Executive Agency of the Dutch Ministry of Infrastructure and Water Management - M. Valkenburg, ECI coordinator, Rijks Waterstaat

OECD Governance
OECD GovernanceOECD Governance
1
• RWS is the largest public sector
procuring body in the Netherlands
• RWS tenders annually over a billion
worth of Infrastructure Works
• We see contractors loose interest
for tenders for large, complex,
fixed price infrastructure works
• In recent years, contractors have
i.e. too often lost tenders, incurred
high transaction costs, taken on too
much work and have not properly
assessed contractual risks
Rijkswaterstaat (RWS) => Executive Agency of the
Dutch Ministry of Infrastructure and Water Management
0
1
2
3
4
5
6
2017 2018 2019 2020 2021 2022
Bidder interest tenders infrastructure works
Overall average number of bids per tender Construction and renovation tenders specifically
2
• Dynamics in imperfect market encourages
contractors not pricing risks.
• Current design of fixed priced contracting
reduces attractiveness to submit bids.
• Calamities threaten continuity of construction
companies and other companies in the
infrastructure sector.
• Rijkswaterstaat has reduced (design) knowledge.
• Labour productivity lags structurally, especially in
construction companies.
• Various barriers hold back innovations.
• Collaboration with other sectors needed for
technological innovation.
• Challenging labour market for well-trained staff.
The 2019 survey conducted
with the help of McKinsey &
Company: the challenges for
the infrastructure sector
Market
dynamics and
dealing with
risks threatens
the infra sector
Improvement
potential is
insufficiently
addressed
Risk of not being
able to fulfil the
social public task
Risk of major
undesired economic
consequences for
the sector
Towards a resilient infrastructure sector
Track 1
Organising and guiding
Track 2
Learning and developing
Track 3
Experimenting and securing
Track
4
Communicate
and
involve
Track
5
Monitoring
and
adjusting
More explicit focus on
climate resilience
Rijkswaterstaat and her market parties have started
a joint process of transition
The Netherlands safe,
accessible and
liveable:
Where:
Sustainable towards
climate neutral and
circular
In doing so:
Maximise digitalisation
opportunities data & lV)
An attitude aimed on
working together based
on sufficient expertise,
while focusing on the
public task at hand
A financially sound,
productive sector, with
risks under control
Sufficient room
for innovation and
learning
Social public
task
Conditions
i.a.
• Collaborative 2-step project approach
• portfolio approach
1 de 3

Recomendados

Construction PROJECT MANAGEMENT por
Construction PROJECT MANAGEMENTConstruction PROJECT MANAGEMENT
Construction PROJECT MANAGEMENTIrfan Ullah
19 visualizações8 slides
Rabobank Construction Update August 2015 por
Rabobank Construction Update August 2015Rabobank Construction Update August 2015
Rabobank Construction Update August 2015Leontien de Waal MSc
485 visualizações38 slides
Technology_and_skills_in_the_construction_industry_slide_pack.pptx por
Technology_and_skills_in_the_construction_industry_slide_pack.pptxTechnology_and_skills_in_the_construction_industry_slide_pack.pptx
Technology_and_skills_in_the_construction_industry_slide_pack.pptxravi795059
24 visualizações24 slides
PP1 - Presentation Slides por
PP1 - Presentation Slides PP1 - Presentation Slides
PP1 - Presentation Slides Pang Khai Shuen
1.2K visualizações46 slides
Modular Construction in MENA 2019 por
Modular Construction in MENA 2019Modular Construction in MENA 2019
Modular Construction in MENA 2019Alexandra Tohme
554 visualizações64 slides
CHAPTER-1 INTRODUCTION.pdf por
CHAPTER-1 INTRODUCTION.pdfCHAPTER-1 INTRODUCTION.pdf
CHAPTER-1 INTRODUCTION.pdfBereketgebreselassie3
19 visualizações59 slides

Mais conteúdo relacionado

Similar a Executive Agency of the Dutch Ministry of Infrastructure and Water Management - M. Valkenburg, ECI coordinator, Rijks Waterstaat

