SlideShare uma empresa Scribd logo
1 de 3
Baixar para ler offline
EZEIFEDI OBINNA
34B Okilton Drive, Okilton Estate Phone: 08039251309
Port Harcourt, Rivers State E-mail: zefedi@yahoo.com
Accomplished proactive Procurement and Project Management Professional with experience in implementing
business methods and process developments that increase quality, reduce cycle time and enhance yields while
reducing bottom-line costs. Proven ability in strategic planning, project management, cost-control, improving
operational efficiency, and increasing productivity. Hands-on experience in managing multi-facility distribution and
customer operation sites. Immense exposure to revitalizing operational performance with a focus on continual
process improvement and value-added solutions that improve the overall organizational performance and aligned
deliverables. Having good communication skills effectively foster cooperation between stake-holders and clients.
Areas of Expertise
 Project Management
 Planning & Control
 Strategic Planning/Analysis
 M.S. Project & Primavera P6
 Tender Designing
 Competitive Intelligence
 New Business Development
 Implementing & Testing
 Procurement & Inspection
 Cross Functional
 Administrative Operations
 Client Relations
Professional Experience
WILKRISS NIGERIA LIMITED, PORT HARCOURT, RIVERS STATE. JULY 2010 – PRESENT
MANAGER, PROJECT/ENGINEERING (Jan 2014 – Present)
Determines project responsibilities by identifying project phases and elements; assigning personnel to phases and
elements; reviewing bids from contractors. Determines project specifications by studying product design, customer
requirements, and performance standards; completing technical studies; preparing cost estimates. Determines project
schedule by studying project plan and specifications; calculating time requirements; sequencing project elements.
 Efficiently develops project objectives by reviewing project proposals and plans; conferring with management.
 Planning and designing projects using Primavera P3 software also tender design and bid management.
 Confirms product performance by designing and conducting tests. Maintains project schedule by monitoring
project progress, coordinating activities, resolving problems.
 Controls project plan by reviewing design, specifications, and plan and schedule changes; recommending actions.
And controls project costs by approving expenditures, administering contractor contracts.
 Prepares project status reports by collecting, analyzing, summarizing information and trends; recommending
actions and monitor process for continuous improvement.
PROJECT HANDLED
 MOBIL - Provision of vessels Provision Of Jack Up Barge To Support Edop Shutdown Activities And Other Jobs As
Required
 ADDAX - Call-Off Contract For Construction And Installation Of Onshore Pipelines
 TOTAL - Contract for Bunkering Inspection Services Offshore
 SHELL - Construction, Replacement And Repair Of Flowlines In Spdc-Land Construction, Replacement And Repair
Of Flowlines In Spdc-Land - ADNE W2L Flowline
 SHELL - Construction, Replacement And Repair Of Flowlines In Spdc-Land - Integrity check for ETELEBOU W1L/S
& W2L/S FLOWLINES
 SHELL - Construction, Replacement And Repair Of Flowlines In Spdc-Land Gbarain 24 well hook-up
 SHELL - Construction, Replacement And Repair Of Flowlines In Spdc-Land Integrity test at ADIBAWA F/S
 SHELL - Replacement of collapsed flare stack/walkway, pilot line and riser in NELS swamp Location
 SAIPEM - Supply of Filters ‘T’ or ‘Y’ welded – Ongoing
 SAIPEM - Supply of Bridge Cranes – Ongoing
 SAIPEM – Construction of Fire Panel Complex – Bid Stage
PROJECT ENGINEER (JULY 2010 – DEC 2013)
Determined project responsibilities by identifying project phases and elements, assigning personnel to phases and
elements, reviewing bids from contractors. Determined project specifications by studying product design, customer
requirements, and performance standards; completing technical studies; preparing cost estimates. Determined
EZEIFEDI OBINNA: 08039251309 Resume, Page 2
project schedule by studying project plan and specifications; calculating time requirements; sequencing project
elements.
 Assisted in developing project objectives by reviewing project proposals and plans, conferring with management.
