PRJ101A – Project 2013
Accelerated
www.ocdatabases.com
slides.1@ocdatabases.com
949-489-1472
PRJ101x Project Accelerated
 Introduction (s)
 Facilities
 Course Packet (May vary by course and class)
– Student Questionnaire
– Collaterals (Maps, Catalog, Etc.)
– Comprehensive ILT Manual
– Evaluation form
– Training certificate
PRJ101A – Project 2013 Accelerated
 Based on courseware from Logical
Operations
 Emphasis on creating and tracking
schedules
 Does not go into resources in depth
 Consists of…
– PRJ101X – Most topics except resources
– PRJ102I – Selected topics
4
PRJ101x – Project 2013
Basic
www.ocdatabases.com
slides.1@ocdatabases.com
949-489-1472
Project 2013: Basic
1. Getting started
2. Tasks
3. Task scheduling
4. Resource management
5. Views and tables
6. Filters, groups, and sorting
7. Finalizing the task plan
GETTING STARTED
Topic 1
Project constraints
Links between project phases
Initial
phase
Planning
phase
Close-out
phase
Implementation
phase
Monitoring
phase
Initiating
tasks
Planning
tasks
Executing
tasks
Monitoring
tasks
Closing
tasks
Controlling phases and communication
Typical project management tasks
Project management tasks
Planning tasks
Monitoring and
tracking tasks
Build the plan
Fine-tune the plan
Link tasks
Assign resources and costs
Set a project start date
Enter task names and duration
Set a baseline
Communicate with the team
Enter actuals
Track variance
Adjust the schedule
Print reports
Gantt Chart view
A task list in Gantt Chart view
Resource Sheet view
The Project 2013 interface
Backstage view
A sample file in Gantt Chart view
Open a Project file
1. Click the File tab and click Open
2. Navigate to and select the Project file
that you want to open
3. Click Open (or double-click the file)
Set the project start date
1. Click the Project tab
2. In the Properties group, click Project
Information
Today’s date is the default project
start date
3. To set a different start date, click the
arrow in the Start date field and
select a date from the calendar
Project Information dialog box
Define project properties
1. Click the File tab and click Info
2. In the right pane, click Project
Information and choose Advanced
Properties
3. Enter values on the Summary tab
and click OK
Save a new project file
1. On the Quick Access toolbar, click
the Save button (or press Ctrl+S)
2. In the Save As dialog box, navigate
to the location where you want to
save the project file
3. Enter a file name
4. Click Save (or press Enter)
TASKS
Topic 2
User-controlled scheduling
 The default task scheduling mode is manual
 In manual scheduling mode, Project does
not automatically calculate the schedule as
you build task relationships
 You can plug in general project information
instead of actual details
 Switch to automatic scheduling later to take
advantage of Project’s scheduling engine
Change default scheduling mode
1. Click the File tab
2. Click Options to open the Project
Options dialog box
3. Click Schedule
4. From the “Scheduling options for this
project” list, select All New Projects
5. From the “New tasks created” list,
select Auto Scheduled
6. Click OK
Add tasks to a task list
1. In the Task Name column, select the
cell below the location where you
want to insert the task
2. On the Task tab, click Insert Task
(Or right-click the cell below where
you want to insert the task and
choose Insert Task)
3. Type the task information in the new
row
Delete tasks
 Right-click the task and choose
Delete Task
 Select the row and press Delete
Cut and paste a task
1. Click a row number to select the row
2. Click Cut
3. Click the row number below where
you want to insert the cut task
4. Click Paste
Drag selected tasks
1. Click the row number to select the
row, or drag across row numbers to
select sequential tasks
2. Drag the selected rows to a new
position in the task list
Create a project summary task
1. Click the Format tab
2. Check Project Summary Task
3. To rename the project summary task,
select the name and type a new
name
Summary tasks
WBS with some hidden subtasks
Convert a task into a milestone
1. In the Sheet pane, double-click the
task to open the Task Information
dialog box
2. Click the Advanced tab
3. Enter 0 as the task duration, and
check “Mark task as milestone”
4. Click OK
TASK SCHEDULING
Topic 3
When you link tasks:
 Project automatically applies a Finish-
to-Start task dependency
 The start of the second task depends
on the completion of the first task
Linking tasks
1. Select the tasks
2. On the Task tab, click the Link Tasks
button
Or:
1. Select the tasks
2. Press Ctrl+F2
Change a task’s predecessor
1. In the Sheet pane, double-click the
task whose predecessor you want to
change
2. Click the Predecessors tab
3. In the ID column, enter the task ID of
the task that you want to set as the
predecessor
4. Click OK
Lag time
 A delay that adds time after the
completion of a task
 Example: “Install trim”
– If you add lag time to its predecessor,
“Paint,” the paint will have time to dry
before the trim installation begins
Lead time
 The overlap between dependent tasks
(when a task can start before its
predecessor finishes)
Apply lead time or lag time
1. Double-click a task in the Sheet pane
2. Click the Predecessors tab
3. To apply lag time, enter a positive
value in the Lag field for the
predecessor
To apply lead time, enter a negative
value
4. Click OK
Insert a recurring task
1. In the Task Name field, select the cell
below where you want to insert the task
2. Click the Task arrow and choose Recurring
Task
3. Enter a name for the recurring task
4. Enter the duration
5. Select a time interval
6. Enter the dates across which the recurring
task will occur
7. Select a calendar for scheduling the task
8. Click OK
Nodes in Network Diagram view
Dependencies
Dependency Gantt bar example Description
Finish-to-Start (FS) Task B cannot start
unless Task A is finished.
Start-to-Start (SS) Task B cannot start
unless Task A starts.
Finish-to-Finish
(FF)
Task B cannot finish
unless Task A is finished.
Start-to-Finish (SF) Task B cannot finish
unless Task A starts.
Task Dependency dialog box
Task types
Type Description
Fixed Duration Has a constant time value
Fixed Work Has a constant value for
the total work to be
performed
Fixed Unit Has a constant quantity or
units-of-resource value
Task constraints
Constraint Description
As Late As Possible Schedules a task to start
as late as possible
As Soon As Possible Schedules a task to begin
as early as possible
Finish No Earlier Than Schedules a task to finish
on or after a specified date
Finish No Later Than Schedules a task to finish
on or before a specified
date
continued
Task constraints, continued
Constraint Description
Must Finish On Schedules a task to finish
on the specified date
Must Start On Schedules a task to start on
a specified date
Start No Earlier Than Schedules a task to start on
or after a specified date
Start No Later Than Schedules a task to start on
or before a specified date
RESOURCE MANAGEMENT
Topic 4
Create a base calendar
1. On the Project tab, click Change Working
Time
2. Click Create New Calendar
3. Type a name for the calendar
4. Select “Create new base calendar” and click
OK
5. Make the necessary changes in the calendar
6. Specify the calendar exceptions and working
times for the work weeks
7. Click OK
8. On the Ribbon, click Project Information
9. Select the new base calendar and click OK
Change Working Time
Resource types
 Work resource
– Performs work on a task
– Examples: people, equipment
 Cost resource
– Fixed amount of money applied to a task
without making the cost dependent on work
performed
– Examples: storage facility costs, airfare
 Material resource
– Item used to perform work on a task
– Examples: paint, wood, steel, fuel
Assign resources
1. Switch to Gantt Chart view
2. Select the task to which you want to
assign a resource
3. On the Task tab, click Assign
Resources
4. Select a resource and click Assign
5. Click Close
VIEWS AND TABLES
Topic 5
Calendar view
Timeline formatting
Insert a column(ex: WBS)
1. Right-click the column heading that’s
to the right of where you want to
insert the WBS column
2. Choose Insert Column
3. Type WBS and press Enter
4. Resize the column as needed
WBS codes
FILTERS, GROUPS AND
SORTING
Topic 6
Filter a view
1. Click the View tab
2. From the Filter list, select a filter
3. To return to an unfiltered view,
choose [No Filter] from the Filter list
Apply an AutoFilter
1. In the Sheet pane, click the arrow on
the right edge of the column you want
to filter by
2. Do either of the following:
– Click Filters and select a built-in option
– Clear Select All, and check only the
items you want to see
A grouped task list
PRJ102i – Project 2013
Advanced
www.ocdatabases.com
slides.1@ocdatabases.com
949-489-1472
Project 2013: Advanced
1. Using Templates and Importing Data
2. Managing a Project
3. Analyzing and Adjusting the Plan
4. Working with Reports
5. Customizing Project
6. Managing Multiple Projects
7. Exchanging Project Information
MANAGING A PROJECT
Topic 2
Save a baseline plan
1. Click the Project tab
2. Click Set Baseline and select Set
Baseline
3. Verify that “Entire project” is selected,
and click OK
Update a baseline plan
1. Select the new tasks that were not
part of the original baseline plan
2. On the Project tab, click Set Baseline
and select Set Baseline
3. Check the date to make sure you’re
updating the correct baseline plan; or
select the correct baseline plan from
the list
4. Select “Selected tasks” and click OK
5. Click Yes
Task bars in Tracking Gantt view
Update actual start and finish dates
1. Select the task you want to update
2. On the Task tab, click the arrow next
to Mark on Track
3. Select Update Tasks
4. Enter the actual start and finish dates
if the task did not start and/or finish
on the scheduled dates
5. Click OK
The status date
 Important component of project
management
– At varying intervals, you’ll want to get
task status information from resources
 Use the last day of a reporting period
as the status date
– It represents the end of that day
 Project uses the status date for
calculating progress
Progress in Network Diagram view
ANALYZING AND ADJUSTING
THE PLAN
Topic 3
The Project Statistics dialog box
WORKING WITH REPORTS
Topic 4
Report categories
Project Overview report
Printing a date range
Create a visual report
1. On the Reports tab, click Visual
Reports
2. Select the visual report you want to
create
3. Select the level of usage data to be
included
4. Click View to generate the report and
open it
5. In Excel or Visio, make any needed
changes, and save the file
A visual report
CUSTOMIZING A PROJECT
Topic 5
Customize the timescale
1. Right-click the timescale and choose
Timescale
2. From the Show list, select the tiers
you want to display
3. Click a Tier tab
4. Select the desired units, label,
alignment, and count
5. Repeat steps 3-4 for the other tiers
6. Click OK
The Timescale dialog box
Project 2013 Accelerated
 Please fill out your evaluations and
submit them to your instructor or
online
 Enjoy using Project!

