SlideShare uma empresa Scribd logo
1 de 33
Baixar para ler offline
 
YEAR	
  2013	
  
COMPANY	
  
PROFILE	
  
  2	
  
TABLE OF CONTENTS
1-17................................COMPANY PROFILE 1.0
..............................................The Organisation 1.1
.........................................................Strategy 1.2
...........................................Organisation Chart 1.3
........................................Financial Information 1.4
.........................................................Contacts 1.5
..........................................................Projects 1.6
.............................History: Company Relocation 1.7
................................Equipments & Applications 1.8
.................S & H Consultant company in pictures 1.9
18.................................................ENVELOPE 2.0
19..............................................LETTERHEAD 3.0
20................................NAME LETTER / CARD 4.0
21-22..........................BUILDING & PROCESS 5.0
.................................Role of Quantity Surveyor 5.1
.....................Before construction / Preliminaries 5.2
.........................................During Construction 5.3
.........................Post Constrction / Final Account 5.4
23-32...........................SAMPLE DOCUMENTS 6.0
..............................................Bill of Quantities 6.1
	
  
  3	
  
1.1THE ORGANISATION
COMPANY DETAILS:
Office Location: Level 3, Jalan Bengkurong, No. 777, 47500,
Muara, Bengkurong,
Brunei Darrussalam.
Telephone: +673 2696146
E-mail: s&h@gmail.com
Website: www.s&h.com.bru
S & H CONSULTANT was founded by HJ MUHD SYAFIQ BIN HJ ABD ZARIFUL,
2009. This company has experienced in many projects types including comm
storey residential, and industrial.
EXPERIENCE
Types of Facilities Undertaken:
• Banks
• Laboratories
• Residential Buildings
• Commercial Buildings
• Educational & Institutional Buildings
• Religious Buildings
• Healthcare Buildings
• Offices
• Civic Amenities
• Defence Installations
• Sport Facilities
• Service Apertments
• Hotel
  4	
  
PRINCIPAL QUANTITY SURVEYOR
PERSONAL DETAILS:
NAME:
ADDRESS:
TELEPHONE:
MOBILE:
E-MAIL:
DATE OF BIRTH:
NATIONALITY: Bruneian
I/C No.: 01-096614
Academic Qualifications:
2002 Bachelor of Science (Hons) (in Quantity Surveying)
(Taylor’s University, Malaysia)
2006 Master of Quantity Surveyor (Harvard University, England)
Hj Muhd Syafiq Bin Hj Abd Zariful
No.5 Spg 10-34 Kg Bengkurong
Jln Bengkurong, Brunei Muara
Brunei Darrusslam
+673 2656996
+673 9769606
syafiq_146@hotmail.com
14 June1981
  5	
  
Professional Association
Professional Member of the Royal Institution of Chartered
Surveyors (RICS), UK since 2009
Corporate Member of Pertubuhan Ukur, Jurutera & Arkitek,
(PUJA) Brunei since 2010
Registered Member of the Board of Quantity Surveyors (BQSM),
Malaysia since 2012 	
  
  6	
  
1.2 STRATEGY
MISSION STATEMENT
We are committed to excellence in the full range of counsulting
services provided and will execute it with the emphasis on
professional integrity. In this process it is expected from all the
members of this practice to be dedicated to a high quality of
service executed in a friendly and fair manner.
We do believe in equal opportunities for all our employees and a
fair distribution of wealth. We do not only accept our social
responsibilities but fully endorse the affirmative development
programme in the country. this will be achieved by the provision
of recruitment, promotion and growth opportunities to anyone
able to satisfy the professional, technical, administrative and
managerial positions within the practice, irrespective of race,
colour, language, sex, class, political, religion or other opinion.
AIM
Ensuring Client’s satisfaction and peace of mind by providing the
highest standards and quality of service through total
professionalism, commitment and cooperation
PHILOSOPHY
S & H CONSULTANT’s underlying commitment is to provide
outstanding professional services through Integrity, Quality and
Competence
VALUES
Integrity, Sincerity, Recognition of community values and
professionalism
  7	
  
BACKGROUND
• Sole Proprietorship
• Independent firm
• Brunei-based
• Chartered Quantity Surveying practice
• Set up in 2009 by local Bruneian Muhd Syafiq Bin Hj Abd
Zariful
SERVICES
• Cost Management
• Tender Documentation
• Dispute Resolution
• Building Valuation
• Contractual Assistance
• Expert Witness in Construction Cost Issues
• Quantity Surveying Consultancy
• Construction Cost Consultancy
• Project Management
• Facilities Management
  8	
  
1.3 ORGANISATION CHART
	
  
	
   	
  
BOARD	
  OF	
  DIRECTORS/	
  SHARE	
  HOLDERS
EXCUTIVE	
  DIRECTOR
EXCUTIVE	
  
(ADMINISTRATION	
  )
EXCUTIVE	
  (ACCOUNT	
  )
SENIOR	
  QUANTITY	
  
SURVEYOR
QUANTITY	
  SURVEYOR
ASSOCIATE	
  
DIRECTOR
QUANTITY	
  SURVEYORQUANTITY	
  SURVEYOR
QUANTITY	
  SURVEYOR
QUANTITY	
  SURVEYOR
QUANTITY	
  SURVEYOR
QUANTITY	
  SURVEYOR ASST.	
  QUANTITY	
  SURVEYOR
MANAGING	
  DIRECTOR
ASST.	
  QUANTITY	
  
SURVEYOR
ASST.	
  QUANTITY	
  
SURVEYOR
ASST.	
  QUANTITY	
  
SURVEYOR
ASST.	
  QUANTITY	
  
SURVEYOR
ASST.	
  QUANTITY	
  
SURVEYOR
SENIOR	
  	
  QUANTITY	
  
SURVEYOR
SENIOR	
  	
  QUANTITY	
  
SURVEYOR
SENIOR	
  	
  QUANTITY	
  SURVEYORSENIOR	
  	
  PROJECT	
  MANAGER
SEPECIAL	
  	
  PROJECT	
  	
  
DIVISION
PROFESSIONAL	
  &	
  SUB-­‐PROFESSIONAL
ADMINISTRATION	
  &	
  
FINANCE
CONSULTANCY	
  DIVISION
  9	
  
1.4 FINANCIAL INFORMATION
Registered Company number: 061496-S
Authorized Capital: B$400,000
Paid up Capital B$146,000
Registered Bank HSBC
Signing Principal Haji Muhammad
Syafiq bin Hj Abdul
Zariful
1.5 CONTACTS
The Company
Telephone: +673 2696146
E-mail: s&h@gmail.com
Website: www.s&h.com.bru
The Director
Telephone: +673 2656996
Mobile: +673 9769606
E-mail: syafiq_146@hotmail.com
  10	
  
