NATIONAL INSTITUTE OF TECHNOLOGY
JAMSHEDPUR
TRAININGREPORT
STEEL MELTING SHOP
TRAINING ORGANISATION
-MECON LIMITED, RANCHI
(DURATION-MAY 25th TO JUNE 24th 2015)
NISHANT SINGH
2013UGME076
SEMESTER-V
DEPARTMENT OF MECHANICAL ENGINEERING
2
ABSTRACT
THIS REPORT IS BASED ON THE LEARNINGS ACHIEVED IN 2 WEEKS OF THE
ONEMONTH TRAINING SESSION IN MECON LTD. UNDER THE STEEL MELTING
SECTION AND ROLLING MILLS SECTION.
THIS REPORT PARTICULARLY FOCUSES ON THE STEEL MELTING SECTION’S
TWO MOST IMPORTANT ASPECTS- BASIC OXYGEN FURNACE AND
CONTINUOUS CASTING SHOP.
THE INFORMATION PROVIDED IN THIS REPORT IN BASED ON THE
CUMULATIVEACCUMULATION OF ALL THE INFORMATION GAINED FROM THE
RESPECTIVE OFFICIALS AND READING THE PROVIDED DOCUMENTS.
3
ACKNOWLEDGEMENTS
I WOULD LIKE TO SINCERELY THANK ALL THE OFFICIALS OF THE STEEL
MELTING SECTION OF MECON LIMITED (A GOVERNMENT OF INDIA
ENTERPRISE) FOR THEIR GENEROUS AND AVID CONTRIBUTION TOWARDS MY
KNOWLEDGE IN THE SUBJECT WHICH WAS COMPLETELY NEW TO ME.
BECAUSE OF THEIR CONTRIBUTION, AT THE END OF THE TRAINING I HAVE
BEEN ABLE TO GAIN ATLEAST THE BASICS OF BASIC OXYGEN FURNACE AND
CONTINUOUS CASTING SHOP, AND ALSO SOME KNOWLEDGE OF THE
NATURE AND TYPE OF WORK ACCOMPLISHED HERE IN MECON LIMITED.
OVERALL THIS LEARNING EXPERIENCE IN MECON LIMITED PROVIDED ME
WITH AN IDEA OF THE CHALLENGES FACED BY THE ENGINEERS IN
PROFESSIONAL LIFE AND AS A MATTER OF FACT TAUGHT ME THAT EVEN AN
IOTA OF NEGLIGENCE BY THE ENGINEERS CAN CAUSE GREAT HAZARDS
DURING UPCOMING PROCESSES AND SO THE JOB OF AN ENGINEER IS THAT
OF GREAT RESPONSIBILITIES.
REMARKS:
4
CONTENTS
TOPIC PAGE NO.
1) THE TRAINING ORGANISATION 5
2) THE PROCESS 6
3)STEELMELTING SECTION
7
4)BASIC OXYGEN FURNACE 8-10
5)OXYGEN LANCE SYSTEM 11
6) BOTTOM STIRRING SYSTEM 12
7) CONVERTER TAPPING, ALLOYING AND
DESLAGGING
13
8)CONTINUOUS CASTING 14-15
9)CASTING MECHANISM 16-23
10)CONCLUSION 24
5
THE TRAINING ORGANISATION
MECON LIMITED, FORMERLY KNOWN AS (METALLURGICAL & ENGINEERING
CONSULTANTS (INDIA) LIMITED) IS A PUBLIC SECTOR UNDERTAKING UNDER
THE MINISTRYOF STEEL OF THE GOVERNMENT OF INDIA.ITBEGANIN 1959 AS
THE CENTRAL ENGINEERING AND DESIGNING BUREAU (CEDB) OF THE
HINDUSTANSTEEL LIMITED (HSL), THE FIRST PUBLIC SECTOR STEEL COMPANY.
SUBSEQUENTLY, CEDB GREW AS METALLURGICAL AND ENGINEERING
CONSULTANT (MECON), A SUBSIDIARY OF THE STEEL AUTHORITY OF INDIA
LIMITED (SAIL) IN 1973. IT LATER BECAME AN AUTONOMOUS COMPANY
REPORTING TO THE MINISTRY OF STEEL IN 1978. 1 APRIL IS OBSERVED AS
FOUNDATION DAY IN MECON.
MECON LTD. IS A GOVERNMENTOF INDIA ENTERPRISEWHICH BASICALLYACTS
AS A HOUSEOF ENGINEERS WHO ASSIST VARIOUS STEEL MAKING COMPANIES
IN SETTING UP THEIR RESPECTIVE PLANTS AT PARTICULAR LOCATIONS FOR A
GIVEN REQUIRED PRODUCTION OF STEEL.
IT IS THE RESPONSIBILITY OF THE ENGINEERS OF MECON LTD. TO ENSURE
THAT ALL THE EQUIPMENTS, LAYOUTS AND OTHER DESIGN RELATED
INFORMATION SENT BY THE CONTRACTOR WHO HAS TAKEN UP THE WORK,
ARE COMPLETELY UP TO THE MARK AND ARE FIT ENOUGH TO BE INSTALLED IN
THE STEEL PLANT.
THE WORK ENVIRONMENT IS EXTREMELY SUITABLE WITH STATE-OF-THE-ART
FACILITIES FOR ALL THE EMPLOYEES AND THROUGHOUT THE TRAINING
PERIOD ALL THE ASSIGNED ENGINEERS WERE VERY CO-OPERATIVE AND
PROVIDED ALL THE REQUIRED INFORMATION IN APPROPRIATE MANNER.
6
THE PROCESS
HOT METAL HANDLING:
HOTMETAL DELIVERED BY TORPEDO CARS IS RECEIVED INTHE RELADLING PIT.
THEN THE HOT METAL IS TRANSFERRED TO THE CHARGING LADLES PLACED ON
ONE OF THE HOT METAL TRANSFER CARS RUNNING IN A RELADLING PIT.
THE HOT METAL TRANSFER CAR HAS A WEIGHING FACILITY.
HOT METAL DE SULPHURISATION UNIT:
NEXT THE HOT METAL INTHE CHARGING LADLE IS TRANSFERRED BY CRANE TO
THE HOT METAL DESULPHURISATION UNIT OR DIRECTLY TO THE CONVERTER
FOR CHARGING. THE MAIN PURPOSE OF THE DESULPHURISATION UNIT IS TO
REDUCE THE PERCENTAGE OF SULPHUR IN THE HOT METAL
SCRAP HANDLING:
A BAY ADJACENT TO THE CONVERTER CHARGING BAY IS NECESSARILY
PROVIDED FOR THE PURPOSE OF SCRAP PREPARATION AND LOADING
PURPOSES.
THE SCRAP IS USUALLY TRANSFERRED BY RAILWAY WAGONS/ OR BY THE
TRUCKS AND THEN BY CRANES INTO THE SCRTAP PITS IN THE YARD.THE
CRANES ARE EQUIPPED WITH A WEIGHING FACILITY AND THEY ADJUST THE
AMOUNT OF SCRAP.
ADDITIVE HANDLING SYSTEM:
EACH CONVERTER IS EQUIPPED WITH ITS OWN ADDITIVE HANDLING SYSTEM.
THE ADDITIVES ARE DELIVERED THROUGH CONVEYOR SYSTEM.
FERRO ALLOYS ARE TRANSPORTED FROM STORAGE YARD TO A BUNKER
THROUGH THE CONVEYOR GROUP SYSTEM INSIDE THE CONVERTER BAY BY
MEANS OF BOTTOM DISCHARGER.
7
STEEL MELTING SECTION
AS DESCRIBED IN THE FLOW CHART, STEEL MELTING SHOP IS AN
INTEGRAL PART OF STEEL MAKING PLANT.THEHOTMETAL COMING FROMTHE
BLAST FURNACE NEEDS PROPER TREATMENT AND REFINING AS PER THE
QUALITY OF STEEL REQUIRED. THE TWO MAIN COMPONENTS OF THE BASIC
OXYGEN FURNACE ARE OXYGEN LANCE SYSTEM AND THE BOTTOM STIRRING
SYSTEM. A DESCRIPRION OF THE VARIOUS PROCESSES TAKIN PLACE INSIDE A
BASIC OXYGEN FURNACE IS FURTHER PROVIDED IN THE REPORT.
FINAL PRODUCT
ROLLING
CASTING
SECONDARY TREATMENT
STEEL MELTING SHOP
HOT METAL
BLAST FURNACE
ORE+COKE+LIME+SLAG
8
BASIC OXYGEN FURNACE (BRIEF OVERVIEW)
A BOF BASICALLY COMPRISES OF A REFRACTORY LINED CONVERTER WITH A
VERTICAL OXYGEN BLOWING LANCE ENTERING THE CONVERTER FROM ABOVE
WITH INERT GAS INJECTED THROUGH THE CONVERTER BOTTOM FOR PROPER
CHURNING OF THE MATERIAL INSIDE.
THE CONVERTER IS FURTHER EQUIPPED WITH A PNEUMATIC SLAG STOPPER
WITH SLAG DETECTIONSYSTEMTO MINIMIZESLAG CARRYOVER FROM THE LD
