SlideShare a Scribd company logo
1 of 17
Download to read offline
John F. Kennedy Space Center
                                                              LAUNCH SERVICES PROGRAM




                                    The BOSS -
                         Business Operating Success Strategies
                                 (LSP-UG-330.01 rev. Basic)


                    Project Management Challenge

                                  February 26, 2007
Recent Events
John F. Kennedy Space Center
                                               LAUNCH SERVICES PROGRAM




         • Baseline and Release LSP-UG-330.01
           Basic of the Business Operating
           Success Strategies (BOSS) User’s
           Guide
                – Plus: LSP-F-330.01 Basic BOSS Checklist
                  & LSP-F-330.02 Basic BOSS Mission
                  Management Schedule




                                                                         2
John F. Kennedy Space Center
                               Outline of BOSS Discussion
                                                   LAUNCH SERVICES PROGRAM




    •     What is BOSS?
    •     Why is BOSS required?
    •     Who SHALL comply?
    •     When is Compliance Required?
    •     How are Assessments Completed?
    •     Where is the BOSS Document located?
    •     Who is the Governing Authority?
    •     Who will update and maintain and How?
                                                                             3
Guidance generated by…
John F. Kennedy Space Center
                                                        LAUNCH SERVICES PROGRAM




      •Wanda Harding (FPO)
      •Randy Mizelle (PBO)
      •Diana Calero (Fleet & Systems)
      •Eric Haddox (Flight Analysis)
      •Julie Schneringer (Infrastructure Mang’t)
      •Greg Peralta (Engineering-NE)


      Team Members reviewed document with supervisor.


                                                                                  4
What is BOSS?
John F. Kennedy Space Center
                                               LAUNCH SERVICES PROGRAM




    •High level of activities that baselines
     standards and prescribed measurable
     mission performance indicators of what
     Mission Managers need to complete the
     Mission Life Cycle

    •A method to align with 7120.5

    •Designed to increase accountability

                                                                         5
What is BOSS?
John F. Kennedy Space Center
                                               LAUNCH SERVICES PROGRAM




                                                                         6
Why is BOSS Required?
John F. Kennedy Space Center
                                                LAUNCH SERVICES PROGRAM




   • To provide better, more consistent Mission
     Delivery to our Customers

   • To document Mission Variables

   • To align existing documents within the
     program for enhanced mission management


                                                                          7
Who Shall Comply?
John F. Kennedy Space Center
                                              LAUNCH SERVICES PROGRAM




     • All of LSP Mission Integration Team
       members

     • Anyone directly involved in supporting
       mission work




                                                                        8
When is Compliance Required?
John F. Kennedy Space Center
                                                                                                     LAUNCH SERVICES PROGRAM



        • Throughout the Mission Life Cycle




                               Gate Review   Gate Review        Gate Review    Gate Review   Gate Review       Gate Review    Gate Review
                               -Assign MIT   -SC Confirmation   - Mission on   -SC Ships     -LV/SC Pre-Mate   -Go for Launch - Final Payment
                                             Review/Concept     Contract
                                             Review                                          Review




       • On a monthly basis at the PTI, a status of
         mission phase will be identified. (Fig.1)
                                                                                                                                                9
John F. Kennedy Space Center
                               BOSS chart for PTI
                                                           LAUNCH SERVICES PROGRAM



    To be presented at PTI as the first page to each Mission on MIRS
      BOSS Mission Status: (Mission Name here)




                               Figure 1: BOSS Mission Status


                                                                                     10
Consolidated look on all Missions
John F. Kennedy Space Center
           Spacecraf                                                                                                          LAUNCH SERVICES PROGRAM



                                   Formulation                                                         Implementation
               t



                       Pre-
                               Phase A           Phase B                 Phase C                                    Phase D                                      Phase E
                       Phase A


                                                                         Baseline
                               Pre-                                                               L/V & S/C             Launch
           Services




                                                      Mission            Mission &                                                            Launch             Post
           Launch




