NABIL_WAGDY_ELBAZ_HSE_2015_doc

NABIL WAGDY ELBAZ – HSE MANAGER
Telephone : +201096215271
Email : nabil_elbaz@hotmail.com (personal)
Discipline : Health Safety & Environment
Language : Arabic (Mother Tongue) & English (Fluent)
Date of Birth : 24 NOV 1968
Nationality : EGYPT.
Qualification :
 B.Sc (Hons.) Science , Chemical (Univ. of Mansura), EGYPT 1990
 NEBOSH International Certificates. London UK.
 Lead Auditor ISO- 9001 – OHSAS – 18001- ISO 14001
Training attended:
 Industrial safety.
 Fire fighting.
 Confined space training.
 Ptw training.
 Defensive driving Course.
 Heat injuries.
 Basic fist Aid training.
 Ptw training.
 H2S & breathing apparatus.
 Behavioral safety audit.
 General safety onshore and offshore.
 Risk assessment.
 Behavioral safety audit.
 Incident investigation.
 Team work /team building workshop.
CAREER SUMMARY
More than 25 years’ experience in different aspects of HSEM in EPC , Construction oil &gas Offshore,
Onshore, Power Plants, Refineries and petrochemical in GCC & Middle-East and Fare East region,
Implementation and application of comprehensive HSE Program.
Key skills:
 Quantitative risk assessment.
 COMAH support and safety report preparation.
 Risk Management.
 HAZOP/HAZID session facilitator.
 Inherent Safety and SHE concepts and application.
 HSEIA verification.
 Risk assessment /ALARP policy review.
 Liase with regulatory bodies (DPR, FEA&RSEPA)
1
Summary of Major Projects Handled.
• HHI (Hyundai Heavy Industries) - HSE Manager FAP Project Ras Gas ,Qatar
- Project HSE Manager for FAP Project Ras Gas (EPC offshore pipeline and Brownfield
modification.)
• BGE-British Gas Egypt - HSE Manager
- All Egypt Projects Offshore/Onshore
• McDermott Middle East, Inc. HSE Manager – Saudi Arabia
- All Saudi Aramco Projects Offshore/Onshore
• Leighton Offshore Middle-East
- ICOEEP Phase 1 - Iraq (Shatt El Arab. Basra. Iraq )
• J. Ray McDermott Middle East, Inc. Project HSE Manager
- Saudi Aramco Karan Offshore platforms and sub-sea pipelines. (based in Dubai – UAE ).
• WORLEYPARSONS – EGYPT
- HSE Manager for Worley Parsons Egypt.
• NPCC –National petroleum and construction company UAE Abu Dhabi.
- Engineering, procurement and construction (EPC) for OGD3 Upstream project at BAB ADCO.
Saudi Aramco: platforms fabrication for saffaneya oil&gas field.
• Kharafi National – Kuwait
- ABB Lumus Crude Oil Heater for CDU project at Mina Al Ahmadi Refinery.
- CIGILIC – new Ammonia plant in PIC .
• M/S DEUTSCHE BABCOCK, KUWAIT
- New Doha Combined cycle Power Plant,
• KPC - Kuwait Oil sector Complex.
• KOC – (Kuwait oil company)
- North Kuwait Upgrading of Gathering Centre -23(Petrofac main contractor).
• KOC (Kuwait oil company)
- North Kuwait Lift Gas Distribution System for Rawdhatain & Sabriya.
• MEW – Power Station Maintenance
- At Al-Zour, Al- Shuaib DOHA West&East.
• KNPC-Kuwait national petroleum
- Underground Distilled Storage Sump (MAB)
• KNPC- Tank Maintenance (Three Refineries)
• KNPC - Pier Rehabilitation and Construction (MAA)
• ABB Project- KNPC (Kuwait National Petroleum) NEW CRUDE OIL HEATER.
JOB PROFILES:
 HHI (HYUDAI HEAVY IDUSTRIES) - HSE Manager FAP Project Ras Gas ,Qatar
Position : HSES Manager
Term : December 2013 Up to January 2015
Duties & Responsibilities:
• Provide HSE assurance to the overall Marine HSE Program, Compliance with the Company policy
requirement and the existing Marine legal requirement, International standards and code and
recommended practices.
2
• Interface with regulatory bodies, client and industry groups on compliance and industry best practice
matters.
• Develop HSES audit schedule and activity plan.
• Monitor for effectiveness and assist in implementation of HSES management system across project.
• To ensure the project HSE team understand and carry out their responsibilities detailed in order to meet
client’s requirements and satisfy the requirements of OHSAS 18001 and ISO14110.
• Participate in project HAZIDS, Risk assessment and HAZOPs, as required or directed.
• Develop HSE programs promoting continuous improvement in safety performance.
• Promoting and raising awareness, at all levels of an organization, of the impact of emerging
environmental issues, whether legislative or best practice, on corporate, ethical and social
responsibility.
• HSE Plan for projects, monitor performance during the project execution, Follow-up.
 BGE-British Gas Egypt
Position : HSES Manager – BGE-British Gas Egypt
Term : January 2013 Up to December 2013
Duties & Responsibilities:
 Provide and arrange:
• Quantitative risk assessment.
• COMAH support and safety report preparation.
• Risk Management.
• HAZOP/HAZID and ENVID session facilitator.
• Inherent Safety and SHE concepts and application.
• HSEIA verification.
• Risk assessment /ALARP policy review.
• Liase with regulatory bodies (DPR, FEA&RSEPA)
 McDermott Middle East, Inc. HSE Manager – Saudi Arabia
Position : HSES Manager – Saudi Arabia, IK Operations
Term : Nov.2011 till January 2013
Duties & Responsibilities
• Interface with regulatory bodies, client and industry groups on compliance and industry best
practice matters
• Monitor for effectiveness and assist in implementation of HSES management system across
projects
• Develop HSES audit schedule and activity plan
• Prepare and issue monthly HSES reports
• Conduct project site visits and audits to ensure HSES compliance
• Develop, manage and present safety training programs, as required.
• Participate in project HAZIDS as required or directed
• Lead/participate in incident investigation, as required
Other duties connected with function, as directed
Basic Functions
• Provide support to projects to enable the division meet or exceed targets.
• Provide support to area management teams and assist in applying the most effective HSES
strategy in accordance with Middle East Area guidelines and operating standards
• Manage and implement audit and inspection programs
• Review contractor HSES management processes and documentation
• Provide HSES guidance and leadership to area management team and IK HSES personnel.
3
Keep up to date with statutory and client HSES regulations, industry HSES standards and ensure
projects are made aware of implementation requirements on an ongoing basis and that changes are
notified in an expedient manner
4
 LEIGHTON OFFSHORE – MIDDLE EAST
Position : HSE MANAGER
Term : OCT 2010 till Nov.2011
Project : ICOEEP Phase 1 - Iraq
Duties & Responsibilities
• Provide HSE assurance to the overall Marine HSE Program, Compliance with the Company
policy requirement and the existing Marine legal requirement, International standards and
code and recommended practices.
• To ensure the project HSE team understand and carry out their responsibilities detailed in
order to meet client’s requirements and satisfy the requirements of OHSAS 18001 and
ISO14110
• Put in the place and implement an inspection / assessment and risks identification program
for the Marine operation and Project operations
• Provide direction, guidance/coaching and supervision of the HSE Program, linking in global
initiatives and best practice as appropriate
• Develop and propose HSE program based on the incident/accident trend analysis and
