Changing Gears
Why it is changing ISO/TS 16949:2009 to IATF 16949 ? :
- The IATF (International Automotive Task Force)
who operate this standard have decided to
based it on ISO 9001:2015 with additional
enhancements. This mean that organization
in automotive industry seeking IATF 16949 certification must
also comply with ISO 9001:2015.
- IATF 16949:2016 is to be implemented and supplemented
to, and it conjunction with ISO 9001:2015. It specifies the
requirements for establishing, implementing, maintaining and
continually improving a QMS for any organization in the
automotive industry.
Summary of Major Changes
• Adoption of the HLS (High Level Structure)
• Explicit requirements for risk-based thinking to support application
of process approach.
• More emphasis on Process Approach & Risk Analysis.
• Requirement to determine Context of Organization.
• Greater emphasis on defining boundary & Scope of QMS with
consideration to organization’s context.
• Increased leadership requirement with need for active
involvement of top management in operation of QMS.
• Reference to ‘Preventive action’ is removed and replaced with
‘Action to address risk & opportunities.
• Improved applicability for service(term product is replaced with
‘Product and Service’.
• Quality objective must include reference to who, what, when.
• Operational planning includes addressing risk.
It focused on :
 Brought quality and continuous improvement into heart of every business –
ensuring that Quality Management is now completely integrated and aligned with
the business strategies of a particular organization.
Emphasized the importance of leadership - making Top Management responsible
for ensuring that the whole organization ‘s Quality Management System is not only
maintained but continually improved.
Introduced Risk and Opportunity Management – reinforcing the use of
management system to help identify business opportunities that contribute to
bottom-line improvements.
Introduced a new integrated approach to management standard – by
introducing the new structure which has now become mandatory to all new ISO
management system standards and which , in future , will make it easier to
implement multiple, Integrated management system.
5
ISO/TS 16949:2009
Model of process -based
QMS
-IATF 16949 Model of
process -based QMS.
- Plan-Do-Check-Act cycle
can be applied to all
processes & to the QMS.
Learn from
Experience
Identify the
risk
opportunities
Analyze &
Prioritize risk
Opportunities
Plan action
to address
the risk
Implement
the action
plan
Check
Effectiveness
of action
plan
Transitioning
smoothly from
ISO/TS 16949
to IATF 16949
Customer
& other
relevant
Interested
parties
Requirements
8. Operations
INPUT
6. Planning 9. Performance
evaluation
4.4 QMS-General &
Process Approach
5. Leadership
10. Improvement
OUTPUT
7. Support Processes
Customer
Satisfaction
Product &
Services
Satisfaction
4.1,4.2& 4.3
Context &
Scope
 Automotive QMS Process Approach Model as per ISO-9001:2015
New / Updated concept with Comment :
• Context of the Organization : Consider the combination of Internal and External factors and
condition that can have an effect on an organization approach to it’s product, service,
investment and interested parties. ( Internal – Values, Culture, knowledge & Performance of
the Organization / External – Legal, Technology, Competitive, Market, Social & Economic
Environments whether International, National, Regional or Local / Can include Positive &
Negative factors).
• Interested Parties : Can be a person or organization that can affect, be affected by, or
perceive themselves to be affected by a decision or activity. Ex-Suppliers, Customers or
Competitors.
• Leadership : Requirements specific to top management who are defined as a person or Group
of people who directs and controls an organization at highest level.
• Risk associated with threats and opportunity : Refined planning process replace preventive
action and defined as the effect of uncertainty on expected result.
• Communication: There are explicit and more detailed requirements for both Internal and
External communication.
• Documented Information: Replace documents and records. There are 2 types : Maintained
(i.e. Procedure and Work Instruction) and Retained (i.e. Records).
• Performance Evaluation: The measurement of quality performance and the effectiveness of
the QMS, covering the methods for monitoring, measurement, analysis and evaluation, as
applicable, to ensure valid result.
• Nonconformity and corrective action: More detailed evaluation both the nonconformities
themselves and corrective action required. Human factor have been added as an element of root
cause analysis.
• Management Review: More detailed requirements relating to Inputs and Outputs of the
review.
• Product Safety: Requirement to address the item define within this new requirement in a
documented and dedicated process for the management of Product-safety related product and
manufacturing processes.
• Embedded Software: Detailed requirements for products with embedded software. Organization
must also implement and maintain a system for software quality assurance of these products.
• Corporate Responsibility: Requirement to have corporate responsibility policies including an
anti-bribery policy, an employee code of conduct, and an ethics escalation (whistle-blowing) policy.
• Supplier Management: Additional requirements regarding the organization’s supplier selection
process have been added.
• Internal Audits: Internal audit frequency requirements have been modified.
1. Scope
2. Normative references
3. Terms and definitions
4. Context of the organization
5. Leadership
6. Planning
7. Support
8. Operation
9. Performance evaluation
10.Improvement
Set objective and build processes
necessary to delivered result
Implemented what was planned
Monitored and measure processes and result against
objectives , including effectiveness, efficiency and risk
Take action to improve result
MAIN CLAUSE ACTIVITY
 In this International Standard, the following verbal forms are used :
 ‘ shall ’ indicates a Requirement;
 ‘ should ’ indicates a Recommendation;
 ‘ may ’ indicates a permission
 ‘ can ‘ indicates a possibility or a capability.
 ‘ NOTE ’ is for Guidance in understanding.
Clause 1 : Scope (supplemental 1.1)
Clause 2 : Normative references (supplemental 2.1)
Clause 3 : Terms and Definitions (supplemental 3.1)
 Customer requirements
 Customer specific requirements
 Escalation process
 Multi-disciplinary approach
 No trouble found (NFT)
 Periodic overhaul
 Predictive maintenance
 Premium freight
 Trade-off process
Clause 4 : Context of the organization
