Ppt akbi fix

N
KELOMPOK 10 : 
SITI ANNISA 
FENY RUSTAN 
ANNISA FITRI
KASUS KASUS KHUSUS DALAM PERHITUNGAN 
AKUNTANSI 
 Adanya Produk Hilang Dalam Proses 
 Adanya Produk Rusak Dalam Proses (Spoiled Goods) 
 Adanya Produk Cacat Dalam Proses (Defective Goods) 
 Adanya Tambahan Bahan Setelah DepartemenAwal 
 Adanya Bahan Sisa Proses Produksi (Scrap Matreial) 
 Adanya Bahan Buangan (Waste Material) 
 Kalkulasi Biaya Rata - Rata VS Kalkulasi Biaya Fifo
Metode Harga Pokok Rata-rata (Weighted Average) 
Proses Pemberlakuan Metode Rata-rata 
 Di departemen – Pertama : 
 Dihitung total biaya untuk masing-masing jenis biaya produksi, yaitu : 
biaya bahan, biaya tenaga kerja, dan biaya overhead pabrik dengan cara 
biaya yang melekat pada persediaan barang dalam proses awal ditambah 
biaya-biaya periode berjalan. 
 Dihitung jumlah unit ekuivalen produksi yang dihasilkan dalam periode 
yang bersangkutan : Barang jadi (yang ditransfer ke departemen 
berikutnya) ditambah barang dalam proses akhir menurut unit ekuivalen. 
Harga pokok rata-rata kemudian dihitung berdasarkan total biaya dibagi 
jumlah unit ekuivalen.
 Di departemen – Lanjutan : 
 Dihitung harga pokok rata-rata yang berasal dari departemen 
sebelumnya. Harga pokok tersebut terdiri dari : Harga pokok persediaan 
awal dan harga pokok yang diterima pada periode yang bersangkutan. 
 Dihitung harga pokok rata-rata per satuan yang ditambahkan dalam 
departemen yang bersangkutan. 
 Menghitung harga pokok rata-rata per satuan di departemen yang 
bersangkutan dengan cara : Harga pokok rata-rata dari departemen yang 
bersangkutan dengan cara : Harga pokok rata-rata dari departemen yang 
mendahului ditambah harga pokok rata-rata di departemen yang 
bersangkutan.
Metode First In First Out (FIFO) 
Proses Pemberlakuan Metode FIFO 
 Proses produksi dianggap untuk menyelesaikan produk dalam proses awal 
menjadi produk selesai. 
 Setiap elemen harga pokok produk dalam proses awal tidak digabungkan 
dengan elemen biaya yang terjadi dalam periode yang bersangkutan. 
 Harga pokok produk dalam proses awal periode tidak perlu dipecah kembali 
menurut elemennya ke dalam setiap elemen biaya. 
 Produksi ekuivalen = (Produksi dalam proses awal x tingkat penyelesaian 
yang dibutuhkan) + Produksi Current + (Produk dalam proses akhir x 
Tingkat penyelesaian yang sudah dinikmati). 
 Besarnya harga pokok satuan setiap elemen biaya dihitung sebesar elemen 
biaya yang terjadi pada periode yang bersangkutan dibagi jumlah produksi 
ekuivalen dari elemen biaya yang bersangkutan.
Metode Last In First Out (LIFO) 
 Pemberlakuan Metode LIFO 
 Proses produksi dianggap untuk menyelesaikan produk yang baru masuk 
proses pada periode yang bersangkutan, apabila semua produk yang 
baru masuk proses sudah dapat diselesaikan kemudian untuk mengolah 
produk dalam proses awal. 
 Setiap elemen harga pokok produk dalam proses awal periode tidak 
perlu digabungkan dengan setiap elemen biaya yang terjadi pada 
periode yang bersangkutan. 
 Besarnya produksi ekuivalen dapat dihitung : 
 Produksi ekuivalen = Produk selesai + [ (Produksi dalam proses akhir x 
tingkat penyelesaian yang dinikmati) – (Produk dalam proses awal x 
Tingkat penyelesaian yang sudah dinikmati periode sebelumnya) ]. 
 Besarnya harga pokok satuan setiap elemen biaya dihitung dengan cara 
membagi elemen biaya tertentu yang terjadi pada periode yang 
bersangkutan dengan produksi ekuivalen biaya yang bersangkutan.
Contoh Kasus 
RELAXO COMPANY memproduksi obat sakit kepala, produksi dibagi dalam tiga proses 
yaitu peramuan, penggandaan dan pengepakan. Kalkulasi biaya rata-rata digunakan pada 
departemen peramuan, kalkulasi biaya FIFO pada departemen penggandaan, kalkulasi biaya 
LIFO digunakan di departemen pengepakan.
Dept. Peramuan Dept. Penggandaan Dept. Pengepakan 
Produk dalam proses per 01/03/98 
(BBB 100%, BTK 30%, BOP 40%) 200 
Produk masuk proses 3.500 
Produk selesai ditransfer ke Dept. Pengadaan 3.000 
- Produk dalam proses per 31/03/98 
(BBB 100%, BTK 40%, BOP 30 %) 710 
Produk dalam proses per 01/03/98 
(BTK 60%, BOP 80%) 600 
Produk selesai diterima dari dept. Peramuan 3020 
produk selesai diterima dari Dept. Pengepakan 2680 
Produk dalam proses per 31/03/98 (BTK 25%, BOP 30%) 1000 
Produk dalam proses per 01/03/98 
(BTK 30%, BOP 25%) 800 
Produk selesai diterima dr Dept. Penggandaan 2680 
Produk selesai ditransfer ke gudang 2400 
Produk dalam proses per 31/03/98 (BTK 70%, BOP 40%) 1000 
Produk cacat karene kesalahan 20 
Hilang awal 10 
Tambahan produk akibat tambahan bahan 60 
Hilang akhir 80 
Harga pokok produkdalam proses 01/03/98 
Bahan Baku Rp. 2.500.000 
Biaya Tenaga Kerja Rp. 1.200.000 Rp. 1.700.000 Rp. 3.500.000 
