Shafiq CV

Muhamed Shafiq Anjum Shafi
Muhamed Shafiq Anjum ShafiIndustrial Inspection Engineer Electrical & Instrumentation @ DNV GL, UAE em DNV GL

Interested to have Change as Lead Inspection Engineer E&I / Commissioning Engineer IRCA/EIMA Certified, Lead Auditor ISO9001:2008 QMS; ISO14001:2004 EMS; BS OHSAS18001:2007 Having around 10.8 years experiences in Middle East Countries (UAE, KSA, Qatar and Pakistan) in the field of Engineering, Construction, Quality and testing expertise being a client representative as Company/TPI/PMC/PMT with well reputed clients, Gasco, Takreer, Adma-Opco, Aegean, Zadco, Al Hosn Gas, Leighton, Gupco-Enppi, KJO, Dolphin Energy, Qatar Petroleum, Qatar Gas, EDT QP Dukhan, PAPCO, OGDC, Lesco/Wapda Pak and Bechtel Arabia KSA. Experienced in various Mega projects in Oil & Gas Industry, Plant Processing Facilities, Oil & Gas Pipeline, Refineries, Water Transmission Pipeline, Infrastructure, Submarine Composite Cables Inspection, Power Transmission lines includes Sub Stations 11/0.433KV to 132KV Systems. Experience and expertise in supervision of Erection, Installation, Pre-Commissioning, Commissioning, Quality Control and Vendor Inspections of LV/MV Electrical & Instrumentation systems includes SCADA Integration, Electronic Control System (ESD/DCS/PLC/ACS/RTU), Port Special Systems, Telecom, LAN, WAN, TNMS, PAGA, CCTV, F&G, FOC and Cathodic Protection systems adept in Engineering Standard, Specification (DGS, DEL, QGPS, TOTAL) & other IEE, IEC, SABIC, QPES, BS Standards.