 4.1 - Understanding the organization and its context
 4.2 - Understanding the needs and expectations of interested parties
 4.3 - Determine the scope of the quality management system
4.3.1 – Supplemental
4.3.2 – Customer specific requirements
 4.4 – Quality management system and Its processes
4.4.1 –
4.4.1.1 – Conformance of products and processes
4.4.1.2 – Product safety
4.4.2 –
Clause 5 : Leadership
 5.1 - Leadership and commitment
5.1.1 - General
5.1.1.1 – Corporate responsibility
5.1.1.2 – Process effectiveness and efficiency
5.1.1.3 – Process Owner
5.1.2 – Customer focus
 5.2 – Policy
5.2.1 – Establishing the Quality policy
5.2.2 – Communication the Quality policy
 5.3 – Organizational Roles, Responsibilities and Authorities
5.3.1 – Supplemental
5.3.2 – Responsibility and Authority for product requirements and
corrective actions
Clause 6 : Planning
 6.1 – Action to address risk and opportunities
6.1.1 –
6.1.2 -
6.1.2.1 – Risk analysis
6.1.2.2 – Preventive action
6.1.2.3 – Contingency plans
 6.2 – Quality objective and planning to achieve them
6.2.1 –
6.2.2 –
6.2.2.1 – Supplemental
 6.3 – Planning of changes
Clause 7 : Support
 7.1 – Resources
7.1.1 – General
7.1.2 - People
7.1.3 – Infrastructure
7.1.3.1 – Plant, Facilitate and Equipment planning
7.1.4 – Environmental for the operation of processes
7.1.4.1 – Supplemental
7.1.5 – Monitoring and Measuring resources
7.1.5.1 – General
7.1.5.1.1 – Measurement system analysis
7.1.5.2 – Measurement Traceability
7.1.5.2.1 – Calibration / Verification records
7.1.5.3 – Laboratory requirements
7.1.5.3.1 – Internal laboratory
7.1.5.3.2 – External laboratory
7.1.6. – Organizational Knowledge
 7.2 – Competence
7.2.1 – Supplemental
7.2.2 – Competence-on the job training
7.2.3 – Internal auditor competency
7.2.4 – Second party auditor competency
 7.3 – Awareness
7.3.1 – Supplemental
7.3.2 - Employee motivation and empowerment
 7.4 – Communication
 7.5 – Documented information
7.5.1 – General
7.5.1.1 – Quality management system documentation
7.5.2 – Creating and updating
7.5.3 – Control of documented information
7.5.3.1 –
7.5.3.2 -
7.5.3.2.1 – Record retention
7.5.3.2.2 – Engineering specifications
Clause 8 : Operation
 8.1 – Operational planning and control
8.1.1 – Supplemental
8.1.2 - Confidentiality
 8.2 – Requirements for Product and Services
8.2.1 – Customer communication
8.2.1.1 – Supplemental
8.2.2 – Determining the requirements for Product and Services
8.2.2.1 – Supplemental
8.2.3 – Review of the requirements for Product and Services
8.2.3.1 – General
8.2.3.1.1 – Supplemental
8.2.3.1.2 – Customer designated special characteristics
8.2.3.1.3 – Organization manufacturing feasibility
8.2.3.2 -
8.2.4 – Changes to requirements for Products and Services
 8.3 – Design and development of Products and services
8.3.1 – General
8.3.1.1 – Supplemental
8.3.2 – Design and development planning
8.3.2.1 – Supplemental
8.3.2.2 – Product design skill
8.3.2.3 – Development of products with embedded software
8.3.3– Design and development inputs
8.3.3.1 – Product design input
8.3.3.2 – Manufacturing process design input
8.3.3.3 – Special characteristic
8.3.4 – Design and development control
8.3.4.1 – Monitoring
8.3.4.2 – Design and development validation
8.3.4.3 – Prototype programme
8.3.4.4 – Product approval process
8.3.5 – Design and development outputs
8.3.5.1 – Supplemental
8.3.5.2 – Manufacturing process design output
8.3.6 – Design and development changes
8.3.6.1 - Supplemental
 8.4 - Control of External provided processes, product and services
8.4.1 – General
8.4.1.1 – Supplemental
8.4.1.2 – Supplier selection process
8.4.1.3 – Customer –directed sources (Directed-Buy)
8.4.2 – Type and extent of control
8.4.2.1 – Supplemental
8.4.2.2 – Statutory and regulatory requirements
8.4.2.3 – Supplier quality management system development
8.4.2.3.1 – Automotive product with embedded software
8.4.2.4 – Supplier Monitoring
8.4.2.4.1 – Second-party audits
8.4.2.5 – Supplier development
8.4.3 – Information for external providers
8.4.3.1 – Supplemental
 8.5 – Production and service provision
8.5.1 – Control of production and service provision
8.5.1.1 – Control plan
8.5.1.2 – Standardized work – Operator instruction and visual standards
8.5.1.3 – Verification of job set-ups
8.5.1.4 – Verification after shutdown
8.5.1.5 – Total productive maintenance
8.5.1.6 – Management of production tooling and manufacturing, test, inspection
tooling and equipment
8.5.1.7 – Production scheduling
8.5.2 – Identification and Traceability
8.5.2.1 - Supplemental
8.5.3 – Property belonging to customers or external providers
8.5.4 – Preservation
8.4.4.1 – Supplemental
8.5.5 – Post-Delivery activity
8.5.5.1 – Feedback of information from service
8.5.5.2 – Service agreement with customer
8.5.6 – Control of changes
8.5.6.1 – Supplemental
8.5.6.1.1 – Temporary changes of process controls
 8.6 – Release of Products and Services
8.6.1 – Supplemental
8.6.2 – Layout inspection and Functional testing
8.6.3 – Appearance Items
8.6.4.- Verification and acceptance of conformity of externally provided
products and services
8.6.5 – Statutory and regulatory conformity
8.6.6 – Acceptance criteria
 8.7 – Control of nonconforming outputs
8.7.1 – Supplemental
8.7.1.1 – Customer authorization for concession
8.7.1.2 – Control of nonconforming product- Customer specified process
8.7.1.3 – Control of suspect product
8.7.1.4 – Control of reworked product
8.7.1.5 - Control of repaired product
8.7.1.6 – Customer notification
8.7.1.7 – Nonconforming product disposition
8.7.2 –
Clause 9 : Performance evaluation
 9.1 - Monitoring, Measurement, Analysis and Evaluation
9.1.1 – General
9.1.1.1 – Monitoring and measurement of manufacturing processes
9.1.1.2 – Identification of statistical tools
9.1.1.3 - Application of statistical concepts
9.1.2 – Customer Satisfaction
9.1.2.1 – Supplemental
9.1.3 – Analysis and Evaluation
9.1.3.1 – Prioritization
 9.2 – Internal Audit
9.2.1 –
9.2.2 –
9.2.2.1 – Internal audit programme
9.2.2.2 – Quality management system audit
9.2.2.3 – Manufacturing process audit
9.2.2.4 – Product audit
 9.3 – Management Review
9.3.1 – General
9.3.1.1 – Supplemental
9.3.2 – Management Review Inputs
9.3.2.1 – Supplemental
9.3.3 – Management Review Outputs
9.3.3.1 – Supplemental
Clause 10 : Improvement
 10.1 – General
 10.2 – Nonconformity and Corrective action
10.2.1 –
10.2.2 –
10.2.3 – Problem Solving
10.2.4 – Error-Proofing
10.2.5 – Warranty management system
10.2.6 – Customer complaints and field failure analysis
 10.3 – Continual Improvement
10.3.1 – Supplemental
 For detail clause to clause study refer standard
IATF 16949: 2016 & ISO 9001:2015
Awareness of iatf 16949