Mais conteúdo relacionado

Mais procurados

How to create S-Curve by MS Project 2013
How to create S-Curve by MS Project 2013How to create S-Curve by MS Project 2013
How to create S-Curve by MS Project 2013Ong-Art Sanpinit
 
How to Create S-Curve by MS Project 2010
How to Create S-Curve by MS Project 2010How to Create S-Curve by MS Project 2010
How to Create S-Curve by MS Project 2010Ong-Art Sanpinit
 
Project management by MS Project 2010
Project management by MS Project 2010Project management by MS Project 2010
Project management by MS Project 2010Wadhwani Foundation
 
05 Formatting and Sharing Your Plan
05 Formatting and Sharing Your Plan 05 Formatting and Sharing Your Plan
05 Formatting and Sharing Your Plan Soe Naing Win
 
Ms project 2000 tutorial
Ms project 2000 tutorialMs project 2000 tutorial
Ms project 2000 tutorialpaolocollector
 
MS Project 2010 Quick Reference Card
MS Project 2010  Quick Reference CardMS Project 2010  Quick Reference Card
MS Project 2010 Quick Reference CardSoe Naing Win
 
Microsoft project 2003
Microsoft project 2003Microsoft project 2003
Microsoft project 2003pparakh
 
Creating a task list
Creating a task listCreating a task list
Creating a task listahmed hamza
 
MS Project Svcs Productivity
MS Project Svcs ProductivityMS Project Svcs Productivity
MS Project Svcs Productivityedmahler
 
Primavera Project Management P6 Course session 5
Primavera Project Management P6 Course session 5Primavera Project Management P6 Course session 5
Primavera Project Management P6 Course session 5Mohamed Adel
 
204460 create s curve reports
204460 create s curve reports204460 create s curve reports
204460 create s curve reportsp6academy
 
Product Management Training - MS Project Training
Product Management Training - MS Project TrainingProduct Management Training - MS Project Training
Product Management Training - MS Project Trainingguest2739cfb
 
Project 2007 full handout
Project 2007 full handoutProject 2007 full handout
Project 2007 full handoutZenawi Mehari
 
Primavera - Tutorial
Primavera - TutorialPrimavera - Tutorial
Primavera - TutorialRajeev Sharma
 
Understanding Microsoft Project 'Calendars' ‘Working Time’, etc
Understanding Microsoft Project 'Calendars' ‘Working Time’, etcUnderstanding Microsoft Project 'Calendars' ‘Working Time’, etc
Understanding Microsoft Project 'Calendars' ‘Working Time’, etcKhalid Noor Mohammed
 

Mais procurados (20)