                               Mission                                                            Engineering           Site Ops
                                                      Planning           Procure                                                                                 Launch
                               Planning                                                           Manufacturing
                                                                         Launch
                                                                         Services


                              Launch – 10-4yrs     L – 4-3 yrs       L – 3 or L-2 yrs         L – 27 mo to L-3 mo    L – 3 mo-10 days   L – 10 days-Launch   Launch + 3 mo




                        MCR   SRR Assign MDR     Mission    PDR/   FPB      ATP CDR     SIR    MIWGsHARs GOR PSR LSRR LVRR ORR SMSR           FRR   LRR LAUNCH        PLAR Mission
                                   MT             Plan      NAR            (LSP)              /GOWGs                                                                       Success
                                                                                                                                                                         Determination


                       GEC      » Midex                                                           SDO                                                            • DAWN
                                                 MMS                  GOES P**
                       JWST** » SMEX             LDCM               • AQUARIUS*                   NOAA-N’
                       GOES R » New Millennium • JUNO               • ST-8                        NPP
                       LISA     » New Frontiers                                                   GLAST
                       ConX     ○ AMS                                                             GLORY
                       TDRS • RBSP                                                                IBEX
                  •    SIM                                                                        LRO                                                               GSFC
                  »    ST-9                                                                       GOES O**                                                        • JPL
                  »    ESSP                                                                                                                                       o DOD
                                                                                              o   STSS
                                                                                                                                                                  » Other
                  »    GPMC**                                                                 o   STSS ATRR                                                         ARC
                  »    Discovery                                                              •   MSL                                                             ○ JSC
                  »    LPRP                                                                   •   OCO                                                   * International
                  »    Mars Scout                                                             •   OSTM*                                                ** Potential Advisory
                                                                                              •   KEPLER                                               Underline is Competed
                                                                                              •   WISE                                                 Update as of 11-28-07
                                                                                                  LCROSS
                                                                                                                                                                                         11
How are Assessments Completed?
John F. Kennedy Space Center
                                            LAUNCH SERVICES PROGRAM



    • Mission Managers work with Mission
      Integration Coordinators

           Download the latest revision from TechDoc
           – Mission Integration Schedule (LSP-F-330.02)
           – BOSS Checklist (LSP-F-330.01)




                                                                      12
How are Assessments Completed?
John F. Kennedy Space Center
                                            LAUNCH SERVICES PROGRAM



    • Mission Managers work with Mission
      Integration Coordinators
           Download the latest revision from TechDoc
           – Mission Integration Schedule (LSP-F-330.02)
           – BOSS Checklist (LSP-F-330.01)




                                                                      13
Who is the Governing Authority?
John F. Kennedy Space Center
                                                 LAUNCH SERVICES PROGRAM


      • Gate Review Board (GRB)
      • Who makes up the GRB?
        –Flight Project Office (FPO) – Chaired
        –Program Business Office Chief
        –Flight Analysis Division Chief
        –Fleet and Systems Management Division Chief
        –Infrastructure Management Division Chief

             Upon successful completion of a phase, entrance into
             the next phase will be implemented by the LSP GRB
             gatekeeper (ref: Close-Out Summary)



                                                                           14
Who will update and maintain?
John F. Kennedy Space Center             And How?     LAUNCH SERVICES PROGRAM



      • Owner of the BOSS document will reside with the FPO
        chief

      • Comments can be captured real time through the
        TechDoc.
                 Go to the Internal Website; In the Reference Section (toward the
                 bottom of the page) find the NASA/KSC TechDoc Systems link.
                 Find TDELV and log on - the ELV Document Library
                 Several people within LSP have been selected as
                 representatives to be BOSS team members that will have
                 accounts and can enter your comments.