CONVERTER INTO THE CASTING LADLE TAPPING.
THE TILTING OF THE CONVERTER IS CARRIED OUT AT AUXILIARY CONTROL
STANDS LOCATED AT THE CHARGING AND TAPPING SIDEOF EACH CONVERTER.
THE CONVERTER IS TILTABLE FOR CHARGING, TAPPING AND DESLAGGING.
THE CHARGE IS NORMALLY MADE UP OF HOT METAL, DRI, SCRAP AND
ADDITIVES.
D.R.I (DIRECTREDUCEDIRON)
IN THIS, IRON ORE IN THE SOLID FORM IS COMPLETELY COATED WITH COAL
AND THEN HEATED BY MEANS OF A TUNNEL FURNACE AT ABOUT 500
DEEGRES CENTIGRADE. DUE TO THIS THE COAL REDUCES THE OXYGEN
PRESSURE IN THE IRON ORE AND THE OXYGEN MOLECULES CREATE VERIOUS
PORE LININGS ON THEIR WAY OUT. DUE TO THIS DRI HAS A LARGE SURFACE
AREA AND HENCE IS VERY REACTIVE.
9
BASIC OXYGEN FURNACE
THE BASIC ADVANTAGES OF BASIC OXYGEN FURNACE ARE:
• OXYGEN BLOWN AT
SUPERSONIC SPEED
• FOR REFINING
OXYGEN
LANCE
SYSTEM
• INERT GASES LIKE ARGON
OR NITROGEN BLOWN
• FOR PROPER CHURNING
AND HOMOGENIZING
BOTTOM
STIRRING
SYSTEM
HIGH SPEED OF REFINING
HIGH PRODUCTIVITY
ECONOMY OF LABOUR
LOW REFRACTORY CONSUMPTION
HIGH QUALITY OF PRODUCTS
10
CONVERTER RELINING:
CONVERTER RELINING IS NECESSARY BEACUSE THE INNER WALL GETS
CARRODED WITH TIME. OUT OF THE 3 FUNCTIONAL CONVERTERS AT A TIME
ONE IS RELINED WHILE THE OTHER 2 REMAIN FUNCTIONAL IN ORDER TO
MAINTAIN CONTINUITY IN PRODUCTIVITY.
CONVERTER RELINING IS DONE FROM TOP.FOR THIS PURPOSE THE MOVABLE
HOODE IS MOVED OUT BY THE HOOD TRANSFER CART AND A RELINING
MACHINE AND RELINING PLATFORM ASSIST IN THE RELINING.
TAKE OVER POINTS:
THESE ARE WELL DEFINED LOCATIONS WHERE THE SCOPE OF ENGINEERING
ENDS FOR ONE ENGINEERING PACKAGEAND THESCOPEOF ENGINEERING FOR
THE OTHER PACKAGE STARTS.
11
OXYGEN LANCE SYSTEM
IN EACH CONVERTER AN OXYGEN LANCE SYSTEM IN PROVIDED.EACH OXYGEN
LANCE SYSTEM CONSISTS OF TWO OXYGEN LANCES WHICH BOTH ARE
PERMANENTLY CONNECTED TO OXYGEN AND COOLING WATER HOSES, READY
FOR OPERATION. THE OXYGEN LANCES ARE AUTOMATICALLY EXCHANGED IN
POSITION BY HORIZONTAL MOVEABLE LANCE CARRIERS.EACH OXYGEN LANCE
IS EQUIPPED WITH A SEPARATE HOISTING DRIVE.
FOR THE REFINING PROCESS THE OXYGEN LANCE IS LOWERED THROUGH A
SOCKET INTO CONVERTER UNTIL THE LANCE TIP HAS REACHED THE
PREDETERMINED HEIGHT ABOVE THE BATH LEVEL.
THE OXYGEN LANCE SYSTEM IN MEANT TO MEET THE FOLLOWING
REQUIREMENTS:
1) HIGH OXYGEN BLOWING RATE.
2) FLOW AND PRESSURE CONTROL OF OXYGEN AND COOLING WATER.
3) EXACT POSITIONING OF OXYGEN LANCE.
THR LANCE DESIGN IS PROVIDED WITH AN INTERNAL TRIPPLE SAFETY O-RING
SEALING ARRANGEMENT AND IS MANUFACTURED FROM HIGH PURITY, HIGH
CONDUCTIVITY COPPER WITH THE LATEST NOZZLE DESIGN IN ACCORDANCE
WITH OPERATING PARAMETERS.
FOR EMERGENCY LIFTING OF THE OXYGEN LANCE AN AIR MOTOR IS
PROVIDED.
PRECISION MACHINED LAVALL NOZZLES IN THE LANCE TIP ARE SIZED TO
PERMIT THE REQUIRED FLOW OF OXYGEN TO EXIT AT A SPECIFIC VELOCITY
AND TO PROVIDE THE BEST OXYGEN DISTRIBUTION PATTERN.
12
BOTTOM STIRRING SYSTEM
BOTTOM STIRRING WITH INERT GAS IS AN ADVANCED DEVELOPMENT OF THE
STEEL MAKING PROCESS. IT OFFERS ADVANTAGES WITH REGARD TO
METALLURGICAL AND OPERATIONAL ASPECTS. IN PARTICULAR THE PROCESS
KUNETICS ARE SIGNIFICANTLY IMPROVED AND THE DECARBURIZATION
REACTION AT LOW CARBON CONTENT IS FAVOURISED.
THUS A VERY LOW CARBON CONTENT AT REASONABLE OXYGEN CONTENTS AS
WELL AS LOWER CONTENTS OF PHOSPHOROUSD AND SULPHUR ARE
ACHIEVED. THE IRON LOSS IN THE SLAG IS SIGNIFICANTLY REDUCED.
THE BOTTOM STIRRING SYSTEM CONTINUOUSLY CHURNS THE HOT METAL
AND SO THE OXYGEN BLOWN BY THE LANCE EFFICIENTLY REACHES EVERY
PART OF THE HOT METAL. ALSO DUE TO THIS CHURNING THE PROBABILITY
OXYGEN GETTING TRAPPED IN THE METAL DECREASES. THOUGH NOT ALL THE
GAS ESCAPES BUT OPTIMISATION IS ACHIEVED BY THIS PROCESS.
13
CONVERTER TAPPING AND ALLOYING
ONCE THE TEMPERATURE ANALYSIS ARE ADJUSTED, THE CASTING LADLE IS
BROUGHT INTO POSITION UNDERNEATH THE CONVERTER AND THE
CONVERTER IS TURNED DOWN FOR TAPPING (TAPPING SIDE). THE STEEL IS
TAPPED VIA THE CONVERTER TAP HOLE.
DURING TAPPING FERRO ALLOYS, DEOXIDANTS AND TOP SLAG ARE ADDED
INTO THE CASTING LADLE ACCORDING TO REQUIREMENTS.
GAS STIRRING AFTER SOME TIME OF TAPPING IS APPLIED IN THE LADLE TO
IMPROVE DISSOLUTION OF FERRO ALLOYS AND HOMOGENIZATION OF THE
STEEL BATH.
CONVERTER DESLAGGING
AFTER TAPPING IS COMPLETED, THE CONVERTER IS TILTED TOWARDS THE
DESLAGGING POSITION (CHARGING SIDE). THE SLAG IS POURED VIA THE
CONVERTER MOUTH INTO A SLAG POT WHICH IS BROUGHT INTO POSITION
UNDERNEATH THE CONVERTER BY MEANS OF A TRANSFER CAR.
A PNEUMATIC CONTROL IS PROVIDED IN ORDER TO DETECT THE SLAG AND
PREVENT THE FLOW OF SLAG ALONG WITH THE METAL.
14
CONTINUOUS CASTING
AFTER THE SECONDARY REFINING UNIT ( OUT OF FURNACE REFINING) THE
STEEL OF THE DESIRED GRADEIS FINALLYSENT TO THE CONTINUOUS CASTING
SHOP IN ORDER TO CAST IT INTO DESIRED SHAPES AND SIZES. USUALLY THE
FOLLOWING CASTERS ARE PROVIDED:
 BILLET CASTER
 BLOOM CASTER
 BILLET CUM BLOOM CASTER( COMBI CASTER)
 BEAM BLANK CASTER
 SLAB CASTER( CONVENTIONAL SLAB CASTER)
 THIN SLAB CASTER
 ROUND CASTER
NOW THE FINISHED OR THE SEMI FINISHED PRODUCT IS OF THE FOLLOWING
TYPES:
SEMI
FINISHED
PRODUCT
LONG
PRODUCTS
BILLETS BLOOMS
BEAM
BLANKS
ROUNDS
FLAT
PRODUCTS
SLABS THIN SLABS
15
16
CASTING MECHANISM
LADLE TURRET:
THE BASICUSE OF LADLE TURRET IS TO CHANGE THE POSITION OF THE LADLE.
IN RECENT YEARS A BUTTERFLY TYPE LADLE TURRET HAS BEEN EVOLVED IN
ORDER TO SUPPORT CONTINUOUS CASTING AND MAINTAIN SIMULTAINEITY
SO AS TO REDUCE THE TIME LAG.
