Examination Paper of Project Management
1
IIBM Institute of Business Management
IIBM Institute of Business Management
Examination Paper MM.100
Project Management
Section A: Objective Type & Short Questions (30 marks)
 This section consists of Multiples choice and Short Note Type questions.
 Answer all the questions.
 Part one carries 1 mark each and Part Two carries 4 marks each.
Part One:
Multiple choices:
1. Liquidation value of the firm’s assets could be considered as________________
a. The minimum wealth of shareholder
b. The maximum wealth of shareholder
c. The average wealth of shareholder
d. None
2. If ‘P’ be the initial investment, ‘I’ be the interest rate and ‘T’ be the time period for which
funds are invested then interest earned will be______________
a. P*I/T
b. P*T/I
c. (P*I*T)2
d. P*I*T
3. Following the above given conditions, compound Interest be given by___________
a. P*(1+I)1/T
b. P*(1+I)T
c. (P*I*T)T
d. Can not be calculated
4. Firms resorting to ‘Proactive Growth’?
a. Do constant strategic planning
b. Watch things happening
c. Never plan but work on fortune
d. None
5. ‘SPACE’ stands for___________________
6. Increasing marketing expenditure leading to an increased market share is known
as________________
a. Market development
b. Market penetration
c. Market expansion
d. Market growth
Examination Paper of Project Management
2
IIBM Institute of Business Management
7. If profit after tax is ‘A’ ,depreciation be ‘B’ and interest be ‘I’ then Interest cover ratio
is given by______________
8. E-V rule is also called_____________
a. Mean co variance rule
b. Mean variance rule
c. Mean deviation rule
d. None
9. In case of internally generated funds the opportunity cost to the firm is____________
a. Zero
b. The lending rate
c. The borrowing rate
d. None
10. ‘PERT’ stands for__________________
Part Two:
1. Write a note on ‘Sinking Fund Payment’.
2. Differentiate between PERT and CPM Model?
3. What is ‘Capital Asset Pricing Model (CAPM)’?
4. What do you understand by PBP (Payback Period Method)?
5. Briefly explain the planning for procurement?
END OF SECTION A
Section B: Caselets (40 marks)
 This section consists of Caselets.
 Answer all the questions.
 Each caselet carries 20 marks.
 Detailed information should form the part of your answer (Word limit 150 to 200 words).
Caselet 1
Project partnering at British Airports Authority (BAA)
The construction sector in recent times has not been noted for its high levels of performance. Firms
like BAA, who own and operate airports including Heathrow and Gatwick – London’s two major
airports – rely heavily on their suppliers, including their construction suppliers, for their own
performance. Where construction projects are delayed, the financial consequences can be disastrous.
Furthermore, the disciplines of working on airport premises, including the security issues, play a
Examination Paper of Project Management
3
IIBM Institute of Business Management
significant part in the daily working lives of project staff. New firms bringing new staff onto the
airport sites invariably require time to bring them up to speed with the appropriate ways of working.
Particular problems include:
 Security – all personnel with access to airside parts of the airport (i.e. past passport control) must
be security vetted and trained. The vetting process takes six weeks, so firms must prepare project
staff in advance;
 Deliveries – getting materials into the airport is problematic, due to significant congestion and
lack of availability of areas for storage;
 Constant use of terminal buildings by passengers – the closing of areas causes problems with
passenger capacity. The firms are required to work with the constraints of passengers using the
areas around where the work is being carried out and physical and noise intrusion must be kept to
a minimum;
 The commercial activities (shops and restaurants) are the economic lifeblood of the business, with
large ground-rents. The objective of projects involving these areas is not simply to complete
works on time but as early as possible, so that the areas can start to generate rental incomes.
The traditional approach to managing fit-out projects (changing internal layouts to accommodate