      • The BOSS shall be reviewed on a semi-annual basis.
                                                                                    15
Initiative Title: Effectively   implement/use the BOSS by the end of the FY 2008 and incorporate into
business practices                                            Focus Sheet for 2008
LSP Goal & Objective Alignment (1,2,3 or 4) 4
JohnMaximize successful delivery of
Goal: F. Kennedy Space Center         Goal: Assure launch services for all   Goal: Promote evolution of competitive    Goal: Continually enhance LSP’s core
spacecraft to space                      customers—now and in the future     space market                 LAUNCH      SERVICES PROGRAM
                                                                                                                        capabilities
    Objective 1.1                            Objective 2.1                       Objective 3.1                             Objective 4.1
    Objective 1.2                            Objective 2.2                       Objective 3.2                             Objective 4.2
    Objective 1.3                            Objective 2.3                       Objective 3.3                             Objective 4.3
    Objective 1.4                            Objective 2.4                       Objective 3.4                             Objective 4.4

Description
Incorporate BOSS into the LSP business practices by making it integral to how LSP manages missions


Why is this an important initiative? What are the factors driving this initiative?
Improve consistency in mission delivery; instill ownership of initiative throughout the program; provides data for metrics

What are the planned deliverables?
Policy for BOSS; metrics; for each mission – completed tool set

What does it “good look like” when you are finished?
People make decisions using BOSS data

Who is accountable for making sure       Who is on the team?                    Who needs to be involved in decisions regarding this initiative?
this initiative achieved?                • Reps from each division (new         • LSP managers (including NE, SMA)
MItskevich/ Daisy Mueller                ones?)


Nov-Dec-Jan Plans                        Feb-Mar-April Plans                    May-June-July Plans                       Aug-Sept-Oct Plans
• BOSS rollout (Lugo/Francois)           • Evaluate effectiveness (Lessons                                                • Evaluate effectiveness
• Transition to all missions                learned) – tweak                                                                 (Lessons Learned) and
• Review and update LSP                                                                                                      tweak
   processes as necessary to
   incorporate BOSS
• Communicate to customer

Additional Dollars Needed:                                                      Additional Talent/People Needed:
Money – PTI additions with AI solutions
                                                                                                                                                          16
Next Steps:
John F. Kennedy Space Center
                                             LAUNCH SERVICES PROGRAM



      • Upon release of BOSS document, current BOSS
        members will assist in answering and guiding
        direct organization to answer questions and/or
        submit comments for new revision.
      • Go around the organization to discuss the new
        document requirement and obtain feedback.
      • Share and collaborate with our customers and
        obtain feedback.
      • Finally, measure the effectiveness of the BOSS


                                                                       17

More Related Content

What's hot

Grammier.richard
Grammier.richardGrammier.richard
Grammier.richard
NASAPMC
 
Bauer.frank
Bauer.frankBauer.frank
Bauer.frank
NASAPMC
 
Solomon.paul
Solomon.paulSolomon.paul
Solomon.paul
NASAPMC
 
Eggert.joe
Eggert.joeEggert.joe
Eggert.joe
NASAPMC
 
Smalley stigberg petze
Smalley stigberg petzeSmalley stigberg petze
Smalley stigberg petze
NASAPMC
 
Vonnie simonsen
Vonnie simonsenVonnie simonsen
Vonnie simonsen
NASAPMC
 
Tim.honeycutt
Tim.honeycuttTim.honeycutt
Tim.honeycutt
NASAPMC
 
Jim.free
Jim.freeJim.free
Jim.free
NASAPMC
 
Armstrong
ArmstrongArmstrong
Armstrong
NASAPMC
 
Ingoldsby.k.lee.y
Ingoldsby.k.lee.yIngoldsby.k.lee.y
Ingoldsby.k.lee.y
NASAPMC
 
Carsile.azarbain
Carsile.azarbainCarsile.azarbain
Carsile.azarbain
NASAPMC
 
Brantley.wayne
Brantley.wayneBrantley.wayne
Brantley.wayne
NASAPMC
 
Ortiz.james
Ortiz.jamesOrtiz.james
Ortiz.james
NASAPMC
 
Ed mangopanelpm challengefinal
Ed mangopanelpm challengefinalEd mangopanelpm challengefinal
Ed mangopanelpm challengefinal
NASAPMC
 