Curriculum Vitae
Name/Surname : Muhamed Shafiq Anjum Shafi
Date of Birth : August 28, 1981
Nationality : Pakistani
Profession : Lead Inspection Engineer E&I / Commissioning Engineer
Educational Qualification : BSc Electrical Engineering - (Reg. # 2003-zm-14) BHZU University Multan, Pak
DAE Associate Engineering (Electrical) - PBTE/DAE/24611 Lahore, Pak
S.S.C (Matriculation) - PBISE/SSC/147670 Multan, Pak
Technical Certification /
Profile Glance
Achievement(s)
: Advance Concept in “Quality Engineering” Regst.# 11011 Franklin University, USA
CQE (ASQ, Certified Regst.# 65373091 / Cert.# A7481) American Society for Quality, USA
Certified Quality Engineer - ASQ Body of Knowledge Cert.# A7481 Chicago Institute of Technology,
Abu Dhabi UAE
Certified QA/QC Engineer (ACAC Certified Reg.# ACAC803132) Accreditation Council, USA
Certified QA/QC Engineer (Ministry of KHDA, Dubai Reg.# KHDA-1998-014-963) Development Institute
for Science & Computer, Dubai
ISO 9001:2008 QMS - Internal Auditor (Cert.# OMCT 550619102/2015) Orient MCT, Abu Dhabi
ISO 9001:2008 QMS - Lead Auditor (IRCA Regst.# AO17561) IRCA Certified, UK
ISO 14001:2004 EMS - Lead Auditor (EIMA Regst.# BO1321) EIMA Certified, UK
BS OHSAS 18001:2007 - Lead Auditor (IRCA Regst.#) IRCA Certified, UK
Certification in Science & Power, Circuits (Royal Charter Certified Cert.# RC/ESCP/282173) City &
Guilds of London Institute, Pak
AUTO CAD Professional (Reg. # PS/SD/P2A.C/1329) Peak Solutions Institute, Pak
Training Courses &
Seminars Attended
(QATAR, UAE, KSA)
:  OFF SHORE-SEA SURVIVAL & HUET (Helicopter under water Escape) Training 2014 from
(ETSDC) Emirates Tech Safety Development Centre, Abu Dhabi-UAE
 HSE Safety Induction Course (ADMA-Off Shore) ZIRKU, DAS Island Abu Dhabi-UAE
 H2S/BA Awareness - VGTC Centre, Qatar
 Hazard Effect Management Process (HEMP) KSA
 Safety Training Observation Program, Petrofac Abu Dhabi-UAE
Operational & Maintenance Training Courses for
 132KV, 33KV ‘’GIS’’ Type, HV Switchgears - Schneider Electric
 6.6KV ‘’Metal Clad’’, MV Switchgears – Schneider Electric
 LV Switch Board, MCC Motor Control Centre - ABB/Siemens/Schneider Electric
 DMS, DCS, HMI, PLC (SCADA) - ABB/Honeywell/Schneider Electric
 UPS 24Vdc, 110Vdc, 48Vdc & 240Vac) - AEG/Power Solution
 DCS “HMI” Modification 800XA System - ABB/Honeywell
Driving Licenses : Holding AE-2142409 Driving License Abu Dhabi - Validity up to Dec, 2023
Holding GTSC-62223 Desert Driving License - Validity up to August, 2016 (GTSC, Abu Dhabi)
Holding CVT-20267 Defensive Driving Course - Validity up to July, 2016 (CVT, Dubai-UAE)
Computer Skills : Ms Office, Adobe Photoshop, Internet
Window Xp, Window 98, Window 2000
Summary of Experiences :
-
-
Having around 10.8 years experiences in Middle East Countries (UAE, KSA, Qatar and Pakistan) in the
field of Engineering, Construction, Quality and testing expertise being a client representative as
Company/TPI/PMC/PMT with well reputed clients, Gasco, Takreer, Adma-Opco, Aegean, Zadco, Al
Hosn Gas, Leighton, Gupco-Enppi, KJO, Dolphin Energy, Qatar Petroleum, Qatar Gas, EDT QP
Dukhan, PAPCO, OGDC, Lesco/Wapda Pak and Bechtel Arabia KSA.
Experienced in various Mega projects in Oil & Gas Industry, Plant Processing Facilities, Oil & Gas
Pipeline, Refineries, Water Transmission Pipeline, Infrastructure, Submarine Composite Cables
Inspection, Power Transmission lines includes Sub Stations 11/0.433KV to 132KV Systems.
Experience and expertise in supervision of Erection, Installation, Pre-Commissioning, Commissioning,
Quality Control and Vendor Inspections of LV/MV Electrical & Instrumentation systems includes SCADA
Integration, Electronic Control System (ESD/DCS/PLC/ACS/RTU), Port Special Systems, Telecom,
LAN, WAN, TNMS, PAGA, CCTV, F&G, FOC and Cathodic Protection systems adept in Engineering
Standard, Specification (DGS, DEL, QGPS, TOTAL) & other IEE, IEC, SABIC, QPES, BS Standards.
DNVGL/CV/FORMAT/VER-2.0-07/2015/MSA 2
Testing Expertise :
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
Proficient and well knowledge about Logic, methodology of operational, functional test for following
System/Sub Systems, (FAT, IFAT, ISAT, SAT) & PRE COMM., COMMISSIONING Activities)
Power Transformers (Up to 120MVA) IR test, Winding Resistance (HV-G, LV-G, HV-LV), Polarization
Index test, CT test, Voltage Ratio test, Vector Group test, Magnetizing Current test, BDV test for Oil,
Neutral, bushing CT, Mechanical Protection & RTCC Operation tests.
HV, MV, LV Switchboard (132kv, 33kv, 11kv, 6.6kv, 3.3kv, 0.433kv) Mechanical Operation test,
functional test of HV/LV in Service & test position, Bus Bar Hi Pot, IR, Continuity test, Contact
Resistance (µΩ) test, Primary Injection for Ammeter, Voltmeter, Incomer Logic test, Interlocking with
AQT, ATS, NCS and DCS system.
CT's & VT's test (Metering & Protection) CT test (IR/Winding Resistance/Ratio/Class/
Burden/Polarity/Excitation), VT test (Ratio/Burden/Polarity) by Current and Voltage Injection.
Protection Relays test Relay setting, configuration, testing of Electro-mechanical and Microprocessor
relays (RD148, MIM200/300, REF630/615, RET, REM, RED) with relay functions of 25, 27, 46, 49, 50,
51, 67, 81, 87 etc.
Numerical relays and protection relay system of Sepam Series (20, 40, 80), Differential protection
relays" & "MIB30" HID (High Impedance Differential Module), MRL1 Lockout relay, TCP Micro logic
relay Series 5.0A & 6.0A and "SR-745" GE TR Management relay, MR Tap Changer "TAPCON 240"
HV/LV Circuit Breakers test Breaker Analyzer test, IR test, Contact Resistance, Tripping and closing
time test of HV/LV circuit breakers.
Hi Pot test for Bus bar, Bus Duct & Cables: DC Hi Pot test of HV cables (3.3kv, 6.6kv, 11kv, 33kv)
and AC Hi Pot test, Insulation Resistance test, DC resistance measurement test, Metallic Screen DC
resistance test, Capacitance Measurement test & Contact Resistance test of MV/LV Bus bars/Bus duct.
Submarine Composite Cables 6.6/11kv Material Receiving & Witnessed test: Non Electric tests;
Overall dimension check, Conductor Screen, Inner Layer and Outer Sheath thickness and Serving
check, Water Blocking Tape check, Conductor Sheath and Anti-Corrosion Sheath check, Anti-Teredo
Protection Test (No of copper tape, copper tape thickness and overlapping check), Inner Sheath /
Bedding, Bitumen check, Armour Check and Binder Tape check, Filler, Insulated steel fillers, diameter
check over the insulation, steel rope and no of wire check.
Electrical test; Power Frequency voltage test withstand 23KV/5minuts, Insulation resistance test after
and before of HV test, Conductor DC resistance measurement test, measured the resistance corrected
to at temperature @ 20degC, Metallic Screen DC resistance test, Capacitance Measurement test
Fibber Optic Cable Test; Non Electric Test, Visual check, overall dimension check, outer Insulation
thickness check; Electrical Test; Attenuation @ 1310nm and 1550nm, OTDR (Optical time domain
reflector) test, end to end test and Splicing with fusion arc splicer.
Sub Stations Energization Stability test of Power transformers and Bus bar; Line differential,
Transformer differential protection, End to End test up stream to downstream, Energization of power
transformers, MV and LV switchboards.
Diesel Generator Sets (5.5kva up to 2500kva) On load/Off load vibration measurements, Alarm & trip
logic checks for protection, Transient response load test (0-25% to 100-0%), Noise level Measurement
(Alternator & Engine), Alarms & Shutdowns on Engine (Emergency Stop/Diagnostic, Over Speed, Low
oil pressure, High coolant temperature test), Painting DFT checks, winding Insulation resistance checks
and full load test.
UPS’s & "TPR" Invertors and Battery Charger Batteries Charging & Dis-charging test of 24VDC,
110VDC, 48VDC & 240VAC and Invertors protection test (Float charging, Low level, earth Fault,
Temperature Limit) etc.
Cathodic Protection Controller test, Pipe to Soil, potential measurement swing test, AC interference
test & line current measurement at EBB points for U/G, A/G Oil & Gas pipeline.
TELECOM/LAN/WAN/TNMS System; System PING test, system Redundancy test, system Interface
test, system Optical Signal level test (Optical TX Power & Receive Sensitivity check)
CCTV System test; Monitoring test from Operator monitor, Operator Live Viewing Test, Calling