different facilities and in particular new retail facilities) was that every contract was different, and
would be negotiated with different contractors. These would then employ their own sub-contractors to
carry out parts of the work. The approach that has worked far better for all concerned has been
through the appointment of lead contractors, with long-term contracts – in most cases 10 years – to be
the prime supplier of fit-out services to B.A.A. This particular contract was awarded to MACE. As
part of the agreement, BAA has paid for MACE staff to attend training programmes. This has
extended further, with help being offered to their suppliers – of both materials and labour – for
development. Where particular problems are identified, the supplier can be asked to take part in an
improvement programme. Satisfactory completion can result in similar long-term deals (tied to
continual improvement) being offered to those suppliers. In some cases the problems – particularly
with designs for areas – have been the responsibility of BAA. The mechanisms are now in place to
identify these problems and to introduce new practices to avoid them in future.
1) Summarise the arguments for such a policy of partnering with a major supplier such as BAA and
MACE have done here.
2) Carry out further research to identify further examples of partnering in projects. How well do they
appear to be working?
Caselet 2
The Big Dig
Any project that involves tunnelling is risky. Any project that involved tunneling under a city whilst
trying to keep that city fully operational, is very risky. When that city is bottom in the USA, it is in a
risk category all of its own. This does not, how – ever, excuse the financial performance of this
project, the results of which are exceptional and even make the performance of previous ‘stars of
disaster’ such as the Channel Tunnel, look good. During the 1950s, the Commonwealth of
Massachusetts commissioned new roads as part of a national road-building frenzy that took place at
that time. The result was a partly elevated freeway that cut the city off from its old harbour and over
time coped increasingly less well with the volumes of traffic that were trying to use it. For many
years, the project had been the subject of much politicking and had been rejected by a number of
national administrations. In 1993, it was given the go-ahead. At this time the budget was $US2.6
Examination Paper of Project Management
4
IIBM Institute of Business Management
billion, an enormous sum of money for an 8-mile tunnel, but given the technical complexity of the
task, this was considered acceptable. Gradually the costs rose, until in 1998, the estimated final cost
was 410.4 billion. By mid-2000 this had risen to $13 billion and by mid-2001 to over $15 billion. It
was still considered a technical success, but both politically and economically, it was a disaster. In
project management terms it is also a disaster – a 500 per cent-plus overrun on budget can only be
described as ‘talented’. How did such a financial disaster occur? The first is a feature of many large
‘political’ projects – that the ‘real cost’ would not be politically acceptable. The original budget was
deliberately deflated to make the project happen. The second is technical risk – that of the tunnelling
process. The ground through which the tunnelling is being carried out is reclaimed land that was
originally under the sea. The tunnelling process being used was also new, presenting a degree of
technical novelty.
1) How might the project be considered a technical success but an economic, political and project
management disaster?
2) Suggest how the 500 per cent-plus overrun might have come about.
END OF SECTION B
Section C: Applied Theory (30 marks)
 This section consists of Long Questions.
 Answer all the questions.
 Each question carries 15 marks.
 Detailed information should form the part of your answer (Word limit 200 to 250 words).
1. Define the term Integration Management? And how would you explain the Project plan in detail?
2. The funds and personnel requirements of the project change significantly with the stage of its life
cycle. What are the stages in the life cycle of project? Describe them.
END OF SECTION C
S-2-300813