Project Management Quick Reference Guide
Project Management Quick Reference GuideProject Management Quick Reference Guide
Project Management Quick Reference Guide
 
How to create S-Curve by MS Project 2013
How to create S-Curve by MS Project 2013How to create S-Curve by MS Project 2013
How to create S-Curve by MS Project 2013
 
How to Create S-Curve by MS Project 2010
How to Create S-Curve by MS Project 2010How to Create S-Curve by MS Project 2010
How to Create S-Curve by MS Project 2010
 
Project management by MS Project 2010
Project management by MS Project 2010Project management by MS Project 2010
Project management by MS Project 2010
 
05 Formatting and Sharing Your Plan
05 Formatting and Sharing Your Plan 05 Formatting and Sharing Your Plan
05 Formatting and Sharing Your Plan
 
Microsoft project 2010
Microsoft project 2010Microsoft project 2010
Microsoft project 2010
 
Ms project 2000 tutorial
Ms project 2000 tutorialMs project 2000 tutorial
Ms project 2000 tutorial
 
MS Project 2010 Quick Reference Card
MS Project 2010  Quick Reference CardMS Project 2010  Quick Reference Card
MS Project 2010 Quick Reference Card
 
Microsoft project 2003
Microsoft project 2003Microsoft project 2003
Microsoft project 2003
 
Project management software
Project management softwareProject management software
Project management software
 
Creating a task list
Creating a task listCreating a task list
Creating a task list
 
MS Project Svcs Productivity
MS Project Svcs ProductivityMS Project Svcs Productivity
MS Project Svcs Productivity
 
Primavera Project Management P6 Course session 5
Primavera Project Management P6 Course session 5Primavera Project Management P6 Course session 5
Primavera Project Management P6 Course session 5
 
204460 create s curve reports
204460 create s curve reports204460 create s curve reports
204460 create s curve reports
 
Product Management Training - MS Project Training
Product Management Training - MS Project TrainingProduct Management Training - MS Project Training
Product Management Training - MS Project Training
 
Project 2007 full handout
Project 2007 full handoutProject 2007 full handout
Project 2007 full handout
 
Microsoft Project 2013
Microsoft Project 2013Microsoft Project 2013
Microsoft Project 2013
 
BhadaniS Microsoft Project Manual Training
BhadaniS Microsoft Project Manual TrainingBhadaniS Microsoft Project Manual Training
BhadaniS Microsoft Project Manual Training
 
Primavera - Tutorial
Primavera - TutorialPrimavera - Tutorial
Primavera - Tutorial
 
Understanding Microsoft Project 'Calendars' ‘Working Time’, etc
Understanding Microsoft Project 'Calendars' ‘Working Time’, etcUnderstanding Microsoft Project 'Calendars' ‘Working Time’, etc
Understanding Microsoft Project 'Calendars' ‘Working Time’, etc
 

Semelhante a PRJ101a Project 2013 Accelerated

Project NameCommunication PlanOverviewEffective and .docx
Project NameCommunication PlanOverviewEffective and .docxProject NameCommunication PlanOverviewEffective and .docx
Project NameCommunication PlanOverviewEffective and .docxwkyra78
 
Microsoft Project for Professionals - 5 Simple & Practical Steps to Mastering...
Microsoft Project for Professionals - 5 Simple & Practical Steps to Mastering...Microsoft Project for Professionals - 5 Simple & Practical Steps to Mastering...
Microsoft Project for Professionals - 5 Simple & Practical Steps to Mastering...DeltaBahn
 
Lesson 3 PMT Getting the Project basics right.pptx
Lesson 3 PMT Getting the Project basics right.pptxLesson 3 PMT Getting the Project basics right.pptx
Lesson 3 PMT Getting the Project basics right.pptxamirasghar6
 
Project 2013 - 4 Simple & Practical Steps to Mastering Reporting Basics in un...
Project 2013 - 4 Simple & Practical Steps to Mastering Reporting Basics in un...Project 2013 - 4 Simple & Practical Steps to Mastering Reporting Basics in un...
Project 2013 - 4 Simple & Practical Steps to Mastering Reporting Basics in un...DeltaBahn
 
02 Creating A Task List
02 Creating A Task List02 Creating A Task List
02 Creating A Task ListSoe Naing Win
 
Using Microsoft Project 2003
Using Microsoft Project 2003Using Microsoft Project 2003
Using Microsoft Project 2003pparakh
 
Ms project tutorial
Ms project tutorialMs project tutorial
Ms project tutorialRonald Oroya
 
CSCI 714 Software Project Planning and EstimationLec.docx
CSCI 714 Software Project Planning and EstimationLec.docxCSCI 714 Software Project Planning and EstimationLec.docx
CSCI 714 Software Project Planning and EstimationLec.docxmydrynan
 
Project management course lecture Notes from Yom college
Project management course lecture Notes from Yom collegeProject management course lecture Notes from Yom college
Project management course lecture Notes from Yom collegeAbebaw31
 
Project 2013: 3 Simple & Practical Steps to Resource Basics in under 20 Minutes
Project 2013: 3 Simple & Practical Steps to Resource Basics in under 20 MinutesProject 2013: 3 Simple & Practical Steps to Resource Basics in under 20 Minutes
Project 2013: 3 Simple & Practical Steps to Resource Basics in under 20 MinutesDeltaBahn
 
MProjectTutorial.pdf
MProjectTutorial.pdfMProjectTutorial.pdf
MProjectTutorial.pdfdhansingh21
 
How to Build an Agile Project Schedule in Elementool
How to Build an Agile Project Schedule in ElementoolHow to Build an Agile Project Schedule in Elementool
How to Build an Agile Project Schedule in ElementoolPerry Moore
 
Pm quick reference guide
Pm quick reference guidePm quick reference guide
Pm quick reference guideGeorge Singer
 
MS Project - Lesson #1A - Basics of Project Scheduling - Part 1O.docx
MS Project - Lesson #1A - Basics of Project Scheduling - Part 1O.docxMS Project - Lesson #1A - Basics of Project Scheduling - Part 1O.docx
MS Project - Lesson #1A - Basics of Project Scheduling - Part 1O.docxrosemarybdodson23141
 
How to Create S Curve by MS Project 2013
How to Create S Curve by MS Project 2013How to Create S Curve by MS Project 2013
How to Create S Curve by MS Project 2013Ong-Art Sanpinit
 
Clarizen cheat sheet v1.0
Clarizen cheat sheet v1.0Clarizen cheat sheet v1.0
Clarizen cheat sheet v1.0hphan01
 
2015 Luminant Energy Process Guide
2015 Luminant Energy Process Guide2015 Luminant Energy Process Guide
2015 Luminant Energy Process GuideKelly Stark
 

Semelhante a PRJ101a Project 2013 Accelerated (20)

Project NameCommunication PlanOverviewEffective and .docx
Project NameCommunication PlanOverviewEffective and .docxProject NameCommunication PlanOverviewEffective and .docx
Project NameCommunication PlanOverviewEffective and .docx
 
PM Lab7
PM Lab7 PM Lab7
PM Lab7
 
Microsoft Project for Professionals - 5 Simple & Practical Steps to Mastering...
Microsoft Project for Professionals - 5 Simple & Practical Steps to Mastering...Microsoft Project for Professionals - 5 Simple & Practical Steps to Mastering...
Microsoft Project for Professionals - 5 Simple & Practical Steps to Mastering...
 