Dickerson mark
Dickerson markDickerson mark
Dickerson mark
NASAPMC
 
Phillip.hall
Phillip.hallPhillip.hall
Phillip.hall
NASAPMC
 
Humphreys.gary
Humphreys.garyHumphreys.gary
Humphreys.gary
NASAPMC
 
Louis.cioletti
Louis.ciolettiLouis.cioletti
Louis.cioletti
NASAPMC
 
Kelly crumbley
Kelly crumbleyKelly crumbley
Kelly crumbley
NASAPMC
 

What's hot (20)

Grammier.richard
Grammier.richardGrammier.richard
Grammier.richard
 
Bauer.frank
Bauer.frankBauer.frank
Bauer.frank
 
Solomon.paul
Solomon.paulSolomon.paul
Solomon.paul
 
Eggert.joe
Eggert.joeEggert.joe
Eggert.joe
 
Smalley stigberg petze
Smalley stigberg petzeSmalley stigberg petze
Smalley stigberg petze
 
Vonnie simonsen
Vonnie simonsenVonnie simonsen
Vonnie simonsen
 
Tim.honeycutt
Tim.honeycuttTim.honeycutt
Tim.honeycutt
 
Jim.free
Jim.freeJim.free
Jim.free
 
Armstrong
ArmstrongArmstrong
Armstrong
 
Ingoldsby.k.lee.y
Ingoldsby.k.lee.yIngoldsby.k.lee.y
Ingoldsby.k.lee.y
 
Carsile.azarbain
Carsile.azarbainCarsile.azarbain
Carsile.azarbain
 
Ortiz
OrtizOrtiz
Ortiz
 
Brantley.wayne
Brantley.wayneBrantley.wayne
Brantley.wayne
 
Ortiz.james
Ortiz.jamesOrtiz.james
Ortiz.james
 
Ed mangopanelpm challengefinal
Ed mangopanelpm challengefinalEd mangopanelpm challengefinal
Ed mangopanelpm challengefinal
 
Dickerson mark
Dickerson markDickerson mark
Dickerson mark
 
Phillip.hall
Phillip.hallPhillip.hall
Phillip.hall
 
Humphreys.gary
Humphreys.garyHumphreys.gary
Humphreys.gary
 
Louis.cioletti
Louis.ciolettiLouis.cioletti
Louis.cioletti
 
Kelly crumbley
Kelly crumbleyKelly crumbley
Kelly crumbley
 

Viewers also liked

Mike.ryschkewitsch
Mike.ryschkewitschMike.ryschkewitsch
Mike.ryschkewitsch
NASAPMC
 
Laliberte,eric nasa pm challenge 2012 pm in changing global environment
Laliberte,eric nasa pm challenge 2012   pm in changing global environmentLaliberte,eric nasa pm challenge 2012   pm in changing global environment
Laliberte,eric nasa pm challenge 2012 pm in changing global environment
NASAPMC
 
Hughitt brian
Hughitt brianHughitt brian
Hughitt brian
NASAPMC
 
Eric.druker
Eric.drukerEric.druker
Eric.druker
NASAPMC
 
Smith.marshall.bryant
Smith.marshall.bryantSmith.marshall.bryant
Smith.marshall.bryant
NASAPMC
 
Borchardt.heidemarie
Borchardt.heidemarieBorchardt.heidemarie
Borchardt.heidemarie
NASAPMC
 

Viewers also liked (7)

Krishen
KrishenKrishen
Krishen
 
Mike.ryschkewitsch
Mike.ryschkewitschMike.ryschkewitsch
Mike.ryschkewitsch
 
Laliberte,eric nasa pm challenge 2012 pm in changing global environment
Laliberte,eric nasa pm challenge 2012   pm in changing global environmentLaliberte,eric nasa pm challenge 2012   pm in changing global environment
Laliberte,eric nasa pm challenge 2012 pm in changing global environment
 
Hughitt brian
Hughitt brianHughitt brian
Hughitt brian
 
Eric.druker
Eric.drukerEric.druker
Eric.druker
 
Smith.marshall.bryant
Smith.marshall.bryantSmith.marshall.bryant
Smith.marshall.bryant
 
