Outline
Introduction
Construction Techniques
Problems Encountered In
Construction
Risks Control In Construction
undergrOund wOrks
Shelters and Fully-Designed Homes..
Basic protection from enemies and
elements..
Partially-modified for added protection
and comfort..
Built to drawings and
specifications..
Mining Operations..
Open Pits transitioning to
Underground mines.. exploiting lodes to
depth and reducing environmental
footprints
water systems..
Collection/Supply/Irrigation/Distribution
Underground Sewage Treatment
Plant, BondiCanal
mass transit systems..
rOad traffic..
HydrO-electric
POwer Plants..
Surge Shaft
Powerhouse
High Pressure Tunnel
fuel stOrage..
Other Ground Storage Media..
–Solution-Mined Salt Domes
–Depleted “Reservoir Rocks”(CO2)
–Lined Hard Rock Caverns (Compressed and
Liquified Natural Gas, LNG)
Packaged and Bulk
materials..
•Silo/Bunker Storage..
–Coal, Grains, Ore..
•Warehousing
–often in converted mine space
critical infrastructure..
•Secure sites with network
-wide access
–Controlled exit/entry
–Atmospheric control (temp., humidity, dust..)
–Ready access for modification and maintenance
•Space and Cost Saving Opportunities (“Utilidors”)..
–Heating/Cooling
–Communications
–Data transfer
–Wastewater
–Freshwater
–Transport
–Power
–etcetera..
researcH
facilities•
Worldwide, many
underground research
laboratories and test sites
(waste repository
characterization, physics,
geo-’bio-sciences,
engineering research,
education/training..)
Public
Facilities
Pretty Much anything you
Want
Temppeliaukio Church
Le Grand Louvre
reasons to go underground
urban congestion..
• Go underground to avoid..
–Road pavement
–Buried infrastructure
–Basements & foundations
–Surface condemnations
–Right of way interruptions
–Minimize surface disruption
create green sPace..
•“The Central
Artery/Tunnel
Project will
create more
than 300 acres
of landscaped
and restored
open space,
including over
45 parks and
major public
plazas”.
Protection..Kobe Earthquake (Japan – 1995)
Severe damage to the Kobe City Hall
No damage to the underground shopping
mall located below
isolation
Stable, Quiet and Shielded
–Waste Isolation
–Experiments and Testing..
underground construction
techniQues
Methods for underground construction
• Cut and cover method in open excavation;
• Cut and cover method between earth retaining walls with lowering of the
ground water levels;
• Cut and cover method between earth retaining walls without lowering of
the ground water levels;
• Wall and roof method;
• Pneumatic caisson method;
• Immersed tunnel method;
• Bored tunnel method;
• Top Down method.
EXCAVATION BY TUNNEL BORING
MACHINE
1. Excavation and support of working shafts
2. Excavation and support of undercut and tail tunnel
3. Excavation of the tunnel itself
4. Disposal of soil from tunnel face
5. Hoisting the soil to ground level
6. Lining the tunnel
7. Extending services and rail tracks (if necessary)
Shielded TBM involve The following acTiviTieS:
excavaTion in dRY SoilS
Earth Pressure Balance Digger Shield”
excavaTion in weT SoilS
• Slurry Shield
excavaTion in RockS
Mechanical
Equipment
Or
Explosive
Blasting.
• The person in charge of blasting shall be
the last to leave the blast area, shall see
that no one remains in the blast area, and
shall operate the sectioning switches in
the firing line while proceeding out of the
blast area.
• No persons shall enter the tunnel blast
area until the ventilation system has
cleared the heading of harmful gases,
smoke, and dust.
• After each blast, the underground
supports in the blast area shall be
inspected and secured as necessary work
is resumed. Rock surfaces shall be
inspected, scaled, and if required,
provided with shoring, bracing, rock bolts,