1.6 PROJECTS
SELECTED COMPLETED PROJECTS
Project Name:
Building Type:
Project Cost:
Project Name:
Building Type:
Project Cost:
Project Name:
Building Type:
Project Cost:
Project Name:
Building Type:
Project Cost:
Project Name:
Building Type:
Project Cost:
	
   	
  
UBD Sports House
Commercial
B$ 1,000,000
Happy District
Commercial
B$ 300,000
Bengkurong Residential
Residential
B$ 30,000,000
Mulaut Mosque
Religious
B$ 1,000,000
BX-treme Park
Commercial
B$ 3,000,000
Bengkurong Residential
B$ 30M
Mulaut Mosque
B$ 1M
  11	
  
CURRENT PROJECTS
Project Name:
Building Type:
Project Cost:
Project Name:
Building Type:
Project Cost:
Project Name:
Building Type:
Project Cost:
Project Name:
Building Type:
Project Cost:
Project Name:
Building Type:
Project Cost:
Rimba Religious School
Educational
B$ 3,500,000
BM District Office Building
Commercial
B$ 8,000,000
Sixth Form Centre at Sengkurong
Educational
B$ 32,000,000
National Housing at Tanah Jambu
Residential
B$ 53,000,000
UBD Sports Complex
Commercial
B$ 6,400,000
Sixth Form Centre at Sengkurong
B$ 32M
BM District Office Building
B$ 8M
  12	
  
1.7 HISTORY: COMPANY RELOCATION
The picture shows the company’s old building in Tutong
The shows the new building in Muara
The new building is currently located in Muara, at Kg BengkurongPreviously
at the old building there were only a few staff but now the business is
getting bigger and the staff has increased.The reason S & H CONSULTANT
relocate to a new building is that there is not much space or rooms for
members in the old building, the solution to that is to extend the building
but another problem is that there is not much space for further extension
because of the other buildings around it so the only way is to relocate the
company to a new building. S & H CONSULTANT relocate its company in Kg
Bengkurong which gives them some profit because all of the members
current houses are closer to the new building which saves transportation
costs and they can arrive puntually for work every working days.
  13	
  
1.8HARDWARES AND SOFTWARES USAGE
CURRENT HARDWARES	
  
-LCD Monitor
Technical Specifications:
Type-Wide-Aspect Active Matrix TFT (Thin Film
Transistor)
Size-19” to 23”
Resolution-Full HD
Reason: The Company needs a Widescreen Thin-Film Transistor (TFT) LCD
monitor because LCD monitor uses less power and less heat which saves electricity
so that means the company don’t have to worry about the payment of using
electricity.
-CPU
Technical Specifications:
Operating system- Windows 7
Processor- Mobile
Memory- 4GB RAM
Storage capacity- 500GB
Reason: This company must have CPU
(Central Processing Unit) for the workers to do the forms and documents.
It is to carry out a computer program.
  14	
  
-Laser Printer
Technical Specifications:
Type: HP CP3525x printer
Size-small
Print Resolution-High Quality, up to 4800 x 1200
dpi
Memory-500 MB
Reason:- Because of the way that laser printers
use their toner, they are able to print far more
copies than inkjet printers do. This means that
over time you save more money on printing
when you use a laser printer.
-Network Adapter
Network Card: It is one of the most important
pieces of hardware as it allows a computer to
communicate with other computers over a
network. It serves as a networking medium and
provides the computers with a MAC address
system. A network card is also known as a
network adapter, a LAN card and better known as a NIC.
Reason: - allows a computer to communicate with other computers over
a network. The company needs it to communicate with other computers
over a network.	
  
  15	
  
CURRENT SOFTWARES
Operating System
-Windows 7
Microsoft 7 is use in the Company because the
system compatibility is in the desired and
acceptable range to the new program because the
windows 7 has better and upgraded parts already
installed in the computers. This is also because
the new program works well with window 7 and it
is more friendly and easy to learn.
Reason: The windows 7 has more advanced
option for the new system to work on and more
tools that useful in the work.
Applications
-Word Processor
It is needed for the company to make documents
Product name: Word 2010
Operating system: Windows 7
-Spreadsheet
The office clerk uses this to create tables such as
creating a Gantt chart. It is also used for calculation
which is easier than calculating manually.
Product name: Excel 2010
Operating system: Windows 7
  16	
  
-Database
Product name: Microsoft Access 2010
Operating system: Windows 7
It contains all the database characteristics needed.
This software is used to create database such as
creating forms and reports.
Benefits of using a database
It gives you true command of your data, enabling you
to retrieve it, sort it, analyze it, summarize it, and
report results in moments. It can combine data from various files, so that
you never have to enter information twice. It can even make data entry
more efficient and accurate.
-Anti-virus software
anti-virus software is used to prevent, detect, and remove malware
Name: Kapersky Anti-Virus 2011
Size:146MB
Type: Anti-Virus
Reason:The company needs anti-virus software to
prevent virus infection. If the computer infected with
virus the data might be lost, computer becomes
slow, and memory becomes smaller and it can affect
the company’s work.
	
   	
  
  17	
  
1.9 S & H Consultant company in pictures
  18	
  
2.0 ENVELOPE
Telephoneno.+673
2696146
Email:s&h@gmail.com
No.477|KgBengkurong
|Spg.10-34|
BruneiDarussalam
  19	
  
3.0 LETTERHEAD
	
  
Telephone no. +673 2696146
Email: s&h@gmail.com
No.477 | Kg Bengkurong | Spg.10 - 34 | Brunei Darussalam
  20	
  
4.0 NAMELETTER
	
  
Front	
  card	
  view	
  
Back	
  card	
  view	
  
5.0 BUILDING & PROCESS (Procedures)
5.1 ROLE OF QUANTITY SURVEYOR
The term quantity surveyor derives from the role taken in
quantifying the numerous resources that it takes to build
a given project, such as labour, supervision, plant and
materials.
A Quantity Surveyor is a construction industry
professional who specialises in estimating the value of
construction works and can also be referred to as a “Cost
Engineer” or “Cost Planner”. Quantity Surveyors are
involved at different stages of the construction process,
typically prior to construction, during construction and
following completion of the works.
Quantity Surveyors work with accountants, architects,
builders, clients, developers, engineers, financiers,
government, insurance underwriters, solicitors and
subcontractors. The Quantity Surveyor’s detailed
knowledge of construction costs allows them to perform
the following tasks independently of whether they are
working for the Client or the Contractor.
5.2 Before construction / Preliminaries:
• Meeting with Client & Consultants
• Estimating project preliminary cost
• Preparation of Bill of Quantities
• Preparation of Tender documents
• Preparation of Contract documents
• preparation of Feasibility Studies
• Assigning work to sub-contractor
	