Lesson 3 PMT Getting the Project basics right.pptx
Lesson 3 PMT Getting the Project basics right.pptxLesson 3 PMT Getting the Project basics right.pptx
Lesson 3 PMT Getting the Project basics right.pptx
 
Project 2013 - 4 Simple & Practical Steps to Mastering Reporting Basics in un...
Project 2013 - 4 Simple & Practical Steps to Mastering Reporting Basics in un...Project 2013 - 4 Simple & Practical Steps to Mastering Reporting Basics in un...
Project 2013 - 4 Simple & Practical Steps to Mastering Reporting Basics in un...
 
02 Creating A Task List
02 Creating A Task List02 Creating A Task List
02 Creating A Task List
 
Using Microsoft Project 2003
Using Microsoft Project 2003Using Microsoft Project 2003
Using Microsoft Project 2003
 
Ms project tutorial
Ms project tutorialMs project tutorial
Ms project tutorial
 
CSCI 714 Software Project Planning and EstimationLec.docx
CSCI 714 Software Project Planning and EstimationLec.docxCSCI 714 Software Project Planning and EstimationLec.docx
CSCI 714 Software Project Planning and EstimationLec.docx
 
Project management course lecture Notes from Yom college
Project management course lecture Notes from Yom collegeProject management course lecture Notes from Yom college
Project management course lecture Notes from Yom college
 
Project 2013: 3 Simple & Practical Steps to Resource Basics in under 20 Minutes
Project 2013: 3 Simple & Practical Steps to Resource Basics in under 20 MinutesProject 2013: 3 Simple & Practical Steps to Resource Basics in under 20 Minutes
Project 2013: 3 Simple & Practical Steps to Resource Basics in under 20 Minutes
 
MProjectTutorial.pdf
MProjectTutorial.pdfMProjectTutorial.pdf
MProjectTutorial.pdf
 
How to Build an Agile Project Schedule in Elementool
How to Build an Agile Project Schedule in ElementoolHow to Build an Agile Project Schedule in Elementool
How to Build an Agile Project Schedule in Elementool
 
Omni plan 2-manual
Omni plan 2-manualOmni plan 2-manual
Omni plan 2-manual
 
Pm quick reference guide
Pm quick reference guidePm quick reference guide
Pm quick reference guide
 
MS Project - Lesson #1A - Basics of Project Scheduling - Part 1O.docx
MS Project - Lesson #1A - Basics of Project Scheduling - Part 1O.docxMS Project - Lesson #1A - Basics of Project Scheduling - Part 1O.docx
MS Project - Lesson #1A - Basics of Project Scheduling - Part 1O.docx
 
How to Create S Curve by MS Project 2013
How to Create S Curve by MS Project 2013How to Create S Curve by MS Project 2013
How to Create S Curve by MS Project 2013
 
Clarizen cheat sheet v1.0
Clarizen cheat sheet v1.0Clarizen cheat sheet v1.0
Clarizen cheat sheet v1.0
 
Microsoft Project Foundations Course.pptx
Microsoft Project Foundations Course.pptxMicrosoft Project Foundations Course.pptx
Microsoft Project Foundations Course.pptx
 
2015 Luminant Energy Process Guide
2015 Luminant Energy Process Guide2015 Luminant Energy Process Guide
2015 Luminant Energy Process Guide
 

Mais de Dan D'Urso

SQL201S Accelerated Introduction to MySQL Queries
SQL201S Accelerated Introduction to MySQL QueriesSQL201S Accelerated Introduction to MySQL Queries
SQL201S Accelerated Introduction to MySQL QueriesDan D'Urso
 
LCD201d Database Diagramming with Lucidchart
LCD201d Database Diagramming with LucidchartLCD201d Database Diagramming with Lucidchart
LCD201d Database Diagramming with LucidchartDan D'Urso
 
Database Normalization
Database NormalizationDatabase Normalization
Database NormalizationDan D'Urso
 
VIS201d Visio Database Diagramming
VIS201d Visio Database DiagrammingVIS201d Visio Database Diagramming
VIS201d Visio Database DiagrammingDan D'Urso
 
Introduction to coding using Python
Introduction to coding using PythonIntroduction to coding using Python
Introduction to coding using PythonDan D'Urso
 
Stem conference
Stem conferenceStem conference
Stem conferenceDan D'Urso
 
SQL200A Microsoft Access SQL Design
SQL200A Microsoft Access SQL DesignSQL200A Microsoft Access SQL Design
SQL200A Microsoft Access SQL DesignDan D'Urso
 
Microsoft access self joins
Microsoft access self joinsMicrosoft access self joins
Microsoft access self joinsDan D'Urso
 
SQL302 Intermediate SQL
SQL302 Intermediate SQLSQL302 Intermediate SQL
SQL302 Intermediate SQLDan D'Urso
 
AIN106 Access Reporting and Analysis
AIN106 Access Reporting and AnalysisAIN106 Access Reporting and Analysis
AIN106 Access Reporting and AnalysisDan D'Urso
 
SQL302 Intermediate SQL Workshop 3
SQL302 Intermediate SQL Workshop 3SQL302 Intermediate SQL Workshop 3
SQL302 Intermediate SQL Workshop 3Dan D'Urso
 
SQL302 Intermediate SQL Workshop 2
SQL302 Intermediate SQL Workshop 2SQL302 Intermediate SQL Workshop 2
SQL302 Intermediate SQL Workshop 2Dan D'Urso
 
Course Catalog
Course CatalogCourse Catalog
Course CatalogDan D'Urso
 
SQL302 Intermediate SQL Workshop 1
SQL302 Intermediate SQL Workshop 1SQL302 Intermediate SQL Workshop 1
SQL302 Intermediate SQL Workshop 1Dan D'Urso
 
