1. Curriculum Vitae
Name : Momen Mohamed
Date: APRIL. 2015
Family Name:
Mohamed
Given Name (s):
Momen
Year of Birth: 01.08.1976 Nationality: Egyptian
Profession: Q.C engineer
Language(s): English and Arabic
Educational
Background
B.Sc. Degree Petroleum & Mining Engineering./ Suez canal University - 2003
Training & Courses
1- CSWIP 3.1 Welding Inspector.(Cert.No.47302 Exp.Date 19Feb.2020)
2 Level II in Radiographic Test (RT)) & Dye Penetrant Test (PT)& Ultrasonic Test (UT) & Magnetic Test,
According to ASNT-TC-1A recommended practice.
3- National Association of Safety Professionals ( NASP)
Page 1 of 8 /
mnt/temp/unoconv/20151102063835_0ef3fb535132d8d0d88afd4327391809817fe09f/aad
58143-a18d-4019-ac5f-78f359bda025-151102063835-lva1-app6892.doc
2. Curriculum Vitae
Name : Momen Mohamed
Date: APRIL. 2015
Professional Experience:
1: Period : Feb. 2015 till Now Germanischer Lloyd (GL) Muscat-Oman
EPC of ABB- gathering system in Abu Tubul Block 60, Oman
Employed by: Germanischer Lloyd as a TPI .
Client: Oman Oil Company Exploration & Production ( OOCEP)
Contractor: Gulf Petrochemical Services.(GPS) & Al- EZ
Position: Site QC Team Leader
Responsibilities:
*leader for the Q.C team (material-welding-piping-Coating- Civil -E&I And Safety).
*Review and approve the QCPs, ITPs and WPSs as per the standards and OOCEP SPECS.(Worley Parsons).
*Review & Verifying the implementation of Contractor Quality Control Plans, Welding Procedure Specifications and Work Procedures /
Method statements.
*Review & Verification of NDT procedure approval and technician approval
* Review of Contractor Project scope and Project Quality Plan
*Conducting weekly Q.C Meeting and attending construction weekly meeting.
* Quality system auditing and Issuing NCR against the non-conformities and suggesting corrective actions
*leading the Q.C mechanical team in Hydrostatic test, Reinstatement and clearing the punch list till systems’ MCC
Issuance
* Witnessing N2 leak testing while prior to pre commissioning.
*Witnessing Pre commissioning & commissioning of the system.
*Review of Final Hand over Packs of the system
Page 2 of 8 /
mnt/temp/unoconv/20151102063835_0ef3fb535132d8d0d88afd4327391809817fe09f/aad
58143-a18d-4019-ac5f-78f359bda025-151102063835-lva1-app6892.doc
3. Curriculum Vitae
Name : Momen Mohamed
Date: APRIL. 2015
2: Period : May. 2014 till Jan. 2015 Germanischer Lloyd (GL) Muscat-Oman
EPC of 32” By Pass Stream in Suhar, Oman
Employed by: Germanischer Lloyd as a TPI .
Client: Oman Gas Company ( S.A.O.C)
Contractor: Gulf Petrochemical Services.(GPS)
Position: QC Team Leader
Responsibilities:
*leader for the Q.C team (material-welding-piping-Coating- Civil -E&I And Safety).
*Review and approve the QCPs, ITPs and WPSs as per the standards and OGC specs.(DEPs).
*Review & Verifying the implementation of Contractor Quality Control Plans, Welding Procedure Specifications and Work
Procedures / Method statements.
*Review & Verification of NDT procedure approval and technician approval
* Review of Contractor Project scope and Project Quality Plan
*Conducting weekly Q.C Meeting and attending construction weekly meeting.
* Quality system auditing and Issuing NCR against the non-conformities and suggesting corrective actions
*leading the Q.C mechanical team in Hydrostatic test, Reinstatement and clearing the punch list till systems’ MCC
Issuance.
* Witnessing N2 leak testing while prior to pre commissioning.
*Witnessing Pre commissioning & commissioning of the system.
*Review of Final Hand over Packs of the system
Page 3 of 8 /
mnt/temp/unoconv/20151102063835_0ef3fb535132d8d0d88afd4327391809817fe09f/aad
58143-a18d-4019-ac5f-78f359bda025-151102063835-lva1-app6892.doc
4. Curriculum Vitae
Name : Momen Mohamed
Date: APRIL. 2015
3: Period : Feb. 2013 till May 2014 Germanischer Lloyd (GL) Muscat-Oman
Umm Lulu & Nasr Phase-1 Development Project.(L&T Yard) Oman
Employed by: Germanischer Lloyd as a TPI (GL inspector).