More Related Content

What's hot

CHALLENGES OT THE BETTER, FASTER, CHEPER PHILOSOPHY OF AERONAUTICAL DESIGN
CHALLENGES OT THE BETTER, FASTER, CHEPER PHILOSOPHY OF AERONAUTICAL DESIGNCHALLENGES OT THE BETTER, FASTER, CHEPER PHILOSOPHY OF AERONAUTICAL DESIGN
CHALLENGES OT THE BETTER, FASTER, CHEPER PHILOSOPHY OF AERONAUTICAL DESIGN
guest3b4ea
 
Project Delivery Methods
Project Delivery MethodsProject Delivery Methods
Project Delivery Methods
Stacy Abernathy
 

What's hot (8)

CHALLENGES OT THE BETTER, FASTER, CHEPER PHILOSOPHY OF AERONAUTICAL DESIGN
CHALLENGES OT THE BETTER, FASTER, CHEPER PHILOSOPHY OF AERONAUTICAL DESIGNCHALLENGES OT THE BETTER, FASTER, CHEPER PHILOSOPHY OF AERONAUTICAL DESIGN
CHALLENGES OT THE BETTER, FASTER, CHEPER PHILOSOPHY OF AERONAUTICAL DESIGN
 
CFW Supply Chain Development
CFW Supply Chain DevelopmentCFW Supply Chain Development
CFW Supply Chain Development
 
CRNM - CARICOM Construction & Installation Services Sector
CRNM - CARICOM Construction & Installation Services SectorCRNM - CARICOM Construction & Installation Services Sector
CRNM - CARICOM Construction & Installation Services Sector
 
Recent developments in Capacity Remuneration Mechanisms
Recent developments in Capacity Remuneration MechanismsRecent developments in Capacity Remuneration Mechanisms
Recent developments in Capacity Remuneration Mechanisms
 
Project Delivery Methods
Project Delivery MethodsProject Delivery Methods
Project Delivery Methods
 
Approach presentation hyperlinks 05292007 3
Approach presentation hyperlinks 05292007 3Approach presentation hyperlinks 05292007 3
Approach presentation hyperlinks 05292007 3
 
Building Economics Tutorial
Building Economics TutorialBuilding Economics Tutorial
Building Economics Tutorial
 
Construction Projects Delivery Methods - Nilaksh Kothari, Manitowoc Public Ut...
Construction Projects Delivery Methods - Nilaksh Kothari, Manitowoc Public Ut...Construction Projects Delivery Methods - Nilaksh Kothari, Manitowoc Public Ut...
Construction Projects Delivery Methods - Nilaksh Kothari, Manitowoc Public Ut...
 

Viewers also liked

Tranzeo%20 %20 Wireless%20 Isp%20 Primer
Tranzeo%20 %20 Wireless%20 Isp%20 PrimerTranzeo%20 %20 Wireless%20 Isp%20 Primer
Tranzeo%20 %20 Wireless%20 Isp%20 Primer
Shahab Shahid
 
Types of internet connections
Types of internet connectionsTypes of internet connections
Types of internet connections
adrianne1114
 
Workshop technology hand basic tools
Workshop technology hand basic toolsWorkshop technology hand basic tools
Workshop technology hand basic tools
nanishajieha
 
Workshop tools & machines
Workshop tools & machinesWorkshop tools & machines
Workshop tools & machines
mrdtwilson
 

Viewers also liked (20)

SGNOG2 - Using communities for multihoming ISP workshop
SGNOG2 - Using communities for multihoming ISP workshopSGNOG2 - Using communities for multihoming ISP workshop
SGNOG2 - Using communities for multihoming ISP workshop
 
Tranzeo%20 %20 Wireless%20 Isp%20 Primer
Tranzeo%20 %20 Wireless%20 Isp%20 PrimerTranzeo%20 %20 Wireless%20 Isp%20 Primer
Tranzeo%20 %20 Wireless%20 Isp%20 Primer
 
Sm4 a book3 musab
Sm4 a book3   musabSm4 a book3   musab
Sm4 a book3 musab
 
D-LINK DSL 2640 U Router Configuration Guide
D-LINK DSL 2640 U Router Configuration GuideD-LINK DSL 2640 U Router Configuration Guide
D-LINK DSL 2640 U Router Configuration Guide
 
Pace IT - Types of Internet Connections
Pace IT - Types of Internet ConnectionsPace IT - Types of Internet Connections
Pace IT - Types of Internet Connections
 
Gretchen Rubin's 10 Tips For Being Happier
Gretchen Rubin's 10 Tips For Being HappierGretchen Rubin's 10 Tips For Being Happier
Gretchen Rubin's 10 Tips For Being Happier
 
Methods of connecting internet
Methods of connecting internetMethods of connecting internet
Methods of connecting internet
 
Using SlideShare
Using SlideShareUsing SlideShare
Using SlideShare
 
Types of internet connections
Types of internet connectionsTypes of internet connections
Types of internet connections
 
All You Need to Know About Customer Journey Mapping
All You Need to Know About Customer Journey MappingAll You Need to Know About Customer Journey Mapping
All You Need to Know About Customer Journey Mapping
 
Workshop technology hand basic tools
Workshop technology hand basic toolsWorkshop technology hand basic tools
Workshop technology hand basic tools
 
Touchpoint Dashboard Journey Mapping Guide 2014
Touchpoint Dashboard Journey Mapping Guide 2014Touchpoint Dashboard Journey Mapping Guide 2014
Touchpoint Dashboard Journey Mapping Guide 2014
 
