๏ƒ˜ This analysis focuses on the shift of labour
across sectors following the implementation of
Resources Efficient and CE policies.
๏ƒ˜Modelling tool: OECDโ€™s ENV-Linkages
general equilibrium model
โ€ข 25 regions
โ€ข 56 sectors, including recycling and 8 metal
processing sectors
โ€ข 60 raw materials linked to economic activities
Recently published report on the labour
impact of circular economy policies
2
Baseline Trends
Business as usual projections
4
The global economy will triple by 2060 but global growth slows down
Material use is going to double, despite relative decoupling between growth and material use
Economic growth will be accompanied with mild employment growth, increases in labour
productivity, and expansion of service sectors
1.9%
1.2%
0.3%
0.4%
1.7%
3.9%
1.4%
0.2%
0.4%
3.1%
3.7%
2.7%
1.7%
1.6%
1.9%
3.0%
1.6%
0.8%
0.9%
1.7%
GDP GROWTH MATERIAL USE
GROWTH
EMPLOYMENT
GROWTH
POPULATION
GROWTH
LABOUR
PRODUCTIVITY
GROWTH
OECD BRIICS Rest of the World WORLD
Source: OECD ENV-Linkages Model
Average annual growth rate (2017-2040)
Structural change shifts activity away from material
intensive sectors
Percentage changes in 2040 baseline projection relative to 2017 values, OECD.
5
-40%
-20%
0%
20%
40%
60%
80%
100%
120%
Employment Gross Output Average output growth
Labour implications of policies
to promote
Resource Efficiency and
Circular Economy transition
Instrument Description Global Targets (2040)
Material tax
Tax on primary
metals and non-
metallic minerals
โ€ข 10 $/t of iron ores
โ€ข 50 $/t of aluminium ores
โ€ข 20 $/t of copper ores
โ€ข 15 $/t of other metals ores
โ€ข 5 $/t of non-metallic minerals
Subsidy to
recycling good
Subsidy for
recycling input
uses
75% subsidy rate on the purchasing
price of the recycling commodity
Subsidy to
secondary metal
production
Production subsidy
to secondary metal
production
Subsidy on the producer (selling) price
of secondary metal - at level that
ensures the full package is revenue-
neutral (budget balance).
7
Material Fiscal Reform (MFR) scenario
โ€ข All these fiscal instruments are implemented from 2018 to gradually reach
their target in 2040.
โ€ข Government revenues from the material taxes are used to finance subsidies.
โ€ข Material taxes are differentiated across countries to take into account
existing royalties and taxes on mining sectors.
MFR is boosting resource efficiency and
employment gains seem possible
8
Percentage changes in 2040 compared to baseline
โ€“ range across aggregate country groups
Employment
0 to +0.1%
Metal use
-17 to -40%
GDP
0 to -0.4%
Minerals use
-4 to -12%
โ€ฆ
Source: OECD ENV-Linkages Model
The policy is efficient relative to its ultimate goal (reducing
environmental damages associated to mineral production and use)
with very low economic cost and even some employment gains.
MFR implies small aggregate employment
impacts with larger job reallocation
โ€ข The impact of material tax policies on total employment is very limited
โ€ข Labour markets dynamic is characterized by shifts of employment across
sectors
โ€ข MFR implies large labour shifts across sectors for limited impacts on GDP
โ€ข The policy will result in: 10 million jobs creations, and 8 million jobs
destructions globally by 2040
9
Changes w.r.t baseline in 2040 as % of total employment.
Source: OECD ENV-Linkages Model
Net
employment
growth
Job creations
Job
destructions
Total job
reallocation
OECD 0.05% 0.1% 0.1% 0.2%
BRIICS
0.05% 0.3% 0.3% 0.6%
Rest of the world 0.01% 0.2% 0.2% 0.4%
Differences across countries depending
on their economic structure
MFR scenario (percentage changes w.r.t baseline in 2040)
10
-50%
-40%
-30%
-20%
-10%
0%
10%
20%
-1.0%
-0.8%
-0.6%
-0.4%
-0.2%
0.0%
0.2%
Canada
Chile
Mexico
USA
OECDEU17
OECDEU4
OtherOECDEurasia
AustraliaandNewZealand
Japan
Korea
Brazil
OtherLatinAmerica
Caspianregion
OtherEU
OtherEurope
Russia
MiddleEast
NorthAfrica
OtherAfrica
SouthAfrica
China
India
Indonesia
OtherASEAN
Othernon-OECDAsia
OECD
America
OECD
Europe
OECD
Pacific
Latin
America
Rest of Europe
and Asia
Middle East
& Africa
South and
South-East Asia
World
Employment GDP Material intensity
Source: OECD ENV-Linkages Model
Employment/GDP
MaterialIntensity
-0.15%
-0.10%
-0.05%
0.00%
0.05%
0.10%
0.15%
2018 2020 2025 2030 2035 2040
Secondary based metals Recycling Other mining
Fossil extraction and transformation Chemicals Utilities
Construction Agriculture Fabricated Metal products
Machinery and equipment n.e.s. Non-metallic Minerals Primary based metals
Power generation Services Transport Equipment
Jobs shift towards less material intensive
sectors gradually
Changes w.r.t baseline as % of total baseline employment, 2018-2040
11
Source: OECD ENV-Linkages Model
Services
Secondary metals
Construction
Minerals
Primary metals
โ€ข The projected employment effect of the policy action
(MFR) is well within the range suggested by the
literature.
โ€ข MFR implies 10 millions of job creations but also 8
millions of job destructions globally in 2040.
โ€ข Although the net impact on employment is small,
some sectors are heavily affected โ€“ both in terms
of job creations (e.g. secondary materials, recycling,
services, utilities) and job destructions (e.g. primary
materials, non-metallic materials, construction)
Summary of findings
12
To maintain public support throughout the transition
process towards a circular economy, it is important:
- To carefully study the sectoral shifts in the labour
market
- To acknowledge the positive and negative implications
that may arise
Policy actions that could help to mitigate some of these
side effects:
- Implement training policies to help workers reskill or
upskill to compete successfully for new jobs (e.g. jobs shift
from material intensive sectors to services).
- Investments in R&D and digitalization to mitigate the
cost of substituting primary materials.
Policy messages
13
THANK YOU!
Eleonora.MAVROEIDI@oecd.org
https://www.oecd.org/environment/modelling.htm
https://doi.org/10.1787/19970900
โ€ข Global assessment (disaggregated to 12 large economies + 13 regions )
โ€ข 2060 time horizon
โ€ข 50+ economic sectors
โ€ข 60 materials
15
Overview of the articulation of models
and assumptions at OECD Environment Dir.
Multisectoral
model
ENV-Linkages
Material extraction data
Recycling technologies
data
Structural change
assumptions on demand
and production
Macro
model
ENV-Growth
Capital
accumulation
Total factor
productivity
Labour
Demographics
Economic
projections
Materials use
projections
Environmental
impacts
Sectoral Aggregation
Agriculture, Fisheries and Forestry Manufacturing
Paddy Rice Food Products
Wheat and Meslin Textiles
Other Grains Wood products
Vegetables and Fruits Chemicals
Oil Seeds Pulp, Paper and Publishing products
Sugar Cane and Sugar Beet Non-metallic Minerals
Fibres Plant Fabricated Metal products
Other Crops Electronics
Cattle and Raw Milk Motor Vehicles
Other Animal products Other Transport Equipment
Fisheries Other Machinery and Equipment
Forestry Recycling
Non-manufacturing Industries Iron and Steel - Primary
Coal extraction Iron and Steel โ€“ Secondary
Crude Oil extraction Aluminium โ€“ Primary
Natural Gas extraction Aluminium โ€“ Secondary
Other Mining Copper โ€“ Primary
Petroleum and Coal products Copper โ€“ Secondary
Gas distribution Other Non-ferrous Metals โ€“ Primary
Water Collection and Distribution Other Non-Ferrous metals โ€“ Secondary
Construction Other Manufacturing
Electricity Transmission and Distribution Services
Electricity Generation (8 technologies) Land Transport
Electricity generation: Nuclear Electricity; Hydro (and
Geothermal); Solar; Wind; Coal-powered electricity; Gas-
powered electricity; Oil-powered electricity; Other
(combustible renewable, waste, etc).
Air Transport
Water Transport
Business Services
Other Services (incl. Government)
BASELINE - Job creations in most sectors
across Non-OECD economies
Percentage changes in 2040 baseline projection relative to 2017 values.
18
-50%
0%
50%
100%
150%
200%
250%
Employment Gross Output Average growth Linear (Average growth)
Within OECD additional employment gains
captured in labor intensive sectors - services
OECD - Changes w.r.t. baseline in 2040
19
-20%
-10%
0%
10%
20%
30%
40%
50%
60%
-0.2
-0.1
0.0
0.1
0.2
0.3
0.4
0.5
0.6
Employment Gross output
MillionJobs
Outputgrowth
Source: OECD ENV-Linkages Model
Non-OECD benefit from lower material costs
Non โ€“OECD - Global variation in 2040 w.r.t. central baseline scenario
20
-20%
-10%
0%
10%
20%
30%
40%
50%
60%
70%
80%
-2.0
-1.0
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
8.0
Outputgrowth
Millionjobs
Employment Gross output
โ€ข Importers of raw materials benefit from lower input prices
โ€ข However, drop in OECD demand for primary metals, negatively affect
certain non-OECD economies (some Asian countries)
Partial implementation of MFR yields
leakages
-0.25%
-0.20%
-0.15%
-0.10%
-0.05%
0.00%
0.05%
0.10%
Canada
Chile
Mexico
USA
OECDEU17
OECDEU4
OtherOECDEurasia
AustraliaandNewZealand
Japan
Korea
Brazil
OtherLatinAmerica
Caspianregion
OtherEU
OtherEurope
Russia
MiddleEast
NorthAfrica
OtherAfrica
SouthAfrica
China
India
Indonesia
OtherASEAN
Othernon-OECDAsia
World
OECD
America
OECD
Europe
OECD
Pacific
Latin
America
Rest of Europe
and Asia
Middle East
& Africa
South and
South-East Asia
World
Employment Gross output
Changes w.r.t. baseline in 2040
Source: OECD ENV-Linkages Model