Cameras test using digital sentry, Video Playback & Recording Test, Pan / Tilt test.
Telephone System; Answering calls test, making calls test, automatic Redialling test, Voice Clarity
check test.
PA/UHF Radio System; Transmit Power & Frequency Measurement Test, UHF Duplexer test, Radio
Voice functionality test, Interface to LAN, TNMS system, Interface to Voice Recording / Dispatcher
System, F&G system Interface test.
PDH Multiplexer, Ethernet Switches, Media Converter; DM2+ Bit Error Rate Measurement test,
Ethernet interface Unit End-To-End test, EPSA Alarm test, Configuration and Traffic verification test,
Through-Put test, LC Transceiver Transmit Power, Receiver Sensitivity test.
DNVGL/CV/FORMAT/VER-2.0-07/2015/MSA 3
WORKING EXPERIENCE / EMPLOYMENT SCAN
Period:
April 2013 to till
date
Company : DNV GL, ABU DHABI UAE
Position : Lead Inspection Engineer E&I (Industrial Services Division)
Projects : Major Projects, Oil & Gas Middle East
ADMA-OPCO:
a) +100 MBD Das Island Project (Off Shore)
b) Nasr Umm Lulu (Brown & Green Fields) Projects
c) Flares Modification Revamp Project, Das Island (Off Shore)
d) Crude Oil Loading Facilities Project
e) ZWIUP Project (Off Shore)
f) DE Mothballing Project
g) Zakum West Super Complex (GGII) Project
h) CTU Treatment Unit Modification Project
i) SARB Island Package-6 Project, EPC Work For Drills Camp and Associated Utilities
ZADCO:
a) Satah Full Field Development (STFFD) Project
b) Thammama ll-Wad Phase-1 Gas Injection Project
c) EPC of work for black Powder Filtration System Project
d) Upper Zakum 750k, Accommodation & Utilities Project
GASCO:
a) HABSHAN-5 Sulphur Granulation Plant
b) 4TH NGL Train & IGD Tank-Ages Project
DOLPHIN ENERGY:
a) Export Gas Compression Facilities Upgrade Project
b) 48’’ Taweelah to Fujairah Down Stream Gas Pipeline Project
c) Third Party Gas Interconnecting Faculties Upgrade, Qatar
d) Ras Laffan Treatment Plant Unit 131 Diesel Train, Qatar
AL HOSN GAS:
a) EPC Package SGD-11 Project
b) EPC Package SGD NP-10 Project
MALAYSIA/LEIGHTON OFF SHORE:
a) S432, South Oil Sea line Project
ENPPI/GUPCO KSA:
a) GUPCO Rehabilitation Project
KOC/KUWAIT OIL COMPANY:
a) EPC of Supply, Erection, Operation, Maintenance of Gas Turbine to Up Grade Power
Capacity At Sabia & Az Zour Power Plant Projects
b) EPC of Effluent Water Disposal System at GC-15 ,GC-25 and Injection pump at CIPF/N
QATAR PETROLEUM:
a) EPIC of 16” JET A1 Fuel Pipeline Project
b) Offshore National Security Shield, Qatar
c) QSTec Polysilicon Project Phase-1, Qatar
d) EPIC of New CIB 33/11kv PDS Halul Island Project (Off Shore)
e) EPIC of Anti surge & Turbine Controls Upgrade @ KN, KM, JDS & RG Project
f) EPIC of Integrated Chiller, Freezer, Laundry, Dining & Accommodation Facilities In Halul
g) EPIC of Online Condition Monitoring System for Rotating Equipment Dukhan fields, Qatar
h) EPIC for Gas Supply to Ras Abu Fontas (RAF) Power Station-W2, Qatar
i) EPIC for Forward Mounted Base (FMB, NSS) Qatar
j) Doha South Sewage Treatment Works 40 MID Expansion
DNVGL/CV/FORMAT/VER-2.0-07/2015/MSA 4
Job Responsibilities :  Review and develop QA/QC Procedures and Quality Inspection Plan for all E&I work activities
includes Vendor inspections, material visual Inspection, FAT, IFAT, Calibration checks, Packing,
Marking, Issuance of inspection report and shipping released etc.
 Do witnessing test of HV, LV, MV and Fiber Optic Cables, MV, LV Switchgears, DBs, JBs, Fire
Alarm Control Panels, Pressure Gauges and Transmitters Instruments including materials as per
approved ITP, FAT, IFAT procedure and QP Plans.
 Do witnessing the loop sale, Interlocks functional test and ensure that all requirements in specified
procedure and narratives are being established.
 Designing and developing new control systems and maintaining and modifying existing systems to
ensure that these systems and processes operate effectively and safely carry out site acceptance
testing and the commissioning.
 Review ITPs to verify that Execution Contractor is performing all required inspections and
witnessing hold points, review Company Inspectors deliverables, analysis, resolve issues and
problems emerging during the Quality control activity and ensure that all inspections and tests
witnessed by Company Inspectors are recorded and documented.
o FAT of “500KVA-120MVA” Power Transformers at Siemens/Brush/Emirates Transformer
o FAT of MV/LV Switchgears at ABB/Siemens/Schneider-Electric
o FAT of 415V LV Switchboards at ABB/Siemens/Eaton/Al-Dafir/Masseera
o FAT of HVAC Control panels at Prisma/Honeywell/York
o FAT of Variable Speed Drive System at Emerson/Siemens/Schneider Electric
o FAT of HG7-Passive Harmonic Filter System at L&T Automation FZE
o FAT of Drive-Applied Passive Harmonic Filter system at Proserv
o FAT of PFC (Power Factor Capacitor) and Active Harmonic Filter System at Eaton/Proserv
o FAT of MV, LV, Control & Instrument cables at MESC Rak/Ducab, Dubai/Musaffah
o IFAT of Control Systems (PLC/DCS/SCADA) at ABB/Yokogawa/Honeywell/Silvertech
o IFAT of DCS “HMI” Modification 800XA system at ABB/Silvertech/Honeywell
o IFAT of “PEMS” Predictive Emission Monitoring system at Yokogawa/Honeywell
o FAT of FACP, HSSD, VESDA F&G System and Detectors at TYCO/NAFCO/Zeener ZLC
o FAT of CCTV & Security Control System at TYCO/Honeywell/3W Network
o IFAT of LAN, WAN, PAGA, ACS, PA/UHF Radio and Telecom systems at ABB/3W Network
o FAT of Diesel Generator (Rated up to 2800kva) at Caterpillar-Al Bahar/FG Wilson/Perkins
o Cathodic Protection System Inspection at AEGIS/Bss-tech
o Inspection of Ex’e/Ex’d Explosion Proof JB & PJB at Weidmuller/Walsall/Cooper/Bartech
o FAT for Inergin System, Chemical Injection skid, Electro-Chlorination Skids, Condensate & NGL
Shipping Metering Skid Packages at Proserv/Tyco/MISWACO/FMC
o Safety Relief Valves, Hydrolytic/Pneumatic actuators visual, function test & Bench Calibration test
at Proserv/Emerson/Adyard/NPCC
o Accommodation module, Electrical Rooms (KAAOT & ABOT for S432-Sealine Project South Oil
Company, Leighton Offshore) and Electrical System Containers Installation as per Zone-II
Classification for Accommodation & Utilities, Zirku Island Pressurization, Electrical, F&G system,
HVAC systems installation and start up test at Specialist Services/WBG/AL JABER
o Performed and witnessed the Powering up test for Accommodation Module Start-up test, Purging
the Accommodation Module, CPFG Start-up test, Powering up the Cabin utilities and Main
Distribution Board system, Powering up of HVAC system, Fire & Gas Detection System.
o FAT of Wellhead Control Panel, Local Gauge Control Panel & Emergency Shutdown System with
combination of standard Pneumatic and Hydraulic/PLC based logic in a single integrated solution
such as Single/Multiple WHCP controls for both onshore and offshore applications at
Proserv/Versatech.
o FAT of Modular Multi-Wellhead control system, PLC Based Wellhead control system, as
Instrumented Protective System (IPS) for Wellhead valves Open/Close sequence, Control,
Operation and shutdown safety requirements & to meet high degree of Reliability, functionality
Integrity of the system at Proserv/Silvertech/Versatech.
o FAT for Contacting/Retractable, pH Sensor/Total Chlorine Sensor and Analyzer system, ABB
Analyzer Houses/Shelters, Solar System, CPIC at AIMS/Emerson/Versatech.
Period:
May 2011 to
Feb 13
Company : MOODY INTERTEK, ABU DHABI UAE
Position : Electrical TPI/GASCO “PMT”
Project :
a). 4th NGL Train & IGD Tankages Project
b). SWI-3, Seawater Intake-3 Project
DNVGL/CV/FORMAT/VER-2.0-07/2015/MSA 5
Job Responsibilities :  Site job execution, Interacting with vendors, Coordination with inspectors, attending walk downs for
RFC, RFSU, Issuance, clearing punch points, pre mechanical completion of systems and witness
the HV, MV, LV Power distribution systems pre-comm., commissioning and start up activities.
 Review construction drawings IFC, AFC, P&ID diagrams, hook-up, Interconnection diagram,
typical installation details, loop, logic diagram, Cause & effect and participate in the demonstration
handover and acceptance of the system with operations group.
 Responsible for installation inspections of equipment, Power Transformers (up to 20MVA) and MV,
LV Switchgears, SB & MCC control panels, HVAC (MCC) Unit, DCS System, RTU System, NCS