Client: Dhabi Marine Operating Company (ADMA – OPCO)
Contractor: Larson and Toupro (L&T)
Position: QC( Welding/ Mechanical) inspector
Project Description:
Umm Lulu and Nasr fields which are parts of ADMA-OPCO concession area as a part of its
continuous development , ADMA-OPCO planned to develop Umm Lulu and Nasr fields in tow consecutive stages,
ULN phase-I and Phase II FFD (Full Field Development).
ADMA- OPCO has awarded the engineering, Procurements, Fabrication, construction and commissioning (EPCC) works
of Umm Lulu & Nasr works of phase –I project to Larsen & Loubro Limited (L&T) – OMAN.
* Umm Lulu phase-I consist of the following facilities:-
1. Two wellhead towers ( WHT-4 and WHT-6)
2. 14” &12” subsea pipelines both pipelines will be piggybacked with subsea FOCs.
* Nasr Phase-I consist of the following facilities:-
1. Two wellhead towers (WHT-1& WHT-2), Manifold tower (MFT).
20”, 20”, 18”& 10” subsea pipelines pipe lines will be piggybacked with subsea FOCs.
Responsibilities:
TPI shall advise ADMA-OPCO of any deviation from the scope of work .TPI activities includes but not limited to the
following:
· Assessment of the adequacy of the (L&T) contractor quality control s system for the project.
· Checking the traceability system for materials and equipment supplied to the fabrication yard.
· Witnessing/Reviewing of welding procedures, welders documentation, witnessing of qualification testes and
Page 4 of 8 /
mnt/temp/unoconv/20151102063835_0ef3fb535132d8d0d88afd4327391809817fe09f/aad
58143-a18d-4019-ac5f-78f359bda025-151102063835-lva1-app6892.doc
5. Curriculum Vitae
Name : Momen Mohamed
Date: APRIL. 2015
endorsing welder’s certification as necessary.
· Witnessing of dimensional control carried out on site.
· Pre-and post-weld heat treatment, NDT carried out, and inspection of all welding works.
· Monitoring of procedures for repair, retest and acceptance hydrostatic pressure test of pipes and spool.
· Monitoring of fabrication structural elements, pipe work
· Witness, where necessary , relevant hydro-testes functional or other testes
· Endorse stage release note generated by (L&T) contractor for any stage release during fabrication.
· Review/Endorse quality control report generated by the L&T contractor during fabrication.
4.: Period : 24 Apr .2011 till 1ST
Jan.2013
: EBGDCO (EGYPTIAN BAHRINI GAS DEREVITVE CO.)),
.
Position : Inspection eng. and SR.QA/QC Eng..
Project : NGL PROJECT – Egypt
Client : EBGDCO (EGYPTIAN BAHRINI GAS DEREVITVE CO.),
5.: Period : 10th December 2010 till 24rd Apr2011
Employer : OPCO. Egypt.
Position : Inspection eng. and SR.QA/QC Eng..
Project : AMAL FIELD DEVELOPMENT PROJECT.
Location : Ras Shukair ,Egypt
Main Contractor : Petrojet
6.: Period : 6th July 2008till 10th Dec.2010
Employer : Inspection eng. and SR.QA/QC Eng..
BADR-ELDIN PETROLUM CO.( BAPETCO)).
Position : Inspection eng. and SR.QA/QC Eng..
Project : Project department
Location : Bed-3(Onshore)
Projects:
•10" Multi phase line from Bed 1 to Bed 3 (75 km).
• 6" Flow line from Neag to Bed 3 (4 km).
•AlASSEl 6 12΄΄ &8’’ Pipe Line (14km)
Page 5 of 8 /
mnt/temp/unoconv/20151102063835_0ef3fb535132d8d0d88afd4327391809817fe09f/aad
58143-a18d-4019-ac5f-78f359bda025-151102063835-lva1-app6892.doc
6. Curriculum Vitae
Name : Momen Mohamed
Date: APRIL. 2015
7.: Period : 1st
Apr..2008till 1st
July. 2008
Employer OPCO), .
Position : Inspection eng. and welding Inspector& OPCO site manager.
Project : Project department
Client : KHALDA PETROLUM CO.( K.P.C
Duties& Responsibilities:
-Review material certificate (mill sheets), electrode certificate, calibration certificate and welders certificates.
-Review welding procedure specification (WPS) and procedure qualification record (PQR) and have been approved as
required by the authority and is employed in production.
-Dimension, tolerance, preparation, fit-up and alignment are in accordance with the approved drawings.
-Supervision on Piping, tanks erection, assembly and wetness for welding procedure.
-Visual inspection is carried out for all welds according to code specified in WPS.
-Performed and supervised the RT, MT, UT and PT inspection on steel structure, pipes, tank and pressure vessels.
-Supervise leak, vacuum, pneumatic and hydrostatic tests.
