Study and Design of Footbridge to connect the first floor of C...
Final Paper on Study and Design of Footbridge to connect the first floor of C...Final Paper on Study and Design of Footbridge to connect the first floor of C...
Final Paper on Study and Design of Footbridge to connect the first floor of C...
 
Planing,designing and analysis of HI TECH SHOPPING MALL
Planing,designing and analysis of HI TECH SHOPPING MALLPlaning,designing and analysis of HI TECH SHOPPING MALL
Planing,designing and analysis of HI TECH SHOPPING MALL
 

Recently uploaded

PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilVinayVitekari
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdfKamal Acharya
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxNadaHaitham1
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesRAJNEESHKUMAR341697
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwaitjaanualu31
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARKOUSTAV SARKAR
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEselvakumar948
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 

Recently uploaded (20)

PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 

design of steel flyover

  • 1. ANALYSIS AND DESIGN OF STEEL FLYOVER AT VANDALUR JUNCTION
  • 2. BATCH MEMBERS J.LOKSUNDAR (412714103030) J.NISHA JANU (412714103043) S.PEER MOHIDEEN (412714103044) V.VIGNESH (412714103307) PROJECT SUPERVISED BY Mr. S.E KAARTHIC M.E. ASSISTANT PROFESSOR
  • 3. CONTENTS • Introduction • Aim and Objective • Scope • Literature review • Methodology • Materials used • Design • Conclusion
  • 4. INTRODUCTION A flyover is a overpass, a high level road bridge that crosses over a highway interchange or intersection. It is a grade separated structure connects a road at different levels for the purpose of reducing vehicle congestion.
  • 5. NEED FOR STUDY  To overcome the traffic congestion caused due to institutional, infrastructural and industrial growth in that area, the location has been changed as one of the most congested area.  This locality needs a suitable remedy to overcome this problem. Therefore, we have planned to design and provide the flyover in this locality. AIM To analyze and design of Steel flyover at Vandalur Junction
  • 6. OBJECTIVE Analysis and designing of flyover : • STAAD pro for analysis. • IRC and IS code books for designing . • Design of deck slab, longitudinal girder , cross girder, piers and pile foundation. SCOPE • It will play a major role in streamlining the traffic control system. • It will reduce the risk of accidents. • Through flyover plenty of time can be saved avoiding congestion
  • 7. LITERATURE REVIEW AUTHOR TITLE DESCRIPTION K. Kreislova Evaluation of corrosion protection of steel flyover bridges In this research, it helps to know about corrosion protection of steel flyover including evaluation of microclimate corrosivity and critical areas of bridge steel constructions during their service life. Causes of corrosion in the steel flyover are described very well in this research. Sudhir Yadav Supply Chain Management in Flyover Projects in India In this research, paper explores the application of supply chain management (SCM) in the Indian construction industry . A case study approach was followed for the research work. Structured interviews were conducted to understand the SCM practices in flyover projects in India. B.Sankar Evaluation and Design of Flyover using Staad pro In this research , Grillage analogy methodology and style the foremost effective skew bridge by victimization STAAD professional software package.
  • 8. AUTHOR TITLE DESCRIPTION Abdulkadhar bin ayat Analysis and design of hammerhead flyover In this research, learnt about the focus on comparison the reinforcement detail drawing produce previously designed using the strength method and reinforcing requirement using strut-and-tie model. G.T.Webb Analysis of structural health monitoring data from Hammersmith flyover In this paper aims to show that value can be derived from detailed analysis of measurements from a number of different sensors, including acoustic emission monitors, strain, temperature and displacement gauges. Ioannis G. Raftoyiannis Strengthening of steel flyover bridge In this research, it helps to know about to ensure the strength and load carrying capacity of the and also estimating of the remaining life of the bridge against fatigue has been discussed very well.
