Cv mohd syahril awth

Mohd Syahril AWTH
Mohd Syahril AWTHMechanical Inspector em Budiman Inspection Sdn Bhd, Malaysia.

A highly motivated and imaginative of Independent inspector with over than 7 Years experiences in fabrication/ vendor inspection of Oil & Gas equipment at Various of Country for Vessel ( Filter, Separator, Coalescor etc), coulomb, heat exchanger, tank, air cooler, metering skid & piping package, structure and valve  Seeking for On-Call/long term contract job of inspection in Mechanical, welding or quality control inspection as current position is Freelance Inspector and had good knowledge, Experiences in Vendor and Welding Inspection.

 A highly motivated and imaginative of Independent inspector with over than 7 Years experiences in
fabrication/ vendor inspection of Oil & Gas equipment at Various of Country for Vessel ( Filter,
Separator, Coalescor etc), coulomb, heat exchanger, tank, air cooler, metering skid & piping
package, structure and valve.
 Seeking for On-Call/long term contract job of inspection in Mechanical, welding or quality control
inspection as current position is Freelance Inspector and had good knowledge, Experiences in
Vendor and Welding Inspection.
 Had a wide experiences in collaborate and joining Inspection with various country of people at any
level, well adapted and good communication.
 Excellent interpersonal and cross-cultural skill, able to build relationship with people at any level,
detailed and result oriented, thrives under pressure and able to meet tight deadlines, meticulous
and posses’ excellent analytical thinking.
SEMINAR / COURSE ATTAND
NO DESCRIPTION LOCATION
1 In-house Seminar of Understanding of Fabrication process, Pressure Vessel
Fabrication Process and inspection, Fabrication work flow (Heavy Wall SS
Pressure Vessel), Fabrication sequence of activities and inspection points by Mr.
Ronnie A Villareal ( QC MANAGER KNM/KPS )
KNM,
Kuantan
Port
2 NATIONAL INSTITUTE OF OCCUPATION & HEALTH (NIOSH) COURSE and
EXAMINATION
1. NIOSH oil and Gas Safety Passport (OGSP)
2. NIOSH TNB
NIOSH,
Bangi
3 DOMI Course – Understanding of Boiler system, HRSG, Fire Tube etc.
Jutasama,
Shah Alam
1
MOHD SYAHRIL AWANG TIH
YEAR : 2014
UPDATE DATE :
19/01/15
POSITION of : MECHANICAL, WELDING INSPECTOR
ADDRESS
A209, PANGSAPURI SRI WIRA, JALAN UKAY PERDANA 2, TAMAN UKAY
PERDANA, 68000 AMPANG SELANGOR, MALAYSIA.
PHONE NO
+6 0199855467
D.O.B : 19 July 1986
SKYPE :msyahrilawth
EMAIL ADDRESS / Linkedin profile
syahril1@hotmail.com
/
my.linkedin.com/pub/mohd-syahril-awth/50/6b1/605/
W O R K I N G O B J E C T I V E S
C O U R S E & P R O F F E S S I O N A L Q U A L I F I C A T I O N
4 CSWIP 3.1 – Welding Inspector Level 2 TWI SEA, KL
5 CSWIP 3.4 – Radiographic Interpretation Level 2 TWI SEA, KL
6 NDE ITALY - SAUDI ARAMCO Preparation course & Examination,
Date : 14 July -21 July 2013
Bergamo,
Italy
7 Technical Engineer Training on DESALTER PROCESS SYSTEM, presented by DR.
Maruyama, Morito at CAMERON JAPAN LTD TOKYO Office. Agenda covering :
1. Understanding of Desalter System Unit.
2. Internal Item and Bush Technical Assembly procedures.
3. Practically handling on assembly Bush, Inspection and Leak Test training.
Gobancho,
Chiyoda-Ku
Tokyo.
.
CERTIFICATION OBTAIN
NO DESCRIPTION EXP DATE
1 CSWIP 3.1- Welding Inspector – Level 2 , ID no : 75620 04-04-2018
2 NDT Certificates of ASNT-TC-1A - NDT Level 2 at Budiman Inspection SDN BHD
1. RT
2. UT
3. MPT
4. LPT
27-06-2015
20-08-2015
13-06-2015
13-06-2015
3 NDE GLOBAL TECHNICAL SERVICES (USA) ONLINE QUALIFICATION
EXAMINATION
1. Safety Approval Certificates (HSSE) – Certificates No: HM0000213
2. Expeditor Approval Certificates – Certificates No: EM0000102
3. Inspector Approval Certificates (General Mechanical & Welding) – Certificates
No: IM0000256
NA
4 ARAMCO APPROVED INSPECTOR, SAP No : 70016485
N
O
SAP CODE SAP DESCRIPTION
1 QM06 Fabricated Piping (01)
2 QM07 Valve (04)
3 QM08 Fittings (03)
4 QM09 Gaskets (06)
5 QM37 Relief Valve, Control Valve (34)
6 QM03 Mechanical-General (01-04,13,31,32)
7 QM13 Lumber (09)
8 QM14 Fasteners (10)
9 QM15 Structural Steels (12)
10 QM24 Aircraft Re-fuelers & de-fuel
11 QM35 Skid Mounted Equip-Mech (34)
12 QM45 Vehicle & Accessories (24)
13 QM04 MPE, X-Ray, US & LPE
14 QM32 Boilers (32)
15 QM33 Heaters (32)
16 QM30 Pressure Vessel (32)
17 QM34 Tanks
NA
** NOTE: The proven certificates will be submitted upon request
2
ADDITIONAL INFO
Highest Education
Course : Diploma in Mechanical Engineering (Grad with 3.71 CGPA)
CLASS : Year of 2005 - 2007
Institute : Politeknik Seberang Perai, Pulau Pinang
On-Going Education : Bachelor Degree of Mechanical – UTM Space (Part Time)
Soft skills : AutoCAD 2D / 3D, Microsoft Office (doc. Pdf, Excel and Email systems)
- Carry out Inspection base on approved ITP (Inspection Test Plan), drawing and procedures.
- Witnessed (spot), traceability, fit up inspection, nozzles layout dimension, welding and visual,
internal and external, outline drawing and involved in welder qualification test (WQT) for the assign
project. Monitor the welding activity as per approved WPS/PQR and project procedures.
- Spot witnessed on PWHT activity, Thermocouple installation refer as per approved PWHT
procedure for assign project.
- Witnessed and carried out inspection for the arriving material such as Plate, flange (ASME B16.5),
pipe and others related item refer to Material certification with Approved drawing, ASME Section II
Part A Edition 2010 (material Specification).
- Conduct Inspection for Hydro Test, Final Dimension Internal/External, Blasting and Painting with
related test (DFT, Holiday Test), Hardness Test, PMI test and Visual Inspection for assign project
refer to approved ITP and procedures. Review and witnessed the calibrated gauge, temp gauge,
water analysis and chart decoder while perform HT.
- Review and witnessed some of NDE activity such WFMT, MT, PTF, PT, RT and UT examination in
accordance with ASME Section V (NDT Examination) for the assign project refer to ITP and client
procedures.
- Review Manufacturing Data Record (MDR) accordingly to make sure all the related document are
completed and comply with the ASME Section VIII Div 1 (Pressure Vessel edition 2010), ITP,
3
Language and Communications
• Good command of written and verbal in
English and Excelent in Bahasa
Malaysia/Indonesia.
Others
• Full clean driving license (D)
• Possess Own Transport.
• Willing To Travel and Located
E D U C A T I O N
G E N E R A L I N D U S T R I A L K N O W L E D G E
Procedures, Approved drawing and project specification.
- Involved in packing activity and final inspection before delivery subject reference approved packing
procedure, packing list etc. as per agreed in Purchase order and project specification.
- Generate reporting for inspection activity as per client instruction such as weekly report or daily
report.
- Generate the Inspection Release Note/Certificate ( IRN/IRC) upon completion and satisfaction final
inspection.
Valve Inspection Activity
- Witnessed the Hydro Testing for Body, seat Leak test, Functional Test refer to approved project
procedures/manufacture recommended procedure.
- Visual Inspection such as painting condition (visual and DFT check), parts installation as per
Drawing and Specification Sheet, Painting, Packing and review the related document as per client
request.
- Witnessed the cryogenic testing (low temperature material), review certificate such as mill
certificate, test certificates, COC to ensure all document comply with project specification.
- Familiar with valve requirement and testing for Butterfly valve, control valve, globe valve, ball
valve, pressure safety relieve valve, Emergency Shutdown Valve (ESDV) and etc.
Blasting and Painting Inspection
- Monitoring the blasting activity and ensure the compressed air was free from water and oil (check
the water and oil trap was install and air used was free from moisture) – ASTM D4285 (test of
compressed air).
- Production test such as blotter test on air compressor, checking the blasting pot, hose, air gun,
competent blasting personal etc. which is required to comply with safety requirement.
- Inspect the abrasive media to be free from moisture and contamination, the media use required
proper storage as per approved project procedure.
- Visual inspection on equipment that will be blasting to ensure that it is free from any of mechanical
damage, weld spatter, grease, debris, oil and others defect that can affected on poor quality of
painting.
- To ensure the blasting and painting was carried out at acceptable ambient temperature which is
can be recorded by Hygrometer. – Refer to Painting and blasting project procedure for value of
humidity and dew point.
- Verified the anchor profile after blasting, normally use testex or needle gauge. All painting shall be
