Overview
Introduction
Proposed project
Connected Load
Calculation of Connected Load
Design of Distribution Board
Current Status and Work to be completed.
2
Electrical System Design
• Electrical system design is the design of electrical systems.
• Simple systems can be created by one person. Large systems require
large teams of people, simulation software and many paper and
electronic records.
• The design should assure proper functioning of the installation.
• The design should provide safety.
3
Electrical System Design For
High Rise Buildings
• High – rise buildings are buildings having 5 floors and above, or
having a height of 15m and above.
• They normally refer to occupancy for:
 General offices
 Commercial establishments
 Hotels /Condominiums
4
Design Concept
• For all building construction the owner must first have a
concept for the new design, and then the architect or
designer can produce a set of building plans.
• An electrical design goes through several important stages
or development.
• Every electrical design has unique requirements,
depending upon the scope of the project. The project
scope is determined by the customers’ requirements and
the type of structure.
5
HIGH RISE BUILDING POWER SUPPLY
REQUIREMENTS:
1. General Lighting & Power
 light for general illumination, seeing tasks, decorative features, hallways and stairways, others
 power for appliances and office machines
2. Heating, Ventilation & Air-conditioning (HVAC) System
 air-conditioning for temperature control
 blowers and fans ventilation
 heaters for humidity control
3. Transport System
 elevators and escalators
 conveyors, dumbwaiters, others
4. Water Pumps
 potable and non-potable water supply
 water sprinkle (fire suppression)
 pumps / drainage
 sewage ejectors
5. Communication System
 PABX telephone system
 Intercom
6
6. Automatic Doors
 entrance and exit for pedestrians
 garage and freight
7. Central Computer System
 CPU and peripherals
 Terminals
8. Auxiliaries
 intrusion and hold-up control system
 fire fighting & alarm system
 background music and paging
 sound reinforcement and video facilities
 noise masking and acoustics, others
7
Proposed Project
• The proposed building “Garden Project” at Belhaven
Road, Kowdiar is a 10 storeyed building. It includes a
cellar for parking purpose, and 10 floors of which 2
floors are for commercial purpose, 1 for parking and
the remaining for residential purpose. It has a total
plinth area of 4948.34 sq. m.
8
Site Plan
9
Section
10
Cellar
11
Ground
12
First Floor
13
Second Floor
14
Third Floor
15
Fourth Floor
16
Fifth Floor
17
Terrace Floor
18
Mezzanine
19
Machine Room
20
Connected Load
 DEFINITION :The sum of the continuous power
ratings of all load-consuming apparatus connected
to an electric power distribution system or any part
thereof.
 Connected load for electricity is the maximum
amount of wattage that is allocated to a building.
 Calculation of Connected Load is done by
engineers from the utility from which the
connection is taken.
21
Description Area of the residential building (sq-m)
35 45 55 85 140
Light points 7 8 10 12 17
Ceiling fan 2-2 3-2 4-3 5-4 7-5
6A sockets 2 3 4 5 7
16A sockets - 1 2 3 4
Call Bell - - 1 1 1
Description Socket Outlets
6A 16A
Bed rooms 2-3 1
Living rooms 2-3 2
Kitchen 1 2
Dining room 2 1
Garage 1 1
For Refrigerator - 1
For Air Conditioner - 1
Verandah 1 for every 10 sq m -
Bathrooms 1 1
22
Min no. of socket outlets
Min no. of points to be provided on the basis of plinth area
Units of Electrical Energy Consumed
by common Domestic
Appliances/Equipment
ELECTRICAL APPLIANCES WATTAGE RATING
Incandescent Bulb 25W,60W,100W
Fluorescent Tube light (4feet) 40W
Fan 60W