  • 10. SELECTION OF SITE  Vandalur junction is one of the adversely affecting traffic congested area. This is because of growth of population and industrial development area.  There are large numbers of educational institutions, universities, IT companies in nearby circumstances.  Vandalur junction is proposed site that we had chosen for the design of flyover.
  • 12. DESCRIPTION OF MATERIALS CEMENT  We use OPC grade 53 for constructing bridge structures like piers and deck slab etc. CONCRETE:  We use M20 grade of concrete for designing the abutment and piers. REINFORCED STEEL:  We prefer HYSD reinforced bars Fe415 for bridge structures. FOUNDATION:  We use pile foundation due to the safe bearing capacity of soil .
  • 13. DESIGN OF DECK SLAB Panel dimensions = 2m x 4.75 m Dead weight of slab = (0.3×1x 24) = 7.20 kN/𝑚2 Dead weight of W.C =(0.08×1x 22) = 1.76 kN/𝑚2 Total load = 9kN/𝑚2
  • 14. Live load bending moment Short span moment MB =31 kNm Long span moment ML = 10.5 kNm Dead load bending moment Short span moment MB =34.15kNm Long span moment ML =11.34 kNm Depth of the deck slab Overall depth =300mm Effective depth =260mm
  • 15. Short span Area of reinforcement = 722 mm2 Diameter bars = 12 mm Numbers of bars = 20 nos Spacing = 140 mm c/c Long span Area of reinforcement = 250 mm2 Diameter bars = 10 mm spacing = 150 mm c/c Number of bars = 15 nos
  • 16. CROSS SECTION OF DECK SLAB
  • 17. MOVING LOAD ON DECK SLAB Influence Surface Group = 1 Design code = IRC Chapter3 Design effect = Node 70: Displacement (Y); Loading Class = Class AA Loading Impact factor : 1 Max. Effect = -3.85488 mm RESULT The correspondent 1 effect = -0.645556 mm The correspondent 3 effect = 0.0363094 mm The correspondent 4 effect = -0.000486124 rad The correspondent 5 effect = 2.79581e-005 rad The correspondent 6 effect = 0.000631681 rad
  • 18.
  • 19. DESIGN OF STEEL PLATE GIRDER Spacing of main girders = 2m Spacing of cross girders = 4.5m Dead load on girder =(9x2) = 18kN/m Self weight of girder (0.2L +1) = 4 kN/m Total load W = 22 kN/ m Self-weight of main girders = (2x1) =2kN
  • 20. Dead load moment The maximum dead load moment is computed as Mmax = [(22 x 182)/8 + (2 x 18)/4 + (2 x 4.5)] = 909kNm
  • 21. Live load moment The maximum live load moment is computed as Mmax = [(350 x 9)/2- (350 x 0.9/2] = 1418kN
  • 22. SHEAR FORCES Dead load shear = [(22 x 18)/2+2/2] = 210kN Live load shear with impact factor = 1.1[(350x16.2)/18] = 347kN Total design shear = V = (201 + 347 ) =548kN.
  • 23. proportioning of I section girder Web plate = 1000mm x 10 mm Flange area required =13303mm2 Flange plates = 500 mm x 30 mm check for maximum stresses allowable average shear stress is 87N/mm2 Hence the average shear stress is with in safe permissible limits.
  • 24. connection between flange and web Use 5mm fillet weld, continuous on either side. intermediate stiffness Spacing of stiffeners = 1000 mm Intermediate stiffeners = 10 mm x 80 mm connection of vertical stiffness to web Use 100mm long, 5mm fillet welds alternately on either side. connection between bearing stiffener and web Use 100mm long 5mm welds alternately.
  • 26. pitch of shear connectors Hence adopt a pitch of 400 mm in the longitudinal direction.
  • 27. CROSS SECTION OF STEEL PLATE GIRDER
  • 28. DESIGN OF PIER Length of the column L = 5.2m Total loads from deck slab as 25 kN/m = 25x 20=500kN we taken100 % of deck slab load i.e 1000 kN Grade of concrete M20 Grade of steel Fe415
  • 29. Size of column calculation Provide the diameter of the column = 350 mm Check for eccentricity Emin = 𝑙 500 + 𝐷 30 = 5200 500 + 350 30 = 29 mm Emin ≤ 0.05x350 = 19 mm Emin= 29 mm > 0.05D
  • 30. Try 750 mm size column diameter Emin = 𝑙 500 + 𝐷 30 = 5200 500 + 750 30 = 36 < 20 mm Hence emin = 36 mm Also check, Emin ≤ 0.05x750 = 37.5 mm Emin= 36mm < 0.05D Now it is axially loaded column Le/D = 3676.4 750 = 4.90 < 12, also it is short column
  • 31. Longitudinal reinforcement calculation Area of longitudinal reinforcement Asc = 2782.53 mm2 diameter bar = 20 mm No of bars = 30 nos Provide minimum Asc = 30 nos- 25 mm diameter bars. Design of ties From clause 26.5.3.2, IS456 – 2000 Dia of ties > 1 4 x largest dia of longitudinal bar = 1 4 x 25 = 6.25 mm ≈ 8 mm Provide 8 mm diameter spiral of ties
  • 32. design of pier cap effective depth = 500 mm and overall depth= 550 mm area of reinforcement Ast = 300×106 230×0.9×500 = 2890mm2 diameter bar = 20 mm No of bars 30 nos Provide 30 Nos of bar at 20 mm dia bar spacing of bar = 200mm adopt 20 mm diameter bars at 200 mm centres