SC for Startups
SC for StartupsSC for Startups
SC for Startups
 
Workshop practise
Workshop practiseWorkshop practise
Workshop practise
 
Taking Charge of Your Brain
Taking Charge of Your BrainTaking Charge of Your Brain
Taking Charge of Your Brain
 
Router Tp-Link TL-WR841N-TL-WR841ND
Router Tp-Link TL-WR841N-TL-WR841NDRouter Tp-Link TL-WR841N-TL-WR841ND
Router Tp-Link TL-WR841N-TL-WR841ND
 
Workshop tools & machines
Workshop tools & machinesWorkshop tools & machines
Workshop tools & machines
 
Fiber optics
Fiber opticsFiber optics
Fiber optics
 
Internet Service Provider-ISP
Internet Service Provider-ISPInternet Service Provider-ISP
Internet Service Provider-ISP
 
Creating Powerful Customer Experiences
Creating Powerful Customer ExperiencesCreating Powerful Customer Experiences
Creating Powerful Customer Experiences
 

Similar to Project management 250613

1. SHORT PAPERWAN Technologies Paper Research Point-to-Point .docx
1. SHORT PAPERWAN Technologies Paper Research Point-to-Point .docx1. SHORT PAPERWAN Technologies Paper Research Point-to-Point .docx
1. SHORT PAPERWAN Technologies Paper Research Point-to-Point .docx
MargaritoWhitt221
 
Changing the Face at the Busiest Airport in the World th.docx
Changing the Face  at the Busiest Airport  in the World th.docxChanging the Face  at the Busiest Airport  in the World th.docx
Changing the Face at the Busiest Airport in the World th.docx
cravennichole326
 
Changing the Face at the Busiest Airport in the World thro.docx
Changing the Face at the Busiest Airport in the World thro.docxChanging the Face at the Busiest Airport in the World thro.docx
Changing the Face at the Busiest Airport in the World thro.docx
cravennichole326
 
2016 McKinsey Tim McManus Managing big projects
2016 McKinsey Tim McManus Managing big projects2016 McKinsey Tim McManus Managing big projects
2016 McKinsey Tim McManus Managing big projects
Tim McManus
 
I B M Rankan Failure Of I T Projects
I B M  Rankan  Failure Of  I T  ProjectsI B M  Rankan  Failure Of  I T  Projects
I B M Rankan Failure Of I T Projects
Rankanidhi Panigrahy
 
Entrepreneurship Prepration of Project report.ppt
Entrepreneurship Prepration of Project report.pptEntrepreneurship Prepration of Project report.ppt
Entrepreneurship Prepration of Project report.ppt
RenuLamba8
 

Similar to Project management 250613 (20)

Heathrow Airport - Refurbishment of Terminal 1
Heathrow Airport - Refurbishment of Terminal 1Heathrow Airport - Refurbishment of Terminal 1
Heathrow Airport - Refurbishment of Terminal 1
 
CHAPTER 1 - Project Management.pdf
CHAPTER 1 - Project Management.pdfCHAPTER 1 - Project Management.pdf
CHAPTER 1 - Project Management.pdf
 
1. SHORT PAPERWAN Technologies Paper Research Point-to-Point .docx
1. SHORT PAPERWAN Technologies Paper Research Point-to-Point .docx1. SHORT PAPERWAN Technologies Paper Research Point-to-Point .docx
1. SHORT PAPERWAN Technologies Paper Research Point-to-Point .docx
 
CHAPTER-1 INTRODUCTION.pdf
CHAPTER-1 INTRODUCTION.pdfCHAPTER-1 INTRODUCTION.pdf
CHAPTER-1 INTRODUCTION.pdf
 
IRJET- Risk Management in BOT PNG Toll Plaza
IRJET- Risk Management in BOT PNG Toll PlazaIRJET- Risk Management in BOT PNG Toll Plaza
IRJET- Risk Management in BOT PNG Toll Plaza
 
Chunnel project project cost management
Chunnel  project project cost managementChunnel  project project cost management
Chunnel project project cost management
 
