CAMBODIA’S
NATIONAL
SOLAR PARK
• How an ADB-supported project delivered ASEAN’s lowest solar energy tariff
• How ADB is using Cambodia's solar energy success to expand work across ASEAN
29 October 2019 | Paris, France
1
Video Narrative
https://www.adb.org/news/videos/helping-cambodia-transition-cleaner-energy-0
2
Solar PV Plant Tender Process: Based on International Best Practices
Evaluation Process
Pre-Bid
Engagement
• Pre-bid meeting.
• Site visit
• Response to
Bidders
clarifications
Best and Final
Offer (BAFO)
• Tariff proposed
in BAFO
proposal should
not be greater
than tariff in
Financial
proposal
• Designed to
attract best
possible price for
EDC
Financial
Evaluation
• Compliance with
financial
requirements
mentioned in the
IFB
Technical
Evaluation
• Compliance with
technical
requirements
mentioned in the
IFB
Prequalification
• Pre-qualification
based on
financial and
technical criteria
• Ensures
selection of only
credible
developers
Negotiation
& Project
Award
Signing of
Project
Agreements
Financial
Closure
Launch of
Tender
Documents
26 bids
received
18 bidders
prequalified
18 bids
technically
compliant
Tariff: USc
4.415 /
kWh
Tariff: USc
3.877 /
kWh
Pre-bid Meeting Site Visit Public Opening of
Financial Proposal
Public Opening of BAFO
148 bidders
purchased tender
documents
3
3
Project attracted Interest from 26 Foreign as well as Local Bidders
International Bidders
Local Bidders
Shaanxi Snock
Co. Ltd.
B. Grimm Power
(Poipet) Co., Ltd.
Green Yellow
Simplified Ltd. Co.NPS 789 Green
Energy Co., Ltd.
Kaishan
International
Harbin Jiuzhou
Electric Co.
VKON Power
(VBB)
Glow Energy
Prime Road
Alternative Co.
Gia Lai Electricity
Co.
China Malaysia
ThailandSingapore Philippines
U.A.E Vietnam France Japan India
Note: The mentioned bidders have been classified into International and Local based on country of registration of bidding entities.
4
4
Tariff for First Phase of Cambodia National Solar Park:
Lowest in the ASEAN region
9.1
7.6
3.877
4.2
7.9
9.4
0
1
2
3
4
5
6
7
8
9
10
10 MW Bavet Solar PV,
Cambodia
2016
4 Projects - Cummulative 140 MW
Solar PV, Cambodia
2018-19
60 MW Solar PV, Cambodia
National Solar Park
2019
100 MW Solar PV, Malaysia LSS
III
2019
Indonesia Price Ceiling (avoided
cost, BPP)
Vietnam FiT
201
201
9
USD cents / kWh
Cambodia
Other ASEAN
Countries
Lowest Tariff in ASEAN
5
5
PART II:
EXPANDING
CLEAN AND
AFFORDABLE
POWER IN
ASEAN
6
The ADB solution will focus on catalyzing green
finance from public and private sectors.
The ADB solution will support all types of renewable
energy projects with scale, low cost and high
replicability potential. Technologies covered are:
• Ground-mounted solar PV
• Floating solar PV
• Onshore wind
• Offshore wind
• Energy storage and hybrid solutions
The ADB solution
7
The ADB Enabling Clean &
Affordable Power in ASEAN
Program leverages on all
possible ADB supports and
provides a one-stop shop
for governments and
private sector
ADB’s Program
8
PROJECT PREPARATION
(1) Pre-project development support
(2) Transaction advisory support
TENDER PROCESS
ADB will accompany the government partner
through the tender / auction from end to end.
FINANCIAL CLOSE
In addition to sovereign funding wherever
appropriate, during financial close, ADB will
leverage on possible non sovereign financing to
the winning bidder, as well as sovereign or non-
sovereign guarantees.
ADB will be providing an end to end
solution to respective ASEAN
government/public utility, for the scaling up
of their renewable capacity, from project
definition to financial close.
How does the ADB
program work?
9
Key Contacts
Pradeep Tharakan
ptharakan@adb.org
Southeast Asia Energy Division
23
Siddharta Shah
sidshah@adb.org
Office of Public Private Partnerships
10
Project in a Glance
OVERVIEW
The Project consists of two key components:
• Solar Park Facility
⚬ The solar park facility will include land, substation and
transmission line to connect to the grid.
⚬ Facility will be constructed by Electricite Du Cambodge (EDC)
using public sector financing to accommodate up to 100 MW of
solar PV power generation.
⚬ Land required for the park will be acquired by EDC.
⚬ Construction is being financed through an ADB sovereign loan.
• Solar PV Plants
⚬ Solar PV power pants within the park will be developed, financed,
constructed, operated and maintained by the private sector.
⚬ Power to be purchased by EDC under a PPA, the tariff for which
will be determined through a competitive process.
⚬ Tender process for first phase of 60 MW is currently underway.
Additional solar power plants supplying the remaining capacity
are expected to be tendered out in a subsequent phase.
KEY PROJECT COMPONENTS
11

Mais conteúdo relacionado

Mais procurados

Engage with...Performance Projects
Engage with...Performance ProjectsEngage with...Performance Projects
Engage with...Performance ProjectsKTN
 