Biaya Overhead Pabrik Rp. 220.000 Rp. 800.000 Rp. 1.600.000 
Biaya ditambahkan selama bulan Maret ‘98 
Biaya Bahan Baku Rp. 4.998.200 
Biaya Tenaga Kerja Rp. 3.198.272 Rp. 5.380.000 Rp. 6.697.320 
Biaya Overhead Pabrik Rp. 1.487.180 Rp. 2.276.650 Rp. 3.299.080
Metode Harga Pokok Rata-rata (Weighted Average) 
1. 
RELAXO COMPANY 
Laporan Harga Pokok Produksi Departemen Peramuan 
Bulan Maret 1998 
( Metode Rata - rata Tertimbang ) 
Laporan Produksi : Unit : 
Produk dalam proses per 01/03/1998 (BBB 100%, BTK 
30%, BOP 40%) 200 
Produk masuk proses 3.500 
Produk cacat karena kesalahan 20 
Produk selesai ditransfer ke Dept. Penggandaan 3.000 
Produk dalam proses per 31/03/1998 
( BTK 100%, BTK 40%, BOP 30% ) 710 
Produk hilang awal 10 
3.720 
Biaya dibebankan di Departemen Peramuan: 
Elemen biaya Jumlah Unit ekuivalen HP/unit 
Hp produk dalam proses awal 
Rp. 3.920.00 
Biaya ditambahkan di Dept. Peramuan: 
Biaya Bahan Baku Rp. 4.998.200 3.730 1] Rp.1.340 
Biaya Tenaga Kerja Rp. 3.198.272 3.304 2] Rp. 968 
Biaya Overhead Pabrik Rp. 1.487.180 3.233 3] Rp. 460 
Rp. 9.683.652 Rp.2.768 
Biaya Kumulatif Rp.13.603.652
Perhitungan Harga Pokok : 
Perhitungan HP produk selesai ditrasfer ke Departemen 
Penggandaan : 
HP produk selesai (3.000 x Rp. 2.768) Rp . 8.304.000 
Hp produk cacat (20 x Rp. 2.768) Rp. 55.360 
HP produk selesai ditransfer ke Dept.Penggandaan : ( 3.020 x Rp. 2.768 ) Rp. 8.359.360 
Perhitungan HP produk dalam proses akhir : 
Biaya Bahan Baku (710 x 100%) x Rp. 1.340 = Rp. 951.400 
Biaya Tenaga Kerja (710 x 40%) x Rp. 968 = Rp. 274.912 
Biaya Overhead Pabrik (710 x 30%) x Rp. 460 = Rp. 97.980 
HP produk dalam proses periode lalu 
Jumlah Harga Pokok Produksi Departemen Peramuan Rp.13.603.652 
1] BBB : 3.000 + (710 x 100%) + 20 
2] BTK : 3.000 + (710 x 40%) + 20 
3] BOP : 3.000 + (710 x 30%) + 20 
2.Jurnal Departemen Peramuan 
a. Mencatat Biaya pada Bulan Maretl 1998 
BDP - BBB Departemen Peramuan Rp. 4.998.200 
BDP - BTK Departemen Peramuan Rp. 3.198.272 
BDP - BOP Departemen Peramuan RP. 1.487.180 Rp. 4.998.200 
Persediaan bahan baku Rp. 3.198.272 
Gaji dan upah Rp. 1.487.180 
Berbagai jenis biaya
b. Mencatat Transfer Produk ke Departemen 
Penggandaan 
BDP - BBB Departemen Penggandaan Rp. 8.359.360 
BDP - BBB Departemen Peramuan Rp.4.046.800 1] 
BDP - BTK Departemen Peramuan Rp.2.923.360 2] 
BDP - BOP Departemen Peramuan Rp.1.389.200 3] 
c. Mencatat Persediaan produk dalam Proses Akhir 
Persediaan PDP Departemen Peramuan Rp. 5.244.292 
BDP - BBB Departemen Peramuan Rp. 951.400 
BDP - BTK Departemen Peramuan Rp. 274.912 
BDP - BOP Departemen Peramuan Rp. 97.980 
Persediaan Prosuk dalam proses awal Rp. 3.920.000 
Keterangan : 
1] ( 3.000 + 20 )x Rp. 1.340 
2] ( 3.000 + 20 ) x Rp. 968 
3] ( 3.000 + 20 ) x Rp. 460
Jurnal Departemen Penggandaan 
Mencatat Biaya pada Bulan Maret 1998 
BDP - BTK Departemen Penggandaan Rp. 5.380.000 
BDP - BOP Departemen Penggandaan Rp. 2.276.650 
Gaji dan upah Rp. 5.380.000 
Berbagai jenis biaya Rp. 2.276.650 
Mencatat Trasfer Produk ke Departemen Pengepakan 
BDP - BBB Departemen Pengepakan Rp. 14.767.006,36 
BDP - BBB Departemen Penggandaan Rp.7.273.726,36 1] 
BDP - BTK Departemen Penggandaan Rp.5.360.000 2] 
BDP - BOP Departemen Penggandaan Rp.2.133.280 3] 
Mencatat Persediaan Produk dalam Proses Akhir 
Persediaan PDP Departemen Penggandaan Rp. 3.749.910,8 
BDP - BBB Departemen Penggandaan Rp. 1.086.630,8 
BDP - BTK Departemen Penggandaan Rp. 20.000 
BDP - BOP Departemen Penggandaan Rp. 143.280 
Persediaan produk dalam prosese awal Rp. 2.500.000 
Keterangan : 
1] 2.680 x Rp. 2.714,077 
2] 2.680 x Rp. 2.000 
3] 2.680 x Rp. 796
Metode First In First Out 
RELAXO COMPANY 
Laporan Harga Pokok Produksi Departemen Penggandaan 
Bulan Maret 1998 
( Metode FIFO ) 
Laporan Produksi : Unit : 
Produk dalam proses per 01/03/1998 
( BTK 60%, BOP 80% ) 600 
Produk masuk proses 3.020 
Tambahan produk karena 
ada tambahan bahan 60 
3.680 
Produk selesai ditransfer 
ke Dept. Pengepakan 2.680 
Produk dalam proses per 31/03/1998 
( BTK 25%, BOP 30% ) 1.000 
3.680 
Biaya dibebankan di Departemen Penggandaan: 
Elemen biaya Jumlah Unit ekuivalen HP/unit 
Hp produk dalam proses awal Rp. 2.500.000 
Biaya ditambahkan di 
Dept. Penggandaan : 
HP produk dari Dept. Peramuan Rp8.359.360 3.080 Rp . 2.768 
Penyesuain tambahan produk 60 Rp. 53,923 
Rp8.359.360 3.020 Rp.2.714,077 
Biaya ditambahkan di 
Dept. Penggandaan : 
Biaya Tenaga Kerja Rp. 5.380.000 2.690 1] Rp .2.000 
Biaya Overhead Pabrik Rp. 2.276.650 2.860 2] Rp .796 
Biaya Kumulatif Rp.18.516.010 Rp.5.510,077
Perhitungan Harga Pokok : 
Perhitungan HP produk selesai ditrasfer ke 
Departemen Pengepakan : 