More Related Content

What's hot

B340723.pdf
B340723.pdfB340723.pdf
B340723.pdfajmrdjournals
ย 
Capital spending and Productivity for North America
Capital spending and Productivity for North AmericaCapital spending and Productivity for North America
Capital spending and Productivity for North Americapaul young cpa, cga
ย 
Government Policies and Market Analysis for Manufacturing in Canada
Government Policies and Market Analysis for Manufacturing in CanadaGovernment Policies and Market Analysis for Manufacturing in Canada
Government Policies and Market Analysis for Manufacturing in Canadapaul young cpa, cga
ย 
Theory of Technical dualism
Theory of Technical dualism Theory of Technical dualism
Theory of Technical dualism Sharin1234
ย 
Energy input, price and industrial output in pakistan
Energy input, price and industrial output in pakistanEnergy input, price and industrial output in pakistan
Energy input, price and industrial output in pakistanAlexander Decker
ย 
128-Junger Frontier measurement in STI
128-Junger Frontier measurement in STI128-Junger Frontier measurement in STI
128-Junger Frontier measurement in STIinnovationoecd
ย 
The U.S. - China Tradewar: A Boon for Southeast Asia
The U.S. - China Tradewar: A Boon for Southeast AsiaThe U.S. - China Tradewar: A Boon for Southeast Asia
The U.S. - China Tradewar: A Boon for Southeast AsiaGolden Gate Ventures
ย 
Europe semiconductor gas sensor industry 2016 market research report
Europe semiconductor gas sensor industry 2016 market research reportEurope semiconductor gas sensor industry 2016 market research report
Europe semiconductor gas sensor industry 2016 market research reportSherry Huang
ย 
Profit rate, distribution and technology in Chinaโ€™s industrial enterprises, 1...
Profit rate, distribution and technology in Chinaโ€™s industrial enterprises, 1...Profit rate, distribution and technology in Chinaโ€™s industrial enterprises, 1...
Profit rate, distribution and technology in Chinaโ€™s industrial enterprises, 1...pkconference
ย 
An Empirical Investigation of Factors Affecting Construction Sector Labour Pr...
An Empirical Investigation of Factors Affecting Construction Sector Labour Pr...An Empirical Investigation of Factors Affecting Construction Sector Labour Pr...
An Empirical Investigation of Factors Affecting Construction Sector Labour Pr...inventionjournals
ย 
Week 31 in Manufacturing News
Week 31 in Manufacturing NewsWeek 31 in Manufacturing News
Week 31 in Manufacturing NewsMRPeasy
ย 
Albert Park: Rising Wages, Labor Regulation, and the Future of Employment in ...
Albert Park: Rising Wages, Labor Regulation, and the Future of Employment in ...Albert Park: Rising Wages, Labor Regulation, and the Future of Employment in ...
Albert Park: Rising Wages, Labor Regulation, and the Future of Employment in ...HKUST IEMS
ย 
Index of Industrial Production and its comparison
Index of Industrial Production and its comparisonIndex of Industrial Production and its comparison
Index of Industrial Production and its comparisonAyush0734
ย 
The Future of U.S. Manufacturing: A Change Manifesto
The Future of U.S. Manufacturing: A Change ManifestoThe Future of U.S. Manufacturing: A Change Manifesto
The Future of U.S. Manufacturing: A Change ManifestoCognizant
ย 
SMART International Symposium for Next Generation Infrastructure: Macroeconom...
SMART International Symposium for Next Generation Infrastructure: Macroeconom...SMART International Symposium for Next Generation Infrastructure: Macroeconom...
SMART International Symposium for Next Generation Infrastructure: Macroeconom...SMART Infrastructure Facility
ย 

What's hot (20)

B340723.pdf
B340723.pdfB340723.pdf
B340723.pdf
ย 
Capital spending and Productivity for North America
Capital spending and Productivity for North AmericaCapital spending and Productivity for North America
Capital spending and Productivity for North America
ย 
Chicago employment update - May 2015
Chicago employment update - May 2015Chicago employment update - May 2015
Chicago employment update - May 2015
ย 
Government Policies and Market Analysis for Manufacturing in Canada
Government Policies and Market Analysis for Manufacturing in CanadaGovernment Policies and Market Analysis for Manufacturing in Canada
Government Policies and Market Analysis for Manufacturing in Canada
ย 
Theory of Technical dualism
Theory of Technical dualism Theory of Technical dualism
Theory of Technical dualism
ย 
Energy input, price and industrial output in pakistan
Energy input, price and industrial output in pakistanEnergy input, price and industrial output in pakistan
Energy input, price and industrial output in pakistan
ย 
Labour productivity
Labour productivityLabour productivity
Labour productivity
ย 
128-Junger Frontier measurement in STI
128-Junger Frontier measurement in STI128-Junger Frontier measurement in STI
128-Junger Frontier measurement in STI
ย 
The U.S. - China Tradewar: A Boon for Southeast Asia
The U.S. - China Tradewar: A Boon for Southeast AsiaThe U.S. - China Tradewar: A Boon for Southeast Asia
The U.S. - China Tradewar: A Boon for Southeast Asia
ย 
Europe semiconductor gas sensor industry 2016 market research report
Europe semiconductor gas sensor industry 2016 market research reportEurope semiconductor gas sensor industry 2016 market research report
Europe semiconductor gas sensor industry 2016 market research report
ย 
Productivity User Group, March 2018
Productivity User Group, March 2018Productivity User Group, March 2018
Productivity User Group, March 2018
ย 
Profit rate, distribution and technology in Chinaโ€™s industrial enterprises, 1...
Profit rate, distribution and technology in Chinaโ€™s industrial enterprises, 1...Profit rate, distribution and technology in Chinaโ€™s industrial enterprises, 1...
Profit rate, distribution and technology in Chinaโ€™s industrial enterprises, 1...
ย 
Economics
EconomicsEconomics
Economics
ย 
An Empirical Investigation of Factors Affecting Construction Sector Labour Pr...
An Empirical Investigation of Factors Affecting Construction Sector Labour Pr...An Empirical Investigation of Factors Affecting Construction Sector Labour Pr...
An Empirical Investigation of Factors Affecting Construction Sector Labour Pr...
ย 
Week 31 in Manufacturing News
Week 31 in Manufacturing NewsWeek 31 in Manufacturing News
Week 31 in Manufacturing News
ย 
Albert Park: Rising Wages, Labor Regulation, and the Future of Employment in ...
Albert Park: Rising Wages, Labor Regulation, and the Future of Employment in ...Albert Park: Rising Wages, Labor Regulation, and the Future of Employment in ...
Albert Park: Rising Wages, Labor Regulation, and the Future of Employment in ...
ย 
Index of Industrial Production and its comparison
Index of Industrial Production and its comparisonIndex of Industrial Production and its comparison
Index of Industrial Production and its comparison
ย 
The Future of U.S. Manufacturing: A Change Manifesto
The Future of U.S. Manufacturing: A Change ManifestoThe Future of U.S. Manufacturing: A Change Manifesto
The Future of U.S. Manufacturing: A Change Manifesto
ย 
Chicago jll employment update september 2015
Chicago jll employment update september 2015Chicago jll employment update september 2015
Chicago jll employment update september 2015
ย 
SMART International Symposium for Next Generation Infrastructure: Macroeconom...
SMART International Symposium for Next Generation Infrastructure: Macroeconom...SMART International Symposium for Next Generation Infrastructure: Macroeconom...
SMART International Symposium for Next Generation Infrastructure: Macroeconom...
ย 

Similar to Jobs Potential of a Transition to a Circular Economy - presentation by Eleonora Mavroeidi

