SMED – Changeover Reduction
www.optimumfx.com
Intent of Session
• Minimise impact of Changeovers
• Define the SMED methodology and process
• Outline the key benefits of carrying out changeover
reduction (SMED) process
What is a Changeover?
The time taken to change-over a machine from the last “Good”
part off one run to the first “Good” part off the next run (including
all the adjustments needed to get the machine running to the
correct production speed / cycle time).
SPEED
What is SMED?
• SMED stands for Single Minute Exchange of Die and is
a process for effectively reducing the time it takes to
change the parts on a machine.
• This process was developed by a man called Shiego
Shingo for the motor car industry in 1969. He reduced a
setup in Toyota Motor Company, Japan on a 1000 ton
press from 4 hours to 1 hour 30 minutes in 6 months and
then to under 3 minutes after a further 3 months. This
was achieved through team work and following 4 simple
steps.
Why SMED?
Consider the process of changing a car tyre:
• You may change a tyre in15min
• By using the SMED process Formula 1 teams achieve
the same changeover in 4.5s
“Pit Stop” mentality
SMED process
How does SMED work?
5 key stages:
1. Break the process into manageable elements
2. Identify the elements that can be prepared in advance
3. Identify how the remaining elements could be engineered out
of the process
4. Reduce the duration of the stages that are left through team
work and organisation, or with engineering
5. Document the changes as work instructions and training aids
The SMED Process
Step 1: Identify elements
• Record your changeover. We recommend using a video recorder and manual observation.
• As a team break the changeover into 30-50 elements. Ensure that these are of a reasonable length –
if one element contains 5min of activity then you will need to break this down into smaller chunks.
Step 2: Identify internal and external elements
• Internal elements are stages that can ONLY occur when the machine is stopped. External elements
are stages that can occur when the machine is running.
Step 3: Convert internal elements to external elements
• Re-examine the operation and identify how EACH internal element could be made into an external
element.
Step 4: Streamline and standardise the remaining elements
• How could each element be reduced in length either through tools, engineering or more people.
Step 5: Create Standard Operating Procedures (SOPs)
• Write detailed and easy to use operating procedures and train across all shifts
Step 1
• Record the changeover process
– Use a Video Camera
– Record all relevant steps
• Split into individual elements
– Make steps reasonable length, aim to achieve 20-50 elements per
process (therefore single step in 60 min process would be between 1-
2 mins)
Identify elements in changeover process
Step 2
• Decide which elements can be performed while the
machine is still running and therefore these are now
‘external’ elements.
• As external elements can be done while the machine is
running they can be eliminated from the overall change-
over time.
• The elements that have to be performed when the
machine is shut down are ‘internal elements’.
Distinguish between Internal and External Elements
Step 3
• Re-examine operations to see whether any steps are
wrongly assumed to be internal and move to external.
• Find ways to convert internal elements to external
elements
Internal External
Using innovation
Convert Internal to External Elements
Step 4
• Need detailed analysis of each element. Question the
purpose of it, can the entire element be eliminated?
• If it cannot be eliminated what is needed in order for
the elements to be easier to do and therefore take less
time.
• Needs innovations and ideas i.e. machine stops and
guides, butterfly bolts rather than hex, air tools.
Streamline all aspects of the Change-over
Step 5
• Define the best standard
• Create a Standard Operating Procedure (SOP)
• Train all operators to the new standard
Streamline all aspects of the Change-over
Why is it effective?
• Emphasis on preparation, correct procedure, teamwork, and organisation.
• Most engineering-based sites do some great engineering work to reduce
time – very few put the same effort into team organisation and
preparation….SMED teaches that this is the key opportunity in reducing
planned downtime.
Engineering
tasks – large
opportunity but
with huge time
investment.
People +
organisation
deliver the
largest
improvement
The Benefits of SMED
6 key benefits:
• Greater levels of productivity
• Increased safety
• Increased quality
• Reduction in overtime costs
• Greater production flexibility
• Increased motivation
Greater productivity
• SMED directly reduces your planned downtime duration and
increases OEE.
• Through analysing and applying SMED thinking to your existing set-
up methods, you'll cut changeover time by at least 45%.
Increased safety
• The ultimate example of SMED application was the wheel changes that
used to win or loose Formula One races.
• If I get a flat at the roadside, it takes me 15-20 minutes to change ONE
wheel. A Formula One team on race day could change all FOUR wheels in
less than one man-minute.
• Yet data from the Royal Society for The Prevention of Accidents shows that
when I change a wheel, there's a 28 in 10,000 chance that I'll end up in
hospital as a result.
• The comparative figure for Formula One is 6 in 10,000. In other words, it's
almost five times safer.
• The lesson is that there's no point being fast, if you injure your team.
• So set-up methods that have been designed using SMED methods are
SAFE, SYSTEMISED, and SPEEDY.
Increased quality
• A key output of the SMED process is that the changeover must be right first
time
– Imagine the impact of your car wheel coming off after changeover…
• SMED specifies that not only should the changeover be faster – but it
MUST be right first time
• All SMED procedures are fully documented to ensure that new operators
can be trained to ensure right first time quality.
Reduced overtime
• Pretty much every manufacturing firm uses overtime to cope with
peaks in demand from customers.
• Staff work longer hours, but at a premium rate, in order to keep up
with demand.
• Overtime is typically paid at 25%-100% more than standard labour
rate, so an reduction in the amount of 'work' that needs doing in a
week, while still achieving the required output has to be worth doing.
• In a typical factory, applying SMED can reduce overtime bills by
69%, and the total labour bill by 16%.
• With costs that much lower, you can either undercut competitors, or
significantly boost bottom-line profits!
Greater flexibility
• Customers are funny, aren't they, the way they always seem to
phone on Friday afternoon, desperate for a rush order, or a change
in the schedule. I'm sure it's not deliberate.
• Unfortunately, many companies choose to build a buffer between
their production and customers. And in a world where product life-
cycles are getting sorter and shorter (less than three months now for
a lap-top, apparently!), that's a highly risky strategy.
• If your current set-up times are 90 minutes, last-minute orders from
customers are probably a huge irritation, meaning re-scheduling or
production and making trade-offs between efficiency and keeping
the customer happy.
• Now imagine that using SMED, you've reduced your set-up times to
9 minutes. Are last-minute orders or changes to schedules
something that you'd even worry about any more?
Motivation
• It's a question of what motivates people. Almost everyone goes to
work in general for the money. If you stop paying, then they'll stop
turning up!
• However, almost everyone chooses to work for a specific employer.
The way they are treated, how they get on with their colleagues, and
the respect they feel all have a powerful pull.
• You can only apply SMED successfully through tapping into the
experience and creativity of the people who run the equipment
you're trying to improve. Allowing people to be creative, express,
and even try out ideas is a HUGE motivator.
• Indeed, this is one of the most common comments that clients make
to us after a SMED programme - their staff are suddenly alive, and
taking an interest in making their company more successful.