System cabinet, Junction Boxes, Marshalling boxes, Motors & Compressors, UPS’s & "TPR"
Battery chargers, Lighting & Small power system, Earthing, Heat Tracing & Lightning system.
 Installation inspection and functional test for Diesel Generator sets (7.5kva up to 10kva).
 Installation, Inspection and functionality test for Modular Multi-Wellhead control system / PLC
Based Wellhead control system, as Instrumented Protective System (IPS) for Wellhead valves
OPEN/CLOSE sequence, Control, Operation and shutdown safety requirements.
 Installation, Inspection and Surveillance for all metallic equipment’s & Structures in seawater “stop
logs, Raking bar screens, travelling band screens, Pump body” and ensure that are protected by
impressed current Cathodic Protection system.
 Installation, Inspection and testing for electrode and ensure that each part of the zone shall be
monitored by reference electrode and shall be positioned such that all the surfaces are covered
within each structure and Test for MMO (Mixed Metal Oxide, Platinum) probe type anodes, ensure
the continuity with connector bars.
Period:
Aug 2010 to
May 2011
Company : VELOSI LLC, ABU DHABI UAE
Position : Sr. QC Inspector E&I - TPI/Dolphin Energy
Project : a). 48’’x243km, Taweelah to Fujairah down Stream Gas Pipeline
Job Responsibilities :  Ensured that all activities assigned compliance with DEL project Spec's and during inspections
follows the IFC, AFC, P&ID, hook-up, typical installation details, logic diagram, Cause & effect
diagrams and QC procedures, Inspection plans and carried out as per planned schedule to
achieve on target dates.
 Responsible to review contractor submittals ITP, QCP, QCF, MST, related QC documents and
make ensure that all Inspections being carried out as per approved documents.
 Responsible for installation inspections, testing of LV Switchgear, 415V motor control center, RMU
units, power transformers, distribution boards, Solar system, power, control, Instrumentation cables
laying, glanding, termination, HVAC & Earthing system, Lightning protection system.
 Involved in swing potential test and Natural potential survey for underground gas pipeline.
 Supervised, witnessed CIP & DCVG (DC voltage gradient) Survey for 48’' U/G gas pipeline.
 Installation of MMO Piggy back anode, Mg Anode, Big Fink, CMTP, CTP, PCR, AJB, NJB, STP,
CPTR, EBB, Zinc ribbon anode, Surge Diverters, Pin Brazing welding.
 Material Receiving & Witnessed test for Submarine Composite Cables 6.6/11kv, Overall dimension
check, Conductor Screen, Inner Layer and Outer Sheath thickness and Serving check, Water
Blocking Tape check, Conductor Sheath and Anti-Corrosion Sheath check, Anti-Teredo Protection
Test (No of copper tape, copper tape thickness and overlapping check), Inner Sheath / Bedding,
Bitumen check, Armour Check and Binder Tape check, Filler, Insulated steel fillers, diameter check
over the insulation, steel rope and no of wire check.
 Performed and witnessed Power Frequency voltage test withstand 23KV/5minuts, Insulation
resistance test after and before of HV test, Conductor DC resistance measurement test, measured
the resistance corrected to at temperature @ 20degC, Metallic Screen DC resistance test,
Capacitance Measurement test
 Fibber Optic Cable Test; Non Electric Test, Visual check, overall dimension check, outer Insulation
thickness check.
 Witnessed attenuation test 1310nm and 1550nm, OTDR (Optical time domain reflector) test, end
to end test and Splicing with fusion arc splicer.
Period:
July 2008 to
Company : TEKFEN CONSTRUCTION Co. QATAR
Position : QA/QC Engineer E&I
DNVGL/CV/FORMAT/VER-2.0-07/2015/MSA 6
Aug 2010 Projects : a). GTC06/190/ED
20’’x81km, A/G Crude Oil pipeline Umm-bab to Um-Messaieed tank farm
b). GTC05/124/ED
24’’/20”x120km, U/G Ras Laffan to Messaieed Gas transmission line
c). GTC05/124/ED VTC#2
6’’x32km, U/G LPG Messaieed Refinery to Doha bottling Plant
Job Responsibilities :  Responsible to conduct Installation inspections, surveillance, testing, mechanical completion on
following systems, power transformers (Up to 12.5/10 MVA), 33/11kv GIS (GM6), 6.6kv (Metal
Clad) Switchgears, SB, MCC control panels, JB, marshalling boxes, RCU, UCP, Motors, Diesel
Generator (Rated 10KVA), Nitrogen Generators (5.5kva), RTU system, Heat tracing system,
Ethane Gas compressors including lube Oil & Fin Fan coolers system, FOC & telecom system,
UPS’s & "TPR" Battery chargers, lighting, Earthing & Lightning.
 Control Valve, GLV, BFV, BD, MOV, ESD Valves and Magnetic Flow, Ultrasonic & Orifice Flow
meters, FT, PT, Transmitters, Gauge Control panel as well as other measuring Instruments.
 Responsible for Inspections field work according with ITP, generating punch lists, making final
inspection reports for various E & I works, loop folder preparation.
 Executes the specific, critical inspections on materials, equipment, construction, installation
activities on site, Inspection of Incoming materials, vendor package receiving
 Review of vender documents, test procedure, IRC certificates, operating manuals, design book,
engineering data book in accordance with the project design basis and specification.
Period:
Oct 2007 to
July 2008
Company : SAUDI BIN LADIN - PIC DIVISION, KSA
Position : QC Inspector Electrical
Project : a). PPLC; Product Pipe Line Corridor Phase-I
Job Responsibilities :  Contract job order review, preparation of Job quality plan and preparation of project specific
procedures, work instructions, QC procedures and method of statement, check lists, calibration
sheets and QC plans as required.
 Participated in creation, Implementation of project quality plans, procedures, work Instructions,
quality records, punch lists and compilation of test packs.
 Verified compliance of performance output, identification of non-conformances for corrective action
and issue of NCRs whenever required.
 Responsible for Inspections field work according with ITP, generating punch lists, making final
inspection reports for various E&I works, loop folder preparation.
 Equipment testing for LV & HV switchboards like CT, PT, MV drop, bus ducts and electro
mechanical relays, breakers, feeder differential and simulation tests.
 Installation & testing of F&G system including detectors GDT's, FDI's, HD, SD, HSSD, FACP,
Inergen and MCL alarming system according to cause & effect matrix.
 Worked on Communication systems (CCTV, PAGA, Data, Voice), Analyzers, Compressor Skids,
Pump Motor Controls, Machine Control Monitoring System (MCMS), Monitoring System (CEMS),
Catalyst & Spent Caustic treatment skids.
 Possesses sound command on Pneumatic & Electronic Instruments, Differential Pressure, Level,
Temperature, Flow Transmitters, Control Valves, Pressure, Temperature, Flow & Level Switches,
Turbine, Magnetic & Vortex flow meter.
Period:
Feb 2001 to
July 2003
Company : LESCO/WAPDA - (GSC) Division, PAK
Position : Line Superintendent Const. Grade-I
Project : a) 132/33/11kv Sub Stations, HT/LT Transmission lines & Electricity
DNVGL/CV/FORMAT/VER-2.0-07/2015/MSA 7
Job Responsibilities :  Responsible for end to end line feeder planning and execution, Erection of HT/LT 132kv, 33kv and
11kv transmission lines and distribution system works.
 Handling the project estimation, monitoring, execution of overhead, underground transmission
HT/LT line as per Project requirement.
 Marking the substation layout and foundation marking of Substation equipment’s like GA, LA,
Isolator, CVT, CT, breakers, post insulators, power transformer, and tower gantries, light mask,
cable trench, ear thing, lighting system etc.
 Responsible and supervision for laying, termination of HV, MV, LV and control cables from SWGR,
Control Panels end to field equipment’s like Power Transformers, Current Transformers (CT’s),
Voltage Transformers (VT’s), Motor Operated Isolators, Capacitor Bank, Capacitor bank Reactors,
Capacitor voltage Transformer and MCCB Breakers.
 Supervised Erection & Start up, Control Auxiliaries for Heavy-duty Gas Turbine Generators (Rated
1.1 to 22.4MW), 13.8/11kv Vacuum, 33kv GIS, 6.6kv Metal Clad switchgear, 415V LV MCC’s,
PCC’s and power transformers.
 Responsible for replacing the old ASEA distance relays with new numerical line differential &
distance relays.