Sri Lanka- Prioritised mitigation options in the third national communication...
Sri Lanka- Prioritised mitigation options in the third national communication...Sri Lanka- Prioritised mitigation options in the third national communication...
Sri Lanka- Prioritised mitigation options in the third national communication...Maxwell Ranasinghe
ย 
RobDellink_session2_Structural-Macroeconomic consequences.pdf
RobDellink_session2_Structural-Macroeconomic consequences.pdfRobDellink_session2_Structural-Macroeconomic consequences.pdf
RobDellink_session2_Structural-Macroeconomic consequences.pdfOECD Environment
ย 
Session 7a: Part II -Decarbonising industry - Hakimul Batih-CEFIM
Session 7a: Part II -Decarbonising industry - Hakimul Batih-CEFIMSession 7a: Part II -Decarbonising industry - Hakimul Batih-CEFIM
Session 7a: Part II -Decarbonising industry - Hakimul Batih-CEFIMOECD Environment
ย 
Green Talks LIVE | International Trade and the Circular Economy
Green Talks LIVE | International Trade and the Circular EconomyGreen Talks LIVE | International Trade and the Circular Economy
Green Talks LIVE | International Trade and the Circular EconomyOECD Environment
ย 
OECD Modelling Plastics Use Projections Workshop - IEA
OECD Modelling Plastics Use Projections Workshop - IEAOECD Modelling Plastics Use Projections Workshop - IEA
OECD Modelling Plastics Use Projections Workshop - IEAJack McNeill
ย 
Energy efficiency indicators in morocco aderee
Energy efficiency indicators in morocco adereeEnergy efficiency indicators in morocco aderee
Energy efficiency indicators in morocco adereeRCREEE
ย 
Industry2009 IEA roadmaps energy and steel aluminum chemicals cement biomass ...
Industry2009 IEA roadmaps energy and steel aluminum chemicals cement biomass ...Industry2009 IEA roadmaps energy and steel aluminum chemicals cement biomass ...
Industry2009 IEA roadmaps energy and steel aluminum chemicals cement biomass ...Steve Wittrig
ย 
Session 3 - Transition to a sustainable mining: a regional perspective
Session 3 - Transition to a sustainable mining: a regional perspectiveSession 3 - Transition to a sustainable mining: a regional perspective
Session 3 - Transition to a sustainable mining: a regional perspectiveOECD Environment
ย 
Energy Efficiency 2018 - South African Webinar
Energy Efficiency 2018 - South African Webinar Energy Efficiency 2018 - South African Webinar
Energy Efficiency 2018 - South African Webinar International Energy Agency
ย 
OECD International Trade and Circular Economy Workshop - Presentation by Elis...
OECD International Trade and Circular Economy Workshop - Presentation by Elis...OECD International Trade and Circular Economy Workshop - Presentation by Elis...
OECD International Trade and Circular Economy Workshop - Presentation by Elis...OECD Environment
ย 
Hall 2C Tuesday 09h30 - Dr Tebogo Makube
Hall 2C Tuesday 09h30 - Dr Tebogo MakubeHall 2C Tuesday 09h30 - Dr Tebogo Makube
Hall 2C Tuesday 09h30 - Dr Tebogo Makube7391456
ย 
Linking the energy crisis with climate change, Ritu Mathu, TERI University, I...
Linking the energy crisis with climate change, Ritu Mathu, TERI University, I...Linking the energy crisis with climate change, Ritu Mathu, TERI University, I...
Linking the energy crisis with climate change, Ritu Mathu, TERI University, I...ESD UNU-IAS
ย 
Business and Sustainable Development - The Green Race is On
Business and Sustainable Development - The Green Race is OnBusiness and Sustainable Development - The Green Race is On
Business and Sustainable Development - The Green Race is OnMichael Soron
ย 
Energy power shift 09_2016
Energy power shift 09_2016 Energy power shift 09_2016
Energy power shift 09_2016 Vasilis Rallis
ย 
Finance Models for Green Tech Startups, IPEEC 2012
Finance Models for Green Tech Startups, IPEEC 2012Finance Models for Green Tech Startups, IPEEC 2012
Finance Models for Green Tech Startups, IPEEC 2012nooone
ย 
Bjorn Stigson's Presentation to the V100 Business Forum
Bjorn Stigson's Presentation to the V100 Business ForumBjorn Stigson's Presentation to the V100 Business Forum
Bjorn Stigson's Presentation to the V100 Business ForumVenture Publishing
ย 
Bjorn Stigson's V100 Presentation
Bjorn Stigson's V100 PresentationBjorn Stigson's V100 Presentation
Bjorn Stigson's V100 PresentationVenture Publishing
ย 
Net Employment Benefits from Onshore Wind in 2020, Sarah Stanley, SEAI
Net Employment Benefits from Onshore Wind in 2020, Sarah Stanley, SEAINet Employment Benefits from Onshore Wind in 2020, Sarah Stanley, SEAI
Net Employment Benefits from Onshore Wind in 2020, Sarah Stanley, SEAISustainableEnergyAut
ย 

Similar to Jobs Potential of a Transition to a Circular Economy - presentation by Eleonora Mavroeidi (20)