following the Manufacturer Recommendation to ensure the coating free from defect.
- Witnessed the wet film thickness (WFT) checking during painting – use comb gauge.
- Witnessed the dry film thickness (DFT) with calibrated electromagnetic gauge.
- Visual inspection was carried out after painting to check the detrimental film, irregularities such as
4
lifting, peeling, mud cracks, blisters excessive sagging and other like insufficient coverage, color
variations, overspray, dry spray etc.
- Involved with the adhesion test (Dolly - pull off testing (ASTM D4541) and cross cut test) which
been carried out by competent paint personnel.
- Involved with the Holiday Test activity – check the continuity of protective coatings to detect
unacceptable discontinuities such as pinholes and voids.
- Review the painting report, which is required to be endorsed by Paint Manufacturers Competent
Personnel.
ENGGAGED COMPANY FOR AD-HOC / RESDIENT / CONTRACT JOB:
1. Company Name : Budiman Inspection Sdn Bhd, Malaysia.
Position : Mechanical Inspector / Welding Inspector/ Expeditor
Date Joined : November 2011 – Present (On Call Assignment)
2. Company Name : Velosi ( M ) Sdn Bhd, Malaysia.
Position : Mechanical Inspector / Welding Inspector
Date Joined : On Call Assignment.
3. Company Name : Cuteh Solution Pte. Ltd, Singapore.
Position : Mechanical Inspector / Welding Inspector
Date Joined : On Call Assignment
4. Company Name : AMO & Partners Engineering, Jeddah KSA
Position : Mechanical Inspector / Welding Inspector
Date Joined : On Call Assignment
1. Company Name : KNM Ogpet ( East Cost ) Sdn Bhd, Pelabuhan Kuantan, Pahang
Position : Site Supervisor
Client : Shell Refining Co (Federation of Malaya) Bhd, Port Dickson.
Date joined : August 2011 – November 2011
Position : QC Inspector
Date joined : Early 2008 – November 2009
5
C O M P A N I E S J O I N E D
2. Company Name : Mackenzie Industries Sdn Bhd (Wasco Group), Shah Alam .
Position : QC Inspector
Client : Delcom Services Sdn Bhd.
Project : Fabrication and Installation 1 Unit of HRSG Boiler, Thermal
Dearator, GAS TURBINE, Refractory and etc. at PERSTIMA,
Pasir Gudang, Johor Malaysia.
Date joined : December 2009 – July 2011
Project : KCSBO (GPPA Petronas Gas Kertih, Terengganu)
Equipment : HRSG Boiler (40T/h @ 25 Bar) /Piping and Structures
Date Joined : November 2009 – June 2010
POSTION: VENDOR INSPECTOR (MECHANICAL& WELDING)
NO PROJECT DETAILS
1. Vendor/Sub Vendor : Technip-MMHE (TMJV) / Valser Sdn Bhd
Owner /Project : Petronas Carigali Sdn Bhd (PCSB) / SK316 Development Project
Equipment : Ball Actuated Valve, MOV and Butterfly with Instruments Panel.
Agency : Intertek for TMJV
Location/Date : Nilai Negeri Sembilan, Malaysia / December 2014
SUMMARIZE ACTIVITY
• To attend the Factory Acceptance Test as per assign NOI.
• Expedite the documentation submission by vendor, client such as ITP and related
procedures.
• Witness hydro test on ball valves.
• Witness visual and dimensional inspection
• Witness FAT inspection which includes seat leak test and function test (including
failure mode test).
• Perform spot inspection on painting using DFT elcometer
• Perform witness inspection on material composition using portable Spectrometer gun
• Documentation review on mill certification, NDT report, PMI report, valve link report and
also COC.
2. Vendor/Sub Vendor : Emerson Europe / Emerson Manufacturing
Owner /Project : Technicas Reunidas for KEMYA / SAUDI ELASTOMERS
PORJECT (SEP)
Equipment : Control Valve
Agency : Budiman Inspection for NDE, Singapore / EUROCONTROL
Location/Date : Emerson , Nilai Malaysia / July – November 2014
SUMMARIZE ACTIVITY
•To attend the Factory Acceptance Test as per assign NOI.
6
P R O J E C T I N V O L V E D & D U T I E S
•Expedite the documentation submission by vendor, client such as ITP and related
procedures.
•Witness the testing of painted valve covering the Hydrostatic shell test, Hydrostatic seat
Test, functional test, valve failure system etc.
•Visual and final dimension of the complete assemble valve against valve specification
sheet and drawing.
•Review the MDR/CMTR contains material and test certificates.
•Produce Inspection report and Inspection release Certificates (IRC).
3. Vendor/Sub Vendor : Korea FA. Co Ltd / Emerson Manufacturing
Owner /Project : SKEC for EPPETROECUADOR (EPP) / ESMERALDAS
REFINERY PROJECT.
Equipment : Control Valve ( V – Ball)
Agency : Budiman Inspection for NDE, Singapore / GoodIn Korea
Location/Date : Emerson , Nilai Malaysia / July – November 2014
SUMMARIZE ACTIVITY
•To attend the Factory Acceptance Test as per assign NOI.
•Expedite the documentation submission by vendor, client such as ITP and related
procedures.
•Witness the testing of painted valve covering the Hydrostatic shell test, Hydrostatic seat
Test, functional test, valve failure system etc.
•Visual and final dimension of the complete assemble valve against valve specification
sheet and drawing.
•Packing Inspection activity.
•Review the MDR/CMTR contains material and test certificates.
•Produce Inspection report and Inspection release Certificates (IRC).
4. Vendor/Sub Vendor : SIEMENS MULHEIM GERMAN/ SIEMENS PTSI, CILEGON BANTEN
Owner /Project : SEPCO for SAUDI ARAMCO OVERSEAS BV / JAZAN - JIGCC Power
Block Project (Package 4)
Equipment : LP Outer Casing for Turbine ( Mechanical General (QM 03))
Agency : Budiman Inspection for NDE, Singapore / TUV RHEINLAND
Location/Date : SIMENS PTSI CILEGON, JAKARTA INDONESIA / November 2014
SUMMARIZE ACTIVITY
•To attend the Factory Acceptance Test / Final Inspection as per assign NOI.
•Expedite the documentation approval submission by vendor, client such as ITP and
related procedures.
•Witness the dimensional and visual inspection including pre-assembly check and
identification marking. Final check for completeness of all inspection steps
•Witness the try fit/assembly condition for outer casing, verified the bolting alignment
condition, fit-up assemble condition, visual inspection on material/equipment and others
related activity as per Inspection test plan witness point.
•Review the MDR contains material and test certificates.
•Produce Inspection report and Inspection release Certificates (IRC) if applicable.
5. Vendor/Sub Vendor : Emerson Process System Pte ltd / Emerson Manufacturing
Owner /Project : GSEC for SAUDI ARAMCO OVERSEAS BV / RABIGH PHASE II
7
CP3/4 PROJECT
Equipment : Control Valve (QM 37)
Agency : Budiman Inspection for NDE, Singapore / GoodIn Korea
Location/Date : Emerson , Nilai Malaysia / July – Present year of 2014
SUMMARIZE ACTIVITY
•To attend the Factory Acceptance Test as per assign NOI.
•Expedite the documentation submission by vendor, client such as ITP and related
procedures.
•Witness the testing of painted valve covering the Hydrostatic shell test, Hydrostatic seat
Test, functional test, valve failure system etc.
•Visual and final dimension of the complete assemble valve against valve specification
sheet and drawing.
•Packing Inspection activity.
•Review the MDR/CMTR contains material and test certificates.
•Produce Inspection report and Inspection release Certificates (IRC).
•Inspection carried out together with AOC representative as a Monitoring Inspector (BV
Malaysia).
6. Vendor/Sub Vendor : GS Engineering & Construction Corp / Shibata Industrial Co. Ltd
Owner /Project : Aramco Oversea Company BV & Sumitomo Chemical Co Ltd / Rabigh
II Project Interconnecting Package.
Equipment : Jetty Fender ( Steel Frame, Rubber Fender & UHMWP Surface
Pad) - QM03/04/12/30
Agency : Budiman Inspection Sdn Bhd for NDE Singapore.
Location/Date : Klang , Malaysia / August 2014
SUMMARIZE ACTIVITY
•To attend the Factory Acceptance Test for Rubber Fender and Frame fender as per assign
NOI.
•Expedite the documentation submission by vendor, client such as ITP and related
procedures.
•Witness the testing of rubber fender – compression test (kN-m) as per required I project
specification.
•Visual and final dimension of the complete assemble of frame fender and UMPWP face
fender.
•Assembly/final inspection for Fender- completes with face pad and rubber fender
installation.
•Packing Inspection activity.
•Review the MDR/CMTR contains material and test certificates.
•Produce Inspection report and Inspection release Certificates (IRC).
7. Vendor/Sub Vendor : KOFAC (Korea FA.CO Ltd) / Emerson Manufacturing
Owner /Project : eTEC E&C Ltd SEOL KOREA for SABIC / SADARA GAS SUPPLY
Equipment : Control Valve
Agency : IPTS for TUV NORD-INCOK, Korea
Location/Date : Emerson , Nilai Malaysia / August 2014
8
SUMMARIZE ACTIVITY
•To attend the Factory Acceptance Test as per assign NOI.
•Expedite the documentation submission by vendor, client such as ITP and related
procedures.
•Witness the testing of painted valve covering the Hydrostatic shell test, Hydrostatic seat
Test, functional test, valve failure system etc.