Mais conteúdo relacionado

Mais procurados

IATF 16949 2016 implementation phases
IATF 16949 2016 implementation phasesIATF 16949 2016 implementation phases
IATF 16949 2016 implementation phasesAmit Mishra
 
ISO 9001-2015 Revision Training Presentation
ISO 9001-2015 Revision Training PresentationISO 9001-2015 Revision Training Presentation
ISO 9001-2015 Revision Training PresentationDQS Inc.
 
IATF 16949 Webinar Slides 3.7.17
IATF 16949 Webinar Slides 3.7.17IATF 16949 Webinar Slides 3.7.17
IATF 16949 Webinar Slides 3.7.17Sara Gulo
 
ISO/TS 16949:2009 to IATF 16949:2016
ISO/TS 16949:2009 to IATF 16949:2016ISO/TS 16949:2009 to IATF 16949:2016
ISO/TS 16949:2009 to IATF 16949:2016Toyo Gustaman
 
ISO 9001 2015 Overview presentation
ISO 9001 2015 Overview presentation ISO 9001 2015 Overview presentation
ISO 9001 2015 Overview presentation Govind Ramu
 
A brief Introduction to ISO 9001 2015-Quality Management System
A brief Introduction to ISO 9001 2015-Quality Management SystemA brief Introduction to ISO 9001 2015-Quality Management System
A brief Introduction to ISO 9001 2015-Quality Management SystemSARWAR SALAM
 
ISO Implementation Roadmap- By Motaharul Islam
ISO Implementation Roadmap- By Motaharul IslamISO Implementation Roadmap- By Motaharul Islam
ISO Implementation Roadmap- By Motaharul IslamMotaharul Islam
 
Training ppt for control plan
Training ppt for control plan   Training ppt for control plan
Training ppt for control plan Jitesh Gaurav
 
Awareness of IATF 16949.pptx
Awareness of IATF 16949.pptxAwareness of IATF 16949.pptx
Awareness of IATF 16949.pptxPrasenjit Puri
 
Implementing Risk Based Thinking in HLS OF ISO 9001:2015 - Praneet Surti
Implementing Risk Based Thinking in HLS OF ISO 9001:2015 - Praneet SurtiImplementing Risk Based Thinking in HLS OF ISO 9001:2015 - Praneet Surti
Implementing Risk Based Thinking in HLS OF ISO 9001:2015 - Praneet SurtiPraneet Surti
 
411705005-IATF-16949-PPT-TRAINING-AWARENESS.pptx
411705005-IATF-16949-PPT-TRAINING-AWARENESS.pptx411705005-IATF-16949-PPT-TRAINING-AWARENESS.pptx
411705005-IATF-16949-PPT-TRAINING-AWARENESS.pptx401apecgkvelu
 
Quality Management System awareness for all
Quality Management System awareness for all Quality Management System awareness for all
Quality Management System awareness for all ANUPAM RAY
 

Mais procurados (20)

IATF 16949 2016 implementation phases
IATF 16949 2016 implementation phasesIATF 16949 2016 implementation phases
IATF 16949 2016 implementation phases
 
ISO 9001-2015 Revision Training Presentation
ISO 9001-2015 Revision Training PresentationISO 9001-2015 Revision Training Presentation
ISO 9001-2015 Revision Training Presentation
 
IATF 16949 Webinar Slides 3.7.17
IATF 16949 Webinar Slides 3.7.17IATF 16949 Webinar Slides 3.7.17
IATF 16949 Webinar Slides 3.7.17
 
ISO/TS 16949:2009 to IATF 16949:2016
ISO/TS 16949:2009 to IATF 16949:2016ISO/TS 16949:2009 to IATF 16949:2016
ISO/TS 16949:2009 to IATF 16949:2016
 
Iso 9001 2015
Iso 9001 2015 Iso 9001 2015
Iso 9001 2015
 
ISO 9001:2015 Awareness
 ISO 9001:2015 Awareness  ISO 9001:2015 Awareness
ISO 9001:2015 Awareness
 
IATF Awareness
IATF AwarenessIATF Awareness
IATF Awareness
 
ISO 9001 2015 Overview presentation
ISO 9001 2015 Overview presentation ISO 9001 2015 Overview presentation
ISO 9001 2015 Overview presentation
 
IATF PPT.pdf
IATF PPT.pdfIATF PPT.pdf
IATF PPT.pdf
 
A brief Introduction to ISO 9001 2015-Quality Management System
A brief Introduction to ISO 9001 2015-Quality Management SystemA brief Introduction to ISO 9001 2015-Quality Management System
A brief Introduction to ISO 9001 2015-Quality Management System
 
ISO Implementation Roadmap- By Motaharul Islam
ISO Implementation Roadmap- By Motaharul IslamISO Implementation Roadmap- By Motaharul Islam
ISO Implementation Roadmap- By Motaharul Islam
 
Internal auditor 9001 day 1
Internal auditor 9001 day 1Internal auditor 9001 day 1
Internal auditor 9001 day 1
 
Training ppt for control plan
Training ppt for control plan   Training ppt for control plan
Training ppt for control plan
 
ISO 9001:2015 awareness.
ISO 9001:2015 awareness. ISO 9001:2015 awareness.
ISO 9001:2015 awareness.
 