HP produk selesai (2.680 x Rp. 5.510,077) = Rp. 14.767.006,36 
Perhitungan HP produk dalam proses akhir : 
Dari Departemen Peramuan 
(1000 - 600)x Rp. 2.714,077 Rp. 1.086.630,8 
Biaya Tenaga Kerja 
(1000 x 25%) - (600 x 40%)x Rp.2.000 Rp. 20.000 
Biaya Overhead Pabrik 
(1000 x 30%) - (600 x 20%)x Rp.796 Rp. 143.280 
HP produk dalam proses periode lalu 
Rp 2.500.000 
Rp. 3.749.910,8 
Jumlah Harga Pokok Produksi Departemen 
Penggandaan Rp.18.516.977,16 
1] BTK : (2.680 - 600) + (600 x 60%) + (1000 x 25%) 
2] BOP : (2.680 - 600) + (600 x 80%) + (1000 x 30%)
2. 
Jurnal Departemen Penggandaan 
a. Mencatat Biaya pada Bulan Maret 1998 
BDP - BTK Departemen Penggandaan Rp. 5.380.000 
BDP - BOP Departemen Penggandaan Rp. 2.276.650 
Gaji dan upah Rp. 5.380.000 
Berbagai jenis biaya 
Rp. 2.276.650 
b. Mencatat Trasfer Produk ke Departemen Pengepakan 
BDP - BBB Departemen Pengepakan Rp. 14.767.006,36 
BDP - BBB Departemen Penggandaan Rp.7.273.726,36 1] 
BDP - BTK Departemen Penggandaan Rp .5.360.000 2] 
BDP - BOP Departemen Penggandaan Rp .2.133.280 3] 
c. Mencatat Persediaan Produk dalam Proses Akhir 
Persediaan PDP Departemen Penggandaan Rp. 3.749.910,8 
BDP - BBB Departemen Penggandaan Rp. 1.086.630,8 
BDP - BTK Departemen Penggandaan Rp. 20.000 
BDP - BOP Departemen Penggandaan Rp. 143.280 
Persediaan produk dalam prosese awal Rp . 2.500.000 
Keterangan : 
1] 2.680 x Rp. 2.714,077 
2] 2.680 x Rp. 2.000 
3] 2.680 x Rp. 796
Metode Last In First Out (Lifo) 
Laporan Produksi : Unit : 
Produk dalam proses per 01/03/1998 
( BTK 30%, BOP 25% ) 800 
Produk masuk proses 2.680 
3.480 
Produk selesai ditransfer ke gudang 2.400 
Produk dalam proses per 31/03/1998 
( BTK 70%, BOP 40% ) 1.000 
Produk hilang akhir 80 
3.480 
Biaya dibebankan di Departemen Pengepakan: 
Elemen biaya Jumlah Unit ekuivalen HP/unit 
Hp produk dalam proses awal Rp. 5.100.000 
Biaya ditambahkan di Dept. Pengepakan : 
HP produk dari Dept. Penggandaan 
Rp.14.767.006,36 
2.680 Rp. 5.510,077 2.680 Rp. 5.510,077 
Biaya ditambahkan di Dept. Pengepakan : 
Biaya Tenaga Kerja Rp. 6.697.320 2.940 1] Rp.2.278 
Biaya Overhead Pabrik 
Rp. 3.299.080 
2.680 2] 2.680 2] Rp.1.231 
Biaya Kumulatif 
Rp.29.863.406,36 
Rp.9.019,077 Rp.9.019,077
Perhitungan Harga Pokok : 
Perhitungan HP produk selesai ditrasfer ke gudang : 
HP produk selesai 
(2.400 x Rp. 9.019,077) Rp. 21.645.784,8 
HP produk hilang akhir 
(80 x Rp. 9.019,077) Rp. 721.526,16 
HP produk selesai ditransfer ke gudang 
(2.480 x 9.019,077) Rp. 22.367.310,96 
Perhitungan HP produk dalam proses akhir : 
Dari Departemen Penggandaan 
(1000 - 800) x Rp. 5.510,077 Rp. 1.102.015,4 
Biaya Tenaga Kerja 
(1000 x 70%) - (800 x 30%) x Rp.2.278 Rp. 1.047.880 
Biaya Overhead Pabrik 
(1000 x 40%) - (800 x 25%) x Rp.1.231 Rp. 246.200 
HP produk dalam proses periode lalu Rp. 5.100.000 Rp. 7.496.095,4 
Jumlah Harga Pokok Produksi Departemen Penggandaan 
Rp.29.863.406,36 
1] BTK : {(2.400 + (1.000 x 70%) - (800 x 30%)} + 80 
2] BOP : {(2.400 + (1.000 x 40%) - (800 x 25%)} + 80
2. 
Jurnal Departemen Pencetakan 
a. Mencatat Biaya pada Bulan April 1998 Rp. 562.030 
BDP - BTK Departemen Pencetakan Rp. 418.500 
BDP - BOP Departemen Pencetakan Rp.562.030 
Gaji dan upah Rp.418.500 
Berbagai jenis biaya 
b. Mencatat Trasfer Produk Jadi ke Gudang 
Persediaan produk jadi Rp.2.215.876 
BDP - BBB Departemen Pencetakan Rp.1.302.046 1] 
BDP - BTK Departemen Pencetakan Rp. 540.330 2] 
BDP - BOP Departemen Pencetakan Rp. 375.500 3] 
c. Mencatat Persediaan Produk dalam Proses Akhir 
Persediaan PDP Departemen Pencetakan Rp. 494.355 
BDP - BBB Departemen Pencetakan Rp. 261.455 
BDP - BTK Departemen Pencetakan Rp. 21.700 
BDP - BOP Departemen Pencetakan Rp. 45.000 
Persediaan produk dalam prosese awal Rp. 166.200 
Keterangan : 
1] 2.490 x Rp. 522,91 
2] 2.490 x Rp. 217 
3] 2.490 x Rp. 150
Simpulan 
 Dari pembahsan dapat disimpulkan bahwa metode harga pokok proses 
merupakan metode pengumpulan biaya produksi yang digunakan oleh 
perusahaan yang mengolah produknya secara massa. 
 Didalam metode ini, biaya produksi dikumpulkan untuk setiap proses 
selama jangka waktu tertentu, dan biaya produksi per satuan dihitung 
dengan cara membagi total biaya produksi dalam periode tertentu dengan 
jumlah satuan produk yang dihasilkan dari proses tersebut selama jangka 
waktu yang bersangkutan. 
 Apabila pada awal periode terdapat persediaan awal barang dalam proses 
maka timbul masalah untuk menentukan harga pokok barang jadi. Hal ini 
tiimbul karena persediaan barang dalam proses tersebut telah mempunyai 
harga pokok yang berasal dari periode sebelumnya. Ada tiga metode dalam 
penyelesaiannya, yaitu ata-rata, FIFO, dan LIFO.
1 de 19