Air Conditioner (1-1.5 ton) 1500-2500W
Refrigerator 100W
Mixer/Blender/Juicer 450W
Toaster 800W
Oven 450-700W
Electric kettle 1000/2000W
Iron 450/700W
Geyser(1.5-2 litre) 3000W
Vacuum Cleaner 700-750W
23
ELECTRICAL APPLIANCES WATTAGE RATING
Washing Machine 325W
Television 60-120W
Computer 120-600W
Radio 15W
Stereo System 50W
CFL 15W
24
Fifth floor
25
Electrical Notations
26
Calculation of Connected Load
(Fifth Floor)
Sl
No
Room Space FL
Tube
4 feet
(40W)
CFL
light
(15W)
6A
socket
(60W)
16A
socket
(500W
)
25A
Socket
(2500
W)
Exhaust
Fan
(60W)
Ceiling
Fan
(60W)
Chandelier
(200W)
Total
CL of
room
space
1 Living Room +
Balcony
2 4 1 2 2 1 1520
2 Dining Room
+Balcony
1 4 2 2 2 1340
3 a Bedroom 1 +
Balcony
1 4 3 2 1 1 3840
b Dressing Room 1 2 1 90
c Toilet 1 2 1 1 590
4a Bedroom 2 1 4 3 2 1 1 3840
b Toilet 2 2 1 1 590
5a Bedroom 3 1 3 3 2 1 1 3825
b Toilet 3 2 1 1 590
6a Kitchen+ Work
Area
1 3 2 3 1 1 1825
b Toilet 1 1 75
7 Foyer 2 30
TOTAL=18155W 27
Distribution Board
• Total No: of light points= 66
(No. of light points= light+fan+6A socket+exhaust
fan)
• No: of light circuits= 66/8 = 8.25 ~9
• Total No: of power points = 19
• No: of power circuits = 19/2 = 9.5~ 10
• Total No: of sub-circuits = 10+9 = 19
• Therefore we choose 8 way 3 phase DB which
has 24 (i.e. 3x8) sub-circuits.
28
Calculation of Connected Load
(Third Floor)
Sl
No
Room Space FL
Tube
4 feet
(40W)
CFL
light
(15W)
6A
socket
(60W)
16A
socket
(500W)
25A
Socket
(2500
W)
Exhaust
Fan
(60W)
Ceiling
Fan
(60W)
Chandelier
(200W)
Total
CL of
room
space
1 Living Room+ Balcony 1 10 3 1 1 2 1 3690
2 Toilet 4 3 1 168
3 Hall 1 4 6 1 1 2 1 3920
4 Family Living+Dining 1 7 3 1 1 2 3445
5 Foyer 4 60
6 Kitchen 2 2 5 3 1 1 1 4530
7 Work Area 1 2 2 1 1 750
8 Store 1 1 55
9 Serva t’s Roo 1 2 1 195
10 Serva t’s Toilet 1 1 75
11a Bedroom +Balcony 1 5 2 5 1 1 5295
b Dressing Room 1 1 75
c Toilet 2 1 1 1 650
TOTAL=22908W29
Calculation of Connected Load
(Fourth Floor)
Sl
N
o
Room Space FL
Tube
4 feet
(40W)
Bell
(60W)
CFL
light
(15W
)
6A
socket
(60W)
16A
socket
(500W
)
25A
Socket
(2500
W)
Exhaust
Fan
(60W)
Ceiling
Fan
(60W)
Chandelier
(200W)
Total
CL of
room
space
1 Family Living Room 3 1 9 1 6 1 2 1 6195
2a Bedroom1 +Balcony 1 5 1 6 1 2 5795
b Dressing Room 1 15
c Toilet 2 2 1 1090
3a Bedroom 2 1 1 6 1 2 5720
b Dressing Room 2 30
c Bathroom 2 2 1 1090
4a Bedroom 3 1 7 1 3 1 2 4325
b Dressing 3 45
c Toilet 3 2 1 1105
5a Bedroom 4 1 3 1 8 1 2 6765
b Dressing Room 2 30
c Toilet 2 2 1 1090
30
Sl
N
o
Room Space FL
Tube
4 feet
(40W)
Bell
(60W)
CFL
light
(15W)
6A
socket
(60W)
16A
socket
(500W)
25A
Socket
(2500
W)
Exhaust
Fan
(60W)
Ceiling
Fan
(60W)
Chandelier
(200W)
Total CL
of room
space
6 Yoga Room 2 4 2 2 1260
7 Internal stairs 1 15
8 Lift(10) 10000
TOTAL=34555W
31
Calculation Of Common
Connected Load
Sl.no Room Space FL light 4 ft
(40W)
CFL light
(15W)
Total connected
load
1 Parking (Second floor) 55 825
2 Lobby 24(6 floors) 360
3 Stairway 12(7 floors) 480
4 Terrace floor 12 180
5 Mezzanine 6 90
6 Machine room 4 60
7 Lift(10) 10000
8 Stretcher lift(18) 15000
8 External lights 20 300
9 Water lifting pump 5000
32
Current Status
• Connected Load of all floors (except commercial) has been calculated.
• Distribution Board of one apartment has been decided.
• Supplementary drawings were completed.
Work to be Completed
DB of commercial floors and Common CL, Cabling, Metering Panel
Design, Transformer Design, Emergency Power Supply, Earthing and
extensive electrical drawings have to be completed.
33
References
• Electrical Systems Design by M.K. Giridharan
• Electrical design estimating and costing by K.B
Raina and S.K Bhattacharya
• National Electric Code, Bureau of Indian
Standards publications, 1986.
34
35