Awareness of IATF 16949.pptx
Awareness of IATF 16949.pptxAwareness of IATF 16949.pptx
Awareness of IATF 16949.pptx
 
Implementing Risk Based Thinking in HLS OF ISO 9001:2015 - Praneet Surti
Implementing Risk Based Thinking in HLS OF ISO 9001:2015 - Praneet SurtiImplementing Risk Based Thinking in HLS OF ISO 9001:2015 - Praneet Surti
Implementing Risk Based Thinking in HLS OF ISO 9001:2015 - Praneet Surti
 
Iso 9001 2015 Understanding
Iso 9001 2015 Understanding Iso 9001 2015 Understanding
Iso 9001 2015 Understanding
 
The new ISO 9001:2015
The new ISO 9001:2015The new ISO 9001:2015
The new ISO 9001:2015
 
411705005-IATF-16949-PPT-TRAINING-AWARENESS.pptx
411705005-IATF-16949-PPT-TRAINING-AWARENESS.pptx411705005-IATF-16949-PPT-TRAINING-AWARENESS.pptx
411705005-IATF-16949-PPT-TRAINING-AWARENESS.pptx
 
Quality Management System awareness for all
Quality Management System awareness for all Quality Management System awareness for all
Quality Management System awareness for all
 

Semelhante a Awareness of iatf 16949

ISO 9001 Quality Management Systems: Implementation and Integration
ISO 9001 Quality Management Systems: Implementation and IntegrationISO 9001 Quality Management Systems: Implementation and Integration
ISO 9001 Quality Management Systems: Implementation and IntegrationSpecialty Technical Publishers
 
Aweareness about ISO 9001-2015.pptx
Aweareness about ISO 9001-2015.pptxAweareness about ISO 9001-2015.pptx
Aweareness about ISO 9001-2015.pptxKuldeepChauhan370926
 
SAI Global Webinar: Tips for Effective Internal Auditing
SAI Global Webinar: Tips for Effective Internal AuditingSAI Global Webinar: Tips for Effective Internal Auditing
SAI Global Webinar: Tips for Effective Internal AuditingSwitzerland09
 
PECB Webinar: Aligning ISO 25000 and CMMI for Development
PECB Webinar: Aligning ISO 25000 and CMMI for DevelopmentPECB Webinar: Aligning ISO 25000 and CMMI for Development
PECB Webinar: Aligning ISO 25000 and CMMI for DevelopmentPECB
 
Risk elimination and safety committee
Risk elimination and safety committeeRisk elimination and safety committee
Risk elimination and safety committeeHpm India
 
Addendum 1 to iso presentation
Addendum 1 to iso presentationAddendum 1 to iso presentation
Addendum 1 to iso presentationC P Chandrasekaran
 
Summary of changes ISO 9001:2015
Summary of changes ISO 9001:2015Summary of changes ISO 9001:2015
Summary of changes ISO 9001:2015Carlin Jannine
 
SWE 333 - ISQM ISO 9000-3.ppt
SWE 333 - ISQM ISO 9000-3.pptSWE 333 - ISQM ISO 9000-3.ppt
SWE 333 - ISQM ISO 9000-3.pptOswaldo Gonzales
 
Quality Course 1
Quality Course 1Quality Course 1
Quality Course 1Fin1
 
Role of Top management
Role of Top managementRole of Top management
Role of Top managementHpm India
 
ISO 9001:2015 DIS Changes, Requirements and Implementation
ISO 9001:2015 DIS Changes, Requirements and ImplementationISO 9001:2015 DIS Changes, Requirements and Implementation
ISO 9001:2015 DIS Changes, Requirements and Implementation Govind Ramu
 
Upload iso 9001 2015 presentation
Upload iso 9001 2015 presentationUpload iso 9001 2015 presentation
Upload iso 9001 2015 presentationRajeesh Thumpayil
 
QMS_ISO 9001_Awareness by Management.pptx
QMS_ISO 9001_Awareness by Management.pptxQMS_ISO 9001_Awareness by Management.pptx
QMS_ISO 9001_Awareness by Management.pptxButchEnalpe
 
QESH Training slides with Check list for
QESH Training slides with Check list forQESH Training slides with Check list for
QESH Training slides with Check list forGobiNava1
 
ISO9001_2015_Frequently_Asked_Questions.docx
ISO9001_2015_Frequently_Asked_Questions.docxISO9001_2015_Frequently_Asked_Questions.docx
ISO9001_2015_Frequently_Asked_Questions.docxSunil Arora
 

Semelhante a Awareness of iatf 16949 (20)

ISO 9001 Quality Management Systems: Implementation and Integration
ISO 9001 Quality Management Systems: Implementation and IntegrationISO 9001 Quality Management Systems: Implementation and Integration
ISO 9001 Quality Management Systems: Implementation and Integration
 
Aweareness about ISO 9001-2015.pptx
Aweareness about ISO 9001-2015.pptxAweareness about ISO 9001-2015.pptx
Aweareness about ISO 9001-2015.pptx
 
SAI Global Webinar: Tips for Effective Internal Auditing
SAI Global Webinar: Tips for Effective Internal AuditingSAI Global Webinar: Tips for Effective Internal Auditing
SAI Global Webinar: Tips for Effective Internal Auditing
 
PECB Webinar: Aligning ISO 25000 and CMMI for Development
PECB Webinar: Aligning ISO 25000 and CMMI for DevelopmentPECB Webinar: Aligning ISO 25000 and CMMI for Development
PECB Webinar: Aligning ISO 25000 and CMMI for Development
 
Risk elimination and safety committee
Risk elimination and safety committeeRisk elimination and safety committee
Risk elimination and safety committee
 
Addendum 1 to iso presentation
Addendum 1 to iso presentationAddendum 1 to iso presentation
Addendum 1 to iso presentation
 
Summary of changes ISO 9001:2015
Summary of changes ISO 9001:2015Summary of changes ISO 9001:2015
Summary of changes ISO 9001:2015
 
Iso 9001 2008 - qms
Iso 9001  2008 - qmsIso 9001  2008 - qms
Iso 9001 2008 - qms
 
SWE 333 - ISQM ISO 9000-3.ppt
SWE 333 - ISQM ISO 9000-3.pptSWE 333 - ISQM ISO 9000-3.ppt
SWE 333 - ISQM ISO 9000-3.ppt
 
Qms 2008 vs2015 - 1.3
Qms 2008 vs2015 - 1.3Qms 2008 vs2015 - 1.3
Qms 2008 vs2015 - 1.3
 
Quality Course 1
Quality Course 1Quality Course 1
Quality Course 1
 
Iso9001 2015
Iso9001 2015Iso9001 2015
Iso9001 2015
 
9001 2008 details
9001 2008 details9001 2008 details
9001 2008 details
 
Role of Top management
Role of Top managementRole of Top management
Role of Top management
 
Glimpses of ISO 9001:2015
Glimpses of ISO 9001:2015Glimpses of ISO 9001:2015
Glimpses of ISO 9001:2015
 
ISO 9001:2015 DIS Changes, Requirements and Implementation
ISO 9001:2015 DIS Changes, Requirements and ImplementationISO 9001:2015 DIS Changes, Requirements and Implementation
ISO 9001:2015 DIS Changes, Requirements and Implementation
 