ARMS
CASTING SIDE
LADLEPLACEMENT SIDE
THE ABOVE FIGURE IS THE BASIC TOP VIEW OF A LADLE TURRET.
THE TWO UNITS OF THE LADLE TURRET SIMULTANEOUSLY EXCHANGE THEIR
POSITIONS. WHEN MOLTEN STEEL IN THE CASTING SIDE REACHES A CERTAIN
MINIMUM LEVELTHE ENTIRE SETUP ROTATES AND THE PLACEMENT SIDE
BECOMES THE CASTING SIDE AND VICE VERSA.
17
18
SLIDE GATE MECHANSM/PLATE IN THE LADLE:
THE SLIDEGATEPLATE WAS ORIGINALLYINTRODUCED TO CONTROL THEFLOW
OF MOLTEN STEEL FROM STEEL LADLES. THE CONCEPT OF SLIDE GATE SYSTEM
WAS HOWEVER PATENTED AS EARLY AS 1885 BY MR. DAVID D. LEWIS OF USA
BUT IT WAS FIRST SUCCESSFULLY INTRODUCED IN GERMANY IN 1964 ONLY.
SOON AFTER THIS SYSTEM WAS ADOPTED IN 9 STEEL PLANTS IN USA BY 1969.
THIS SYSTEMWAS FIRSTINTRODUCED INJAPANIN1968 AND BY 1970 ALL THE
LADLES IN JAPAN ADOPTED SLIDE GATE SYSTEM.AND OVER THE YEARS THIS
HAS BECOME PREVALENT IN INDIA AS WELL.
HYDRAULIC MECHANISM SLIDEGATE(PLATE)
THE ABOVE FIGURE SHOWS THE SLIDE GATE MECHANISM
PICTORIALLY.
THE SLIDE GATE IS CONTROLLED BY A HYDRAULIC FUEL-PISTON MECHANISM.
AND ACCORDING TO THE REQUIREMENT PRESSURE CAN BE APPLIED ON THE
SLIDING GATE IN ORDER TO OPEN IT OR CLOSE IT OR PARTIALLY CLOSE IT AS
THE CASE MAY BE. WHEN THE LADLEIS ON THE PLACEMENT SIDE THE SLIDING
GATE IS CLOSED WHILEWHENONTHE CASTING SIDE IT IS CONTROLLED AS TO
HOW MUCH IT HAS TO BE OPENED. MANY A TIMES SILICA ETC. GET
19
DEPOSITED ATTHEBASE OF THE PLATER AND THEN A MANYALLY CONTROLLED
OXYGEN LANCING IS DONE IN ORDER TO REMOVE THE DEPOSITS.
LADLE SHROUD:
WHEN THE MOLTEMETAL FLOWS FROMTHE LADLEINTHE CASTING POSITION
THEN IT IS VERY VULNERABLE TO THE ATMOSPHERIC AIR AND NEEDS TO BE
PROTECTED FROM IT THEREFORE A SHROUD OF I SIMPLE TERMS BASICALLY A
COVER IS PROVIDED AT THE FLOW AREA IN ORDER TO PROTECT THE MOLTEN
STEEL FROM ATMOSPHERIC CONTAMINATION.
TUNDISH:
THE MOLTEN STEEL FLOWS FROM THE LADLE INTO THE TUNDISH WHERE IT IS
ALLOWED TO SETTLE FOR SOME TIME IN ORDERTO LET THE STEEL SETTLE
DOWN DUE TO MGRAVITY AND WHATEVER IMPURITIES,IF PRESENT, TO RISE
ABOVE.
FROM THE TUNDISH THE MOLTEN METAL IS FINALLY SENT TO THE MOULD IN
ORDER TO CAST IT INTO DESIRED SHAPES.
IN ORDER TO CONTROL THE FLOW OF MOLTEN METAL FROM THE TUNDISH A
STOPPER ROD MECHANISM IS PROIVIDED.
STOPPER ROD MECHANISM:
AT THE OUTLET OF THE TUNDISH A STOPPER ROD MECHANISM IS PROVIDED
WHICH IS CONTROLLED BY A SERVO MOTOR. THE STOPPER ROD HAS A
GRADUALLY DECREASING CROSS SECTION AND IT IS INSERTED INTO THE
OUTLET AT THE TUNDISH. A GRADUALLY DECREASING CROSS SECTION IS
PROVIDED SO THAT THE FLOW CAN BE CONTROLLED MORE EFFICIENTLY.
SUBMERGED ENTRY NOZZLE:
FROM THE TUNDISH THROUGH A SUBMERGED ENTRY NOZZLE THE MOLTEN
STEEL IS POURED INTO THE MOULD FOR CASTING. AFTRE THIS A WORK OF
GREAT PRECISION AND CARE STARTS. HERE ALSO THE ENTRY IS SUBMERGED
SO AS TO PREVENT ATMOSPHERIC CONTAMINATION OF THE MOLTEN STEEL.
20
THE ABOVE DIAGRAMATIC REPRESENTATION DEPICTS THE ENTIRE
CONTINUOUS CASTING PROCESS IN BRIEF FOR ANY REFERENCE.
21
FORMATION OF SOLIDIFIED SHELL:
THIS IS BY FAR THE MOST CRUCIAL STEP IN CASTING AS A SLIGHT ERROR IN
THIS STEP AND THE ENTIRE CAST WILL GET DEFORMED.
THE ENTRY TO THE MOULD IS WATERCOOLED ATALL THE FOUR SIDES. SO THE
OUTER SURFACE OF THGE MOLTEN STEEL, BY EXCHANGING HEAT FROM THE
WALLS OF THE MOULD STARTS GETTING SOLIDIFIED FORMING A SHEEL OF
SOLIDIFIED STEEL WHICH HAS TO BE STRONG ENOUGH SO AS TO WITHSTAND
THE PRESSURE OF THE MOLTEN STEEL WITHIN, IN ORDER TO PREVENT
SPILLING.
WATER COOLING
WATER COOLING
MOULD ENTRY
DUMMY BAR SHELL FORMATION
22
SEGMENTS:
SEGMENTS ARE A GROUP OF SUPPORT ROLLETS PROVIDD IN ORDER TO
FURTHER ASSISTINTHESOLIDIFICATION OF THE SHELL IN ORDER TO PREVENT
THE SPILLING OF MOLTEN STEEL.
THE SEGMENTS ARE PROOVIDED WITH WATER SPRAY NOZZLES OR AIR MIST
SPRAY NOZZLES. WATER KEEPS CONTINUOUSLY CIRCULATING THROUGH
THESE PROVIDING CONSTANT COOLING.
THE ABOVE FIGURE IS A REPRESENTATION OF A SEGMENT UNIT. PASSING
THROUGH A SERIES OF SUCH WATER COOLED SEGMENTS THE MOLTEN METAL
INSIDETHESOLIDIFIED SHELL GETS COMPLETELYSOLIDIFIED AND THENCOMES
THE WITHDRAWING AND STRAIGHTENING UNIT.
23
WITHDRAWAL AND STRAIGHTENING UNIT:
WHEN THE SOLIDIFICATION PROCESS IS ON THE VERGE OF COMPLETION, THE
SEGMENTS ARE EQUIPPED WITH A HYDRASULIC PINCHING MECHANISM. NOT
THE SEGMENTS SERVE FOR THE PURPOSE OF STRAIGHTENING. THE PRESSURE
HELPS IN STRAIGHTENING THE STEEL. VERY HIGH PRESSURE NEEDS TO BE
APPLIED THROUGH THE HYDRAULIC PINCHING MECHANISM.
MEASURING ROLL:
A MEASURING ROLL MEASURES THE LENGTH OF THE BEAM OR THE BILLET OR
ANY OTHER SHAPE AND WHEN WHE REQUIRED LENGTH HAS BEEN
WITHDRAWN THEN SENDS A SIGNAL TO THE TORCH CUTTING MACHINE.
TORCH CUTTING MACHINE:
THE TORCH CUTTING MACHINE, ON RECEIVING THE SIGNAL FROM THE
MEASUTING ROLL, CUTS THE STEEL IN ORDER TO GET THE FINAL PRODUCT.
CASTING SPEED:
THE CASTING SPEED BASICALLY DEPENDS ON TWO FACTORS NAMELY THE
SECTION SIZE AND THE STEEL GRADE.
24
CONCLUSION
THE PROJECT REPORT CONSTITUTES ALL THE BASIC KNOWLEDGE AS
RECEIVED DURING THE 2 WEEKS IN STEEL MELTING SECTION OF
MECON LIMITED, RANCHI. ALL POSSIBLE EFFORS HAVE BEEN MADE
TO PROVIDE LEGITIMATE INFORMATION IN THE REPORT BUT A
KIND CONSIDERATION IS EXPECTED FROM THE READERS IN CASE
ANY INEVITABLE ERROR MIGHT HAVE CREPT IN.
THE SUPPORT AND GUIDANCE OF ALL THE OFFICIALS DESPITE THEIR
OWN WORKLOAD THROUGHOUT THE COMPLETION OF THE
REPORT IS HIGHLY COMMENDABLE AND APPRECIATED FROM THE
STUDENT'S END.
THANK YOU.