Horizon 2020 Green Deal: Information and Consortia Building Event Series, 9 O...
Horizon 2020 Green Deal: Information and Consortia Building Event Series, 9 O...Horizon 2020 Green Deal: Information and Consortia Building Event Series, 9 O...
Horizon 2020 Green Deal: Information and Consortia Building Event Series, 9 O...KTN
 
Horizon 2020 Green Deal: Information and Consortia Building Event Series, 15 ...
Horizon 2020 Green Deal: Information and Consortia Building Event Series, 15 ...Horizon 2020 Green Deal: Information and Consortia Building Event Series, 15 ...
Horizon 2020 Green Deal: Information and Consortia Building Event Series, 15 ...KTN
 
Programme Management challenges on the UK Governments Geological Disposal Fac...
Programme Management challenges on the UK Governments Geological Disposal Fac...Programme Management challenges on the UK Governments Geological Disposal Fac...
Programme Management challenges on the UK Governments Geological Disposal Fac...Association for Project Management
 
Zero Emission Vehicle Innovation Grant Announcement by Tomas Endicott
Zero Emission Vehicle Innovation Grant Announcement by Tomas EndicottZero Emission Vehicle Innovation Grant Announcement by Tomas Endicott
Zero Emission Vehicle Innovation Grant Announcement by Tomas EndicottForth
 
Heating without the hot air: Principles for smart heat electrification
Heating without the hot air: Principles for smart heat electrificationHeating without the hot air: Principles for smart heat electrification
Heating without the hot air: Principles for smart heat electrificationLeonardo ENERGY
 
Remida energy agency of la ribera - gorizia 13.5.2015
Remida   energy agency of la ribera - gorizia 13.5.2015Remida   energy agency of la ribera - gorizia 13.5.2015
Remida energy agency of la ribera - gorizia 13.5.2015Informest
 
Sasniedzot energoefektivitātes mērķus publiskajā sektorā ar ārpus bilances pr...
Sasniedzot energoefektivitātes mērķus publiskajā sektorā ar ārpus bilances pr...Sasniedzot energoefektivitātes mērķus publiskajā sektorā ar ārpus bilances pr...
Sasniedzot energoefektivitātes mērķus publiskajā sektorā ar ārpus bilances pr...Ekonomikas ministrija/ Dzīvo siltāk
 
Energy Show 2022 - Deep Retrofit, Insulation and Recovery Plan
Energy Show 2022 - Deep Retrofit, Insulation and Recovery PlanEnergy Show 2022 - Deep Retrofit, Insulation and Recovery Plan
Energy Show 2022 - Deep Retrofit, Insulation and Recovery PlanSustainableEnergyAut
 
Flexibility options in the electricity system
Flexibility options in the electricity systemFlexibility options in the electricity system
Flexibility options in the electricity systemLeonardo ENERGY
 
How demand for flexibility will develop in the German power system
How demand for flexibility will develop in the German power systemHow demand for flexibility will develop in the German power system
How demand for flexibility will develop in the German power systemLeonardo ENERGY
 
An innovation pipeline for hydrogen & fuel cells b. madden
An innovation pipeline for hydrogen & fuel cells   b. maddenAn innovation pipeline for hydrogen & fuel cells   b. madden
An innovation pipeline for hydrogen & fuel cells b. maddenEuropean Commission
 
Plaša mēroga PPP EPC pieeja Ļubļanas pilsētas ēku atjaunošanai
Plaša mēroga PPP EPC pieeja Ļubļanas pilsētas ēku atjaunošanaiPlaša mēroga PPP EPC pieeja Ļubļanas pilsētas ēku atjaunošanai
Plaša mēroga PPP EPC pieeja Ļubļanas pilsētas ēku atjaunošanaiEkonomikas ministrija/ Dzīvo siltāk
 
Financing REnnovates retrofit
Financing REnnovates retrofit Financing REnnovates retrofit
Financing REnnovates retrofit Henri Relyveld
 

Mais procurados (20)

Engage with...Performance Projects
Engage with...Performance ProjectsEngage with...Performance Projects
Engage with...Performance Projects
 
CoM Barcelona_Bossio
CoM Barcelona_BossioCoM Barcelona_Bossio
CoM Barcelona_Bossio
 
Horizon 2020 Green Deal: Information and Consortia Building Event Series, 9 O...
Horizon 2020 Green Deal: Information and Consortia Building Event Series, 9 O...Horizon 2020 Green Deal: Information and Consortia Building Event Series, 9 O...
Horizon 2020 Green Deal: Information and Consortia Building Event Series, 9 O...
 
Horizon 2020 Green Deal: Information and Consortia Building Event Series, 15 ...
Horizon 2020 Green Deal: Information and Consortia Building Event Series, 15 ...Horizon 2020 Green Deal: Information and Consortia Building Event Series, 15 ...
Horizon 2020 Green Deal: Information and Consortia Building Event Series, 15 ...
 
Programme Management challenges on the UK Governments Geological Disposal Fac...
Programme Management challenges on the UK Governments Geological Disposal Fac...Programme Management challenges on the UK Governments Geological Disposal Fac...
Programme Management challenges on the UK Governments Geological Disposal Fac...
 