•Visual and final dimension of the complete assemble valve against valve specification
sheet and drawing.
•Packing Inspection activity.
•Review the MDR/CMTR contains material and test certificates.
•Produce Inspection report and Inspection release Certificates (IRC).
8. Vendor/Sub Vendor : Emerson Process System Pte ltd / Emerson Manufacturing
Owner /Project : SKEC for SAUDI ARAMCO OVERSEAS BV / WASIT INLET GAS
PACKAGE #1
Equipment : Control Valve (QM 37)
Agency : IPTS for TUV NORD-INCOK, Korea
Location/Date : Emerson , Nilai Malaysia / July and August 2014
SUMMARIZE ACTIVITY
•To attend the Factory Acceptance Test as per assign NOI.
•Expedite the documentation submission by vendor, client such as ITP and related
procedures.
•Witness the testing of painted valve covering the Hydrostatic shell test, Hydrostatic seat
Test, functional test, valve failure system etc.
•Visual and final dimension of the complete assemble valve against valve specification
sheet and drawing.
•Packing Inspection activity.
•Review the MDR/CMTR contains material and test certificates.
•Produce Inspection report and Inspection release Certificates (IRC).
•Inspection carried out together with AOC representative as a Monitoring Inspector (BV
Malaysia).
9. Vendor/Sub Vendor : SHENZEN JUTAL MACINERY EQUIPMENT CO LTD / ZHUHAI
JUTAL OFFSHORE OIL SERVCE LIMITED
Owner /Project : SKEC for ARAMCO OVERSEAS / WASIT GAS PROCESSING PLANT
Equipment : Pressure Vessel ( Filter ) - QM 30
Agency : Budiman Inspection for NDE Singapore
Location/Date : Zhuhai, China / July 2014
SUMMARIZE ACTIVITY
•To attend the Final Inspection as per assign NOI for 16 units of Vessel ( filter & separator)
•Expedite the documentation submission by vendor for approval from Client and AOC
including the ITP, related procedures and drawing.
•Witness the final visual welding, dimensional as per approved drawing, hardness test,
hydrostatic test , RT Film Review, NDE Report review- MT, PT, DPT and blasting activity
during the visit.
9
•To ensure that all the fabrication been doing as per client – AOC specification, SAMSS**
•Review the MDR/CMTR contains material certificates, NDE report, test report – PWHT, HT,
fabrication record and etc.
•Inspection carried out together with AOC representative as a Monitoring Inspector (SGS
China).
•Produce Daily Inspection report and Inspection release Certificates (IRC).
10. Vendor/Sub Vendor : Emerson Process System Pte ltd / Emerson Manufacturing
Owner /Project : DAEWOO / SADARA Project
Equipment : Control Valve
Agency : Budiman Inspection for Goodin Inspection, Korea
Location/Date : Emerson , Nilai Malaysia / May 2014
SUMMARIZE ACTIVITY
•To attend the Factory Acceptance Test as per assign NOI.
•Expedite the documentation submission by vendor, client such as ITP and related
procedures.
•Witness the testing of painted valve covering the Hydrostatic shell test, Hydrostatic seat
Test, functional test, valve failure system etc.
•Visual and final dimension of the complete assemble valve against valve specification
sheet and drawing.
•Packing Inspection activity.
•Review the MDR/CMTR contains material and test certificates.
•Produce Inspection report and Inspection release Certificates (IRC).
11. Vendor/Sub Vendor : KNM-KEE Shah Alam
Owner /Project : Lukoil Uzbekistan./ GISSAR Project
Equipment : GAS EXCHANGER & VESSEL
Agency : Velosi Malaysia.
Location/Date : Shah Alam, Selangor Malaysia / May 2014
SUMMARIZE ACTIVITY
•To attend the Final Inspection as per assign NOI.
•Expedite the documentation submission by vendor, client such as ITP and related
procedures.
•Visual and final dimension of the exchanger refer to approved drawing.
•Witness the Hydro testing for the Vessel and exchanger.
•Review the MDR such as material, NDE report, PWHT and test certificates.
•Produce Inspection report for every visit
12. Vendor/Sub Vendor : Tharphone Energy Services Asia Pacific / Vantage Eng.works S/B
Owner /Project : Caracal Energy Inc./ Moundou Generation Project
Equipment : E HOUSE STRUCTURE & WELDING WORKS
Agency : Budiman Inspection for NDE, Singapore.
Location/Date : Teluk Panglima Garang, Selangor Malaysia / May 2014
SUMMARIZE ACTIVITY
10
•To attend the Final Inspection as per assign NOI.
•Expedite the documentation submission by vendor, client such as ITP and related
procedures.
•Visual and final dimension of the E-HOUSE refer to approved drawing.
•Painting inspection, DFT check and paint report review.
•Review the MDR such as material, NDE report and test certificates.
•Produce Inspection report and IRC (Inspection release Certificates)
13. Vendor/Sub Vendor : In Line Co Ltd / Paladon System Sdn Bhd
Owner /Project : Darya Pala Engineering Co. / SHURIJEH “D” Gas Injection Project
Equipment : Control Valve sizing 3” & 4” (30 units)
Agency : IKA Eng. & Tech Co, Iran.
Location/Date : Paladon System Sdn Bhd , Malaysia / April 2014 - Present
SUMMARIZE ACTIVITY
•To attend the Factory Acceptance Test as per assign NOI.
•Expedite the documentation submission by vendor, client such as ITP and related
procedures.
•Witness the testing of Control Valve for valve and actuator integration covering the
activity on functional test, valve failure system, joint leakage test, linearity, and
hysteresis.
•Visual and final dimension of the complete assemble valve against valve specification
sheet and drawing.
•Painting Inspection activity.
•Review the MDR such as material and test certificates.
•Produce Inspection report and Inspection release Certificates (IRC).
14.Vendor/Sub Vendor : Frames Separation Tech. BV / BKT Fraser Thermal Tech. Sdn Bhd
Owner /Project : STONE FPSO-TOPSIDE OIL SEPARATOR
Equipment : 4 Units of Vessel Test Separator
Agency : Budiman Inspection for OGTECH Singapore.
Location/Date : Rawang Integrated Industrial Estate Malaysia / April 2014
SUMMARIZE ACTIVITY
•To attend the Final Inspection – Visual & Dimension, HT and Painting as per assign NOI.
• Verified the traceability of heat no for all inspected items, review the mill certificates and
endorsed.
• Expedite the status of approved document such as ITP and related procedures.
•MDR review activity, mill certificates and test report (NDE – MT, UT & RT)
• Produce Inspection report and Inspection release Certificates (IRC).
15.Vendor/Sub Vendor : PHOCEENNE / KT Fittings Sdn Bhd
Owner /Project : Saudi Aramco / SADARA Project
Equipment : SS BW Fittings (QM 08)
Agency : Budiman Inspection for NDE, Singapore.
Location/Date : Klang, Malaysia / January 2014
SUMMARIZE ACTIVITY
11
•To attend the Final Inspection as per assign NOI.
• Final Inspection before Delivery, covering the dimensional, visual inspection, QTTY
verification vs PO and packing for the SS fittings.
• Verified the traceability of heat no for all inspected items, review the mill certificates and
endorsed.
• Expedite the status of approved document such as ITP and related procedures.
• Produce Inspection report and Inspection release Certificates (IRC).
16. Vendor/Sub Vendor : PT. VME Process
Owner /Project : Saudi Aramco / WASIT Gas Processing Project
Equipment : Control Valve (QM 07)
Agency : AMO & Partners Engineering, Jeddah KSA.
Location/Date : Emerson , Nilai Malaysia / February 2014 - Present
SUMMARIZE ACTIVITY
•To attend the Factory Acceptance Test as per assign NOI.
•Expedite the documentation submission by vendor, client such as ITP and related
procedures.
•Witness the testing of unpainted valve covering the Hydrostatic shell test, Hydrostatic
seat Test, functional test, valve failure system etc.
•Visual and final dimension of the complete assemble valve against valve specification
sheet and drawing.
•Packing Inspection activity.
•Review the MDR such as material and test certificates.
•Produce Inspection report and Inspection release Certificates (IRC).
•Inspection carried out together with AOC representative as a Monitoring Inspector (ABS
Malaysia).
17. Vendor/Sub Vendor : PT. VME Process
Owner /Project : Saudi Aramco / WASIT Gas Processing Project
Equipment : Structural Fabrication (QM 15)
Agency : Cutech Solution Pte Ltd, Singapore.
Location/Date : Batam Island, Indonesia / December 2013 – Present.
SUMMARIZE ACTIVITY
•To attend the Inspection as per assign NOI with references to ITP activity.
•Activity covering the monitoring and surveillance of fabrication such as fit up, welding,
consumable control, dimensional and welding visual inspection for structure (H-Beam).
•MDR review activity, mill certificates and test report (NDE)
•Expedite the documentation and procedures approval status
•Produce Inspection report and Inspection release Certificates (IRC).
18. Vendor/Sub Vendor : JAG Flowcomponents LP / Mir Valve, Malaysia
Owner /Project : Enbridge Pipeline Inc / South Edmonton Terminal
Equipment : Ball Valve
Agency : Budiman Inspection for NDE, Singapore.