Mais conteúdo relacionado

Mais procurados

Introduction to steel making processes
Introduction to steel making processesIntroduction to steel making processes
Introduction to steel making processespooja verma
 
Billet defects
Billet defectsBillet defects
Billet defectsZiad Salem
 
Deoxidation and inclusion control
Deoxidation and inclusion controlDeoxidation and inclusion control
Deoxidation and inclusion controlNikhi Lesh
 
Breakouts Problem during continuous casting of steel
Breakouts Problem during continuous casting of steelBreakouts Problem during continuous casting of steel
Breakouts Problem during continuous casting of steelSonal Kothari Runwal
 
Secondary steel making
Secondary steel making Secondary steel making
Secondary steel making Abhishek Kumar
 
C 18 - steel melting
C   18 - steel meltingC   18 - steel melting
C 18 - steel meltingcpandiv
 
Secondary steel making
Secondary steel makingSecondary steel making
Secondary steel makingLài Trần
 
Corex Process in Iron Making
Corex Process in Iron MakingCorex Process in Iron Making
Corex Process in Iron MakingAditya Singh
 
JSPL DRI#1 Training Report 2017
JSPL DRI#1 Training Report 2017JSPL DRI#1 Training Report 2017
JSPL DRI#1 Training Report 2017Abhishek Prajapati
 
LADLE FURNACE AND SECONDARY METALLURGY TRAINING PREPARED BY CVS MAKINA
LADLE FURNACE AND SECONDARY METALLURGY TRAINING PREPARED BY CVS MAKINALADLE FURNACE AND SECONDARY METALLURGY TRAINING PREPARED BY CVS MAKINA
LADLE FURNACE AND SECONDARY METALLURGY TRAINING PREPARED BY CVS MAKINAmetudgn
 
BSP Project (Based on Continuous Casting) [Final]
BSP Project (Based on Continuous Casting) [Final]BSP Project (Based on Continuous Casting) [Final]
BSP Project (Based on Continuous Casting) [Final]Subham Shit
 
project report bsl
project report bslproject report bsl
project report bslAKSHAY KUMAR
 

Mais procurados (20)

Introduction to steel making processes
Introduction to steel making processesIntroduction to steel making processes
Introduction to steel making processes
 
Steel MAking: Lecture Vacuum Degassing, VOD, Ladle-De-S, ESR
Steel MAking: Lecture Vacuum Degassing, VOD, Ladle-De-S, ESRSteel MAking: Lecture Vacuum Degassing, VOD, Ladle-De-S, ESR
Steel MAking: Lecture Vacuum Degassing, VOD, Ladle-De-S, ESR
 
VT20152215-Report
VT20152215-ReportVT20152215-Report
VT20152215-Report
 
Steel Making: Lecture Secondary Steel Making
Steel Making: Lecture Secondary Steel Making Steel Making: Lecture Secondary Steel Making
Steel Making: Lecture Secondary Steel Making
 
Tundish making1
Tundish making1Tundish making1
Tundish making1
 
Billet defects
Billet defectsBillet defects
Billet defects
 
Deoxidation and inclusion control
Deoxidation and inclusion controlDeoxidation and inclusion control
Deoxidation and inclusion control
 
Breakouts Problem during continuous casting of steel
Breakouts Problem during continuous casting of steelBreakouts Problem during continuous casting of steel
Breakouts Problem during continuous casting of steel
 
Secondary steel making
Secondary steel making Secondary steel making
Secondary steel making
 
C 18 - steel melting
C   18 - steel meltingC   18 - steel melting
C 18 - steel melting
 
Raw Material In Iron Making
Raw Material In Iron MakingRaw Material In Iron Making
Raw Material In Iron Making
 
Secondary steel making
Secondary steel makingSecondary steel making
Secondary steel making
 
Corex Process in Iron Making
Corex Process in Iron MakingCorex Process in Iron Making
Corex Process in Iron Making
 
JSPL DRI#1 Training Report 2017
JSPL DRI#1 Training Report 2017JSPL DRI#1 Training Report 2017
JSPL DRI#1 Training Report 2017
 
Steel Making: Ingot casting
Steel Making: Ingot casting Steel Making: Ingot casting
Steel Making: Ingot casting
 
LADLE FURNACE AND SECONDARY METALLURGY TRAINING PREPARED BY CVS MAKINA
LADLE FURNACE AND SECONDARY METALLURGY TRAINING PREPARED BY CVS MAKINALADLE FURNACE AND SECONDARY METALLURGY TRAINING PREPARED BY CVS MAKINA
LADLE FURNACE AND SECONDARY METALLURGY TRAINING PREPARED BY CVS MAKINA
 
BSP Project (Based on Continuous Casting) [Final]
BSP Project (Based on Continuous Casting) [Final]BSP Project (Based on Continuous Casting) [Final]
BSP Project (Based on Continuous Casting) [Final]
 
Steel Making: Lecture AOD
Steel Making: Lecture AOD Steel Making: Lecture AOD
Steel Making: Lecture AOD
 
LD process
LD processLD process
LD process
 
project report bsl
project report bslproject report bsl
project report bsl
 

Destaque

IBM Vs Microsoft and the battle for the corporate cloud business
IBM Vs Microsoft and the battle for the corporate cloud businessIBM Vs Microsoft and the battle for the corporate cloud business
IBM Vs Microsoft and the battle for the corporate cloud businessNancy Saini
 
квест игра экспедиция - отеч 2015 1
квест игра экспедиция - отеч 2015 1квест игра экспедиция - отеч 2015 1
квест игра экспедиция - отеч 2015 1Vlad Safianov
 
Producción y desarrollo sustentable
Producción y desarrollo sustentableProducción y desarrollo sustentable
Producción y desarrollo sustentablepaolajo
 
Mentor Initial Training May 30
Mentor Initial Training May 30Mentor Initial Training May 30
Mentor Initial Training May 30Jamie Harper
 
Barra Roantree, IFS, London - NERI Seminar presentation slides July 2016
Barra Roantree, IFS, London - NERI Seminar presentation slides July 2016Barra Roantree, IFS, London - NERI Seminar presentation slides July 2016
Barra Roantree, IFS, London - NERI Seminar presentation slides July 2016NevinInstitute
 
Final portfolio
Final portfolioFinal portfolio
Final portfolioMickbelb
 
2015_12_10 MIIETL RTL Conference v2
2015_12_10 MIIETL RTL Conference v22015_12_10 MIIETL RTL Conference v2
2015_12_10 MIIETL RTL Conference v2Kaitlyn Gonsalves
 
Processor module Ax-som-cl335x reference
Processor module Ax-som-cl335x referenceProcessor module Ax-som-cl335x reference
Processor module Ax-som-cl335x referenceAlexey Yurko
 
Презентація_ТВБВ_10002-07
Презентація_ТВБВ_10002-07Презентація_ТВБВ_10002-07
Презентація_ТВБВ_10002-07Arsen Bielik
 
It handllingsplan förskolan
It handllingsplan förskolanIt handllingsplan förskolan
It handllingsplan förskolanHelene Oskarsson
 
NERI SEminar - Investment and the Fiscal Rules - Eddie Casey - IFAC - 8/2/17
NERI SEminar - Investment and the Fiscal Rules - Eddie Casey - IFAC - 8/2/17NERI SEminar - Investment and the Fiscal Rules - Eddie Casey - IFAC - 8/2/17
NERI SEminar - Investment and the Fiscal Rules - Eddie Casey - IFAC - 8/2/17NevinInstitute
 
Mary murphy nui maynooth post budget seminar slides 19 oct 16
Mary murphy nui maynooth post budget seminar slides 19 oct 16Mary murphy nui maynooth post budget seminar slides 19 oct 16
Mary murphy nui maynooth post budget seminar slides 19 oct 16NevinInstitute
 
Kuliah 1 konsep jaringan
Kuliah 1 konsep jaringanKuliah 1 konsep jaringan
Kuliah 1 konsep jaringanjanuari massudi
 

Destaque (18)

IBM Vs Microsoft and the battle for the corporate cloud business
IBM Vs Microsoft and the battle for the corporate cloud businessIBM Vs Microsoft and the battle for the corporate cloud business
IBM Vs Microsoft and the battle for the corporate cloud business
 
квест игра экспедиция - отеч 2015 1
квест игра экспедиция - отеч 2015 1квест игра экспедиция - отеч 2015 1
квест игра экспедиция - отеч 2015 1
 