More Related Content

What's hot

Electrical lighting design and calculations
Electrical lighting design and calculationsElectrical lighting design and calculations
Electrical lighting design and calculationsMusaib ul Hassan Bhat
 
Package air conditioner
Package air conditionerPackage air conditioner
Package air conditionerAnubhav Gupta
 
MITEC : Building Service System
MITEC : Building Service System MITEC : Building Service System
MITEC : Building Service System chiwunloi
 
Illumination - Method of calculation
Illumination - Method of calculationIllumination - Method of calculation
Illumination - Method of calculationVijay Raskar
 
ELECTRICAL LAYOUT SYSTEM
ELECTRICAL LAYOUT SYSTEMELECTRICAL LAYOUT SYSTEM
ELECTRICAL LAYOUT SYSTEMHafiz JUNAID
 
building services -Lift's and escalators
building services -Lift's and escalatorsbuilding services -Lift's and escalators
building services -Lift's and escalatorsKethees Waran
 
Electrical Installation in Buildings
Electrical Installation in BuildingsElectrical Installation in Buildings
Electrical Installation in Buildingsramnathpanwar
 
Electrical services of bs by krt
Electrical services of bs by krt Electrical services of bs by krt
Electrical services of bs by krt Krunal Thanki
 
INTERIOR LIGHTING DESIGN A STUDENT'S GUIDE
INTERIOR LIGHTING DESIGN A STUDENT'S GUIDEINTERIOR LIGHTING DESIGN A STUDENT'S GUIDE
INTERIOR LIGHTING DESIGN A STUDENT'S GUIDEno suhaila
 
Lighting design considerations
Lighting design considerationsLighting design considerations
Lighting design considerationsmominzaki
 
Design considerations of electrical installations
Design considerations of electrical installationsDesign considerations of electrical installations
Design considerations of electrical installationsvishalgohel12195
 
Air Conditioning case study
Air Conditioning case studyAir Conditioning case study
Air Conditioning case studySona Rawat
 
#Building wiring system#presentation#Wire is a single electrical conductor, w...
#Building wiring system#presentation#Wire is a single electrical conductor, w...#Building wiring system#presentation#Wire is a single electrical conductor, w...
#Building wiring system#presentation#Wire is a single electrical conductor, w...Bint Shameem
 
Building Electrical Systems Design
Building Electrical Systems DesignBuilding Electrical Systems Design
Building Electrical Systems DesignVictor Sun
 