Transforming Infrastructure Performance #COMIT2018 por
Transforming Infrastructure Performance #COMIT2018Transforming Infrastructure Performance #COMIT2018
Transforming Infrastructure Performance #COMIT2018Comit Projects Ltd
228 visualizações23 slides
Fbe procurement event 23rd July 2015 por
Fbe procurement event 23rd July 2015Fbe procurement event 23rd July 2015
Fbe procurement event 23rd July 2015FBE Manchester
518 visualizações47 slides
MASCA - Twin Cities - Construction Diversity Market Pain Points por
MASCA - Twin Cities - Construction Diversity Market Pain PointsMASCA - Twin Cities - Construction Diversity Market Pain Points
MASCA - Twin Cities - Construction Diversity Market Pain PointsSilas Houston
22 visualizações1 slide
Advanced CM_04.09.2022.pptx por
Advanced CM_04.09.2022.pptxAdvanced CM_04.09.2022.pptx
Advanced CM_04.09.2022.pptxSiharaGallage
10 visualizações64 slides
Dutch Construction Industry por
Dutch Construction IndustryDutch Construction Industry
Dutch Construction IndustryMichael Hompes
234 visualizações24 slides
Ncc construction DK, Strategy por
Ncc construction DK, StrategyNcc construction DK, Strategy
Ncc construction DK, StrategyAlessandro Rinaldi
2K visualizações22 slides

Similar a Executive Agency of the Dutch Ministry of Infrastructure and Water Management - M. Valkenburg, ECI coordinator, Rijks Waterstaat (20)

Transforming Infrastructure Performance #COMIT2018 por Comit Projects Ltd
Transforming Infrastructure Performance #COMIT2018Transforming Infrastructure Performance #COMIT2018
Transforming Infrastructure Performance #COMIT2018
Comit Projects Ltd228 visualizações
Fbe procurement event 23rd July 2015 por FBE Manchester
Fbe procurement event 23rd July 2015Fbe procurement event 23rd July 2015
Fbe procurement event 23rd July 2015
FBE Manchester518 visualizações
MASCA - Twin Cities - Construction Diversity Market Pain Points por Silas Houston
MASCA - Twin Cities - Construction Diversity Market Pain PointsMASCA - Twin Cities - Construction Diversity Market Pain Points
MASCA - Twin Cities - Construction Diversity Market Pain Points
Silas Houston22 visualizações
Advanced CM_04.09.2022.pptx por SiharaGallage
Advanced CM_04.09.2022.pptxAdvanced CM_04.09.2022.pptx
Advanced CM_04.09.2022.pptx
SiharaGallage10 visualizações
Dutch Construction Industry por Michael Hompes
Dutch Construction IndustryDutch Construction Industry
Dutch Construction Industry
Michael Hompes234 visualizações
Ncc construction DK, Strategy por Alessandro Rinaldi
Ncc construction DK, StrategyNcc construction DK, Strategy
Ncc construction DK, Strategy
Alessandro Rinaldi2K visualizações
Chapter 1 por Dean Sanchez
Chapter 1Chapter 1
Chapter 1
Dean Sanchez2K visualizações
Chris Kane por Informa Australia
Chris KaneChris Kane
Chris Kane
Informa Australia1.1K visualizações
Policies and Best Practices for Industry Transition: Tareq Emtairah, UNIDO por OECD Environment
Policies and Best Practices for Industry Transition: Tareq Emtairah, UNIDOPolicies and Best Practices for Industry Transition: Tareq Emtairah, UNIDO
Policies and Best Practices for Industry Transition: Tareq Emtairah, UNIDO
OECD Environment48 visualizações
Enabled by Design-athon: Robin Wilson por enabledbydesign
Enabled by Design-athon: Robin WilsonEnabled by Design-athon: Robin Wilson
Enabled by Design-athon: Robin Wilson
enabledbydesign1.4K visualizações
Wednesday, 22 July 2015, Hall 2C, 09:00 - Tony Nkuna por 7391456
Wednesday, 22 July 2015, Hall 2C, 09:00 - Tony NkunaWednesday, 22 July 2015, Hall 2C, 09:00 - Tony Nkuna
Wednesday, 22 July 2015, Hall 2C, 09:00 - Tony Nkuna
7391456232 visualizações
Hall2C Wednesday 09h00 - Tony Nkuna por 7391456
Hall2C Wednesday 09h00 - Tony NkunaHall2C Wednesday 09h00 - Tony Nkuna
Hall2C Wednesday 09h00 - Tony Nkuna
7391456248 visualizações
Role Of The Quantity Surveyor por Maggie Cavanaugh
Role Of The Quantity SurveyorRole Of The Quantity Surveyor
Role Of The Quantity Surveyor
Maggie Cavanaugh5 visualizações
Competition scope and funding revised por KTN
Competition scope and funding revisedCompetition scope and funding revised
Competition scope and funding revised
KTN205 visualizações
Procurement & contract.(bot) por rajlaxmipardeshi
Procurement & contract.(bot)Procurement & contract.(bot)
Procurement & contract.(bot)
rajlaxmipardeshi32 visualizações
A Basic Guide to Infrastructure Business, Investing and Financing in India por Empowerhosting
A Basic Guide to Infrastructure Business, Investing and Financing in IndiaA Basic Guide to Infrastructure Business, Investing and Financing in India
A Basic Guide to Infrastructure Business, Investing and Financing in India
Empowerhosting522 visualizações
A Basic guide to Infrastructure Business and Financing in India by Netz Capit... por atulpkhekade
A Basic guide to Infrastructure Business and Financing in India by Netz Capit...A Basic guide to Infrastructure Business and Financing in India by Netz Capit...
A Basic guide to Infrastructure Business and Financing in India by Netz Capit...
atulpkhekade1.5K visualizações
061 logistics and productivity por drdej19
061 logistics and productivity061 logistics and productivity
061 logistics and productivity
drdej1939 visualizações
061 Logistics & Productivity PART 2 por Dr Fereidoun Dejahang
061 Logistics & Productivity PART 2061 Logistics & Productivity PART 2
061 Logistics & Productivity PART 2
Dr Fereidoun Dejahang90 visualizações