Shotcrete, or chain link fabric, before
mucking is started. Rock bolts within 100
ft (30.4 m) of a blast shall be tested after
each blast before drilling for the next
round begins.
• The muck pile shall be wet down prior to
and kept wet during operations.
SoMe gRound iMpRoveMenT
opTionS..
Freezing.. to stabilize the ground and/or
preserve the water table Grouting.. to
stabilize the ground and/or render it ~
watertight
SoMe gRound SuppoRT
SYSTeMS..
Rock Bolts and Steel Channel
Steel Arches
Pre-Cast Concrete Segments
Shotcrete
Integrated Waterproofing
Cast Iron Segments
The Technique Of
Jacked Box
Tunneling:
 simplest form
 A purpose designed tunnel shield
is cast on to the leading end of
the box, and thrust jacks are
provided at the rear end reacting
against the jacking base
 Control of Ground Disturbance
 Constructional Tolerances
 Particular hazards
 Alternative method for such case
pRoBleMS encounTeRed in
undeRgRound
conSTRucTion
gRound SuRpRiSeS..
• Geo-material properties vary in time/space (e.g.
geo-statistics..)
–Strengths
–Loads/Stresses
–Deformations (elastic and plastic)
• Sometimes the engineering process fails to
account for the impacts of geo-variability on..
–Designed structures..
–Surrounding structures/environment
MajoR excavaTion happen..
Shanghai
Singapore
London
Munich
WorldWide, Major Projects..
Major losses
• –1999 Hull Yorkshire Tunnel, UK Collapse
• –1999 TAV Bologna -Florence, Italy Collapse
• –1999 Anatolia Motorway, Turkey Earthquake
• –2000 Metro Taegu, Korea Collapse
• –2000 TAV Bologna -Florence, Italy Collapse
• –2002 Taiwan High Speed Railway Collapse
• –2003 Shanghai Metro, PRC Collapse
• –2004 Singapore Metro, Singapore Collapse.
• –2005 Barcelona Metro, Spain Collapse
• –2005 Lausanne Metro, Switzerland Collapse
• –2005 Lane Cove Tunnel, Sydney Collapse
• –2005 Kaohsiung Metro, Taiwan
• ………etcetera..
Fractured rock subject to
stress & Gravity
Observed at the engineering scale
rock is rarely solid..A “hard” rock
mass may contain weak clays or
even voids..
Ravelling
Alteration
Spalling/Bursting
chanGinG GroundWater
conditions• “High Water
Pressure
Complicates
Arrowhead
Tunnels..”
risks controls
in studyinG the reGional
GeoloGy
• Benefit from the
experience of others..–
Same/similar rock–
Same/similar needs–
Much of the early work
can be done from
behind the desk
Putting the Site in Context..
in scoPinG the site
investiGation (si)
• Mixed-scale data sets..
• experience needed
• Field Investigation..
–Exposures
–Geophysics
–Boreholes
–Testing
•Field
•Lab
characterizinG subsurFace
site
• 3-D Geo-Models
–From cms to kms
–Basis of Design..
• Conditions;
dry, damp, wet, massive, hard, stratified, seamy, schistose,
jointed, blocky, crushed, soil-like..
• •Behaviors;
raveling, running, flowing, squeezing, swelling, spalling, rock
burst..
• –Deciding between options..
•Siting
•Design
•Construction
desiGn & sPeciFy For Geo-
diversity
• Plan for Variation..
–Geologic
Uncertainties
–Design &
Construction Changes
Many
Designs..One
Tunnel
in conclusion..
Reference
• American society of civil engineers - technical committee on contracting practices
of the underground technology research council. 1991.
• The equipment magazine for the underground construction industry
• Forensic engineering for underground construction-e. T. Brown
• Journal of geotechnical engineering, asce, 115(11): 1513-1531.
• Seismic analysis of underground structures-kazuhiko kawashima
• Underground structures engineering services for owners and contractors
• Geoengineering considerations in the optimum use of underground space -
raymond l. Sterling
• Support in underground hard rock mines
• Drilling and blasting for underground space
Underground construction Techniques civil final year seminar