Yo soy uniatlantico
Yo soy uniatlanticoYo soy uniatlantico
Yo soy uniatlantico
 
Kaizen 改善
Kaizen 改善Kaizen 改善
Kaizen 改善
 
Producción y desarrollo sustentable
Producción y desarrollo sustentableProducción y desarrollo sustentable
Producción y desarrollo sustentable
 
Mentor Initial Training May 30
Mentor Initial Training May 30Mentor Initial Training May 30
Mentor Initial Training May 30
 
Practica5
Practica5Practica5
Practica5
 
Barra Roantree, IFS, London - NERI Seminar presentation slides July 2016
Barra Roantree, IFS, London - NERI Seminar presentation slides July 2016Barra Roantree, IFS, London - NERI Seminar presentation slides July 2016
Barra Roantree, IFS, London - NERI Seminar presentation slides July 2016
 
Final portfolio
Final portfolioFinal portfolio
Final portfolio
 
2015_12_10 MIIETL RTL Conference v2
2015_12_10 MIIETL RTL Conference v22015_12_10 MIIETL RTL Conference v2
2015_12_10 MIIETL RTL Conference v2
 
letest my cv0509
letest my cv0509letest my cv0509
letest my cv0509
 
Processor module Ax-som-cl335x reference
Processor module Ax-som-cl335x referenceProcessor module Ax-som-cl335x reference
Processor module Ax-som-cl335x reference
 
Презентація_ТВБВ_10002-07
Презентація_ТВБВ_10002-07Презентація_ТВБВ_10002-07
Презентація_ТВБВ_10002-07
 
Rapport chantepie écrit
Rapport chantepie écritRapport chantepie écrit
Rapport chantepie écrit
 
It handllingsplan förskolan
It handllingsplan förskolanIt handllingsplan förskolan
It handllingsplan förskolan
 
NERI SEminar - Investment and the Fiscal Rules - Eddie Casey - IFAC - 8/2/17
NERI SEminar - Investment and the Fiscal Rules - Eddie Casey - IFAC - 8/2/17NERI SEminar - Investment and the Fiscal Rules - Eddie Casey - IFAC - 8/2/17
NERI SEminar - Investment and the Fiscal Rules - Eddie Casey - IFAC - 8/2/17
 
Mary murphy nui maynooth post budget seminar slides 19 oct 16
Mary murphy nui maynooth post budget seminar slides 19 oct 16Mary murphy nui maynooth post budget seminar slides 19 oct 16
Mary murphy nui maynooth post budget seminar slides 19 oct 16
 
Kuliah 1 konsep jaringan
Kuliah 1 konsep jaringanKuliah 1 konsep jaringan
Kuliah 1 konsep jaringan
 

Semelhante a NIT Jamshedpur's Report on Steel Melting and Continuous Casting Processes

NATIONAL INSTITUTE OF TECHNOLOGY1
NATIONAL INSTITUTE OF TECHNOLOGY1NATIONAL INSTITUTE OF TECHNOLOGY1
NATIONAL INSTITUTE OF TECHNOLOGY1Nishant Singh
 
Cost reduction in melting-A SQC & 6Sigma Approach
Cost reduction in melting-A SQC & 6Sigma ApproachCost reduction in melting-A SQC & 6Sigma Approach
Cost reduction in melting-A SQC & 6Sigma ApproachArun Sadvi
 
Critical Aspects of Condensate Polishers, Its Impact on Feed Water Quality & ...
Critical Aspects of Condensate Polishers, Its Impact on Feed Water Quality & ...Critical Aspects of Condensate Polishers, Its Impact on Feed Water Quality & ...
Critical Aspects of Condensate Polishers, Its Impact on Feed Water Quality & ...IRJET Journal
 
Case study of profiles of electrical steel
Case study of profiles of electrical steelCase study of profiles of electrical steel
Case study of profiles of electrical steelGautham Reddy
 
Rail cum Road Bridge across the Ganga near Munger
Rail cum Road Bridge across the Ganga near MungerRail cum Road Bridge across the Ganga near Munger
Rail cum Road Bridge across the Ganga near MungerAshish Kumar Yadav
 
ppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESH
ppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESHppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESH
ppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESHAKHILESH KUMAR
 
Photocatalytic Converter
Photocatalytic ConverterPhotocatalytic Converter
Photocatalytic Convertertheijes
 
magneto-hydro-dynamic-power-generation.pptx
magneto-hydro-dynamic-power-generation.pptxmagneto-hydro-dynamic-power-generation.pptx
magneto-hydro-dynamic-power-generation.pptxAravindAG7
 
A summer training presentation on national thermal power
A summer training presentation on national thermal powerA summer training presentation on national thermal power
A summer training presentation on national thermal powerShishupal03012015
 
7 Million Dollar Joint Venture Partner Request Synopsis
7 Million Dollar Joint Venture Partner  Request Synopsis7 Million Dollar Joint Venture Partner  Request Synopsis
7 Million Dollar Joint Venture Partner Request SynopsisMichael Mattison
 
Basic Training Centre lalgarh Bikaner Training Report
Basic Training Centre lalgarh Bikaner Training ReportBasic Training Centre lalgarh Bikaner Training Report
Basic Training Centre lalgarh Bikaner Training ReportAMIT RAJ
 
Lanco training
Lanco trainingLanco training
Lanco trainingKSOM
 
Studies on aluminium silicon eutectic alloy casting and design approach of it...
Studies on aluminium silicon eutectic alloy casting and design approach of it...Studies on aluminium silicon eutectic alloy casting and design approach of it...
Studies on aluminium silicon eutectic alloy casting and design approach of it...IAEME Publication
 
Training
TrainingTraining
Trainingkulrao
 

Semelhante a NIT Jamshedpur's Report on Steel Melting and Continuous Casting Processes (20)

NATIONAL INSTITUTE OF TECHNOLOGY1
NATIONAL INSTITUTE OF TECHNOLOGY1NATIONAL INSTITUTE OF TECHNOLOGY1
NATIONAL INSTITUTE OF TECHNOLOGY1
 
Vineet project
Vineet projectVineet project
Vineet project
 
PRESNTAION
PRESNTAIONPRESNTAION
PRESNTAION
 
Ductile iron
Ductile ironDuctile iron
Ductile iron
 
Cost reduction in melting-A SQC & 6Sigma Approach
Cost reduction in melting-A SQC & 6Sigma ApproachCost reduction in melting-A SQC & 6Sigma Approach
Cost reduction in melting-A SQC & 6Sigma Approach
 
Critical Aspects of Condensate Polishers, Its Impact on Feed Water Quality & ...
Critical Aspects of Condensate Polishers, Its Impact on Feed Water Quality & ...Critical Aspects of Condensate Polishers, Its Impact on Feed Water Quality & ...
Critical Aspects of Condensate Polishers, Its Impact on Feed Water Quality & ...
 
Case study of profiles of electrical steel
Case study of profiles of electrical steelCase study of profiles of electrical steel
Case study of profiles of electrical steel
 
Rail cum Road Bridge across the Ganga near Munger
Rail cum Road Bridge across the Ganga near MungerRail cum Road Bridge across the Ganga near Munger
Rail cum Road Bridge across the Ganga near Munger
 
ppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESH
ppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESHppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESH
ppt on NTPC kahalgaon ,bhagalpur ( bihar) BY AKHILESH & PRIYESH
 
Innovative Technology for Steel Melt Shop
Innovative Technology for Steel Melt ShopInnovative Technology for Steel Melt Shop
Innovative Technology for Steel Melt Shop
 
Photocatalytic Converter
Photocatalytic ConverterPhotocatalytic Converter
Photocatalytic Converter
 
magneto-hydro-dynamic-power-generation.pptx
magneto-hydro-dynamic-power-generation.pptxmagneto-hydro-dynamic-power-generation.pptx
magneto-hydro-dynamic-power-generation.pptx
 
A summer training presentation on national thermal power
A summer training presentation on national thermal powerA summer training presentation on national thermal power
A summer training presentation on national thermal power
 
7 Million Dollar Joint Venture Partner Request Synopsis
7 Million Dollar Joint Venture Partner  Request Synopsis7 Million Dollar Joint Venture Partner  Request Synopsis
7 Million Dollar Joint Venture Partner Request Synopsis
 
Final pdf report
Final pdf reportFinal pdf report
Final pdf report
 
Basic Training Centre lalgarh Bikaner Training Report
Basic Training Centre lalgarh Bikaner Training ReportBasic Training Centre lalgarh Bikaner Training Report
Basic Training Centre lalgarh Bikaner Training Report
 
Ntpc training report
Ntpc training reportNtpc training report
Ntpc training report
 
Lanco training
Lanco trainingLanco training
Lanco training
 
Studies on aluminium silicon eutectic alloy casting and design approach of it...
Studies on aluminium silicon eutectic alloy casting and design approach of it...Studies on aluminium silicon eutectic alloy casting and design approach of it...
Studies on aluminium silicon eutectic alloy casting and design approach of it...
 