Borchardt.heidemarie
Borchardt.heidemarieBorchardt.heidemarie
Borchardt.heidemarie
 

Similar to Daisy.mueller

Mitskevich amanda
Mitskevich amandaMitskevich amanda
Mitskevich amanda
NASAPMC
 
Mary.faller
Mary.fallerMary.faller
Mary.faller
NASAPMC
 
Pamela.west
Pamela.westPamela.west
Pamela.west
NASAPMC
 
Albert sierra
Albert sierraAlbert sierra
Albert sierra
NASAPMC
 
Poole.eric
Poole.ericPoole.eric
Poole.eric
NASAPMC
 
Poole.eric
Poole.ericPoole.eric
Poole.eric
NASAPMC
 
Geyer.m.sasaki.c
Geyer.m.sasaki.cGeyer.m.sasaki.c
Geyer.m.sasaki.c
NASAPMC
 
Garg.sanjay
Garg.sanjayGarg.sanjay
Garg.sanjay
NASAPMC
 
Tsi reporting saifulnizam - june2012
Tsi reporting   saifulnizam - june2012Tsi reporting   saifulnizam - june2012
Tsi reporting saifulnizam - june2012
Saifulnizam Bahari
 
Project Execution and PM Elements
Project Execution and PM ElementsProject Execution and PM Elements
Project Execution and PM Elements
haroldtaylor1113
 
Charles.leising
Charles.leisingCharles.leising
Charles.leising
NASAPMC
 
Localization Project Management
Localization Project ManagementLocalization Project Management
Localization Project Management
Maria Asnes
 
Localization Project Management
Localization Project ManagementLocalization Project Management
Localization Project Management
barakdanin
 
Ortiz.james
Ortiz.jamesOrtiz.james
Ortiz.james
NASAPMC
 

Similar to Daisy.mueller (20)

Mitskevich amanda
Mitskevich amandaMitskevich amanda
Mitskevich amanda
 
Mary.faller
Mary.fallerMary.faller
Mary.faller
 
Pamela.west
Pamela.westPamela.west
Pamela.west
 
Albert sierra
Albert sierraAlbert sierra
Albert sierra
 
Poole.eric
Poole.ericPoole.eric
Poole.eric
 
Poole.eric
Poole.ericPoole.eric
Poole.eric
 
Ms project training ver 01
Ms project training ver 01Ms project training ver 01
Ms project training ver 01
 
Pianificazione Progetti 4
Pianificazione Progetti 4Pianificazione Progetti 4
Pianificazione Progetti 4
 
Geyer.m.sasaki.c
Geyer.m.sasaki.cGeyer.m.sasaki.c
Geyer.m.sasaki.c
 
Garg.sanjay
Garg.sanjayGarg.sanjay
Garg.sanjay
 
Tsi reporting saifulnizam - june2012
Tsi reporting   saifulnizam - june2012Tsi reporting   saifulnizam - june2012
Tsi reporting saifulnizam - june2012
 
Pepperdine itsm presentation 10.11
Pepperdine itsm presentation 10.11Pepperdine itsm presentation 10.11
Pepperdine itsm presentation 10.11
 
Project Execution and PM Elements
Project Execution and PM ElementsProject Execution and PM Elements
Project Execution and PM Elements
 
Charles.leising
Charles.leisingCharles.leising
Charles.leising
 
Localization Project Management
Localization Project ManagementLocalization Project Management
Localization Project Management
 
Localization Project Management
Localization Project ManagementLocalization Project Management
Localization Project Management
 
Skibsmotorer reducerer brændselsforbruget (IBM Rational)
Skibsmotorer reducerer brændselsforbruget (IBM Rational)Skibsmotorer reducerer brændselsforbruget (IBM Rational)
Skibsmotorer reducerer brændselsforbruget (IBM Rational)
 
