Our Core Strength
Building Automation System (BAS)
Building Management System (BMS)
Central Energy Management System (CEMS)
SCADA
Data Centre Management System (DCMS)
Highlights
Web based and user-friendly interface
Universal communication protocol application
High-capability controllers
Non-rigid application
24/7 maintenance team
• Graphical control station for control, monitoring, and whole system
understanding
• Freedom for user to control the operation settings
• Alarm system in case of emergency on running equipment
• Data logging system to allow further assessment
• Real-time monitoring and control system
• SMS and email alert
• WebView and Control
• Smart Phone Application Icon (Android Only)
User Interfacing Highlights
“Universal communication Protocol allows any equipment that implementing
any universal communication protocol to be integrated into Pegasus IBMS
System.
Universal Communication Protocol Application
Pegasus Controllers Highlights
• Highly capable of multiple application and controls
• Wide variance based clients preferences
• Battery time backup up to 2 years
• Certified by BAS international assessment committee
• Certified by SIRIM
• Implementing universal communication protocol
• Low operating voltage (24 AC/DC)
• Expandable INPUT/OUTPUT per controllers
Non-Rigid Application
“ Pegasus System allows user to have freedom on their preferred running
system. Either to run in fully automated mode where all the schedules is set,
or to bypass the system in case if needed, Pegasus System allows user to fully
control the system on fingertips.
24/7 MaintenanceTeam
“ Pegasus MaintenanceTeam has been the backbone for the company to
thrive against others.We provide our best help either in person or via remote
application whenever necessary, during the day or at night.
PEGASUS 24X7 STANDBY MAINTENANCE
No Project Project Code SLA Level LEVEL 1 duty LEVEL 1 standby LEVEL 2 duty
LEVEL 2
standby
1 Basis Bay BBCY-24S 4 Hrs 150 75 150 100
2 CSC PJ CSCPJ-24S 2 Hrs 300 150 300 200
3 P1 SHT, WGP P1SB-24S 4 Hrs 150 75 150 100
4 PPJ PPJ-24S 4 Hrs 150 100 150 100
5 UTUSAN UTUSAN-24S 2 Hrs 50 30 50 30
TOTAL 800 430 800 530
Northern Region2
No Project Project Code SLA Level LEVEL 1 duty LEVEL 1 standby LEVEL 2 duty
LEVEL 2
standby
1 P1 PG P1PG-24S 4 Hrs 150 N/A 100 N/A
2 WD Bayan Lepas WDPG-24S 8 Hrs 150 N/A 100 N/A
TOTAL 300 0 200 0
PPUM
No Project Project Code SLA Level LEVEL 1 duty LEVEL 1 standby LEVEL 2 duty
1 PPUM PPUM-24S 2 Hrs 100 50 100
TOTAL 100 50 100