  
5.3 During construction:
• Feasibility Studies
• Calculating the contractor's progress claims
• Preparing finantial statements
• Site visits for assessment and verification
• Monthly meetings to discuss payments
• Make final payments to contractors
• Determine the final cost of the project
	
  
5.4 Post construction / Final Account:
• Accurate calculation of the final project payment
• Assessment of work completed by the contractor
• Architects issues final certificate for final payment to
main contractor
6.0 SAMPLE DOCUMENTS
6.1 BILL OF QUANTITIES
Bill No. 1: General Items
Item
no.
Description Unit Quantity Rate Amount
101 Performance
Bond/Guarantee
sum item -
102 Insurance of the Works sum item -
103 Insurance of Contractor's
Equipment
sum item -
104 Third-Party Insurance sum item -
105 Allow for maintenance of
Works for 12 months after
completion
month 12
106 -etc.-
112 Provide and equip
Engineer's offices
nr 2
113 Maintain Engineer's offices
for 24 months, including
services
month 24
114 -etc.-
121 Provide diversion road sum item -
122 Provide for traffic control and
maintenance of diversion
road
month 24 -
123 -etc.-
132 Provide for cleaning up the
Site on completion
-etc.-
sum item -
Total for Bill No. 1
(carried forward to Summary, p. )
Bill of Quantities
Bill No. 2: Earthworks
Item
no.
Description Unit Quantity Rate Amount
201 Excavate topsoil to maximum
depth 25 cm and stockpile for
reuse, maximum haul
distance 1 km
m3
95,000
202 Excavate topsoil to maximum
depth 25-50 cm, and dispose
m3
15,000
203 -etc.-
206 Excavate fill material from
cuttings or approved borrow
pits, haul up to 1 km, deposit,
shape, and compact to fill
m3
258,000
207 Excavate rock in cuttings and
dispose, any depth
m3
25,000
208 -etc.-
Total for Bill No. 2
(carried forward to Summary, p. )
Bill of Quantities
Bill No. 3: Culverts and Bridges
Item
no.
Description Unit Quantity Rate Amount
301 Excavate in all materials
other than rock from ground
level to underside of
foundations, maximum
depth 5 m, and dispose
m3
18,500
302 Excavate in all materials
other than rock, depth 5 m
to 7.5 m
m3
2,500
303 Provisional Item
As Item 302, depth 7.5 m to
10 m
m3
500
304 -etc.-
311 Concrete class B in
abutments
m3
18,500
312 -etc.-
318 Mild steel reinforcement in
abutments and piers up to
20 mm diameter
t 370
319 -etc.-
Total for Bill No. 3
(carried forward to Summary, p. )
Bill of Quantities
Schedule of Daywork Rates: 1. Labor
Item
no.
Description Unit Nominal
quantity
Rate Extended
amount
D100 Ganger hour 500
D101 Laborer hour 5,000
D102 Bricklayer hour 500
D103 Mason hour 500
D104 Carpenter hour 500
D105 Steelwork Erector hour 500
D106 -etc.- hour
D113 Driver for vehicle up to 10
tons
hour 1,000
D114 Operator for excavator,
dragline, shovel, or crane
hour 500
D115 Operator for tractor with
dozer blade or ripper
hour 500
D116 -etc.- hour
Subtotal
D122 Allow percent%
of Subtotal for Contractor's
overhead, profit, etc., in accordance with
paragraph 3 (b) above.
Total for Daywork: Labor
(carried forward to Daywork Summary, p. )
a. To be entered by the bidder.
Bill of Quantities
Schedule of Daywork Rates: 2. Materials
Item
no.
Description Unit Nominal
quantity
Rate Extended
amount
D201 Cement, ordinary Portland,
or equivalent in bags
t 200
D202 Mild steel reinforcing bar up
to 16 mm diameter to BS
4449 or equivalent
t 100
D203 Fine aggregate for concrete
as specified in Clause
m3
1,000
D204 -etc.-
D222 Gelignite (Nobel Special
Gelatine 60%, or equivalent)
including caps, fuse, wire,
and requisite accessories
t 10
Subtotal
D122 Allow percenta
of Subtotal for Contractors
overhead, profit, etc., in accordance with
paragraph 3 (b) above.
Total for Daywork: Materials
(carried forward to Daywork Summary, p. )
a. To be entered by the bidder.
Bill of Quantities
Schedule of Daywork Rates: 3. Contractor¬タル s Equipment
Item
no.
Description Nominal
quantity
(hours)
Basic
hourly
rental
rate
Extended
amount
D301 Excavator, face shovel, or
dragline:
.1 Up to and including 1 m3
500
.2 Over 1 m3
to 2 m3
400
.3 Over 2 m3
100
D302 Tractor, including bull or angle
dozer:
.1 Up to and including 150 kW 500
.2 Over 150 kW to 200 kW 400
.3 Over 200 kW to 250 kW 200
D303 Tractor with ripper:
.1 Up to and including 200 kW 400
.2 Over 200 kW to 250 kW 200
D304 -etc-.
Total for Daywork: Contractor¬タル s Equipment
(carried forward to Daywork Summary, p. )
Bill of Quantities
Daywork Summary
Amounta
( )
%
Foreign
1. Total for Daywork: Labor
2. Total for Daywork: Materials
3. Total for Daywork: Contractor's Equipment
Total for Daywork (Provisional Sum)
(carried forward to Bid Summary, p. )
a. The Employer should insert local currency unit.
Bill of Quantities
Summary of Specified Provisional Sums
Bill
no.
Item
no.
Description Amount
1
2 2.8 Supply and install equipment in pumping
station
1,250,000
3
4 4.32 Provide for ventilation system in subway
tunnel
3,500,000
Total for Specified Provisional Sums
(carried forward to Grand Summary (B), p. )
4,750,000
Bill of Quantities
Grand Summary
Contract Name:
Contract No.:
General Summary Page Amount
Bill No. 1: Preliminary Items
Bill No. 2: Earthworks
Bill No. 3: Drainage Structures
Total for Daywork (Provisional Sum)
Subtotal of Bills (A)
Specified Provisional Sums included in subtotal of
bills
(B) 4,750,000b
Total of Bills Less Specified Provisional Sums (A
- B)
(C)
Add Provisional Suma
for Contingency Allowance (D) [sum]b
Bid Price (A + D) (Carried forward to Form of Bid) (E)
a. All Provisional Sums are to be expended in whole or in part at the direction and discretion
of the Engineer in accordance with Sub-Clause 52.4 and Clause 58 of Part I of the Conditions
of Contract.
b. To be entered by the Employer.
Ici project 2.docx.