Recomendados

Electrical Engineer Resume por
Electrical Engineer ResumeElectrical Engineer Resume
Electrical Engineer ResumeAbdul Rahiman
3.3K visualizações8 slides
CV Electrical QA QC Engineer por
CV Electrical QA QC EngineerCV Electrical QA QC Engineer
CV Electrical QA QC EngineerKashif ali muhammad
35.4K visualizações6 slides
ELECTRICAL FOREMAN CV 10042016 por
ELECTRICAL FOREMAN CV 10042016ELECTRICAL FOREMAN CV 10042016
ELECTRICAL FOREMAN CV 10042016RUKNUDDIN ALI
7.2K visualizações2 slides
Instrument Supervisor CV por
Instrument Supervisor CVInstrument Supervisor CV
Instrument Supervisor CVAthmanathan SwamiPrahadeeswaran
9.5K visualizações4 slides
JEYARAJ CV QA-QC Inspector(E &I) por
JEYARAJ CV QA-QC Inspector(E &I)JEYARAJ CV QA-QC Inspector(E &I)
JEYARAJ CV QA-QC Inspector(E &I)jeyaraj selvaraj
9.5K visualizações5 slides
Resume electrical engineer- for oil & gas por
Resume  electrical engineer- for oil & gasResume  electrical engineer- for oil & gas
Resume electrical engineer- for oil & gasvineeth ravi
3.4K visualizações4 slides

Mais conteúdo relacionado

Mais procurados

Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar) por
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)MOHAMMED ASLAM SHAREEF
3.7K visualizações4 slides
ELECTRICAL SUPERVISOR CURRICULUM VITAE por
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAEsekar palani
8.5K visualizações7 slides
Mechanical Maintenance Supervisor CV por
Mechanical  Maintenance  Supervisor CVMechanical  Maintenance  Supervisor CV
Mechanical Maintenance Supervisor CVvaithiya nathan
20.7K visualizações10 slides
Instrument Technician CV por
Instrument Technician CVInstrument Technician CV
Instrument Technician CVManoj Kumar Yadav
3.1K visualizações3 slides
CV Electrical Engineer - Emad Ahmed Mohamed Sabek por
CV Electrical Engineer - Emad  Ahmed Mohamed SabekCV Electrical Engineer - Emad  Ahmed Mohamed Sabek
CV Electrical Engineer - Emad Ahmed Mohamed SabekEmad Ahmed Mohamed Sabek
1.2K visualizações4 slides
Electrical Engineer cv.PDF por
Electrical Engineer cv.PDFElectrical Engineer cv.PDF
Electrical Engineer cv.PDFMuhammad Zuhad Siddiqui
18.8K visualizações7 slides

Mais procurados(20)

Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar) por MOHAMMED ASLAM SHAREEF
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
Mechanical Engineer 4 years Experience (2yrs Gulf Exp KSA&Qatar)
MOHAMMED ASLAM SHAREEF3.7K visualizações
ELECTRICAL SUPERVISOR CURRICULUM VITAE por sekar palani
ELECTRICAL SUPERVISOR CURRICULUM VITAEELECTRICAL SUPERVISOR CURRICULUM VITAE
ELECTRICAL SUPERVISOR CURRICULUM VITAE
sekar palani8.5K visualizações
Mechanical Maintenance Supervisor CV por vaithiya nathan
Mechanical  Maintenance  Supervisor CVMechanical  Maintenance  Supervisor CV
Mechanical Maintenance Supervisor CV
vaithiya nathan20.7K visualizações
Instrument Technician CV por Manoj Kumar Yadav
Instrument Technician CVInstrument Technician CV
Instrument Technician CV
Manoj Kumar Yadav3.1K visualizações
CV Electrical Engineer - Emad Ahmed Mohamed Sabek por Emad Ahmed Mohamed Sabek
CV Electrical Engineer - Emad  Ahmed Mohamed SabekCV Electrical Engineer - Emad  Ahmed Mohamed Sabek
CV Electrical Engineer - Emad Ahmed Mohamed Sabek
Emad Ahmed Mohamed Sabek1.2K visualizações
SUDHEESH CV . por sudheesh karuvath
SUDHEESH CV .SUDHEESH CV .
SUDHEESH CV .
sudheesh karuvath702 visualizações
Senior Electrical Engineer resume Jan 2016 por Khadar Ali Shaik, P.Eng
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016
Khadar Ali Shaik, P.Eng1.8K visualizações
Cv electrical por Pareshkumar Patel
Cv electricalCv electrical
Cv electrical
Pareshkumar Patel15.4K visualizações
Instrument Technician for Maintenance new por Noel Roque
Instrument Technician  for Maintenance newInstrument Technician  for Maintenance new
Instrument Technician for Maintenance new
Noel Roque14.2K visualizações
CV instrument (E&I) Engineer2 por Meer Azhar Ali Patel
CV instrument (E&I) Engineer2CV instrument (E&I) Engineer2
CV instrument (E&I) Engineer2
Meer Azhar Ali Patel15K visualizações
Sr. Electrical & Instrument QA/QC Engineer CV por Sanad Samir
Sr. Electrical & Instrument QA/QC Engineer CVSr. Electrical & Instrument QA/QC Engineer CV
Sr. Electrical & Instrument QA/QC Engineer CV
Sanad Samir4.4K visualizações
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) por Mudassir Nazar Dabilkar
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit) MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
MEP Machanical Engineer (Design, Estimation, Execution, Cad-Revit)
Mudassir Nazar Dabilkar1.2K visualizações
QC INSPECTOR E&I por NASIM NEZAM
QC INSPECTOR E&IQC INSPECTOR E&I
QC INSPECTOR E&I
NASIM NEZAM1.2K visualizações
CV_Electrical and Instrumentation Engineer por Deva Narayanan
CV_Electrical and Instrumentation EngineerCV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation Engineer
Deva Narayanan938 visualizações
Electrical Engineer-Abid1 por abidullah ullah
Electrical Engineer-Abid1Electrical Engineer-Abid1
Electrical Engineer-Abid1
abidullah ullah899 visualizações
MOHAN M&E SUPERVISOR CV por Mohan Soundararaj
MOHAN M&E SUPERVISOR CVMOHAN M&E SUPERVISOR CV
MOHAN M&E SUPERVISOR CV
Mohan Soundararaj4.5K visualizações
Khalid -cv_electrical_engineer (2) por Khalid Eltahir
Khalid  -cv_electrical_engineer (2)Khalid  -cv_electrical_engineer (2)
Khalid -cv_electrical_engineer (2)
Khalid Eltahir826 visualizações
Electrical Inspector CV por Abdul Hakkim
Electrical Inspector CVElectrical Inspector CV
Electrical Inspector CV
Abdul Hakkim4.5K visualizações

Destaque

Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san... por
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Sangilimuthu Samiayyah
24.6K visualizações10 slides
Resume Shinemon por
Resume ShinemonResume Shinemon
Resume ShinemonShinemon Vettuvanchery
1.1K visualizações2 slides
Updated cv por
Updated cvUpdated cv
Updated cvShaju Chittilappilly( Awaiting New Contract)
615 visualizações6 slides
Inspection engineer ali zeineldein por
Inspection engineer   ali zeineldeinInspection engineer   ali zeineldein
Inspection engineer ali zeineldeinAli Zeineldein
181 visualizações4 slides
Resume Sandeep Patel 04092015 por
Resume  Sandeep Patel 04092015Resume  Sandeep Patel 04092015
Resume Sandeep Patel 04092015Sandeep Patel
2.8K visualizações6 slides
NEW CV. SANKET APTE (1) por
NEW CV. SANKET APTE (1)NEW CV. SANKET APTE (1)
NEW CV. SANKET APTE (1)Sanket Apte
1.6K visualizações5 slides

Destaque(20)

Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san... por Sangilimuthu Samiayyah
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Sangilimuthu Samiayyah24.6K visualizações
Inspection engineer ali zeineldein por Ali Zeineldein
Inspection engineer   ali zeineldeinInspection engineer   ali zeineldein
Inspection engineer ali zeineldein
Ali Zeineldein181 visualizações
Resume Sandeep Patel 04092015 por Sandeep Patel
Resume  Sandeep Patel 04092015Resume  Sandeep Patel 04092015
Resume Sandeep Patel 04092015
Sandeep Patel2.8K visualizações
NEW CV. SANKET APTE (1) por Sanket Apte
NEW CV. SANKET APTE (1)NEW CV. SANKET APTE (1)
NEW CV. SANKET APTE (1)
Sanket Apte1.6K visualizações
B gas painting-multiple-choice-2 por Abdul Sayeed Mohammed
B gas painting-multiple-choice-2B gas painting-multiple-choice-2
B gas painting-multiple-choice-2
Abdul Sayeed Mohammed25.8K visualizações
PetroSync - API 579 Fitness for Service por PetroSync
PetroSync - API 579 Fitness for ServicePetroSync - API 579 Fitness for Service
PetroSync - API 579 Fitness for Service
PetroSync811 visualizações
Aramco Certificate Experience por Elias Omer Adam
Aramco Certificate ExperienceAramco Certificate Experience
Aramco Certificate Experience
Elias Omer Adam332 visualizações
ARAVINTH(CV Aramco Approved) por Aravinth Jai
ARAVINTH(CV Aramco Approved)ARAVINTH(CV Aramco Approved)
ARAVINTH(CV Aramco Approved)
Aravinth Jai810 visualizações
saudi aramco (1) por tamazhar Hussein
saudi aramco (1)saudi aramco (1)
saudi aramco (1)
tamazhar Hussein381 visualizações
Complet cv of engineer habibi revet1 - por khanwali habibi
Complet  cv of engineer habibi revet1 -Complet  cv of engineer habibi revet1 -
Complet cv of engineer habibi revet1 -
khanwali habibi417 visualizações
Saudi Aramco Heatmap por Aaron Marion
Saudi Aramco HeatmapSaudi Aramco Heatmap
Saudi Aramco Heatmap
Aaron Marion387 visualizações
Louis Johannes du Plessis CV Electrical Engineer por Louis du Plessis
Louis Johannes du Plessis CV Electrical EngineerLouis Johannes du Plessis CV Electrical Engineer
Louis Johannes du Plessis CV Electrical Engineer
Louis du Plessis275 visualizações
New base 815 special 24 march 2016 por Khaled Al Awadi
New base 815 special 24 march 2016New base 815 special 24 march 2016
New base 815 special 24 march 2016
Khaled Al Awadi298 visualizações
Vigil Sitesafe Aramco Sch B system Compliance Document por Nabeel Khan
Vigil Sitesafe Aramco Sch B system Compliance DocumentVigil Sitesafe Aramco Sch B system Compliance Document
Vigil Sitesafe Aramco Sch B system Compliance Document
Nabeel Khan1.1K visualizações
A. zouaghi drilling fluids & waste management engineer cv por Abderrazak Zouaghi
A. zouaghi drilling fluids & waste management engineer cvA. zouaghi drilling fluids & waste management engineer cv
A. zouaghi drilling fluids & waste management engineer cv
Abderrazak Zouaghi2.2K visualizações
Aramco Question por Sagar Avasarkar
Aramco Question Aramco Question
Aramco Question
Sagar Avasarkar259 visualizações
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071 por Nithy Anantham
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
INSTRUMENTATION ENGINNER - QC INSPECTOR ARAMCO SAP 70013071
Nithy Anantham1K visualizações
Aramco Exp. por Abdullah M
Aramco Exp.Aramco Exp.
Aramco Exp.
Abdullah M351 visualizações

Similar a Shafiq CV

Cv shafiq por
Cv shafiqCv shafiq
Cv shafiqMuhammad Shafiq Anjum
1K visualizações8 slides
New cv jithesh por
New cv jitheshNew cv jithesh
New cv jitheshJithesh Keezhedath
286 visualizações5 slides
ANBARASAN R CV por
ANBARASAN R CV ANBARASAN R CV
ANBARASAN R CV Anbarasan Rajadurai
532 visualizações5 slides
Engineer Mr. AR.Mohamed Iqbal Resume por
Engineer Mr. AR.Mohamed Iqbal ResumeEngineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal ResumeIqbal Mohamed
223 visualizações6 slides
sivachandran resume por
sivachandran resumesivachandran resume
sivachandran resumesiva karnan
400 visualizações10 slides
CURRICULUM VITAE UPDATED 07.01.17 por
CURRICULUM VITAE UPDATED 07.01.17 CURRICULUM VITAE UPDATED 07.01.17
CURRICULUM VITAE UPDATED 07.01.17 Ahmed Jaffar
555 visualizações5 slides

Similar a Shafiq CV(20)

Engineer Mr. AR.Mohamed Iqbal Resume por Iqbal Mohamed
Engineer Mr. AR.Mohamed Iqbal ResumeEngineer Mr. AR.Mohamed Iqbal Resume
Engineer Mr. AR.Mohamed Iqbal Resume
Iqbal Mohamed223 visualizações
sivachandran resume por siva karnan
sivachandran resumesivachandran resume
sivachandran resume
siva karnan400 visualizações
CURRICULUM VITAE UPDATED 07.01.17 por Ahmed Jaffar
CURRICULUM VITAE UPDATED 07.01.17 CURRICULUM VITAE UPDATED 07.01.17
CURRICULUM VITAE UPDATED 07.01.17
Ahmed Jaffar555 visualizações
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |... por Sanil Balakrishnan
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Sanil Balakrishnan168 visualizações
Asish CV (electrical engineer testing and commissioning and maintenance 9 years) por asish jana
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
asish jana15.5K visualizações
Kumar RESUME por Kumar murugesan
Kumar RESUMEKumar RESUME
Kumar RESUME
Kumar murugesan1.5K visualizações
QA/QC ENGINEER por T.N. Sathish
QA/QC ENGINEERQA/QC ENGINEER
QA/QC ENGINEER
T.N. Sathish266 visualizações
Testing & Commissioning Engineer por KumaresanT7
Testing & Commissioning EngineerTesting & Commissioning Engineer
Testing & Commissioning Engineer
KumaresanT7832 visualizações
Tamil E&I Compex inspector por Kandhasamisenthamizh
Tamil E&I Compex  inspectorTamil E&I Compex  inspector
Tamil E&I Compex inspector
Kandhasamisenthamizh167 visualizações
Byjul rahman cv (updated) por BYJUL RAHMAN
Byjul rahman   cv (updated)Byjul rahman   cv (updated)
Byjul rahman cv (updated)
BYJUL RAHMAN241 visualizações
Resume por Rakesh Rosan
ResumeResume
Resume
Rakesh Rosan196 visualizações
NAVNATH UPDATED CV por NAVNATH BHALERAO
NAVNATH UPDATED CVNAVNATH UPDATED CV
NAVNATH UPDATED CV
NAVNATH BHALERAO187 visualizações
resume krishna electrical engineer por KRISHNAMOORTHY A
resume krishna electrical engineerresume krishna electrical engineer
resume krishna electrical engineer
KRISHNAMOORTHY A1.5K visualizações
pradip updated c v por Pradipsinh Gohil
pradip updated c vpradip updated c v
pradip updated c v
Pradipsinh Gohil128 visualizações
QAQC E&I por Ataur Rahaman_Qc
QAQC E&IQAQC E&I
QAQC E&I
Ataur Rahaman_Qc1.4K visualizações
Shah faisal shah cv por Shah Faisal Shah
Shah faisal shah cvShah faisal shah cv
Shah faisal shah cv
Shah Faisal Shah545 visualizações

Último

Informed search algorithms.pptx por
Informed search algorithms.pptxInformed search algorithms.pptx
Informed search algorithms.pptxDr.Shweta
12 visualizações19 slides
Plumbing por
PlumbingPlumbing
PlumbingIwiss Tools Co.,Ltd
14 visualizações14 slides
SEMI CONDUCTORS por
SEMI CONDUCTORSSEMI CONDUCTORS
SEMI CONDUCTORSpavaniaalla2005
19 visualizações8 slides
13_DVD_Latch-up_prevention.pdf por
13_DVD_Latch-up_prevention.pdf13_DVD_Latch-up_prevention.pdf
13_DVD_Latch-up_prevention.pdfUsha Mehta
9 visualizações16 slides
SNMPx por
SNMPxSNMPx
SNMPxAmatullahbutt
12 visualizações12 slides
Solar PV por
Solar PVSolar PV
Solar PVIwiss Tools Co.,Ltd
12 visualizações4 slides

Último(20)

Informed search algorithms.pptx por Dr.Shweta
Informed search algorithms.pptxInformed search algorithms.pptx
Informed search algorithms.pptx
Dr.Shweta12 visualizações
SEMI CONDUCTORS por pavaniaalla2005
SEMI CONDUCTORSSEMI CONDUCTORS
SEMI CONDUCTORS
pavaniaalla200519 visualizações
13_DVD_Latch-up_prevention.pdf por Usha Mehta
13_DVD_Latch-up_prevention.pdf13_DVD_Latch-up_prevention.pdf
13_DVD_Latch-up_prevention.pdf
Usha Mehta9 visualizações
SNMPx por Amatullahbutt
SNMPxSNMPx
SNMPx
Amatullahbutt12 visualizações
DevOps to DevSecOps: Enhancing Software Security Throughout The Development L... por Anowar Hossain
DevOps to DevSecOps: Enhancing Software Security Throughout The Development L...DevOps to DevSecOps: Enhancing Software Security Throughout The Development L...
DevOps to DevSecOps: Enhancing Software Security Throughout The Development L...
Anowar Hossain10 visualizações
Extensions of Time - Contract Management por brainquisitive
Extensions of Time - Contract ManagementExtensions of Time - Contract Management
Extensions of Time - Contract Management
brainquisitive15 visualizações
Electronic Devices - Integrated Circuit.pdf por booksarpita
Electronic Devices - Integrated Circuit.pdfElectronic Devices - Integrated Circuit.pdf
Electronic Devices - Integrated Circuit.pdf
booksarpita11 visualizações
cloud computing-virtualization.pptx por RajaulKarim20
cloud computing-virtualization.pptxcloud computing-virtualization.pptx
cloud computing-virtualization.pptx
RajaulKarim2082 visualizações
Machine Element II Course outline.pdf por odatadese1
Machine Element II Course outline.pdfMachine Element II Course outline.pdf
Machine Element II Course outline.pdf
odatadese16 visualizações
Performance of Back-to-Back Mechanically Stabilized Earth Walls Supporting th... por ahmedmesaiaoun
Performance of Back-to-Back Mechanically Stabilized Earth Walls Supporting th...Performance of Back-to-Back Mechanically Stabilized Earth Walls Supporting th...
Performance of Back-to-Back Mechanically Stabilized Earth Walls Supporting th...
ahmedmesaiaoun12 visualizações
9_DVD_Dynamic_logic_circuits.pdf por Usha Mehta
9_DVD_Dynamic_logic_circuits.pdf9_DVD_Dynamic_logic_circuits.pdf
9_DVD_Dynamic_logic_circuits.pdf
Usha Mehta21 visualizações
An approach of ontology and knowledge base for railway maintenance por IJECEIAES
An approach of ontology and knowledge base for railway maintenanceAn approach of ontology and knowledge base for railway maintenance
An approach of ontology and knowledge base for railway maintenance
IJECEIAES12 visualizações
SWM L1-L14_drhasan (Part 1).pdf por MahmudHasan747870
SWM L1-L14_drhasan (Part 1).pdfSWM L1-L14_drhasan (Part 1).pdf
SWM L1-L14_drhasan (Part 1).pdf
MahmudHasan74787048 visualizações
Digital Watermarking Of Audio Signals.pptx por AyushJaiswal781174
Digital Watermarking Of Audio Signals.pptxDigital Watermarking Of Audio Signals.pptx
Digital Watermarking Of Audio Signals.pptx
AyushJaiswal7811748 visualizações
A multi-microcontroller-based hardware for deploying Tiny machine learning mo... por IJECEIAES
A multi-microcontroller-based hardware for deploying Tiny machine learning mo...A multi-microcontroller-based hardware for deploying Tiny machine learning mo...
A multi-microcontroller-based hardware for deploying Tiny machine learning mo...
IJECEIAES10 visualizações
MSA Website Slideshow (16).pdf por msaucla
MSA Website Slideshow (16).pdfMSA Website Slideshow (16).pdf
MSA Website Slideshow (16).pdf
msaucla39 visualizações
performance uploading.pptx por SanthiS10
performance uploading.pptxperformance uploading.pptx
performance uploading.pptx
SanthiS107 visualizações