Zero Emission Vehicle Innovation Grant Announcement by Tomas Endicott
Zero Emission Vehicle Innovation Grant Announcement by Tomas EndicottZero Emission Vehicle Innovation Grant Announcement by Tomas Endicott
Zero Emission Vehicle Innovation Grant Announcement by Tomas Endicott
 
Heating without the hot air: Principles for smart heat electrification
Heating without the hot air: Principles for smart heat electrificationHeating without the hot air: Principles for smart heat electrification
Heating without the hot air: Principles for smart heat electrification
 
Remida energy agency of la ribera - gorizia 13.5.2015
Remida   energy agency of la ribera - gorizia 13.5.2015Remida   energy agency of la ribera - gorizia 13.5.2015
Remida energy agency of la ribera - gorizia 13.5.2015
 
Sasniedzot energoefektivitātes mērķus publiskajā sektorā ar ārpus bilances pr...
Sasniedzot energoefektivitātes mērķus publiskajā sektorā ar ārpus bilances pr...Sasniedzot energoefektivitātes mērķus publiskajā sektorā ar ārpus bilances pr...
Sasniedzot energoefektivitātes mērķus publiskajā sektorā ar ārpus bilances pr...
 
OPTEMUS - Optimised Energy Management and Use
OPTEMUS - Optimised Energy Management and UseOPTEMUS - Optimised Energy Management and Use
OPTEMUS - Optimised Energy Management and Use
 
Energy Show 2022 - Deep Retrofit, Insulation and Recovery Plan
Energy Show 2022 - Deep Retrofit, Insulation and Recovery PlanEnergy Show 2022 - Deep Retrofit, Insulation and Recovery Plan
Energy Show 2022 - Deep Retrofit, Insulation and Recovery Plan
 
ALISE - Advanced Lithium Sulphur battery for xEV
ALISE - Advanced Lithium Sulphur battery for xEV ALISE - Advanced Lithium Sulphur battery for xEV
ALISE - Advanced Lithium Sulphur battery for xEV
 
Energoefektivitātes pakalpojuma līgumi Slovēnijā
Energoefektivitātes pakalpojuma līgumi SlovēnijāEnergoefektivitātes pakalpojuma līgumi Slovēnijā
Energoefektivitātes pakalpojuma līgumi Slovēnijā
 
ILP Scotland webinar: Edinburgh’s 64,000 energy efficient project
ILP Scotland webinar: Edinburgh’s 64,000 energy efficient projectILP Scotland webinar: Edinburgh’s 64,000 energy efficient project
ILP Scotland webinar: Edinburgh’s 64,000 energy efficient project
 
Flexibility options in the electricity system
Flexibility options in the electricity systemFlexibility options in the electricity system
Flexibility options in the electricity system
 
How demand for flexibility will develop in the German power system
How demand for flexibility will develop in the German power systemHow demand for flexibility will develop in the German power system
How demand for flexibility will develop in the German power system
 
An innovation pipeline for hydrogen & fuel cells b. madden
An innovation pipeline for hydrogen & fuel cells   b. maddenAn innovation pipeline for hydrogen & fuel cells   b. madden
An innovation pipeline for hydrogen & fuel cells b. madden
 
Plaša mēroga PPP EPC pieeja Ļubļanas pilsētas ēku atjaunošanai
Plaša mēroga PPP EPC pieeja Ļubļanas pilsētas ēku atjaunošanaiPlaša mēroga PPP EPC pieeja Ļubļanas pilsētas ēku atjaunošanai
Plaša mēroga PPP EPC pieeja Ļubļanas pilsētas ēku atjaunošanai
 
Financing REnnovates retrofit
Financing REnnovates retrofit Financing REnnovates retrofit
Financing REnnovates retrofit
 
CCS in H2020: Overview, Lessons Learned and Next Steps - webinar hosted by th...
CCS in H2020: Overview, Lessons Learned and Next Steps - webinar hosted by th...CCS in H2020: Overview, Lessons Learned and Next Steps - webinar hosted by th...
CCS in H2020: Overview, Lessons Learned and Next Steps - webinar hosted by th...
 

Semelhante a Pradeep Tharakan - Cambodia's National Solar Park

Floating Offshore Wind Demonstration Programme - Competition Briefing
Floating Offshore Wind Demonstration Programme - Competition BriefingFloating Offshore Wind Demonstration Programme - Competition Briefing
Floating Offshore Wind Demonstration Programme - Competition BriefingKTN
 
projectfinancingandpublicprivatepartnershipppp-191120191032.pdf
projectfinancingandpublicprivatepartnershipppp-191120191032.pdfprojectfinancingandpublicprivatepartnershipppp-191120191032.pdf
projectfinancingandpublicprivatepartnershipppp-191120191032.pdfSeshukumar53
 
Project financing and public private partnership (ppp)
Project financing and public private partnership (ppp)Project financing and public private partnership (ppp)
Project financing and public private partnership (ppp)M. Asim U Khan
 
Market information meeting - Flagship Events Project Management
Market information meeting - Flagship Events Project ManagementMarket information meeting - Flagship Events Project Management
Market information meeting - Flagship Events Project ManagementSustainableEnergyAut
 
Meridian 3: autonomous highway, rural and parking test facilities: Competitio...
Meridian 3: autonomous highway, rural and parking test facilities: Competitio...Meridian 3: autonomous highway, rural and parking test facilities: Competitio...
Meridian 3: autonomous highway, rural and parking test facilities: Competitio...KTN
 