Marine /Project HSE issues as when these occur
• Develop HSE programs promoting continuous improvement in safety performance
• Assist the Divisional HSE Manager, and Project Director /Manager to develop and
implement HSE related specific training programs in order to ensure that all staff /Project
personnel understand and carry out their responsibilities.
• Liaise with certification bodies and relevant authorities in order to ensure all legislative
requirements and standards are met.
• Collate and analyze data pertaining to the system performance in order to ensure continual
improvement at all times.
• Developing and implementing environmental strategies and action plans that ensure Project
sustainable development
• Coordinating all aspects of pollution control, waste management, recycling, environmental
health, conservation and renewable energy
• Promoting and raising awareness, at all levels of an organization, of the impact of emerging
environmental issues, whether legislative or best practice, on corporate, ethical and social
responsibility
• Managing the development and implementation of an environmental management system
• Training staff at all levels in environmental issues and responsibilities
 J. RAY MCDERMOTT INC. – MIDDLE EAST
Position : PROJECT HSE MANAGER
Term : April 2009 to September 2010
Project : Saudi Aramco Karan Offshore platforms and sub-sea pipelines.
Installation and pre-commissioning of Gas pipelines, Well Head platforms, auxiliary platforms, bridges,
tie in Platform TP-1, power & communication cables. Scope also includes onshore pipelines & cables,
internal coating of Gas pipelines, trenching, installation of tie-in pigging, hydro testing, dewatering and
drying of pipelines
Duties & Responsibilities
• Maintain and control daily HSE practices of work sites onshore and offshore ,
• Ensure that hazards are identified, precautionary measures are taken and advise on HSE
matters;
• Co-ordinate, monitors and controls the implementation of the HSEMS;
• Investigates causation of accidents / incidents and recommends corrective actions;
5
• Perform statistical analysis to determine the underlying causes, analyze trends, and suggest
protective measures.
• Monitors the issue and proper implementation of work permit system.
• Conduct gas & atmospheric tests. Participate in specific tasks as necessary, such as entry in
confined space, mechanical sealing, etc.;
• Monitors and advises on implementation and compliance with the Company’s HSE training
standards.
• Co-ordinate and liaises with work associates for presentation of specialized safety training
courses. Promotes awareness;
• Conducts risk assessment of potentially hazardous operations.
• Prepare, conduct and facilitate Risk Assessment sessions for day-to-day activities as well as
for major plant overhauls;
• Setup & implement the HSE promotion & Motivation scheme through workshops.
• Perform inspection & testing of the Portable, Mobile, Fixed Fire Suppression System &
equipments;
• Submission of HSE requirements during tendering process establish
• HSE Plan for projects, monitor performance during the project execution, Follow-up Projects
HSE Issues; Plan and set up crisis response, perform, table top exercises etc. and recommend
improvements.
 WORLEYPARSONS - EGYPT
Position : CORPORATE HSE MANAGER(AFRICA/EYGYPT)
Term : Jan 2009 to April 2009
Project : All Hydro-carbon projects (Offshore/Onshore)
Duties & Responsibilities:
• Strictly Adhere to Safety Manual and Implement all the Safety Measures.
• Look in to the overall safety of the Company which includes implementation of company
safety
• Policy, safety standards and provide advisory services to project Staff and Management
• Prepare Safety procedures / Check lists for Hazardous operations.
• Prepare Emergency Response Procedure, set up and train Emergency response team, train all
the
• Employees of the Response procedure procure and locate response equipment. Conduct the
• Emergency Drills and improve upon the shortcomings.
• Train and educate the employees to promote/ improve Safety standards in the company as
well as
• Prevent all the accident or Incidents.
• Risk management through identification of Potential Hazards involved, Assessment of risk
and
• Recommend mitigation measures
• Incorporate changes in the Safety Requirements to comply with the recent developments in
the Safety
• Regulation and Conduct HAZOP/HAZID session facilitator.
 NPCC, Abu Dhabi. UAE
Position : PROJECT HSE MANAGER
Term : March 2006 to December 2008
Project : Engineering, procurement and construction (EPC) for OGD3 Upstream project
at BAB ADCO. Saudi Aramco: platforms fabrication for saffaneya oil&gas field. ADMA-OPCO
Replacement of 24’’ water injection lines in UMM Shaif & Zakum Fields. ADMA-OPCO Well Head
6
Tower Installation (Integrated Gas Development Project) IGDP WHT. ADMA-OPCO 2007 SHUT
DOWN PROJECT for ADMA-OPCO. ADMA-OPCO Waste Gas Handling Unit (USSC).
Duties & Responsibilities:
• Responsible for assisting line management and supervision of all aspect of construction
health safety and environmental matters undertaken by construction operations.
• Responsible for assisting line management and supervision on commissioning operations
HSE matters.
• Provide functional support to field HSE officers and Loss prevention Officers.
• Ensure all aspect of Company HSE policies are implemented by construction team
• Hazard identification/risk assessment liaison is maintained with construction engineering.
• Investigate, compile and analyze accident &incident statistics on a monthly basis.
• Participate in selection, assignment and appraisal of field HSE officer.
• Liaise with Client on all aspect of HSE project requirement and ensure contractual HSE
requirements are met.
• Keep all site appraised of new legislations/development.
• Review QRA’s and reports from subcontractor.
• Maintain HSE dossier for the project.
• Responsible for reviewing HSEIA reports for the project.
• Facilitate HAZID/HAZOP session for the projects.
• Review with engineering Discipline all outstanding actions from HAZOP/HAZID for close
out prior to Construction.
• Communicate with all construction personnel the content of HSE manuals and ensure
associated policies are implemented.
• Carry out HSE audits on different site as per schedule.
• Evaluate nominations for HSE personnel for the month.
• Participate in client Project HSE reviews (PHSER) and ensure recommendations are closed
out.
• Custodian of HSE action tracking register for the project.
• Chair remobilization meetings for Offshore Campaigns.
 M/S DEUTSCHE BABCOCK, KUWAIT
Position : HSE Engineer
Term : 2004
Project : All maintenance Project for petrochemical and power stations.
Duties & Responsibilities:
• Responsible for monitoring all HSEMS procedures and make sure the system is
implementing.
• Lead HSE team on projects.
• Responsible for Developing Company HSE plans and HSEMS.
 M/S KHARAFI NATIONAL KUWAIT
Position : HSE ENGINEER
Term : Mar 2001 to Jan 2004
Project : (KNPC) CDU-3 unit New Crude Oil Heater
(KNPC) CDU-3 unit New Crude Oil Heater, in Mina Al Ahmadi Refinery. (ABB Project). Upgrading of
Gathering Center- 23 facilities, Kuwait Oil Co (KOC) north Kuwait. Lift Gas Distribution System for