More Related Content

What's hot

Seminar Underground Construction PPT.pptx
Seminar Underground Construction PPT.pptxSeminar Underground Construction PPT.pptx
Seminar Underground Construction PPT.pptxMansimishra351962
 
Prefabricated structures
Prefabricated structuresPrefabricated structures
Prefabricated structuresFAIZAL MUHAMMED
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concreteRajesh Burde
 
Coffer Dams and Caissons
Coffer Dams and CaissonsCoffer Dams and Caissons
Coffer Dams and CaissonsRizwan Samor
 
prefabricated Structures
prefabricated Structuresprefabricated Structures
prefabricated StructuresBoopathi Raja
 
1. classification of urban roads 28 jun
1. classification of urban roads 28 jun1. classification of urban roads 28 jun
1. classification of urban roads 28 junPrathamesh Kulkarni
 
On street and off street parking
On street and off street parkingOn street and off street parking
On street and off street parkingSagar Vekariya
 
Construction equipments
Construction equipmentsConstruction equipments
Construction equipmentsAshish Parihar
 
Prefabrication types and Applications explained
Prefabrication types and Applications explainedPrefabrication types and Applications explained
Prefabrication types and Applications explainedEyad Reda
 
Slab site report
Slab site reportSlab site report
Slab site reportskmunazzar
 
UNDERWATER CONSTRUCTION
UNDERWATER CONSTRUCTIONUNDERWATER CONSTRUCTION
UNDERWATER CONSTRUCTIONHamsui Harold
 

What's hot (20)

Cofferdams
Cofferdams Cofferdams
Cofferdams
 
Seminar Underground Construction PPT.pptx
Seminar Underground Construction PPT.pptxSeminar Underground Construction PPT.pptx
Seminar Underground Construction PPT.pptx
 
Prefabricated structures
Prefabricated structuresPrefabricated structures
Prefabricated structures
 
Prestressed concrete
Prestressed concretePrestressed concrete
Prestressed concrete
 
Prefabrication
PrefabricationPrefabrication
Prefabrication
 
Pre-stressed Concrete
Pre-stressed ConcretePre-stressed Concrete
Pre-stressed Concrete
 
Coffer Dams and Caissons
Coffer Dams and CaissonsCoffer Dams and Caissons
Coffer Dams and Caissons
 
prefabricated Structures
prefabricated Structuresprefabricated Structures
prefabricated Structures
 
1. classification of urban roads 28 jun
1. classification of urban roads 28 jun1. classification of urban roads 28 jun
1. classification of urban roads 28 jun
 
On street and off street parking
On street and off street parkingOn street and off street parking
On street and off street parking
 
Pile foundation
Pile foundationPile foundation
Pile foundation
 
Construction equipments
Construction equipmentsConstruction equipments
Construction equipments
 
Pavement ppt
Pavement pptPavement ppt
Pavement ppt
 
Prefabrication types and Applications explained
Prefabrication types and Applications explainedPrefabrication types and Applications explained
Prefabrication types and Applications explained
 
specification of Rcc
specification of Rccspecification of Rcc
specification of Rcc
 
Slab site report
Slab site reportSlab site report
Slab site report
 
Foundation types
Foundation typesFoundation types
Foundation types
 
Construction of diaphragm wall
Construction of diaphragm wallConstruction of diaphragm wall
Construction of diaphragm wall
 
Slabs and types
Slabs and typesSlabs and types
Slabs and types
 
UNDERWATER CONSTRUCTION
UNDERWATER CONSTRUCTIONUNDERWATER CONSTRUCTION
UNDERWATER CONSTRUCTION
 

Similar to Underground construction Techniques civil final year seminar

UNDERGROUND-CONSTRUCTION.pptx
UNDERGROUND-CONSTRUCTION.pptxUNDERGROUND-CONSTRUCTION.pptx
UNDERGROUND-CONSTRUCTION.pptxIffalconQled
 
Excavation of Tunnels
Excavation of TunnelsExcavation of Tunnels
Excavation of Tunnelspartha sharma
 
Tunneling exploration
Tunneling explorationTunneling exploration
Tunneling explorationjamali husain
 
Study of tunnel engineering
Study of tunnel engineeringStudy of tunnel engineering
Study of tunnel engineeringAdil Shaikh
 
Tunnelling Methods.pdf
Tunnelling Methods.pdfTunnelling Methods.pdf
Tunnelling Methods.pdfSuryoNegoro3
 
NATM Tunneling ppt
NATM Tunneling pptNATM Tunneling ppt
NATM Tunneling pptSuman Paul
 