Mais de OECD Governance

Public Integrity Indicators Slides por
Public Integrity Indicators SlidesPublic Integrity Indicators Slides
Public Integrity Indicators SlidesOECD Governance
253 visualizações10 slides
Summary of the OECD expert meeting: Construction Risk Management in Infrastru... por
Summary of the OECD expert meeting: Construction Risk Management in Infrastru...Summary of the OECD expert meeting: Construction Risk Management in Infrastru...
Summary of the OECD expert meeting: Construction Risk Management in Infrastru...OECD Governance
339 visualizações8 slides
Using AI led assurance to deliver projects on time and on budget - D. Amratia... por
Using AI led assurance to deliver projects on time and on budget - D. Amratia...Using AI led assurance to deliver projects on time and on budget - D. Amratia...
Using AI led assurance to deliver projects on time and on budget - D. Amratia...OECD Governance
58 visualizações24 slides
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE) por
 ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE) ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE)
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE)OECD Governance
33 visualizações18 slides
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at... por
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...OECD Governance
13 visualizações22 slides
Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš... por
Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...
Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...OECD Governance
68 visualizações31 slides

Mais de OECD Governance(20)

Public Integrity Indicators Slides por OECD Governance
Public Integrity Indicators SlidesPublic Integrity Indicators Slides
Public Integrity Indicators Slides
OECD Governance253 visualizações
Summary of the OECD expert meeting: Construction Risk Management in Infrastru... por OECD Governance
Summary of the OECD expert meeting: Construction Risk Management in Infrastru...Summary of the OECD expert meeting: Construction Risk Management in Infrastru...
Summary of the OECD expert meeting: Construction Risk Management in Infrastru...
OECD Governance339 visualizações
Using AI led assurance to deliver projects on time and on budget - D. Amratia... por OECD Governance
Using AI led assurance to deliver projects on time and on budget - D. Amratia...Using AI led assurance to deliver projects on time and on budget - D. Amratia...
Using AI led assurance to deliver projects on time and on budget - D. Amratia...
OECD Governance58 visualizações
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE) por OECD Governance
 ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE) ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE)
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE)
OECD Governance33 visualizações
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at... por OECD Governance
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...
OECD Governance13 visualizações
Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš... por OECD Governance
Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...
Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...
OECD Governance68 visualizações
Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ... por OECD Governance
Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...
Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...
OECD Governance45 visualizações
ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co... por OECD Governance
ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...
ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...
OECD Governance30 visualizações
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm por OECD Governance
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, StockholmECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm
OECD Governance28 visualizações
EPEC's perception of market developments - E. Farquharson, Principal Adviser,... por OECD Governance
EPEC's perception of market developments - E. Farquharson, Principal Adviser,...EPEC's perception of market developments - E. Farquharson, Principal Adviser,...
EPEC's perception of market developments - E. Farquharson, Principal Adviser,...
OECD Governance28 visualizações
Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir... por OECD Governance
Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...
Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...
OECD Governance26 visualizações
New Jersey Wind Port - J. Kennedy, New Jersey Economic Development Authority ... por OECD Governance
New Jersey Wind Port - J. Kennedy, New Jersey Economic Development Authority ...New Jersey Wind Port - J. Kennedy, New Jersey Economic Development Authority ...
New Jersey Wind Port - J. Kennedy, New Jersey Economic Development Authority ...
OECD Governance23 visualizações
Presentation of OECD Government at a Glance 2023 por OECD Governance
Presentation of OECD Government at a Glance 2023Presentation of OECD Government at a Glance 2023
Presentation of OECD Government at a Glance 2023
OECD Governance325 visualizações
The Protection and Promotion of Civic Space: Strengthening Alignment with Int... por OECD Governance
The Protection and Promotion of Civic Space: Strengthening Alignment with Int...The Protection and Promotion of Civic Space: Strengthening Alignment with Int...
The Protection and Promotion of Civic Space: Strengthening Alignment with Int...
OECD Governance3K visualizações
Digital Government Review Türkiye - Assessment and Recommendations por OECD Governance
Digital Government Review Türkiye - Assessment and RecommendationsDigital Government Review Türkiye - Assessment and Recommendations
Digital Government Review Türkiye - Assessment and Recommendations
OECD Governance2.5K visualizações
Buliding-Financial-Resilience-to climate-Impacts.pdf por OECD Governance
Buliding-Financial-Resilience-to climate-Impacts.pdfBuliding-Financial-Resilience-to climate-Impacts.pdf
Buliding-Financial-Resilience-to climate-Impacts.pdf
OECD Governance45 visualizações
Session-7-OECD-Strengthening-climate.pptx por OECD Governance
Session-7-OECD-Strengthening-climate.pptxSession-7-OECD-Strengthening-climate.pptx
Session-7-OECD-Strengthening-climate.pptx
OECD Governance8 visualizações
Session-6-Building-Financial-Resilience.pptx por OECD Governance
Session-6-Building-Financial-Resilience.pptxSession-6-Building-Financial-Resilience.pptx
Session-6-Building-Financial-Resilience.pptx
OECD Governance60 visualizações
Session-5-Assurance-on-sustainability-Peter-Welch.pptx por OECD Governance
Session-5-Assurance-on-sustainability-Peter-Welch.pptxSession-5-Assurance-on-sustainability-Peter-Welch.pptx
Session-5-Assurance-on-sustainability-Peter-Welch.pptx
OECD Governance17 visualizações
Session-4-Sovereign-green-bonds-Fatos-Koc.pptx por OECD Governance
Session-4-Sovereign-green-bonds-Fatos-Koc.pptxSession-4-Sovereign-green-bonds-Fatos-Koc.pptx
Session-4-Sovereign-green-bonds-Fatos-Koc.pptx
OECD Governance103 visualizações