WIRING ACCESORIES AND LIGHTING.pptx
WIRING ACCESORIES AND LIGHTING.pptxWIRING ACCESORIES AND LIGHTING.pptx
WIRING ACCESORIES AND LIGHTING.pptxRIDDHESH VARIK
 
High rise residential building
High rise residential buildingHigh rise residential building
High rise residential buildingsurya teja
 

What's hot (20)

Electrical lighting design and calculations
Electrical lighting design and calculationsElectrical lighting design and calculations
Electrical lighting design and calculations
 
Package air conditioner
Package air conditionerPackage air conditioner
Package air conditioner
 
MITEC : Building Service System
MITEC : Building Service System MITEC : Building Service System
MITEC : Building Service System
 
Illumination - Method of calculation
Illumination - Method of calculationIllumination - Method of calculation
Illumination - Method of calculation
 
ELECTRICAL LAYOUT SYSTEM
ELECTRICAL LAYOUT SYSTEMELECTRICAL LAYOUT SYSTEM
ELECTRICAL LAYOUT SYSTEM
 
Electrical services
Electrical servicesElectrical services
Electrical services
 
building services -Lift's and escalators
building services -Lift's and escalatorsbuilding services -Lift's and escalators
building services -Lift's and escalators
 
Electrical Installation in Buildings
Electrical Installation in BuildingsElectrical Installation in Buildings
Electrical Installation in Buildings
 
Electrical services of bs by krt
Electrical services of bs by krt Electrical services of bs by krt
Electrical services of bs by krt
 
Electrical lighting design
Electrical lighting designElectrical lighting design
Electrical lighting design
 
INTERIOR LIGHTING DESIGN A STUDENT'S GUIDE
INTERIOR LIGHTING DESIGN A STUDENT'S GUIDEINTERIOR LIGHTING DESIGN A STUDENT'S GUIDE
INTERIOR LIGHTING DESIGN A STUDENT'S GUIDE
 
Lighting design considerations
Lighting design considerationsLighting design considerations
Lighting design considerations
 
Design considerations of electrical installations
Design considerations of electrical installationsDesign considerations of electrical installations
Design considerations of electrical installations
 
Electrical Wiring Practices and Diagrams
Electrical Wiring Practices and DiagramsElectrical Wiring Practices and Diagrams
Electrical Wiring Practices and Diagrams
 
Air Conditioning case study
Air Conditioning case studyAir Conditioning case study
Air Conditioning case study
 
#Building wiring system#presentation#Wire is a single electrical conductor, w...
#Building wiring system#presentation#Wire is a single electrical conductor, w...#Building wiring system#presentation#Wire is a single electrical conductor, w...
#Building wiring system#presentation#Wire is a single electrical conductor, w...
 
Building Electrical Systems Design
Building Electrical Systems DesignBuilding Electrical Systems Design
Building Electrical Systems Design
 
WIRING ACCESORIES AND LIGHTING.pptx
WIRING ACCESORIES AND LIGHTING.pptxWIRING ACCESORIES AND LIGHTING.pptx
WIRING ACCESORIES AND LIGHTING.pptx
 
Building Services
Building ServicesBuilding Services
Building Services
 
High rise residential building
High rise residential buildingHigh rise residential building
High rise residential building
 

Similar to Electrical system design of garden project at belhaven (10 Storey High Rise Building)

odunlami prese_033552.pptx
odunlami prese_033552.pptxodunlami prese_033552.pptx
odunlami prese_033552.pptxAgohaChinonso
 
odunlami prese_033552.pptx
odunlami prese_033552.pptxodunlami prese_033552.pptx
odunlami prese_033552.pptxAgohaChinonso
 
New Persentation
New PersentationNew Persentation
New PersentationTarek Fagal
 
odun dgdgf_125332.pptx
odun dgdgf_125332.pptxodun dgdgf_125332.pptx
odun dgdgf_125332.pptxAgohaChinonso
 