-Finally collect all the documents and reports for certification
Employment History:
I participated in many projects of different WPS's, and applied codes, standard, and specifications such as API-1104 for
pipelines, API-650 for tanks construction, API-653 for tanks repair, ASME-IX for welder and procedure qualification,
ASME-B31.3 for chemical plant and petroleum refinery piping, ASME-VIII-Division 2 for pressure vessels and AWS D 1.1
for steel structure
Projects:
• Construction of Um Barka water flood tanks (2 ea. 1000 BBL).
•8" Jade 2x gas line (2 km).
• 8" Jade 1x gas line (4 km).
• Construction of Hayat new facility
(hayat gas compressor, hayat water flood and hayat oil upgrading).
• Khalda 2x gas line (6 km).
• Maintenance of tut heater fire tube.
• Construction of kahraman oil tanks (3 ea. 10000 BBL).
Page 6 of 8 /
mnt/temp/unoconv/20151102063835_0ef3fb535132d8d0d88afd4327391809817fe09f/aad
58143-a18d-4019-ac5f-78f359bda025-151102063835-lva1-app6892.doc
7. Curriculum Vitae
Name : Momen Mohamed
Date: APRIL. 2015
8.: Period : 2nd
March 2006till 29rd March.2008
Employer :BELAYIM Petroleum Co (client Rep.).
Position : Inspection eng. and welding Inspector& mechanical supervisor
Project : Maintenance Department
Location : PETROBEL (Sinai fields- Belayim area).
Main responsibilities & achievements:-
-Review material certificate (mill sheets), electrode certificate, calibration certificate and welders certificates.
-Review welding procedure specification (WPS) and procedure qualification record
- (PQR) and have been approved as required by the authority and is employed in production.
-Dimension, tolerance, preparation, fit-up and alignment are in accordance with the approved drawings.
-Supervision on Piping, tanks erection, assembly and wetness for welding procedure.
-Visual inspection is carried out for all welds according to code specified in WPS.
-Performed and supervised the RT, UT and PT inspection on steel structure, pipes, tanks and pressure vessels.
-Supervise leak, vacuum, pneumatic and hydrostatic tests.
-Finally collect all the documents and reports for certification.
PIPE LINES:
12'' pipe line, 14'' pipe line, connections (10'', 8'', 6'' and 4'') of tank battery upgrading and fire fighting net work at Feiran
Terminal.
10" & 8" F.F lines of tank #21 At petreco plant.
12",10"&6" piping of tank battery( 6-1) at Belayim area.
TANKS:
Tank # 09 (Height 20m, Diameter 76.2m).
Tank # 14 (Height 17m, Diameter 34.2m).
Tank # 27 (Height 11.8m, Diameter 22m).
Tank # 40 (Height 12.85m, Diameter 14.85m).
Tank # 02 (Height 9m, Diameter 15m).
Diesel tank (Height 10m, Diameter 7.4m).
Tank #01 (Height 9m, Diameter 15m)
PRESSURE VESSELS:
RACO separator (Length 18m, Diameter 4.5m).
RACO heat exchanger unit.
Page 7 of 8 /
mnt/temp/unoconv/20151102063835_0ef3fb535132d8d0d88afd4327391809817fe09f/aad
58143-a18d-4019-ac5f-78f359bda025-151102063835-lva1-app6892.doc
8. Curriculum Vitae
Name : Momen Mohamed
Date: APRIL. 2015
PIICO gas boot.
SICES gas boot.
SICES heat exchanger unite
DUTIES:
Discuss the proposal with drawing which contain all the materials used such as (flanges, fitting, valves, plates ...).
Preparing and supervising the materials procurement that necessary to repair or maintenance works.
Reviewing the cutting and welding sequences and welding maps.
Supervising dislodging, cleaning and gas freeing.
Supervising, dismantling of the bottom plates and roof plates for tanks.
Supervising and approved the hydrostatic test.
Supervising the external painting and internal lining activities.
Reviewing the invoices that belong to the contractors.
9.: Period : 23Sep.2003till 5th Feb. 2006
Employer : AMERON EGYPT
(For Concrete Pipes with steel cylinder Manufacturing) – Suez
Position : Lab. Section Head (Quality Control Department)
Main responsibilities & achievements:-
Since Ameron is an international company, and ISO 9001 certified, that, the quality is a major aim, so that I’m
responsible for applying the company quality policy by witnessing and making the different tests on the row materials
(steel sheets, reinforcing steel rods, sand, cement, water ) and the products during the different manufacturing processes
(visual inspection and dye penetrant test for welds, hydrostatic test for the manufactured steel pipes and compressive
strength of the concrete mortar), and so painting inspection for the final product. Finally prepare the different quality
control reports and documents for the factory general manager
Page 8 of 8 /
mnt/temp/unoconv/20151102063835_0ef3fb535132d8d0d88afd4327391809817fe09f/aad
58143-a18d-4019-ac5f-78f359bda025-151102063835-lva1-app6892.doc