Blast hole drill
Blast hole drillBlast hole drill
Blast hole drillpavan kumar
 
OIL EXPLORATION | Offshore Drilling Operation| Deilling Rig operation | Types
OIL EXPLORATION | Offshore Drilling Operation| Deilling Rig operation | TypesOIL EXPLORATION | Offshore Drilling Operation| Deilling Rig operation | Types
OIL EXPLORATION | Offshore Drilling Operation| Deilling Rig operation | TypesGaurav Singh Rajput
 
Basics for oil riggers
Basics for oil riggersBasics for oil riggers
Basics for oil riggersEjaz Bhatti
 
tunnelsppt-170126104231-converted (1)-converted.pdf
tunnelsppt-170126104231-converted (1)-converted.pdftunnelsppt-170126104231-converted (1)-converted.pdf
tunnelsppt-170126104231-converted (1)-converted.pdfBalpreetSingh47890
 
Michalis presentation_2015
Michalis presentation_2015Michalis presentation_2015
Michalis presentation_2015ILIAS MICHALIS
 
Tunnels ppt
Tunnels pptTunnels ppt
Tunnels ppt1971995
 

Similar to Underground construction Techniques civil final year seminar (20)

UNDERGROUND-CONSTRUCTION.pptx
UNDERGROUND-CONSTRUCTION.pptxUNDERGROUND-CONSTRUCTION.pptx
UNDERGROUND-CONSTRUCTION.pptx
 
NATM ppt sumit
NATM ppt sumitNATM ppt sumit
NATM ppt sumit
 
Tunnels concepts
Tunnels conceptsTunnels concepts
Tunnels concepts
 
Tunnelling
TunnellingTunnelling
Tunnelling
 
Excavation of Tunnels
Excavation of TunnelsExcavation of Tunnels
Excavation of Tunnels
 
Tunnels, types & importance
Tunnels, types &  importanceTunnels, types &  importance
Tunnels, types & importance
 
Tunneling
TunnelingTunneling
Tunneling
 
Tunneling exploration
Tunneling explorationTunneling exploration
Tunneling exploration
 
Study of tunnel engineering
Study of tunnel engineeringStudy of tunnel engineering
Study of tunnel engineering
 
Tunnelling Methods.pdf
Tunnelling Methods.pdfTunnelling Methods.pdf
Tunnelling Methods.pdf
 
NATM Tunneling ppt
NATM Tunneling pptNATM Tunneling ppt
NATM Tunneling ppt
 
Tunnelling
TunnellingTunnelling
Tunnelling
 
Blast hole drill
Blast hole drillBlast hole drill
Blast hole drill
 
OIL EXPLORATION | Offshore Drilling Operation| Deilling Rig operation | Types
OIL EXPLORATION | Offshore Drilling Operation| Deilling Rig operation | TypesOIL EXPLORATION | Offshore Drilling Operation| Deilling Rig operation | Types
OIL EXPLORATION | Offshore Drilling Operation| Deilling Rig operation | Types
 
Basics for oil riggers
Basics for oil riggersBasics for oil riggers
Basics for oil riggers
 
Lecture 6 p
Lecture 6 pLecture 6 p
Lecture 6 p
 
tunnelsppt-170126104231-converted (1)-converted.pdf
tunnelsppt-170126104231-converted (1)-converted.pdftunnelsppt-170126104231-converted (1)-converted.pdf
tunnelsppt-170126104231-converted (1)-converted.pdf
 
Tunnel Engineering.pptx
Tunnel Engineering.pptxTunnel Engineering.pptx
Tunnel Engineering.pptx
 
Michalis presentation_2015
Michalis presentation_2015Michalis presentation_2015
Michalis presentation_2015
 
Tunnels ppt
Tunnels pptTunnels ppt
Tunnels ppt
 

More from Pavan Kumar N

More from Pavan Kumar N (13)

Seismic behavior of beam column Joint
Seismic behavior of beam column JointSeismic behavior of beam column Joint
Seismic behavior of beam column Joint
 
Repair and strengthening of reinforced concrete beam column joints
Repair and strengthening of reinforced concrete beam column jointsRepair and strengthening of reinforced concrete beam column joints
Repair and strengthening of reinforced concrete beam column joints
 
Theory of plates and shells timoshenko
Theory of plates and shells timoshenkoTheory of plates and shells timoshenko
Theory of plates and shells timoshenko
 