Asce 7 10 presentation on seismic bracing for mep systems
Asce 7 10 presentation on seismic bracing for mep systemsAsce 7 10 presentation on seismic bracing for mep systems
Asce 7 10 presentation on seismic bracing for mep systemsmichaeljmack
 
Modelling energy system project report (1)
Modelling energy system project report (1)Modelling energy system project report (1)
Modelling energy system project report (1)AliSaleh126
 
Audio amplification System
Audio amplification SystemAudio amplification System
Audio amplification SystemShivam Sharma
 
Leisure Center. Part 2
Leisure Center. Part 2Leisure Center. Part 2
Leisure Center. Part 2Tej Raj Upreti
 
Presentation final 4.29
Presentation final 4.29Presentation final 4.29
Presentation final 4.29Xueyin Shi
 
DESIGN OF AN ELECTRICAL INSTALLATION OF A STOREY BUILDING
DESIGN OF AN ELECTRICAL INSTALLATION OF A STOREY  BUILDINGDESIGN OF AN ELECTRICAL INSTALLATION OF A STOREY  BUILDING
DESIGN OF AN ELECTRICAL INSTALLATION OF A STOREY BUILDINGNajeem Olawale Adelakun
 
Optimal Cable Sizing in PV Systems: Case Study
Optimal Cable Sizing in PV Systems: Case StudyOptimal Cable Sizing in PV Systems: Case Study
Optimal Cable Sizing in PV Systems: Case StudyLeonardo ENERGY
 
56211728 automatic-room-light-controller-with-bidirectional-visitor-counter
56211728 automatic-room-light-controller-with-bidirectional-visitor-counter56211728 automatic-room-light-controller-with-bidirectional-visitor-counter
56211728 automatic-room-light-controller-with-bidirectional-visitor-counterAnn Francis Olita
 
Plant growth chamber 400 litres
Plant growth chamber 400 litresPlant growth chamber 400 litres
Plant growth chamber 400 litreshuzaifa_ujjain
 
Automatic room-light-controller-visitor-counter
Automatic room-light-controller-visitor-counterAutomatic room-light-controller-visitor-counter
Automatic room-light-controller-visitor-counterMohit Awasthi
 
St Angela's College General Arrangment Drawings
St Angela's College General Arrangment DrawingsSt Angela's College General Arrangment Drawings
St Angela's College General Arrangment DrawingsJonathan Flanagan
 
Smart Grid in Europe Presentation, IET Power in Unity Conference.
Smart Grid in Europe Presentation, IET Power in Unity Conference.Smart Grid in Europe Presentation, IET Power in Unity Conference.
Smart Grid in Europe Presentation, IET Power in Unity Conference.Smarter Grid Solutions
 
Cabling Standards Update 2014
Cabling Standards Update 2014Cabling Standards Update 2014
Cabling Standards Update 2014Dimitris Filippou
 

Similar to Electrical system design of garden project at belhaven (10 Storey High Rise Building) (20)

DEBORA PPT.pptx
DEBORA PPT.pptxDEBORA PPT.pptx
DEBORA PPT.pptx
 
odunlami prese_033552.pptx
odunlami prese_033552.pptxodunlami prese_033552.pptx
odunlami prese_033552.pptx
 
odunlami prese_033552.pptx
odunlami prese_033552.pptxodunlami prese_033552.pptx
odunlami prese_033552.pptx
 
New Persentation
New PersentationNew Persentation
New Persentation
 
odun dgdgf_125332.pptx
odun dgdgf_125332.pptxodun dgdgf_125332.pptx
odun dgdgf_125332.pptx
 
Asce 7 10 presentation on seismic bracing for mep systems
Asce 7 10 presentation on seismic bracing for mep systemsAsce 7 10 presentation on seismic bracing for mep systems
Asce 7 10 presentation on seismic bracing for mep systems
 