Training
TrainingTraining
Training
 

NIT Jamshedpur's Report on Steel Melting and Continuous Casting Processes

  • 1. 1 NATIONAL INSTITUTE OF TECHNOLOGY JAMSHEDPUR TRAININGREPORT STEEL MELTING SHOP TRAINING ORGANISATION -MECON LIMITED, RANCHI (DURATION-MAY 25th TO JUNE 24th 2015) NISHANT SINGH 2013UGME076 SEMESTER-V DEPARTMENT OF MECHANICAL ENGINEERING
  • 2. 2 ABSTRACT THIS REPORT IS BASED ON THE LEARNINGS ACHIEVED IN 2 WEEKS OF THE ONEMONTH TRAINING SESSION IN MECON LTD. UNDER THE STEEL MELTING SECTION AND ROLLING MILLS SECTION. THIS REPORT PARTICULARLY FOCUSES ON THE STEEL MELTING SECTION’S TWO MOST IMPORTANT ASPECTS- BASIC OXYGEN FURNACE AND CONTINUOUS CASTING SHOP. THE INFORMATION PROVIDED IN THIS REPORT IN BASED ON THE CUMULATIVEACCUMULATION OF ALL THE INFORMATION GAINED FROM THE RESPECTIVE OFFICIALS AND READING THE PROVIDED DOCUMENTS.
  • 3. 3 ACKNOWLEDGEMENTS I WOULD LIKE TO SINCERELY THANK ALL THE OFFICIALS OF THE STEEL MELTING SECTION OF MECON LIMITED (A GOVERNMENT OF INDIA ENTERPRISE) FOR THEIR GENEROUS AND AVID CONTRIBUTION TOWARDS MY KNOWLEDGE IN THE SUBJECT WHICH WAS COMPLETELY NEW TO ME. BECAUSE OF THEIR CONTRIBUTION, AT THE END OF THE TRAINING I HAVE BEEN ABLE TO GAIN ATLEAST THE BASICS OF BASIC OXYGEN FURNACE AND CONTINUOUS CASTING SHOP, AND ALSO SOME KNOWLEDGE OF THE NATURE AND TYPE OF WORK ACCOMPLISHED HERE IN MECON LIMITED. OVERALL THIS LEARNING EXPERIENCE IN MECON LIMITED PROVIDED ME WITH AN IDEA OF THE CHALLENGES FACED BY THE ENGINEERS IN PROFESSIONAL LIFE AND AS A MATTER OF FACT TAUGHT ME THAT EVEN AN IOTA OF NEGLIGENCE BY THE ENGINEERS CAN CAUSE GREAT HAZARDS DURING UPCOMING PROCESSES AND SO THE JOB OF AN ENGINEER IS THAT OF GREAT RESPONSIBILITIES. REMARKS:
  • 4. 4 CONTENTS TOPIC PAGE NO. 1) THE TRAINING ORGANISATION 5 2) THE PROCESS 6 3)STEELMELTING SECTION 7 4)BASIC OXYGEN FURNACE 8-10 5)OXYGEN LANCE SYSTEM 11 6) BOTTOM STIRRING SYSTEM 12 7) CONVERTER TAPPING, ALLOYING AND DESLAGGING 13 8)CONTINUOUS CASTING 14-15 9)CASTING MECHANISM 16-23 10)CONCLUSION 24
  • 5. 5 THE TRAINING ORGANISATION MECON LIMITED, FORMERLY KNOWN AS (METALLURGICAL & ENGINEERING CONSULTANTS (INDIA) LIMITED) IS A PUBLIC SECTOR UNDERTAKING UNDER THE MINISTRYOF STEEL OF THE GOVERNMENT OF INDIA.ITBEGANIN 1959 AS THE CENTRAL ENGINEERING AND DESIGNING BUREAU (CEDB) OF THE HINDUSTANSTEEL LIMITED (HSL), THE FIRST PUBLIC SECTOR STEEL COMPANY. SUBSEQUENTLY, CEDB GREW AS METALLURGICAL AND ENGINEERING CONSULTANT (MECON), A SUBSIDIARY OF THE STEEL AUTHORITY OF INDIA LIMITED (SAIL) IN 1973. IT LATER BECAME AN AUTONOMOUS COMPANY REPORTING TO THE MINISTRY OF STEEL IN 1978. 1 APRIL IS OBSERVED AS FOUNDATION DAY IN MECON. MECON LTD. IS A GOVERNMENTOF INDIA ENTERPRISEWHICH BASICALLYACTS AS A HOUSEOF ENGINEERS WHO ASSIST VARIOUS STEEL MAKING COMPANIES IN SETTING UP THEIR RESPECTIVE PLANTS AT PARTICULAR LOCATIONS FOR A GIVEN REQUIRED PRODUCTION OF STEEL. IT IS THE RESPONSIBILITY OF THE ENGINEERS OF MECON LTD. TO ENSURE THAT ALL THE EQUIPMENTS, LAYOUTS AND OTHER DESIGN RELATED INFORMATION SENT BY THE CONTRACTOR WHO HAS TAKEN UP THE WORK, ARE COMPLETELY UP TO THE MARK AND ARE FIT ENOUGH TO BE INSTALLED IN THE STEEL PLANT. THE WORK ENVIRONMENT IS EXTREMELY SUITABLE WITH STATE-OF-THE-ART FACILITIES FOR ALL THE EMPLOYEES AND THROUGHOUT THE TRAINING PERIOD ALL THE ASSIGNED ENGINEERS WERE VERY CO-OPERATIVE AND PROVIDED ALL THE REQUIRED INFORMATION IN APPROPRIATE MANNER.
  • 6. 6 THE PROCESS HOT METAL HANDLING: HOTMETAL DELIVERED BY TORPEDO CARS IS RECEIVED INTHE RELADLING PIT. THEN THE HOT METAL IS TRANSFERRED TO THE CHARGING LADLES PLACED ON ONE OF THE HOT METAL TRANSFER CARS RUNNING IN A RELADLING PIT. THE HOT METAL TRANSFER CAR HAS A WEIGHING FACILITY. HOT METAL DE SULPHURISATION UNIT: NEXT THE HOT METAL INTHE CHARGING LADLE IS TRANSFERRED BY CRANE TO THE HOT METAL DESULPHURISATION UNIT OR DIRECTLY TO THE CONVERTER FOR CHARGING. THE MAIN PURPOSE OF THE DESULPHURISATION UNIT IS TO REDUCE THE PERCENTAGE OF SULPHUR IN THE HOT METAL SCRAP HANDLING: A BAY ADJACENT TO THE CONVERTER CHARGING BAY IS NECESSARILY PROVIDED FOR THE PURPOSE OF SCRAP PREPARATION AND LOADING PURPOSES. THE SCRAP IS USUALLY TRANSFERRED BY RAILWAY WAGONS/ OR BY THE TRUCKS AND THEN BY CRANES INTO THE SCRTAP PITS IN THE YARD.THE CRANES ARE EQUIPPED WITH A WEIGHING FACILITY AND THEY ADJUST THE AMOUNT OF SCRAP. ADDITIVE HANDLING SYSTEM: EACH CONVERTER IS EQUIPPED WITH ITS OWN ADDITIVE HANDLING SYSTEM. THE ADDITIVES ARE DELIVERED THROUGH CONVEYOR SYSTEM. FERRO ALLOYS ARE TRANSPORTED FROM STORAGE YARD TO A BUNKER THROUGH THE CONVEYOR GROUP SYSTEM INSIDE THE CONVERTER BAY BY MEANS OF BOTTOM DISCHARGER.
  • 7. 7 STEEL MELTING SECTION AS DESCRIBED IN THE FLOW CHART, STEEL MELTING SHOP IS AN INTEGRAL PART OF STEEL MAKING PLANT.THEHOTMETAL COMING FROMTHE BLAST FURNACE NEEDS PROPER TREATMENT AND REFINING AS PER THE QUALITY OF STEEL REQUIRED. THE TWO MAIN COMPONENTS OF THE BASIC OXYGEN FURNACE ARE OXYGEN LANCE SYSTEM AND THE BOTTOM STIRRING SYSTEM. A DESCRIPRION OF THE VARIOUS PROCESSES TAKIN PLACE INSIDE A BASIC OXYGEN FURNACE IS FURTHER PROVIDED IN THE REPORT. FINAL PRODUCT ROLLING CASTING SECONDARY TREATMENT STEEL MELTING SHOP HOT METAL BLAST FURNACE ORE+COKE+LIME+SLAG
