Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Mustafa cv 2016
1. Mustafa Munsoer 10500 ValleyForge Dr APT#228
ASHRAE membership,PE Houston,TX 77042
(832) 878-4548
hvac.master@yahoo.comSUMMARY
HVAC Engineer,PE
15 yearsof extensivetechnical experience andprojectleadershipinHVACmanagement.
SKILLS & Experience
Bachelor’s degree inMechanical Engineer– Damascus 1992
HVAC systemdesignlevel I+ level II(ASHRAE)
HVACR Technician Diploma –Penn Foster 2015
EPA Certificate
AutoCad Diploma2005
SMACNA HVACduct construction standardsprogramCertificate 2011
Gas Furnace update and review TRANECertificate2014
MPS multi andheat loadcalculation,LG Certificate 2006
VRF,LG Certificate 2014
DevelopdetailedHVACsystemdesignprogram
Heat loadcalculation Software (HAP-Elite-CARRIERBlockLoadE20-II).
Prepare shopdrawings
Schedulingandselectingmajorequipment
projectestimating
ProficientinMSOffice
Complete testingandcommissioning
PerformA/Cmaintenance andairbalancing
Hire and manage staff
Meetwithclients,findsolutionsforexistingsystemproblems.
PROFESSIONAL EXPERIENCE
US Air Conditioning Houston, TX, USA
Mechanical Engineer, 6/2015-present
Delta Air Conditioning Company
Project Manager,2014-2015
Responsible foroverallprojectcompletionfromconceptionto design,material procurement, installation,andlabor
supervision formultiple facilities.
Work withincomplianceof citycodes forinspection andtimely approval.
Projectsinclude: 14unitcustom residential homes,HarmonySchool,medical clinic,VaughnBuilding,Shopping
Center,warehouses, andoffice buildings.
I workedinDeltaAirConditioningCompanyinthe following projects:
I designedandcalculatedthe heatloadforService TransportCompany@9513 Telephone rood,Houston,TX77075.
I designedandcalculatedthe heatloadforCalhonchemical Employee Building@11674 State Hwy185 North,Port
Lavaca,TX77979.
I designedandcalculatedthe heatloadforCalhonEmployee CafeteriaBuilding@11676 State Hwy185 North,Port
Lavaca,TX77979.
I designedandcalculatedthe heatloadforSegmentShoppingCenterUltimate Nail @12065 Beamer,Houston,TX77089.
2. Mustafa Munsoer 10500 ValleyForge Dr APT#228
ASHRAE membership,PE Houston,TX 77042
(832) 878-4548
hvac.master@yahoo.com
I designedRemodel of SegmentShoppingCenterRestaurant@12011 Beamer,Houston,TX77089.
I designedandcalculatedthe heatforWestPark GardenWarehouse @4013 Arc street,HOUSTON ,TX77063.
I designedand remodeledVeughnoffice building (12StoryHighrise building)@400W.Texas Ave,Midland,Texas 79702.
I designedandcalculatedforSalazarsClinic@19255 Park Row Dr,Houston,Texas77084.
I designedandcalculatedthe heatloadforGate of KnowledgeRemodel @2619 Kentucky,League City,Texas77573.
I designedandcalculatedthe heatloadfor14 CustomHouses @11001-11015 JardinDes Circle,HoustonTexas77043.
I designedandcalculatedthe heatforEl Farouq Mosque Remodel @1207 Conrad Sauer,HoustonTexas77043.
Royal Suite Dubai, Sharjah, UAE
Project Manager,2005-2014
Coordinated all phasesof HVACprojectsfromdesign throughconstructionforlarge-scale commercial,industrial,
and residential projects.
Responsible formaterial selectionandinstallationof: pipes,ducts, heatexchangers,pumps,boilers,chillers,cooling
towers,exhaustfans, airhandlers, andcondensingunits.
Managementlevel interactionwith clients,architects,vendors,andcontractors.
I workedinthiscompanyas the following:
Heat loadcalculation,Design(Duct+pipe+equipments) andsupervise forthisprojectsinDubai,SharjahandAbuDhabi:
• Couple highrise Building(Al QadesiaBlockA&B) 35 Story Building, 1316 Ductedsplitunits.