Design HVAC System for Hospital
Design HVAC System for Hospital Design HVAC System for Hospital
Design HVAC System for Hospital
 
Sustainable Design of a Commercial Building
Sustainable Design of a Commercial BuildingSustainable Design of a Commercial Building
Sustainable Design of a Commercial Building
 
Modelling energy system project report (1)
Modelling energy system project report (1)Modelling energy system project report (1)
Modelling energy system project report (1)
 
Audio amplification System
Audio amplification SystemAudio amplification System
Audio amplification System
 
Leisure Center. Part 2
Leisure Center. Part 2Leisure Center. Part 2
Leisure Center. Part 2
 
Presentation final 4.29
Presentation final 4.29Presentation final 4.29
Presentation final 4.29
 
DESIGN OF AN ELECTRICAL INSTALLATION OF A STOREY BUILDING
DESIGN OF AN ELECTRICAL INSTALLATION OF A STOREY  BUILDINGDESIGN OF AN ELECTRICAL INSTALLATION OF A STOREY  BUILDING
DESIGN OF AN ELECTRICAL INSTALLATION OF A STOREY BUILDING
 
Optimal Cable Sizing in PV Systems: Case Study
Optimal Cable Sizing in PV Systems: Case StudyOptimal Cable Sizing in PV Systems: Case Study
Optimal Cable Sizing in PV Systems: Case Study
 
56211728 automatic-room-light-controller-with-bidirectional-visitor-counter
56211728 automatic-room-light-controller-with-bidirectional-visitor-counter56211728 automatic-room-light-controller-with-bidirectional-visitor-counter
56211728 automatic-room-light-controller-with-bidirectional-visitor-counter
 
Plant growth chamber 400 litres
Plant growth chamber 400 litresPlant growth chamber 400 litres
Plant growth chamber 400 litres
 
Automatic room-light-controller-visitor-counter
Automatic room-light-controller-visitor-counterAutomatic room-light-controller-visitor-counter
Automatic room-light-controller-visitor-counter
 
St Angela's College General Arrangment Drawings
St Angela's College General Arrangment DrawingsSt Angela's College General Arrangment Drawings
St Angela's College General Arrangment Drawings
 
Smart Grid in Europe Presentation, IET Power in Unity Conference.
Smart Grid in Europe Presentation, IET Power in Unity Conference.Smart Grid in Europe Presentation, IET Power in Unity Conference.
Smart Grid in Europe Presentation, IET Power in Unity Conference.
 
Cabling Standards Update 2014
Cabling Standards Update 2014Cabling Standards Update 2014
Cabling Standards Update 2014
 

Recently uploaded

University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGSIVASHANKAR N
 

Recently uploaded (20)

Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 

Electrical system design of garden project at belhaven (10 Storey High Rise Building)