Mais conteúdo relacionado

Mais procurados

Financial analysis of BSRM Steel Ltd
Financial analysis of BSRM Steel LtdFinancial analysis of BSRM Steel Ltd
Financial analysis of BSRM Steel LtdShagufta Rahman
 
Financialanalysisofbsrmsteelltd 171007085120
Financialanalysisofbsrmsteelltd 171007085120Financialanalysisofbsrmsteelltd 171007085120
Financialanalysisofbsrmsteelltd 171007085120Shakho saha
 
Business plan for structural engineering firm
Business plan for structural engineering firmBusiness plan for structural engineering firm
Business plan for structural engineering firmCochin University
 
Resume as Procurement Engineer
Resume as Procurement EngineerResume as Procurement Engineer
Resume as Procurement EngineerKarthick MK
 
CONSULTING SERVICES PROCUREMENT AND SELECTION AUGUST 2013 PRESENTATION
CONSULTING SERVICES PROCUREMENT AND SELECTION AUGUST 2013 PRESENTATIONCONSULTING SERVICES PROCUREMENT AND SELECTION AUGUST 2013 PRESENTATION
CONSULTING SERVICES PROCUREMENT AND SELECTION AUGUST 2013 PRESENTATIONChester, Ryan Bourne MSc., MBA, PMP
 
Nazish Hasan Khan
Nazish Hasan KhanNazish Hasan Khan
Nazish Hasan Khanrehan khan
 
CV_Furqan (Accountant)
CV_Furqan (Accountant)CV_Furqan (Accountant)
CV_Furqan (Accountant)furqan haider
 

Mais procurados (13)

Resume_raghvendra_1updated
Resume_raghvendra_1updatedResume_raghvendra_1updated
Resume_raghvendra_1updated
 
Financial analysis of BSRM Steel Ltd
Financial analysis of BSRM Steel LtdFinancial analysis of BSRM Steel Ltd
Financial analysis of BSRM Steel Ltd
 
Financialanalysisofbsrmsteelltd 171007085120
Financialanalysisofbsrmsteelltd 171007085120Financialanalysisofbsrmsteelltd 171007085120
Financialanalysisofbsrmsteelltd 171007085120
 
Business plan for structural engineering firm
Business plan for structural engineering firmBusiness plan for structural engineering firm
Business plan for structural engineering firm
 
Amit-CV
Amit-CVAmit-CV
Amit-CV
 
CV_JAMIL
CV_JAMILCV_JAMIL
CV_JAMIL
 
Resume as Procurement Engineer
Resume as Procurement EngineerResume as Procurement Engineer
Resume as Procurement Engineer
 
CONSULTING SERVICES PROCUREMENT AND SELECTION AUGUST 2013 PRESENTATION
CONSULTING SERVICES PROCUREMENT AND SELECTION AUGUST 2013 PRESENTATIONCONSULTING SERVICES PROCUREMENT AND SELECTION AUGUST 2013 PRESENTATION
CONSULTING SERVICES PROCUREMENT AND SELECTION AUGUST 2013 PRESENTATION
 
Murali procurement
Murali procurementMurali procurement
Murali procurement
 
CV S.K.Panda
CV S.K.PandaCV S.K.Panda
CV S.K.Panda
 
Nazish Hasan Khan
Nazish Hasan KhanNazish Hasan Khan
Nazish Hasan Khan
 
CV_Furqan (Accountant)
CV_Furqan (Accountant)CV_Furqan (Accountant)
CV_Furqan (Accountant)
 
CV-PRASHANT PATIL
CV-PRASHANT PATILCV-PRASHANT PATIL
CV-PRASHANT PATIL
 

Semelhante a Ici project 2.docx.

Nippon Data Systems - An Overview
Nippon Data Systems - An OverviewNippon Data Systems - An Overview
Nippon Data Systems - An OverviewAsit Ranjan Mishra
 
Strategic consulting -1.pdf
Strategic consulting -1.pdfStrategic consulting -1.pdf
Strategic consulting -1.pdfRajesh Parmar
 
Increasing Productivity & Improving Knowledge Management in Amdocs
Increasing Productivity & Improving Knowledge Management in AmdocsIncreasing Productivity & Improving Knowledge Management in Amdocs
Increasing Productivity & Improving Knowledge Management in AmdocsDEEPRAJ PATHAK
 
DIGIT North 2022
DIGIT North 2022DIGIT North 2022
DIGIT North 2022Ray Bugg
 
Professional Business Case
Professional Business CaseProfessional Business Case
Professional Business CaseDanielBrady33
 
BSCIMS_Thesis
BSCIMS_ThesisBSCIMS_Thesis
BSCIMS_ThesisJose Rego
 
Comsys Staffing Solutions Overview
Comsys Staffing Solutions OverviewComsys Staffing Solutions Overview
Comsys Staffing Solutions Overviewkcompton
 
Accenture Program Project and Service Management
Accenture Program Project and Service ManagementAccenture Program Project and Service Management
Accenture Program Project and Service ManagementAccenture Technology
 
The Power and Promise of SaaS: CA Cloud Service Management Case Study
The Power and Promise of SaaS: CA Cloud Service Management Case StudyThe Power and Promise of SaaS: CA Cloud Service Management Case Study
The Power and Promise of SaaS: CA Cloud Service Management Case StudyCA Technologies
 
Industrial man power
Industrial man powerIndustrial man power
Industrial man powerRaju Insan
 
2020 TeleOptics Limited Profile
2020 TeleOptics Limited Profile2020 TeleOptics Limited Profile
2020 TeleOptics Limited ProfileJason Cowie
 
Performance appraisal (MBA summer training project) (Report File)
Performance appraisal (MBA summer training project) (Report File)Performance appraisal (MBA summer training project) (Report File)
Performance appraisal (MBA summer training project) (Report File)JASTINDER PAL SINGH
 
Business case-template
Business case-templateBusiness case-template
Business case-templateJo Padilha
 
T/DG's Pulse.Time - Resource and Project Management of Enterprise
T/DG's Pulse.Time - Resource and Project Management of EnterpriseT/DG's Pulse.Time - Resource and Project Management of Enterprise
T/DG's Pulse.Time - Resource and Project Management of EnterpriseThe Digital Group
 

Semelhante a Ici project 2.docx. (20)