SQL212 Oracle SQL Manual
SQL212 Oracle SQL ManualSQL212 Oracle SQL Manual
SQL212 Oracle SQL ManualDan D'Urso
 
SQL201W MySQL SQL Manual
SQL201W MySQL SQL ManualSQL201W MySQL SQL Manual
SQL201W MySQL SQL ManualDan D'Urso
 
SQL206 SQL Median
SQL206 SQL MedianSQL206 SQL Median
SQL206 SQL MedianDan D'Urso
 
SQL202.3 Accelerated Introduction to SQL Using SQL Server Module 3
SQL202.3 Accelerated Introduction to SQL Using SQL Server Module 3SQL202.3 Accelerated Introduction to SQL Using SQL Server Module 3
SQL202.3 Accelerated Introduction to SQL Using SQL Server Module 3Dan D'Urso
 
SQL202.2 Accelerated Introduction to SQL Using SQL Server Module 2
SQL202.2 Accelerated Introduction to SQL Using SQL Server Module 2SQL202.2 Accelerated Introduction to SQL Using SQL Server Module 2
SQL202.2 Accelerated Introduction to SQL Using SQL Server Module 2Dan D'Urso
 

Mais de Dan D'Urso (20)

SQL201S Accelerated Introduction to MySQL Queries
SQL201S Accelerated Introduction to MySQL QueriesSQL201S Accelerated Introduction to MySQL Queries
SQL201S Accelerated Introduction to MySQL Queries
 
LCD201d Database Diagramming with Lucidchart
LCD201d Database Diagramming with LucidchartLCD201d Database Diagramming with Lucidchart
LCD201d Database Diagramming with Lucidchart
 
Database Normalization
Database NormalizationDatabase Normalization
Database Normalization
 
VIS201d Visio Database Diagramming
VIS201d Visio Database DiagrammingVIS201d Visio Database Diagramming
VIS201d Visio Database Diagramming
 
Introduction to coding using Python
Introduction to coding using PythonIntroduction to coding using Python
Introduction to coding using Python
 
Stem conference
Stem conferenceStem conference
Stem conference
 
SQL200A Microsoft Access SQL Design
SQL200A Microsoft Access SQL DesignSQL200A Microsoft Access SQL Design
SQL200A Microsoft Access SQL Design
 
Microsoft access self joins
Microsoft access self joinsMicrosoft access self joins
Microsoft access self joins
 
SQL302 Intermediate SQL
SQL302 Intermediate SQLSQL302 Intermediate SQL
SQL302 Intermediate SQL
 
AIN106 Access Reporting and Analysis
AIN106 Access Reporting and AnalysisAIN106 Access Reporting and Analysis
AIN106 Access Reporting and Analysis
 
SQL302 Intermediate SQL Workshop 3
SQL302 Intermediate SQL Workshop 3SQL302 Intermediate SQL Workshop 3
SQL302 Intermediate SQL Workshop 3
 
SQL302 Intermediate SQL Workshop 2
SQL302 Intermediate SQL Workshop 2SQL302 Intermediate SQL Workshop 2
SQL302 Intermediate SQL Workshop 2
 
Course Catalog
Course CatalogCourse Catalog
Course Catalog
 
SQL302 Intermediate SQL Workshop 1
SQL302 Intermediate SQL Workshop 1SQL302 Intermediate SQL Workshop 1
SQL302 Intermediate SQL Workshop 1
 
SQL212 Oracle SQL Manual
SQL212 Oracle SQL ManualSQL212 Oracle SQL Manual
SQL212 Oracle SQL Manual
 
SQL201W MySQL SQL Manual
SQL201W MySQL SQL ManualSQL201W MySQL SQL Manual
SQL201W MySQL SQL Manual
 
AIN100
AIN100AIN100
AIN100
 
SQL206 SQL Median
SQL206 SQL MedianSQL206 SQL Median
SQL206 SQL Median
 
SQL202.3 Accelerated Introduction to SQL Using SQL Server Module 3
SQL202.3 Accelerated Introduction to SQL Using SQL Server Module 3SQL202.3 Accelerated Introduction to SQL Using SQL Server Module 3
SQL202.3 Accelerated Introduction to SQL Using SQL Server Module 3
 
SQL202.2 Accelerated Introduction to SQL Using SQL Server Module 2
SQL202.2 Accelerated Introduction to SQL Using SQL Server Module 2SQL202.2 Accelerated Introduction to SQL Using SQL Server Module 2
SQL202.2 Accelerated Introduction to SQL Using SQL Server Module 2
 

Último

Amazon Bedrock in Action - presentation of the Bedrock's capabilities
Amazon Bedrock in Action - presentation of the Bedrock's capabilitiesAmazon Bedrock in Action - presentation of the Bedrock's capabilities
Amazon Bedrock in Action - presentation of the Bedrock's capabilitiesKrzysztofKkol1
 
OpenChain AI Study Group - Europe and Asia Recap - 2024-04-11 - Full Recording
OpenChain AI Study Group - Europe and Asia Recap - 2024-04-11 - Full RecordingOpenChain AI Study Group - Europe and Asia Recap - 2024-04-11 - Full Recording
OpenChain AI Study Group - Europe and Asia Recap - 2024-04-11 - Full RecordingShane Coughlan
 
eSoftTools IMAP Backup Software and migration tools
eSoftTools IMAP Backup Software and migration toolseSoftTools IMAP Backup Software and migration tools
eSoftTools IMAP Backup Software and migration toolsosttopstonverter
 
Revolutionizing the Digital Transformation Office - Leveraging OnePlan’s AI a...
Revolutionizing the Digital Transformation Office - Leveraging OnePlan’s AI a...Revolutionizing the Digital Transformation Office - Leveraging OnePlan’s AI a...
Revolutionizing the Digital Transformation Office - Leveraging OnePlan’s AI a...OnePlan Solutions
 
The Role of IoT and Sensor Technology in Cargo Cloud Solutions.pptx
The Role of IoT and Sensor Technology in Cargo Cloud Solutions.pptxThe Role of IoT and Sensor Technology in Cargo Cloud Solutions.pptx
The Role of IoT and Sensor Technology in Cargo Cloud Solutions.pptxRTS corp
 
Keeping your build tool updated in a multi repository world
Keeping your build tool updated in a multi repository worldKeeping your build tool updated in a multi repository world
Keeping your build tool updated in a multi repository worldRoberto Pérez Alcolea
 