More Related Content

What's hot

Lean Manufacturing SMED
Lean Manufacturing SMEDLean Manufacturing SMED
Lean Manufacturing SMEDLean Sigma
 
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORSLEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORSJulian Kalac P.Eng
 
SMED - Quick Change Over
SMED - Quick Change OverSMED - Quick Change Over
SMED - Quick Change OverOskar Olofsson
 
SMED - Single Minute Exchange of Dies
SMED - Single Minute Exchange of DiesSMED - Single Minute Exchange of Dies
SMED - Single Minute Exchange of Dies5S BALAMURUGAN
 
8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM
8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM
8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSMSedhuSiddarth
 
Lean Fundamentals Overview Webinar
Lean Fundamentals Overview WebinarLean Fundamentals Overview Webinar
Lean Fundamentals Overview WebinarMichael E. Parker
 
LEAN Setup Reduction (SMED) training for welding by JULIAN KALAC
LEAN Setup Reduction (SMED) training for welding by JULIAN KALACLEAN Setup Reduction (SMED) training for welding by JULIAN KALAC
LEAN Setup Reduction (SMED) training for welding by JULIAN KALACJulian Kalac P.Eng
 
Lean Manufacturing
Lean Manufacturing Lean Manufacturing
Lean Manufacturing Marico Ltd.
 