Sri Lanka- Prioritised mitigation options in the third national communication...
Sri Lanka- Prioritised mitigation options in the third national communication...Sri Lanka- Prioritised mitigation options in the third national communication...
Sri Lanka- Prioritised mitigation options in the third national communication...
ย 
RobDellink_session2_Structural-Macroeconomic consequences.pdf
RobDellink_session2_Structural-Macroeconomic consequences.pdfRobDellink_session2_Structural-Macroeconomic consequences.pdf
RobDellink_session2_Structural-Macroeconomic consequences.pdf
ย 
Session 7a: Part II -Decarbonising industry - Hakimul Batih-CEFIM
Session 7a: Part II -Decarbonising industry - Hakimul Batih-CEFIMSession 7a: Part II -Decarbonising industry - Hakimul Batih-CEFIM
Session 7a: Part II -Decarbonising industry - Hakimul Batih-CEFIM
ย 
Green Talks LIVE | International Trade and the Circular Economy
Green Talks LIVE | International Trade and the Circular EconomyGreen Talks LIVE | International Trade and the Circular Economy
Green Talks LIVE | International Trade and the Circular Economy
ย 
OECD Modelling Plastics Use Projections Workshop - IEA
OECD Modelling Plastics Use Projections Workshop - IEAOECD Modelling Plastics Use Projections Workshop - IEA
OECD Modelling Plastics Use Projections Workshop - IEA
ย 
Energy efficiency indicators in morocco aderee
Energy efficiency indicators in morocco adereeEnergy efficiency indicators in morocco aderee
Energy efficiency indicators in morocco aderee
ย 
Industry2009 IEA roadmaps energy and steel aluminum chemicals cement biomass ...
Industry2009 IEA roadmaps energy and steel aluminum chemicals cement biomass ...Industry2009 IEA roadmaps energy and steel aluminum chemicals cement biomass ...
Industry2009 IEA roadmaps energy and steel aluminum chemicals cement biomass ...
ย 
Session 3 - Transition to a sustainable mining: a regional perspective
Session 3 - Transition to a sustainable mining: a regional perspectiveSession 3 - Transition to a sustainable mining: a regional perspective
Session 3 - Transition to a sustainable mining: a regional perspective
ย 
Energy Efficiency 2018 - South African Webinar
Energy Efficiency 2018 - South African Webinar Energy Efficiency 2018 - South African Webinar
Energy Efficiency 2018 - South African Webinar
ย 
OECD International Trade and Circular Economy Workshop - Presentation by Elis...
OECD International Trade and Circular Economy Workshop - Presentation by Elis...OECD International Trade and Circular Economy Workshop - Presentation by Elis...
OECD International Trade and Circular Economy Workshop - Presentation by Elis...
ย 
Hall 2C Tuesday 09h30 - Dr Tebogo Makube
Hall 2C Tuesday 09h30 - Dr Tebogo MakubeHall 2C Tuesday 09h30 - Dr Tebogo Makube
Hall 2C Tuesday 09h30 - Dr Tebogo Makube
ย 
Misato Sato
Misato SatoMisato Sato
Misato Sato
ย 
Linking the energy crisis with climate change, Ritu Mathu, TERI University, I...
Linking the energy crisis with climate change, Ritu Mathu, TERI University, I...Linking the energy crisis with climate change, Ritu Mathu, TERI University, I...
Linking the energy crisis with climate change, Ritu Mathu, TERI University, I...
ย 
Business and Sustainable Development - The Green Race is On
Business and Sustainable Development - The Green Race is OnBusiness and Sustainable Development - The Green Race is On
Business and Sustainable Development - The Green Race is On
ย 
Energy power shift 09_2016
Energy power shift 09_2016 Energy power shift 09_2016
Energy power shift 09_2016
ย 
Finance Models for Green Tech Startups, IPEEC 2012
Finance Models for Green Tech Startups, IPEEC 2012Finance Models for Green Tech Startups, IPEEC 2012
Finance Models for Green Tech Startups, IPEEC 2012
ย 
Bjorn Stigson's Presentation to the V100 Business Forum
Bjorn Stigson's Presentation to the V100 Business ForumBjorn Stigson's Presentation to the V100 Business Forum
Bjorn Stigson's Presentation to the V100 Business Forum
ย 
Bjorn Stigson's V100 Presentation
Bjorn Stigson's V100 PresentationBjorn Stigson's V100 Presentation
Bjorn Stigson's V100 Presentation
ย 
2017 Melchett Lecture
2017 Melchett Lecture2017 Melchett Lecture
2017 Melchett Lecture
ย 
Net Employment Benefits from Onshore Wind in 2020, Sarah Stanley, SEAI
Net Employment Benefits from Onshore Wind in 2020, Sarah Stanley, SEAINet Employment Benefits from Onshore Wind in 2020, Sarah Stanley, SEAI
Net Employment Benefits from Onshore Wind in 2020, Sarah Stanley, SEAI
ย 

More from OECD Environment

GREEN Action Task Force - Full Presentations.pdf
GREEN Action Task Force - Full Presentations.pdfGREEN Action Task Force - Full Presentations.pdf
GREEN Action Task Force - Full Presentations.pdfOECD Environment
ย 
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...OECD Environment
ย 
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...OECD Environment
ย 
Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...OECD Environment
ย 
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...OECD Environment
ย 
Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...OECD Environment
ย 
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...OECD Environment
ย 
APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...OECD Environment
ย 
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGESThe U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGESOECD Environment
ย 
Problem formulation for environmental risk assessment โ€“ Finnish case study: ...
Problem formulation for environmental risk assessment โ€“ Finnish case study:  ...Problem formulation for environmental risk assessment โ€“ Finnish case study:  ...
Problem formulation for environmental risk assessment โ€“ Finnish case study: ...OECD Environment
ย 
Problem formulation for environmental risk assessment in the context of EC Re...
Problem formulation for environmental risk assessment in the context of EC Re...Problem formulation for environmental risk assessment in the context of EC Re...
Problem formulation for environmental risk assessment in the context of EC Re...OECD Environment
ย 
Canadian Perspective on Problem Formulation for Biopesticides: Emma Babij
Canadian Perspective on Problem Formulation for Biopesticides: Emma BabijCanadian Perspective on Problem Formulation for Biopesticides: Emma Babij
Canadian Perspective on Problem Formulation for Biopesticides: Emma BabijOECD Environment
ย 
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...OECD Environment
ย 
History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...OECD Environment
ย 
CCXG global forum, April 2025, Key takeaways
CCXG global forum, April 2025, Key takeawaysCCXG global forum, April 2025, Key takeaways
CCXG global forum, April 2025, Key takeawaysOECD Environment
ย 
CCXG global forum, April 2024, Mentimeter results
CCXG global forum, April 2024, Mentimeter resultsCCXG global forum, April 2024, Mentimeter results
CCXG global forum, April 2024, Mentimeter resultsOECD Environment
ย 
CCXG global forum, April 2024, Chiara Falduto
CCXG global forum, April 2024, Chiara FaldutoCCXG global forum, April 2024, Chiara Falduto
CCXG global forum, April 2024, Chiara FaldutoOECD Environment
ย 
CCXG global forum, April 2024, Siddharth Singh
CCXG global forum, April 2024, Siddharth SinghCCXG global forum, April 2024, Siddharth Singh
CCXG global forum, April 2024, Siddharth SinghOECD Environment
ย 
CCXG global forum, April 2024, Geraldine Ang
CCXG global forum, April 2024, Geraldine AngCCXG global forum, April 2024, Geraldine Ang
CCXG global forum, April 2024, Geraldine AngOECD Environment
ย 
CCXG global forum, April 2024, Raphaรซl Jachnik
CCXG global forum, April 2024, Raphaรซl JachnikCCXG global forum, April 2024, Raphaรซl Jachnik
CCXG global forum, April 2024, Raphaรซl JachnikOECD Environment
ย 