Raudhatain &Sabriyah. In Kuwait Oil Co. (KOC) North Kuwait. Rehabilitations and upgrade Kuwait
south and north berth of Kuwait national petroleum.
Duties & Responsibilities:
7
• Focal point for Accident/incident investigation reporting and close out of recommendations.
• Produce monthly and annual HSE statistical returns.
• Ensure personnel on the project are familiar with safety procedures, checklist and have
• Received safety induction courses..
• Form part of management Emergency Response team.
• Prepare daily, weekly and monthly reports on all Health, Safety and environmental
• Performance on the project.
• Ensure safety audits are conducted onshore and offshore covering all aspect of the
• Operations. Also ensure senior management are informed of the results requiring follow-up
• And actions are completed successfully by responsible parties. Contractor/client).
• Planning of emergency drills in line with company’s HSE policy.
• Conduct risk assessment to recognize potential hazards are addressed and mitigating factors
• Are introduced prior to work execution. Reviewing of safety procedures for high risk to
ensure
• Risks are eliminated to ALARP
• Develop project HSE plan for the project.
• Ensure audits/inspections are held & maintain tracking record of close out status for all
report.
• Ensure contractors and project leaders and engineers maintain HSE records
• Report and be involved with pre-start HSE session and mobilization of equipments and
Personnel.
• Review of relevant Design / Construction work procedures and method statements.
• Attend weekly HSE/progress meetings and prepare MOM.
• Support contractor’s staff HSE training in line with the approved training matrix.
• Provided HSE advice to the Quality Control team.
• Review and sign off JHA’s for different work packs on the project.
• Review of all contractors’ equipment, certification status, etc. on allocated sites.
• Ensure the implementations of Task Hazard Control Sheet (THCS) for Hazard analysis.
• Review contractors HSE plan, emergency response plan, journey management plan
• And waste management plan.
• Liaise with the regulatory bodies on HSE issues of concern and incompliance with
• Statutory regulations.
• Conduct HSE-MS adult on contractor for compliance.
• Advise the project team on all safe work practices.
 M/S KUWAIT SHIPBUILDING & REPAIR
Position : PROJECT HSE ADVISOR
Term : Jul 1999 to Feb 2001
Project : Fabrication shops and ship building yard
Duties & Responsibilities:
• HSE inspection to ensure HSE policy compliance by employee and contractors.
• HSE inspection to ensure HSE plan is compliance.
• Monitoring of all HSE activities on site to ensure HSE objectives are met.
• Assessments of Hazard risk level to ensure risk are managed to ALARP.
• Organize HSE meetings to cascade HSE information to staff and contractor personnel.
• Attached/chaired weekly meetings and prepare Minutes of Meeting.
• Development of various checklist used in HSE monitoring.
• Tracking of audit action items as remedial action plan items (RAP).
8
• Follow-up actions items from audits conducted on site.
• Remobilization inspection of contractor’s resources and personnel.
• Inspection of retainer ship clinics of contactors/subcontractors.
• Monitored and Reviewed Detail Engineering Work Schedule.
• Attended client-chaired weekly meetings and prepare Minutes of Meeting.
• Provided Technical assistance to the Quality Control team.
• Co-ordinate toolbox talks on site.
• Review of cofferdam procedures and drawings addressing all critical HSE risk areas.
• Organize safety emergency drills on site (fire, medivac, and man-overboard).
• Review and update weekly/monthly HSE statistics for contractors.
• Monitor Hazard trend and recommend update follow up system (RUFUS).
• Prepared, Monitored and Reviewed the Project Work Schedule.
• Attended client-chaired weekly meetings and prepare Minutes of Meeting.
• Provided Technical HSE assistance to the Quality/construction department.
• Recommendation of HSE incentives on site to boost HSE performance.
• Carry out JHA’s review.
• EIA compliance monitoring on the project.
• HSE supervision of Hazardous activities (confine space activities, work adjacent to live
• Activities.
• Maintain High degree of HSE standards through daily site HSE enforcement.
• DEP certification of staff and contractor’s personnel in line with company’s policy.
• Site HSE walk about to monitor compliance.
• Conduct HSE awareness training for contractor’s personnel.
• PTW/ permits approval in line with approved work activities.
 M/S KUWAIT CONTROLS CO.
Position : PROJECT HSE Engineer
Term : 1992 to 1998
Project : Doha West Power Station MEW: Instrument and Electrical Contract.
K.N.P.C Shuaiba Refinery: construction- Mechanical and Civil
Contract in Doha East Power Station: Boiler, Turbine and Distillation maintenance
Contract. Mechanical, instrument and electrical.
Alzour power station: maintenance contract boiler, turbines and distillation.
Shuaiba power station: maintenance contract boiler, turbines and distillation.
Duties & Responsibilities:
• To conducting Safety training programs to work force at all levels such as Fire fighting,
Confined Space Entry etc.
• Chair HSE meetings where all HSE issues on construction are discussed and close out audit
action items.
• Review JSA’s for specific job tasks prior to execution.
• Preparation of HSE Statistics/performance.
• Ensuring Construction safety standards are complied with on Site.
• Audio Visual Aid on Industrial Fire and Safety fields activities to the work force.
• Conduct HSE induction for new employees.
• Attend client’s progress/HSE committee meeting.
• Advise the Construction team on Critical HSE issues
• Conduct risk assessment of oil and existing facility before work commences.
• Conduct reliability test on PPE.
9
• Develop accident /incident tract outstanding register HSE issues for close out.
• Assess the regulatory bodies on HSE related to matters Compliance on projects.
• Team leading for Emergency response scenarios.
• Carry out hygiene inspections.
• Inspection of equipments before project execution.
• Inspection of fire extinguisher for HSE compliance.
• Review of lifting procedures and operation.
• Prepared and carryout the project risk assessment.
 M/S ELHAJERY CONTRACTING CO.
Position : PROJECT HSE Engineer
Term : 1991
Project : Saudi Arabia Refinery – El-Dhammam (1991).
Duties & Responsibilities:
• Safety Supervision of the project of mechanical and civil works including piping, welding
machining, Construction, Excavation, working at heights, safety inspection, etc. Prepared and
carry out risk Assessments of the project.
• Review of lifting procedure and operation.
• Inspection of equipments.
• Prepare and implementing all the HSE plane in site.
• Attend the client progress and HSE committee meeting.
• Chair HSE meetings where all HSE issues on construction are discussed and close out audit
action items.
• Monitor Hazard trend and recommend update follow up system (RUFUS).
• Ensuring Construction safety standards are complied with on Site.
• Prepare and update weekly/monthly HSE statistics for company, contractors
10