 Confirmed product performance by designing and conducting tests.
 Maintained project schedule by monitored project progress; coordinated activities; resolved problems.
PROJECT HANDLED
 Procured and inspected of Line Carbon Steel Line Pipes and transfer from Wharf to SHELL materials Warehouse
and installation of Offshore Electric Motor from ABB South Africa for TOTAL E & P PLC.
 Materials Handling (line-pipes) for SHELL at Kidney Island.
 Etelebou Flowline Decommissioning & Hook-up
 Obigbo North Well 53T Leak Repairs, EH3148
 Gasliftline Replacement & Burial of Imo Wells 53S & 32L/S, EH6513
 Replacement / Burial of Flowline in PH2 District, EH3148
INTERCONTINENTAL BANK PLC, PORT HARCOURT, RIVERS STATE. Aug 2008 – Jan 2010
RELATIONSHIP OFFICER
 Established new relationships and maintained existing relationships through excellent service delivery.
 Constantly meet and surpassing set targets and ensured adequate service and products availability and visibility.
 Created operational plans to manage existing customers and updating reports based on customer’s feedback also
build up customer’s interest on new and existing products. Implemented product marketing plan.
WILKRISS NIGERIA LIMITED, PORT HARCOURT, RIVERS STATE. APRIL 2008 – July 2008
SAFETY ENGINEER
 Formulated and communicated HSE rules and guidelines. Ensured HSE compliance at all times by organizing
safety meetings and toolbox talks and constantly met and surpassed set HSE targets on projects.
 Ensured safety at office and site. Prepared and ensured compliance with safety procedures.
Trainings
NNPC/NAPIMS Industrial Training Jan-June 2004
Project Management – Vast Integrated Solutions Ltd – June 2013
Human resources & Skill Acquisition Development – Nov. 2007
HSE-MS & Quality Management System – April 2008
Environmental Awareness / Unsafe Act Audit (SPDC) – August 2008
Legislation & Compliance / Safe handling of Chemicals (SPDC)
HSE Competence Development Training (Nigerian Institute of Safety Professional) - April and August 2008
Fire Fighting / First Aid Course (NISP) – April 2008
Hazard and Effect Management Process / Emergency response (SPDC) - April 2008
Corrosion and Coating (Jimcol Resources) - Jan. 2010
Use of D-Meter and Reporting (Jimcol Resources) - Jan. 2010
Cathodic Protection and Applications (Jimcol Resources) - Jan. 2010
Welding and Welding Defects Identifications (Jimcol Resources) - Jan. 2010
NDT methods, Procedures and Application (Jimcol Resources) - Jan. 2010
Plant Design Management System (PDMS)software Design Training – June 2010
Autocad 2D and 3D software Design Training – June 2010
Caesar II software Design Training – June 2010
Heart and Mind HSE Training (SPDC) – August 2010
Training on use of Microsoft Project and Primavera P3 software – Nov.2010 – Feb. 2011
Certified Welding Inspector Training – (in View) May 2012
EZEIFEDI OBINNA: 08039251309 Resume, Page 3
Education & Training
Bachelor of Science(Hons), Materials and Metallurgical Engineering, University of Lagos, City, Lagos
Senior Secondary School Certificate, Oguola Primary school, Benin City, ST
First School leaving certificate
Licenses and Certificates
Member, Project Management Institute- PMI
IN VIEW: Project Management Professional
Sept 2015: PMI
IN VIEW: Certified Welding Inspector
May 2012: AWS/Gennesaret Resources Nigeria Ltd
Proficiency in use of Autocad 2D and 3D
June - July 2010: Vast Integrated Solutions Ltd
Proficiency in use of Plant Design Management System (PDMS)
June - July 2010: Vast Integrated Solutions Ltd
Proficiency in use of Caesar II Pipe Stress Analysis Software
June - July 2010: Vast Integrated Solutions Ltd
Health, Safety and Environment (HSE) Supervisor Level 3
APRIL 2008: Nigeria Institute of Safety Professionals
Health, Safety and Environment (HSE) Appreciation Level 2
NOV.2007: Horebson Resources
Human resources & Skill Acquisition Development
APRIL 2008: Nigeria Institute of Safety Professionals
Health, Safety and Environment (HSE) Appreciation Level 2
Jan. 2008: Jimcol Resources Nigeria Limited
Corrosion/Coating Training Programme
Mar. 2011: Chip – Bits Technology
Proficiency in Project Management (Microsoft Project and Primavera)
Personal Details
Date of Birth: March 3RD, 1980 • Sex: Male • Nationality: Nigerian