SAM Training Session - How to use EXCEL ?
SAM Training Session - How to use EXCEL ?SAM Training Session - How to use EXCEL ?
SAM Training Session - How to use EXCEL ?Alexandre Beguel
 
Understanding Plagiarism: Causes, Consequences and Prevention.pptx
Understanding Plagiarism: Causes, Consequences and Prevention.pptxUnderstanding Plagiarism: Causes, Consequences and Prevention.pptx
Understanding Plagiarism: Causes, Consequences and Prevention.pptxSasikiranMarri
 
The Ultimate Guide to Performance Testing in Low-Code, No-Code Environments (...
The Ultimate Guide to Performance Testing in Low-Code, No-Code Environments (...The Ultimate Guide to Performance Testing in Low-Code, No-Code Environments (...
The Ultimate Guide to Performance Testing in Low-Code, No-Code Environments (...kalichargn70th171
 
Understanding Flamingo - DeepMind's VLM Architecture
Understanding Flamingo - DeepMind's VLM ArchitectureUnderstanding Flamingo - DeepMind's VLM Architecture
Understanding Flamingo - DeepMind's VLM Architecturerahul_net
 
Tech Tuesday Slides - Introduction to Project Management with OnePlan's Work ...
Tech Tuesday Slides - Introduction to Project Management with OnePlan's Work ...Tech Tuesday Slides - Introduction to Project Management with OnePlan's Work ...
Tech Tuesday Slides - Introduction to Project Management with OnePlan's Work ...OnePlan Solutions
 
Large Language Models for Test Case Evolution and Repair
Large Language Models for Test Case Evolution and RepairLarge Language Models for Test Case Evolution and Repair
Large Language Models for Test Case Evolution and RepairLionel Briand
 
Advantages of Cargo Cloud Solutions.pptx
Advantages of Cargo Cloud Solutions.pptxAdvantages of Cargo Cloud Solutions.pptx
Advantages of Cargo Cloud Solutions.pptxRTS corp
 
Mastering Project Planning with Microsoft Project 2016.pptx
Mastering Project Planning with Microsoft Project 2016.pptxMastering Project Planning with Microsoft Project 2016.pptx
Mastering Project Planning with Microsoft Project 2016.pptxAS Design & AST.
 
VictoriaMetrics Q1 Meet Up '24 - Community & News Update
VictoriaMetrics Q1 Meet Up '24 - Community & News UpdateVictoriaMetrics Q1 Meet Up '24 - Community & News Update
VictoriaMetrics Q1 Meet Up '24 - Community & News UpdateVictoriaMetrics
 
JavaLand 2024 - Going serverless with Quarkus GraalVM native images and AWS L...
JavaLand 2024 - Going serverless with Quarkus GraalVM native images and AWS L...JavaLand 2024 - Going serverless with Quarkus GraalVM native images and AWS L...
JavaLand 2024 - Going serverless with Quarkus GraalVM native images and AWS L...Bert Jan Schrijver
 
2024-04-09 - From Complexity to Clarity - AWS Summit AMS.pdf
2024-04-09 - From Complexity to Clarity - AWS Summit AMS.pdf2024-04-09 - From Complexity to Clarity - AWS Summit AMS.pdf
2024-04-09 - From Complexity to Clarity - AWS Summit AMS.pdfAndrey Devyatkin
 
GraphSummit Madrid - Product Vision and Roadmap - Luis Salvador Neo4j
GraphSummit Madrid - Product Vision and Roadmap - Luis Salvador Neo4jGraphSummit Madrid - Product Vision and Roadmap - Luis Salvador Neo4j
GraphSummit Madrid - Product Vision and Roadmap - Luis Salvador Neo4jNeo4j
 
Zer0con 2024 final share short version.pdf
Zer0con 2024 final share short version.pdfZer0con 2024 final share short version.pdf
Zer0con 2024 final share short version.pdfmaor17
 
Leveraging AI for Mobile App Testing on Real Devices | Applitools + Kobiton
Leveraging AI for Mobile App Testing on Real Devices | Applitools + KobitonLeveraging AI for Mobile App Testing on Real Devices | Applitools + Kobiton
Leveraging AI for Mobile App Testing on Real Devices | Applitools + KobitonApplitools
 

Último (20)

Amazon Bedrock in Action - presentation of the Bedrock's capabilities
Amazon Bedrock in Action - presentation of the Bedrock's capabilitiesAmazon Bedrock in Action - presentation of the Bedrock's capabilities
Amazon Bedrock in Action - presentation of the Bedrock's capabilities
 
OpenChain AI Study Group - Europe and Asia Recap - 2024-04-11 - Full Recording
OpenChain AI Study Group - Europe and Asia Recap - 2024-04-11 - Full RecordingOpenChain AI Study Group - Europe and Asia Recap - 2024-04-11 - Full Recording
OpenChain AI Study Group - Europe and Asia Recap - 2024-04-11 - Full Recording
 
eSoftTools IMAP Backup Software and migration tools
eSoftTools IMAP Backup Software and migration toolseSoftTools IMAP Backup Software and migration tools
eSoftTools IMAP Backup Software and migration tools
 
Revolutionizing the Digital Transformation Office - Leveraging OnePlan’s AI a...
Revolutionizing the Digital Transformation Office - Leveraging OnePlan’s AI a...Revolutionizing the Digital Transformation Office - Leveraging OnePlan’s AI a...
Revolutionizing the Digital Transformation Office - Leveraging OnePlan’s AI a...
 
The Role of IoT and Sensor Technology in Cargo Cloud Solutions.pptx
The Role of IoT and Sensor Technology in Cargo Cloud Solutions.pptxThe Role of IoT and Sensor Technology in Cargo Cloud Solutions.pptx
The Role of IoT and Sensor Technology in Cargo Cloud Solutions.pptx
 
Keeping your build tool updated in a multi repository world
Keeping your build tool updated in a multi repository worldKeeping your build tool updated in a multi repository world
Keeping your build tool updated in a multi repository world
 
SAM Training Session - How to use EXCEL ?
SAM Training Session - How to use EXCEL ?SAM Training Session - How to use EXCEL ?
SAM Training Session - How to use EXCEL ?
 
Understanding Plagiarism: Causes, Consequences and Prevention.pptx
Understanding Plagiarism: Causes, Consequences and Prevention.pptxUnderstanding Plagiarism: Causes, Consequences and Prevention.pptx
Understanding Plagiarism: Causes, Consequences and Prevention.pptx
 
The Ultimate Guide to Performance Testing in Low-Code, No-Code Environments (...
The Ultimate Guide to Performance Testing in Low-Code, No-Code Environments (...The Ultimate Guide to Performance Testing in Low-Code, No-Code Environments (...
The Ultimate Guide to Performance Testing in Low-Code, No-Code Environments (...
 