Lean Quick Changeover (SMED) Training Module
Lean Quick Changeover (SMED) Training ModuleLean Quick Changeover (SMED) Training Module
Lean Quick Changeover (SMED) Training ModuleFrank-G. Adler
 
Jidoka - An Improvement Tool of Lean
Jidoka - An Improvement Tool of LeanJidoka - An Improvement Tool of Lean
Jidoka - An Improvement Tool of Lean5S BALAMURUGAN
 

What's hot (20)

Standard Work
Standard WorkStandard Work
Standard Work
 
Lean basics
Lean basicsLean basics
Lean basics
 
SMED
SMEDSMED
SMED
 
Single Minute Exchange of Dies
Single Minute Exchange of DiesSingle Minute Exchange of Dies
Single Minute Exchange of Dies
 
Lean Manufacturing SMED
Lean Manufacturing SMEDLean Manufacturing SMED
Lean Manufacturing SMED
 
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORSLEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
LEAN SMED TRAINING FOR SUPERVISORS AND OPERATORS
 
SMED - Quick Change Over
SMED - Quick Change OverSMED - Quick Change Over
SMED - Quick Change Over
 
How to reduce changeover loss
How to reduce changeover lossHow to reduce changeover loss
How to reduce changeover loss
 
Quick Smed Sample
Quick Smed SampleQuick Smed Sample
Quick Smed Sample
 
SMED - Single Minute Exchange of Dies
SMED - Single Minute Exchange of DiesSMED - Single Minute Exchange of Dies
SMED - Single Minute Exchange of Dies
 
smed
smedsmed
smed
 
Smed simulation game_intro
Smed simulation game_introSmed simulation game_intro
Smed simulation game_intro
 
8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM
8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM
8 WASTES IN LEAN MANUFACUTING & OVERVIEW OF VSM
 
Lean Fundamentals Overview Webinar
Lean Fundamentals Overview WebinarLean Fundamentals Overview Webinar
Lean Fundamentals Overview Webinar
 
LEAN Setup Reduction (SMED) training for welding by JULIAN KALAC
LEAN Setup Reduction (SMED) training for welding by JULIAN KALACLEAN Setup Reduction (SMED) training for welding by JULIAN KALAC
LEAN Setup Reduction (SMED) training for welding by JULIAN KALAC
 
Standard work
Standard workStandard work
Standard work
 
Lean Manufacturing
Lean Manufacturing Lean Manufacturing
Lean Manufacturing
 
Lean Quick Changeover (SMED) Training Module
Lean Quick Changeover (SMED) Training ModuleLean Quick Changeover (SMED) Training Module
Lean Quick Changeover (SMED) Training Module
 
Jidoka - An Improvement Tool of Lean
Jidoka - An Improvement Tool of LeanJidoka - An Improvement Tool of Lean
Jidoka - An Improvement Tool of Lean
 
Kaizen
KaizenKaizen
Kaizen
 

Viewers also liked (15)

SMED Setup & Lead Time Reduction
SMED Setup & Lead Time ReductionSMED Setup & Lead Time Reduction
SMED Setup & Lead Time Reduction
 
SMED Kaizen Event
SMED Kaizen EventSMED Kaizen Event
SMED Kaizen Event
 
One point lessons (OPLs)
One point lessons (OPLs)One point lessons (OPLs)
One point lessons (OPLs)
 
In-depth problem solving tool
In-depth problem solving toolIn-depth problem solving tool
In-depth problem solving tool
 
5S stage 1 - Sort
5S stage 1 - Sort5S stage 1 - Sort
5S stage 1 - Sort
 
SOP example
SOP exampleSOP example
SOP example
 
Single minute exchange of die - Introduction
Single minute exchange of die - Introduction Single minute exchange of die - Introduction
Single minute exchange of die - Introduction
 
5S stage 5 - Sustain
5S stage 5 - Sustain5S stage 5 - Sustain
5S stage 5 - Sustain
 
SMED
SMED SMED
SMED
 
Visual One Point Lessons
Visual One Point LessonsVisual One Point Lessons
Visual One Point Lessons
 
Day In The Life Of (DILO)
Day In The Life Of (DILO)Day In The Life Of (DILO)
Day In The Life Of (DILO)
 
Smed Training Model Trainer Instructions[1]
Smed Training Model Trainer Instructions[1]Smed Training Model Trainer Instructions[1]
Smed Training Model Trainer Instructions[1]
 
Do you SMED?
Do you SMED?Do you SMED?
Do you SMED?
 