Mais conteúdo relacionado

Mais procurados

Mais procurados (20)

Sam Sun_Sr. Mechanical Engineer
Sam Sun_Sr. Mechanical EngineerSam Sun_Sr. Mechanical Engineer
Sam Sun_Sr. Mechanical Engineer
 
Resume Built Using Primavera P6
Resume Built Using Primavera P6Resume Built Using Primavera P6
Resume Built Using Primavera P6
 
Mechanical Engineer-Juffrie
Mechanical Engineer-JuffrieMechanical Engineer-Juffrie
Mechanical Engineer-Juffrie
 
edwin cv for QA-QC Engineer
edwin cv for QA-QC Engineeredwin cv for QA-QC Engineer
edwin cv for QA-QC Engineer
 
Sathish_CV Quality Control Engineer
Sathish_CV Quality Control EngineerSathish_CV Quality Control Engineer
Sathish_CV Quality Control Engineer
 
Piping engineer cv
Piping engineer cvPiping engineer cv
Piping engineer cv
 
Jestin - Resume
Jestin - ResumeJestin - Resume
Jestin - Resume
 
Resume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - GowrijayashankarResume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - Gowrijayashankar
 
Nidhin George_CV
Nidhin George_CVNidhin George_CV
Nidhin George_CV
 
Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016Anas M H Mechanical Piping Engineer 2016
Anas M H Mechanical Piping Engineer 2016
 
renjith piping engineer
renjith piping engineerrenjith piping engineer
renjith piping engineer
 
QA/QC Manager-Civil
QA/QC Manager-Civil QA/QC Manager-Civil
QA/QC Manager-Civil
 
SSNair-CV-Latest-2016
SSNair-CV-Latest-2016SSNair-CV-Latest-2016
SSNair-CV-Latest-2016
 
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
Ramiz Ahmed Sayed Reyad CV Updated as of Jan 2015
 
Abdul Azeem(Mechanical Engineer ) -CV
Abdul Azeem(Mechanical Engineer ) -CVAbdul Azeem(Mechanical Engineer ) -CV
Abdul Azeem(Mechanical Engineer ) -CV
 
DOCUMENT CONTROLLER CV
DOCUMENT CONTROLLER  CVDOCUMENT CONTROLLER  CV
DOCUMENT CONTROLLER CV
 
Sudeshna Resume
Sudeshna ResumeSudeshna Resume
Sudeshna Resume
 
Cv mm
Cv mmCv mm
Cv mm
 
Senior Mechanical Engineer CV
Senior Mechanical Engineer CVSenior Mechanical Engineer CV
Senior Mechanical Engineer CV
 
KARTHICK-DESIGN RESUME
KARTHICK-DESIGN RESUMEKARTHICK-DESIGN RESUME
KARTHICK-DESIGN RESUME
 

Destaque

CRIWG 2010 opening
CRIWG 2010 opening CRIWG 2010 opening
CRIWG 2010 opening slukosch
 
React, Redux, ES2015 by Max Petruck
React, Redux, ES2015 by Max PetruckReact, Redux, ES2015 by Max Petruck
React, Redux, ES2015 by Max PetruckLingvokot
 
Améliorer l'efficacité énergétique en utilisant les tours de refroidissement ...
Améliorer l'efficacité énergétique en utilisant les tours de refroidissement ...Améliorer l'efficacité énergétique en utilisant les tours de refroidissement ...
Améliorer l'efficacité énergétique en utilisant les tours de refroidissement ...atgagnon
 
Wideo W Internecie Arek Kustra
Wideo W Internecie Arek KustraWideo W Internecie Arek Kustra
Wideo W Internecie Arek Kustravar13
 
Finaldraft- team project
Finaldraft- team projectFinaldraft- team project
Finaldraft- team projectAndy Bohl
 
Plan d'accès pépinière SOREA
Plan d'accès pépinière SOREAPlan d'accès pépinière SOREA
Plan d'accès pépinière SOREASOREA
 