  • 33. Distribution reinforcement= 1990 mm2 diameter bar = 16 mm No of bars = 15 nos Provide 15 Nos of bars at 16mm dia bar Adopt 16mm diameter bars at 250 mm centres as distribution steel Maximum shear force = V = 500 KN Shear stress = τv = 𝑣 𝑏𝑑 = 500×103 1500×500 = 0.40 N/𝑚𝑚2 Using 10 mm diameter stirrups (8 legged), spacing is given by Sv= 8×79×230×500 500×103 = 242.5 mm Adopt 10 mm diameter stirrups at 250 mm centres.
  • 34. REINFORCEMENT DETAIL OF PIER AND PIER CAP
  • 35. Grade of concrete = M20 Grade of steel = Fe415 (HYSD BARS) Length = 5200 mm Cross section = 1500 mm Cover = 40 mm Required steel area = 2769.74 sq.mm Required concrete area = 1766951.75 sq.mm Main Reinforcement : provide 25-12 dia (0.16% 2827.43 sq.mm) Ties Reinforcement : provided 8 mm dia helical ties @ 55 mm c/c Section capacity based on reinforced required (K) PUZ = -1020.84 kN; Interaction ratio = 0.063 (as per CL.39.6, IS456:2000)
  • 36. PROPERTIES AND REINFORCEMENT DETAILING OF PIER COLUMN
  • 37. DESIGN OF PILE FOUNDATION proportioning of pile arrangements Length of pile above the ground level = 0.5 m Length of pile below ground level = 5 m Total length of pile = (5 +0.5) = 5.5 m Size of pile = 300x300 mm Length of pile = 5.5 m Width of pile = 0.3 m Ratio (L/B) = 5.5/0.3 = 19 > 12 Hence the pile is design as a long column
  • 38.
  • 39. Longitudinal reinforcements Adopt 8 bars of 20mm diameter providing an area of Asc = 2200𝑚𝑚2 with a clear cover of 40 mm. Lateral reinforcements Hence provide 8 mm diameter ties at 150 mm centres in the main body of the pile. Lateral reinforcement near pile head clear cover of 40 mm to the main longitudinal reinforcement of 20 mm diameter bars and using 8 mm diameter spiral ties inside the main reinforcements Adopt 8 mm diameter spirals at a pitch of 50 mm for a length of 900 mm at the top of pile. Lateral reinforcement near pile ends Adopt 8 mm diameter ties at 80 mm centres for a length of 900 mm from the end of the pile both at top and bottom
  • 40. design of pile cap The maximum bending moment in the pile cap Mzz = 375 kNm effective depth = 600 and overall depth= 650 mm area of reinforcement Ast = 375×106 230×0.9×500 = 3020 mm2 diameter bar = 25 mm, spacing = 250 mm adopt 25 mm diameter bars at 250 mm centres
  • 41. Distribution reinforcement = 780 mm2 Adopt 16mm diameter bars at 250 mm centres as distribution steel Maximum shear force = V = 500 KN Shear stress = τv = 𝑣 𝑏𝑑 = 600×106 1500×600 = 0.40 N/mm2 From table 17 of IS 456- 2000,τc = 0.28 N/mm2 Adopt 10 mm diameter stirrups at 200 mm centres in a width of 1500 mm.
  • 44. CONCLUSION • In this project we designed a road over bridge elements in order to avoid traffic congestion in our proposed project site. • In this grade separator, the main components consist of deck slab, longitudinal girders, cross girders, pier and pile foundation. The geometric design of the grade separator was done by using IRC Code books. • The deck slab was designed as using IRC 6-2000 codal provisions. The deck slab was supported by the steel girder (I section) was design by using IS800 codal provisions.
  • 45. • The geometric dimension of the separator was designed by considering the future traffic density. • Finally, all the elements are designed for the purpose of reducing the traffic density and avoiding accidents.
  • 46. REFERENCES • Abdul kadhar bin ayat “Analysis and design of hammerhead flyover” vol 2 issue 3 (2017) • B.Sankar “Evaluation and Design of Flyover using Staad pro” international journal of professional engineering studies volume vii /issue 2 / sep (2016) • Pichai Taneerananon “A Study of a Flyover-Bridge - Improved Intersection” ENGINEERING JOURNAL Volume 19 Issue 1 30 January (2015) • Akhilesh Kumar Maurya “Performance-based intersection layout under a flyover for heterogeneous traffic” (2015)
  • 47. BIBLOGRAPHY • IS 456-2000 Indian standards - Plain and Reinforced concrete – code of practice. • IRC 6-2000 Specification for Road bridges – Section - 2- Code of practice. • IRC 78:2000 Standard speciation and code of practice for road Bridges • IS: 800-2007 Indian Standard Specifications General Construction in Steel-Code of Practice, Bureau of Indian Standards, 2007 • Ponnuswamy.S, “Bridge Engineering” publisher, Tata MeGraw-Hill, New Delhi. • Krishna Raju. N, “DESIGN OF BRIDGE ENGINEERING”, CBS publishers and distributors Delhi, 2006