Structural anlysis
Structural anlysisStructural anlysis
Structural anlysis
 
Vol.3 session4 1917
Vol.3 session4 1917Vol.3 session4 1917
Vol.3 session4 1917
 
Unit5 pn
Unit5 pnUnit5 pn
Unit5 pn
 
Unit7 skp
Unit7 skpUnit7 skp
Unit7 skp
 
Unit8 skp
Unit8 skpUnit8 skp
Unit8 skp
 
Unit3 hbn
Unit3 hbnUnit3 hbn
Unit3 hbn
 
Unit1 hbn
Unit1 hbnUnit1 hbn
Unit1 hbn
 
Unit2 hbn
Unit2 hbnUnit2 hbn
Unit2 hbn
 
Unit4 kvv
Unit4 kvvUnit4 kvv
Unit4 kvv
 
Unit6 svd
Unit6 svdUnit6 svd
Unit6 svd
 

Recently uploaded

Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Christo Ananth
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSrknatarajan
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTbhaskargani46
 

Recently uploaded (20)

Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 

Underground construction Techniques civil final year seminar

  • 2. Outline Introduction Construction Techniques Problems Encountered In Construction Risks Control In Construction
  • 4. Shelters and Fully-Designed Homes.. Basic protection from enemies and elements.. Partially-modified for added protection and comfort.. Built to drawings and specifications..
  • 5. Mining Operations.. Open Pits transitioning to Underground mines.. exploiting lodes to depth and reducing environmental footprints
  • 10. fuel stOrage.. Other Ground Storage Media.. –Solution-Mined Salt Domes –Depleted “Reservoir Rocks”(CO2) –Lined Hard Rock Caverns (Compressed and Liquified Natural Gas, LNG)
  • 11. Packaged and Bulk materials.. •Silo/Bunker Storage.. –Coal, Grains, Ore.. •Warehousing –often in converted mine space
  • 12. critical infrastructure.. •Secure sites with network -wide access –Controlled exit/entry –Atmospheric control (temp., humidity, dust..) –Ready access for modification and maintenance •Space and Cost Saving Opportunities (“Utilidors”).. –Heating/Cooling –Communications –Data transfer –Wastewater –Freshwater –Transport –Power –etcetera..
  • 13. researcH facilities• Worldwide, many underground research laboratories and test sites (waste repository characterization, physics, geo-’bio-sciences, engineering research, education/training..)
  • 15. Pretty Much anything you Want Temppeliaukio Church Le Grand Louvre
  • 16. reasons to go underground
  • 17. urban congestion.. • Go underground to avoid.. –Road pavement –Buried infrastructure –Basements & foundations –Surface condemnations –Right of way interruptions –Minimize surface disruption
  • 18. create green sPace.. •“The Central Artery/Tunnel Project will create more than 300 acres of landscaped and restored open space, including over 45 parks and major public plazas”.
  • 19. Protection..Kobe Earthquake (Japan – 1995) Severe damage to the Kobe City Hall No damage to the underground shopping mall located below
  • 20. isolation Stable, Quiet and Shielded –Waste Isolation –Experiments and Testing..
  • 22. Methods for underground construction • Cut and cover method in open excavation; • Cut and cover method between earth retaining walls with lowering of the ground water levels; • Cut and cover method between earth retaining walls without lowering of the ground water levels; • Wall and roof method; • Pneumatic caisson method; • Immersed tunnel method; • Bored tunnel method; • Top Down method.
  • 23.
  • 24.
  • 25.
  • 26. EXCAVATION BY TUNNEL BORING MACHINE
  • 27. 1. Excavation and support of working shafts 2. Excavation and support of undercut and tail tunnel 3. Excavation of the tunnel itself 4. Disposal of soil from tunnel face 5. Hoisting the soil to ground level 6. Lining the tunnel 7. Extending services and rail tracks (if necessary) Shielded TBM involve The following acTiviTieS:
  • 28. excavaTion in dRY SoilS Earth Pressure Balance Digger Shield”
  • 29. excavaTion in weT SoilS • Slurry Shield