Recomendados

Materi 3 metode_harga_pokok_proses por
Materi 3 metode_harga_pokok_prosesMateri 3 metode_harga_pokok_proses
Materi 3 metode_harga_pokok_prosesdedykurniawan90
120 visualizações35 slides
Process costing1 por
Process costing1Process costing1
Process costing1Lia Ivvana
14.4K visualizações54 slides
Akuntansi Biaya : Metode Harga Pokok Proses por
Akuntansi Biaya : Metode Harga Pokok ProsesAkuntansi Biaya : Metode Harga Pokok Proses
Akuntansi Biaya : Metode Harga Pokok ProsesHasan Romadon
44.7K visualizações22 slides
Harga Pokok Proses metode rata-rata tertimbang por
Harga Pokok Proses metode rata-rata tertimbangHarga Pokok Proses metode rata-rata tertimbang
Harga Pokok Proses metode rata-rata tertimbangRAnie Chucute
13.5K visualizações22 slides
Metode harga pokok proses (pengantar) por
Metode harga pokok proses (pengantar)Metode harga pokok proses (pengantar)
Metode harga pokok proses (pengantar)jhumanangshare
27.2K visualizações23 slides
Metode Harga Pokok Proses Costing por
Metode Harga Pokok Proses CostingMetode Harga Pokok Proses Costing
Metode Harga Pokok Proses CostingAyi Suwandi
110.5K visualizações54 slides