Location/Date : Shah Alam Selangor / December 2013
12
SUMMARIZE ACTIVITY
•To attend the Factory Acceptance Test as per assign NOI.
•Testing activities covering the Hydrostatic shell test, Hydrostatic seat Test, Double
isolation and bleed (DIB) test and low pressure air seat test for the unpainted valve.
•All the testing was carried out as per FAT test procedures provide by Vendor/client.
•Review the quality document such as Mill certificates, test report as per stated in project
specification sheet.
•Produce Inspection report and Inspection release Certificates (IRC).
19. Vendor/Sub Vendor : Technip - NPCC / Favelle Favco Crane (M) Sdn Bhd
Owner /Project : ZAKUM Development Company /Upper ZAKUM Project
Equipment : 5 units of pedestal Crane with inspected items - Pedestal, Turret,
Powerpack, Winch and Boom.
Agency : Velosi (M) Sdn Bhd
Location/Date : Senawang, Negeri Sembilan, Malaysia / December 2013 - Present
SUMMARIZE ACTIVITY
• Attend the inspection as per given NOI with references by ITP inspection point.
•The activity covering the in process of fabrication (visual on welding) for pedestal, turret,
boom top & bottom, winch and power pack
•Final inspection before delivery for pedestal on painting and all quality document such as
painting report etc.
•Review all the NDE report, Mill certificates and MDR for all the crane parts.
• Pre-commissioning inspection on major part for winch, cabin, slew ring, slew drive, bolt
torque inspection and associate work.
• Witness the high pressure hydro test for hydraulic hose.
• Involved in FAT & COMMISSIONING for pedestal crane such as functional test, load test
and endurance test.
•Produce Inspection report and Inspection release Certificates (IRC).
20. Vendor/Sub Vendor : Sterling Deaerator Company / VESSELTECH Engineering S/B
Owner /Project : Technicas Reunidas for KEMYA / SAUDI ELASTOMERS Project
Equipment : Thermal Dearator - Heater Tank (SS) and Storage Tank.
Agency : Budiman Inspection for NDE, Singapore
Location/Date : Balakong, Selangor Malaysia / December 2013
SUMMARIZE ACTIVITY
•Attend the inspection as per given NOI with references by ITP inspection point.
•Activity covering the monitoring and surveillance of fabrication such as fit up, welding,
consumable control, dimensional and welding visual inspection.
•Witness the Hydrostatics shell test, PWHT result report etc.
•Review the NDE report, Mill certificates and MDR for the equipment’s.
•Witness the painting visual inspection, review report and endorsed.
•Attend the factory acceptance test, final inspection before delivery and packing.
•Produce Inspection report and Inspection release Certificates (IRC).
13
21. Vendor/Sub Vendor : The Reynold’s Company / IME Cable support System Sdn Bhd
Owner /Project : AMEC Oil&Gas Inc for Exxon Mobil USA / Angola Blck Kizomba
Satellite Phase 2
Equipment : Cable Tray / ladder with Multiple Tag and Hardware.
Agency : Budiman Inspection for NDE, Singapore
Location / Date : Subang, Selangor Malaysia / November 2013
22. Vendor/Sub Vendor : Frame Separation Technology BV / Tepat Teknik SB
Owner /Project : SBM OFFSHORE / Shell Stone FPSO
Equipment : Chemical Injection Skid Module (Structure, Tank, Pressure Vessel
and Pump Skid)
Agency : Budiman Inspection for OGTECH, Singapore
Location / Date : Shah Alam, Selangor, Malaysia/ October 2012
23. Vendor/Sub Vendor : KROHNE OIL & GAS - Malaysia / PeerMark Engineering
Owner /Project : FLUOR Philippine for SANTOS Ltd / GLADSTONE
Equipment : Metering Skid (Piping Fabrication as per B31.3 –Process Piping).
Agency : Budiman Inspection for NDE, Singapore
Location / Date : Telok Gong, Klang, Malaysia / April 2012 – October 2013
24. Vendor/Sub Vendor : OVIVO / Peer Mark Engineering SDN BHD
Owner /Project : MALAKOFF Eng.SDN BHD / Tanjung Bin Power Plant
Equipment : Skid Module (Structure and Piping SS and CS)
Agency : Budiman Inspection Malaysia.
Location / Date : Telok Gong, Klang, Malaysia / October & November 2013
25. Vendor/Sub Vendor : Hyundai Eng. Co. Ltd / Interstate M&E, Malaysia
Owner /Project : Petronas Gas Berhad (PGB) / PRR2
Equipment : Junction Box, Cable Tray
Agency : Budiman Inspection for Goodin Inspection, Korea
Location / Date : Subang, Selangor, Malaysia / March 2013
26. Vendor/Sub Vendor : Emerson Process Management Sdn Bhd
Owner /Project : FLUOR Aust. PTY LTD. / GLNG –
Equipment : Pneumatic Control - Globe Valve
Agency : Budiman Inspection for NDE, Singapore
Location / Date : Nilai, Negeri Sembilan, Malaysia / October – December 2013
27. Vendor/Sub Vendor : Hyundai Eng. Co. Ltd / Mir Valve, Malaysia
Owner /Project : Petronas Gas Berhad (PGB) / PRR2 Project
Equipment : Ball Valve with Cryogenic Testing
Agency : Budiman Inspection for Goodin Inspection, Korea
Location / Date : Shah Alam, Selangor, Malaysia / March 2013
28. Vendor/Sub Vendor : Frame Separation Technology BV / Tepat Teknik SB
Owner /Project : SBM OFFSHORE / FPSO N’GOMA
Equipment : Chemical Injection Skid Module (Structure, Tank, Pressure
Vessel
and Pump Skid)
Agency : Budiman Inspection for OGTECH, Singapore
Location / Date : Shah Alam, Selangor, Malaysia / September 2013
14
29. Vendor/Sub Vendor : Frame Separation Technology BV / Petra Fabricator SB
Owner /Project : BUMI ARMADA BHD / FPSO ARMADA CLAIRE
Equipment : Pressure Vessel
Agency : Budiman Inspection for OGTECH, Singapore
Location / Date : Shah Alam, Selangor, Malaysia / February 2013 – April 2013
30. Vendor/Sub Vendor : Emerson Process Management
Owner /Project : CB & I / PNG-LNG
Equipment : Control Pneumatic Globe/Ball Valve
Agency : Budiman Inspection for NDE, Singapore
Location/Date : Nilai, Negeri Sembilan, Malaysia / May 2012 – July 2012
31. Vendor/Sub Vendor : Siemens Energy INC / Jord International PTY LTD
Owner /Project : FLUOR US / Gas Turbine Alternator
Equipment : Lube Oil Cooler Package
Agency : Budiman Inspection for NDE, Singapore
Location/ Date : Rawang, Selangor, Malaysia / July 2012
32. Vendor/Sub Vendor : Hyundai Eng Corp (HEC) / KNM Exotic Equipment SDN BHD
Owner /Project : Petronas Gas Berhad / PRR2
Equipment : Heat Exchanger
Agency : Budiman Inspection for Goodin Inspection, Korea
Location /Date : Shah Alam, Selangor, Malaysia / July 2012 – August 2012
33. Vendor/Sub Vendor : Korea F.A. Co. Ltd / Emerson Process Management.
Owner / Project : S K Eng. and Construction Co. Ltd / TAKREER RRE PROJECT
Equipment : Globe Pneumatic Valve with Cryogenic Testing
Agency : Budiman Inspection for NDE, Singapore
Location / Date : Nilai, Negeri Sembilan, Malaysia / March 2012 – April 2014
34. Vendor/Sub Vendor : Hyundai Eng Corp (HEC) / Emerson Process Management.
Owner /Project : Petronas Gas Berhad / PRR2
Equipment : Globe Pneumatic Valve
Agency : Budiman Inspection for Goodin Inspection, Korea
Location /Date : Nilai, Negeri Sembilan, Malaysia / April – May 2012
35. Vendor/Sub Vendor : Krohne Oil and Gas Sdn Bhd/Peer Mark Engineering Sdn Bhd
Owner/Project : ORIGIN, Australia / Australia Pacific LNG Project
Equipment : Metering Skids (Piping Fabrication as per B31.3 -Process Piping).
Agency : Budiman Inspection for NDE, Singapore
Location / Date : Telok Gong, Klang, Malaysia / March 2012 – April 2012
36. Vendor/Sub Vendor : Frame Separation Technology BV /Petra Fabricator SB
Owner/Project : SIME DARBY/ B193 HP Gas Compression Module
Equipment : Pressure Vessel (Separator)
Agency : Budiman Inspection for OGTECH, Singapore
Location / Date : Shah Alam, Selangor Malaysia / November 2011 – April 2012
15
Project Involved with KNM – Year of 2008
Location - Kuantan Port Fabrication Yard
1. Project Name
• Stainless Stell Vessel for Pluto Onshore LNG Project Australia (2st-st Flare KO Drum)
Client
• Foster Wheeler Woodside (FWUK)
2. Project Name
• Propylene Fractionators for NCP Ethylene Plant, Al-Jubail
Client
• Saudi Chevron Philips / Contractor: JGC Corporation ( NIKKI )
3. Project Name
• C4 SPLITTER (FPT10) for SPT OLEFIN RECOVERY
Owner /Client
• Exxon Mobil Chemical Asia Pacific / Stone & Webster International Inc.
Tuan Adnan Tuan Ali (Managing Director)
Budiman Inspection Sdn Bhd (Malaysia)
Tel: +6013 9821405
Rasidah Wagiman
Technical Coordinator
NDE Technical Services Singapore Pte Ltd (Singapore)
Tel: +65 6425 0018
Nurul Adibah Hashim (Inspector Coordinator)
Velosi (M) Sdn Bhd (Malaysia)
Tel: O: 03 56337219, M: +6013 5947796
Krishnan Muthukumar (QA/QC Manager)
Cutech Quality Solution Pte Ltd (Singapore)
Tel: 68963556, 66650187
John Varghese (Section Head I&C)
AMO & Partners Engineering Co. (Jeddah KSA)
Ph:+9663 -8589403 Ext:250
Fax: + 9663 857 9132, Mob:+966-530705067
Emi Moriyama
Assistant Project Engineer
Cameron Japan Ltd (Japan)
DD +81-3-6893-4270
16
R E F E R E N C E S
Laveena Pinto
Resource Coordinator – Asia and Far East
Energy Engineering Oil & GAS Technical Service (Ajman – UAE)
Ph : +971 6 7419328, Ext 217 7 Fax : +971 6 741932
17