Changing the Face at the Busiest Airport in the World th.docx
Changing the Face  at the Busiest Airport  in the World th.docxChanging the Face  at the Busiest Airport  in the World th.docx
Changing the Face at the Busiest Airport in the World th.docx
 
HOW TO MINIMIZE DELAYS IN CONSTRUCTION OF COMMERCIAL PROJECT
HOW TO MINIMIZE DELAYS IN CONSTRUCTION OF COMMERCIAL PROJECTHOW TO MINIMIZE DELAYS IN CONSTRUCTION OF COMMERCIAL PROJECT
HOW TO MINIMIZE DELAYS IN CONSTRUCTION OF COMMERCIAL PROJECT
 
Changing the Face at the Busiest Airport in the World thro.docx
Changing the Face at the Busiest Airport in the World thro.docxChanging the Face at the Busiest Airport in the World thro.docx
Changing the Face at the Busiest Airport in the World thro.docx
 
2016 McKinsey Tim McManus Managing big projects
2016 McKinsey Tim McManus Managing big projects2016 McKinsey Tim McManus Managing big projects
2016 McKinsey Tim McManus Managing big projects
 
I B M Rankan Failure Of I T Projects
I B M  Rankan  Failure Of  I T  ProjectsI B M  Rankan  Failure Of  I T  Projects
I B M Rankan Failure Of I T Projects
 
Tokyo Bay Mega- Float
Tokyo Bay Mega- FloatTokyo Bay Mega- Float
Tokyo Bay Mega- Float
 
Assignment 1 Project Scope And Scheduling
Assignment 1 Project Scope And SchedulingAssignment 1 Project Scope And Scheduling
Assignment 1 Project Scope And Scheduling
 
(Essay) HRO & Lean 6 Sigma
(Essay) HRO & Lean 6 Sigma(Essay) HRO & Lean 6 Sigma
(Essay) HRO & Lean 6 Sigma
 
cost control analysis as effective tools in construction industry in nigeria
cost control analysis as effective tools in construction industry in nigeriacost control analysis as effective tools in construction industry in nigeria
cost control analysis as effective tools in construction industry in nigeria
 
Entrepreneurship Prepration of Project report.ppt
Entrepreneurship Prepration of Project report.pptEntrepreneurship Prepration of Project report.ppt
Entrepreneurship Prepration of Project report.ppt
 
Mario megaprojekt 2 11.4.2021
Mario megaprojekt 2 11.4.2021Mario megaprojekt 2 11.4.2021
Mario megaprojekt 2 11.4.2021
 
Toronto Pearson Airport - Procurement Strategy Study
Toronto Pearson Airport - Procurement Strategy StudyToronto Pearson Airport - Procurement Strategy Study
Toronto Pearson Airport - Procurement Strategy Study
 
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
IRJET- Case Study on Budget and Schedule Overrun During the Construction Phas...
 
A Study of Factors Caused for Time & Cost Overruns in Construction Project & ...
A Study of Factors Caused for Time & Cost Overruns in Construction Project & ...A Study of Factors Caused for Time & Cost Overruns in Construction Project & ...
A Study of Factors Caused for Time & Cost Overruns in Construction Project & ...
 

Recently uploaded

Mastering Affiliate Marketing: A Comprehensive Guide to Success
Mastering Affiliate Marketing: A Comprehensive Guide to SuccessMastering Affiliate Marketing: A Comprehensive Guide to Success
Mastering Affiliate Marketing: A Comprehensive Guide to Success
Abdulsamad Lukman
 
Abortion Clinic in Alberton +27791653574 WhatsApp Abortion Clinic Services in...
Abortion Clinic in Alberton +27791653574 WhatsApp Abortion Clinic Services in...Abortion Clinic in Alberton +27791653574 WhatsApp Abortion Clinic Services in...
Abortion Clinic in Alberton +27791653574 WhatsApp Abortion Clinic Services in...
mikehavy0
 
WA | 0821-8888-6412 | Apotik Jual Obat Aborsi Cytotec Asli Di Pasuruan
WA | 0821-8888-6412 | Apotik Jual Obat Aborsi Cytotec Asli Di PasuruanWA | 0821-8888-6412 | Apotik Jual Obat Aborsi Cytotec Asli Di Pasuruan
WA | 0821-8888-6412 | Apotik Jual Obat Aborsi Cytotec Asli Di Pasuruan
infoobataborsi24
 