Mais conteúdo relacionado

Mais procurados

Harga pokok proses por
Harga pokok prosesHarga pokok proses
Harga pokok prosesRahmatia Azzindani
11K visualizações23 slides
Metode Harga Pokok Proses Tanpa Produk Dalam Proses Awal por
Metode Harga Pokok Proses Tanpa Produk Dalam Proses AwalMetode Harga Pokok Proses Tanpa Produk Dalam Proses Awal
Metode Harga Pokok Proses Tanpa Produk Dalam Proses AwalFenny Handayani
12.3K visualizações48 slides
Metode harga pokok proses pengantar por
Metode harga pokok proses pengantarMetode harga pokok proses pengantar
Metode harga pokok proses pengantarkomarhasan
9.4K visualizações12 slides
Harga Pokok Proses por
Harga Pokok ProsesHarga Pokok Proses
Harga Pokok ProsesNahdzia Heryanni
5.3K visualizações21 slides
Akuntansi biaya bab 3 metode harga pokok proses 1 departemen por
Akuntansi biaya bab 3 metode harga pokok proses 1 departemenAkuntansi biaya bab 3 metode harga pokok proses 1 departemen
Akuntansi biaya bab 3 metode harga pokok proses 1 departemenSelfia Dewi
10.9K visualizações34 slides
Akuntanis biaya bab 4 metode harga pokok proses diolah 2 departemen por
Akuntanis biaya bab 4 metode harga pokok proses diolah 2 departemenAkuntanis biaya bab 4 metode harga pokok proses diolah 2 departemen
Akuntanis biaya bab 4 metode harga pokok proses diolah 2 departemenSelfia Dewi
45.8K visualizações46 slides

Mais procurados(20)

Harga pokok proses por Rahmatia Azzindani
Harga pokok prosesHarga pokok proses
Harga pokok proses
Rahmatia Azzindani11K visualizações
Metode Harga Pokok Proses Tanpa Produk Dalam Proses Awal por Fenny Handayani
Metode Harga Pokok Proses Tanpa Produk Dalam Proses AwalMetode Harga Pokok Proses Tanpa Produk Dalam Proses Awal
Metode Harga Pokok Proses Tanpa Produk Dalam Proses Awal
Fenny Handayani12.3K visualizações
Metode harga pokok proses pengantar por komarhasan
Metode harga pokok proses pengantarMetode harga pokok proses pengantar
Metode harga pokok proses pengantar
komarhasan9.4K visualizações
Harga Pokok Proses por Nahdzia Heryanni
Harga Pokok ProsesHarga Pokok Proses
Harga Pokok Proses
Nahdzia Heryanni5.3K visualizações
Akuntansi biaya bab 3 metode harga pokok proses 1 departemen por Selfia Dewi
Akuntansi biaya bab 3 metode harga pokok proses 1 departemenAkuntansi biaya bab 3 metode harga pokok proses 1 departemen
Akuntansi biaya bab 3 metode harga pokok proses 1 departemen
Selfia Dewi10.9K visualizações
Akuntanis biaya bab 4 metode harga pokok proses diolah 2 departemen por Selfia Dewi
Akuntanis biaya bab 4 metode harga pokok proses diolah 2 departemenAkuntanis biaya bab 4 metode harga pokok proses diolah 2 departemen
Akuntanis biaya bab 4 metode harga pokok proses diolah 2 departemen
Selfia Dewi45.8K visualizações
Harga pokok proses lanjutan 1 por jhumanangshare
Harga pokok proses lanjutan 1Harga pokok proses lanjutan 1
Harga pokok proses lanjutan 1
jhumanangshare11.2K visualizações
Bab 4 metode harga pokok proses por Bogel MumedtNdase
Bab 4   metode harga pokok prosesBab 4   metode harga pokok proses
Bab 4 metode harga pokok proses
Bogel MumedtNdase13.5K visualizações
Metode harga-pokok-proses por Nur Faiz-zha
Metode harga-pokok-prosesMetode harga-pokok-proses
Metode harga-pokok-proses
Nur Faiz-zha13.2K visualizações
METODE HARGA POKOK PROSES_PENGANTAR por RisaDenilla
METODE HARGA POKOK PROSES_PENGANTARMETODE HARGA POKOK PROSES_PENGANTAR
METODE HARGA POKOK PROSES_PENGANTAR
RisaDenilla277 visualizações
Akuntansi Biaya 2#5 por Judianto Nugroho
Akuntansi Biaya 2#5Akuntansi Biaya 2#5
Akuntansi Biaya 2#5
Judianto Nugroho29.3K visualizações
Materi Metode Harga Pokok Proses & Biaya Bahan Baku dan Pengendaliannya por KameliaRahma1
Materi Metode Harga Pokok Proses & Biaya Bahan Baku dan PengendaliannyaMateri Metode Harga Pokok Proses & Biaya Bahan Baku dan Pengendaliannya
Materi Metode Harga Pokok Proses & Biaya Bahan Baku dan Pengendaliannya
KameliaRahma1283 visualizações
Akuntansi biaya 2 por dyna septiani
Akuntansi biaya 2Akuntansi biaya 2
Akuntansi biaya 2
dyna septiani344 visualizações
Akuntansi biaya _ semester III por hasril ariel
Akuntansi biaya _ semester IIIAkuntansi biaya _ semester III
Akuntansi biaya _ semester III
hasril ariel70.3K visualizações
Harga pokok pesanan por jhumanangshare
Harga pokok pesananHarga pokok pesanan
Harga pokok pesanan
jhumanangshare11K visualizações
Standard cost – materials and labor por Arif Setiawan
Standard cost – materials and laborStandard cost – materials and labor
Standard cost – materials and labor
Arif Setiawan589 visualizações
Ppt akutansi biaya fix por Nahdzia Heryanni
Ppt akutansi biaya   fixPpt akutansi biaya   fix
Ppt akutansi biaya fix
Nahdzia Heryanni7.5K visualizações
Akuntansi biaya bab 2 metode job order, full costing por Selfia Dewi
Akuntansi biaya bab 2 metode job order, full costingAkuntansi biaya bab 2 metode job order, full costing
Akuntansi biaya bab 2 metode job order, full costing
Selfia Dewi1.9K visualizações
akb 2 por Ayu Chairunisa
akb 2akb 2
akb 2
Ayu Chairunisa3.4K visualizações

Destaque

persediaan por
persediaanpersediaan
persediaanBeleke MetAll
1.2K visualizações23 slides
Calculations with personal por
Calculations with personalCalculations with personal
Calculations with personalssnet2
2.7K visualizações52 slides
GSNSW Activities The Year in Review por
GSNSW Activities The Year in ReviewGSNSW Activities The Year in Review
GSNSW Activities The Year in ReviewNSW Environment and Planning
324 visualizações20 slides
Mark Parcell - History of mining legislation nsw por
Mark Parcell - History of mining legislation nswMark Parcell - History of mining legislation nsw
Mark Parcell - History of mining legislation nswNSW Environment and Planning
649 visualizações41 slides
Perspective on New Zealand Smart Meter rollout por
Perspective on New Zealand Smart Meter rolloutPerspective on New Zealand Smart Meter rollout
Perspective on New Zealand Smart Meter rolloutNSW Environment and Planning
506 visualizações16 slides
Aychel jimenez manga por
Aychel jimenez mangaAychel jimenez manga
Aychel jimenez mangaaychellmanga
255 visualizações191 slides