Recomendados

Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san... por
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Sangilimuthu Samiayyah
24.6K visualizações10 slides
Welding_Inspector_Resume-Muruganandam_(1) (1) por
Welding_Inspector_Resume-Muruganandam_(1) (1)Welding_Inspector_Resume-Muruganandam_(1) (1)
Welding_Inspector_Resume-Muruganandam_(1) (1)Muruganandam Govindharajan
1.2K visualizações5 slides
Resume of QA QC-Welding Engineer with 5+ years of exp por
Resume of QA QC-Welding Engineer with 5+ years of expResume of QA QC-Welding Engineer with 5+ years of exp
Resume of QA QC-Welding Engineer with 5+ years of expVijay Raghavan
5.8K visualizações4 slides
2016 Resume of Rajeev Kumar, Inspection Engineer (Surveyor-1) por
2016 Resume of Rajeev Kumar, Inspection Engineer (Surveyor-1)2016 Resume of Rajeev Kumar, Inspection Engineer (Surveyor-1)
2016 Resume of Rajeev Kumar, Inspection Engineer (Surveyor-1)Rajeev Kumar
822 visualizações7 slides
Manohar CV QA-QC por
Manohar CV QA-QCManohar CV QA-QC
Manohar CV QA-QCManohar Thangamani
1.7K visualizações7 slides
Aramco Approved Welding Inspector Resume por
Aramco Approved Welding Inspector ResumeAramco Approved Welding Inspector Resume
Aramco Approved Welding Inspector ResumeRobin Parayil
4.4K visualizações5 slides

Mais conteúdo relacionado

Mais procurados

QA QC Inspector.doc 1 por
QA QC Inspector.doc 1QA QC Inspector.doc 1
QA QC Inspector.doc 1Gurusamy Selvan
2.1K visualizações7 slides
Updated cv por
Updated cvUpdated cv
Updated cvShaju Chittilappilly( Awaiting New Contract)
619 visualizações6 slides
QC WELDING INSPECTOR por
QC WELDING INSPECTORQC WELDING INSPECTOR
QC WELDING INSPECTORNASEEB AHMAD
6.5K visualizações7 slides
RAJU CV por
RAJU  CVRAJU  CV
RAJU CVAlladi Pallapa Raju
910 visualizações7 slides
Mohammad Taher_QA-QC Piping-Welding por
Mohammad Taher_QA-QC Piping-WeldingMohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-WeldingMohammad Taher
582 visualizações10 slides
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipeline por
Resume -   Sr.QC Inspector-Mech.welding-painting-piping-pipelineResume -   Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipelineUDAYAKUMAR P C PANICKER
4.6K visualizações3 slides

Mais procurados(20)

QA QC Inspector.doc 1 por Gurusamy Selvan
QA QC Inspector.doc 1QA QC Inspector.doc 1
QA QC Inspector.doc 1
Gurusamy Selvan2.1K visualizações
QC WELDING INSPECTOR por NASEEB AHMAD
QC WELDING INSPECTORQC WELDING INSPECTOR
QC WELDING INSPECTOR
NASEEB AHMAD6.5K visualizações
Mohammad Taher_QA-QC Piping-Welding por Mohammad Taher
Mohammad Taher_QA-QC Piping-WeldingMohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-Welding
Mohammad Taher582 visualizações
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipeline por UDAYAKUMAR P C PANICKER
Resume -   Sr.QC Inspector-Mech.welding-painting-piping-pipelineResume -   Sr.QC Inspector-Mech.welding-painting-piping-pipeline
Resume - Sr.QC Inspector-Mech.welding-painting-piping-pipeline
UDAYAKUMAR P C PANICKER4.6K visualizações
SUPERVISOR CV for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ... por Saleem P.P
SUPERVISOR CV  for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...SUPERVISOR CV  for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...
SUPERVISOR CV for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...
Saleem P.P11.3K visualizações
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014 por Chandra ABS IV
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Chandra ABS IV13.3K visualizações
Cv mechanical supervisor por James Ct
Cv mechanical supervisorCv mechanical supervisor
Cv mechanical supervisor
James Ct6.4K visualizações
NDT Resume por suresh ndt
NDT ResumeNDT Resume
NDT Resume
suresh ndt1.8K visualizações
CV_Electrical and Instrumentation Engineer por Deva Narayanan
CV_Electrical and Instrumentation EngineerCV_Electrical and Instrumentation Engineer
CV_Electrical and Instrumentation Engineer
Deva Narayanan942 visualizações
Piping supervisor Cv.mohamad anwar malik por MOHAMAD ANWAR MALIK
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malik
MOHAMAD ANWAR MALIK3.6K visualizações
AKRAM CV QC Supervisor Mechanical por Mohammad Akram Mian
AKRAM CV QC Supervisor MechanicalAKRAM CV QC Supervisor Mechanical
AKRAM CV QC Supervisor Mechanical
Mohammad Akram Mian426 visualizações
Electrical Inspector CV por Abdul Hakkim
Electrical Inspector CVElectrical Inspector CV
Electrical Inspector CV
Abdul Hakkim4.5K visualizações
Resume- Rotating Equipment supervisor por nitin mokal
Resume- Rotating Equipment supervisorResume- Rotating Equipment supervisor
Resume- Rotating Equipment supervisor
nitin mokal4K visualizações
BNMurthy-Updated CV- QC Inspector por narasimha murthy
BNMurthy-Updated CV- QC InspectorBNMurthy-Updated CV- QC Inspector
BNMurthy-Updated CV- QC Inspector
narasimha murthy336 visualizações
Amjad CV Pipeing sup 2016 por Amjad Goraya
Amjad CV Pipeing sup 2016Amjad CV Pipeing sup 2016
Amjad CV Pipeing sup 2016
Amjad Goraya3.2K visualizações
Resume of jaison varkey, QA/QC inspector welding,coating offshore Oil & Gas por jaison varkey
Resume of jaison varkey, QA/QC  inspector welding,coating offshore Oil & GasResume of jaison varkey, QA/QC  inspector welding,coating offshore Oil & Gas
Resume of jaison varkey, QA/QC inspector welding,coating offshore Oil & Gas
jaison varkey12.3K visualizações
Karthik Resume por KARTHIK NATARAJAN
Karthik Resume Karthik Resume
Karthik Resume
KARTHIK NATARAJAN994 visualizações
Sr. QA/QC Mechanical Engineer por ahmedsgs
Sr. QA/QC Mechanical EngineerSr. QA/QC Mechanical Engineer
Sr. QA/QC Mechanical Engineer
ahmedsgs34.4K visualizações

Destaque

MOHAMMAD NAZHRI BIN MOHAMMAD HASHIM RESUME por
MOHAMMAD NAZHRI BIN MOHAMMAD HASHIM RESUME MOHAMMAD NAZHRI BIN MOHAMMAD HASHIM RESUME
MOHAMMAD NAZHRI BIN MOHAMMAD HASHIM RESUME mohammad nazhri mohammad hashim
3K visualizações5 slides
Nalinii-16477-VCB4233 por
Nalinii-16477-VCB4233Nalinii-16477-VCB4233
Nalinii-16477-VCB4233NALINII RAVICHANDRAN
220 visualizações8 slides
Jason Ngu Kai Sheng_ Resume por
Jason Ngu Kai Sheng_ ResumeJason Ngu Kai Sheng_ Resume
Jason Ngu Kai Sheng_ ResumeJason Ngu
400 visualizações2 slides
RESUME_-_IZZUDDIN_BIN_SAIFUL_ARIF_(Aug_2015)[1] por
RESUME_-_IZZUDDIN_BIN_SAIFUL_ARIF_(Aug_2015)[1]RESUME_-_IZZUDDIN_BIN_SAIFUL_ARIF_(Aug_2015)[1]
RESUME_-_IZZUDDIN_BIN_SAIFUL_ARIF_(Aug_2015)[1]Izzudin Arif
666 visualizações3 slides
RESUME SITI AISHAH BINTI ZOLKANAIN por
RESUME SITI AISHAH BINTI ZOLKANAINRESUME SITI AISHAH BINTI ZOLKANAIN
RESUME SITI AISHAH BINTI ZOLKANAINAishah Zolkanain
858 visualizações2 slides
RESUME Latest 2015 por
RESUME Latest 2015RESUME Latest 2015
RESUME Latest 2015Jadd Juhari
1K visualizações4 slides

Destaque(8)