Ortiz.james
Ortiz.jamesOrtiz.james
Ortiz.james
 
Enterey Life Sciences Consulting PDA So. Cal PAI Presentation3
Enterey Life Sciences Consulting PDA So. Cal PAI Presentation3Enterey Life Sciences Consulting PDA So. Cal PAI Presentation3
Enterey Life Sciences Consulting PDA So. Cal PAI Presentation3
 
oakland county parks cost recovery
oakland county parks cost recoveryoakland county parks cost recovery
oakland county parks cost recovery
 

More from NASAPMC

Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk bo
NASAPMC
 
Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski john
NASAPMC
 
Yew manson
Yew mansonYew manson
Yew manson
NASAPMC
 
Wood frank
Wood frankWood frank
Wood frank
NASAPMC
 
Wood frank
Wood frankWood frank
Wood frank
NASAPMC
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)
NASAPMC
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joe
NASAPMC
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuart
NASAPMC
 
Stock gahm
Stock gahmStock gahm
Stock gahm
NASAPMC
 
Snow lee
Snow leeSnow lee
Snow lee
NASAPMC
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandra
NASAPMC
 
Seftas krage
Seftas krageSeftas krage
Seftas krage
NASAPMC
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marco
NASAPMC
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mike
NASAPMC
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karlene
NASAPMC
 
Rackley mike
Rackley mikeRackley mike
Rackley mike
NASAPMC
 
Paradis william
Paradis williamParadis william
Paradis william
NASAPMC
 
Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeff
NASAPMC
 
O'keefe william
O'keefe williamO'keefe william
O'keefe william
NASAPMC
 
Muller ralf
Muller ralfMuller ralf
Muller ralf
NASAPMC
 

More from NASAPMC (20)

Bejmuk bo
Bejmuk boBejmuk bo
Bejmuk bo
 
Baniszewski john
Baniszewski johnBaniszewski john
Baniszewski john
 
Yew manson
Yew mansonYew manson
Yew manson
 
Wood frank
Wood frankWood frank
Wood frank
 
Wood frank
Wood frankWood frank
Wood frank
 
Wessen randi (cd)
Wessen randi (cd)Wessen randi (cd)
Wessen randi (cd)
 
Vellinga joe
Vellinga joeVellinga joe
Vellinga joe
 
Trahan stuart
Trahan stuartTrahan stuart
Trahan stuart
 
Stock gahm
Stock gahmStock gahm
Stock gahm
 
Snow lee
Snow leeSnow lee
Snow lee
 
Smalley sandra
Smalley sandraSmalley sandra
Smalley sandra
 
Seftas krage
Seftas krageSeftas krage
Seftas krage
 
Sampietro marco
Sampietro marcoSampietro marco
Sampietro marco
 
Rudolphi mike
Rudolphi mikeRudolphi mike
Rudolphi mike
 
Roberts karlene
Roberts karleneRoberts karlene
Roberts karlene
 
Rackley mike
Rackley mikeRackley mike
Rackley mike
 
Paradis william
Paradis williamParadis william
Paradis william
 
Osterkamp jeff
Osterkamp jeffOsterkamp jeff
Osterkamp jeff
 
O'keefe william
O'keefe williamO'keefe william
O'keefe william
 
Muller ralf
Muller ralfMuller ralf
Muller ralf
 

Recently uploaded

+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
panagenda
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 

Recently uploaded (20)

Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
Why Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire businessWhy Teams call analytics are critical to your entire business
Why Teams call analytics are critical to your entire business
 
ICT role in 21st century education and its challenges
ICT role in 21st century education and its challengesICT role in 21st century education and its challenges
ICT role in 21st century education and its challenges
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistan
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering Developers
 
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdfRising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
Rising Above_ Dubai Floods and the Fortitude of Dubai International Airport.pdf
 