Practical guide book - Solar Streetlights - International Solar Alliance
Practical guide book - Solar Streetlights - International Solar AlliancePractical guide book - Solar Streetlights - International Solar Alliance
Practical guide book - Solar Streetlights - International Solar AllianceMartin Saunier-Plumaz
 
MCE Learning and Teaching Version 2.0 Page 1 of 6 Cour
MCE  Learning and Teaching Version 2.0  Page 1 of 6 CourMCE  Learning and Teaching Version 2.0  Page 1 of 6 Cour
MCE Learning and Teaching Version 2.0 Page 1 of 6 CourAbramMartino96
 
Financing Energy Optimization Projects
Financing Energy Optimization Projects Financing Energy Optimization Projects
Financing Energy Optimization Projects Avanceon
 
2021 SEAI RD&D Funding Call Webinar
2021 SEAI RD&D Funding Call Webinar 2021 SEAI RD&D Funding Call Webinar
2021 SEAI RD&D Funding Call Webinar SustainableEnergyAut
 
Project Development Routemap - Infrastructure Foundation Masterclass
Project Development Routemap - Infrastructure Foundation  MasterclassProject Development Routemap - Infrastructure Foundation  Masterclass
Project Development Routemap - Infrastructure Foundation MasterclassCaribbean Development Bank
 
From EU Project to Market Enabler: Creating the Marketplace for Sustainable E...
From EU Project to Market Enabler: Creating the Marketplace for Sustainable E...From EU Project to Market Enabler: Creating the Marketplace for Sustainable E...
From EU Project to Market Enabler: Creating the Marketplace for Sustainable E...Leonardo ENERGY
 
Clean Energy Finance and Investment Roadmap OECD.pdf
Clean Energy Finance and Investment Roadmap OECD.pdfClean Energy Finance and Investment Roadmap OECD.pdf
Clean Energy Finance and Investment Roadmap OECD.pdfOECD Environment
 
CEFIM Industry Indonesia.pdf
CEFIM Industry Indonesia.pdfCEFIM Industry Indonesia.pdf
CEFIM Industry Indonesia.pdfOECD Environment
 
RE:FIT LONDON – Making London a resilient, sustainable and resource efficient...
RE:FIT LONDON – Making London a resilient, sustainable and resource efficient...RE:FIT LONDON – Making London a resilient, sustainable and resource efficient...
RE:FIT LONDON – Making London a resilient, sustainable and resource efficient...EMEX
 

Semelhante a Pradeep Tharakan - Cambodia's National Solar Park (20)

Floating Offshore Wind Demonstration Programme - Competition Briefing
Floating Offshore Wind Demonstration Programme - Competition BriefingFloating Offshore Wind Demonstration Programme - Competition Briefing
Floating Offshore Wind Demonstration Programme - Competition Briefing
 
Sarah Eager
Sarah EagerSarah Eager
Sarah Eager
 
Incentives enbridge-gbf2007
Incentives enbridge-gbf2007Incentives enbridge-gbf2007
Incentives enbridge-gbf2007
 
Acciona Energia Madrid Information Day
Acciona Energia Madrid Information DayAcciona Energia Madrid Information Day
Acciona Energia Madrid Information Day
 
projectfinancingandpublicprivatepartnershipppp-191120191032.pdf
projectfinancingandpublicprivatepartnershipppp-191120191032.pdfprojectfinancingandpublicprivatepartnershipppp-191120191032.pdf
projectfinancingandpublicprivatepartnershipppp-191120191032.pdf
 
Project financing and public private partnership (ppp)
Project financing and public private partnership (ppp)Project financing and public private partnership (ppp)
Project financing and public private partnership (ppp)
 
Market information meeting - Flagship Events Project Management
Market information meeting - Flagship Events Project ManagementMarket information meeting - Flagship Events Project Management
Market information meeting - Flagship Events Project Management
 
RDD 2022 Call Launch Webinar
RDD 2022 Call Launch WebinarRDD 2022 Call Launch Webinar
RDD 2022 Call Launch Webinar
 
Framework launch_vf.pdf
Framework launch_vf.pdfFramework launch_vf.pdf
Framework launch_vf.pdf
 
Meridian 3: autonomous highway, rural and parking test facilities: Competitio...
Meridian 3: autonomous highway, rural and parking test facilities: Competitio...Meridian 3: autonomous highway, rural and parking test facilities: Competitio...
Meridian 3: autonomous highway, rural and parking test facilities: Competitio...
 
Practical guide book - Solar Streetlights - International Solar Alliance
Practical guide book - Solar Streetlights - International Solar AlliancePractical guide book - Solar Streetlights - International Solar Alliance
Practical guide book - Solar Streetlights - International Solar Alliance
 
MCE Learning and Teaching Version 2.0 Page 1 of 6 Cour
MCE  Learning and Teaching Version 2.0  Page 1 of 6 CourMCE  Learning and Teaching Version 2.0  Page 1 of 6 Cour
MCE Learning and Teaching Version 2.0 Page 1 of 6 Cour
 
Financing Energy Optimization Projects
Financing Energy Optimization Projects Financing Energy Optimization Projects
Financing Energy Optimization Projects
 
2021 SEAI RD&D Funding Call Webinar
2021 SEAI RD&D Funding Call Webinar 2021 SEAI RD&D Funding Call Webinar
2021 SEAI RD&D Funding Call Webinar
 
Project Development Routemap - Infrastructure Foundation Masterclass
Project Development Routemap - Infrastructure Foundation  MasterclassProject Development Routemap - Infrastructure Foundation  Masterclass
Project Development Routemap - Infrastructure Foundation Masterclass
 
From EU Project to Market Enabler: Creating the Marketplace for Sustainable E...
From EU Project to Market Enabler: Creating the Marketplace for Sustainable E...From EU Project to Market Enabler: Creating the Marketplace for Sustainable E...
From EU Project to Market Enabler: Creating the Marketplace for Sustainable E...
 