Jason Ngu Kai Sheng_ Resume por Jason Ngu
Jason Ngu Kai Sheng_ ResumeJason Ngu Kai Sheng_ Resume
Jason Ngu Kai Sheng_ Resume
Jason Ngu400 visualizações
RESUME_-_IZZUDDIN_BIN_SAIFUL_ARIF_(Aug_2015)[1] por Izzudin Arif
RESUME_-_IZZUDDIN_BIN_SAIFUL_ARIF_(Aug_2015)[1]RESUME_-_IZZUDDIN_BIN_SAIFUL_ARIF_(Aug_2015)[1]
RESUME_-_IZZUDDIN_BIN_SAIFUL_ARIF_(Aug_2015)[1]
Izzudin Arif666 visualizações
RESUME SITI AISHAH BINTI ZOLKANAIN por Aishah Zolkanain
RESUME SITI AISHAH BINTI ZOLKANAINRESUME SITI AISHAH BINTI ZOLKANAIN
RESUME SITI AISHAH BINTI ZOLKANAIN
Aishah Zolkanain858 visualizações
RESUME Latest 2015 por Jadd Juhari
RESUME Latest 2015RESUME Latest 2015
RESUME Latest 2015
Jadd Juhari1K visualizações
CV Muhammad Afi Hassan 2015 por Muhammad Afi Hassan
CV Muhammad Afi Hassan 2015CV Muhammad Afi Hassan 2015
CV Muhammad Afi Hassan 2015
Muhammad Afi Hassan802 visualizações
Contoh Resume Terbaik por Syafwan Laili
Contoh Resume TerbaikContoh Resume Terbaik
Contoh Resume Terbaik
Syafwan Laili190.6K visualizações

Similar a Cv mohd syahril awth

Tahir CV por
Tahir CVTahir CV
Tahir CVTahir Mahmood
243 visualizações4 slides
Tahir CV por
Tahir CVTahir CV
Tahir CVTahir Mahmood
116 visualizações4 slides
RESUME 26 JAN por
RESUME 26 JANRESUME 26 JAN
RESUME 26 JANKrishna Narayana
419 visualizações3 slides
Ganesan Selvakumar CV 151116_M+W por
Ganesan Selvakumar CV 151116_M+WGanesan Selvakumar CV 151116_M+W
Ganesan Selvakumar CV 151116_M+WGanesan Selvakumar
396 visualizações4 slides
Multidispline Inspector - DEEPAK Rai por
Multidispline Inspector - DEEPAK RaiMultidispline Inspector - DEEPAK Rai
Multidispline Inspector - DEEPAK RaiDeepak Rai
447 visualizações8 slides
Resume por
ResumeResume
Resumepreecha tubtimkaew
282 visualizações4 slides

Similar a Cv mohd syahril awth(20)

Tahir CV por Tahir Mahmood
Tahir CVTahir CV
Tahir CV
Tahir Mahmood243 visualizações
Tahir CV por Tahir Mahmood
Tahir CVTahir CV
Tahir CV
Tahir Mahmood116 visualizações
RESUME 26 JAN por Krishna Narayana
RESUME 26 JANRESUME 26 JAN
RESUME 26 JAN
Krishna Narayana419 visualizações
Ganesan Selvakumar CV 151116_M+W por Ganesan Selvakumar
Ganesan Selvakumar CV 151116_M+WGanesan Selvakumar CV 151116_M+W
Ganesan Selvakumar CV 151116_M+W
Ganesan Selvakumar396 visualizações
Multidispline Inspector - DEEPAK Rai por Deepak Rai
Multidispline Inspector - DEEPAK RaiMultidispline Inspector - DEEPAK Rai
Multidispline Inspector - DEEPAK Rai
Deepak Rai447 visualizações
Multidispline Inspector - DEEPAK RAI por Deepak Rai
Multidispline Inspector - DEEPAK RAIMultidispline Inspector - DEEPAK RAI
Multidispline Inspector - DEEPAK RAI
Deepak Rai482 visualizações
CV-Vuong Tatthang por Vuong Thang
CV-Vuong TatthangCV-Vuong Tatthang
CV-Vuong Tatthang
Vuong Thang328 visualizações
T.rajakumar.cv por rajakumar kumar
T.rajakumar.cvT.rajakumar.cv
T.rajakumar.cv
rajakumar kumar236 visualizações
QA&QC Welding Inspector (R) por arjunan saravanan
QA&QC Welding Inspector (R)QA&QC Welding Inspector (R)
QA&QC Welding Inspector (R)
arjunan saravanan1.1K visualizações
Abdul Halim Sadikun - Resume 2016 (1) por Abdul Halim Sadikun
Abdul Halim Sadikun - Resume 2016 (1)Abdul Halim Sadikun - Resume 2016 (1)
Abdul Halim Sadikun - Resume 2016 (1)
Abdul Halim Sadikun164 visualizações
Phairat-CV(2015) por PHAIRAT INTO
Phairat-CV(2015)Phairat-CV(2015)
Phairat-CV(2015)
PHAIRAT INTO361 visualizações
QA QC Engineer-Inspector NEW por Milen Kurian
QA QC Engineer-Inspector NEWQA QC Engineer-Inspector NEW
QA QC Engineer-Inspector NEW
Milen Kurian491 visualizações
Muhammed Riswan-QC rev1 por MUHAMMED RISWAN
Muhammed Riswan-QC rev1Muhammed Riswan-QC rev1
Muhammed Riswan-QC rev1
MUHAMMED RISWAN264 visualizações
MADHAN RESUME - UPDATED por Madan Kumar
MADHAN RESUME - UPDATEDMADHAN RESUME - UPDATED
MADHAN RESUME - UPDATED
Madan Kumar939 visualizações
Linsin CV por Lincin Krishnan
Linsin CVLinsin CV
Linsin CV
Lincin Krishnan327 visualizações
NEW RESUME AUG-16 por Tushar Patel
NEW RESUME AUG-16NEW RESUME AUG-16
NEW RESUME AUG-16
Tushar Patel92 visualizações
MWI CV3 por Mark Woodman
MWI CV3MWI CV3
MWI CV3
Mark Woodman147 visualizações
Swarup cv 3 (1) por swarup mohanty
Swarup cv 3 (1)Swarup cv 3 (1)
Swarup cv 3 (1)
swarup mohanty227 visualizações

Último

Robotics in construction enterprise por
Robotics in construction enterpriseRobotics in construction enterprise
Robotics in construction enterpriseKhalid Abdel Naser Abdel Rahim
5 visualizações1 slide
dummy.pptx por
dummy.pptxdummy.pptx
dummy.pptxJamesLamp
5 visualizações2 slides
GDSC Mikroskil Members Onboarding 2023.pdf por
GDSC Mikroskil Members Onboarding 2023.pdfGDSC Mikroskil Members Onboarding 2023.pdf
GDSC Mikroskil Members Onboarding 2023.pdfgdscmikroskil
63 visualizações62 slides
Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc... por
Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc...Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc...
Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc...csegroupvn
8 visualizações210 slides
Web Dev Session 1.pptx por
Web Dev Session 1.pptxWeb Dev Session 1.pptx
Web Dev Session 1.pptxVedVekhande
17 visualizações22 slides
Plant Design Report-Oil Refinery.pdf por
Plant Design Report-Oil Refinery.pdfPlant Design Report-Oil Refinery.pdf
Plant Design Report-Oil Refinery.pdfSafeen Yaseen Ja'far
7 visualizações10 slides

Último(20)

dummy.pptx por JamesLamp
dummy.pptxdummy.pptx
dummy.pptx
JamesLamp5 visualizações
GDSC Mikroskil Members Onboarding 2023.pdf por gdscmikroskil
GDSC Mikroskil Members Onboarding 2023.pdfGDSC Mikroskil Members Onboarding 2023.pdf
GDSC Mikroskil Members Onboarding 2023.pdf
gdscmikroskil63 visualizações
Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc... por csegroupvn
Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc...Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc...
Design of Structures and Foundations for Vibrating Machines, Arya-ONeill-Pinc...
csegroupvn8 visualizações
Web Dev Session 1.pptx por VedVekhande
Web Dev Session 1.pptxWeb Dev Session 1.pptx
Web Dev Session 1.pptx
VedVekhande17 visualizações
Plant Design Report-Oil Refinery.pdf por Safeen Yaseen Ja'far
Plant Design Report-Oil Refinery.pdfPlant Design Report-Oil Refinery.pdf
Plant Design Report-Oil Refinery.pdf
Safeen Yaseen Ja'far7 visualizações
2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptx por lwang78
2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptx2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptx
2023Dec ASU Wang NETR Group Research Focus and Facility Overview.pptx
lwang78180 visualizações
Searching in Data Structure por raghavbirla63
Searching in Data StructureSearching in Data Structure
Searching in Data Structure
raghavbirla6317 visualizações
START Newsletter 3 por Start Project
START Newsletter 3START Newsletter 3
START Newsletter 3
Start Project7 visualizações
MK__Cert.pdf por Hassan Khan
MK__Cert.pdfMK__Cert.pdf
MK__Cert.pdf
Hassan Khan19 visualizações
sam_software_eng_cv.pdf por sammyigbinovia
sam_software_eng_cv.pdfsam_software_eng_cv.pdf
sam_software_eng_cv.pdf
sammyigbinovia10 visualizações
SUMIT SQL PROJECT SUPERSTORE 1.pptx por Sumit Jadhav
SUMIT SQL PROJECT SUPERSTORE 1.pptxSUMIT SQL PROJECT SUPERSTORE 1.pptx
SUMIT SQL PROJECT SUPERSTORE 1.pptx
Sumit Jadhav 22 visualizações
Créativité dans le design mécanique à l’aide de l’optimisation topologique por LIEGE CREATIVE
Créativité dans le design mécanique à l’aide de l’optimisation topologiqueCréativité dans le design mécanique à l’aide de l’optimisation topologique
Créativité dans le design mécanique à l’aide de l’optimisation topologique
LIEGE CREATIVE8 visualizações
REACTJS.pdf por ArthyR3
REACTJS.pdfREACTJS.pdf
REACTJS.pdf
ArthyR337 visualizações
ASSIGNMENTS ON FUZZY LOGIC IN TRAFFIC FLOW.pdf por AlhamduKure
ASSIGNMENTS ON FUZZY LOGIC IN TRAFFIC FLOW.pdfASSIGNMENTS ON FUZZY LOGIC IN TRAFFIC FLOW.pdf
ASSIGNMENTS ON FUZZY LOGIC IN TRAFFIC FLOW.pdf
AlhamduKure8 visualizações
Proposal Presentation.pptx por keytonallamon
Proposal Presentation.pptxProposal Presentation.pptx
Proposal Presentation.pptx
keytonallamon67 visualizações
Ansari: Practical experiences with an LLM-based Islamic Assistant por M Waleed Kadous
Ansari: Practical experiences with an LLM-based Islamic AssistantAnsari: Practical experiences with an LLM-based Islamic Assistant
Ansari: Practical experiences with an LLM-based Islamic Assistant
M Waleed Kadous9 visualizações
DESIGN OF SPRINGS-UNIT4.pptx por gopinathcreddy
DESIGN OF SPRINGS-UNIT4.pptxDESIGN OF SPRINGS-UNIT4.pptx
DESIGN OF SPRINGS-UNIT4.pptx
gopinathcreddy21 visualizações
Pitchbook Repowerlab.pdf por VictoriaGaleano
Pitchbook Repowerlab.pdfPitchbook Repowerlab.pdf
Pitchbook Repowerlab.pdf
VictoriaGaleano6 visualizações
Design of machine elements-UNIT 3.pptx por gopinathcreddy
Design of machine elements-UNIT 3.pptxDesign of machine elements-UNIT 3.pptx
Design of machine elements-UNIT 3.pptx
gopinathcreddy37 visualizações