Lean Simulation Activity Ideas using a ream of copy paper
Lean Simulation Activity Ideas using a ream of copy paperLean Simulation Activity Ideas using a ream of copy paper
Lean Simulation Activity Ideas using a ream of copy paper
 
5S Presentation for beginners and professionals for implementation
5S Presentation for beginners and professionals for implementation5S Presentation for beginners and professionals for implementation
5S Presentation for beginners and professionals for implementation
 

Similar to SMED overview

Production and operation Unit_3.pptx
Production and operation Unit_3.pptxProduction and operation Unit_3.pptx
Production and operation Unit_3.pptxMargi Shah
 
Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)MohammedLahssaini1
 
Just in time and Lean systems
Just in time and Lean systemsJust in time and Lean systems
Just in time and Lean systemsAyman Aljahdali
 
IMPROVING EQUIPMENT PERFORMANCE
IMPROVING EQUIPMENT PERFORMANCEIMPROVING EQUIPMENT PERFORMANCE
IMPROVING EQUIPMENT PERFORMANCEDrBiz Arikrishnan
 
Total Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh Arora
Total Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh AroraTotal Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh Arora
Total Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh AroraADD VALUE CONSULTING Inc
 
Standardised work for garment industry- Prakhar Jain
Standardised work for garment industry- Prakhar JainStandardised work for garment industry- Prakhar Jain
Standardised work for garment industry- Prakhar JainPrakhar Jain
 
1OM, Ch. 17 Lean Operating Systems©2009 South-Western, a p.docx
1OM, Ch. 17 Lean Operating Systems©2009 South-Western, a p.docx1OM, Ch. 17 Lean Operating Systems©2009 South-Western, a p.docx
1OM, Ch. 17 Lean Operating Systems©2009 South-Western, a p.docxhyacinthshackley2629
 
Productivity and Quality Management
Productivity and Quality ManagementProductivity and Quality Management
Productivity and Quality ManagementSameer Omles
 
Generic Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S DesrocherGeneric Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S DesrocherAlan Desrocher
 
K10798 ashok opc me 6th sem
K10798 ashok opc me 6th semK10798 ashok opc me 6th sem
K10798 ashok opc me 6th semGuddu Ali
 
Toyota's jit revolution ppt
Toyota's jit revolution pptToyota's jit revolution ppt
Toyota's jit revolution pptAkshay Jain
 
Just In Time
Just In TimeJust In Time
Just In Timedvyvjy
 
Just in time in supply chain management &
Just in time in supply chain management &Just in time in supply chain management &
Just in time in supply chain management &ganessh04
 
Basics of maintenance processes
Basics of maintenance processesBasics of maintenance processes
Basics of maintenance processesGangaSumanth
 

Similar to SMED overview (20)

Production and operation Unit_3.pptx
Production and operation Unit_3.pptxProduction and operation Unit_3.pptx
Production and operation Unit_3.pptx
 
Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)
 
Just in time and Lean systems
Just in time and Lean systemsJust in time and Lean systems
Just in time and Lean systems
 
TPM
TPMTPM
TPM
 
IMPROVING EQUIPMENT PERFORMANCE
IMPROVING EQUIPMENT PERFORMANCEIMPROVING EQUIPMENT PERFORMANCE
IMPROVING EQUIPMENT PERFORMANCE
 
Just in time
Just in timeJust in time
Just in time
 
Total Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh Arora
Total Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh AroraTotal Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh Arora
Total Productive Maintenance (TPM) Basics - ADDVALUE - Nilesh Arora
 
Standardised work for garment industry- Prakhar Jain
Standardised work for garment industry- Prakhar JainStandardised work for garment industry- Prakhar Jain
Standardised work for garment industry- Prakhar Jain
 