Destaque(20)

persediaan por Beleke MetAll
persediaanpersediaan
persediaan
Beleke MetAll1.2K visualizações
Calculations with personal por ssnet2
Calculations with personalCalculations with personal
Calculations with personal
ssnet22.7K visualizações
Aychel jimenez manga por aychellmanga
Aychel jimenez mangaAychel jimenez manga
Aychel jimenez manga
aychellmanga255 visualizações
Sport por stepanbuchta
SportSport
Sport
stepanbuchta133 visualizações
Exploration in the House 2015: Geology Survey of NSW Overview and highlights ... por NSW Environment and Planning
Exploration in the House 2015: Geology Survey of NSW Overview and highlights ...Exploration in the House 2015: Geology Survey of NSW Overview and highlights ...
Exploration in the House 2015: Geology Survey of NSW Overview and highlights ...
NSW Environment and Planning809 visualizações
Quest learning institute outbound activities por Quest Adventure Group
Quest learning institute outbound activitiesQuest learning institute outbound activities
Quest learning institute outbound activities
Quest Adventure Group1.1K visualizações
Exploration in the House 2015: The Importance of the Junior Sector for minera... por NSW Environment and Planning
Exploration in the House 2015: The Importance of the Junior Sector for minera...Exploration in the House 2015: The Importance of the Junior Sector for minera...
Exploration in the House 2015: The Importance of the Junior Sector for minera...
NSW Environment and Planning898 visualizações
Bebelusii nu cauta scurtaturi si nu tin cont de gura lumii por Fani Rarinca
Bebelusii nu cauta scurtaturi si nu tin cont de gura lumiiBebelusii nu cauta scurtaturi si nu tin cont de gura lumii
Bebelusii nu cauta scurtaturi si nu tin cont de gura lumii
Fani Rarinca320 visualizações
Komsas soniyah 2015 por lolita riyah
Komsas soniyah 2015Komsas soniyah 2015
Komsas soniyah 2015
lolita riyah452 visualizações
Tony Linnane NSW Trade & Investment Mine Safety - new WHS laws for mining por NSW Environment and Planning
Tony Linnane NSW Trade & Investment Mine Safety - new WHS laws for miningTony Linnane NSW Trade & Investment Mine Safety - new WHS laws for mining
Tony Linnane NSW Trade & Investment Mine Safety - new WHS laws for mining
NSW Environment and Planning854 visualizações
ιός por alexandram2002
ιόςιός
ιός
alexandram2002241 visualizações
Presentation1 por h00236551
Presentation1Presentation1
Presentation1
h00236551238 visualizações

Similar a Ppt akbi fix

Akuntansi-biaya-pertemuan-11.pptx por
Akuntansi-biaya-pertemuan-11.pptxAkuntansi-biaya-pertemuan-11.pptx
Akuntansi-biaya-pertemuan-11.pptxdivaaprilia4
20 visualizações16 slides
3. Harga Pokok Proses (Full-Costing)-PENGANTAR.OK.pdf por
3. Harga Pokok Proses (Full-Costing)-PENGANTAR.OK.pdf3. Harga Pokok Proses (Full-Costing)-PENGANTAR.OK.pdf
3. Harga Pokok Proses (Full-Costing)-PENGANTAR.OK.pdfAlyaLestari10
4 visualizações38 slides
Harga pokok proses lanjutan adnan rosadi situmorang por
Harga pokok proses lanjutan adnan rosadi situmorangHarga pokok proses lanjutan adnan rosadi situmorang
Harga pokok proses lanjutan adnan rosadi situmorangAdnanSitumorang
37 visualizações21 slides
5 harga pokok proses por
5 harga pokok proses5 harga pokok proses
5 harga pokok prosessugiartobyl
3.6K visualizações6 slides
Ak211 072148-723-3 por
Ak211 072148-723-3Ak211 072148-723-3
Ak211 072148-723-3Dita Ariningrum
356 visualizações17 slides
Akuntansi biaya bab 7.pptx por
Akuntansi biaya bab 7.pptxAkuntansi biaya bab 7.pptx
Akuntansi biaya bab 7.pptxMiaAdinda3
21 visualizações13 slides

Similar a Ppt akbi fix(20)

Akuntansi-biaya-pertemuan-11.pptx por divaaprilia4
Akuntansi-biaya-pertemuan-11.pptxAkuntansi-biaya-pertemuan-11.pptx
Akuntansi-biaya-pertemuan-11.pptx
divaaprilia420 visualizações
3. Harga Pokok Proses (Full-Costing)-PENGANTAR.OK.pdf por AlyaLestari10
3. Harga Pokok Proses (Full-Costing)-PENGANTAR.OK.pdf3. Harga Pokok Proses (Full-Costing)-PENGANTAR.OK.pdf
3. Harga Pokok Proses (Full-Costing)-PENGANTAR.OK.pdf
AlyaLestari104 visualizações
Harga pokok proses lanjutan adnan rosadi situmorang por AdnanSitumorang
Harga pokok proses lanjutan adnan rosadi situmorangHarga pokok proses lanjutan adnan rosadi situmorang
Harga pokok proses lanjutan adnan rosadi situmorang
AdnanSitumorang37 visualizações
5 harga pokok proses por sugiartobyl
5 harga pokok proses5 harga pokok proses
5 harga pokok proses
sugiartobyl3.6K visualizações
Ak211 072148-723-3 por Dita Ariningrum
Ak211 072148-723-3Ak211 072148-723-3
Ak211 072148-723-3
Dita Ariningrum356 visualizações
Akuntansi biaya bab 7.pptx por MiaAdinda3
Akuntansi biaya bab 7.pptxAkuntansi biaya bab 7.pptx
Akuntansi biaya bab 7.pptx
MiaAdinda321 visualizações
Metode harga pokok proses por Diana Marlyna
Metode harga pokok proses Metode harga pokok proses
Metode harga pokok proses
Diana Marlyna638 visualizações
Harga pokok proses 3.ppt por MuhamadNaufal36
Harga pokok proses 3.pptHarga pokok proses 3.ppt
Harga pokok proses 3.ppt
MuhamadNaufal367 visualizações
PPT KEL3 AKUNTANSI BIAYA.pptx por BetaYonest
PPT KEL3 AKUNTANSI BIAYA.pptxPPT KEL3 AKUNTANSI BIAYA.pptx
PPT KEL3 AKUNTANSI BIAYA.pptx
BetaYonest2 visualizações
Pertemuan_5,_6_Metode_Harga_Pokok_Proses.ppt por denyistnaeni
Pertemuan_5,_6_Metode_Harga_Pokok_Proses.pptPertemuan_5,_6_Metode_Harga_Pokok_Proses.ppt
Pertemuan_5,_6_Metode_Harga_Pokok_Proses.ppt
denyistnaeni36 visualizações
materi Juni.pptx por WiwiRatnawati
materi Juni.pptxmateri Juni.pptx
materi Juni.pptx
WiwiRatnawati6 visualizações
10_ METODE HARGA POKOK PROSES LANJUTAN.pdf por DumaKu89
10_ METODE HARGA POKOK PROSES LANJUTAN.pdf10_ METODE HARGA POKOK PROSES LANJUTAN.pdf
10_ METODE HARGA POKOK PROSES LANJUTAN.pdf
DumaKu89832 visualizações
Laporan produksi dengan persediaan awal por Diana Marlyna
Laporan produksi dengan persediaan awalLaporan produksi dengan persediaan awal
Laporan produksi dengan persediaan awal
Diana Marlyna707 visualizações
Modul praktek ak & prak ap oke por andika dwi
Modul praktek ak & prak  ap  okeModul praktek ak & prak  ap  oke
Modul praktek ak & prak ap oke
andika dwi3K visualizações
AnggaranFullCosting^0VariabelCosting.pdf por RafinaRamadhanti
AnggaranFullCosting^0VariabelCosting.pdfAnggaranFullCosting^0VariabelCosting.pdf
AnggaranFullCosting^0VariabelCosting.pdf
RafinaRamadhanti4 visualizações
PERTEMUAN 13_METODE HARGA POKOK PROSES PRODUK HILANG.ppt por hennytriyanahasibuan1
PERTEMUAN 13_METODE HARGA POKOK PROSES PRODUK HILANG.pptPERTEMUAN 13_METODE HARGA POKOK PROSES PRODUK HILANG.ppt
PERTEMUAN 13_METODE HARGA POKOK PROSES PRODUK HILANG.ppt
hennytriyanahasibuan1202 visualizações
Metode harga pokok proses 2 departemen por Diana Marlyna
Metode harga pokok proses  2 departemenMetode harga pokok proses  2 departemen
Metode harga pokok proses 2 departemen
Diana Marlyna1K visualizações
Kelompok 5 Perhitungan Biaya Proses.pptx por mulianipelita
Kelompok 5 Perhitungan Biaya Proses.pptxKelompok 5 Perhitungan Biaya Proses.pptx
Kelompok 5 Perhitungan Biaya Proses.pptx
mulianipelita426 visualizações
PPT AKBI KLP 4.pptx por Nurulmutia12
PPT AKBI KLP 4.pptxPPT AKBI KLP 4.pptx
PPT AKBI KLP 4.pptx
Nurulmutia123 visualizações