Cv mohd syahril awth

  • 1.  A highly motivated and imaginative of Independent inspector with over than 7 Years experiences in fabrication/ vendor inspection of Oil & Gas equipment at Various of Country for Vessel ( Filter, Separator, Coalescor etc), coulomb, heat exchanger, tank, air cooler, metering skid & piping package, structure and valve.  Seeking for On-Call/long term contract job of inspection in Mechanical, welding or quality control inspection as current position is Freelance Inspector and had good knowledge, Experiences in Vendor and Welding Inspection.  Had a wide experiences in collaborate and joining Inspection with various country of people at any level, well adapted and good communication.  Excellent interpersonal and cross-cultural skill, able to build relationship with people at any level, detailed and result oriented, thrives under pressure and able to meet tight deadlines, meticulous and posses’ excellent analytical thinking. SEMINAR / COURSE ATTAND NO DESCRIPTION LOCATION 1 In-house Seminar of Understanding of Fabrication process, Pressure Vessel Fabrication Process and inspection, Fabrication work flow (Heavy Wall SS Pressure Vessel), Fabrication sequence of activities and inspection points by Mr. Ronnie A Villareal ( QC MANAGER KNM/KPS ) KNM, Kuantan Port 2 NATIONAL INSTITUTE OF OCCUPATION & HEALTH (NIOSH) COURSE and EXAMINATION 1. NIOSH oil and Gas Safety Passport (OGSP) 2. NIOSH TNB NIOSH, Bangi 3 DOMI Course – Understanding of Boiler system, HRSG, Fire Tube etc. Jutasama, Shah Alam 1 MOHD SYAHRIL AWANG TIH YEAR : 2014 UPDATE DATE : 19/01/15 POSITION of : MECHANICAL, WELDING INSPECTOR ADDRESS A209, PANGSAPURI SRI WIRA, JALAN UKAY PERDANA 2, TAMAN UKAY PERDANA, 68000 AMPANG SELANGOR, MALAYSIA. PHONE NO +6 0199855467 D.O.B : 19 July 1986 SKYPE :msyahrilawth EMAIL ADDRESS / Linkedin profile syahril1@hotmail.com / my.linkedin.com/pub/mohd-syahril-awth/50/6b1/605/ W O R K I N G O B J E C T I V E S C O U R S E & P R O F F E S S I O N A L Q U A L I F I C A T I O N
  • 2. 4 CSWIP 3.1 – Welding Inspector Level 2 TWI SEA, KL 5 CSWIP 3.4 – Radiographic Interpretation Level 2 TWI SEA, KL 6 NDE ITALY - SAUDI ARAMCO Preparation course & Examination, Date : 14 July -21 July 2013 Bergamo, Italy 7 Technical Engineer Training on DESALTER PROCESS SYSTEM, presented by DR. Maruyama, Morito at CAMERON JAPAN LTD TOKYO Office. Agenda covering : 1. Understanding of Desalter System Unit. 2. Internal Item and Bush Technical Assembly procedures. 3. Practically handling on assembly Bush, Inspection and Leak Test training. Gobancho, Chiyoda-Ku Tokyo. . CERTIFICATION OBTAIN NO DESCRIPTION EXP DATE 1 CSWIP 3.1- Welding Inspector – Level 2 , ID no : 75620 04-04-2018 2 NDT Certificates of ASNT-TC-1A - NDT Level 2 at Budiman Inspection SDN BHD 1. RT 2. UT 3. MPT 4. LPT 27-06-2015 20-08-2015 13-06-2015 13-06-2015 3 NDE GLOBAL TECHNICAL SERVICES (USA) ONLINE QUALIFICATION EXAMINATION 1. Safety Approval Certificates (HSSE) – Certificates No: HM0000213 2. Expeditor Approval Certificates – Certificates No: EM0000102 3. Inspector Approval Certificates (General Mechanical & Welding) – Certificates No: IM0000256 NA 4 ARAMCO APPROVED INSPECTOR, SAP No : 70016485 N O SAP CODE SAP DESCRIPTION 1 QM06 Fabricated Piping (01) 2 QM07 Valve (04) 3 QM08 Fittings (03) 4 QM09 Gaskets (06) 5 QM37 Relief Valve, Control Valve (34) 6 QM03 Mechanical-General (01-04,13,31,32) 7 QM13 Lumber (09) 8 QM14 Fasteners (10) 9 QM15 Structural Steels (12) 10 QM24 Aircraft Re-fuelers & de-fuel 11 QM35 Skid Mounted Equip-Mech (34) 12 QM45 Vehicle & Accessories (24) 13 QM04 MPE, X-Ray, US & LPE 14 QM32 Boilers (32) 15 QM33 Heaters (32) 16 QM30 Pressure Vessel (32) 17 QM34 Tanks NA ** NOTE: The proven certificates will be submitted upon request 2
  • 3. ADDITIONAL INFO Highest Education Course : Diploma in Mechanical Engineering (Grad with 3.71 CGPA) CLASS : Year of 2005 - 2007 Institute : Politeknik Seberang Perai, Pulau Pinang On-Going Education : Bachelor Degree of Mechanical – UTM Space (Part Time) Soft skills : AutoCAD 2D / 3D, Microsoft Office (doc. Pdf, Excel and Email systems) - Carry out Inspection base on approved ITP (Inspection Test Plan), drawing and procedures. - Witnessed (spot), traceability, fit up inspection, nozzles layout dimension, welding and visual, internal and external, outline drawing and involved in welder qualification test (WQT) for the assign project. Monitor the welding activity as per approved WPS/PQR and project procedures. - Spot witnessed on PWHT activity, Thermocouple installation refer as per approved PWHT procedure for assign project. - Witnessed and carried out inspection for the arriving material such as Plate, flange (ASME B16.5), pipe and others related item refer to Material certification with Approved drawing, ASME Section II Part A Edition 2010 (material Specification). - Conduct Inspection for Hydro Test, Final Dimension Internal/External, Blasting and Painting with related test (DFT, Holiday Test), Hardness Test, PMI test and Visual Inspection for assign project refer to approved ITP and procedures. Review and witnessed the calibrated gauge, temp gauge, water analysis and chart decoder while perform HT. - Review and witnessed some of NDE activity such WFMT, MT, PTF, PT, RT and UT examination in accordance with ASME Section V (NDT Examination) for the assign project refer to ITP and client procedures. - Review Manufacturing Data Record (MDR) accordingly to make sure all the related document are completed and comply with the ASME Section VIII Div 1 (Pressure Vessel edition 2010), ITP, 3 Language and Communications • Good command of written and verbal in English and Excelent in Bahasa Malaysia/Indonesia. Others • Full clean driving license (D) • Possess Own Transport. • Willing To Travel and Located E D U C A T I O N G E N E R A L I N D U S T R I A L K N O W L E D G E
  • 4. Procedures, Approved drawing and project specification. - Involved in packing activity and final inspection before delivery subject reference approved packing procedure, packing list etc. as per agreed in Purchase order and project specification. - Generate reporting for inspection activity as per client instruction such as weekly report or daily report. - Generate the Inspection Release Note/Certificate ( IRN/IRC) upon completion and satisfaction final inspection. Valve Inspection Activity - Witnessed the Hydro Testing for Body, seat Leak test, Functional Test refer to approved project procedures/manufacture recommended procedure. - Visual Inspection such as painting condition (visual and DFT check), parts installation as per Drawing and Specification Sheet, Painting, Packing and review the related document as per client request. - Witnessed the cryogenic testing (low temperature material), review certificate such as mill certificate, test certificates, COC to ensure all document comply with project specification. - Familiar with valve requirement and testing for Butterfly valve, control valve, globe valve, ball valve, pressure safety relieve valve, Emergency Shutdown Valve (ESDV) and etc. Blasting and Painting Inspection - Monitoring the blasting activity and ensure the compressed air was free from water and oil (check the water and oil trap was install and air used was free from moisture) – ASTM D4285 (test of compressed air). - Production test such as blotter test on air compressor, checking the blasting pot, hose, air gun, competent blasting personal etc. which is required to comply with safety requirement. - Inspect the abrasive media to be free from moisture and contamination, the media use required proper storage as per approved project procedure. - Visual inspection on equipment that will be blasting to ensure that it is free from any of mechanical damage, weld spatter, grease, debris, oil and others defect that can affected on poor quality of painting. - To ensure the blasting and painting was carried out at acceptable ambient temperature which is can be recorded by Hygrometer. – Refer to Painting and blasting project procedure for value of humidity and dew point. - Verified the anchor profile after blasting, normally use testex or needle gauge. All painting shall be following the Manufacturer Recommendation to ensure the coating free from defect. - Witnessed the wet film thickness (WFT) checking during painting – use comb gauge. - Witnessed the dry film thickness (DFT) with calibrated electromagnetic gauge. - Visual inspection was carried out after painting to check the detrimental film, irregularities such as 4