  • 8. 8 BASIC OXYGEN FURNACE (BRIEF OVERVIEW) A BOF BASICALLY COMPRISES OF A REFRACTORY LINED CONVERTER WITH A VERTICAL OXYGEN BLOWING LANCE ENTERING THE CONVERTER FROM ABOVE WITH INERT GAS INJECTED THROUGH THE CONVERTER BOTTOM FOR PROPER CHURNING OF THE MATERIAL INSIDE. THE CONVERTER IS FURTHER EQUIPPED WITH A PNEUMATIC SLAG STOPPER WITH SLAG DETECTIONSYSTEMTO MINIMIZESLAG CARRYOVER FROM THE LD CONVERTER INTO THE CASTING LADLE TAPPING. THE TILTING OF THE CONVERTER IS CARRIED OUT AT AUXILIARY CONTROL STANDS LOCATED AT THE CHARGING AND TAPPING SIDEOF EACH CONVERTER. THE CONVERTER IS TILTABLE FOR CHARGING, TAPPING AND DESLAGGING. THE CHARGE IS NORMALLY MADE UP OF HOT METAL, DRI, SCRAP AND ADDITIVES. D.R.I (DIRECTREDUCEDIRON) IN THIS, IRON ORE IN THE SOLID FORM IS COMPLETELY COATED WITH COAL AND THEN HEATED BY MEANS OF A TUNNEL FURNACE AT ABOUT 500 DEEGRES CENTIGRADE. DUE TO THIS THE COAL REDUCES THE OXYGEN PRESSURE IN THE IRON ORE AND THE OXYGEN MOLECULES CREATE VERIOUS PORE LININGS ON THEIR WAY OUT. DUE TO THIS DRI HAS A LARGE SURFACE AREA AND HENCE IS VERY REACTIVE.
  • 9. 9 BASIC OXYGEN FURNACE THE BASIC ADVANTAGES OF BASIC OXYGEN FURNACE ARE: • OXYGEN BLOWN AT SUPERSONIC SPEED • FOR REFINING OXYGEN LANCE SYSTEM • INERT GASES LIKE ARGON OR NITROGEN BLOWN • FOR PROPER CHURNING AND HOMOGENIZING BOTTOM STIRRING SYSTEM HIGH SPEED OF REFINING HIGH PRODUCTIVITY ECONOMY OF LABOUR LOW REFRACTORY CONSUMPTION HIGH QUALITY OF PRODUCTS
  • 10. 10 CONVERTER RELINING: CONVERTER RELINING IS NECESSARY BEACUSE THE INNER WALL GETS CARRODED WITH TIME. OUT OF THE 3 FUNCTIONAL CONVERTERS AT A TIME ONE IS RELINED WHILE THE OTHER 2 REMAIN FUNCTIONAL IN ORDER TO MAINTAIN CONTINUITY IN PRODUCTIVITY. CONVERTER RELINING IS DONE FROM TOP.FOR THIS PURPOSE THE MOVABLE HOODE IS MOVED OUT BY THE HOOD TRANSFER CART AND A RELINING MACHINE AND RELINING PLATFORM ASSIST IN THE RELINING. TAKE OVER POINTS: THESE ARE WELL DEFINED LOCATIONS WHERE THE SCOPE OF ENGINEERING ENDS FOR ONE ENGINEERING PACKAGEAND THESCOPEOF ENGINEERING FOR THE OTHER PACKAGE STARTS.
  • 11. 11 OXYGEN LANCE SYSTEM IN EACH CONVERTER AN OXYGEN LANCE SYSTEM IN PROVIDED.EACH OXYGEN LANCE SYSTEM CONSISTS OF TWO OXYGEN LANCES WHICH BOTH ARE PERMANENTLY CONNECTED TO OXYGEN AND COOLING WATER HOSES, READY FOR OPERATION. THE OXYGEN LANCES ARE AUTOMATICALLY EXCHANGED IN POSITION BY HORIZONTAL MOVEABLE LANCE CARRIERS.EACH OXYGEN LANCE IS EQUIPPED WITH A SEPARATE HOISTING DRIVE. FOR THE REFINING PROCESS THE OXYGEN LANCE IS LOWERED THROUGH A SOCKET INTO CONVERTER UNTIL THE LANCE TIP HAS REACHED THE PREDETERMINED HEIGHT ABOVE THE BATH LEVEL. THE OXYGEN LANCE SYSTEM IN MEANT TO MEET THE FOLLOWING REQUIREMENTS: 1) HIGH OXYGEN BLOWING RATE. 2) FLOW AND PRESSURE CONTROL OF OXYGEN AND COOLING WATER. 3) EXACT POSITIONING OF OXYGEN LANCE. THR LANCE DESIGN IS PROVIDED WITH AN INTERNAL TRIPPLE SAFETY O-RING SEALING ARRANGEMENT AND IS MANUFACTURED FROM HIGH PURITY, HIGH CONDUCTIVITY COPPER WITH THE LATEST NOZZLE DESIGN IN ACCORDANCE WITH OPERATING PARAMETERS. FOR EMERGENCY LIFTING OF THE OXYGEN LANCE AN AIR MOTOR IS PROVIDED. PRECISION MACHINED LAVALL NOZZLES IN THE LANCE TIP ARE SIZED TO PERMIT THE REQUIRED FLOW OF OXYGEN TO EXIT AT A SPECIFIC VELOCITY AND TO PROVIDE THE BEST OXYGEN DISTRIBUTION PATTERN.
  • 12. 12 BOTTOM STIRRING SYSTEM BOTTOM STIRRING WITH INERT GAS IS AN ADVANCED DEVELOPMENT OF THE STEEL MAKING PROCESS. IT OFFERS ADVANTAGES WITH REGARD TO METALLURGICAL AND OPERATIONAL ASPECTS. IN PARTICULAR THE PROCESS KUNETICS ARE SIGNIFICANTLY IMPROVED AND THE DECARBURIZATION REACTION AT LOW CARBON CONTENT IS FAVOURISED. THUS A VERY LOW CARBON CONTENT AT REASONABLE OXYGEN CONTENTS AS WELL AS LOWER CONTENTS OF PHOSPHOROUSD AND SULPHUR ARE ACHIEVED. THE IRON LOSS IN THE SLAG IS SIGNIFICANTLY REDUCED. THE BOTTOM STIRRING SYSTEM CONTINUOUSLY CHURNS THE HOT METAL AND SO THE OXYGEN BLOWN BY THE LANCE EFFICIENTLY REACHES EVERY PART OF THE HOT METAL. ALSO DUE TO THIS CHURNING THE PROBABILITY OXYGEN GETTING TRAPPED IN THE METAL DECREASES. THOUGH NOT ALL THE GAS ESCAPES BUT OPTIMISATION IS ACHIEVED BY THIS PROCESS.
  • 13. 13 CONVERTER TAPPING AND ALLOYING ONCE THE TEMPERATURE ANALYSIS ARE ADJUSTED, THE CASTING LADLE IS BROUGHT INTO POSITION UNDERNEATH THE CONVERTER AND THE CONVERTER IS TURNED DOWN FOR TAPPING (TAPPING SIDE). THE STEEL IS TAPPED VIA THE CONVERTER TAP HOLE. DURING TAPPING FERRO ALLOYS, DEOXIDANTS AND TOP SLAG ARE ADDED INTO THE CASTING LADLE ACCORDING TO REQUIREMENTS. GAS STIRRING AFTER SOME TIME OF TAPPING IS APPLIED IN THE LADLE TO IMPROVE DISSOLUTION OF FERRO ALLOYS AND HOMOGENIZATION OF THE STEEL BATH. CONVERTER DESLAGGING AFTER TAPPING IS COMPLETED, THE CONVERTER IS TILTED TOWARDS THE DESLAGGING POSITION (CHARGING SIDE). THE SLAG IS POURED VIA THE CONVERTER MOUTH INTO A SLAG POT WHICH IS BROUGHT INTO POSITION UNDERNEATH THE CONVERTER BY MEANS OF A TRANSFER CAR. A PNEUMATIC CONTROL IS PROVIDED IN ORDER TO DETECT THE SLAG AND PREVENT THE FLOW OF SLAG ALONG WITH THE METAL.
  • 14. 14 CONTINUOUS CASTING AFTER THE SECONDARY REFINING UNIT ( OUT OF FURNACE REFINING) THE STEEL OF THE DESIRED GRADEIS FINALLYSENT TO THE CONTINUOUS CASTING SHOP IN ORDER TO CAST IT INTO DESIRED SHAPES AND SIZES. USUALLY THE FOLLOWING CASTERS ARE PROVIDED:  BILLET CASTER  BLOOM CASTER  BILLET CUM BLOOM CASTER( COMBI CASTER)  BEAM BLANK CASTER  SLAB CASTER( CONVENTIONAL SLAB CASTER)  THIN SLAB CASTER  ROUND CASTER NOW THE FINISHED OR THE SEMI FINISHED PRODUCT IS OF THE FOLLOWING TYPES: SEMI FINISHED PRODUCT LONG PRODUCTS BILLETS BLOOMS BEAM BLANKS ROUNDS FLAT PRODUCTS SLABS THIN SLABS
  • 15. 15