Shafiq CV

  • 1. Curriculum Vitae Name/Surname : Muhamed Shafiq Anjum Shafi Date of Birth : August 28, 1981 Nationality : Pakistani Profession : Lead Inspection Engineer E&I / Commissioning Engineer Educational Qualification : BSc Electrical Engineering - (Reg. # 2003-zm-14) BHZU University Multan, Pak DAE Associate Engineering (Electrical) - PBTE/DAE/24611 Lahore, Pak S.S.C (Matriculation) - PBISE/SSC/147670 Multan, Pak Technical Certification / Profile Glance Achievement(s) : Advance Concept in “Quality Engineering” Regst.# 11011 Franklin University, USA CQE (ASQ, Certified Regst.# 65373091 / Cert.# A7481) American Society for Quality, USA Certified Quality Engineer - ASQ Body of Knowledge Cert.# A7481 Chicago Institute of Technology, Abu Dhabi UAE Certified QA/QC Engineer (ACAC Certified Reg.# ACAC803132) Accreditation Council, USA Certified QA/QC Engineer (Ministry of KHDA, Dubai Reg.# KHDA-1998-014-963) Development Institute for Science & Computer, Dubai ISO 9001:2008 QMS - Internal Auditor (Cert.# OMCT 550619102/2015) Orient MCT, Abu Dhabi ISO 9001:2008 QMS - Lead Auditor (IRCA Regst.# AO17561) IRCA Certified, UK ISO 14001:2004 EMS - Lead Auditor (EIMA Regst.# BO1321) EIMA Certified, UK BS OHSAS 18001:2007 - Lead Auditor (IRCA Regst.#) IRCA Certified, UK Certification in Science & Power, Circuits (Royal Charter Certified Cert.# RC/ESCP/282173) City & Guilds of London Institute, Pak AUTO CAD Professional (Reg. # PS/SD/P2A.C/1329) Peak Solutions Institute, Pak Training Courses & Seminars Attended (QATAR, UAE, KSA) :  OFF SHORE-SEA SURVIVAL & HUET (Helicopter under water Escape) Training 2014 from (ETSDC) Emirates Tech Safety Development Centre, Abu Dhabi-UAE  HSE Safety Induction Course (ADMA-Off Shore) ZIRKU, DAS Island Abu Dhabi-UAE  H2S/BA Awareness - VGTC Centre, Qatar  Hazard Effect Management Process (HEMP) KSA  Safety Training Observation Program, Petrofac Abu Dhabi-UAE Operational & Maintenance Training Courses for  132KV, 33KV ‘’GIS’’ Type, HV Switchgears - Schneider Electric  6.6KV ‘’Metal Clad’’, MV Switchgears – Schneider Electric  LV Switch Board, MCC Motor Control Centre - ABB/Siemens/Schneider Electric  DMS, DCS, HMI, PLC (SCADA) - ABB/Honeywell/Schneider Electric  UPS 24Vdc, 110Vdc, 48Vdc & 240Vac) - AEG/Power Solution  DCS “HMI” Modification 800XA System - ABB/Honeywell Driving Licenses : Holding AE-2142409 Driving License Abu Dhabi - Validity up to Dec, 2023 Holding GTSC-62223 Desert Driving License - Validity up to August, 2016 (GTSC, Abu Dhabi) Holding CVT-20267 Defensive Driving Course - Validity up to July, 2016 (CVT, Dubai-UAE) Computer Skills : Ms Office, Adobe Photoshop, Internet Window Xp, Window 98, Window 2000 Summary of Experiences : - - Having around 10.8 years experiences in Middle East Countries (UAE, KSA, Qatar and Pakistan) in the field of Engineering, Construction, Quality and testing expertise being a client representative as Company/TPI/PMC/PMT with well reputed clients, Gasco, Takreer, Adma-Opco, Aegean, Zadco, Al Hosn Gas, Leighton, Gupco-Enppi, KJO, Dolphin Energy, Qatar Petroleum, Qatar Gas, EDT QP Dukhan, PAPCO, OGDC, Lesco/Wapda Pak and Bechtel Arabia KSA. Experienced in various Mega projects in Oil & Gas Industry, Plant Processing Facilities, Oil & Gas Pipeline, Refineries, Water Transmission Pipeline, Infrastructure, Submarine Composite Cables Inspection, Power Transmission lines includes Sub Stations 11/0.433KV to 132KV Systems. Experience and expertise in supervision of Erection, Installation, Pre-Commissioning, Commissioning, Quality Control and Vendor Inspections of LV/MV Electrical & Instrumentation systems includes SCADA Integration, Electronic Control System (ESD/DCS/PLC/ACS/RTU), Port Special Systems, Telecom, LAN, WAN, TNMS, PAGA, CCTV, F&G, FOC and Cathodic Protection systems adept in Engineering Standard, Specification (DGS, DEL, QGPS, TOTAL) & other IEE, IEC, SABIC, QPES, BS Standards.
  • 2. DNVGL/CV/FORMAT/VER-2.0-07/2015/MSA 2 Testing Expertise : - - - - - - - - - - - - - - - - - - - Proficient and well knowledge about Logic, methodology of operational, functional test for following System/Sub Systems, (FAT, IFAT, ISAT, SAT) & PRE COMM., COMMISSIONING Activities) Power Transformers (Up to 120MVA) IR test, Winding Resistance (HV-G, LV-G, HV-LV), Polarization Index test, CT test, Voltage Ratio test, Vector Group test, Magnetizing Current test, BDV test for Oil, Neutral, bushing CT, Mechanical Protection & RTCC Operation tests. HV, MV, LV Switchboard (132kv, 33kv, 11kv, 6.6kv, 3.3kv, 0.433kv) Mechanical Operation test, functional test of HV/LV in Service & test position, Bus Bar Hi Pot, IR, Continuity test, Contact Resistance (µΩ) test, Primary Injection for Ammeter, Voltmeter, Incomer Logic test, Interlocking with AQT, ATS, NCS and DCS system. CT's & VT's test (Metering & Protection) CT test (IR/Winding Resistance/Ratio/Class/ Burden/Polarity/Excitation), VT test (Ratio/Burden/Polarity) by Current and Voltage Injection. Protection Relays test Relay setting, configuration, testing of Electro-mechanical and Microprocessor relays (RD148, MIM200/300, REF630/615, RET, REM, RED) with relay functions of 25, 27, 46, 49, 50, 51, 67, 81, 87 etc. Numerical relays and protection relay system of Sepam Series (20, 40, 80), Differential protection relays" & "MIB30" HID (High Impedance Differential Module), MRL1 Lockout relay, TCP Micro logic relay Series 5.0A & 6.0A and "SR-745" GE TR Management relay, MR Tap Changer "TAPCON 240" HV/LV Circuit Breakers test Breaker Analyzer test, IR test, Contact Resistance, Tripping and closing time test of HV/LV circuit breakers. Hi Pot test for Bus bar, Bus Duct & Cables: DC Hi Pot test of HV cables (3.3kv, 6.6kv, 11kv, 33kv) and AC Hi Pot test, Insulation Resistance test, DC resistance measurement test, Metallic Screen DC resistance test, Capacitance Measurement test & Contact Resistance test of MV/LV Bus bars/Bus duct. Submarine Composite Cables 6.6/11kv Material Receiving & Witnessed test: Non Electric tests; Overall dimension check, Conductor Screen, Inner Layer and Outer Sheath thickness and Serving check, Water Blocking Tape check, Conductor Sheath and Anti-Corrosion Sheath check, Anti-Teredo Protection Test (No of copper tape, copper tape thickness and overlapping check), Inner Sheath / Bedding, Bitumen check, Armour Check and Binder Tape check, Filler, Insulated steel fillers, diameter check over the insulation, steel rope and no of wire check. Electrical test; Power Frequency voltage test withstand 23KV/5minuts, Insulation resistance test after and before of HV test, Conductor DC resistance measurement test, measured the resistance corrected to at temperature @ 20degC, Metallic Screen DC resistance test, Capacitance Measurement test Fibber Optic Cable Test; Non Electric Test, Visual check, overall dimension check, outer Insulation thickness check; Electrical Test; Attenuation @ 1310nm and 1550nm, OTDR (Optical time domain reflector) test, end to end test and Splicing with fusion arc splicer. Sub Stations Energization Stability test of Power transformers and Bus bar; Line differential, Transformer differential protection, End to End test up stream to downstream, Energization of power transformers, MV and LV switchboards. Diesel Generator Sets (5.5kva up to 2500kva) On load/Off load vibration measurements, Alarm & trip logic checks for protection, Transient response load test (0-25% to 100-0%), Noise level Measurement (Alternator & Engine), Alarms & Shutdowns on Engine (Emergency Stop/Diagnostic, Over Speed, Low oil pressure, High coolant temperature test), Painting DFT checks, winding Insulation resistance checks and full load test. UPS’s & "TPR" Invertors and Battery Charger Batteries Charging & Dis-charging test of 24VDC, 110VDC, 48VDC & 240VAC and Invertors protection test (Float charging, Low level, earth Fault, Temperature Limit) etc. Cathodic Protection Controller test, Pipe to Soil, potential measurement swing test, AC interference test & line current measurement at EBB points for U/G, A/G Oil & Gas pipeline. TELECOM/LAN/WAN/TNMS System; System PING test, system Redundancy test, system Interface test, system Optical Signal level test (Optical TX Power & Receive Sensitivity check) CCTV System test; Monitoring test from Operator monitor, Operator Live Viewing Test, Calling Cameras test using digital sentry, Video Playback & Recording Test, Pan / Tilt test. Telephone System; Answering calls test, making calls test, automatic Redialling test, Voice Clarity check test. PA/UHF Radio System; Transmit Power & Frequency Measurement Test, UHF Duplexer test, Radio Voice functionality test, Interface to LAN, TNMS system, Interface to Voice Recording / Dispatcher System, F&G system Interface test. PDH Multiplexer, Ethernet Switches, Media Converter; DM2+ Bit Error Rate Measurement test, Ethernet interface Unit End-To-End test, EPSA Alarm test, Configuration and Traffic verification test, Through-Put test, LC Transceiver Transmit Power, Receiver Sensitivity test.
  • 3. DNVGL/CV/FORMAT/VER-2.0-07/2015/MSA 3 WORKING EXPERIENCE / EMPLOYMENT SCAN Period: April 2013 to till date Company : DNV GL, ABU DHABI UAE Position : Lead Inspection Engineer E&I (Industrial Services Division) Projects : Major Projects, Oil & Gas Middle East ADMA-OPCO: a) +100 MBD Das Island Project (Off Shore) b) Nasr Umm Lulu (Brown & Green Fields) Projects c) Flares Modification Revamp Project, Das Island (Off Shore) d) Crude Oil Loading Facilities Project e) ZWIUP Project (Off Shore) f) DE Mothballing Project g) Zakum West Super Complex (GGII) Project h) CTU Treatment Unit Modification Project i) SARB Island Package-6 Project, EPC Work For Drills Camp and Associated Utilities ZADCO: a) Satah Full Field Development (STFFD) Project b) Thammama ll-Wad Phase-1 Gas Injection Project c) EPC of work for black Powder Filtration System Project d) Upper Zakum 750k, Accommodation & Utilities Project GASCO: a) HABSHAN-5 Sulphur Granulation Plant b) 4TH NGL Train & IGD Tank-Ages Project DOLPHIN ENERGY: a) Export Gas Compression Facilities Upgrade Project b) 48’’ Taweelah to Fujairah Down Stream Gas Pipeline Project c) Third Party Gas Interconnecting Faculties Upgrade, Qatar d) Ras Laffan Treatment Plant Unit 131 Diesel Train, Qatar AL HOSN GAS: a) EPC Package SGD-11 Project b) EPC Package SGD NP-10 Project MALAYSIA/LEIGHTON OFF SHORE: a) S432, South Oil Sea line Project ENPPI/GUPCO KSA: a) GUPCO Rehabilitation Project KOC/KUWAIT OIL COMPANY: a) EPC of Supply, Erection, Operation, Maintenance of Gas Turbine to Up Grade Power Capacity At Sabia & Az Zour Power Plant Projects b) EPC of Effluent Water Disposal System at GC-15 ,GC-25 and Injection pump at CIPF/N QATAR PETROLEUM: a) EPIC of 16” JET A1 Fuel Pipeline Project b) Offshore National Security Shield, Qatar c) QSTec Polysilicon Project Phase-1, Qatar d) EPIC of New CIB 33/11kv PDS Halul Island Project (Off Shore) e) EPIC of Anti surge & Turbine Controls Upgrade @ KN, KM, JDS & RG Project f) EPIC of Integrated Chiller, Freezer, Laundry, Dining & Accommodation Facilities In Halul g) EPIC of Online Condition Monitoring System for Rotating Equipment Dukhan fields, Qatar h) EPIC for Gas Supply to Ras Abu Fontas (RAF) Power Station-W2, Qatar i) EPIC for Forward Mounted Base (FMB, NSS) Qatar j) Doha South Sewage Treatment Works 40 MID Expansion