Clean Energy Finance and Investment Roadmap OECD.pdf
Clean Energy Finance and Investment Roadmap OECD.pdfClean Energy Finance and Investment Roadmap OECD.pdf
Clean Energy Finance and Investment Roadmap OECD.pdf
 
CEFIM Industry Indonesia.pdf
CEFIM Industry Indonesia.pdfCEFIM Industry Indonesia.pdf
CEFIM Industry Indonesia.pdf
 
RE:FIT LONDON – Making London a resilient, sustainable and resource efficient...
RE:FIT LONDON – Making London a resilient, sustainable and resource efficient...RE:FIT LONDON – Making London a resilient, sustainable and resource efficient...
RE:FIT LONDON – Making London a resilient, sustainable and resource efficient...
 
Lessons Learnt from ROAD
Lessons Learnt from ROADLessons Learnt from ROAD
Lessons Learnt from ROAD
 

Mais de OECD Environment

Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...OECD Environment
 
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...OECD Environment
 
Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...OECD Environment
 
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...OECD Environment
 
Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...OECD Environment
 
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...OECD Environment
 
APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...OECD Environment
 
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGESThe U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGESOECD Environment
 
Problem formulation for environmental risk assessment – Finnish case study: ...
Problem formulation for environmental risk assessment – Finnish case study:  ...Problem formulation for environmental risk assessment – Finnish case study:  ...
Problem formulation for environmental risk assessment – Finnish case study: ...OECD Environment
 
Problem formulation for environmental risk assessment in the context of EC Re...
Problem formulation for environmental risk assessment in the context of EC Re...Problem formulation for environmental risk assessment in the context of EC Re...
Problem formulation for environmental risk assessment in the context of EC Re...OECD Environment
 
Canadian Perspective on Problem Formulation for Biopesticides: Emma Babij
Canadian Perspective on Problem Formulation for Biopesticides: Emma BabijCanadian Perspective on Problem Formulation for Biopesticides: Emma Babij
Canadian Perspective on Problem Formulation for Biopesticides: Emma BabijOECD Environment
 
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...OECD Environment
 
History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...OECD Environment
 
CCXG global forum, April 2025, Key takeaways
CCXG global forum, April 2025, Key takeawaysCCXG global forum, April 2025, Key takeaways
CCXG global forum, April 2025, Key takeawaysOECD Environment
 
CCXG global forum, April 2024, Mentimeter results
CCXG global forum, April 2024, Mentimeter resultsCCXG global forum, April 2024, Mentimeter results
CCXG global forum, April 2024, Mentimeter resultsOECD Environment
 
CCXG global forum, April 2024, Chiara Falduto
CCXG global forum, April 2024, Chiara FaldutoCCXG global forum, April 2024, Chiara Falduto
CCXG global forum, April 2024, Chiara FaldutoOECD Environment
 
CCXG global forum, April 2024, Siddharth Singh
CCXG global forum, April 2024, Siddharth SinghCCXG global forum, April 2024, Siddharth Singh
CCXG global forum, April 2024, Siddharth SinghOECD Environment
 
CCXG global forum, April 2024, Geraldine Ang
CCXG global forum, April 2024, Geraldine AngCCXG global forum, April 2024, Geraldine Ang
CCXG global forum, April 2024, Geraldine AngOECD Environment
 
CCXG global forum, April 2024, Raphaël Jachnik
CCXG global forum, April 2024, Raphaël JachnikCCXG global forum, April 2024, Raphaël Jachnik
CCXG global forum, April 2024, Raphaël JachnikOECD Environment
 
CCXG global forum, April 2024, Manjeet Dhakal
CCXG global forum, April 2024,  Manjeet DhakalCCXG global forum, April 2024,  Manjeet Dhakal
CCXG global forum, April 2024, Manjeet DhakalOECD Environment
 

Mais de OECD Environment (20)

Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
 
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
 
Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...
 
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
 
Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...
 
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
 
APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...
 
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGESThe U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
 
Problem formulation for environmental risk assessment – Finnish case study: ...
Problem formulation for environmental risk assessment – Finnish case study:  ...Problem formulation for environmental risk assessment – Finnish case study:  ...
Problem formulation for environmental risk assessment – Finnish case study: ...
 
Problem formulation for environmental risk assessment in the context of EC Re...
Problem formulation for environmental risk assessment in the context of EC Re...Problem formulation for environmental risk assessment in the context of EC Re...
Problem formulation for environmental risk assessment in the context of EC Re...
 
Canadian Perspective on Problem Formulation for Biopesticides: Emma Babij
Canadian Perspective on Problem Formulation for Biopesticides: Emma BabijCanadian Perspective on Problem Formulation for Biopesticides: Emma Babij
Canadian Perspective on Problem Formulation for Biopesticides: Emma Babij
 
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...
 