• Al TaawunBuilding(15Story highrise building),365Ductedsplitunits.
• Al JawherBuildingBlockA&B(25 StoryCouple highrise building), 982Ductedsplitunits.
• 4Story building@ALkrama area,162 Ducted splitunits+FAHU+ Smoke System
• 8 Story building@ALmajrarea,80 splitunit.
• 4 Story building@AlKHAN area,32 ductedsplitunits.
• 22 CustomHomes,66 ductedsplit+105splitunits.
• 26 LuxuryVillas, 26VRF system+ 130 splitnits+26Ventilationsystem.
• 6 PalacesinALramla Areafor(SheckAbdullahAl Thani) 18package unites.
• ALP27 (Race car serviceswarehouse)6package units.
• AL-ButtinaMosque,6Package nits.
• 11 Storyhighrise building,3AirColdChiller+2FAHU+pumproom+222AHU.
• Gym of ThobanCamp, 3 Air ColdChillers+Pumproom+2 FAHU+Spiral Duct.
• SalimHospital,2AirColdChillers+Pumproom+2FAHU+AHU+ 122 FCU.
• Remodel of Al Shamrestaurant,3 ductedsplitunit+ventilation.
• Remodel Kitchenof SharjahPalace Hotel,A/C+Ventilationsystem,
• Remodel of TasareehBuilding,15 Ductedsplitunits.
• Remodel of FoodcourtinSharjahCityCenterMall.
• Remodel of Al DhyaSchool,54 Ductedsplitunits.
• Remodel of 40 storyhighrise building(Mechanicalventilationforservicefloorsandadded
1 AircoldChiller+40FCU to Halls).
• Remodel of 6story building@DParea,92AHU.
• Remodel of LGAcademicworkshoparea @Free Zone No.7,1 MPS SYSTEM+2 Multi VIII
+2Multi VIV system+3 Cassette units+8FCU+2splitunits.
3. Mustafa Munsoer 10500 ValleyForge Dr APT#228
ASHRAE membership,PE Houston,TX 77042
(832) 878-4548
hvac.master@yahoo.com
WATTAR Company, ModernIndustries Damascus, Syria
Consultant/Contractor/DivisionManager,PE 1992-2005
I worked inthisElectronicManufacture (Fans-Iron-ElectricVacuum-Meatchopper...)asfollowing:
• DesignCastMoldingsandfabricby CNCMachine.
• Supervise the processof all productpartsfabricbyinjectorMachines.
• Supervise all assemblylines.
• Supervise all productquality.
• Productstylesandfunctionsdevelopment.
• Planandsupervise newengineerstrainingprogram.
I worked in Modern Industrials Company that was specialized in spinning and fabric in the following assignments :
• Heat load calculation for each division in the company
• Calculation and selection for all parameters (Humidity - Wet-Bulb Temperature- Density....)
For all materials, Silk -Cotton- Clothes....
• Calculation and selection for air compressors that service control systems.
• Remodeling all interior air channels.
• Calculation for remodeling heating pipes and heat aluminum radiators in old offices.
• Calculation for ventilation and insulation thickness to save materials and products from fungus and moldy and
keep it in good condition in the storage areas.
• Remodeling of water spray stations.
• Calculation and selection huge Fan blades.
• Prepare maintenance schedule for all equipments.
• Plan and supervise new technicians training program.
• Prepare Weekly report to general manager.
• Coordinate with other departments engineers.
• Supervision of all HVAC works.
• Cost Estimate for new equipments.
• Remodeling of existing equipments per any product requirement.
Design,heatloadcalculationandSupervise Heatingequipmentsforthe followingbuildings:
• Agriculture University( 5 storybuilding).
• LanguagesInstitute (3story building).
• NursesSchool(3storybuilding).
• NursesApartment(5story building).
• UniversityManagement( 9 blocks4 story).
• Water CenterinQudsia.
Design,HeatloadcalculationandSupervise Airconditioningandheatingforthisprojects:
• EducationcenterinQattana.
• EducationcenterinZabadani.
• Theaterof Damascus University.
• CustomhomesinYafour.
• Many Mosques