Recomendados

CV - Saif Al-Shadfan por
CV - Saif Al-ShadfanCV - Saif Al-Shadfan
CV - Saif Al-ShadfanSaif Al-Shadfan, NEBOSH, OSHA, PMP
830 visualizações6 slides
Hse resume(brief) roy stanley amuegbunem8z por
Hse resume(brief)   roy stanley amuegbunem8zHse resume(brief)   roy stanley amuegbunem8z
Hse resume(brief) roy stanley amuegbunem8zRoy Stanley Amuegbunem
218 visualizações3 slides
DEL HSE C.V updated por
DEL HSE C.V  updatedDEL HSE C.V  updated
DEL HSE C.V updatedEid Mohamed
613 visualizações6 slides
afzal malick updated HSE RESUME 30-08-2016 por
afzal malick updated HSE RESUME 30-08-2016afzal malick updated HSE RESUME 30-08-2016
afzal malick updated HSE RESUME 30-08-2016Afzal Malick
260 visualizações11 slides
Steve Anderson 2016 por
Steve Anderson 2016Steve Anderson 2016
Steve Anderson 2016Steve Anderson
189 visualizações10 slides
Richard (Rik) Stuart Barnett Resume por
Richard (Rik) Stuart Barnett ResumeRichard (Rik) Stuart Barnett Resume
Richard (Rik) Stuart Barnett ResumeRichard (Rik) Barnett
430 visualizações4 slides

Mais conteúdo relacionado

Mais procurados

SRLF-S-5654-0000_0_Role and Responsibilities(20160130) por
SRLF-S-5654-0000_0_Role and Responsibilities(20160130)SRLF-S-5654-0000_0_Role and Responsibilities(20160130)
SRLF-S-5654-0000_0_Role and Responsibilities(20160130)Herman Moral
766 visualizações16 slides
54231708 hse-audit-hse-procedure por
54231708 hse-audit-hse-procedure54231708 hse-audit-hse-procedure
54231708 hse-audit-hse-procedureMohammed Alam
956 visualizações11 slides
Wayne Vig CV - September 2015 por
Wayne Vig CV - September 2015Wayne Vig CV - September 2015
Wayne Vig CV - September 2015Wayne Vig
267 visualizações5 slides
Alan Stewart(AJ) CV 2 por
Alan Stewart(AJ) CV 2Alan Stewart(AJ) CV 2
Alan Stewart(AJ) CV 2Alan Stewart
425 visualizações10 slides
Petronas exploration guidelines por
Petronas exploration guidelinesPetronas exploration guidelines
Petronas exploration guidelinesEaswaran Kanason
6.3K visualizações51 slides
NM SM por
NM SMNM SM
NM SMNikos Managos
207 visualizações5 slides

Mais procurados(18)

SRLF-S-5654-0000_0_Role and Responsibilities(20160130) por Herman Moral
SRLF-S-5654-0000_0_Role and Responsibilities(20160130)SRLF-S-5654-0000_0_Role and Responsibilities(20160130)
SRLF-S-5654-0000_0_Role and Responsibilities(20160130)
Herman Moral766 visualizações
54231708 hse-audit-hse-procedure por Mohammed Alam
54231708 hse-audit-hse-procedure54231708 hse-audit-hse-procedure
54231708 hse-audit-hse-procedure
Mohammed Alam956 visualizações
Wayne Vig CV - September 2015 por Wayne Vig
Wayne Vig CV - September 2015Wayne Vig CV - September 2015
Wayne Vig CV - September 2015
Wayne Vig267 visualizações
Alan Stewart(AJ) CV 2 por Alan Stewart
Alan Stewart(AJ) CV 2Alan Stewart(AJ) CV 2
Alan Stewart(AJ) CV 2
Alan Stewart425 visualizações
Petronas exploration guidelines por Easwaran Kanason
Petronas exploration guidelinesPetronas exploration guidelines
Petronas exploration guidelines
Easwaran Kanason6.3K visualizações
NM SM por Nikos Managos
NM SMNM SM
NM SM
Nikos Managos207 visualizações
Stevan Hicks Short por Stevan Hicks
Stevan Hicks ShortStevan Hicks Short
Stevan Hicks Short
Stevan Hicks101 visualizações
Localisation Readiness and Fabrication Code Opportunities por Mark Mitchell
Localisation Readiness and Fabrication Code OpportunitiesLocalisation Readiness and Fabrication Code Opportunities
Localisation Readiness and Fabrication Code Opportunities
Mark Mitchell1.8K visualizações
Andrew Walker-CV por Andrew Walker
Andrew Walker-CVAndrew Walker-CV
Andrew Walker-CV
Andrew Walker115 visualizações
Complete Personnel Service Solution - Oil & Gas Upstream por Rogier Kind
Complete Personnel Service Solution - Oil & Gas UpstreamComplete Personnel Service Solution - Oil & Gas Upstream
Complete Personnel Service Solution - Oil & Gas Upstream
Rogier Kind501 visualizações
CURRECULUM VITAE por johnny nanat
CURRECULUM VITAECURRECULUM VITAE
CURRECULUM VITAE
johnny nanat255 visualizações
Quality Management – Enabling Localization of Nuclear New Build por Mark Mitchell
Quality Management – Enabling Localization of Nuclear New BuildQuality Management – Enabling Localization of Nuclear New Build
Quality Management – Enabling Localization of Nuclear New Build
Mark Mitchell729 visualizações
Dave's resume por Dave Kirby
Dave's resumeDave's resume
Dave's resume
Dave Kirby223 visualizações
Myles Dobinson Resume Jan 2016 por Myles Dobinson
Myles Dobinson Resume Jan 2016Myles Dobinson Resume Jan 2016
Myles Dobinson Resume Jan 2016
Myles Dobinson260 visualizações
Ron Williams CV Feb 2017 por Ron Williams
Ron Williams CV Feb 2017Ron Williams CV Feb 2017
Ron Williams CV Feb 2017
Ron Williams308 visualizações
TONY HERCEGl resume por Tony Herceg
TONY  HERCEGl resumeTONY  HERCEGl resume
TONY HERCEGl resume
Tony Herceg690 visualizações
Grant Thomison PSM Engineer 2016 por Grant T
Grant Thomison PSM Engineer 2016Grant Thomison PSM Engineer 2016
Grant Thomison PSM Engineer 2016
Grant T554 visualizações
HSE construction environment management plan por Dwarika Bhushan Sharma
HSE construction environment management planHSE construction environment management plan
HSE construction environment management plan
Dwarika Bhushan Sharma437 visualizações