History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...
 
CCXG global forum, April 2025, Key takeaways
CCXG global forum, April 2025, Key takeawaysCCXG global forum, April 2025, Key takeaways
CCXG global forum, April 2025, Key takeaways
 
CCXG global forum, April 2024, Mentimeter results
CCXG global forum, April 2024, Mentimeter resultsCCXG global forum, April 2024, Mentimeter results
CCXG global forum, April 2024, Mentimeter results
 
CCXG global forum, April 2024, Chiara Falduto
CCXG global forum, April 2024, Chiara FaldutoCCXG global forum, April 2024, Chiara Falduto
CCXG global forum, April 2024, Chiara Falduto
 
CCXG global forum, April 2024, Siddharth Singh
CCXG global forum, April 2024, Siddharth SinghCCXG global forum, April 2024, Siddharth Singh
CCXG global forum, April 2024, Siddharth Singh
 
CCXG global forum, April 2024, Geraldine Ang
CCXG global forum, April 2024, Geraldine AngCCXG global forum, April 2024, Geraldine Ang
CCXG global forum, April 2024, Geraldine Ang
 
CCXG global forum, April 2024, Raphaël Jachnik
CCXG global forum, April 2024, Raphaël JachnikCCXG global forum, April 2024, Raphaël Jachnik
CCXG global forum, April 2024, Raphaël Jachnik
 
CCXG global forum, April 2024, Manjeet Dhakal
CCXG global forum, April 2024,  Manjeet DhakalCCXG global forum, April 2024,  Manjeet Dhakal
CCXG global forum, April 2024, Manjeet Dhakal
 

Último

Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170simranguptaxx69
 
Düsseldorf U学位证,杜塞尔多夫大学毕业证书1:1制作
Düsseldorf U学位证,杜塞尔多夫大学毕业证书1:1制作Düsseldorf U学位证,杜塞尔多夫大学毕业证书1:1制作
Düsseldorf U学位证,杜塞尔多夫大学毕业证书1:1制作f3774p8b
 
Science, Technology and Nation Building.pptx
Science, Technology and Nation Building.pptxScience, Technology and Nation Building.pptx
Science, Technology and Nation Building.pptxgrandmarshall132
 
Uae-NO1 Black Magic Specialist Expert In Bahawalpur, Sargodha, Sialkot, Sheik...
Uae-NO1 Black Magic Specialist Expert In Bahawalpur, Sargodha, Sialkot, Sheik...Uae-NO1 Black Magic Specialist Expert In Bahawalpur, Sargodha, Sialkot, Sheik...
Uae-NO1 Black Magic Specialist Expert In Bahawalpur, Sargodha, Sialkot, Sheik...Amil baba
 
Group 4The Species of the Atlantic Forest.pdf
Group 4The Species of the Atlantic Forest.pdfGroup 4The Species of the Atlantic Forest.pdf
Group 4The Species of the Atlantic Forest.pdfs2015004
 
Asexual-and-Sexual-Reproduction.huhupptx
Asexual-and-Sexual-Reproduction.huhupptxAsexual-and-Sexual-Reproduction.huhupptx
Asexual-and-Sexual-Reproduction.huhupptxMyBrightestStarParkJ
 
التغيرات المناخية وتاثيرها على القطاع الزراعي المصري
التغيرات المناخية وتاثيرها على القطاع الزراعي المصريالتغيرات المناخية وتاثيرها على القطاع الزراعي المصري
التغيرات المناخية وتاثيرها على القطاع الزراعي المصريRawhyaShaheen
 
Slide deck for the IPCC Briefing to Latvian Parliamentarians
Slide deck for the IPCC Briefing to Latvian ParliamentariansSlide deck for the IPCC Briefing to Latvian Parliamentarians
Slide deck for the IPCC Briefing to Latvian Parliamentariansipcc-media
 
NO1 Certified Rohani Amil In Islamabad Amil Baba in Rawalpindi Kala Jadu Amil...
NO1 Certified Rohani Amil In Islamabad Amil Baba in Rawalpindi Kala Jadu Amil...NO1 Certified Rohani Amil In Islamabad Amil Baba in Rawalpindi Kala Jadu Amil...
NO1 Certified Rohani Amil In Islamabad Amil Baba in Rawalpindi Kala Jadu Amil...Amil baba
 
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best ServicesDwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Servicesnajka9823
 
'Upcycling Research' presentation for SNU GSES
'Upcycling Research' presentation for SNU GSES'Upcycling Research' presentation for SNU GSES
'Upcycling Research' presentation for SNU GSESKyungeun Sung
 
INSIDER THREAT PREVENTION IN THE US BANKING SYSTEM
INSIDER THREAT PREVENTION IN THE US BANKING SYSTEMINSIDER THREAT PREVENTION IN THE US BANKING SYSTEM
INSIDER THREAT PREVENTION IN THE US BANKING SYSTEMijsc
 
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一z xss
 
https://www.facebook.com/people/Proper-Keto-Capsules-UK/61557989683758/
https://www.facebook.com/people/Proper-Keto-Capsules-UK/61557989683758/https://www.facebook.com/people/Proper-Keto-Capsules-UK/61557989683758/
https://www.facebook.com/people/Proper-Keto-Capsules-UK/61557989683758/dikjog
 