Recently uploaded (20)

Global Trends in Market Reserch & Insights - Ray Poynter - May 2023.pdf
Global Trends in Market Reserch & Insights - Ray Poynter - May 2023.pdfGlobal Trends in Market Reserch & Insights - Ray Poynter - May 2023.pdf
Global Trends in Market Reserch & Insights - Ray Poynter - May 2023.pdf
 
Marketing Automation Insights - Unlocking Success
Marketing Automation Insights - Unlocking SuccessMarketing Automation Insights - Unlocking Success
Marketing Automation Insights - Unlocking Success
 
SALES-PITCH-an-introduction-to-sales.pptx
SALES-PITCH-an-introduction-to-sales.pptxSALES-PITCH-an-introduction-to-sales.pptx
SALES-PITCH-an-introduction-to-sales.pptx
 
Best Digital Expert Corporation of India
Best Digital Expert Corporation of IndiaBest Digital Expert Corporation of India
Best Digital Expert Corporation of India
 
Resumé Karina Perez | Digital Strategist
Resumé Karina Perez | Digital StrategistResumé Karina Perez | Digital Strategist
Resumé Karina Perez | Digital Strategist
 
The Essence of Mothers Celebrating the Heart of the Family.pptx
The Essence of Mothers Celebrating the Heart of the Family.pptxThe Essence of Mothers Celebrating the Heart of the Family.pptx
The Essence of Mothers Celebrating the Heart of the Family.pptx
 
Optimizing Your Marketing with AI-Powered Prompts
Optimizing Your Marketing with AI-Powered PromptsOptimizing Your Marketing with AI-Powered Prompts
Optimizing Your Marketing with AI-Powered Prompts
 
Fantasy Cricket Apps: A New Viewpoint for Online Cricket Betting Apps
Fantasy Cricket Apps: A New Viewpoint for Online Cricket Betting AppsFantasy Cricket Apps: A New Viewpoint for Online Cricket Betting Apps
Fantasy Cricket Apps: A New Viewpoint for Online Cricket Betting Apps
 
Engaging Sensory Activities for 5-10 Year Olds
Engaging Sensory Activities for 5-10 Year OldsEngaging Sensory Activities for 5-10 Year Olds
Engaging Sensory Activities for 5-10 Year Olds
 
Taprank - Boost your Google reviews with personalized NFC cards
Taprank - Boost your Google reviews with personalized NFC cardsTaprank - Boost your Google reviews with personalized NFC cards
Taprank - Boost your Google reviews with personalized NFC cards
 
Flyers, posters, booklets and brochures-3 (6).pptx
Flyers, posters, booklets and brochures-3 (6).pptxFlyers, posters, booklets and brochures-3 (6).pptx
Flyers, posters, booklets and brochures-3 (6).pptx
 
Mastering Affiliate Marketing: A Comprehensive Guide to Success
Mastering Affiliate Marketing: A Comprehensive Guide to SuccessMastering Affiliate Marketing: A Comprehensive Guide to Success
Mastering Affiliate Marketing: A Comprehensive Guide to Success
 
The 9th May Incident in Pakistan A Turning Point in History.pptx
The 9th May Incident in Pakistan A Turning Point in History.pptxThe 9th May Incident in Pakistan A Turning Point in History.pptx
The 9th May Incident in Pakistan A Turning Point in History.pptx
 
SEO: A Beginner's Guide to Ranking Higher
SEO: A Beginner's Guide to Ranking HigherSEO: A Beginner's Guide to Ranking Higher
SEO: A Beginner's Guide to Ranking Higher
 
Aiizennxqc Digital Marketing | SEO & SMM
Aiizennxqc Digital Marketing | SEO & SMMAiizennxqc Digital Marketing | SEO & SMM
Aiizennxqc Digital Marketing | SEO & SMM
 
Abortion Clinic in Alberton +27791653574 WhatsApp Abortion Clinic Services in...
Abortion Clinic in Alberton +27791653574 WhatsApp Abortion Clinic Services in...Abortion Clinic in Alberton +27791653574 WhatsApp Abortion Clinic Services in...
Abortion Clinic in Alberton +27791653574 WhatsApp Abortion Clinic Services in...
 