Upload iso 9001 2015 presentation
Upload iso 9001 2015 presentationUpload iso 9001 2015 presentation
Upload iso 9001 2015 presentation
 
QMS_ISO 9001_Awareness by Management.pptx
QMS_ISO 9001_Awareness by Management.pptxQMS_ISO 9001_Awareness by Management.pptx
QMS_ISO 9001_Awareness by Management.pptx
 
QESH Training slides with Check list for
QESH Training slides with Check list forQESH Training slides with Check list for
QESH Training slides with Check list for
 
ISO9001_2015_Frequently_Asked_Questions.docx
ISO9001_2015_Frequently_Asked_Questions.docxISO9001_2015_Frequently_Asked_Questions.docx
ISO9001_2015_Frequently_Asked_Questions.docx
 

Último

Pros and cons of buying used fleet vehicles.pptx
Pros and cons of buying used fleet vehicles.pptxPros and cons of buying used fleet vehicles.pptx
Pros and cons of buying used fleet vehicles.pptxjennifermiller8137
 
Trent engineer.pptx presentation reports
Trent engineer.pptx presentation reportsTrent engineer.pptx presentation reports
Trent engineer.pptx presentation reportsbasant11731
 
办理阿德莱德大学毕业证Adelaide毕业证留信学历认证
办理阿德莱德大学毕业证Adelaide毕业证留信学历认证办理阿德莱德大学毕业证Adelaide毕业证留信学历认证
办理阿德莱德大学毕业证Adelaide毕业证留信学历认证jdkhjh
 
原版1:1定制宾州州立大学毕业证(PSU毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制宾州州立大学毕业证(PSU毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制宾州州立大学毕业证(PSU毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制宾州州立大学毕业证(PSU毕业证)#文凭成绩单#真实留信学历认证永久存档208367051
 
Transportation Electrification Funding Strategy by Jeff Allen and Brandt Hert...
Transportation Electrification Funding Strategy by Jeff Allen and Brandt Hert...Transportation Electrification Funding Strategy by Jeff Allen and Brandt Hert...
Transportation Electrification Funding Strategy by Jeff Allen and Brandt Hert...Forth
 
英国Bradford学位证,布拉德福德大学毕业证书1:1制作
英国Bradford学位证,布拉德福德大学毕业证书1:1制作英国Bradford学位证,布拉德福德大学毕业证书1:1制作
英国Bradford学位证,布拉德福德大学毕业证书1:1制作yjvk25x9
 
办理乔治布朗学院毕业证成绩单|购买加拿大文凭证书
办理乔治布朗学院毕业证成绩单|购买加拿大文凭证书办理乔治布朗学院毕业证成绩单|购买加拿大文凭证书
办理乔治布朗学院毕业证成绩单|购买加拿大文凭证书zdzoqco
 
(办理学位证)(Toledo毕业证)托莱多大学毕业证成绩单修改留信学历认证原版一模一样
(办理学位证)(Toledo毕业证)托莱多大学毕业证成绩单修改留信学历认证原版一模一样(办理学位证)(Toledo毕业证)托莱多大学毕业证成绩单修改留信学历认证原版一模一样
(办理学位证)(Toledo毕业证)托莱多大学毕业证成绩单修改留信学历认证原版一模一样gfghbihg
 
原版1:1定制阳光海岸大学毕业证(JCU毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制阳光海岸大学毕业证(JCU毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制阳光海岸大学毕业证(JCU毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制阳光海岸大学毕业证(JCU毕业证)#文凭成绩单#真实留信学历认证永久存档208367051
 
办理萨省大学毕业证成绩单|购买加拿大USASK文凭证书
办理萨省大学毕业证成绩单|购买加拿大USASK文凭证书办理萨省大学毕业证成绩单|购买加拿大USASK文凭证书
办理萨省大学毕业证成绩单|购买加拿大USASK文凭证书zdzoqco
 
248649330-Animatronics-Technical-Seminar-Report-by-Aswin-Sarang.pdf
248649330-Animatronics-Technical-Seminar-Report-by-Aswin-Sarang.pdf248649330-Animatronics-Technical-Seminar-Report-by-Aswin-Sarang.pdf
248649330-Animatronics-Technical-Seminar-Report-by-Aswin-Sarang.pdfkushkruthik555
 
原版工艺美国普林斯顿大学毕业证Princeton毕业证成绩单修改留信学历认证
原版工艺美国普林斯顿大学毕业证Princeton毕业证成绩单修改留信学历认证原版工艺美国普林斯顿大学毕业证Princeton毕业证成绩单修改留信学历认证
原版工艺美国普林斯顿大学毕业证Princeton毕业证成绩单修改留信学历认证jjrehjwj11gg
 
What Causes The key not detected Message In Mercedes Cars
What Causes The key not detected Message In Mercedes CarsWhat Causes The key not detected Message In Mercedes Cars
What Causes The key not detected Message In Mercedes CarsGermany's Best Inc
 
办理阳光海岸大学毕业证成绩单原版一比一
办理阳光海岸大学毕业证成绩单原版一比一办理阳光海岸大学毕业证成绩单原版一比一
办理阳光海岸大学毕业证成绩单原版一比一F La
 
Building a Budget by Cat Plein and Josh Rodriguez
Building a Budget by Cat Plein and Josh RodriguezBuilding a Budget by Cat Plein and Josh Rodriguez
Building a Budget by Cat Plein and Josh RodriguezForth
 
(办理原版一样)Flinders毕业证弗林德斯大学毕业证学位证留信学历认证成绩单补办
(办理原版一样)Flinders毕业证弗林德斯大学毕业证学位证留信学历认证成绩单补办(办理原版一样)Flinders毕业证弗林德斯大学毕业证学位证留信学历认证成绩单补办
(办理原版一样)Flinders毕业证弗林德斯大学毕业证学位证留信学历认证成绩单补办fqiuho152
 
Can't Roll Up Your Audi A4 Power Window Let's Uncover the Issue!
Can't Roll Up Your Audi A4 Power Window Let's Uncover the Issue!Can't Roll Up Your Audi A4 Power Window Let's Uncover the Issue!
Can't Roll Up Your Audi A4 Power Window Let's Uncover the Issue!Mint Automotive
 
-The-Present-Simple-Tense.pdf english hh
-The-Present-Simple-Tense.pdf english hh-The-Present-Simple-Tense.pdf english hh
-The-Present-Simple-Tense.pdf english hhmhamadhawlery16
 
办理昆士兰科技大学毕业证QUT毕业证留信学历认证
办理昆士兰科技大学毕业证QUT毕业证留信学历认证办理昆士兰科技大学毕业证QUT毕业证留信学历认证
办理昆士兰科技大学毕业证QUT毕业证留信学历认证jdkhjh
 