Destaque

Juliocesarcamachodiaz1 l por
Juliocesarcamachodiaz1 lJuliocesarcamachodiaz1 l
Juliocesarcamachodiaz1 lCesar Diiaz
136 visualizações4 slides
Clase n° 5 passo por
Clase n° 5   passoClase n° 5   passo
Clase n° 5 passoMario Salazar Orihuela
376 visualizações47 slides
Flujo circular economico por
Flujo circular economicoFlujo circular economico
Flujo circular economicoElí Cortés
366 visualizações2 slides
GreenRoad Fleet Managment solution spotlight por
GreenRoad Fleet Managment solution spotlightGreenRoad Fleet Managment solution spotlight
GreenRoad Fleet Managment solution spotlightMiles Driven
116 visualizações17 slides
Skill Development Program por
Skill Development ProgramSkill Development Program
Skill Development ProgramDev Textile Services, Ludhiana
153 visualizações1 slide
243 por
243243
243Canalpc_Informatica
93 visualizações4 slides

Destaque(14)

Juliocesarcamachodiaz1 l por Cesar Diiaz
Juliocesarcamachodiaz1 lJuliocesarcamachodiaz1 l
Juliocesarcamachodiaz1 l
Cesar Diiaz136 visualizações
Flujo circular economico por Elí Cortés
Flujo circular economicoFlujo circular economico
Flujo circular economico
Elí Cortés366 visualizações
GreenRoad Fleet Managment solution spotlight por Miles Driven
GreenRoad Fleet Managment solution spotlightGreenRoad Fleet Managment solution spotlight
GreenRoad Fleet Managment solution spotlight
Miles Driven116 visualizações
Julius caesar by william shakespeare por jocsan jimenez
Julius caesar by william shakespeareJulius caesar by william shakespeare
Julius caesar by william shakespeare
jocsan jimenez106 visualizações
Prezentacija Sokobanja por Luka Stosic
Prezentacija SokobanjaPrezentacija Sokobanja
Prezentacija Sokobanja
Luka Stosic196 visualizações
Prezentacija Zemun por Luka Stosic
Prezentacija ZemunPrezentacija Zemun
Prezentacija Zemun
Luka Stosic224 visualizações
Komunitas tumbuhan por Jessy Damayanti
Komunitas tumbuhanKomunitas tumbuhan
Komunitas tumbuhan
Jessy Damayanti17.6K visualizações
Guiding Identification of Missing Scenarios for Dynamic Feature Location por Shinpei Hayashi
Guiding Identification of Missing Scenarios for Dynamic Feature LocationGuiding Identification of Missing Scenarios for Dynamic Feature Location
Guiding Identification of Missing Scenarios for Dynamic Feature Location
Shinpei Hayashi22.7K visualizações
Big Data Trend with Open Platform por Jongwook Woo
Big Data Trend with Open PlatformBig Data Trend with Open Platform
Big Data Trend with Open Platform
Jongwook Woo699 visualizações
Hse plan por Cuong Manh Nguyen
Hse planHse plan
Hse plan
Cuong Manh Nguyen23.5K visualizações
ArtByte presentation por Mike Cabaniss
ArtByte presentationArtByte presentation
ArtByte presentation
Mike Cabaniss9.4K visualizações

Similar a NABIL_WAGDY_ELBAZ_HSE_2015_doc

Resume Craig Edwards 042016 por
Resume  Craig Edwards 042016Resume  Craig Edwards 042016
Resume Craig Edwards 042016Craig Edwards
221 visualizações7 slides
Shafik Janhangeer - Resume -HSE Practitioner por
Shafik Janhangeer - Resume -HSE PractitionerShafik Janhangeer - Resume -HSE Practitioner
Shafik Janhangeer - Resume -HSE PractitionerShafik Janhangeer (BSc Hons,UK;GradIosh)
457 visualizações3 slides
Resume Tahir por
Resume TahirResume Tahir
Resume TahirSyed Tahir Shah
319 visualizações5 slides
Cv reguieg h last update por
Cv reguieg h last updateCv reguieg h last update
Cv reguieg h last updatereguieg hichem
24 visualizações4 slides
Melvin Lee CV (Updated) por
Melvin Lee CV (Updated)Melvin Lee CV (Updated)
Melvin Lee CV (Updated)Melvin Lee
637 visualizações7 slides
Richie Afeno's CV por
Richie Afeno's CVRichie Afeno's CV
Richie Afeno's CVRichard Afeno
476 visualizações6 slides

Similar a NABIL_WAGDY_ELBAZ_HSE_2015_doc(20)

Resume Craig Edwards 042016 por Craig Edwards
Resume  Craig Edwards 042016Resume  Craig Edwards 042016
Resume Craig Edwards 042016
Craig Edwards221 visualizações
Resume Tahir por Syed Tahir Shah
Resume TahirResume Tahir
Resume Tahir
Syed Tahir Shah319 visualizações
Cv reguieg h last update por reguieg hichem
Cv reguieg h last updateCv reguieg h last update
Cv reguieg h last update
reguieg hichem24 visualizações
Melvin Lee CV (Updated) por Melvin Lee
Melvin Lee CV (Updated)Melvin Lee CV (Updated)
Melvin Lee CV (Updated)
Melvin Lee637 visualizações
Richie Afeno's CV por Richard Afeno
Richie Afeno's CVRichie Afeno's CV
Richie Afeno's CV
Richard Afeno476 visualizações
Monib Traboulsi CV 2015 por traboulsi
Monib Traboulsi CV 2015Monib Traboulsi CV 2015
Monib Traboulsi CV 2015
traboulsi320 visualizações
Psm cv presentation jan15, 2013 por psmuga9
Psm cv presentation jan15, 2013Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013
psmuga9358 visualizações
Psm cv presentation jan17, 2013 por psmuga9
Psm cv presentation jan17, 2013Psm cv presentation jan17, 2013
Psm cv presentation jan17, 2013
psmuga9793 visualizações
Psm cv presentation jan15, 2013 por psmuga9
Psm cv presentation jan15, 2013Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013
psmuga9489 visualizações
Naushad_CV 2016 por Naushad Azhar
Naushad_CV 2016Naushad_CV 2016
Naushad_CV 2016
Naushad Azhar191 visualizações
HSE Engineer Resume por Mohammadali Hussain
HSE Engineer ResumeHSE Engineer Resume
HSE Engineer Resume
Mohammadali Hussain5.5K visualizações
CV Vikram HSE Updatedt Nov 2015 por hsechouhan
CV Vikram HSE Updatedt Nov 2015CV Vikram HSE Updatedt Nov 2015
CV Vikram HSE Updatedt Nov 2015
hsechouhan430 visualizações
HSE Manager CV Abdeslem Dahmani Rev12 2016 por dahmani abdeslem
HSE Manager CV Abdeslem Dahmani Rev12 2016HSE Manager CV Abdeslem Dahmani Rev12 2016
HSE Manager CV Abdeslem Dahmani Rev12 2016
dahmani abdeslem379 visualizações
UFR Hse supervision Resume por olorunyomi wale
UFR Hse supervision ResumeUFR Hse supervision Resume
UFR Hse supervision Resume
olorunyomi wale451 visualizações
Jawed Ali CV 1.doc April 2016 por Jawed Ali
Jawed Ali CV 1.doc April 2016Jawed Ali CV 1.doc April 2016
Jawed Ali CV 1.doc April 2016
Jawed Ali494 visualizações
CMIOSH-Adelodun por ADERIBIGBE AKEEM
CMIOSH-AdelodunCMIOSH-Adelodun
CMIOSH-Adelodun
ADERIBIGBE AKEEM284 visualizações