Último

IEA EnergyEfficiency Report 2023 por
IEA EnergyEfficiency Report 2023IEA EnergyEfficiency Report 2023
IEA EnergyEfficiency Report 2023Energy for One World
10 visualizações126 slides
How to Find Contractors and Architects for Your Historic Home Renovation por
How to Find Contractors and Architects for Your Historic Home RenovationHow to Find Contractors and Architects for Your Historic Home Renovation
How to Find Contractors and Architects for Your Historic Home RenovationNational Trust for Historic Preservation
181 visualizações8 slides
ΕΚΘΕΣΗ ΚΟΜΙΣΙΟΝ ΓΙΑ ΤΟΥΡΚΙΑ por
ΕΚΘΕΣΗ ΚΟΜΙΣΙΟΝ ΓΙΑ ΤΟΥΡΚΙΑΕΚΘΕΣΗ ΚΟΜΙΣΙΟΝ ΓΙΑ ΤΟΥΡΚΙΑ
ΕΚΘΕΣΗ ΚΟΜΙΣΙΟΝ ΓΙΑ ΤΟΥΡΚΙΑssuser9e6212
172 visualizações18 slides
University of Cambridge: COP28 briefing por
University of Cambridge: COP28 briefingUniversity of Cambridge: COP28 briefing
University of Cambridge: COP28 briefingEnergy for One World
13 visualizações33 slides
Dr. John Ulimwengu - 2023 ReSAKSS Conference.pptx por
Dr. John Ulimwengu - 2023 ReSAKSS Conference.pptxDr. John Ulimwengu - 2023 ReSAKSS Conference.pptx
Dr. John Ulimwengu - 2023 ReSAKSS Conference.pptxAKADEMIYA2063
8 visualizações9 slides
COP 28 GHANA DELEGATES.docx por
COP 28 GHANA DELEGATES.docxCOP 28 GHANA DELEGATES.docx
COP 28 GHANA DELEGATES.docxKweku Zurek
6.5K visualizações23 slides

Último(20)

IEA EnergyEfficiency Report 2023 por Energy for One World
IEA EnergyEfficiency Report 2023IEA EnergyEfficiency Report 2023
IEA EnergyEfficiency Report 2023
Energy for One World10 visualizações
ΕΚΘΕΣΗ ΚΟΜΙΣΙΟΝ ΓΙΑ ΤΟΥΡΚΙΑ por ssuser9e6212
ΕΚΘΕΣΗ ΚΟΜΙΣΙΟΝ ΓΙΑ ΤΟΥΡΚΙΑΕΚΘΕΣΗ ΚΟΜΙΣΙΟΝ ΓΙΑ ΤΟΥΡΚΙΑ
ΕΚΘΕΣΗ ΚΟΜΙΣΙΟΝ ΓΙΑ ΤΟΥΡΚΙΑ
ssuser9e6212172 visualizações
University of Cambridge: COP28 briefing por Energy for One World
University of Cambridge: COP28 briefingUniversity of Cambridge: COP28 briefing
University of Cambridge: COP28 briefing
Energy for One World13 visualizações
Dr. John Ulimwengu - 2023 ReSAKSS Conference.pptx por AKADEMIYA2063
Dr. John Ulimwengu - 2023 ReSAKSS Conference.pptxDr. John Ulimwengu - 2023 ReSAKSS Conference.pptx
Dr. John Ulimwengu - 2023 ReSAKSS Conference.pptx
AKADEMIYA20638 visualizações
COP 28 GHANA DELEGATES.docx por Kweku Zurek
COP 28 GHANA DELEGATES.docxCOP 28 GHANA DELEGATES.docx
COP 28 GHANA DELEGATES.docx
Kweku Zurek6.5K visualizações
WCAG 2.2 - An Overview of the New Accessibility Guidelines.pptx por AbilityNet
WCAG 2.2 - An Overview of the New Accessibility Guidelines.pptxWCAG 2.2 - An Overview of the New Accessibility Guidelines.pptx
WCAG 2.2 - An Overview of the New Accessibility Guidelines.pptx
AbilityNet42 visualizações