REport Fle.pdf
REport Fle.pdfREport Fle.pdf
REport Fle.pdf
 
Nippon Data Systems - An Overview
Nippon Data Systems - An OverviewNippon Data Systems - An Overview
Nippon Data Systems - An Overview
 
Strategic consulting -1.pdf
Strategic consulting -1.pdfStrategic consulting -1.pdf
Strategic consulting -1.pdf
 
Increasing Productivity & Improving Knowledge Management in Amdocs
Increasing Productivity & Improving Knowledge Management in AmdocsIncreasing Productivity & Improving Knowledge Management in Amdocs
Increasing Productivity & Improving Knowledge Management in Amdocs
 
Proposal for pos
Proposal for posProposal for pos
Proposal for pos
 
Proposal for pos
Proposal for posProposal for pos
Proposal for pos
 
DIGIT North 2022
DIGIT North 2022DIGIT North 2022
DIGIT North 2022
 
ISS_5
ISS_5ISS_5
ISS_5
 
Professional Business Case
Professional Business CaseProfessional Business Case
Professional Business Case
 
Project report on cctv
Project report on cctvProject report on cctv
Project report on cctv
 
BSCIMS_Thesis
BSCIMS_ThesisBSCIMS_Thesis
BSCIMS_Thesis
 
Comsys Staffing Solutions Overview
Comsys Staffing Solutions OverviewComsys Staffing Solutions Overview
Comsys Staffing Solutions Overview
 
Accenture Program Project and Service Management
Accenture Program Project and Service ManagementAccenture Program Project and Service Management
Accenture Program Project and Service Management
 
The Power and Promise of SaaS: CA Cloud Service Management Case Study
The Power and Promise of SaaS: CA Cloud Service Management Case StudyThe Power and Promise of SaaS: CA Cloud Service Management Case Study
The Power and Promise of SaaS: CA Cloud Service Management Case Study
 
Industrial man power
Industrial man powerIndustrial man power
Industrial man power
 
2020 TeleOptics Limited Profile
2020 TeleOptics Limited Profile2020 TeleOptics Limited Profile
2020 TeleOptics Limited Profile
 
Performance appraisal (MBA summer training project) (Report File)
Performance appraisal (MBA summer training project) (Report File)Performance appraisal (MBA summer training project) (Report File)
Performance appraisal (MBA summer training project) (Report File)
 
Business case-template
Business case-templateBusiness case-template
Business case-template
 
T/DG's Pulse.Time - Resource and Project Management of Enterprise
T/DG's Pulse.Time - Resource and Project Management of EnterpriseT/DG's Pulse.Time - Resource and Project Management of Enterprise
T/DG's Pulse.Time - Resource and Project Management of Enterprise
 
How to Win Friends and Save Money
How to Win Friends and Save MoneyHow to Win Friends and Save Money
How to Win Friends and Save Money
 

Mais de PK146

Tj 03
Tj 03Tj 03
Tj 03PK146
 
Enjoying the event (the curse of the hook group)
Enjoying the event (the curse of the hook group)Enjoying the event (the curse of the hook group)
Enjoying the event (the curse of the hook group)PK146
 
Presentation idj 3
Presentation idj 3Presentation idj 3
Presentation idj 3PK146
 
Idj 04
Idj 04Idj 04
Idj 04PK146
 
Tj 02
Tj 02Tj 02
Tj 02PK146
 
Presentation cts project 01
Presentation cts project 01Presentation cts project 01
Presentation cts project 01PK146
 
Group documentation
Group documentationGroup documentation
Group documentationPK146
 
Company profile 2012 (rev.7)
Company profile 2012 (rev.7)Company profile 2012 (rev.7)
Company profile 2012 (rev.7)PK146
 
Project brief
Project brief Project brief
Project brief PK146
 
Ici magazine!!!!
Ici magazine!!!!Ici magazine!!!!
Ici magazine!!!!PK146
 
Enbe sketches project 02
Enbe sketches project 02Enbe sketches project 02
Enbe sketches project 02PK146
 
Idj 1
Idj 1Idj 1
Idj 1PK146
 
English essay assignment 1
English essay assignment 1English essay assignment 1
English essay assignment 1PK146
 
CTS Project 02 Part A booklet
CTS Project 02 Part A bookletCTS Project 02 Part A booklet
CTS Project 02 Part A bookletPK146
 
Enbe project 01
Enbe project 01Enbe project 01
Enbe project 01PK146
 

Mais de PK146 (16)

Tj 03
Tj 03Tj 03
Tj 03
 
Enjoying the event (the curse of the hook group)
Enjoying the event (the curse of the hook group)Enjoying the event (the curse of the hook group)
Enjoying the event (the curse of the hook group)
 
Tj1
Tj1Tj1
Tj1
 
Presentation idj 3
Presentation idj 3Presentation idj 3
Presentation idj 3
 
Idj 04
Idj 04Idj 04
Idj 04
 
Tj 02
Tj 02Tj 02
Tj 02
 
Presentation cts project 01
Presentation cts project 01Presentation cts project 01
Presentation cts project 01
 
Group documentation
Group documentationGroup documentation
Group documentation
 
Company profile 2012 (rev.7)
Company profile 2012 (rev.7)Company profile 2012 (rev.7)
Company profile 2012 (rev.7)
 
Project brief
Project brief Project brief
Project brief
 
Ici magazine!!!!
Ici magazine!!!!Ici magazine!!!!
Ici magazine!!!!
 
Enbe sketches project 02
Enbe sketches project 02Enbe sketches project 02
Enbe sketches project 02
 
Idj 1
Idj 1Idj 1
Idj 1
 
English essay assignment 1
English essay assignment 1English essay assignment 1
English essay assignment 1
 
CTS Project 02 Part A booklet
CTS Project 02 Part A bookletCTS Project 02 Part A booklet
CTS Project 02 Part A booklet
 
Enbe project 01
Enbe project 01Enbe project 01
Enbe project 01
 

Último

BAILMENT & PLEDGE business law notes.pptx
BAILMENT & PLEDGE business law notes.pptxBAILMENT & PLEDGE business law notes.pptx
BAILMENT & PLEDGE business law notes.pptxran17april2001
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...Hector Del Castillo, CPM, CPMM
 
Excvation Safety for safety officers reference
Excvation Safety for safety officers referenceExcvation Safety for safety officers reference
Excvation Safety for safety officers referencessuser2c065e
 
Planetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifePlanetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifeBhavana Pujan Kendra
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...ssuserf63bd7
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdfChris Skinner
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxappkodes
 
digital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingdigital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingrajputmeenakshi733
 
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...SOFTTECHHUB
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdfShaun Heinrichs
 
Unveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesUnveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesDoe Paoro
 