NABIL_WAGDY_ELBAZ_HSE_2015_doc

  • 1. NABIL WAGDY ELBAZ – HSE MANAGER Telephone : +201096215271 Email : nabil_elbaz@hotmail.com (personal) Discipline : Health Safety & Environment Language : Arabic (Mother Tongue) & English (Fluent) Date of Birth : 24 NOV 1968 Nationality : EGYPT. Qualification :  B.Sc (Hons.) Science , Chemical (Univ. of Mansura), EGYPT 1990  NEBOSH International Certificates. London UK.  Lead Auditor ISO- 9001 – OHSAS – 18001- ISO 14001 Training attended:  Industrial safety.  Fire fighting.  Confined space training.  Ptw training.  Defensive driving Course.  Heat injuries.  Basic fist Aid training.  Ptw training.  H2S & breathing apparatus.  Behavioral safety audit.  General safety onshore and offshore.  Risk assessment.  Behavioral safety audit.  Incident investigation.  Team work /team building workshop. CAREER SUMMARY More than 25 years’ experience in different aspects of HSEM in EPC , Construction oil &gas Offshore, Onshore, Power Plants, Refineries and petrochemical in GCC & Middle-East and Fare East region, Implementation and application of comprehensive HSE Program. Key skills:  Quantitative risk assessment.  COMAH support and safety report preparation.  Risk Management.  HAZOP/HAZID session facilitator.  Inherent Safety and SHE concepts and application.  HSEIA verification.  Risk assessment /ALARP policy review.  Liase with regulatory bodies (DPR, FEA&RSEPA) 1
  • 2. Summary of Major Projects Handled. • HHI (Hyundai Heavy Industries) - HSE Manager FAP Project Ras Gas ,Qatar - Project HSE Manager for FAP Project Ras Gas (EPC offshore pipeline and Brownfield modification.) • BGE-British Gas Egypt - HSE Manager - All Egypt Projects Offshore/Onshore • McDermott Middle East, Inc. HSE Manager – Saudi Arabia - All Saudi Aramco Projects Offshore/Onshore • Leighton Offshore Middle-East - ICOEEP Phase 1 - Iraq (Shatt El Arab. Basra. Iraq ) • J. Ray McDermott Middle East, Inc. Project HSE Manager - Saudi Aramco Karan Offshore platforms and sub-sea pipelines. (based in Dubai – UAE ). • WORLEYPARSONS – EGYPT - HSE Manager for Worley Parsons Egypt. • NPCC –National petroleum and construction company UAE Abu Dhabi. - Engineering, procurement and construction (EPC) for OGD3 Upstream project at BAB ADCO. Saudi Aramco: platforms fabrication for saffaneya oil&gas field. • Kharafi National – Kuwait - ABB Lumus Crude Oil Heater for CDU project at Mina Al Ahmadi Refinery. - CIGILIC – new Ammonia plant in PIC . • M/S DEUTSCHE BABCOCK, KUWAIT - New Doha Combined cycle Power Plant, • KPC - Kuwait Oil sector Complex. • KOC – (Kuwait oil company) - North Kuwait Upgrading of Gathering Centre -23(Petrofac main contractor). • KOC (Kuwait oil company) - North Kuwait Lift Gas Distribution System for Rawdhatain & Sabriya. • MEW – Power Station Maintenance - At Al-Zour, Al- Shuaib DOHA West&East. • KNPC-Kuwait national petroleum - Underground Distilled Storage Sump (MAB) • KNPC- Tank Maintenance (Three Refineries) • KNPC - Pier Rehabilitation and Construction (MAA) • ABB Project- KNPC (Kuwait National Petroleum) NEW CRUDE OIL HEATER. JOB PROFILES:  HHI (HYUDAI HEAVY IDUSTRIES) - HSE Manager FAP Project Ras Gas ,Qatar Position : HSES Manager Term : December 2013 Up to January 2015 Duties & Responsibilities: • Provide HSE assurance to the overall Marine HSE Program, Compliance with the Company policy requirement and the existing Marine legal requirement, International standards and code and recommended practices. 2
  • 3. • Interface with regulatory bodies, client and industry groups on compliance and industry best practice matters. • Develop HSES audit schedule and activity plan. • Monitor for effectiveness and assist in implementation of HSES management system across project. • To ensure the project HSE team understand and carry out their responsibilities detailed in order to meet client’s requirements and satisfy the requirements of OHSAS 18001 and ISO14110. • Participate in project HAZIDS, Risk assessment and HAZOPs, as required or directed. • Develop HSE programs promoting continuous improvement in safety performance. • Promoting and raising awareness, at all levels of an organization, of the impact of emerging environmental issues, whether legislative or best practice, on corporate, ethical and social responsibility. • HSE Plan for projects, monitor performance during the project execution, Follow-up.  BGE-British Gas Egypt Position : HSES Manager – BGE-British Gas Egypt Term : January 2013 Up to December 2013 Duties & Responsibilities:  Provide and arrange: • Quantitative risk assessment. • COMAH support and safety report preparation. • Risk Management. • HAZOP/HAZID and ENVID session facilitator. • Inherent Safety and SHE concepts and application. • HSEIA verification. • Risk assessment /ALARP policy review. • Liase with regulatory bodies (DPR, FEA&RSEPA)  McDermott Middle East, Inc. HSE Manager – Saudi Arabia Position : HSES Manager – Saudi Arabia, IK Operations Term : Nov.2011 till January 2013 Duties & Responsibilities • Interface with regulatory bodies, client and industry groups on compliance and industry best practice matters • Monitor for effectiveness and assist in implementation of HSES management system across projects • Develop HSES audit schedule and activity plan • Prepare and issue monthly HSES reports • Conduct project site visits and audits to ensure HSES compliance • Develop, manage and present safety training programs, as required. • Participate in project HAZIDS as required or directed • Lead/participate in incident investigation, as required Other duties connected with function, as directed Basic Functions • Provide support to projects to enable the division meet or exceed targets. • Provide support to area management teams and assist in applying the most effective HSES strategy in accordance with Middle East Area guidelines and operating standards • Manage and implement audit and inspection programs • Review contractor HSES management processes and documentation • Provide HSES guidance and leadership to area management team and IK HSES personnel. 3
  • 4. Keep up to date with statutory and client HSES regulations, industry HSES standards and ensure projects are made aware of implementation requirements on an ongoing basis and that changes are notified in an expedient manner 4