  • 1. ELECTRICAL SYSTEM DESIGN OF GARDEN PROJECT AT BELHAVEN, KOWDIAR Presented by: Nithya Susan Varghese Guided by: Prof M.K. Giridharan
  • 2. Overview Introduction Proposed project Connected Load Calculation of Connected Load Design of Distribution Board Current Status and Work to be completed. 2
  • 3. Electrical System Design • Electrical system design is the design of electrical systems. • Simple systems can be created by one person. Large systems require large teams of people, simulation software and many paper and electronic records. • The design should assure proper functioning of the installation. • The design should provide safety. 3
  • 4. Electrical System Design For High Rise Buildings • High – rise buildings are buildings having 5 floors and above, or having a height of 15m and above. • They normally refer to occupancy for:  General offices  Commercial establishments  Hotels /Condominiums 4
  • 5. Design Concept • For all building construction the owner must first have a concept for the new design, and then the architect or designer can produce a set of building plans. • An electrical design goes through several important stages or development. • Every electrical design has unique requirements, depending upon the scope of the project. The project scope is determined by the customers’ requirements and the type of structure. 5
  • 6. HIGH RISE BUILDING POWER SUPPLY REQUIREMENTS: 1. General Lighting & Power  light for general illumination, seeing tasks, decorative features, hallways and stairways, others  power for appliances and office machines 2. Heating, Ventilation & Air-conditioning (HVAC) System  air-conditioning for temperature control  blowers and fans ventilation  heaters for humidity control 3. Transport System  elevators and escalators  conveyors, dumbwaiters, others 4. Water Pumps  potable and non-potable water supply  water sprinkle (fire suppression)  pumps / drainage  sewage ejectors 5. Communication System  PABX telephone system  Intercom 6
  • 7. 6. Automatic Doors  entrance and exit for pedestrians  garage and freight 7. Central Computer System  CPU and peripherals  Terminals 8. Auxiliaries  intrusion and hold-up control system  fire fighting & alarm system  background music and paging  sound reinforcement and video facilities  noise masking and acoustics, others 7
  • 8. Proposed Project • The proposed building “Garden Project” at Belhaven Road, Kowdiar is a 10 storeyed building. It includes a cellar for parking purpose, and 10 floors of which 2 floors are for commercial purpose, 1 for parking and the remaining for residential purpose. It has a total plinth area of 4948.34 sq. m. 8
  • 21. Connected Load  DEFINITION :The sum of the continuous power ratings of all load-consuming apparatus connected to an electric power distribution system or any part thereof.  Connected load for electricity is the maximum amount of wattage that is allocated to a building.  Calculation of Connected Load is done by engineers from the utility from which the connection is taken. 21
  • 22. Description Area of the residential building (sq-m) 35 45 55 85 140 Light points 7 8 10 12 17 Ceiling fan 2-2 3-2 4-3 5-4 7-5 6A sockets 2 3 4 5 7 16A sockets - 1 2 3 4 Call Bell - - 1 1 1 Description Socket Outlets 6A 16A Bed rooms 2-3 1 Living rooms 2-3 2 Kitchen 1 2 Dining room 2 1 Garage 1 1 For Refrigerator - 1 For Air Conditioner - 1 Verandah 1 for every 10 sq m - Bathrooms 1 1 22 Min no. of socket outlets Min no. of points to be provided on the basis of plinth area
