The presentation describes activities of the Weights and Measures Agency in Tanzania. The presentation was made during the 49th CIML meeting in Auckland New Zealand on the 6th November 2014
How to design healthy team dynamics to deliver successful digital projects.pptx
Weights and Measures Agency - Tanzania
1. WEIGHTS AND MEASURES AGENCY
TANZANIA
Presented at the 49th CIML MEETING
[Auckland, 2014]
2. - Geographically located
in the eastern part of
Africa
- Has a total surface
area of 945,087 sq.km
- With a population of
47.6 million (UN 2012)
- and some of the continent’s
greatest concentrations of
wild animals
Facts about Tanzania
3. Contents
• Introduction
• International and regional
affiliation
• Verification and Inspection
Activities Covered
• Achievements
• Challenges
• Future plans
4. 4
Introduction
WMA was transformed into an
Executive Agency in May 2002.
Formerly, it was a department within
the Ministry of
Industry and Trade
The governing legislation for weights
and measures activities is the Weights
and Measures Act Cap 340 [R.E 2002],
but The new Legal Metrology Act is now
being developed
12. Achievements
(a) Extend consumer protection to more areas (e.g. prepackages
inspection at ports and some borders, verifying quantities of
imported fuels, etc)
14. Achievements-contd…
(c) 30 technical staff trained in electronic scales and dispensing
pumps based on OIML recommendations & documents
[invitations
were
extended
to Zambia,
Zimbabwe,
Malawi and
Uganda]
18. Challenges
1. Influx of sub-standard
scales from outside
Tanzania due to
scarcity of genuine
scales
19. Challenges - contd…..
2. Demand for
verification of other
instruments such as
medical syringes,
traffic speed
measuring
instruments, etc.
20. Challenges - contd…..
3. Fast growing technology in legal metrology (e.g. the shift from
mechanical to electronic equipment) Vs the capability to build capacity
21. Future Plans
1. Construction of modern calibration bay for vehicle tanks
22. Future Plans – contd…..
2. Construction of buildings for regional offices
23. Future Plans – contd…..
3. Procurement of a special truck for verification of weigh-bridges
24. Future Plans – contd…..