Pivotal Digital Transformation Forum: Cloud and Devops - The Reality
Pivotal Digital Transformation Forum: Cloud and Devops - The RealityPivotal Digital Transformation Forum: Cloud and Devops - The Reality
Pivotal Digital Transformation Forum: Cloud and Devops - The RealityVMware Tanzu
 
Presentationgraphics
PresentationgraphicsPresentationgraphics
PresentationgraphicsBelkis Lane
 
Les avantages et les risques d'opérer une tour de refroidissement en débit va...
Les avantages et les risques d'opérer une tour de refroidissement en débit va...Les avantages et les risques d'opérer une tour de refroidissement en débit va...
Les avantages et les risques d'opérer une tour de refroidissement en débit va...atgagnon
 
Docker architecture rework case study
Docker  architecture rework case studyDocker  architecture rework case study
Docker architecture rework case studydchaffiol
 
La nit de hallowen
La nit de hallowenLa nit de hallowen
La nit de hallowen08escola
 
Prophylaxis & Prevention of Postoperative Surgical Wound Infections in Oral S...
Prophylaxis & Prevention of Postoperative Surgical Wound Infections in Oral S...Prophylaxis & Prevention of Postoperative Surgical Wound Infections in Oral S...
Prophylaxis & Prevention of Postoperative Surgical Wound Infections in Oral S...giupitas
 
Lean Software Development: Values and Principles
Lean Software Development: Values and PrinciplesLean Software Development: Values and Principles
Lean Software Development: Values and PrinciplesBalaji Sathram
 
ONOS - setting, configuration, installation, and test
ONOS - setting, configuration, installation, and testONOS - setting, configuration, installation, and test
ONOS - setting, configuration, installation, and testsangyun han
 
Conectores, Cables y Puertos de un ordenador (Tabla Resumen)
Conectores, Cables y Puertos de un ordenador (Tabla Resumen)Conectores, Cables y Puertos de un ordenador (Tabla Resumen)
Conectores, Cables y Puertos de un ordenador (Tabla Resumen)Dani Lara
 
Un veí molt estrany
Un veí molt estranyUn veí molt estrany
Un veí molt estrany08escola
 

Destaque (20)

Asianpres
AsianpresAsianpres
Asianpres
 
CRIWG 2010 opening
CRIWG 2010 opening CRIWG 2010 opening
CRIWG 2010 opening
 
React, Redux, ES2015 by Max Petruck
React, Redux, ES2015 by Max PetruckReact, Redux, ES2015 by Max Petruck
React, Redux, ES2015 by Max Petruck
 
Améliorer l'efficacité énergétique en utilisant les tours de refroidissement ...
Améliorer l'efficacité énergétique en utilisant les tours de refroidissement ...Améliorer l'efficacité énergétique en utilisant les tours de refroidissement ...
Améliorer l'efficacité énergétique en utilisant les tours de refroidissement ...
 
Wideo W Internecie Arek Kustra
Wideo W Internecie Arek KustraWideo W Internecie Arek Kustra
Wideo W Internecie Arek Kustra
 
Finaldraft- team project
Finaldraft- team projectFinaldraft- team project
Finaldraft- team project
 
Plan d'accès pépinière SOREA
Plan d'accès pépinière SOREAPlan d'accès pépinière SOREA
Plan d'accès pépinière SOREA
 
Pivotal Digital Transformation Forum: Cloud and Devops - The Reality
Pivotal Digital Transformation Forum: Cloud and Devops - The RealityPivotal Digital Transformation Forum: Cloud and Devops - The Reality
Pivotal Digital Transformation Forum: Cloud and Devops - The Reality
 
Food Packaging , the smartest package IDM10
Food Packaging , the smartest package IDM10Food Packaging , the smartest package IDM10
Food Packaging , the smartest package IDM10
 
Presentationgraphics
PresentationgraphicsPresentationgraphics
Presentationgraphics
 
Introduction to Celery
Introduction to CeleryIntroduction to Celery
Introduction to Celery
 
Les avantages et les risques d'opérer une tour de refroidissement en débit va...
Les avantages et les risques d'opérer une tour de refroidissement en débit va...Les avantages et les risques d'opérer une tour de refroidissement en débit va...
Les avantages et les risques d'opérer une tour de refroidissement en débit va...
 