Species composition, diversity and community structure of mangroves in Barang...
Species composition, diversity and community structure of mangroves in Barang...Species composition, diversity and community structure of mangroves in Barang...
Species composition, diversity and community structure of mangroves in Barang...Open Access Research Paper
 
办理英属哥伦比亚大学毕业证成绩单|购买加拿大UBC文凭证书
办理英属哥伦比亚大学毕业证成绩单|购买加拿大UBC文凭证书办理英属哥伦比亚大学毕业证成绩单|购买加拿大UBC文凭证书
办理英属哥伦比亚大学毕业证成绩单|购买加拿大UBC文凭证书zdzoqco
 
Air Pollution Control Technique and application.
Air Pollution Control Technique and application.Air Pollution Control Technique and application.
Air Pollution Control Technique and application.yadavsuyash008
 

Último (20)

Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
Call Girls Sarovar Portico Naraina Hotel, New Delhi 9873777170
 
Düsseldorf U学位证,杜塞尔多夫大学毕业证书1:1制作
Düsseldorf U学位证,杜塞尔多夫大学毕业证书1:1制作Düsseldorf U学位证,杜塞尔多夫大学毕业证书1:1制作
Düsseldorf U学位证,杜塞尔多夫大学毕业证书1:1制作
 
Science, Technology and Nation Building.pptx
Science, Technology and Nation Building.pptxScience, Technology and Nation Building.pptx
Science, Technology and Nation Building.pptx
 
Uae-NO1 Black Magic Specialist Expert In Bahawalpur, Sargodha, Sialkot, Sheik...
Uae-NO1 Black Magic Specialist Expert In Bahawalpur, Sargodha, Sialkot, Sheik...Uae-NO1 Black Magic Specialist Expert In Bahawalpur, Sargodha, Sialkot, Sheik...
Uae-NO1 Black Magic Specialist Expert In Bahawalpur, Sargodha, Sialkot, Sheik...
 
Group 4The Species of the Atlantic Forest.pdf
Group 4The Species of the Atlantic Forest.pdfGroup 4The Species of the Atlantic Forest.pdf
Group 4The Species of the Atlantic Forest.pdf
 
Asexual-and-Sexual-Reproduction.huhupptx
Asexual-and-Sexual-Reproduction.huhupptxAsexual-and-Sexual-Reproduction.huhupptx
Asexual-and-Sexual-Reproduction.huhupptx
 
التغيرات المناخية وتاثيرها على القطاع الزراعي المصري
التغيرات المناخية وتاثيرها على القطاع الزراعي المصريالتغيرات المناخية وتاثيرها على القطاع الزراعي المصري
التغيرات المناخية وتاثيرها على القطاع الزراعي المصري
 
Slide deck for the IPCC Briefing to Latvian Parliamentarians
Slide deck for the IPCC Briefing to Latvian ParliamentariansSlide deck for the IPCC Briefing to Latvian Parliamentarians
Slide deck for the IPCC Briefing to Latvian Parliamentarians
 
PLANTILLAS DE MEMORAMA CIENCIAS NATURALES
PLANTILLAS DE MEMORAMA CIENCIAS NATURALESPLANTILLAS DE MEMORAMA CIENCIAS NATURALES
PLANTILLAS DE MEMORAMA CIENCIAS NATURALES
 
NO1 Certified Rohani Amil In Islamabad Amil Baba in Rawalpindi Kala Jadu Amil...
NO1 Certified Rohani Amil In Islamabad Amil Baba in Rawalpindi Kala Jadu Amil...NO1 Certified Rohani Amil In Islamabad Amil Baba in Rawalpindi Kala Jadu Amil...
NO1 Certified Rohani Amil In Islamabad Amil Baba in Rawalpindi Kala Jadu Amil...
 
Health Facility Electrification: State of Play
Health Facility Electrification: State of PlayHealth Facility Electrification: State of Play
Health Facility Electrification: State of Play
 
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best ServicesDwarka Call Girls 9643097474 Phone Number 24x7 Best Services
Dwarka Call Girls 9643097474 Phone Number 24x7 Best Services
 
'Upcycling Research' presentation for SNU GSES
'Upcycling Research' presentation for SNU GSES'Upcycling Research' presentation for SNU GSES
'Upcycling Research' presentation for SNU GSES
 
INSIDER THREAT PREVENTION IN THE US BANKING SYSTEM
INSIDER THREAT PREVENTION IN THE US BANKING SYSTEMINSIDER THREAT PREVENTION IN THE US BANKING SYSTEM
INSIDER THREAT PREVENTION IN THE US BANKING SYSTEM
 
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一
办理(Victoria毕业证书)维多利亚大学毕业证成绩单原版一比一
 
https://www.facebook.com/people/Proper-Keto-Capsules-UK/61557989683758/
https://www.facebook.com/people/Proper-Keto-Capsules-UK/61557989683758/https://www.facebook.com/people/Proper-Keto-Capsules-UK/61557989683758/
https://www.facebook.com/people/Proper-Keto-Capsules-UK/61557989683758/
 
Species composition, diversity and community structure of mangroves in Barang...
Species composition, diversity and community structure of mangroves in Barang...Species composition, diversity and community structure of mangroves in Barang...
Species composition, diversity and community structure of mangroves in Barang...
 