  • 16. 16 CASTING MECHANISM LADLE TURRET: THE BASICUSE OF LADLE TURRET IS TO CHANGE THE POSITION OF THE LADLE. IN RECENT YEARS A BUTTERFLY TYPE LADLE TURRET HAS BEEN EVOLVED IN ORDER TO SUPPORT CONTINUOUS CASTING AND MAINTAIN SIMULTAINEITY SO AS TO REDUCE THE TIME LAG. ARMS CASTING SIDE LADLEPLACEMENT SIDE THE ABOVE FIGURE IS THE BASIC TOP VIEW OF A LADLE TURRET. THE TWO UNITS OF THE LADLE TURRET SIMULTANEOUSLY EXCHANGE THEIR POSITIONS. WHEN MOLTEN STEEL IN THE CASTING SIDE REACHES A CERTAIN MINIMUM LEVELTHE ENTIRE SETUP ROTATES AND THE PLACEMENT SIDE BECOMES THE CASTING SIDE AND VICE VERSA.
  • 17. 17
  • 18. 18 SLIDE GATE MECHANSM/PLATE IN THE LADLE: THE SLIDEGATEPLATE WAS ORIGINALLYINTRODUCED TO CONTROL THEFLOW OF MOLTEN STEEL FROM STEEL LADLES. THE CONCEPT OF SLIDE GATE SYSTEM WAS HOWEVER PATENTED AS EARLY AS 1885 BY MR. DAVID D. LEWIS OF USA BUT IT WAS FIRST SUCCESSFULLY INTRODUCED IN GERMANY IN 1964 ONLY. SOON AFTER THIS SYSTEM WAS ADOPTED IN 9 STEEL PLANTS IN USA BY 1969. THIS SYSTEMWAS FIRSTINTRODUCED INJAPANIN1968 AND BY 1970 ALL THE LADLES IN JAPAN ADOPTED SLIDE GATE SYSTEM.AND OVER THE YEARS THIS HAS BECOME PREVALENT IN INDIA AS WELL. HYDRAULIC MECHANISM SLIDEGATE(PLATE) THE ABOVE FIGURE SHOWS THE SLIDE GATE MECHANISM PICTORIALLY. THE SLIDE GATE IS CONTROLLED BY A HYDRAULIC FUEL-PISTON MECHANISM. AND ACCORDING TO THE REQUIREMENT PRESSURE CAN BE APPLIED ON THE SLIDING GATE IN ORDER TO OPEN IT OR CLOSE IT OR PARTIALLY CLOSE IT AS THE CASE MAY BE. WHEN THE LADLEIS ON THE PLACEMENT SIDE THE SLIDING GATE IS CLOSED WHILEWHENONTHE CASTING SIDE IT IS CONTROLLED AS TO HOW MUCH IT HAS TO BE OPENED. MANY A TIMES SILICA ETC. GET
  • 19. 19 DEPOSITED ATTHEBASE OF THE PLATER AND THEN A MANYALLY CONTROLLED OXYGEN LANCING IS DONE IN ORDER TO REMOVE THE DEPOSITS. LADLE SHROUD: WHEN THE MOLTEMETAL FLOWS FROMTHE LADLEINTHE CASTING POSITION THEN IT IS VERY VULNERABLE TO THE ATMOSPHERIC AIR AND NEEDS TO BE PROTECTED FROM IT THEREFORE A SHROUD OF I SIMPLE TERMS BASICALLY A COVER IS PROVIDED AT THE FLOW AREA IN ORDER TO PROTECT THE MOLTEN STEEL FROM ATMOSPHERIC CONTAMINATION. TUNDISH: THE MOLTEN STEEL FLOWS FROM THE LADLE INTO THE TUNDISH WHERE IT IS ALLOWED TO SETTLE FOR SOME TIME IN ORDERTO LET THE STEEL SETTLE DOWN DUE TO MGRAVITY AND WHATEVER IMPURITIES,IF PRESENT, TO RISE ABOVE. FROM THE TUNDISH THE MOLTEN METAL IS FINALLY SENT TO THE MOULD IN ORDER TO CAST IT INTO DESIRED SHAPES. IN ORDER TO CONTROL THE FLOW OF MOLTEN METAL FROM THE TUNDISH A STOPPER ROD MECHANISM IS PROIVIDED. STOPPER ROD MECHANISM: AT THE OUTLET OF THE TUNDISH A STOPPER ROD MECHANISM IS PROVIDED WHICH IS CONTROLLED BY A SERVO MOTOR. THE STOPPER ROD HAS A GRADUALLY DECREASING CROSS SECTION AND IT IS INSERTED INTO THE OUTLET AT THE TUNDISH. A GRADUALLY DECREASING CROSS SECTION IS PROVIDED SO THAT THE FLOW CAN BE CONTROLLED MORE EFFICIENTLY. SUBMERGED ENTRY NOZZLE: FROM THE TUNDISH THROUGH A SUBMERGED ENTRY NOZZLE THE MOLTEN STEEL IS POURED INTO THE MOULD FOR CASTING. AFTRE THIS A WORK OF GREAT PRECISION AND CARE STARTS. HERE ALSO THE ENTRY IS SUBMERGED SO AS TO PREVENT ATMOSPHERIC CONTAMINATION OF THE MOLTEN STEEL.
  • 20. 20 THE ABOVE DIAGRAMATIC REPRESENTATION DEPICTS THE ENTIRE CONTINUOUS CASTING PROCESS IN BRIEF FOR ANY REFERENCE.
  • 21. 21 FORMATION OF SOLIDIFIED SHELL: THIS IS BY FAR THE MOST CRUCIAL STEP IN CASTING AS A SLIGHT ERROR IN THIS STEP AND THE ENTIRE CAST WILL GET DEFORMED. THE ENTRY TO THE MOULD IS WATERCOOLED ATALL THE FOUR SIDES. SO THE OUTER SURFACE OF THGE MOLTEN STEEL, BY EXCHANGING HEAT FROM THE WALLS OF THE MOULD STARTS GETTING SOLIDIFIED FORMING A SHEEL OF SOLIDIFIED STEEL WHICH HAS TO BE STRONG ENOUGH SO AS TO WITHSTAND THE PRESSURE OF THE MOLTEN STEEL WITHIN, IN ORDER TO PREVENT SPILLING. WATER COOLING WATER COOLING MOULD ENTRY DUMMY BAR SHELL FORMATION
  • 22. 22 SEGMENTS: SEGMENTS ARE A GROUP OF SUPPORT ROLLETS PROVIDD IN ORDER TO FURTHER ASSISTINTHESOLIDIFICATION OF THE SHELL IN ORDER TO PREVENT THE SPILLING OF MOLTEN STEEL. THE SEGMENTS ARE PROOVIDED WITH WATER SPRAY NOZZLES OR AIR MIST SPRAY NOZZLES. WATER KEEPS CONTINUOUSLY CIRCULATING THROUGH THESE PROVIDING CONSTANT COOLING. THE ABOVE FIGURE IS A REPRESENTATION OF A SEGMENT UNIT. PASSING THROUGH A SERIES OF SUCH WATER COOLED SEGMENTS THE MOLTEN METAL INSIDETHESOLIDIFIED SHELL GETS COMPLETELYSOLIDIFIED AND THENCOMES THE WITHDRAWING AND STRAIGHTENING UNIT.
  • 23. 23 WITHDRAWAL AND STRAIGHTENING UNIT: WHEN THE SOLIDIFICATION PROCESS IS ON THE VERGE OF COMPLETION, THE SEGMENTS ARE EQUIPPED WITH A HYDRASULIC PINCHING MECHANISM. NOT THE SEGMENTS SERVE FOR THE PURPOSE OF STRAIGHTENING. THE PRESSURE HELPS IN STRAIGHTENING THE STEEL. VERY HIGH PRESSURE NEEDS TO BE APPLIED THROUGH THE HYDRAULIC PINCHING MECHANISM. MEASURING ROLL: A MEASURING ROLL MEASURES THE LENGTH OF THE BEAM OR THE BILLET OR ANY OTHER SHAPE AND WHEN WHE REQUIRED LENGTH HAS BEEN WITHDRAWN THEN SENDS A SIGNAL TO THE TORCH CUTTING MACHINE. TORCH CUTTING MACHINE: THE TORCH CUTTING MACHINE, ON RECEIVING THE SIGNAL FROM THE MEASUTING ROLL, CUTS THE STEEL IN ORDER TO GET THE FINAL PRODUCT. CASTING SPEED: THE CASTING SPEED BASICALLY DEPENDS ON TWO FACTORS NAMELY THE SECTION SIZE AND THE STEEL GRADE.
  • 24. 24 CONCLUSION THE PROJECT REPORT CONSTITUTES ALL THE BASIC KNOWLEDGE AS RECEIVED DURING THE 2 WEEKS IN STEEL MELTING SECTION OF MECON LIMITED, RANCHI. ALL POSSIBLE EFFORS HAVE BEEN MADE TO PROVIDE LEGITIMATE INFORMATION IN THE REPORT BUT A KIND CONSIDERATION IS EXPECTED FROM THE READERS IN CASE ANY INEVITABLE ERROR MIGHT HAVE CREPT IN. THE SUPPORT AND GUIDANCE OF ALL THE OFFICIALS DESPITE THEIR OWN WORKLOAD THROUGHOUT THE COMPLETION OF THE REPORT IS HIGHLY COMMENDABLE AND APPRECIATED FROM THE STUDENT'S END. THANK YOU.