1OM, Ch. 17 Lean Operating Systems©2009 South-Western, a p.docx
1OM, Ch. 17 Lean Operating Systems©2009 South-Western, a p.docx1OM, Ch. 17 Lean Operating Systems©2009 South-Western, a p.docx
1OM, Ch. 17 Lean Operating Systems©2009 South-Western, a p.docx
 
Productivity and Quality Management
Productivity and Quality ManagementProductivity and Quality Management
Productivity and Quality Management
 
SMED
SMEDSMED
SMED
 
Generic Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S DesrocherGeneric Lean Overview For Future Employer Of Alan S Desrocher
Generic Lean Overview For Future Employer Of Alan S Desrocher
 
K10798 ashok opc me 6th sem
K10798 ashok opc me 6th semK10798 ashok opc me 6th sem
K10798 ashok opc me 6th sem
 
Srj tpm
Srj tpmSrj tpm
Srj tpm
 
Toyota's jit revolution ppt
Toyota's jit revolution pptToyota's jit revolution ppt
Toyota's jit revolution ppt
 
Just In Time
Just In TimeJust In Time
Just In Time
 
Just in time in supply chain management &
Just in time in supply chain management &Just in time in supply chain management &
Just in time in supply chain management &
 
Basics of maintenance processes
Basics of maintenance processesBasics of maintenance processes
Basics of maintenance processes
 
Quick Changeover
Quick ChangeoverQuick Changeover
Quick Changeover
 
Quick Changeover
Quick ChangeoverQuick Changeover
Quick Changeover
 

More from LineView Academy (was OFX Academy)

More from LineView Academy (was OFX Academy) (20)

SIC (Short Interval Control) Methodology
SIC (Short Interval Control) MethodologySIC (Short Interval Control) Methodology
SIC (Short Interval Control) Methodology
 
Giving and receiving feedback - the methodology
Giving and receiving feedback - the methodologyGiving and receiving feedback - the methodology
Giving and receiving feedback - the methodology
 
Line Crew Optimisation Methodology
Line Crew Optimisation MethodologyLine Crew Optimisation Methodology
Line Crew Optimisation Methodology
 
RACI Methodology
RACI MethodologyRACI Methodology
RACI Methodology
 
Actionable information 3
Actionable information 3Actionable information 3
Actionable information 3
 
Actionable information 2
Actionable information 2Actionable information 2
Actionable information 2
 
Actionable information 1
Actionable information 1Actionable information 1
Actionable information 1
 
SERVE model
SERVE modelSERVE model
SERVE model
 
Paradigm thinking
Paradigm thinkingParadigm thinking
Paradigm thinking
 
Neurological levels
Neurological levelsNeurological levels
Neurological levels
 
Living in the present
Living in the presentLiving in the present
Living in the present
 
Helicopter leadership
Helicopter leadershipHelicopter leadership
Helicopter leadership
 
Evolving consciousness
Evolving consciousnessEvolving consciousness
Evolving consciousness
 
AADACM - Changing habits
AADACM - Changing habitsAADACM - Changing habits
AADACM - Changing habits
 
Creating a high five team
Creating a high five teamCreating a high five team
Creating a high five team
 
Situaltional leadership
Situaltional leadershipSitualtional leadership
Situaltional leadership
 
Performance management
Performance managementPerformance management
Performance management
 
Developing a sustainable CI culture
Developing a sustainable CI cultureDeveloping a sustainable CI culture
Developing a sustainable CI culture
 
Meeting auditing skills
Meeting auditing skillsMeeting auditing skills
Meeting auditing skills
 
Auditing meetings
Auditing meetingsAuditing meetings
Auditing meetings
 

Recently uploaded

DM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in projectDM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in projectssuserb6619e
 
National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfRajuKanojiya4
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
Engineering Drawing section of solid
Engineering Drawing     section of solidEngineering Drawing     section of solid
Engineering Drawing section of solidnamansinghjarodiya
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingBootNeck1
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxsiddharthjain2303
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgsaravananr517913
 
Configuration of IoT devices - Systems managament
Configuration of IoT devices - Systems managamentConfiguration of IoT devices - Systems managament
Configuration of IoT devices - Systems managamentBharaniDharan195623
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionMebane Rash
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating SystemRashmi Bhat
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...Erbil Polytechnic University
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadaditya806802
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communicationpanditadesh123
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdfHafizMudaserAhmad
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptMadan Karki
 