  • 31. Blasting. • The person in charge of blasting shall be the last to leave the blast area, shall see that no one remains in the blast area, and shall operate the sectioning switches in the firing line while proceeding out of the blast area. • No persons shall enter the tunnel blast area until the ventilation system has cleared the heading of harmful gases, smoke, and dust. • After each blast, the underground supports in the blast area shall be inspected and secured as necessary work is resumed. Rock surfaces shall be inspected, scaled, and if required, provided with shoring, bracing, rock bolts, Shotcrete, or chain link fabric, before mucking is started. Rock bolts within 100 ft (30.4 m) of a blast shall be tested after each blast before drilling for the next round begins. • The muck pile shall be wet down prior to and kept wet during operations.
  • 32. SoMe gRound iMpRoveMenT opTionS.. Freezing.. to stabilize the ground and/or preserve the water table Grouting.. to stabilize the ground and/or render it ~ watertight
  • 33.
  • 34. SoMe gRound SuppoRT SYSTeMS.. Rock Bolts and Steel Channel Steel Arches Pre-Cast Concrete Segments Shotcrete Integrated Waterproofing Cast Iron Segments
  • 35. The Technique Of Jacked Box Tunneling:  simplest form  A purpose designed tunnel shield is cast on to the leading end of the box, and thrust jacks are provided at the rear end reacting against the jacking base  Control of Ground Disturbance  Constructional Tolerances  Particular hazards  Alternative method for such case
  • 36.
  • 38. gRound SuRpRiSeS.. • Geo-material properties vary in time/space (e.g. geo-statistics..) –Strengths –Loads/Stresses –Deformations (elastic and plastic) • Sometimes the engineering process fails to account for the impacts of geo-variability on.. –Designed structures.. –Surrounding structures/environment
  • 40. WorldWide, Major Projects.. Major losses • –1999 Hull Yorkshire Tunnel, UK Collapse • –1999 TAV Bologna -Florence, Italy Collapse • –1999 Anatolia Motorway, Turkey Earthquake • –2000 Metro Taegu, Korea Collapse • –2000 TAV Bologna -Florence, Italy Collapse • –2002 Taiwan High Speed Railway Collapse • –2003 Shanghai Metro, PRC Collapse • –2004 Singapore Metro, Singapore Collapse. • –2005 Barcelona Metro, Spain Collapse • –2005 Lausanne Metro, Switzerland Collapse • –2005 Lane Cove Tunnel, Sydney Collapse • –2005 Kaohsiung Metro, Taiwan • ………etcetera..
  • 41. Fractured rock subject to stress & Gravity Observed at the engineering scale rock is rarely solid..A “hard” rock mass may contain weak clays or even voids.. Ravelling Alteration Spalling/Bursting
  • 42. chanGinG GroundWater conditions• “High Water Pressure Complicates Arrowhead Tunnels..”
  • 44. in studyinG the reGional GeoloGy • Benefit from the experience of others..– Same/similar rock– Same/similar needs– Much of the early work can be done from behind the desk Putting the Site in Context..
  • 45. in scoPinG the site investiGation (si) • Mixed-scale data sets.. • experience needed • Field Investigation.. –Exposures –Geophysics –Boreholes –Testing •Field •Lab
  • 46. characterizinG subsurFace site • 3-D Geo-Models –From cms to kms –Basis of Design.. • Conditions; dry, damp, wet, massive, hard, stratified, seamy, schistose, jointed, blocky, crushed, soil-like.. • •Behaviors; raveling, running, flowing, squeezing, swelling, spalling, rock burst.. • –Deciding between options.. •Siting •Design •Construction
  • 47. desiGn & sPeciFy For Geo- diversity • Plan for Variation.. –Geologic Uncertainties –Design & Construction Changes Many Designs..One Tunnel
  • 49. Reference • American society of civil engineers - technical committee on contracting practices of the underground technology research council. 1991. • The equipment magazine for the underground construction industry • Forensic engineering for underground construction-e. T. Brown • Journal of geotechnical engineering, asce, 115(11): 1513-1531. • Seismic analysis of underground structures-kazuhiko kawashima • Underground structures engineering services for owners and contractors • Geoengineering considerations in the optimum use of underground space - raymond l. Sterling • Support in underground hard rock mines • Drilling and blasting for underground space