Docker architecture rework case study
Docker  architecture rework case studyDocker  architecture rework case study
Docker architecture rework case study
 
La nit de hallowen
La nit de hallowenLa nit de hallowen
La nit de hallowen
 
Prophylaxis & Prevention of Postoperative Surgical Wound Infections in Oral S...
Prophylaxis & Prevention of Postoperative Surgical Wound Infections in Oral S...Prophylaxis & Prevention of Postoperative Surgical Wound Infections in Oral S...
Prophylaxis & Prevention of Postoperative Surgical Wound Infections in Oral S...
 
Lean Software Development: Values and Principles
Lean Software Development: Values and PrinciplesLean Software Development: Values and Principles
Lean Software Development: Values and Principles
 
ONOS - setting, configuration, installation, and test
ONOS - setting, configuration, installation, and testONOS - setting, configuration, installation, and test
ONOS - setting, configuration, installation, and test
 
Conectores, Cables y Puertos de un ordenador (Tabla Resumen)
Conectores, Cables y Puertos de un ordenador (Tabla Resumen)Conectores, Cables y Puertos de un ordenador (Tabla Resumen)
Conectores, Cables y Puertos de un ordenador (Tabla Resumen)
 
Bootstrap grids
Bootstrap gridsBootstrap grids
Bootstrap grids
 
Un veí molt estrany
Un veí molt estranyUn veí molt estrany
Un veí molt estrany
 

Semelhante a EZEIFEDI OBINNA RESUME 2015 (20)

Resume Dax Roque C.
Resume Dax Roque C.Resume Dax Roque C.
Resume Dax Roque C.
 
CV-Essam Saadeh
CV-Essam SaadehCV-Essam Saadeh
CV-Essam Saadeh
 
Soumyajit Das
Soumyajit DasSoumyajit Das
Soumyajit Das
 
My Resume
My ResumeMy Resume
My Resume
 
Gary Clancy CV - November 2016
Gary Clancy CV - November 2016Gary Clancy CV - November 2016
Gary Clancy CV - November 2016
 
Jabir CV
Jabir CVJabir CV
Jabir CV
 
Romell CV_PE
Romell CV_PERomell CV_PE
Romell CV_PE
 
Dale Crowe Resume 2016
Dale Crowe Resume 2016Dale Crowe Resume 2016
Dale Crowe Resume 2016
 
John Okusolubo Resume 2015
John Okusolubo Resume 2015John Okusolubo Resume 2015
John Okusolubo Resume 2015
 
Syed Shihabdeen - Resume
Syed Shihabdeen - ResumeSyed Shihabdeen - Resume
Syed Shihabdeen - Resume
 
Saddam A. Abas -PDF
Saddam A. Abas -PDFSaddam A. Abas -PDF
Saddam A. Abas -PDF
 
CV
CVCV
CV
 
Peter L. Cabbab.
Peter L. Cabbab.Peter L. Cabbab.
Peter L. Cabbab.
 
Resume_P Prakosa 201605
Resume_P Prakosa 201605Resume_P Prakosa 201605
Resume_P Prakosa 201605
 
Resume_Omkar Palit
Resume_Omkar PalitResume_Omkar Palit
Resume_Omkar Palit
 
Faruk Ulas SULHAN CV
Faruk Ulas SULHAN CVFaruk Ulas SULHAN CV
Faruk Ulas SULHAN CV
 
Project Management Specialist
Project Management SpecialistProject Management Specialist
Project Management Specialist
 
Samrat Khanorkar_Resume
Samrat Khanorkar_ResumeSamrat Khanorkar_Resume
Samrat Khanorkar_Resume
 
Eng Delsaer Corporate 2009 New
Eng   Delsaer Corporate 2009 NewEng   Delsaer Corporate 2009 New
Eng Delsaer Corporate 2009 New
 