COP28 President Launches Global Decarbonization Accelerator por Energy for One World
COP28 President Launches Global Decarbonization AcceleratorCOP28 President Launches Global Decarbonization Accelerator
COP28 President Launches Global Decarbonization Accelerator
Energy for One World38 visualizações
Support Girl students with Education por SERUDS INDIA
Support Girl students with EducationSupport Girl students with Education
Support Girl students with Education
SERUDS INDIA7 visualizações
Financial sustainability of schemes managed by PHED in Punjab_Krishnakumar Th... por India Water Portal
Financial sustainability of schemes managed by PHED in Punjab_Krishnakumar Th...Financial sustainability of schemes managed by PHED in Punjab_Krishnakumar Th...
Financial sustainability of schemes managed by PHED in Punjab_Krishnakumar Th...
India Water Portal7 visualizações
Food for Elderly homeless por SERUDS INDIA
Food for Elderly homelessFood for Elderly homeless
Food for Elderly homeless
SERUDS INDIA10 visualizações
East godavari_art63.pdf por narsireddynannuri1
East godavari_art63.pdfEast godavari_art63.pdf
East godavari_art63.pdf
narsireddynannuri16 visualizações
Arrow Adoption Training for Kinship Families por ArrowMarketing
Arrow Adoption Training for Kinship FamiliesArrow Adoption Training for Kinship Families
Arrow Adoption Training for Kinship Families
ArrowMarketing42 visualizações
Silver Nanema - 2023 ReSAKSS Conference.pptx por AKADEMIYA2063
Silver Nanema - 2023 ReSAKSS Conference.pptxSilver Nanema - 2023 ReSAKSS Conference.pptx
Silver Nanema - 2023 ReSAKSS Conference.pptx
AKADEMIYA20636 visualizações
Dr. Fatima Kareem - 2023 ReSAKSS Conference.pptx por AKADEMIYA2063
Dr. Fatima Kareem - 2023 ReSAKSS Conference.pptxDr. Fatima Kareem - 2023 ReSAKSS Conference.pptx
Dr. Fatima Kareem - 2023 ReSAKSS Conference.pptx
AKADEMIYA20635 visualizações
COP28: Example of Formation of Negotiated Texts: Global StockTake por Energy for One World
COP28: Example of  Formation of Negotiated Texts: Global StockTakeCOP28: Example of  Formation of Negotiated Texts: Global StockTake
COP28: Example of Formation of Negotiated Texts: Global StockTake
Energy for One World11 visualizações
Social behavioural change to drive community ownership_ Divyang Waghela_Tata ... por India Water Portal
Social behavioural change to drive community ownership_ Divyang Waghela_Tata ...Social behavioural change to drive community ownership_ Divyang Waghela_Tata ...
Social behavioural change to drive community ownership_ Divyang Waghela_Tata ...
India Water Portal13 visualizações