Ppt akbi fix

  • 1. KELOMPOK 10 : SITI ANNISA FENY RUSTAN ANNISA FITRI
  • 2. KASUS KASUS KHUSUS DALAM PERHITUNGAN AKUNTANSI  Adanya Produk Hilang Dalam Proses  Adanya Produk Rusak Dalam Proses (Spoiled Goods)  Adanya Produk Cacat Dalam Proses (Defective Goods)  Adanya Tambahan Bahan Setelah DepartemenAwal  Adanya Bahan Sisa Proses Produksi (Scrap Matreial)  Adanya Bahan Buangan (Waste Material)  Kalkulasi Biaya Rata - Rata VS Kalkulasi Biaya Fifo
  • 3. Metode Harga Pokok Rata-rata (Weighted Average) Proses Pemberlakuan Metode Rata-rata  Di departemen – Pertama :  Dihitung total biaya untuk masing-masing jenis biaya produksi, yaitu : biaya bahan, biaya tenaga kerja, dan biaya overhead pabrik dengan cara biaya yang melekat pada persediaan barang dalam proses awal ditambah biaya-biaya periode berjalan.  Dihitung jumlah unit ekuivalen produksi yang dihasilkan dalam periode yang bersangkutan : Barang jadi (yang ditransfer ke departemen berikutnya) ditambah barang dalam proses akhir menurut unit ekuivalen. Harga pokok rata-rata kemudian dihitung berdasarkan total biaya dibagi jumlah unit ekuivalen.
  • 4.  Di departemen – Lanjutan :  Dihitung harga pokok rata-rata yang berasal dari departemen sebelumnya. Harga pokok tersebut terdiri dari : Harga pokok persediaan awal dan harga pokok yang diterima pada periode yang bersangkutan.  Dihitung harga pokok rata-rata per satuan yang ditambahkan dalam departemen yang bersangkutan.  Menghitung harga pokok rata-rata per satuan di departemen yang bersangkutan dengan cara : Harga pokok rata-rata dari departemen yang bersangkutan dengan cara : Harga pokok rata-rata dari departemen yang mendahului ditambah harga pokok rata-rata di departemen yang bersangkutan.
  • 5. Metode First In First Out (FIFO) Proses Pemberlakuan Metode FIFO  Proses produksi dianggap untuk menyelesaikan produk dalam proses awal menjadi produk selesai.  Setiap elemen harga pokok produk dalam proses awal tidak digabungkan dengan elemen biaya yang terjadi dalam periode yang bersangkutan.  Harga pokok produk dalam proses awal periode tidak perlu dipecah kembali menurut elemennya ke dalam setiap elemen biaya.  Produksi ekuivalen = (Produksi dalam proses awal x tingkat penyelesaian yang dibutuhkan) + Produksi Current + (Produk dalam proses akhir x Tingkat penyelesaian yang sudah dinikmati).  Besarnya harga pokok satuan setiap elemen biaya dihitung sebesar elemen biaya yang terjadi pada periode yang bersangkutan dibagi jumlah produksi ekuivalen dari elemen biaya yang bersangkutan.
  • 6. Metode Last In First Out (LIFO)  Pemberlakuan Metode LIFO  Proses produksi dianggap untuk menyelesaikan produk yang baru masuk proses pada periode yang bersangkutan, apabila semua produk yang baru masuk proses sudah dapat diselesaikan kemudian untuk mengolah produk dalam proses awal.  Setiap elemen harga pokok produk dalam proses awal periode tidak perlu digabungkan dengan setiap elemen biaya yang terjadi pada periode yang bersangkutan.  Besarnya produksi ekuivalen dapat dihitung :  Produksi ekuivalen = Produk selesai + [ (Produksi dalam proses akhir x tingkat penyelesaian yang dinikmati) – (Produk dalam proses awal x Tingkat penyelesaian yang sudah dinikmati periode sebelumnya) ].  Besarnya harga pokok satuan setiap elemen biaya dihitung dengan cara membagi elemen biaya tertentu yang terjadi pada periode yang bersangkutan dengan produksi ekuivalen biaya yang bersangkutan.
  • 7. Contoh Kasus RELAXO COMPANY memproduksi obat sakit kepala, produksi dibagi dalam tiga proses yaitu peramuan, penggandaan dan pengepakan. Kalkulasi biaya rata-rata digunakan pada departemen peramuan, kalkulasi biaya FIFO pada departemen penggandaan, kalkulasi biaya LIFO digunakan di departemen pengepakan.
  • 8. Dept. Peramuan Dept. Penggandaan Dept. Pengepakan Produk dalam proses per 01/03/98 (BBB 100%, BTK 30%, BOP 40%) 200 Produk masuk proses 3.500 Produk selesai ditransfer ke Dept. Pengadaan 3.000 - Produk dalam proses per 31/03/98 (BBB 100%, BTK 40%, BOP 30 %) 710 Produk dalam proses per 01/03/98 (BTK 60%, BOP 80%) 600 Produk selesai diterima dari dept. Peramuan 3020 produk selesai diterima dari Dept. Pengepakan 2680 Produk dalam proses per 31/03/98 (BTK 25%, BOP 30%) 1000 Produk dalam proses per 01/03/98 (BTK 30%, BOP 25%) 800 Produk selesai diterima dr Dept. Penggandaan 2680 Produk selesai ditransfer ke gudang 2400 Produk dalam proses per 31/03/98 (BTK 70%, BOP 40%) 1000 Produk cacat karene kesalahan 20 Hilang awal 10 Tambahan produk akibat tambahan bahan 60 Hilang akhir 80 Harga pokok produkdalam proses 01/03/98 Bahan Baku Rp. 2.500.000 Biaya Tenaga Kerja Rp. 1.200.000 Rp. 1.700.000 Rp. 3.500.000 Biaya Overhead Pabrik Rp. 220.000 Rp. 800.000 Rp. 1.600.000 Biaya ditambahkan selama bulan Maret ‘98 Biaya Bahan Baku Rp. 4.998.200 Biaya Tenaga Kerja Rp. 3.198.272 Rp. 5.380.000 Rp. 6.697.320 Biaya Overhead Pabrik Rp. 1.487.180 Rp. 2.276.650 Rp. 3.299.080
  • 9. Metode Harga Pokok Rata-rata (Weighted Average) 1. RELAXO COMPANY Laporan Harga Pokok Produksi Departemen Peramuan Bulan Maret 1998 ( Metode Rata - rata Tertimbang ) Laporan Produksi : Unit : Produk dalam proses per 01/03/1998 (BBB 100%, BTK 30%, BOP 40%) 200 Produk masuk proses 3.500 Produk cacat karena kesalahan 20 Produk selesai ditransfer ke Dept. Penggandaan 3.000 Produk dalam proses per 31/03/1998 ( BTK 100%, BTK 40%, BOP 30% ) 710 Produk hilang awal 10 3.720 Biaya dibebankan di Departemen Peramuan: Elemen biaya Jumlah Unit ekuivalen HP/unit Hp produk dalam proses awal Rp. 3.920.00 Biaya ditambahkan di Dept. Peramuan: Biaya Bahan Baku Rp. 4.998.200 3.730 1] Rp.1.340 Biaya Tenaga Kerja Rp. 3.198.272 3.304 2] Rp. 968 Biaya Overhead Pabrik Rp. 1.487.180 3.233 3] Rp. 460 Rp. 9.683.652 Rp.2.768 Biaya Kumulatif Rp.13.603.652
  • 10. Perhitungan Harga Pokok : Perhitungan HP produk selesai ditrasfer ke Departemen Penggandaan : HP produk selesai (3.000 x Rp. 2.768) Rp . 8.304.000 Hp produk cacat (20 x Rp. 2.768) Rp. 55.360 HP produk selesai ditransfer ke Dept.Penggandaan : ( 3.020 x Rp. 2.768 ) Rp. 8.359.360 Perhitungan HP produk dalam proses akhir : Biaya Bahan Baku (710 x 100%) x Rp. 1.340 = Rp. 951.400 Biaya Tenaga Kerja (710 x 40%) x Rp. 968 = Rp. 274.912 Biaya Overhead Pabrik (710 x 30%) x Rp. 460 = Rp. 97.980 HP produk dalam proses periode lalu Jumlah Harga Pokok Produksi Departemen Peramuan Rp.13.603.652 1] BBB : 3.000 + (710 x 100%) + 20 2] BTK : 3.000 + (710 x 40%) + 20 3] BOP : 3.000 + (710 x 30%) + 20 2.Jurnal Departemen Peramuan a. Mencatat Biaya pada Bulan Maretl 1998 BDP - BBB Departemen Peramuan Rp. 4.998.200 BDP - BTK Departemen Peramuan Rp. 3.198.272 BDP - BOP Departemen Peramuan RP. 1.487.180 Rp. 4.998.200 Persediaan bahan baku Rp. 3.198.272 Gaji dan upah Rp. 1.487.180 Berbagai jenis biaya