More from OECD Environment (20)

GREEN Action Task Force - Full Presentations.pdf
GREEN Action Task Force - Full Presentations.pdfGREEN Action Task Force - Full Presentations.pdf
GREEN Action Task Force - Full Presentations.pdf
ย 
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
ย 
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
ย 
Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...
ย 
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
ย 
Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...
ย 
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
ย 
APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...
ย 
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGESThe U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
ย 
Problem formulation for environmental risk assessment โ€“ Finnish case study: ...
Problem formulation for environmental risk assessment โ€“ Finnish case study:  ...Problem formulation for environmental risk assessment โ€“ Finnish case study:  ...
Problem formulation for environmental risk assessment โ€“ Finnish case study: ...
ย 
Problem formulation for environmental risk assessment in the context of EC Re...
Problem formulation for environmental risk assessment in the context of EC Re...Problem formulation for environmental risk assessment in the context of EC Re...
Problem formulation for environmental risk assessment in the context of EC Re...
ย 
Canadian Perspective on Problem Formulation for Biopesticides: Emma Babij
Canadian Perspective on Problem Formulation for Biopesticides: Emma BabijCanadian Perspective on Problem Formulation for Biopesticides: Emma Babij
Canadian Perspective on Problem Formulation for Biopesticides: Emma Babij
ย 
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...
ย 
History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...
ย 
CCXG global forum, April 2025, Key takeaways
CCXG global forum, April 2025, Key takeawaysCCXG global forum, April 2025, Key takeaways
CCXG global forum, April 2025, Key takeaways
ย 
CCXG global forum, April 2024, Mentimeter results
CCXG global forum, April 2024, Mentimeter resultsCCXG global forum, April 2024, Mentimeter results
CCXG global forum, April 2024, Mentimeter results
ย 
CCXG global forum, April 2024, Chiara Falduto
CCXG global forum, April 2024, Chiara FaldutoCCXG global forum, April 2024, Chiara Falduto
CCXG global forum, April 2024, Chiara Falduto
ย 
CCXG global forum, April 2024, Siddharth Singh
CCXG global forum, April 2024, Siddharth SinghCCXG global forum, April 2024, Siddharth Singh
CCXG global forum, April 2024, Siddharth Singh
ย 
CCXG global forum, April 2024, Geraldine Ang
CCXG global forum, April 2024, Geraldine AngCCXG global forum, April 2024, Geraldine Ang
CCXG global forum, April 2024, Geraldine Ang
ย 
CCXG global forum, April 2024, Raphaรซl Jachnik
CCXG global forum, April 2024, Raphaรซl JachnikCCXG global forum, April 2024, Raphaรซl Jachnik
CCXG global forum, April 2024, Raphaรซl Jachnik
ย 

Recently uploaded

Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
ย 
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING  SYSTEMS- IGBC, GRIHA, LEED--.pptxRATING  SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptxJIT KUMAR GUPTA
ย 
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...tanu pandey
ย 
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7Call Girls in Nagpur High Profile Call Girls
ย 
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...Pooja Nehwal
ย 
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation AreasProposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas๐Ÿ’ฅVictoria K. Colangelo
ย 
CSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -ENCSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -ENGeorgeDiamandis11
ย 
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
ย 
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...Amil baba
ย 
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
ย 
Book Sex Workers Available Pune Call Girls Khadki 6297143586 Call Hot Indian...
Book Sex Workers Available Pune Call Girls Khadki  6297143586 Call Hot Indian...Book Sex Workers Available Pune Call Girls Khadki  6297143586 Call Hot Indian...
Book Sex Workers Available Pune Call Girls Khadki 6297143586 Call Hot Indian...Call Girls in Nagpur High Profile
ย 
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...tanu pandey
ย 
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts ServicesBOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Servicesdollysharma2066
ย 
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
ย 
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...Call Girls in Nagpur High Profile
ย 
Hot Call Girls |Delhi |Preet Vihar โ˜Ž 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar โ˜Ž 9711199171 Book Your One night StandHot Call Girls |Delhi |Preet Vihar โ˜Ž 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar โ˜Ž 9711199171 Book Your One night Standkumarajju5765
ย 
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...ranjana rawat
ย 
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Sapana Sha
ย 
Call Now โ˜Ž Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now โ˜Ž Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...Call Now โ˜Ž Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now โ˜Ž Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...kauryashika82
ย 

Recently uploaded (20)

Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Magarpatta Call Me 7737669865 Budget Friendly No Advance Booking
ย 
Green Marketing
Green MarketingGreen Marketing
Green Marketing
ย 
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING  SYSTEMS- IGBC, GRIHA, LEED--.pptxRATING  SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
ย 
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...Alandi Road ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready ...
Alandi Road ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready ...
ย 
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
ย 
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
ย 
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation AreasProposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
ย 
CSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -ENCSR_Tested activities in the classroom -EN
CSR_Tested activities in the classroom -EN
ย 
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
ย 
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
ย 
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Wagholi ( Pune ) Call ON 8005736733 Starting From 5K to ...
ย 
Book Sex Workers Available Pune Call Girls Khadki 6297143586 Call Hot Indian...
Book Sex Workers Available Pune Call Girls Khadki  6297143586 Call Hot Indian...Book Sex Workers Available Pune Call Girls Khadki  6297143586 Call Hot Indian...
Book Sex Workers Available Pune Call Girls Khadki 6297143586 Call Hot Indian...
ย 
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...Call On 6297143586  Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
Call On 6297143586 Pimpri Chinchwad Call Girls In All Pune 24/7 Provide Call...
ย 
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts ServicesBOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
BOOK Call Girls in (Dwarka) CALL | 8377087607 Delhi Escorts Services
ย 
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
ย 
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
VVIP Pune Call Girls Koregaon Park (7001035870) Pune Escorts Nearby with Comp...
ย 
Hot Call Girls |Delhi |Preet Vihar โ˜Ž 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar โ˜Ž 9711199171 Book Your One night StandHot Call Girls |Delhi |Preet Vihar โ˜Ž 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar โ˜Ž 9711199171 Book Your One night Stand
ย 
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Shirwal 8250192130 Will You Miss This Cha...
ย 
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
ย 
Call Now โ˜Ž Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now โ˜Ž Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...Call Now โ˜Ž Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
Call Now โ˜Ž Russian Call Girls Connaught Place @ 9899900591 # Russian Escorts ...
ย 

Jobs Potential of a Transition to a Circular Economy - presentation by Eleonora Mavroeidi