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...Operational Excellence Consulting
 
Driving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerDriving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerAggregage
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdfChris Skinner
 
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryEffective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryWhittensFineJewelry1
 
Send Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSendBig4
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 

Último (20)

BAILMENT & PLEDGE business law notes.pptx
BAILMENT & PLEDGE business law notes.pptxBAILMENT & PLEDGE business law notes.pptx
BAILMENT & PLEDGE business law notes.pptx
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
 
Excvation Safety for safety officers reference
Excvation Safety for safety officers referenceExcvation Safety for safety officers reference
Excvation Safety for safety officers reference
 
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptxThe Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
 
Planetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifePlanetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in Life
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptx
 
digital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingdigital marketing , introduction of digital marketing
digital marketing , introduction of digital marketing
 
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
How To Simplify Your Scheduling with AI Calendarfly The Hassle-Free Online Bo...
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf1911 Gold Corporate Presentation Apr 2024.pdf
1911 Gold Corporate Presentation Apr 2024.pdf
 
Unveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesUnveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic Experiences
 
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
 
Driving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerDriving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon Harmer
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
 
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold JewelryEffective Strategies for Maximizing Your Profit When Selling Gold Jewelry
Effective Strategies for Maximizing Your Profit When Selling Gold Jewelry
 
Send Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.com
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 

Ici project 2.docx.