  • 11. b. Mencatat Transfer Produk ke Departemen Penggandaan BDP - BBB Departemen Penggandaan Rp. 8.359.360 BDP - BBB Departemen Peramuan Rp.4.046.800 1] BDP - BTK Departemen Peramuan Rp.2.923.360 2] BDP - BOP Departemen Peramuan Rp.1.389.200 3] c. Mencatat Persediaan produk dalam Proses Akhir Persediaan PDP Departemen Peramuan Rp. 5.244.292 BDP - BBB Departemen Peramuan Rp. 951.400 BDP - BTK Departemen Peramuan Rp. 274.912 BDP - BOP Departemen Peramuan Rp. 97.980 Persediaan Prosuk dalam proses awal Rp. 3.920.000 Keterangan : 1] ( 3.000 + 20 )x Rp. 1.340 2] ( 3.000 + 20 ) x Rp. 968 3] ( 3.000 + 20 ) x Rp. 460
  • 12. Jurnal Departemen Penggandaan Mencatat Biaya pada Bulan Maret 1998 BDP - BTK Departemen Penggandaan Rp. 5.380.000 BDP - BOP Departemen Penggandaan Rp. 2.276.650 Gaji dan upah Rp. 5.380.000 Berbagai jenis biaya Rp. 2.276.650 Mencatat Trasfer Produk ke Departemen Pengepakan BDP - BBB Departemen Pengepakan Rp. 14.767.006,36 BDP - BBB Departemen Penggandaan Rp.7.273.726,36 1] BDP - BTK Departemen Penggandaan Rp.5.360.000 2] BDP - BOP Departemen Penggandaan Rp.2.133.280 3] Mencatat Persediaan Produk dalam Proses Akhir Persediaan PDP Departemen Penggandaan Rp. 3.749.910,8 BDP - BBB Departemen Penggandaan Rp. 1.086.630,8 BDP - BTK Departemen Penggandaan Rp. 20.000 BDP - BOP Departemen Penggandaan Rp. 143.280 Persediaan produk dalam prosese awal Rp. 2.500.000 Keterangan : 1] 2.680 x Rp. 2.714,077 2] 2.680 x Rp. 2.000 3] 2.680 x Rp. 796
  • 13. Metode First In First Out RELAXO COMPANY Laporan Harga Pokok Produksi Departemen Penggandaan Bulan Maret 1998 ( Metode FIFO ) Laporan Produksi : Unit : Produk dalam proses per 01/03/1998 ( BTK 60%, BOP 80% ) 600 Produk masuk proses 3.020 Tambahan produk karena ada tambahan bahan 60 3.680 Produk selesai ditransfer ke Dept. Pengepakan 2.680 Produk dalam proses per 31/03/1998 ( BTK 25%, BOP 30% ) 1.000 3.680 Biaya dibebankan di Departemen Penggandaan: Elemen biaya Jumlah Unit ekuivalen HP/unit Hp produk dalam proses awal Rp. 2.500.000 Biaya ditambahkan di Dept. Penggandaan : HP produk dari Dept. Peramuan Rp8.359.360 3.080 Rp . 2.768 Penyesuain tambahan produk 60 Rp. 53,923 Rp8.359.360 3.020 Rp.2.714,077 Biaya ditambahkan di Dept. Penggandaan : Biaya Tenaga Kerja Rp. 5.380.000 2.690 1] Rp .2.000 Biaya Overhead Pabrik Rp. 2.276.650 2.860 2] Rp .796 Biaya Kumulatif Rp.18.516.010 Rp.5.510,077
  • 14. Perhitungan Harga Pokok : Perhitungan HP produk selesai ditrasfer ke Departemen Pengepakan : HP produk selesai (2.680 x Rp. 5.510,077) = Rp. 14.767.006,36 Perhitungan HP produk dalam proses akhir : Dari Departemen Peramuan (1000 - 600)x Rp. 2.714,077 Rp. 1.086.630,8 Biaya Tenaga Kerja (1000 x 25%) - (600 x 40%)x Rp.2.000 Rp. 20.000 Biaya Overhead Pabrik (1000 x 30%) - (600 x 20%)x Rp.796 Rp. 143.280 HP produk dalam proses periode lalu Rp 2.500.000 Rp. 3.749.910,8 Jumlah Harga Pokok Produksi Departemen Penggandaan Rp.18.516.977,16 1] BTK : (2.680 - 600) + (600 x 60%) + (1000 x 25%) 2] BOP : (2.680 - 600) + (600 x 80%) + (1000 x 30%)
  • 15. 2. Jurnal Departemen Penggandaan a. Mencatat Biaya pada Bulan Maret 1998 BDP - BTK Departemen Penggandaan Rp. 5.380.000 BDP - BOP Departemen Penggandaan Rp. 2.276.650 Gaji dan upah Rp. 5.380.000 Berbagai jenis biaya Rp. 2.276.650 b. Mencatat Trasfer Produk ke Departemen Pengepakan BDP - BBB Departemen Pengepakan Rp. 14.767.006,36 BDP - BBB Departemen Penggandaan Rp.7.273.726,36 1] BDP - BTK Departemen Penggandaan Rp .5.360.000 2] BDP - BOP Departemen Penggandaan Rp .2.133.280 3] c. Mencatat Persediaan Produk dalam Proses Akhir Persediaan PDP Departemen Penggandaan Rp. 3.749.910,8 BDP - BBB Departemen Penggandaan Rp. 1.086.630,8 BDP - BTK Departemen Penggandaan Rp. 20.000 BDP - BOP Departemen Penggandaan Rp. 143.280 Persediaan produk dalam prosese awal Rp . 2.500.000 Keterangan : 1] 2.680 x Rp. 2.714,077 2] 2.680 x Rp. 2.000 3] 2.680 x Rp. 796
  • 16. Metode Last In First Out (Lifo) Laporan Produksi : Unit : Produk dalam proses per 01/03/1998 ( BTK 30%, BOP 25% ) 800 Produk masuk proses 2.680 3.480 Produk selesai ditransfer ke gudang 2.400 Produk dalam proses per 31/03/1998 ( BTK 70%, BOP 40% ) 1.000 Produk hilang akhir 80 3.480 Biaya dibebankan di Departemen Pengepakan: Elemen biaya Jumlah Unit ekuivalen HP/unit Hp produk dalam proses awal Rp. 5.100.000 Biaya ditambahkan di Dept. Pengepakan : HP produk dari Dept. Penggandaan Rp.14.767.006,36 2.680 Rp. 5.510,077 2.680 Rp. 5.510,077 Biaya ditambahkan di Dept. Pengepakan : Biaya Tenaga Kerja Rp. 6.697.320 2.940 1] Rp.2.278 Biaya Overhead Pabrik Rp. 3.299.080 2.680 2] 2.680 2] Rp.1.231 Biaya Kumulatif Rp.29.863.406,36 Rp.9.019,077 Rp.9.019,077
  • 17. Perhitungan Harga Pokok : Perhitungan HP produk selesai ditrasfer ke gudang : HP produk selesai (2.400 x Rp. 9.019,077) Rp. 21.645.784,8 HP produk hilang akhir (80 x Rp. 9.019,077) Rp. 721.526,16 HP produk selesai ditransfer ke gudang (2.480 x 9.019,077) Rp. 22.367.310,96 Perhitungan HP produk dalam proses akhir : Dari Departemen Penggandaan (1000 - 800) x Rp. 5.510,077 Rp. 1.102.015,4 Biaya Tenaga Kerja (1000 x 70%) - (800 x 30%) x Rp.2.278 Rp. 1.047.880 Biaya Overhead Pabrik (1000 x 40%) - (800 x 25%) x Rp.1.231 Rp. 246.200 HP produk dalam proses periode lalu Rp. 5.100.000 Rp. 7.496.095,4 Jumlah Harga Pokok Produksi Departemen Penggandaan Rp.29.863.406,36 1] BTK : {(2.400 + (1.000 x 70%) - (800 x 30%)} + 80 2] BOP : {(2.400 + (1.000 x 40%) - (800 x 25%)} + 80
  • 18. 2. Jurnal Departemen Pencetakan a. Mencatat Biaya pada Bulan April 1998 Rp. 562.030 BDP - BTK Departemen Pencetakan Rp. 418.500 BDP - BOP Departemen Pencetakan Rp.562.030 Gaji dan upah Rp.418.500 Berbagai jenis biaya b. Mencatat Trasfer Produk Jadi ke Gudang Persediaan produk jadi Rp.2.215.876 BDP - BBB Departemen Pencetakan Rp.1.302.046 1] BDP - BTK Departemen Pencetakan Rp. 540.330 2] BDP - BOP Departemen Pencetakan Rp. 375.500 3] c. Mencatat Persediaan Produk dalam Proses Akhir Persediaan PDP Departemen Pencetakan Rp. 494.355 BDP - BBB Departemen Pencetakan Rp. 261.455 BDP - BTK Departemen Pencetakan Rp. 21.700 BDP - BOP Departemen Pencetakan Rp. 45.000 Persediaan produk dalam prosese awal Rp. 166.200 Keterangan : 1] 2.490 x Rp. 522,91 2] 2.490 x Rp. 217 3] 2.490 x Rp. 150
  • 19. Simpulan  Dari pembahsan dapat disimpulkan bahwa metode harga pokok proses merupakan metode pengumpulan biaya produksi yang digunakan oleh perusahaan yang mengolah produknya secara massa.  Didalam metode ini, biaya produksi dikumpulkan untuk setiap proses selama jangka waktu tertentu, dan biaya produksi per satuan dihitung dengan cara membagi total biaya produksi dalam periode tertentu dengan jumlah satuan produk yang dihasilkan dari proses tersebut selama jangka waktu yang bersangkutan.  Apabila pada awal periode terdapat persediaan awal barang dalam proses maka timbul masalah untuk menentukan harga pokok barang jadi. Hal ini tiimbul karena persediaan barang dalam proses tersebut telah mempunyai harga pokok yang berasal dari periode sebelumnya. Ada tiga metode dalam penyelesaiannya, yaitu ata-rata, FIFO, dan LIFO.