Último (20)

Pros and cons of buying used fleet vehicles.pptx
Pros and cons of buying used fleet vehicles.pptxPros and cons of buying used fleet vehicles.pptx
Pros and cons of buying used fleet vehicles.pptx
 
Trent engineer.pptx presentation reports
Trent engineer.pptx presentation reportsTrent engineer.pptx presentation reports
Trent engineer.pptx presentation reports
 
办理阿德莱德大学毕业证Adelaide毕业证留信学历认证
办理阿德莱德大学毕业证Adelaide毕业证留信学历认证办理阿德莱德大学毕业证Adelaide毕业证留信学历认证
办理阿德莱德大学毕业证Adelaide毕业证留信学历认证
 
原版1:1定制宾州州立大学毕业证(PSU毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制宾州州立大学毕业证(PSU毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制宾州州立大学毕业证(PSU毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制宾州州立大学毕业证(PSU毕业证)#文凭成绩单#真实留信学历认证永久存档
 
Transportation Electrification Funding Strategy by Jeff Allen and Brandt Hert...
Transportation Electrification Funding Strategy by Jeff Allen and Brandt Hert...Transportation Electrification Funding Strategy by Jeff Allen and Brandt Hert...
Transportation Electrification Funding Strategy by Jeff Allen and Brandt Hert...
 
英国Bradford学位证,布拉德福德大学毕业证书1:1制作
英国Bradford学位证,布拉德福德大学毕业证书1:1制作英国Bradford学位证,布拉德福德大学毕业证书1:1制作
英国Bradford学位证,布拉德福德大学毕业证书1:1制作
 
办理乔治布朗学院毕业证成绩单|购买加拿大文凭证书
办理乔治布朗学院毕业证成绩单|购买加拿大文凭证书办理乔治布朗学院毕业证成绩单|购买加拿大文凭证书
办理乔治布朗学院毕业证成绩单|购买加拿大文凭证书
 
(办理学位证)(Toledo毕业证)托莱多大学毕业证成绩单修改留信学历认证原版一模一样
(办理学位证)(Toledo毕业证)托莱多大学毕业证成绩单修改留信学历认证原版一模一样(办理学位证)(Toledo毕业证)托莱多大学毕业证成绩单修改留信学历认证原版一模一样
(办理学位证)(Toledo毕业证)托莱多大学毕业证成绩单修改留信学历认证原版一模一样
 
原版1:1定制阳光海岸大学毕业证(JCU毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制阳光海岸大学毕业证(JCU毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制阳光海岸大学毕业证(JCU毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制阳光海岸大学毕业证(JCU毕业证)#文凭成绩单#真实留信学历认证永久存档
 
办理萨省大学毕业证成绩单|购买加拿大USASK文凭证书
办理萨省大学毕业证成绩单|购买加拿大USASK文凭证书办理萨省大学毕业证成绩单|购买加拿大USASK文凭证书
办理萨省大学毕业证成绩单|购买加拿大USASK文凭证书
 
248649330-Animatronics-Technical-Seminar-Report-by-Aswin-Sarang.pdf
248649330-Animatronics-Technical-Seminar-Report-by-Aswin-Sarang.pdf248649330-Animatronics-Technical-Seminar-Report-by-Aswin-Sarang.pdf
248649330-Animatronics-Technical-Seminar-Report-by-Aswin-Sarang.pdf
 
原版工艺美国普林斯顿大学毕业证Princeton毕业证成绩单修改留信学历认证
原版工艺美国普林斯顿大学毕业证Princeton毕业证成绩单修改留信学历认证原版工艺美国普林斯顿大学毕业证Princeton毕业证成绩单修改留信学历认证
原版工艺美国普林斯顿大学毕业证Princeton毕业证成绩单修改留信学历认证
 
What Causes The key not detected Message In Mercedes Cars
What Causes The key not detected Message In Mercedes CarsWhat Causes The key not detected Message In Mercedes Cars
What Causes The key not detected Message In Mercedes Cars
 
办理阳光海岸大学毕业证成绩单原版一比一
办理阳光海岸大学毕业证成绩单原版一比一办理阳光海岸大学毕业证成绩单原版一比一
办理阳光海岸大学毕业证成绩单原版一比一
 
Building a Budget by Cat Plein and Josh Rodriguez
Building a Budget by Cat Plein and Josh RodriguezBuilding a Budget by Cat Plein and Josh Rodriguez
Building a Budget by Cat Plein and Josh Rodriguez
 
(办理原版一样)Flinders毕业证弗林德斯大学毕业证学位证留信学历认证成绩单补办
(办理原版一样)Flinders毕业证弗林德斯大学毕业证学位证留信学历认证成绩单补办(办理原版一样)Flinders毕业证弗林德斯大学毕业证学位证留信学历认证成绩单补办
(办理原版一样)Flinders毕业证弗林德斯大学毕业证学位证留信学历认证成绩单补办
 
Can't Roll Up Your Audi A4 Power Window Let's Uncover the Issue!
Can't Roll Up Your Audi A4 Power Window Let's Uncover the Issue!Can't Roll Up Your Audi A4 Power Window Let's Uncover the Issue!
Can't Roll Up Your Audi A4 Power Window Let's Uncover the Issue!
 
Hot Sexy call girls in Pira Garhi🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Pira Garhi🔝 9953056974 🔝 escort ServiceHot Sexy call girls in Pira Garhi🔝 9953056974 🔝 escort Service
Hot Sexy call girls in Pira Garhi🔝 9953056974 🔝 escort Service
 
-The-Present-Simple-Tense.pdf english hh
-The-Present-Simple-Tense.pdf english hh-The-Present-Simple-Tense.pdf english hh
-The-Present-Simple-Tense.pdf english hh
 
办理昆士兰科技大学毕业证QUT毕业证留信学历认证
办理昆士兰科技大学毕业证QUT毕业证留信学历认证办理昆士兰科技大学毕业证QUT毕业证留信学历认证
办理昆士兰科技大学毕业证QUT毕业证留信学历认证
 