Understanding Flamingo - DeepMind's VLM Architecture
Understanding Flamingo - DeepMind's VLM ArchitectureUnderstanding Flamingo - DeepMind's VLM Architecture
Understanding Flamingo - DeepMind's VLM Architecture
 
Tech Tuesday Slides - Introduction to Project Management with OnePlan's Work ...
Tech Tuesday Slides - Introduction to Project Management with OnePlan's Work ...Tech Tuesday Slides - Introduction to Project Management with OnePlan's Work ...
Tech Tuesday Slides - Introduction to Project Management with OnePlan's Work ...
 
Large Language Models for Test Case Evolution and Repair
Large Language Models for Test Case Evolution and RepairLarge Language Models for Test Case Evolution and Repair
Large Language Models for Test Case Evolution and Repair
 
Advantages of Cargo Cloud Solutions.pptx
Advantages of Cargo Cloud Solutions.pptxAdvantages of Cargo Cloud Solutions.pptx
Advantages of Cargo Cloud Solutions.pptx
 
Mastering Project Planning with Microsoft Project 2016.pptx
Mastering Project Planning with Microsoft Project 2016.pptxMastering Project Planning with Microsoft Project 2016.pptx
Mastering Project Planning with Microsoft Project 2016.pptx
 
VictoriaMetrics Q1 Meet Up '24 - Community & News Update
VictoriaMetrics Q1 Meet Up '24 - Community & News UpdateVictoriaMetrics Q1 Meet Up '24 - Community & News Update
VictoriaMetrics Q1 Meet Up '24 - Community & News Update
 
JavaLand 2024 - Going serverless with Quarkus GraalVM native images and AWS L...
JavaLand 2024 - Going serverless with Quarkus GraalVM native images and AWS L...JavaLand 2024 - Going serverless with Quarkus GraalVM native images and AWS L...
JavaLand 2024 - Going serverless with Quarkus GraalVM native images and AWS L...
 
2024-04-09 - From Complexity to Clarity - AWS Summit AMS.pdf
2024-04-09 - From Complexity to Clarity - AWS Summit AMS.pdf2024-04-09 - From Complexity to Clarity - AWS Summit AMS.pdf
2024-04-09 - From Complexity to Clarity - AWS Summit AMS.pdf
 
GraphSummit Madrid - Product Vision and Roadmap - Luis Salvador Neo4j
GraphSummit Madrid - Product Vision and Roadmap - Luis Salvador Neo4jGraphSummit Madrid - Product Vision and Roadmap - Luis Salvador Neo4j
GraphSummit Madrid - Product Vision and Roadmap - Luis Salvador Neo4j
 
Zer0con 2024 final share short version.pdf
Zer0con 2024 final share short version.pdfZer0con 2024 final share short version.pdf
Zer0con 2024 final share short version.pdf
 
Leveraging AI for Mobile App Testing on Real Devices | Applitools + Kobiton
Leveraging AI for Mobile App Testing on Real Devices | Applitools + KobitonLeveraging AI for Mobile App Testing on Real Devices | Applitools + Kobiton
Leveraging AI for Mobile App Testing on Real Devices | Applitools + Kobiton
 