SASI NEW RESUME
SASI NEW RESUMESASI NEW RESUME
SASI NEW RESUME
 

EZEIFEDI OBINNA RESUME 2015

  • 1. EZEIFEDI OBINNA 34B Okilton Drive, Okilton Estate Phone: 08039251309 Port Harcourt, Rivers State E-mail: zefedi@yahoo.com Accomplished proactive Procurement and Project Management Professional with experience in implementing business methods and process developments that increase quality, reduce cycle time and enhance yields while reducing bottom-line costs. Proven ability in strategic planning, project management, cost-control, improving operational efficiency, and increasing productivity. Hands-on experience in managing multi-facility distribution and customer operation sites. Immense exposure to revitalizing operational performance with a focus on continual process improvement and value-added solutions that improve the overall organizational performance and aligned deliverables. Having good communication skills effectively foster cooperation between stake-holders and clients. Areas of Expertise  Project Management  Planning & Control  Strategic Planning/Analysis  M.S. Project & Primavera P6  Tender Designing  Competitive Intelligence  New Business Development  Implementing & Testing  Procurement & Inspection  Cross Functional  Administrative Operations  Client Relations Professional Experience WILKRISS NIGERIA LIMITED, PORT HARCOURT, RIVERS STATE. JULY 2010 – PRESENT MANAGER, PROJECT/ENGINEERING (Jan 2014 – Present) Determines project responsibilities by identifying project phases and elements; assigning personnel to phases and elements; reviewing bids from contractors. Determines project specifications by studying product design, customer requirements, and performance standards; completing technical studies; preparing cost estimates. Determines project schedule by studying project plan and specifications; calculating time requirements; sequencing project elements.  Efficiently develops project objectives by reviewing project proposals and plans; conferring with management.  Planning and designing projects using Primavera P3 software also tender design and bid management.  Confirms product performance by designing and conducting tests. Maintains project schedule by monitoring project progress, coordinating activities, resolving problems.  Controls project plan by reviewing design, specifications, and plan and schedule changes; recommending actions. And controls project costs by approving expenditures, administering contractor contracts.  Prepares project status reports by collecting, analyzing, summarizing information and trends; recommending actions and monitor process for continuous improvement. PROJECT HANDLED  MOBIL - Provision of vessels Provision Of Jack Up Barge To Support Edop Shutdown Activities And Other Jobs As Required  ADDAX - Call-Off Contract For Construction And Installation Of Onshore Pipelines  TOTAL - Contract for Bunkering Inspection Services Offshore  SHELL - Construction, Replacement And Repair Of Flowlines In Spdc-Land Construction, Replacement And Repair Of Flowlines In Spdc-Land - ADNE W2L Flowline  SHELL - Construction, Replacement And Repair Of Flowlines In Spdc-Land - Integrity check for ETELEBOU W1L/S & W2L/S FLOWLINES  SHELL - Construction, Replacement And Repair Of Flowlines In Spdc-Land Gbarain 24 well hook-up  SHELL - Construction, Replacement And Repair Of Flowlines In Spdc-Land Integrity test at ADIBAWA F/S  SHELL - Replacement of collapsed flare stack/walkway, pilot line and riser in NELS swamp Location  SAIPEM - Supply of Filters ‘T’ or ‘Y’ welded – Ongoing  SAIPEM - Supply of Bridge Cranes – Ongoing  SAIPEM – Construction of Fire Panel Complex – Bid Stage PROJECT ENGINEER (JULY 2010 – DEC 2013) Determined project responsibilities by identifying project phases and elements, assigning personnel to phases and elements, reviewing bids from contractors. Determined project specifications by studying product design, customer requirements, and performance standards; completing technical studies; preparing cost estimates. Determined