Awareness of iatf 16949

  • 2. Why it is changing ISO/TS 16949:2009 to IATF 16949 ? : - The IATF (International Automotive Task Force) who operate this standard have decided to based it on ISO 9001:2015 with additional enhancements. This mean that organization in automotive industry seeking IATF 16949 certification must also comply with ISO 9001:2015. - IATF 16949:2016 is to be implemented and supplemented to, and it conjunction with ISO 9001:2015. It specifies the requirements for establishing, implementing, maintaining and continually improving a QMS for any organization in the automotive industry.
  • 3. Summary of Major Changes • Adoption of the HLS (High Level Structure) • Explicit requirements for risk-based thinking to support application of process approach. • More emphasis on Process Approach & Risk Analysis. • Requirement to determine Context of Organization. • Greater emphasis on defining boundary & Scope of QMS with consideration to organization’s context. • Increased leadership requirement with need for active involvement of top management in operation of QMS. • Reference to ‘Preventive action’ is removed and replaced with ‘Action to address risk & opportunities. • Improved applicability for service(term product is replaced with ‘Product and Service’. • Quality objective must include reference to who, what, when. • Operational planning includes addressing risk.
  • 4. It focused on :  Brought quality and continuous improvement into heart of every business – ensuring that Quality Management is now completely integrated and aligned with the business strategies of a particular organization. Emphasized the importance of leadership - making Top Management responsible for ensuring that the whole organization ‘s Quality Management System is not only maintained but continually improved. Introduced Risk and Opportunity Management – reinforcing the use of management system to help identify business opportunities that contribute to bottom-line improvements. Introduced a new integrated approach to management standard – by introducing the new structure which has now become mandatory to all new ISO management system standards and which , in future , will make it easier to implement multiple, Integrated management system.
  • 5. 5 ISO/TS 16949:2009 Model of process -based QMS -IATF 16949 Model of process -based QMS. - Plan-Do-Check-Act cycle can be applied to all processes & to the QMS.
  • 6. Learn from Experience Identify the risk opportunities Analyze & Prioritize risk Opportunities Plan action to address the risk Implement the action plan Check Effectiveness of action plan Transitioning smoothly from ISO/TS 16949 to IATF 16949
  • 7. Customer & other relevant Interested parties Requirements 8. Operations INPUT 6. Planning 9. Performance evaluation 4.4 QMS-General & Process Approach 5. Leadership 10. Improvement OUTPUT 7. Support Processes Customer Satisfaction Product & Services Satisfaction 4.1,4.2& 4.3 Context & Scope  Automotive QMS Process Approach Model as per ISO-9001:2015
  • 8. New / Updated concept with Comment : • Context of the Organization : Consider the combination of Internal and External factors and condition that can have an effect on an organization approach to it’s product, service, investment and interested parties. ( Internal – Values, Culture, knowledge & Performance of the Organization / External – Legal, Technology, Competitive, Market, Social & Economic Environments whether International, National, Regional or Local / Can include Positive & Negative factors). • Interested Parties : Can be a person or organization that can affect, be affected by, or perceive themselves to be affected by a decision or activity. Ex-Suppliers, Customers or Competitors. • Leadership : Requirements specific to top management who are defined as a person or Group of people who directs and controls an organization at highest level. • Risk associated with threats and opportunity : Refined planning process replace preventive action and defined as the effect of uncertainty on expected result. • Communication: There are explicit and more detailed requirements for both Internal and External communication. • Documented Information: Replace documents and records. There are 2 types : Maintained (i.e. Procedure and Work Instruction) and Retained (i.e. Records).
  • 9. • Performance Evaluation: The measurement of quality performance and the effectiveness of the QMS, covering the methods for monitoring, measurement, analysis and evaluation, as applicable, to ensure valid result. • Nonconformity and corrective action: More detailed evaluation both the nonconformities themselves and corrective action required. Human factor have been added as an element of root cause analysis. • Management Review: More detailed requirements relating to Inputs and Outputs of the review. • Product Safety: Requirement to address the item define within this new requirement in a documented and dedicated process for the management of Product-safety related product and manufacturing processes. • Embedded Software: Detailed requirements for products with embedded software. Organization must also implement and maintain a system for software quality assurance of these products. • Corporate Responsibility: Requirement to have corporate responsibility policies including an anti-bribery policy, an employee code of conduct, and an ethics escalation (whistle-blowing) policy. • Supplier Management: Additional requirements regarding the organization’s supplier selection process have been added. • Internal Audits: Internal audit frequency requirements have been modified.
  • 10. 1. Scope 2. Normative references 3. Terms and definitions 4. Context of the organization 5. Leadership 6. Planning 7. Support 8. Operation 9. Performance evaluation 10.Improvement Set objective and build processes necessary to delivered result Implemented what was planned Monitored and measure processes and result against objectives , including effectiveness, efficiency and risk Take action to improve result MAIN CLAUSE ACTIVITY
  • 11.  In this International Standard, the following verbal forms are used :  ‘ shall ’ indicates a Requirement;  ‘ should ’ indicates a Recommendation;  ‘ may ’ indicates a permission  ‘ can ‘ indicates a possibility or a capability.  ‘ NOTE ’ is for Guidance in understanding.
  • 12.
  • 13.
  • 14.
  • 15. Clause 1 : Scope (supplemental 1.1) Clause 2 : Normative references (supplemental 2.1) Clause 3 : Terms and Definitions (supplemental 3.1)  Customer requirements  Customer specific requirements  Escalation process  Multi-disciplinary approach  No trouble found (NFT)  Periodic overhaul  Predictive maintenance  Premium freight  Trade-off process