  • 2.   2   TABLE OF CONTENTS 1-17................................COMPANY PROFILE 1.0 ..............................................The Organisation 1.1 .........................................................Strategy 1.2 ...........................................Organisation Chart 1.3 ........................................Financial Information 1.4 .........................................................Contacts 1.5 ..........................................................Projects 1.6 .............................History: Company Relocation 1.7 ................................Equipments & Applications 1.8 .................S & H Consultant company in pictures 1.9 18.................................................ENVELOPE 2.0 19..............................................LETTERHEAD 3.0 20................................NAME LETTER / CARD 4.0 21-22..........................BUILDING & PROCESS 5.0 .................................Role of Quantity Surveyor 5.1 .....................Before construction / Preliminaries 5.2 .........................................During Construction 5.3 .........................Post Constrction / Final Account 5.4 23-32...........................SAMPLE DOCUMENTS 6.0 ..............................................Bill of Quantities 6.1  
  • 3.   3   1.1THE ORGANISATION COMPANY DETAILS: Office Location: Level 3, Jalan Bengkurong, No. 777, 47500, Muara, Bengkurong, Brunei Darrussalam. Telephone: +673 2696146 E-mail: s&h@gmail.com Website: www.s&h.com.bru S & H CONSULTANT was founded by HJ MUHD SYAFIQ BIN HJ ABD ZARIFUL, 2009. This company has experienced in many projects types including comm storey residential, and industrial. EXPERIENCE Types of Facilities Undertaken: • Banks • Laboratories • Residential Buildings • Commercial Buildings • Educational & Institutional Buildings • Religious Buildings • Healthcare Buildings • Offices • Civic Amenities • Defence Installations • Sport Facilities • Service Apertments • Hotel
  • 4.   4   PRINCIPAL QUANTITY SURVEYOR PERSONAL DETAILS: NAME: ADDRESS: TELEPHONE: MOBILE: E-MAIL: DATE OF BIRTH: NATIONALITY: Bruneian I/C No.: 01-096614 Academic Qualifications: 2002 Bachelor of Science (Hons) (in Quantity Surveying) (Taylor’s University, Malaysia) 2006 Master of Quantity Surveyor (Harvard University, England) Hj Muhd Syafiq Bin Hj Abd Zariful No.5 Spg 10-34 Kg Bengkurong Jln Bengkurong, Brunei Muara Brunei Darrusslam +673 2656996 +673 9769606 syafiq_146@hotmail.com 14 June1981
  • 5.   5   Professional Association Professional Member of the Royal Institution of Chartered Surveyors (RICS), UK since 2009 Corporate Member of Pertubuhan Ukur, Jurutera & Arkitek, (PUJA) Brunei since 2010 Registered Member of the Board of Quantity Surveyors (BQSM), Malaysia since 2012  
  • 6.   6   1.2 STRATEGY MISSION STATEMENT We are committed to excellence in the full range of counsulting services provided and will execute it with the emphasis on professional integrity. In this process it is expected from all the members of this practice to be dedicated to a high quality of service executed in a friendly and fair manner. We do believe in equal opportunities for all our employees and a fair distribution of wealth. We do not only accept our social responsibilities but fully endorse the affirmative development programme in the country. this will be achieved by the provision of recruitment, promotion and growth opportunities to anyone able to satisfy the professional, technical, administrative and managerial positions within the practice, irrespective of race, colour, language, sex, class, political, religion or other opinion. AIM Ensuring Client’s satisfaction and peace of mind by providing the highest standards and quality of service through total professionalism, commitment and cooperation PHILOSOPHY S & H CONSULTANT’s underlying commitment is to provide outstanding professional services through Integrity, Quality and Competence VALUES Integrity, Sincerity, Recognition of community values and professionalism
  • 7.   7   BACKGROUND • Sole Proprietorship • Independent firm • Brunei-based • Chartered Quantity Surveying practice • Set up in 2009 by local Bruneian Muhd Syafiq Bin Hj Abd Zariful SERVICES • Cost Management • Tender Documentation • Dispute Resolution • Building Valuation • Contractual Assistance • Expert Witness in Construction Cost Issues • Quantity Surveying Consultancy • Construction Cost Consultancy • Project Management • Facilities Management
  • 8.   8   1.3 ORGANISATION CHART       BOARD  OF  DIRECTORS/  SHARE  HOLDERS EXCUTIVE  DIRECTOR EXCUTIVE   (ADMINISTRATION  ) EXCUTIVE  (ACCOUNT  ) SENIOR  QUANTITY   SURVEYOR QUANTITY  SURVEYOR ASSOCIATE   DIRECTOR QUANTITY  SURVEYORQUANTITY  SURVEYOR QUANTITY  SURVEYOR QUANTITY  SURVEYOR QUANTITY  SURVEYOR QUANTITY  SURVEYOR ASST.  QUANTITY  SURVEYOR MANAGING  DIRECTOR ASST.  QUANTITY   SURVEYOR ASST.  QUANTITY   SURVEYOR ASST.  QUANTITY   SURVEYOR ASST.  QUANTITY   SURVEYOR ASST.  QUANTITY   SURVEYOR SENIOR    QUANTITY   SURVEYOR SENIOR    QUANTITY   SURVEYOR SENIOR    QUANTITY  SURVEYORSENIOR    PROJECT  MANAGER SEPECIAL    PROJECT     DIVISION PROFESSIONAL  &  SUB-­‐PROFESSIONAL ADMINISTRATION  &   FINANCE CONSULTANCY  DIVISION
  • 9.   9   1.4 FINANCIAL INFORMATION Registered Company number: 061496-S Authorized Capital: B$400,000 Paid up Capital B$146,000 Registered Bank HSBC Signing Principal Haji Muhammad Syafiq bin Hj Abdul Zariful 1.5 CONTACTS The Company Telephone: +673 2696146 E-mail: s&h@gmail.com Website: www.s&h.com.bru The Director Telephone: +673 2656996 Mobile: +673 9769606 E-mail: syafiq_146@hotmail.com
  • 10.   10   1.6 PROJECTS SELECTED COMPLETED PROJECTS Project Name: Building Type: Project Cost: Project Name: Building Type: Project Cost: Project Name: Building Type: Project Cost: Project Name: Building Type: Project Cost: Project Name: Building Type: Project Cost:     UBD Sports House Commercial B$ 1,000,000 Happy District Commercial B$ 300,000 Bengkurong Residential Residential B$ 30,000,000 Mulaut Mosque Religious B$ 1,000,000 BX-treme Park Commercial B$ 3,000,000 Bengkurong Residential B$ 30M Mulaut Mosque B$ 1M
  • 11.   11   CURRENT PROJECTS Project Name: Building Type: Project Cost: Project Name: Building Type: Project Cost: Project Name: Building Type: Project Cost: Project Name: Building Type: Project Cost: Project Name: Building Type: Project Cost: Rimba Religious School Educational B$ 3,500,000 BM District Office Building Commercial B$ 8,000,000 Sixth Form Centre at Sengkurong Educational B$ 32,000,000 National Housing at Tanah Jambu Residential B$ 53,000,000 UBD Sports Complex Commercial B$ 6,400,000 Sixth Form Centre at Sengkurong B$ 32M BM District Office Building B$ 8M
  • 12.   12   1.7 HISTORY: COMPANY RELOCATION The picture shows the company’s old building in Tutong The shows the new building in Muara The new building is currently located in Muara, at Kg BengkurongPreviously at the old building there were only a few staff but now the business is getting bigger and the staff has increased.The reason S & H CONSULTANT relocate to a new building is that there is not much space or rooms for members in the old building, the solution to that is to extend the building but another problem is that there is not much space for further extension because of the other buildings around it so the only way is to relocate the company to a new building. S & H CONSULTANT relocate its company in Kg Bengkurong which gives them some profit because all of the members current houses are closer to the new building which saves transportation costs and they can arrive puntually for work every working days.
  • 13.   13   1.8HARDWARES AND SOFTWARES USAGE CURRENT HARDWARES   -LCD Monitor Technical Specifications: Type-Wide-Aspect Active Matrix TFT (Thin Film Transistor) Size-19” to 23” Resolution-Full HD Reason: The Company needs a Widescreen Thin-Film Transistor (TFT) LCD monitor because LCD monitor uses less power and less heat which saves electricity so that means the company don’t have to worry about the payment of using electricity. -CPU Technical Specifications: Operating system- Windows 7 Processor- Mobile Memory- 4GB RAM Storage capacity- 500GB Reason: This company must have CPU (Central Processing Unit) for the workers to do the forms and documents. It is to carry out a computer program.
  • 14.   14   -Laser Printer Technical Specifications: Type: HP CP3525x printer Size-small Print Resolution-High Quality, up to 4800 x 1200 dpi Memory-500 MB Reason:- Because of the way that laser printers use their toner, they are able to print far more copies than inkjet printers do. This means that over time you save more money on printing when you use a laser printer. -Network Adapter Network Card: It is one of the most important pieces of hardware as it allows a computer to communicate with other computers over a network. It serves as a networking medium and provides the computers with a MAC address system. A network card is also known as a network adapter, a LAN card and better known as a NIC. Reason: - allows a computer to communicate with other computers over a network. The company needs it to communicate with other computers over a network.  