  • 5.  LEIGHTON OFFSHORE – MIDDLE EAST Position : HSE MANAGER Term : OCT 2010 till Nov.2011 Project : ICOEEP Phase 1 - Iraq Duties & Responsibilities • Provide HSE assurance to the overall Marine HSE Program, Compliance with the Company policy requirement and the existing Marine legal requirement, International standards and code and recommended practices. • To ensure the project HSE team understand and carry out their responsibilities detailed in order to meet client’s requirements and satisfy the requirements of OHSAS 18001 and ISO14110 • Put in the place and implement an inspection / assessment and risks identification program for the Marine operation and Project operations • Provide direction, guidance/coaching and supervision of the HSE Program, linking in global initiatives and best practice as appropriate • Develop and propose HSE program based on the incident/accident trend analysis and Marine /Project HSE issues as when these occur • Develop HSE programs promoting continuous improvement in safety performance • Assist the Divisional HSE Manager, and Project Director /Manager to develop and implement HSE related specific training programs in order to ensure that all staff /Project personnel understand and carry out their responsibilities. • Liaise with certification bodies and relevant authorities in order to ensure all legislative requirements and standards are met. • Collate and analyze data pertaining to the system performance in order to ensure continual improvement at all times. • Developing and implementing environmental strategies and action plans that ensure Project sustainable development • Coordinating all aspects of pollution control, waste management, recycling, environmental health, conservation and renewable energy • Promoting and raising awareness, at all levels of an organization, of the impact of emerging environmental issues, whether legislative or best practice, on corporate, ethical and social responsibility • Managing the development and implementation of an environmental management system • Training staff at all levels in environmental issues and responsibilities  J. RAY MCDERMOTT INC. – MIDDLE EAST Position : PROJECT HSE MANAGER Term : April 2009 to September 2010 Project : Saudi Aramco Karan Offshore platforms and sub-sea pipelines. Installation and pre-commissioning of Gas pipelines, Well Head platforms, auxiliary platforms, bridges, tie in Platform TP-1, power & communication cables. Scope also includes onshore pipelines & cables, internal coating of Gas pipelines, trenching, installation of tie-in pigging, hydro testing, dewatering and drying of pipelines Duties & Responsibilities • Maintain and control daily HSE practices of work sites onshore and offshore , • Ensure that hazards are identified, precautionary measures are taken and advise on HSE matters; • Co-ordinate, monitors and controls the implementation of the HSEMS; • Investigates causation of accidents / incidents and recommends corrective actions; 5
  • 6. • Perform statistical analysis to determine the underlying causes, analyze trends, and suggest protective measures. • Monitors the issue and proper implementation of work permit system. • Conduct gas & atmospheric tests. Participate in specific tasks as necessary, such as entry in confined space, mechanical sealing, etc.; • Monitors and advises on implementation and compliance with the Company’s HSE training standards. • Co-ordinate and liaises with work associates for presentation of specialized safety training courses. Promotes awareness; • Conducts risk assessment of potentially hazardous operations. • Prepare, conduct and facilitate Risk Assessment sessions for day-to-day activities as well as for major plant overhauls; • Setup & implement the HSE promotion & Motivation scheme through workshops. • Perform inspection & testing of the Portable, Mobile, Fixed Fire Suppression System & equipments; • Submission of HSE requirements during tendering process establish • HSE Plan for projects, monitor performance during the project execution, Follow-up Projects HSE Issues; Plan and set up crisis response, perform, table top exercises etc. and recommend improvements.  WORLEYPARSONS - EGYPT Position : CORPORATE HSE MANAGER(AFRICA/EYGYPT) Term : Jan 2009 to April 2009 Project : All Hydro-carbon projects (Offshore/Onshore) Duties & Responsibilities: • Strictly Adhere to Safety Manual and Implement all the Safety Measures. • Look in to the overall safety of the Company which includes implementation of company safety • Policy, safety standards and provide advisory services to project Staff and Management • Prepare Safety procedures / Check lists for Hazardous operations. • Prepare Emergency Response Procedure, set up and train Emergency response team, train all the • Employees of the Response procedure procure and locate response equipment. Conduct the • Emergency Drills and improve upon the shortcomings. • Train and educate the employees to promote/ improve Safety standards in the company as well as • Prevent all the accident or Incidents. • Risk management through identification of Potential Hazards involved, Assessment of risk and • Recommend mitigation measures • Incorporate changes in the Safety Requirements to comply with the recent developments in the Safety • Regulation and Conduct HAZOP/HAZID session facilitator.  NPCC, Abu Dhabi. UAE Position : PROJECT HSE MANAGER Term : March 2006 to December 2008 Project : Engineering, procurement and construction (EPC) for OGD3 Upstream project at BAB ADCO. Saudi Aramco: platforms fabrication for saffaneya oil&gas field. ADMA-OPCO Replacement of 24’’ water injection lines in UMM Shaif & Zakum Fields. ADMA-OPCO Well Head 6
  • 7. Tower Installation (Integrated Gas Development Project) IGDP WHT. ADMA-OPCO 2007 SHUT DOWN PROJECT for ADMA-OPCO. ADMA-OPCO Waste Gas Handling Unit (USSC). Duties & Responsibilities: • Responsible for assisting line management and supervision of all aspect of construction health safety and environmental matters undertaken by construction operations. • Responsible for assisting line management and supervision on commissioning operations HSE matters. • Provide functional support to field HSE officers and Loss prevention Officers. • Ensure all aspect of Company HSE policies are implemented by construction team • Hazard identification/risk assessment liaison is maintained with construction engineering. • Investigate, compile and analyze accident &incident statistics on a monthly basis. • Participate in selection, assignment and appraisal of field HSE officer. • Liaise with Client on all aspect of HSE project requirement and ensure contractual HSE requirements are met. • Keep all site appraised of new legislations/development. • Review QRA’s and reports from subcontractor. • Maintain HSE dossier for the project. • Responsible for reviewing HSEIA reports for the project. • Facilitate HAZID/HAZOP session for the projects. • Review with engineering Discipline all outstanding actions from HAZOP/HAZID for close out prior to Construction. • Communicate with all construction personnel the content of HSE manuals and ensure associated policies are implemented. • Carry out HSE audits on different site as per schedule. • Evaluate nominations for HSE personnel for the month. • Participate in client Project HSE reviews (PHSER) and ensure recommendations are closed out. • Custodian of HSE action tracking register for the project. • Chair remobilization meetings for Offshore Campaigns.  M/S DEUTSCHE BABCOCK, KUWAIT Position : HSE Engineer Term : 2004 Project : All maintenance Project for petrochemical and power stations. Duties & Responsibilities: • Responsible for monitoring all HSEMS procedures and make sure the system is implementing. • Lead HSE team on projects. • Responsible for Developing Company HSE plans and HSEMS.  M/S KHARAFI NATIONAL KUWAIT Position : HSE ENGINEER Term : Mar 2001 to Jan 2004 Project : (KNPC) CDU-3 unit New Crude Oil Heater (KNPC) CDU-3 unit New Crude Oil Heater, in Mina Al Ahmadi Refinery. (ABB Project). Upgrading of Gathering Center- 23 facilities, Kuwait Oil Co (KOC) north Kuwait. Lift Gas Distribution System for Raudhatain &Sabriyah. In Kuwait Oil Co. (KOC) North Kuwait. Rehabilitations and upgrade Kuwait south and north berth of Kuwait national petroleum. Duties & Responsibilities: 7