  • 16. Clause 4 : Context of the organization  4.1 - Understanding the organization and its context  4.2 - Understanding the needs and expectations of interested parties  4.3 - Determine the scope of the quality management system 4.3.1 – Supplemental 4.3.2 – Customer specific requirements  4.4 – Quality management system and Its processes 4.4.1 – 4.4.1.1 – Conformance of products and processes 4.4.1.2 – Product safety 4.4.2 –
  • 17. Clause 5 : Leadership  5.1 - Leadership and commitment 5.1.1 - General 5.1.1.1 – Corporate responsibility 5.1.1.2 – Process effectiveness and efficiency 5.1.1.3 – Process Owner 5.1.2 – Customer focus  5.2 – Policy 5.2.1 – Establishing the Quality policy 5.2.2 – Communication the Quality policy  5.3 – Organizational Roles, Responsibilities and Authorities 5.3.1 – Supplemental 5.3.2 – Responsibility and Authority for product requirements and corrective actions
  • 18. Clause 6 : Planning  6.1 – Action to address risk and opportunities 6.1.1 – 6.1.2 - 6.1.2.1 – Risk analysis 6.1.2.2 – Preventive action 6.1.2.3 – Contingency plans  6.2 – Quality objective and planning to achieve them 6.2.1 – 6.2.2 – 6.2.2.1 – Supplemental  6.3 – Planning of changes
  • 19. Clause 7 : Support  7.1 – Resources 7.1.1 – General 7.1.2 - People 7.1.3 – Infrastructure 7.1.3.1 – Plant, Facilitate and Equipment planning 7.1.4 – Environmental for the operation of processes 7.1.4.1 – Supplemental 7.1.5 – Monitoring and Measuring resources 7.1.5.1 – General 7.1.5.1.1 – Measurement system analysis 7.1.5.2 – Measurement Traceability 7.1.5.2.1 – Calibration / Verification records 7.1.5.3 – Laboratory requirements 7.1.5.3.1 – Internal laboratory 7.1.5.3.2 – External laboratory 7.1.6. – Organizational Knowledge  7.2 – Competence 7.2.1 – Supplemental 7.2.2 – Competence-on the job training 7.2.3 – Internal auditor competency 7.2.4 – Second party auditor competency
  • 20.  7.3 – Awareness 7.3.1 – Supplemental 7.3.2 - Employee motivation and empowerment  7.4 – Communication  7.5 – Documented information 7.5.1 – General 7.5.1.1 – Quality management system documentation 7.5.2 – Creating and updating 7.5.3 – Control of documented information 7.5.3.1 – 7.5.3.2 - 7.5.3.2.1 – Record retention 7.5.3.2.2 – Engineering specifications
  • 21. Clause 8 : Operation  8.1 – Operational planning and control 8.1.1 – Supplemental 8.1.2 - Confidentiality  8.2 – Requirements for Product and Services 8.2.1 – Customer communication 8.2.1.1 – Supplemental 8.2.2 – Determining the requirements for Product and Services 8.2.2.1 – Supplemental 8.2.3 – Review of the requirements for Product and Services 8.2.3.1 – General 8.2.3.1.1 – Supplemental 8.2.3.1.2 – Customer designated special characteristics 8.2.3.1.3 – Organization manufacturing feasibility 8.2.3.2 - 8.2.4 – Changes to requirements for Products and Services  8.3 – Design and development of Products and services 8.3.1 – General 8.3.1.1 – Supplemental 8.3.2 – Design and development planning 8.3.2.1 – Supplemental 8.3.2.2 – Product design skill 8.3.2.3 – Development of products with embedded software
  • 22. 8.3.3– Design and development inputs 8.3.3.1 – Product design input 8.3.3.2 – Manufacturing process design input 8.3.3.3 – Special characteristic 8.3.4 – Design and development control 8.3.4.1 – Monitoring 8.3.4.2 – Design and development validation 8.3.4.3 – Prototype programme 8.3.4.4 – Product approval process 8.3.5 – Design and development outputs 8.3.5.1 – Supplemental 8.3.5.2 – Manufacturing process design output 8.3.6 – Design and development changes 8.3.6.1 - Supplemental  8.4 - Control of External provided processes, product and services 8.4.1 – General 8.4.1.1 – Supplemental 8.4.1.2 – Supplier selection process 8.4.1.3 – Customer –directed sources (Directed-Buy)
  • 23. 8.4.2 – Type and extent of control 8.4.2.1 – Supplemental 8.4.2.2 – Statutory and regulatory requirements 8.4.2.3 – Supplier quality management system development 8.4.2.3.1 – Automotive product with embedded software 8.4.2.4 – Supplier Monitoring 8.4.2.4.1 – Second-party audits 8.4.2.5 – Supplier development 8.4.3 – Information for external providers 8.4.3.1 – Supplemental  8.5 – Production and service provision 8.5.1 – Control of production and service provision 8.5.1.1 – Control plan 8.5.1.2 – Standardized work – Operator instruction and visual standards 8.5.1.3 – Verification of job set-ups 8.5.1.4 – Verification after shutdown 8.5.1.5 – Total productive maintenance 8.5.1.6 – Management of production tooling and manufacturing, test, inspection tooling and equipment 8.5.1.7 – Production scheduling 8.5.2 – Identification and Traceability 8.5.2.1 - Supplemental
  • 24. 8.5.3 – Property belonging to customers or external providers 8.5.4 – Preservation 8.4.4.1 – Supplemental 8.5.5 – Post-Delivery activity 8.5.5.1 – Feedback of information from service 8.5.5.2 – Service agreement with customer 8.5.6 – Control of changes 8.5.6.1 – Supplemental 8.5.6.1.1 – Temporary changes of process controls  8.6 – Release of Products and Services 8.6.1 – Supplemental 8.6.2 – Layout inspection and Functional testing 8.6.3 – Appearance Items 8.6.4.- Verification and acceptance of conformity of externally provided products and services 8.6.5 – Statutory and regulatory conformity 8.6.6 – Acceptance criteria
  • 25.  8.7 – Control of nonconforming outputs 8.7.1 – Supplemental 8.7.1.1 – Customer authorization for concession 8.7.1.2 – Control of nonconforming product- Customer specified process 8.7.1.3 – Control of suspect product 8.7.1.4 – Control of reworked product 8.7.1.5 - Control of repaired product 8.7.1.6 – Customer notification 8.7.1.7 – Nonconforming product disposition 8.7.2 –
  • 26. Clause 9 : Performance evaluation  9.1 - Monitoring, Measurement, Analysis and Evaluation 9.1.1 – General 9.1.1.1 – Monitoring and measurement of manufacturing processes 9.1.1.2 – Identification of statistical tools 9.1.1.3 - Application of statistical concepts 9.1.2 – Customer Satisfaction 9.1.2.1 – Supplemental 9.1.3 – Analysis and Evaluation 9.1.3.1 – Prioritization  9.2 – Internal Audit 9.2.1 – 9.2.2 – 9.2.2.1 – Internal audit programme 9.2.2.2 – Quality management system audit 9.2.2.3 – Manufacturing process audit 9.2.2.4 – Product audit
  • 27.  9.3 – Management Review 9.3.1 – General 9.3.1.1 – Supplemental 9.3.2 – Management Review Inputs 9.3.2.1 – Supplemental 9.3.3 – Management Review Outputs 9.3.3.1 – Supplemental Clause 10 : Improvement  10.1 – General  10.2 – Nonconformity and Corrective action 10.2.1 – 10.2.2 – 10.2.3 – Problem Solving 10.2.4 – Error-Proofing 10.2.5 – Warranty management system 10.2.6 – Customer complaints and field failure analysis  10.3 – Continual Improvement 10.3.1 – Supplemental
  • 28.  For detail clause to clause study refer standard IATF 16949: 2016 & ISO 9001:2015