  • 23. Units of Electrical Energy Consumed by common Domestic Appliances/Equipment ELECTRICAL APPLIANCES WATTAGE RATING Incandescent Bulb 25W,60W,100W Fluorescent Tube light (4feet) 40W Fan 60W Air Conditioner (1-1.5 ton) 1500-2500W Refrigerator 100W Mixer/Blender/Juicer 450W Toaster 800W Oven 450-700W Electric kettle 1000/2000W Iron 450/700W Geyser(1.5-2 litre) 3000W Vacuum Cleaner 700-750W 23
  • 24. ELECTRICAL APPLIANCES WATTAGE RATING Washing Machine 325W Television 60-120W Computer 120-600W Radio 15W Stereo System 50W CFL 15W 24
  • 27. Calculation of Connected Load (Fifth Floor) Sl No Room Space FL Tube 4 feet (40W) CFL light (15W) 6A socket (60W) 16A socket (500W ) 25A Socket (2500 W) Exhaust Fan (60W) Ceiling Fan (60W) Chandelier (200W) Total CL of room space 1 Living Room + Balcony 2 4 1 2 2 1 1520 2 Dining Room +Balcony 1 4 2 2 2 1340 3 a Bedroom 1 + Balcony 1 4 3 2 1 1 3840 b Dressing Room 1 2 1 90 c Toilet 1 2 1 1 590 4a Bedroom 2 1 4 3 2 1 1 3840 b Toilet 2 2 1 1 590 5a Bedroom 3 1 3 3 2 1 1 3825 b Toilet 3 2 1 1 590 6a Kitchen+ Work Area 1 3 2 3 1 1 1825 b Toilet 1 1 75 7 Foyer 2 30 TOTAL=18155W 27
  • 28. Distribution Board • Total No: of light points= 66 (No. of light points= light+fan+6A socket+exhaust fan) • No: of light circuits= 66/8 = 8.25 ~9 • Total No: of power points = 19 • No: of power circuits = 19/2 = 9.5~ 10 • Total No: of sub-circuits = 10+9 = 19 • Therefore we choose 8 way 3 phase DB which has 24 (i.e. 3x8) sub-circuits. 28
  • 29. Calculation of Connected Load (Third Floor) Sl No Room Space FL Tube 4 feet (40W) CFL light (15W) 6A socket (60W) 16A socket (500W) 25A Socket (2500 W) Exhaust Fan (60W) Ceiling Fan (60W) Chandelier (200W) Total CL of room space 1 Living Room+ Balcony 1 10 3 1 1 2 1 3690 2 Toilet 4 3 1 168 3 Hall 1 4 6 1 1 2 1 3920 4 Family Living+Dining 1 7 3 1 1 2 3445 5 Foyer 4 60 6 Kitchen 2 2 5 3 1 1 1 4530 7 Work Area 1 2 2 1 1 750 8 Store 1 1 55 9 Serva t’s Roo 1 2 1 195 10 Serva t’s Toilet 1 1 75 11a Bedroom +Balcony 1 5 2 5 1 1 5295 b Dressing Room 1 1 75 c Toilet 2 1 1 1 650 TOTAL=22908W29
  • 30. Calculation of Connected Load (Fourth Floor) Sl N o Room Space FL Tube 4 feet (40W) Bell (60W) CFL light (15W ) 6A socket (60W) 16A socket (500W ) 25A Socket (2500 W) Exhaust Fan (60W) Ceiling Fan (60W) Chandelier (200W) Total CL of room space 1 Family Living Room 3 1 9 1 6 1 2 1 6195 2a Bedroom1 +Balcony 1 5 1 6 1 2 5795 b Dressing Room 1 15 c Toilet 2 2 1 1090 3a Bedroom 2 1 1 6 1 2 5720 b Dressing Room 2 30 c Bathroom 2 2 1 1090 4a Bedroom 3 1 7 1 3 1 2 4325 b Dressing 3 45 c Toilet 3 2 1 1105 5a Bedroom 4 1 3 1 8 1 2 6765 b Dressing Room 2 30 c Toilet 2 2 1 1090 30
  • 31. Sl N o Room Space FL Tube 4 feet (40W) Bell (60W) CFL light (15W) 6A socket (60W) 16A socket (500W) 25A Socket (2500 W) Exhaust Fan (60W) Ceiling Fan (60W) Chandelier (200W) Total CL of room space 6 Yoga Room 2 4 2 2 1260 7 Internal stairs 1 15 8 Lift(10) 10000 TOTAL=34555W 31
  • 32. Calculation Of Common Connected Load Sl.no Room Space FL light 4 ft (40W) CFL light (15W) Total connected load 1 Parking (Second floor) 55 825 2 Lobby 24(6 floors) 360 3 Stairway 12(7 floors) 480 4 Terrace floor 12 180 5 Mezzanine 6 90 6 Machine room 4 60 7 Lift(10) 10000 8 Stretcher lift(18) 15000 8 External lights 20 300 9 Water lifting pump 5000 32
  • 33. Current Status • Connected Load of all floors (except commercial) has been calculated. • Distribution Board of one apartment has been decided. • Supplementary drawings were completed. Work to be Completed DB of commercial floors and Common CL, Cabling, Metering Panel Design, Transformer Design, Emergency Power Supply, Earthing and extensive electrical drawings have to be completed. 33
  • 34. References • Electrical Systems Design by M.K. Giridharan • Electrical design estimating and costing by K.B Raina and S.K Bhattacharya • National Electric Code, Bureau of Indian Standards publications, 1986. 34