PRJ101a Project 2013 Accelerated

  • 1. PRJ101A – Project 2013 Accelerated www.ocdatabases.com slides.1@ocdatabases.com 949-489-1472
  • 2. PRJ101x Project Accelerated  Introduction (s)  Facilities  Course Packet (May vary by course and class) – Student Questionnaire – Collaterals (Maps, Catalog, Etc.) – Comprehensive ILT Manual – Evaluation form – Training certificate
  • 3. PRJ101A – Project 2013 Accelerated  Based on courseware from Logical Operations  Emphasis on creating and tracking schedules  Does not go into resources in depth  Consists of… – PRJ101X – Most topics except resources – PRJ102I – Selected topics
  • 4. 4
  • 5. PRJ101x – Project 2013 Basic www.ocdatabases.com slides.1@ocdatabases.com 949-489-1472
  • 6. Project 2013: Basic 1. Getting started 2. Tasks 3. Task scheduling 4. Resource management 5. Views and tables 6. Filters, groups, and sorting 7. Finalizing the task plan
  • 9. Links between project phases Initial phase Planning phase Close-out phase Implementation phase Monitoring phase Initiating tasks Planning tasks Executing tasks Monitoring tasks Closing tasks Controlling phases and communication
  • 10. Typical project management tasks Project management tasks Planning tasks Monitoring and tracking tasks Build the plan Fine-tune the plan Link tasks Assign resources and costs Set a project start date Enter task names and duration Set a baseline Communicate with the team Enter actuals Track variance Adjust the schedule Print reports
  • 12. A task list in Gantt Chart view
  • 14. The Project 2013 interface
  • 16. A sample file in Gantt Chart view
  • 17. Open a Project file 1. Click the File tab and click Open 2. Navigate to and select the Project file that you want to open 3. Click Open (or double-click the file)
  • 18. Set the project start date 1. Click the Project tab 2. In the Properties group, click Project Information Today’s date is the default project start date 3. To set a different start date, click the arrow in the Start date field and select a date from the calendar
  • 20. Define project properties 1. Click the File tab and click Info 2. In the right pane, click Project Information and choose Advanced Properties 3. Enter values on the Summary tab and click OK
  • 21. Save a new project file 1. On the Quick Access toolbar, click the Save button (or press Ctrl+S) 2. In the Save As dialog box, navigate to the location where you want to save the project file 3. Enter a file name 4. Click Save (or press Enter)
  • 23. User-controlled scheduling  The default task scheduling mode is manual  In manual scheduling mode, Project does not automatically calculate the schedule as you build task relationships  You can plug in general project information instead of actual details  Switch to automatic scheduling later to take advantage of Project’s scheduling engine
  • 24. Change default scheduling mode 1. Click the File tab 2. Click Options to open the Project Options dialog box 3. Click Schedule 4. From the “Scheduling options for this project” list, select All New Projects 5. From the “New tasks created” list, select Auto Scheduled 6. Click OK
  • 25. Add tasks to a task list 1. In the Task Name column, select the cell below the location where you want to insert the task 2. On the Task tab, click Insert Task (Or right-click the cell below where you want to insert the task and choose Insert Task) 3. Type the task information in the new row
  • 26. Delete tasks  Right-click the task and choose Delete Task  Select the row and press Delete
  • 27. Cut and paste a task 1. Click a row number to select the row 2. Click Cut 3. Click the row number below where you want to insert the cut task 4. Click Paste
  • 28. Drag selected tasks 1. Click the row number to select the row, or drag across row numbers to select sequential tasks 2. Drag the selected rows to a new position in the task list
  • 29. Create a project summary task 1. Click the Format tab 2. Check Project Summary Task 3. To rename the project summary task, select the name and type a new name
  • 31. WBS with some hidden subtasks
  • 32. Convert a task into a milestone 1. In the Sheet pane, double-click the task to open the Task Information dialog box 2. Click the Advanced tab 3. Enter 0 as the task duration, and check “Mark task as milestone” 4. Click OK
  • 34. When you link tasks:  Project automatically applies a Finish- to-Start task dependency  The start of the second task depends on the completion of the first task
  • 35. Linking tasks 1. Select the tasks 2. On the Task tab, click the Link Tasks button Or: 1. Select the tasks 2. Press Ctrl+F2
  • 36. Change a task’s predecessor 1. In the Sheet pane, double-click the task whose predecessor you want to change 2. Click the Predecessors tab 3. In the ID column, enter the task ID of the task that you want to set as the predecessor 4. Click OK
  • 37. Lag time  A delay that adds time after the completion of a task  Example: “Install trim” – If you add lag time to its predecessor, “Paint,” the paint will have time to dry before the trim installation begins Lead time  The overlap between dependent tasks (when a task can start before its predecessor finishes)
  • 38. Apply lead time or lag time 1. Double-click a task in the Sheet pane 2. Click the Predecessors tab 3. To apply lag time, enter a positive value in the Lag field for the predecessor To apply lead time, enter a negative value 4. Click OK
  • 39. Insert a recurring task 1. In the Task Name field, select the cell below where you want to insert the task 2. Click the Task arrow and choose Recurring Task 3. Enter a name for the recurring task 4. Enter the duration 5. Select a time interval 6. Enter the dates across which the recurring task will occur 7. Select a calendar for scheduling the task 8. Click OK
  • 40. Nodes in Network Diagram view
  • 41. Dependencies Dependency Gantt bar example Description Finish-to-Start (FS) Task B cannot start unless Task A is finished. Start-to-Start (SS) Task B cannot start unless Task A starts. Finish-to-Finish (FF) Task B cannot finish unless Task A is finished. Start-to-Finish (SF) Task B cannot finish unless Task A starts.
  • 43. Task types Type Description Fixed Duration Has a constant time value Fixed Work Has a constant value for the total work to be performed Fixed Unit Has a constant quantity or units-of-resource value
  • 44. Task constraints Constraint Description As Late As Possible Schedules a task to start as late as possible As Soon As Possible Schedules a task to begin as early as possible Finish No Earlier Than Schedules a task to finish on or after a specified date Finish No Later Than Schedules a task to finish on or before a specified date continued
  • 45. Task constraints, continued Constraint Description Must Finish On Schedules a task to finish on the specified date Must Start On Schedules a task to start on a specified date Start No Earlier Than Schedules a task to start on or after a specified date Start No Later Than Schedules a task to start on or before a specified date
  • 47. Create a base calendar 1. On the Project tab, click Change Working Time 2. Click Create New Calendar 3. Type a name for the calendar 4. Select “Create new base calendar” and click OK 5. Make the necessary changes in the calendar 6. Specify the calendar exceptions and working times for the work weeks 7. Click OK 8. On the Ribbon, click Project Information 9. Select the new base calendar and click OK
  • 49. Resource types  Work resource – Performs work on a task – Examples: people, equipment  Cost resource – Fixed amount of money applied to a task without making the cost dependent on work performed – Examples: storage facility costs, airfare  Material resource – Item used to perform work on a task – Examples: paint, wood, steel, fuel
  • 50. Assign resources 1. Switch to Gantt Chart view 2. Select the task to which you want to assign a resource 3. On the Task tab, click Assign Resources 4. Select a resource and click Assign 5. Click Close
  • 54. Insert a column(ex: WBS) 1. Right-click the column heading that’s to the right of where you want to insert the WBS column 2. Choose Insert Column 3. Type WBS and press Enter 4. Resize the column as needed
  • 57. Filter a view 1. Click the View tab 2. From the Filter list, select a filter 3. To return to an unfiltered view, choose [No Filter] from the Filter list
  • 58. Apply an AutoFilter 1. In the Sheet pane, click the arrow on the right edge of the column you want to filter by 2. Do either of the following: – Click Filters and select a built-in option – Clear Select All, and check only the items you want to see
  • 60. PRJ102i – Project 2013 Advanced www.ocdatabases.com slides.1@ocdatabases.com 949-489-1472
  • 61. Project 2013: Advanced 1. Using Templates and Importing Data 2. Managing a Project 3. Analyzing and Adjusting the Plan 4. Working with Reports 5. Customizing Project 6. Managing Multiple Projects 7. Exchanging Project Information
  • 63. Save a baseline plan 1. Click the Project tab 2. Click Set Baseline and select Set Baseline 3. Verify that “Entire project” is selected, and click OK
  • 64. Update a baseline plan 1. Select the new tasks that were not part of the original baseline plan 2. On the Project tab, click Set Baseline and select Set Baseline 3. Check the date to make sure you’re updating the correct baseline plan; or select the correct baseline plan from the list 4. Select “Selected tasks” and click OK 5. Click Yes
  • 65. Task bars in Tracking Gantt view
  • 66. Update actual start and finish dates 1. Select the task you want to update 2. On the Task tab, click the arrow next to Mark on Track 3. Select Update Tasks 4. Enter the actual start and finish dates if the task did not start and/or finish on the scheduled dates 5. Click OK
  • 67. The status date  Important component of project management – At varying intervals, you’ll want to get task status information from resources  Use the last day of a reporting period as the status date – It represents the end of that day  Project uses the status date for calculating progress
  • 68. Progress in Network Diagram view
  • 75. Create a visual report 1. On the Reports tab, click Visual Reports 2. Select the visual report you want to create 3. Select the level of usage data to be included 4. Click View to generate the report and open it 5. In Excel or Visio, make any needed changes, and save the file
  • 78. Customize the timescale 1. Right-click the timescale and choose Timescale 2. From the Show list, select the tiers you want to display 3. Click a Tier tab 4. Select the desired units, label, alignment, and count 5. Repeat steps 3-4 for the other tiers 6. Click OK
  • 80. Project 2013 Accelerated  Please fill out your evaluations and submit them to your instructor or online  Enjoy using Project!