  • 4. DNVGL/CV/FORMAT/VER-2.0-07/2015/MSA 4 Job Responsibilities :  Review and develop QA/QC Procedures and Quality Inspection Plan for all E&I work activities includes Vendor inspections, material visual Inspection, FAT, IFAT, Calibration checks, Packing, Marking, Issuance of inspection report and shipping released etc.  Do witnessing test of HV, LV, MV and Fiber Optic Cables, MV, LV Switchgears, DBs, JBs, Fire Alarm Control Panels, Pressure Gauges and Transmitters Instruments including materials as per approved ITP, FAT, IFAT procedure and QP Plans.  Do witnessing the loop sale, Interlocks functional test and ensure that all requirements in specified procedure and narratives are being established.  Designing and developing new control systems and maintaining and modifying existing systems to ensure that these systems and processes operate effectively and safely carry out site acceptance testing and the commissioning.  Review ITPs to verify that Execution Contractor is performing all required inspections and witnessing hold points, review Company Inspectors deliverables, analysis, resolve issues and problems emerging during the Quality control activity and ensure that all inspections and tests witnessed by Company Inspectors are recorded and documented. o FAT of “500KVA-120MVA” Power Transformers at Siemens/Brush/Emirates Transformer o FAT of MV/LV Switchgears at ABB/Siemens/Schneider-Electric o FAT of 415V LV Switchboards at ABB/Siemens/Eaton/Al-Dafir/Masseera o FAT of HVAC Control panels at Prisma/Honeywell/York o FAT of Variable Speed Drive System at Emerson/Siemens/Schneider Electric o FAT of HG7-Passive Harmonic Filter System at L&T Automation FZE o FAT of Drive-Applied Passive Harmonic Filter system at Proserv o FAT of PFC (Power Factor Capacitor) and Active Harmonic Filter System at Eaton/Proserv o FAT of MV, LV, Control & Instrument cables at MESC Rak/Ducab, Dubai/Musaffah o IFAT of Control Systems (PLC/DCS/SCADA) at ABB/Yokogawa/Honeywell/Silvertech o IFAT of DCS “HMI” Modification 800XA system at ABB/Silvertech/Honeywell o IFAT of “PEMS” Predictive Emission Monitoring system at Yokogawa/Honeywell o FAT of FACP, HSSD, VESDA F&G System and Detectors at TYCO/NAFCO/Zeener ZLC o FAT of CCTV & Security Control System at TYCO/Honeywell/3W Network o IFAT of LAN, WAN, PAGA, ACS, PA/UHF Radio and Telecom systems at ABB/3W Network o FAT of Diesel Generator (Rated up to 2800kva) at Caterpillar-Al Bahar/FG Wilson/Perkins o Cathodic Protection System Inspection at AEGIS/Bss-tech o Inspection of Ex’e/Ex’d Explosion Proof JB & PJB at Weidmuller/Walsall/Cooper/Bartech o FAT for Inergin System, Chemical Injection skid, Electro-Chlorination Skids, Condensate & NGL Shipping Metering Skid Packages at Proserv/Tyco/MISWACO/FMC o Safety Relief Valves, Hydrolytic/Pneumatic actuators visual, function test & Bench Calibration test at Proserv/Emerson/Adyard/NPCC o Accommodation module, Electrical Rooms (KAAOT & ABOT for S432-Sealine Project South Oil Company, Leighton Offshore) and Electrical System Containers Installation as per Zone-II Classification for Accommodation & Utilities, Zirku Island Pressurization, Electrical, F&G system, HVAC systems installation and start up test at Specialist Services/WBG/AL JABER o Performed and witnessed the Powering up test for Accommodation Module Start-up test, Purging the Accommodation Module, CPFG Start-up test, Powering up the Cabin utilities and Main Distribution Board system, Powering up of HVAC system, Fire & Gas Detection System. o FAT of Wellhead Control Panel, Local Gauge Control Panel & Emergency Shutdown System with combination of standard Pneumatic and Hydraulic/PLC based logic in a single integrated solution such as Single/Multiple WHCP controls for both onshore and offshore applications at Proserv/Versatech. o FAT of Modular Multi-Wellhead control system, PLC Based Wellhead control system, as Instrumented Protective System (IPS) for Wellhead valves Open/Close sequence, Control, Operation and shutdown safety requirements & to meet high degree of Reliability, functionality Integrity of the system at Proserv/Silvertech/Versatech. o FAT for Contacting/Retractable, pH Sensor/Total Chlorine Sensor and Analyzer system, ABB Analyzer Houses/Shelters, Solar System, CPIC at AIMS/Emerson/Versatech. Period: May 2011 to Feb 13 Company : MOODY INTERTEK, ABU DHABI UAE Position : Electrical TPI/GASCO “PMT” Project : a). 4th NGL Train & IGD Tankages Project b). SWI-3, Seawater Intake-3 Project
  • 5. DNVGL/CV/FORMAT/VER-2.0-07/2015/MSA 5 Job Responsibilities :  Site job execution, Interacting with vendors, Coordination with inspectors, attending walk downs for RFC, RFSU, Issuance, clearing punch points, pre mechanical completion of systems and witness the HV, MV, LV Power distribution systems pre-comm., commissioning and start up activities.  Review construction drawings IFC, AFC, P&ID diagrams, hook-up, Interconnection diagram, typical installation details, loop, logic diagram, Cause & effect and participate in the demonstration handover and acceptance of the system with operations group.  Responsible for installation inspections of equipment, Power Transformers (up to 20MVA) and MV, LV Switchgears, SB & MCC control panels, HVAC (MCC) Unit, DCS System, RTU System, NCS System cabinet, Junction Boxes, Marshalling boxes, Motors & Compressors, UPS’s & "TPR" Battery chargers, Lighting & Small power system, Earthing, Heat Tracing & Lightning system.  Installation inspection and functional test for Diesel Generator sets (7.5kva up to 10kva).  Installation, Inspection and functionality test for Modular Multi-Wellhead control system / PLC Based Wellhead control system, as Instrumented Protective System (IPS) for Wellhead valves OPEN/CLOSE sequence, Control, Operation and shutdown safety requirements.  Installation, Inspection and Surveillance for all metallic equipment’s & Structures in seawater “stop logs, Raking bar screens, travelling band screens, Pump body” and ensure that are protected by impressed current Cathodic Protection system.  Installation, Inspection and testing for electrode and ensure that each part of the zone shall be monitored by reference electrode and shall be positioned such that all the surfaces are covered within each structure and Test for MMO (Mixed Metal Oxide, Platinum) probe type anodes, ensure the continuity with connector bars. Period: Aug 2010 to May 2011 Company : VELOSI LLC, ABU DHABI UAE Position : Sr. QC Inspector E&I - TPI/Dolphin Energy Project : a). 48’’x243km, Taweelah to Fujairah down Stream Gas Pipeline Job Responsibilities :  Ensured that all activities assigned compliance with DEL project Spec's and during inspections follows the IFC, AFC, P&ID, hook-up, typical installation details, logic diagram, Cause & effect diagrams and QC procedures, Inspection plans and carried out as per planned schedule to achieve on target dates.  Responsible to review contractor submittals ITP, QCP, QCF, MST, related QC documents and make ensure that all Inspections being carried out as per approved documents.  Responsible for installation inspections, testing of LV Switchgear, 415V motor control center, RMU units, power transformers, distribution boards, Solar system, power, control, Instrumentation cables laying, glanding, termination, HVAC & Earthing system, Lightning protection system.  Involved in swing potential test and Natural potential survey for underground gas pipeline.  Supervised, witnessed CIP & DCVG (DC voltage gradient) Survey for 48’' U/G gas pipeline.  Installation of MMO Piggy back anode, Mg Anode, Big Fink, CMTP, CTP, PCR, AJB, NJB, STP, CPTR, EBB, Zinc ribbon anode, Surge Diverters, Pin Brazing welding.  Material Receiving & Witnessed test for Submarine Composite Cables 6.6/11kv, Overall dimension check, Conductor Screen, Inner Layer and Outer Sheath thickness and Serving check, Water Blocking Tape check, Conductor Sheath and Anti-Corrosion Sheath check, Anti-Teredo Protection Test (No of copper tape, copper tape thickness and overlapping check), Inner Sheath / Bedding, Bitumen check, Armour Check and Binder Tape check, Filler, Insulated steel fillers, diameter check over the insulation, steel rope and no of wire check.  Performed and witnessed Power Frequency voltage test withstand 23KV/5minuts, Insulation resistance test after and before of HV test, Conductor DC resistance measurement test, measured the resistance corrected to at temperature @ 20degC, Metallic Screen DC resistance test, Capacitance Measurement test  Fibber Optic Cable Test; Non Electric Test, Visual check, overall dimension check, outer Insulation thickness check.  Witnessed attenuation test 1310nm and 1550nm, OTDR (Optical time domain reflector) test, end to end test and Splicing with fusion arc splicer. Period: July 2008 to Company : TEKFEN CONSTRUCTION Co. QATAR Position : QA/QC Engineer E&I
  • 6. DNVGL/CV/FORMAT/VER-2.0-07/2015/MSA 6 Aug 2010 Projects : a). GTC06/190/ED 20’’x81km, A/G Crude Oil pipeline Umm-bab to Um-Messaieed tank farm b). GTC05/124/ED 24’’/20”x120km, U/G Ras Laffan to Messaieed Gas transmission line c). GTC05/124/ED VTC#2 6’’x32km, U/G LPG Messaieed Refinery to Doha bottling Plant Job Responsibilities :  Responsible to conduct Installation inspections, surveillance, testing, mechanical completion on following systems, power transformers (Up to 12.5/10 MVA), 33/11kv GIS (GM6), 6.6kv (Metal Clad) Switchgears, SB, MCC control panels, JB, marshalling boxes, RCU, UCP, Motors, Diesel Generator (Rated 10KVA), Nitrogen Generators (5.5kva), RTU system, Heat tracing system, Ethane Gas compressors including lube Oil & Fin Fan coolers system, FOC & telecom system, UPS’s & "TPR" Battery chargers, lighting, Earthing & Lightning.  Control Valve, GLV, BFV, BD, MOV, ESD Valves and Magnetic Flow, Ultrasonic & Orifice Flow meters, FT, PT, Transmitters, Gauge Control panel as well as other measuring Instruments.  Responsible for Inspections field work according with ITP, generating punch lists, making final inspection reports for various E & I works, loop folder preparation.  Executes the specific, critical inspections on materials, equipment, construction, installation activities on site, Inspection of Incoming materials, vendor package receiving  Review of vender documents, test procedure, IRC certificates, operating manuals, design book, engineering data book in accordance with the project design basis and specification. Period: Oct 2007 to July 2008 Company : SAUDI BIN LADIN - PIC DIVISION, KSA Position : QC Inspector Electrical Project : a). PPLC; Product Pipe Line Corridor Phase-I Job Responsibilities :  Contract job order review, preparation of Job quality plan and preparation of project specific procedures, work instructions, QC procedures and method of statement, check lists, calibration sheets and QC plans as required.  Participated in creation, Implementation of project quality plans, procedures, work Instructions, quality records, punch lists and compilation of test packs.  Verified compliance of performance output, identification of non-conformances for corrective action and issue of NCRs whenever required.  Responsible for Inspections field work according with ITP, generating punch lists, making final inspection reports for various E&I works, loop folder preparation.  Equipment testing for LV & HV switchboards like CT, PT, MV drop, bus ducts and electro mechanical relays, breakers, feeder differential and simulation tests.  Installation & testing of F&G system including detectors GDT's, FDI's, HD, SD, HSSD, FACP, Inergen and MCL alarming system according to cause & effect matrix.  Worked on Communication systems (CCTV, PAGA, Data, Voice), Analyzers, Compressor Skids, Pump Motor Controls, Machine Control Monitoring System (MCMS), Monitoring System (CEMS), Catalyst & Spent Caustic treatment skids.  Possesses sound command on Pneumatic & Electronic Instruments, Differential Pressure, Level, Temperature, Flow Transmitters, Control Valves, Pressure, Temperature, Flow & Level Switches, Turbine, Magnetic & Vortex flow meter. Period: Feb 2001 to July 2003 Company : LESCO/WAPDA - (GSC) Division, PAK Position : Line Superintendent Const. Grade-I Project : a) 132/33/11kv Sub Stations, HT/LT Transmission lines & Electricity
  • 7. DNVGL/CV/FORMAT/VER-2.0-07/2015/MSA 7 Job Responsibilities :  Responsible for end to end line feeder planning and execution, Erection of HT/LT 132kv, 33kv and 11kv transmission lines and distribution system works.  Handling the project estimation, monitoring, execution of overhead, underground transmission HT/LT line as per Project requirement.  Marking the substation layout and foundation marking of Substation equipment’s like GA, LA, Isolator, CVT, CT, breakers, post insulators, power transformer, and tower gantries, light mask, cable trench, ear thing, lighting system etc.  Responsible and supervision for laying, termination of HV, MV, LV and control cables from SWGR, Control Panels end to field equipment’s like Power Transformers, Current Transformers (CT’s), Voltage Transformers (VT’s), Motor Operated Isolators, Capacitor Bank, Capacitor bank Reactors, Capacitor voltage Transformer and MCCB Breakers.  Supervised Erection & Start up, Control Auxiliaries for Heavy-duty Gas Turbine Generators (Rated 1.1 to 22.4MW), 13.8/11kv Vacuum, 33kv GIS, 6.6kv Metal Clad switchgear, 415V LV MCC’s, PCC’s and power transformers.  Responsible for replacing the old ASEA distance relays with new numerical line differential & distance relays.