Recently uploaded (20)

Designing pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptxDesigning pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptx
 
DM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in projectDM Pillar Training Manual.ppt will be useful in deploying TPM in project
DM Pillar Training Manual.ppt will be useful in deploying TPM in project
 
National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdf
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
Engineering Drawing section of solid
Engineering Drawing     section of solidEngineering Drawing     section of solid
Engineering Drawing section of solid
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event Scheduling
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptx
 
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfgUnit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
Unit7-DC_Motors nkkjnsdkfnfcdfknfdgfggfg
 
Configuration of IoT devices - Systems managament
Configuration of IoT devices - Systems managamentConfiguration of IoT devices - Systems managament
Configuration of IoT devices - Systems managament
 
US Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of ActionUS Department of Education FAFSA Week of Action
US Department of Education FAFSA Week of Action
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating System
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
home automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasadhome automation using Arduino by Aditya Prasad
home automation using Arduino by Aditya Prasad
 
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes  examplesPOWER SYSTEMS-1 Complete notes  examples
POWER SYSTEMS-1 Complete notes examples
 
multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communication
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf
 
Indian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.pptIndian Dairy Industry Present Status and.ppt
Indian Dairy Industry Present Status and.ppt
 

SMED overview

  • 1. SMED – Changeover Reduction www.optimumfx.com
  • 2. Intent of Session • Minimise impact of Changeovers • Define the SMED methodology and process • Outline the key benefits of carrying out changeover reduction (SMED) process
  • 3. What is a Changeover? The time taken to change-over a machine from the last “Good” part off one run to the first “Good” part off the next run (including all the adjustments needed to get the machine running to the correct production speed / cycle time). SPEED
  • 4. What is SMED? • SMED stands for Single Minute Exchange of Die and is a process for effectively reducing the time it takes to change the parts on a machine. • This process was developed by a man called Shiego Shingo for the motor car industry in 1969. He reduced a setup in Toyota Motor Company, Japan on a 1000 ton press from 4 hours to 1 hour 30 minutes in 6 months and then to under 3 minutes after a further 3 months. This was achieved through team work and following 4 simple steps.
  • 5. Why SMED? Consider the process of changing a car tyre: • You may change a tyre in15min • By using the SMED process Formula 1 teams achieve the same changeover in 4.5s “Pit Stop” mentality SMED process
  • 6. How does SMED work? 5 key stages: 1. Break the process into manageable elements 2. Identify the elements that can be prepared in advance 3. Identify how the remaining elements could be engineered out of the process 4. Reduce the duration of the stages that are left through team work and organisation, or with engineering 5. Document the changes as work instructions and training aids
  • 7. The SMED Process Step 1: Identify elements • Record your changeover. We recommend using a video recorder and manual observation. • As a team break the changeover into 30-50 elements. Ensure that these are of a reasonable length – if one element contains 5min of activity then you will need to break this down into smaller chunks. Step 2: Identify internal and external elements • Internal elements are stages that can ONLY occur when the machine is stopped. External elements are stages that can occur when the machine is running. Step 3: Convert internal elements to external elements • Re-examine the operation and identify how EACH internal element could be made into an external element. Step 4: Streamline and standardise the remaining elements • How could each element be reduced in length either through tools, engineering or more people. Step 5: Create Standard Operating Procedures (SOPs) • Write detailed and easy to use operating procedures and train across all shifts
  • 8. Step 1 • Record the changeover process – Use a Video Camera – Record all relevant steps • Split into individual elements – Make steps reasonable length, aim to achieve 20-50 elements per process (therefore single step in 60 min process would be between 1- 2 mins) Identify elements in changeover process
  • 9. Step 2 • Decide which elements can be performed while the machine is still running and therefore these are now ‘external’ elements. • As external elements can be done while the machine is running they can be eliminated from the overall change- over time. • The elements that have to be performed when the machine is shut down are ‘internal elements’. Distinguish between Internal and External Elements