  • 15.   15   CURRENT SOFTWARES Operating System -Windows 7 Microsoft 7 is use in the Company because the system compatibility is in the desired and acceptable range to the new program because the windows 7 has better and upgraded parts already installed in the computers. This is also because the new program works well with window 7 and it is more friendly and easy to learn. Reason: The windows 7 has more advanced option for the new system to work on and more tools that useful in the work. Applications -Word Processor It is needed for the company to make documents Product name: Word 2010 Operating system: Windows 7 -Spreadsheet The office clerk uses this to create tables such as creating a Gantt chart. It is also used for calculation which is easier than calculating manually. Product name: Excel 2010 Operating system: Windows 7
  • 16.   16   -Database Product name: Microsoft Access 2010 Operating system: Windows 7 It contains all the database characteristics needed. This software is used to create database such as creating forms and reports. Benefits of using a database It gives you true command of your data, enabling you to retrieve it, sort it, analyze it, summarize it, and report results in moments. It can combine data from various files, so that you never have to enter information twice. It can even make data entry more efficient and accurate. -Anti-virus software anti-virus software is used to prevent, detect, and remove malware Name: Kapersky Anti-Virus 2011 Size:146MB Type: Anti-Virus Reason:The company needs anti-virus software to prevent virus infection. If the computer infected with virus the data might be lost, computer becomes slow, and memory becomes smaller and it can affect the company’s work.    
  • 17.   17   1.9 S & H Consultant company in pictures
  • 18.   18   2.0 ENVELOPE Telephoneno.+673 2696146 Email:s&h@gmail.com No.477|KgBengkurong |Spg.10-34| BruneiDarussalam
  • 19.   19   3.0 LETTERHEAD   Telephone no. +673 2696146 Email: s&h@gmail.com No.477 | Kg Bengkurong | Spg.10 - 34 | Brunei Darussalam
  • 20.   20   4.0 NAMELETTER   Front  card  view   Back  card  view  
  • 21. 5.0 BUILDING & PROCESS (Procedures) 5.1 ROLE OF QUANTITY SURVEYOR The term quantity surveyor derives from the role taken in quantifying the numerous resources that it takes to build a given project, such as labour, supervision, plant and materials. A Quantity Surveyor is a construction industry professional who specialises in estimating the value of construction works and can also be referred to as a “Cost Engineer” or “Cost Planner”. Quantity Surveyors are involved at different stages of the construction process, typically prior to construction, during construction and following completion of the works. Quantity Surveyors work with accountants, architects, builders, clients, developers, engineers, financiers, government, insurance underwriters, solicitors and subcontractors. The Quantity Surveyor’s detailed knowledge of construction costs allows them to perform the following tasks independently of whether they are working for the Client or the Contractor.
  • 22. 5.2 Before construction / Preliminaries: • Meeting with Client & Consultants • Estimating project preliminary cost • Preparation of Bill of Quantities • Preparation of Tender documents • Preparation of Contract documents • preparation of Feasibility Studies • Assigning work to sub-contractor   5.3 During construction: • Feasibility Studies • Calculating the contractor's progress claims • Preparing finantial statements • Site visits for assessment and verification • Monthly meetings to discuss payments • Make final payments to contractors • Determine the final cost of the project   5.4 Post construction / Final Account: • Accurate calculation of the final project payment • Assessment of work completed by the contractor • Architects issues final certificate for final payment to main contractor
  • 23. 6.0 SAMPLE DOCUMENTS 6.1 BILL OF QUANTITIES Bill No. 1: General Items Item no. Description Unit Quantity Rate Amount 101 Performance Bond/Guarantee sum item - 102 Insurance of the Works sum item - 103 Insurance of Contractor's Equipment sum item - 104 Third-Party Insurance sum item - 105 Allow for maintenance of Works for 12 months after completion month 12 106 -etc.- 112 Provide and equip Engineer's offices nr 2 113 Maintain Engineer's offices for 24 months, including services month 24 114 -etc.- 121 Provide diversion road sum item - 122 Provide for traffic control and maintenance of diversion road month 24 - 123 -etc.- 132 Provide for cleaning up the Site on completion -etc.- sum item -
  • 24. Total for Bill No. 1 (carried forward to Summary, p. ) Bill of Quantities Bill No. 2: Earthworks Item no. Description Unit Quantity Rate Amount 201 Excavate topsoil to maximum depth 25 cm and stockpile for reuse, maximum haul distance 1 km m3 95,000 202 Excavate topsoil to maximum depth 25-50 cm, and dispose m3 15,000 203 -etc.- 206 Excavate fill material from cuttings or approved borrow pits, haul up to 1 km, deposit, shape, and compact to fill m3 258,000 207 Excavate rock in cuttings and dispose, any depth m3 25,000
  • 25. 208 -etc.- Total for Bill No. 2 (carried forward to Summary, p. )
  • 26. Bill of Quantities Bill No. 3: Culverts and Bridges Item no. Description Unit Quantity Rate Amount 301 Excavate in all materials other than rock from ground level to underside of foundations, maximum depth 5 m, and dispose m3 18,500 302 Excavate in all materials other than rock, depth 5 m to 7.5 m m3 2,500 303 Provisional Item As Item 302, depth 7.5 m to 10 m m3 500 304 -etc.- 311 Concrete class B in abutments m3 18,500 312 -etc.- 318 Mild steel reinforcement in abutments and piers up to 20 mm diameter t 370 319 -etc.- Total for Bill No. 3 (carried forward to Summary, p. )
  • 27. Bill of Quantities Schedule of Daywork Rates: 1. Labor Item no. Description Unit Nominal quantity Rate Extended amount D100 Ganger hour 500 D101 Laborer hour 5,000 D102 Bricklayer hour 500 D103 Mason hour 500 D104 Carpenter hour 500 D105 Steelwork Erector hour 500 D106 -etc.- hour D113 Driver for vehicle up to 10 tons hour 1,000 D114 Operator for excavator, dragline, shovel, or crane hour 500 D115 Operator for tractor with dozer blade or ripper hour 500 D116 -etc.- hour
  • 28. Subtotal D122 Allow percent% of Subtotal for Contractor's overhead, profit, etc., in accordance with paragraph 3 (b) above. Total for Daywork: Labor (carried forward to Daywork Summary, p. ) a. To be entered by the bidder. Bill of Quantities Schedule of Daywork Rates: 2. Materials Item no. Description Unit Nominal quantity Rate Extended amount D201 Cement, ordinary Portland, or equivalent in bags t 200 D202 Mild steel reinforcing bar up to 16 mm diameter to BS 4449 or equivalent t 100 D203 Fine aggregate for concrete as specified in Clause m3 1,000 D204 -etc.- D222 Gelignite (Nobel Special Gelatine 60%, or equivalent) including caps, fuse, wire, and requisite accessories t 10
  • 29. Subtotal D122 Allow percenta of Subtotal for Contractors overhead, profit, etc., in accordance with paragraph 3 (b) above. Total for Daywork: Materials (carried forward to Daywork Summary, p. ) a. To be entered by the bidder. Bill of Quantities Schedule of Daywork Rates: 3. Contractor¬タル s Equipment Item no. Description Nominal quantity (hours) Basic hourly rental rate Extended amount D301 Excavator, face shovel, or dragline: .1 Up to and including 1 m3 500 .2 Over 1 m3 to 2 m3 400 .3 Over 2 m3 100 D302 Tractor, including bull or angle dozer:
  • 30. .1 Up to and including 150 kW 500 .2 Over 150 kW to 200 kW 400 .3 Over 200 kW to 250 kW 200 D303 Tractor with ripper: .1 Up to and including 200 kW 400 .2 Over 200 kW to 250 kW 200 D304 -etc-. Total for Daywork: Contractor¬タル s Equipment (carried forward to Daywork Summary, p. )
  • 31. Bill of Quantities Daywork Summary Amounta ( ) % Foreign 1. Total for Daywork: Labor 2. Total for Daywork: Materials 3. Total for Daywork: Contractor's Equipment Total for Daywork (Provisional Sum) (carried forward to Bid Summary, p. ) a. The Employer should insert local currency unit. Bill of Quantities Summary of Specified Provisional Sums Bill no. Item no. Description Amount 1 2 2.8 Supply and install equipment in pumping station 1,250,000 3 4 4.32 Provide for ventilation system in subway tunnel 3,500,000
  • 32. Total for Specified Provisional Sums (carried forward to Grand Summary (B), p. ) 4,750,000 Bill of Quantities Grand Summary Contract Name: Contract No.: General Summary Page Amount Bill No. 1: Preliminary Items Bill No. 2: Earthworks Bill No. 3: Drainage Structures Total for Daywork (Provisional Sum) Subtotal of Bills (A) Specified Provisional Sums included in subtotal of bills (B) 4,750,000b Total of Bills Less Specified Provisional Sums (A - B) (C) Add Provisional Suma for Contingency Allowance (D) [sum]b Bid Price (A + D) (Carried forward to Form of Bid) (E) a. All Provisional Sums are to be expended in whole or in part at the direction and discretion of the Engineer in accordance with Sub-Clause 52.4 and Clause 58 of Part I of the Conditions of Contract. b. To be entered by the Employer.