  • 2. EZEIFEDI OBINNA: 08039251309 Resume, Page 2 project schedule by studying project plan and specifications; calculating time requirements; sequencing project elements.  Assisted in developing project objectives by reviewing project proposals and plans, conferring with management.  Confirmed product performance by designing and conducting tests.  Maintained project schedule by monitored project progress; coordinated activities; resolved problems. PROJECT HANDLED  Procured and inspected of Line Carbon Steel Line Pipes and transfer from Wharf to SHELL materials Warehouse and installation of Offshore Electric Motor from ABB South Africa for TOTAL E & P PLC.  Materials Handling (line-pipes) for SHELL at Kidney Island.  Etelebou Flowline Decommissioning & Hook-up  Obigbo North Well 53T Leak Repairs, EH3148  Gasliftline Replacement & Burial of Imo Wells 53S & 32L/S, EH6513  Replacement / Burial of Flowline in PH2 District, EH3148 INTERCONTINENTAL BANK PLC, PORT HARCOURT, RIVERS STATE. Aug 2008 – Jan 2010 RELATIONSHIP OFFICER  Established new relationships and maintained existing relationships through excellent service delivery.  Constantly meet and surpassing set targets and ensured adequate service and products availability and visibility.  Created operational plans to manage existing customers and updating reports based on customer’s feedback also build up customer’s interest on new and existing products. Implemented product marketing plan. WILKRISS NIGERIA LIMITED, PORT HARCOURT, RIVERS STATE. APRIL 2008 – July 2008 SAFETY ENGINEER  Formulated and communicated HSE rules and guidelines. Ensured HSE compliance at all times by organizing safety meetings and toolbox talks and constantly met and surpassed set HSE targets on projects.  Ensured safety at office and site. Prepared and ensured compliance with safety procedures. Trainings NNPC/NAPIMS Industrial Training Jan-June 2004 Project Management – Vast Integrated Solutions Ltd – June 2013 Human resources & Skill Acquisition Development – Nov. 2007 HSE-MS & Quality Management System – April 2008 Environmental Awareness / Unsafe Act Audit (SPDC) – August 2008 Legislation & Compliance / Safe handling of Chemicals (SPDC) HSE Competence Development Training (Nigerian Institute of Safety Professional) - April and August 2008 Fire Fighting / First Aid Course (NISP) – April 2008 Hazard and Effect Management Process / Emergency response (SPDC) - April 2008 Corrosion and Coating (Jimcol Resources) - Jan. 2010 Use of D-Meter and Reporting (Jimcol Resources) - Jan. 2010 Cathodic Protection and Applications (Jimcol Resources) - Jan. 2010 Welding and Welding Defects Identifications (Jimcol Resources) - Jan. 2010 NDT methods, Procedures and Application (Jimcol Resources) - Jan. 2010 Plant Design Management System (PDMS)software Design Training – June 2010 Autocad 2D and 3D software Design Training – June 2010 Caesar II software Design Training – June 2010 Heart and Mind HSE Training (SPDC) – August 2010 Training on use of Microsoft Project and Primavera P3 software – Nov.2010 – Feb. 2011 Certified Welding Inspector Training – (in View) May 2012
  • 3. EZEIFEDI OBINNA: 08039251309 Resume, Page 3 Education & Training Bachelor of Science(Hons), Materials and Metallurgical Engineering, University of Lagos, City, Lagos Senior Secondary School Certificate, Oguola Primary school, Benin City, ST First School leaving certificate Licenses and Certificates Member, Project Management Institute- PMI IN VIEW: Project Management Professional Sept 2015: PMI IN VIEW: Certified Welding Inspector May 2012: AWS/Gennesaret Resources Nigeria Ltd Proficiency in use of Autocad 2D and 3D June - July 2010: Vast Integrated Solutions Ltd Proficiency in use of Plant Design Management System (PDMS) June - July 2010: Vast Integrated Solutions Ltd Proficiency in use of Caesar II Pipe Stress Analysis Software June - July 2010: Vast Integrated Solutions Ltd Health, Safety and Environment (HSE) Supervisor Level 3 APRIL 2008: Nigeria Institute of Safety Professionals Health, Safety and Environment (HSE) Appreciation Level 2 NOV.2007: Horebson Resources Human resources & Skill Acquisition Development APRIL 2008: Nigeria Institute of Safety Professionals Health, Safety and Environment (HSE) Appreciation Level 2 Jan. 2008: Jimcol Resources Nigeria Limited Corrosion/Coating Training Programme Mar. 2011: Chip – Bits Technology Proficiency in Project Management (Microsoft Project and Primavera) Personal Details Date of Birth: March 3RD, 1980 • Sex: Male • Nationality: Nigerian