[Expert Panel] New Google Shopping Ads Strategies Uncovered
[Expert Panel] New Google Shopping Ads Strategies Uncovered[Expert Panel] New Google Shopping Ads Strategies Uncovered
[Expert Panel] New Google Shopping Ads Strategies Uncovered
 
Generating Leads with Analyst Content Webinar Slides_SJN Final.pdf
Generating Leads with Analyst Content Webinar Slides_SJN Final.pdfGenerating Leads with Analyst Content Webinar Slides_SJN Final.pdf
Generating Leads with Analyst Content Webinar Slides_SJN Final.pdf
 
WA | 0821-8888-6412 | Apotik Jual Obat Aborsi Cytotec Asli Di Pasuruan
WA | 0821-8888-6412 | Apotik Jual Obat Aborsi Cytotec Asli Di PasuruanWA | 0821-8888-6412 | Apotik Jual Obat Aborsi Cytotec Asli Di Pasuruan
WA | 0821-8888-6412 | Apotik Jual Obat Aborsi Cytotec Asli Di Pasuruan
 
youtube_marketing_partner_vling_service_introduction
youtube_marketing_partner_vling_service_introductionyoutube_marketing_partner_vling_service_introduction
youtube_marketing_partner_vling_service_introduction
 

Project management 250613

  • 1. Examination Paper of Project Management 1 IIBM Institute of Business Management IIBM Institute of Business Management Examination Paper MM.100 Project Management Section A: Objective Type & Short Questions (30 marks)  This section consists of Multiples choice and Short Note Type questions.  Answer all the questions.  Part one carries 1 mark each and Part Two carries 4 marks each. Part One: Multiple choices: 1. Liquidation value of the firm’s assets could be considered as________________ a. The minimum wealth of shareholder b. The maximum wealth of shareholder c. The average wealth of shareholder d. None 2. If ‘P’ be the initial investment, ‘I’ be the interest rate and ‘T’ be the time period for which funds are invested then interest earned will be______________ a. P*I/T b. P*T/I c. (P*I*T)2 d. P*I*T 3. Following the above given conditions, compound Interest be given by___________ a. P*(1+I)1/T b. P*(1+I)T c. (P*I*T)T d. Can not be calculated 4. Firms resorting to ‘Proactive Growth’? a. Do constant strategic planning b. Watch things happening c. Never plan but work on fortune d. None 5. ‘SPACE’ stands for___________________ 6. Increasing marketing expenditure leading to an increased market share is known as________________ a. Market development b. Market penetration c. Market expansion d. Market growth
  • 2. Examination Paper of Project Management 2 IIBM Institute of Business Management 7. If profit after tax is ‘A’ ,depreciation be ‘B’ and interest be ‘I’ then Interest cover ratio is given by______________ 8. E-V rule is also called_____________ a. Mean co variance rule b. Mean variance rule c. Mean deviation rule d. None 9. In case of internally generated funds the opportunity cost to the firm is____________ a. Zero b. The lending rate c. The borrowing rate d. None 10. ‘PERT’ stands for__________________ Part Two: 1. Write a note on ‘Sinking Fund Payment’. 2. Differentiate between PERT and CPM Model? 3. What is ‘Capital Asset Pricing Model (CAPM)’? 4. What do you understand by PBP (Payback Period Method)? 5. Briefly explain the planning for procurement? END OF SECTION A Section B: Caselets (40 marks)  This section consists of Caselets.  Answer all the questions.  Each caselet carries 20 marks.  Detailed information should form the part of your answer (Word limit 150 to 200 words). Caselet 1 Project partnering at British Airports Authority (BAA) The construction sector in recent times has not been noted for its high levels of performance. Firms like BAA, who own and operate airports including Heathrow and Gatwick – London’s two major airports – rely heavily on their suppliers, including their construction suppliers, for their own performance. Where construction projects are delayed, the financial consequences can be disastrous. Furthermore, the disciplines of working on airport premises, including the security issues, play a
  • 3. Examination Paper of Project Management 3 IIBM Institute of Business Management significant part in the daily working lives of project staff. New firms bringing new staff onto the airport sites invariably require time to bring them up to speed with the appropriate ways of working. Particular problems include:  Security – all personnel with access to airside parts of the airport (i.e. past passport control) must be security vetted and trained. The vetting process takes six weeks, so firms must prepare project staff in advance;  Deliveries – getting materials into the airport is problematic, due to significant congestion and lack of availability of areas for storage;  Constant use of terminal buildings by passengers – the closing of areas causes problems with passenger capacity. The firms are required to work with the constraints of