  • 1. JOBS POTENTIAL OF A TRANSITION TO A CIRCULAR ECONOMY Eleonora Mavroeidi Environment and Economy Integration Division OECD Environment Directorate WCEF Side event, 7 December 2020
  • 2. ๏ƒ˜ This analysis focuses on the shift of labour across sectors following the implementation of Resources Efficient and CE policies. ๏ƒ˜Modelling tool: OECDโ€™s ENV-Linkages general equilibrium model โ€ข 25 regions โ€ข 56 sectors, including recycling and 8 metal processing sectors โ€ข 60 raw materials linked to economic activities Recently published report on the labour impact of circular economy policies 2
  • 4. Business as usual projections 4 The global economy will triple by 2060 but global growth slows down Material use is going to double, despite relative decoupling between growth and material use Economic growth will be accompanied with mild employment growth, increases in labour productivity, and expansion of service sectors 1.9% 1.2% 0.3% 0.4% 1.7% 3.9% 1.4% 0.2% 0.4% 3.1% 3.7% 2.7% 1.7% 1.6% 1.9% 3.0% 1.6% 0.8% 0.9% 1.7% GDP GROWTH MATERIAL USE GROWTH EMPLOYMENT GROWTH POPULATION GROWTH LABOUR PRODUCTIVITY GROWTH OECD BRIICS Rest of the World WORLD Source: OECD ENV-Linkages Model Average annual growth rate (2017-2040)
  • 5. Structural change shifts activity away from material intensive sectors Percentage changes in 2040 baseline projection relative to 2017 values, OECD. 5 -40% -20% 0% 20% 40% 60% 80% 100% 120% Employment Gross Output Average output growth
  • 6. Labour implications of policies to promote Resource Efficiency and Circular Economy transition
  • 7. Instrument Description Global Targets (2040) Material tax Tax on primary metals and non- metallic minerals โ€ข 10 $/t of iron ores โ€ข 50 $/t of aluminium ores โ€ข 20 $/t of copper ores โ€ข 15 $/t of other metals ores โ€ข 5 $/t of non-metallic minerals Subsidy to recycling good Subsidy for recycling input uses 75% subsidy rate on the purchasing price of the recycling commodity Subsidy to secondary metal production Production subsidy to secondary metal production Subsidy on the producer (selling) price of secondary metal - at level that ensures the full package is revenue- neutral (budget balance). 7 Material Fiscal Reform (MFR) scenario โ€ข All these fiscal instruments are implemented from 2018 to gradually reach their target in 2040. โ€ข Government revenues from the material taxes are used to finance subsidies. โ€ข Material taxes are differentiated across countries to take into account existing royalties and taxes on mining sectors.
  • 8. MFR is boosting resource efficiency and employment gains seem possible 8 Percentage changes in 2040 compared to baseline โ€“ range across aggregate country groups Employment 0 to +0.1% Metal use -17 to -40% GDP 0 to -0.4% Minerals use -4 to -12% โ€ฆ Source: OECD ENV-Linkages Model The policy is efficient relative to its ultimate goal (reducing environmental damages associated to mineral production and use) with very low economic cost and even some employment gains.
  • 9. MFR implies small aggregate employment impacts with larger job reallocation โ€ข The impact of material tax policies on total employment is very limited โ€ข Labour markets dynamic is characterized by shifts of employment across sectors โ€ข MFR implies large labour shifts across sectors for limited impacts on GDP โ€ข The policy will result in: 10 million jobs creations, and 8 million jobs destructions globally by 2040 9 Changes w.r.t baseline in 2040 as % of total employment. Source: OECD ENV-Linkages Model Net employment growth Job creations Job destructions Total job reallocation OECD 0.05% 0.1% 0.1% 0.2% BRIICS 0.05% 0.3% 0.3% 0.6% Rest of the world 0.01% 0.2% 0.2% 0.4%
  • 10. Differences across countries depending on their economic structure MFR scenario (percentage changes w.r.t baseline in 2040) 10 -50% -40% -30% -20% -10% 0% 10% 20% -1.0% -0.8% -0.6% -0.4% -0.2% 0.0% 0.2% Canada Chile Mexico USA OECDEU17 OECDEU4 OtherOECDEurasia AustraliaandNewZealand Japan Korea Brazil OtherLatinAmerica Caspianregion OtherEU OtherEurope Russia MiddleEast NorthAfrica OtherAfrica SouthAfrica China India Indonesia OtherASEAN Othernon-OECDAsia OECD America OECD Europe OECD Pacific Latin America Rest of Europe and Asia Middle East & Africa South and South-East Asia World Employment GDP Material intensity Source: OECD ENV-Linkages Model Employment/GDP MaterialIntensity
  • 11. -0.15% -0.10% -0.05% 0.00% 0.05% 0.10% 0.15% 2018 2020 2025 2030 2035 2040 Secondary based metals Recycling Other mining Fossil extraction and transformation Chemicals Utilities Construction Agriculture Fabricated Metal products Machinery and equipment n.e.s. Non-metallic Minerals Primary based metals Power generation Services Transport Equipment Jobs shift towards less material intensive sectors gradually Changes w.r.t baseline as % of total baseline employment, 2018-2040 11 Source: OECD ENV-Linkages Model Services Secondary metals Construction Minerals Primary metals
  • 12. โ€ข The projected employment effect of the policy action (MFR) is well within the range suggested by the literature. โ€ข MFR implies 10 millions of job creations but also 8 millions of job destructions globally in 2040. โ€ข Although the net impact on employment is small, some sectors are heavily affected โ€“ both in terms of job creations (e.g. secondary materials, recycling, services, utilities) and job destructions (e.g. primary materials, non-metallic materials, construction) Summary of findings 12