Daisy.mueller

  • 1. John F. Kennedy Space Center LAUNCH SERVICES PROGRAM The BOSS - Business Operating Success Strategies (LSP-UG-330.01 rev. Basic) Project Management Challenge February 26, 2007
  • 2. Recent Events John F. Kennedy Space Center LAUNCH SERVICES PROGRAM • Baseline and Release LSP-UG-330.01 Basic of the Business Operating Success Strategies (BOSS) User’s Guide – Plus: LSP-F-330.01 Basic BOSS Checklist & LSP-F-330.02 Basic BOSS Mission Management Schedule 2
  • 3. John F. Kennedy Space Center Outline of BOSS Discussion LAUNCH SERVICES PROGRAM • What is BOSS? • Why is BOSS required? • Who SHALL comply? • When is Compliance Required? • How are Assessments Completed? • Where is the BOSS Document located? • Who is the Governing Authority? • Who will update and maintain and How? 3
  • 4. Guidance generated by… John F. Kennedy Space Center LAUNCH SERVICES PROGRAM •Wanda Harding (FPO) •Randy Mizelle (PBO) •Diana Calero (Fleet & Systems) •Eric Haddox (Flight Analysis) •Julie Schneringer (Infrastructure Mang’t) •Greg Peralta (Engineering-NE) Team Members reviewed document with supervisor. 4
  • 5. What is BOSS? John F. Kennedy Space Center LAUNCH SERVICES PROGRAM •High level of activities that baselines standards and prescribed measurable mission performance indicators of what Mission Managers need to complete the Mission Life Cycle •A method to align with 7120.5 •Designed to increase accountability 5
  • 6. What is BOSS? John F. Kennedy Space Center LAUNCH SERVICES PROGRAM 6
  • 7. Why is BOSS Required? John F. Kennedy Space Center LAUNCH SERVICES PROGRAM • To provide better, more consistent Mission Delivery to our Customers • To document Mission Variables • To align existing documents within the program for enhanced mission management 7
  • 8. Who Shall Comply? John F. Kennedy Space Center LAUNCH SERVICES PROGRAM • All of LSP Mission Integration Team members • Anyone directly involved in supporting mission work 8
  • 9. When is Compliance Required? John F. Kennedy Space Center LAUNCH SERVICES PROGRAM • Throughout the Mission Life Cycle Gate Review Gate Review Gate Review Gate Review Gate Review Gate Review Gate Review -Assign MIT -SC Confirmation - Mission on -SC Ships -LV/SC Pre-Mate -Go for Launch - Final Payment Review/Concept Contract Review Review • On a monthly basis at the PTI, a status of mission phase will be identified. (Fig.1) 9
  • 10. John F. Kennedy Space Center BOSS chart for PTI LAUNCH SERVICES PROGRAM To be presented at PTI as the first page to each Mission on MIRS BOSS Mission Status: (Mission Name here) Figure 1: BOSS Mission Status 10
  • 11. Consolidated look on all Missions John F. Kennedy Space Center Spacecraf LAUNCH SERVICES PROGRAM Formulation Implementation t Pre- Phase A Phase B Phase C Phase D Phase E Phase A Baseline Pre- L/V & S/C Launch Services Mission Mission & Launch Post Launch Mission Engineering Site Ops Planning Procure Launch Planning Manufacturing Launch Services Launch – 10-4yrs L – 4-3 yrs L – 3 or L-2 yrs L – 27 mo to L-3 mo L – 3 mo-10 days L – 10 days-Launch Launch + 3 mo MCR SRR Assign MDR Mission PDR/ FPB ATP CDR SIR MIWGsHARs GOR PSR LSRR LVRR ORR SMSR FRR LRR LAUNCH PLAR Mission MT Plan NAR (LSP) /GOWGs Success Determination GEC » Midex SDO • DAWN MMS GOES P** JWST** » SMEX LDCM • AQUARIUS* NOAA-N’ GOES R » New Millennium • JUNO • ST-8 NPP LISA » New Frontiers GLAST ConX ○ AMS GLORY TDRS • RBSP IBEX • SIM LRO GSFC » ST-9 GOES O** • JPL » ESSP o DOD o STSS » Other » GPMC** o STSS ATRR ARC » Discovery • MSL ○ JSC » LPRP • OCO * International » Mars Scout • OSTM* ** Potential Advisory • KEPLER Underline is Competed • WISE Update as of 11-28-07 LCROSS 11
  • 12. How are Assessments Completed? John F. Kennedy Space Center LAUNCH SERVICES PROGRAM • Mission Managers work with Mission Integration Coordinators Download the latest revision from TechDoc – Mission Integration Schedule (LSP-F-330.02) – BOSS Checklist (LSP-F-330.01) 12