  • 10. Step 3 • Re-examine operations to see whether any steps are wrongly assumed to be internal and move to external. • Find ways to convert internal elements to external elements Internal External Using innovation Convert Internal to External Elements
  • 11. Step 4 • Need detailed analysis of each element. Question the purpose of it, can the entire element be eliminated? • If it cannot be eliminated what is needed in order for the elements to be easier to do and therefore take less time. • Needs innovations and ideas i.e. machine stops and guides, butterfly bolts rather than hex, air tools. Streamline all aspects of the Change-over
  • 12. Step 5 • Define the best standard • Create a Standard Operating Procedure (SOP) • Train all operators to the new standard Streamline all aspects of the Change-over
  • 13. Why is it effective? • Emphasis on preparation, correct procedure, teamwork, and organisation. • Most engineering-based sites do some great engineering work to reduce time – very few put the same effort into team organisation and preparation….SMED teaches that this is the key opportunity in reducing planned downtime. Engineering tasks – large opportunity but with huge time investment. People + organisation deliver the largest improvement
  • 14. The Benefits of SMED 6 key benefits: • Greater levels of productivity • Increased safety • Increased quality • Reduction in overtime costs • Greater production flexibility • Increased motivation
  • 15. Greater productivity • SMED directly reduces your planned downtime duration and increases OEE. • Through analysing and applying SMED thinking to your existing set- up methods, you'll cut changeover time by at least 45%.
  • 16. Increased safety • The ultimate example of SMED application was the wheel changes that used to win or loose Formula One races. • If I get a flat at the roadside, it takes me 15-20 minutes to change ONE wheel. A Formula One team on race day could change all FOUR wheels in less than one man-minute. • Yet data from the Royal Society for The Prevention of Accidents shows that when I change a wheel, there's a 28 in 10,000 chance that I'll end up in hospital as a result. • The comparative figure for Formula One is 6 in 10,000. In other words, it's almost five times safer. • The lesson is that there's no point being fast, if you injure your team. • So set-up methods that have been designed using SMED methods are SAFE, SYSTEMISED, and SPEEDY.
  • 17. Increased quality • A key output of the SMED process is that the changeover must be right first time – Imagine the impact of your car wheel coming off after changeover… • SMED specifies that not only should the changeover be faster – but it MUST be right first time • All SMED procedures are fully documented to ensure that new operators can be trained to ensure right first time quality.
  • 18. Reduced overtime • Pretty much every manufacturing firm uses overtime to cope with peaks in demand from customers. • Staff work longer hours, but at a premium rate, in order to keep up with demand. • Overtime is typically paid at 25%-100% more than standard labour rate, so an reduction in the amount of 'work' that needs doing in a week, while still achieving the required output has to be worth doing. • In a typical factory, applying SMED can reduce overtime bills by 69%, and the total labour bill by 16%. • With costs that much lower, you can either undercut competitors, or significantly boost bottom-line profits!
  • 19. Greater flexibility • Customers are funny, aren't they, the way they always seem to phone on Friday afternoon, desperate for a rush order, or a change in the schedule. I'm sure it's not deliberate. • Unfortunately, many companies choose to build a buffer between their production and customers. And in a world where product life- cycles are getting sorter and shorter (less than three months now for a lap-top, apparently!), that's a highly risky strategy. • If your current set-up times are 90 minutes, last-minute orders from customers are probably a huge irritation, meaning re-scheduling or production and making trade-offs between efficiency and keeping the customer happy. • Now imagine that using SMED, you've reduced your set-up times to 9 minutes. Are last-minute orders or changes to schedules something that you'd even worry about any more?
  • 20. Motivation • It's a question of what motivates people. Almost everyone goes to work in general for the money. If you stop paying, then they'll stop turning up! • However, almost everyone chooses to work for a specific employer. The way they are treated, how they get on with their colleagues, and the respect they feel all have a powerful pull. • You can only apply SMED successfully through tapping into the experience and creativity of the people who run the equipment you're trying to improve. Allowing people to be creative, express, and even try out ideas is a HUGE motivator. • Indeed, this is one of the most common comments that clients make to us after a SMED programme - their staff are suddenly alive, and taking an interest in making their company more successful.