Executive Agency of the Dutch Ministry of Infrastructure and Water Management - M. Valkenburg, ECI coordinator, Rijks Waterstaat

  • 1. 1 • RWS is the largest public sector procuring body in the Netherlands • RWS tenders annually over a billion worth of Infrastructure Works • We see contractors loose interest for tenders for large, complex, fixed price infrastructure works • In recent years, contractors have i.e. too often lost tenders, incurred high transaction costs, taken on too much work and have not properly assessed contractual risks Rijkswaterstaat (RWS) => Executive Agency of the Dutch Ministry of Infrastructure and Water Management 0 1 2 3 4 5 6 2017 2018 2019 2020 2021 2022 Bidder interest tenders infrastructure works Overall average number of bids per tender Construction and renovation tenders specifically
  • 2. 2 • Dynamics in imperfect market encourages contractors not pricing risks. • Current design of fixed priced contracting reduces attractiveness to submit bids. • Calamities threaten continuity of construction companies and other companies in the infrastructure sector. • Rijkswaterstaat has reduced (design) knowledge. • Labour productivity lags structurally, especially in construction companies. • Various barriers hold back innovations. • Collaboration with other sectors needed for technological innovation. • Challenging labour market for well-trained staff. The 2019 survey conducted with the help of McKinsey & Company: the challenges for the infrastructure sector Market dynamics and dealing with risks threatens the infra sector Improvement potential is insufficiently addressed Risk of not being able to fulfil the social public task Risk of major undesired economic consequences for the sector Towards a resilient infrastructure sector
  • 3. Track 1 Organising and guiding Track 2 Learning and developing Track 3 Experimenting and securing Track 4 Communicate and involve Track 5 Monitoring and adjusting More explicit focus on climate resilience Rijkswaterstaat and her market parties have started a joint process of transition The Netherlands safe, accessible and liveable: Where: Sustainable towards climate neutral and circular In doing so: Maximise digitalisation opportunities data & lV) An attitude aimed on working together based on sufficient expertise, while focusing on the public task at hand A financially sound, productive sector, with risks under control Sufficient room for innovation and learning Social public task Conditions i.a. • Collaborative 2-step project approach • portfolio approach