  • 13. How are Assessments Completed? John F. Kennedy Space Center LAUNCH SERVICES PROGRAM • Mission Managers work with Mission Integration Coordinators Download the latest revision from TechDoc – Mission Integration Schedule (LSP-F-330.02) – BOSS Checklist (LSP-F-330.01) 13
  • 14. Who is the Governing Authority? John F. Kennedy Space Center LAUNCH SERVICES PROGRAM • Gate Review Board (GRB) • Who makes up the GRB? –Flight Project Office (FPO) – Chaired –Program Business Office Chief –Flight Analysis Division Chief –Fleet and Systems Management Division Chief –Infrastructure Management Division Chief Upon successful completion of a phase, entrance into the next phase will be implemented by the LSP GRB gatekeeper (ref: Close-Out Summary) 14
  • 15. Who will update and maintain? John F. Kennedy Space Center And How? LAUNCH SERVICES PROGRAM • Owner of the BOSS document will reside with the FPO chief • Comments can be captured real time through the TechDoc. Go to the Internal Website; In the Reference Section (toward the bottom of the page) find the NASA/KSC TechDoc Systems link. Find TDELV and log on - the ELV Document Library Several people within LSP have been selected as representatives to be BOSS team members that will have accounts and can enter your comments. • The BOSS shall be reviewed on a semi-annual basis. 15
  • 16. Initiative Title: Effectively implement/use the BOSS by the end of the FY 2008 and incorporate into business practices Focus Sheet for 2008 LSP Goal & Objective Alignment (1,2,3 or 4) 4 JohnMaximize successful delivery of Goal: F. Kennedy Space Center Goal: Assure launch services for all Goal: Promote evolution of competitive Goal: Continually enhance LSP’s core spacecraft to space customers—now and in the future space market LAUNCH SERVICES PROGRAM capabilities Objective 1.1 Objective 2.1 Objective 3.1 Objective 4.1 Objective 1.2 Objective 2.2 Objective 3.2 Objective 4.2 Objective 1.3 Objective 2.3 Objective 3.3 Objective 4.3 Objective 1.4 Objective 2.4 Objective 3.4 Objective 4.4 Description Incorporate BOSS into the LSP business practices by making it integral to how LSP manages missions Why is this an important initiative? What are the factors driving this initiative? Improve consistency in mission delivery; instill ownership of initiative throughout the program; provides data for metrics What are the planned deliverables? Policy for BOSS; metrics; for each mission – completed tool set What does it “good look like” when you are finished? People make decisions using BOSS data Who is accountable for making sure Who is on the team? Who needs to be involved in decisions regarding this initiative? this initiative achieved? • Reps from each division (new • LSP managers (including NE, SMA) MItskevich/ Daisy Mueller ones?) Nov-Dec-Jan Plans Feb-Mar-April Plans May-June-July Plans Aug-Sept-Oct Plans • BOSS rollout (Lugo/Francois) • Evaluate effectiveness (Lessons • Evaluate effectiveness • Transition to all missions learned) – tweak (Lessons Learned) and • Review and update LSP tweak processes as necessary to incorporate BOSS • Communicate to customer Additional Dollars Needed: Additional Talent/People Needed: Money – PTI additions with AI solutions 16
  • 17. Next Steps: John F. Kennedy Space Center LAUNCH SERVICES PROGRAM • Upon release of BOSS document, current BOSS members will assist in answering and guiding direct organization to answer questions and/or submit comments for new revision. • Go around the organization to discuss the new document requirement and obtain feedback. • Share and collaborate with our customers and obtain feedback. • Finally, measure the effectiveness of the BOSS 17