  • 13. To maintain public support throughout the transition process towards a circular economy, it is important: - To carefully study the sectoral shifts in the labour market - To acknowledge the positive and negative implications that may arise Policy actions that could help to mitigate some of these side effects: - Implement training policies to help workers reskill or upskill to compete successfully for new jobs (e.g. jobs shift from material intensive sectors to services). - Investments in R&D and digitalization to mitigate the cost of substituting primary materials. Policy messages 13
  • 15. โ€ข Global assessment (disaggregated to 12 large economies + 13 regions ) โ€ข 2060 time horizon โ€ข 50+ economic sectors โ€ข 60 materials 15 Overview of the articulation of models and assumptions at OECD Environment Dir. Multisectoral model ENV-Linkages Material extraction data Recycling technologies data Structural change assumptions on demand and production Macro model ENV-Growth Capital accumulation Total factor productivity Labour Demographics Economic projections Materials use projections Environmental impacts
  • 16. Sectoral Aggregation Agriculture, Fisheries and Forestry Manufacturing Paddy Rice Food Products Wheat and Meslin Textiles Other Grains Wood products Vegetables and Fruits Chemicals Oil Seeds Pulp, Paper and Publishing products Sugar Cane and Sugar Beet Non-metallic Minerals Fibres Plant Fabricated Metal products Other Crops Electronics Cattle and Raw Milk Motor Vehicles Other Animal products Other Transport Equipment Fisheries Other Machinery and Equipment Forestry Recycling Non-manufacturing Industries Iron and Steel - Primary Coal extraction Iron and Steel โ€“ Secondary Crude Oil extraction Aluminium โ€“ Primary Natural Gas extraction Aluminium โ€“ Secondary Other Mining Copper โ€“ Primary Petroleum and Coal products Copper โ€“ Secondary Gas distribution Other Non-ferrous Metals โ€“ Primary Water Collection and Distribution Other Non-Ferrous metals โ€“ Secondary Construction Other Manufacturing Electricity Transmission and Distribution Services Electricity Generation (8 technologies) Land Transport Electricity generation: Nuclear Electricity; Hydro (and Geothermal); Solar; Wind; Coal-powered electricity; Gas- powered electricity; Oil-powered electricity; Other (combustible renewable, waste, etc). Air Transport Water Transport Business Services Other Services (incl. Government)
  • 17. BASELINE - Job creations in most sectors across Non-OECD economies Percentage changes in 2040 baseline projection relative to 2017 values. 18 -50% 0% 50% 100% 150% 200% 250% Employment Gross Output Average growth Linear (Average growth)
  • 18. Within OECD additional employment gains captured in labor intensive sectors - services OECD - Changes w.r.t. baseline in 2040 19 -20% -10% 0% 10% 20% 30% 40% 50% 60% -0.2 -0.1 0.0 0.1 0.2 0.3 0.4 0.5 0.6 Employment Gross output MillionJobs Outputgrowth Source: OECD ENV-Linkages Model
  • 19. Non-OECD benefit from lower material costs Non โ€“OECD - Global variation in 2040 w.r.t. central baseline scenario 20 -20% -10% 0% 10% 20% 30% 40% 50% 60% 70% 80% -2.0 -1.0 0.0 1.0 2.0 3.0 4.0 5.0 6.0 7.0 8.0 Outputgrowth Millionjobs Employment Gross output
  • 20. โ€ข Importers of raw materials benefit from lower input prices โ€ข However, drop in OECD demand for primary metals, negatively affect certain non-OECD economies (some Asian countries) Partial implementation of MFR yields leakages -0.25% -0.20% -0.15% -0.10% -0.05% 0.00% 0.05% 0.10% Canada Chile Mexico USA OECDEU17 OECDEU4 OtherOECDEurasia AustraliaandNewZealand Japan Korea Brazil OtherLatinAmerica Caspianregion OtherEU OtherEurope Russia MiddleEast NorthAfrica OtherAfrica SouthAfrica China India Indonesia OtherASEAN Othernon-OECDAsia World OECD America OECD Europe OECD Pacific Latin America Rest of Europe and Asia Middle East & Africa South and South-East Asia World Employment Gross output Changes w.r.t. baseline in 2040 Source: OECD ENV-Linkages Model

Editor's Notes

  1. However, they miss the distributional aspects of a CE transition. Distributional aspects in transitions are key and employment implications of the circular economy transition are an important aspect to ensure a just transition. The transition to CE implies structural changes (e.g. changes in production modes and demand patterns) that in turn would shift labour from material intensive sector to less material intensive sectors. Subsequently, in addition to job creations, RE-CE transition may also affect jobs negatively in certain sectors. (for instance in extraction sectors and materials intensive sectors.) It is thus important to study carefully the labour implications across sectors of a CE transition. This analysis focuses on the implied structural changes and the subsequent shift of labour across
  2. The first section of the paper describes the underlying trends in the absence of RE-CE policies
  3. Jobs destructions in industrial sectors and job creations in services sectors across OECD economies
  4. countries with large extraction sectors (Indonesia, Australia and New Zealand) face a larger number of job destructions compared to job creations economies with manufacturing sectors that are also net importers of primary materials (Korea, Japan, China, USA, OECD EU 4), exhibit net employment gains of magnitude 0.1% compared to baseline in 2040