办理英属哥伦比亚大学毕业证成绩单|购买加拿大UBC文凭证书
办理英属哥伦比亚大学毕业证成绩单|购买加拿大UBC文凭证书办理英属哥伦比亚大学毕业证成绩单|购买加拿大UBC文凭证书
办理英属哥伦比亚大学毕业证成绩单|购买加拿大UBC文凭证书
 
young call girls in Janakpuri🔝 9953056974 🔝 escort Service
young call girls in Janakpuri🔝 9953056974 🔝 escort Serviceyoung call girls in Janakpuri🔝 9953056974 🔝 escort Service
young call girls in Janakpuri🔝 9953056974 🔝 escort Service
 
Air Pollution Control Technique and application.
Air Pollution Control Technique and application.Air Pollution Control Technique and application.
Air Pollution Control Technique and application.
 

Pradeep Tharakan - Cambodia's National Solar Park

  • 1. CAMBODIA’S NATIONAL SOLAR PARK • How an ADB-supported project delivered ASEAN’s lowest solar energy tariff • How ADB is using Cambodia's solar energy success to expand work across ASEAN 29 October 2019 | Paris, France 1
  • 3. Solar PV Plant Tender Process: Based on International Best Practices Evaluation Process Pre-Bid Engagement • Pre-bid meeting. • Site visit • Response to Bidders clarifications Best and Final Offer (BAFO) • Tariff proposed in BAFO proposal should not be greater than tariff in Financial proposal • Designed to attract best possible price for EDC Financial Evaluation • Compliance with financial requirements mentioned in the IFB Technical Evaluation • Compliance with technical requirements mentioned in the IFB Prequalification • Pre-qualification based on financial and technical criteria • Ensures selection of only credible developers Negotiation & Project Award Signing of Project Agreements Financial Closure Launch of Tender Documents 26 bids received 18 bidders prequalified 18 bids technically compliant Tariff: USc 4.415 / kWh Tariff: USc 3.877 / kWh Pre-bid Meeting Site Visit Public Opening of Financial Proposal Public Opening of BAFO 148 bidders purchased tender documents 3 3
  • 4. Project attracted Interest from 26 Foreign as well as Local Bidders International Bidders Local Bidders Shaanxi Snock Co. Ltd. B. Grimm Power (Poipet) Co., Ltd. Green Yellow Simplified Ltd. Co.NPS 789 Green Energy Co., Ltd. Kaishan International Harbin Jiuzhou Electric Co. VKON Power (VBB) Glow Energy Prime Road Alternative Co. Gia Lai Electricity Co. China Malaysia ThailandSingapore Philippines U.A.E Vietnam France Japan India Note: The mentioned bidders have been classified into International and Local based on country of registration of bidding entities. 4 4
  • 5. Tariff for First Phase of Cambodia National Solar Park: Lowest in the ASEAN region 9.1 7.6 3.877 4.2 7.9 9.4 0 1 2 3 4 5 6 7 8 9 10 10 MW Bavet Solar PV, Cambodia 2016 4 Projects - Cummulative 140 MW Solar PV, Cambodia 2018-19 60 MW Solar PV, Cambodia National Solar Park 2019 100 MW Solar PV, Malaysia LSS III 2019 Indonesia Price Ceiling (avoided cost, BPP) Vietnam FiT 201 201 9 USD cents / kWh Cambodia Other ASEAN Countries Lowest Tariff in ASEAN 5 5
  • 7. The ADB solution will focus on catalyzing green finance from public and private sectors. The ADB solution will support all types of renewable energy projects with scale, low cost and high replicability potential. Technologies covered are: • Ground-mounted solar PV • Floating solar PV • Onshore wind • Offshore wind • Energy storage and hybrid solutions The ADB solution 7
  • 8. The ADB Enabling Clean & Affordable Power in ASEAN Program leverages on all possible ADB supports and provides a one-stop shop for governments and private sector ADB’s Program 8
  • 9. PROJECT PREPARATION (1) Pre-project development support (2) Transaction advisory support TENDER PROCESS ADB will accompany the government partner through the tender / auction from end to end. FINANCIAL CLOSE In addition to sovereign funding wherever appropriate, during financial close, ADB will leverage on possible non sovereign financing to the winning bidder, as well as sovereign or non- sovereign guarantees. ADB will be providing an end to end solution to respective ASEAN government/public utility, for the scaling up of their renewable capacity, from project definition to financial close. How does the ADB program work? 9
  • 10. Key Contacts Pradeep Tharakan ptharakan@adb.org Southeast Asia Energy Division 23 Siddharta Shah sidshah@adb.org Office of Public Private Partnerships 10
  • 11. Project in a Glance OVERVIEW The Project consists of two key components: • Solar Park Facility ⚬ The solar park facility will include land, substation and transmission line to connect to the grid. ⚬ Facility will be constructed by Electricite Du Cambodge (EDC) using public sector financing to accommodate up to 100 MW of solar PV power generation. ⚬ Land required for the park will be acquired by EDC. ⚬ Construction is being financed through an ADB sovereign loan. • Solar PV Plants ⚬ Solar PV power pants within the park will be developed, financed, constructed, operated and maintained by the private sector. ⚬ Power to be purchased by EDC under a PPA, the tariff for which will be determined through a competitive process. ⚬ Tender process for first phase of 60 MW is currently underway. Additional solar power plants supplying the remaining capacity are expected to be tendered out in a subsequent phase. KEY PROJECT COMPONENTS 11