  • 8. • Focal point for Accident/incident investigation reporting and close out of recommendations. • Produce monthly and annual HSE statistical returns. • Ensure personnel on the project are familiar with safety procedures, checklist and have • Received safety induction courses.. • Form part of management Emergency Response team. • Prepare daily, weekly and monthly reports on all Health, Safety and environmental • Performance on the project. • Ensure safety audits are conducted onshore and offshore covering all aspect of the • Operations. Also ensure senior management are informed of the results requiring follow-up • And actions are completed successfully by responsible parties. Contractor/client). • Planning of emergency drills in line with company’s HSE policy. • Conduct risk assessment to recognize potential hazards are addressed and mitigating factors • Are introduced prior to work execution. Reviewing of safety procedures for high risk to ensure • Risks are eliminated to ALARP • Develop project HSE plan for the project. • Ensure audits/inspections are held & maintain tracking record of close out status for all report. • Ensure contractors and project leaders and engineers maintain HSE records • Report and be involved with pre-start HSE session and mobilization of equipments and Personnel. • Review of relevant Design / Construction work procedures and method statements. • Attend weekly HSE/progress meetings and prepare MOM. • Support contractor’s staff HSE training in line with the approved training matrix. • Provided HSE advice to the Quality Control team. • Review and sign off JHA’s for different work packs on the project. • Review of all contractors’ equipment, certification status, etc. on allocated sites. • Ensure the implementations of Task Hazard Control Sheet (THCS) for Hazard analysis. • Review contractors HSE plan, emergency response plan, journey management plan • And waste management plan. • Liaise with the regulatory bodies on HSE issues of concern and incompliance with • Statutory regulations. • Conduct HSE-MS adult on contractor for compliance. • Advise the project team on all safe work practices.  M/S KUWAIT SHIPBUILDING & REPAIR Position : PROJECT HSE ADVISOR Term : Jul 1999 to Feb 2001 Project : Fabrication shops and ship building yard Duties & Responsibilities: • HSE inspection to ensure HSE policy compliance by employee and contractors. • HSE inspection to ensure HSE plan is compliance. • Monitoring of all HSE activities on site to ensure HSE objectives are met. • Assessments of Hazard risk level to ensure risk are managed to ALARP. • Organize HSE meetings to cascade HSE information to staff and contractor personnel. • Attached/chaired weekly meetings and prepare Minutes of Meeting. • Development of various checklist used in HSE monitoring. • Tracking of audit action items as remedial action plan items (RAP). 8
  • 9. • Follow-up actions items from audits conducted on site. • Remobilization inspection of contractor’s resources and personnel. • Inspection of retainer ship clinics of contactors/subcontractors. • Monitored and Reviewed Detail Engineering Work Schedule. • Attended client-chaired weekly meetings and prepare Minutes of Meeting. • Provided Technical assistance to the Quality Control team. • Co-ordinate toolbox talks on site. • Review of cofferdam procedures and drawings addressing all critical HSE risk areas. • Organize safety emergency drills on site (fire, medivac, and man-overboard). • Review and update weekly/monthly HSE statistics for contractors. • Monitor Hazard trend and recommend update follow up system (RUFUS). • Prepared, Monitored and Reviewed the Project Work Schedule. • Attended client-chaired weekly meetings and prepare Minutes of Meeting. • Provided Technical HSE assistance to the Quality/construction department. • Recommendation of HSE incentives on site to boost HSE performance. • Carry out JHA’s review. • EIA compliance monitoring on the project. • HSE supervision of Hazardous activities (confine space activities, work adjacent to live • Activities. • Maintain High degree of HSE standards through daily site HSE enforcement. • DEP certification of staff and contractor’s personnel in line with company’s policy. • Site HSE walk about to monitor compliance. • Conduct HSE awareness training for contractor’s personnel. • PTW/ permits approval in line with approved work activities.  M/S KUWAIT CONTROLS CO. Position : PROJECT HSE Engineer Term : 1992 to 1998 Project : Doha West Power Station MEW: Instrument and Electrical Contract. K.N.P.C Shuaiba Refinery: construction- Mechanical and Civil Contract in Doha East Power Station: Boiler, Turbine and Distillation maintenance Contract. Mechanical, instrument and electrical. Alzour power station: maintenance contract boiler, turbines and distillation. Shuaiba power station: maintenance contract boiler, turbines and distillation. Duties & Responsibilities: • To conducting Safety training programs to work force at all levels such as Fire fighting, Confined Space Entry etc. • Chair HSE meetings where all HSE issues on construction are discussed and close out audit action items. • Review JSA’s for specific job tasks prior to execution. • Preparation of HSE Statistics/performance. • Ensuring Construction safety standards are complied with on Site. • Audio Visual Aid on Industrial Fire and Safety fields activities to the work force. • Conduct HSE induction for new employees. • Attend client’s progress/HSE committee meeting. • Advise the Construction team on Critical HSE issues • Conduct risk assessment of oil and existing facility before work commences. • Conduct reliability test on PPE. 9
  • 10. • Develop accident /incident tract outstanding register HSE issues for close out. • Assess the regulatory bodies on HSE related to matters Compliance on projects. • Team leading for Emergency response scenarios. • Carry out hygiene inspections. • Inspection of equipments before project execution. • Inspection of fire extinguisher for HSE compliance. • Review of lifting procedures and operation. • Prepared and carryout the project risk assessment.  M/S ELHAJERY CONTRACTING CO. Position : PROJECT HSE Engineer Term : 1991 Project : Saudi Arabia Refinery – El-Dhammam (1991). Duties & Responsibilities: • Safety Supervision of the project of mechanical and civil works including piping, welding machining, Construction, Excavation, working at heights, safety inspection, etc. Prepared and carry out risk Assessments of the project. • Review of lifting procedure and operation. • Inspection of equipments. • Prepare and implementing all the HSE plane in site. • Attend the client progress and HSE committee meeting. • Chair HSE meetings where all HSE issues on construction are discussed and close out audit action items. • Monitor Hazard trend and recommend update follow up system (RUFUS). • Ensuring Construction safety standards are complied with on Site. • Prepare and update weekly/monthly HSE statistics for company, contractors 10