passengers using the areas around where the work is being carried out and physical and noise intrusion must be kept to a minimum;  The commercial activities (shops and restaurants) are the economic lifeblood of the business, with large ground-rents. The objective of projects involving these areas is not simply to complete works on time but as early as possible, so that the areas can start to generate rental incomes. The traditional approach to managing fit-out projects (changing internal layouts to accommodate different facilities and in particular new retail facilities) was that every contract was different, and would be negotiated with different contractors. These would then employ their own sub-contractors to carry out parts of the work. The approach that has worked far better for all concerned has been through the appointment of lead contractors, with long-term contracts – in most cases 10 years – to be the prime supplier of fit-out services to B.A.A. This particular contract was awarded to MACE. As part of the agreement, BAA has paid for MACE staff to attend training programmes. This has extended further, with help being offered to their suppliers – of both materials and labour – for development. Where particular problems are identified, the supplier can be asked to take part in an improvement programme. Satisfactory completion can result in similar long-term deals (tied to continual improvement) being offered to those suppliers. In some cases the problems – particularly with designs for areas – have been the responsibility of BAA. The mechanisms are now in place to identify these problems and to introduce new practices to avoid them in future. 1) Summarise the arguments for such a policy of partnering with a major supplier such as BAA and MACE have done here. 2) Carry out further research to identify further examples of partnering in projects. How well do they appear to be working? Caselet 2 The Big Dig Any project that involves tunnelling is risky. Any project that involved tunneling under a city whilst trying to keep that city fully operational, is very risky. When that city is bottom in the USA, it is in a risk category all of its own. This does not, how – ever, excuse the financial performance of this project, the results of which are exceptional and even make the performance of previous ‘stars of disaster’ such as the Channel Tunnel, look good. During the 1950s, the Commonwealth of Massachusetts commissioned new roads as part of a national road-building frenzy that took place at that time. The result was a partly elevated freeway that cut the city off from its old harbour and over time coped increasingly less well with the volumes of traffic that were trying to use it. For many years, the project had been the subject of much politicking and had been rejected by a number of national administrations. In 1993, it was given the go-ahead. At this time the budget was $US2.6
  • 4. Examination Paper of Project Management 4 IIBM Institute of Business Management billion, an enormous sum of money for an 8-mile tunnel, but given the technical complexity of the task, this was considered acceptable. Gradually the costs rose, until in 1998, the estimated final cost was 410.4 billion. By mid-2000 this had risen to $13 billion and by mid-2001 to over $15 billion. It was still considered a technical success, but both politically and economically, it was a disaster. In project management terms it is also a disaster – a 500 per cent-plus overrun on budget can only be described as ‘talented’. How did such a financial disaster occur? The first is a feature of many large ‘political’ projects – that the ‘real cost’ would not be politically acceptable. The original budget was deliberately deflated to make the project happen. The second is technical risk – that of the tunnelling process. The ground through which the tunnelling is being carried out is reclaimed land that was originally under the sea. The tunnelling process being used was also new, presenting a degree of technical novelty. 1) How might the project be considered a technical success but an economic, political and project management disaster? 2) Suggest how the 500 per cent-plus overrun might have come about. END OF SECTION B Section C: Applied Theory (30 marks)  This section consists of Long Questions.  Answer all the questions.  Each question carries 15 marks.  Detailed information should form the part of your answer (Word limit 200 to 250 words). 1. Define the term Integration Management? And how would you explain the Project plan in detail? 2. The funds and personnel requirements of the project change significantly with the stage of its life cycle. What are the stages in the life cycle of project? Describe them. END OF SECTION C S-2-300813