  • 5. lifting, peeling, mud cracks, blisters excessive sagging and other like insufficient coverage, color variations, overspray, dry spray etc. - Involved with the adhesion test (Dolly - pull off testing (ASTM D4541) and cross cut test) which been carried out by competent paint personnel. - Involved with the Holiday Test activity – check the continuity of protective coatings to detect unacceptable discontinuities such as pinholes and voids. - Review the painting report, which is required to be endorsed by Paint Manufacturers Competent Personnel. ENGGAGED COMPANY FOR AD-HOC / RESDIENT / CONTRACT JOB: 1. Company Name : Budiman Inspection Sdn Bhd, Malaysia. Position : Mechanical Inspector / Welding Inspector/ Expeditor Date Joined : November 2011 – Present (On Call Assignment) 2. Company Name : Velosi ( M ) Sdn Bhd, Malaysia. Position : Mechanical Inspector / Welding Inspector Date Joined : On Call Assignment. 3. Company Name : Cuteh Solution Pte. Ltd, Singapore. Position : Mechanical Inspector / Welding Inspector Date Joined : On Call Assignment 4. Company Name : AMO & Partners Engineering, Jeddah KSA Position : Mechanical Inspector / Welding Inspector Date Joined : On Call Assignment 1. Company Name : KNM Ogpet ( East Cost ) Sdn Bhd, Pelabuhan Kuantan, Pahang Position : Site Supervisor Client : Shell Refining Co (Federation of Malaya) Bhd, Port Dickson. Date joined : August 2011 – November 2011 Position : QC Inspector Date joined : Early 2008 – November 2009 5 C O M P A N I E S J O I N E D
  • 6. 2. Company Name : Mackenzie Industries Sdn Bhd (Wasco Group), Shah Alam . Position : QC Inspector Client : Delcom Services Sdn Bhd. Project : Fabrication and Installation 1 Unit of HRSG Boiler, Thermal Dearator, GAS TURBINE, Refractory and etc. at PERSTIMA, Pasir Gudang, Johor Malaysia. Date joined : December 2009 – July 2011 Project : KCSBO (GPPA Petronas Gas Kertih, Terengganu) Equipment : HRSG Boiler (40T/h @ 25 Bar) /Piping and Structures Date Joined : November 2009 – June 2010 POSTION: VENDOR INSPECTOR (MECHANICAL& WELDING) NO PROJECT DETAILS 1. Vendor/Sub Vendor : Technip-MMHE (TMJV) / Valser Sdn Bhd Owner /Project : Petronas Carigali Sdn Bhd (PCSB) / SK316 Development Project Equipment : Ball Actuated Valve, MOV and Butterfly with Instruments Panel. Agency : Intertek for TMJV Location/Date : Nilai Negeri Sembilan, Malaysia / December 2014 SUMMARIZE ACTIVITY • To attend the Factory Acceptance Test as per assign NOI. • Expedite the documentation submission by vendor, client such as ITP and related procedures. • Witness hydro test on ball valves. • Witness visual and dimensional inspection • Witness FAT inspection which includes seat leak test and function test (including failure mode test). • Perform spot inspection on painting using DFT elcometer • Perform witness inspection on material composition using portable Spectrometer gun • Documentation review on mill certification, NDT report, PMI report, valve link report and also COC. 2. Vendor/Sub Vendor : Emerson Europe / Emerson Manufacturing Owner /Project : Technicas Reunidas for KEMYA / SAUDI ELASTOMERS PORJECT (SEP) Equipment : Control Valve Agency : Budiman Inspection for NDE, Singapore / EUROCONTROL Location/Date : Emerson , Nilai Malaysia / July – November 2014 SUMMARIZE ACTIVITY •To attend the Factory Acceptance Test as per assign NOI. 6 P R O J E C T I N V O L V E D & D U T I E S
  • 7. •Expedite the documentation submission by vendor, client such as ITP and related procedures. •Witness the testing of painted valve covering the Hydrostatic shell test, Hydrostatic seat Test, functional test, valve failure system etc. •Visual and final dimension of the complete assemble valve against valve specification sheet and drawing. •Review the MDR/CMTR contains material and test certificates. •Produce Inspection report and Inspection release Certificates (IRC). 3. Vendor/Sub Vendor : Korea FA. Co Ltd / Emerson Manufacturing Owner /Project : SKEC for EPPETROECUADOR (EPP) / ESMERALDAS REFINERY PROJECT. Equipment : Control Valve ( V – Ball) Agency : Budiman Inspection for NDE, Singapore / GoodIn Korea Location/Date : Emerson , Nilai Malaysia / July – November 2014 SUMMARIZE ACTIVITY •To attend the Factory Acceptance Test as per assign NOI. •Expedite the documentation submission by vendor, client such as ITP and related procedures. •Witness the testing of painted valve covering the Hydrostatic shell test, Hydrostatic seat Test, functional test, valve failure system etc. •Visual and final dimension of the complete assemble valve against valve specification sheet and drawing. •Packing Inspection activity. •Review the MDR/CMTR contains material and test certificates. •Produce Inspection report and Inspection release Certificates (IRC). 4. Vendor/Sub Vendor : SIEMENS MULHEIM GERMAN/ SIEMENS PTSI, CILEGON BANTEN Owner /Project : SEPCO for SAUDI ARAMCO OVERSEAS BV / JAZAN - JIGCC Power Block Project (Package 4) Equipment : LP Outer Casing for Turbine ( Mechanical General (QM 03)) Agency : Budiman Inspection for NDE, Singapore / TUV RHEINLAND Location/Date : SIMENS PTSI CILEGON, JAKARTA INDONESIA / November 2014 SUMMARIZE ACTIVITY •To attend the Factory Acceptance Test / Final Inspection as per assign NOI. •Expedite the documentation approval submission by vendor, client such as ITP and related procedures. •Witness the dimensional and visual inspection including pre-assembly check and identification marking. Final check for completeness of all inspection steps •Witness the try fit/assembly condition for outer casing, verified the bolting alignment condition, fit-up assemble condition, visual inspection on material/equipment and others related activity as per Inspection test plan witness point. •Review the MDR contains material and test certificates. •Produce Inspection report and Inspection release Certificates (IRC) if applicable. 5. Vendor/Sub Vendor : Emerson Process System Pte ltd / Emerson Manufacturing Owner /Project : GSEC for SAUDI ARAMCO OVERSEAS BV / RABIGH PHASE II 7
  • 8. CP3/4 PROJECT Equipment : Control Valve (QM 37) Agency : Budiman Inspection for NDE, Singapore / GoodIn Korea Location/Date : Emerson , Nilai Malaysia / July – Present year of 2014 SUMMARIZE ACTIVITY •To attend the Factory Acceptance Test as per assign NOI. •Expedite the documentation submission by vendor, client such as ITP and related procedures. •Witness the testing of painted valve covering the Hydrostatic shell test, Hydrostatic seat Test, functional test, valve failure system etc. •Visual and final dimension of the complete assemble valve against valve specification sheet and drawing. •Packing Inspection activity. •Review the MDR/CMTR contains material and test certificates. •Produce Inspection report and Inspection release Certificates (IRC). •Inspection carried out together with AOC representative as a Monitoring Inspector (BV Malaysia). 6. Vendor/Sub Vendor : GS Engineering & Construction Corp / Shibata Industrial Co. Ltd Owner /Project : Aramco Oversea Company BV & Sumitomo Chemical Co Ltd / Rabigh II Project Interconnecting Package. Equipment : Jetty Fender ( Steel Frame, Rubber Fender & UHMWP Surface Pad) - QM03/04/12/30 Agency : Budiman Inspection Sdn Bhd for NDE Singapore. Location/Date : Klang , Malaysia / August 2014 SUMMARIZE ACTIVITY •To attend the Factory Acceptance Test for Rubber Fender and Frame fender as per assign NOI. •Expedite the documentation submission by vendor, client such as ITP and related procedures. •Witness the testing of rubber fender – compression test (kN-m) as per required I project specification. •Visual and final dimension of the complete assemble of frame fender and UMPWP face fender. •Assembly/final inspection for Fender- completes with face pad and rubber fender installation. •Packing Inspection activity. •Review the MDR/CMTR contains material and test certificates. •Produce Inspection report and Inspection release Certificates (IRC). 7. Vendor/Sub Vendor : KOFAC (Korea FA.CO Ltd) / Emerson Manufacturing Owner /Project : eTEC E&C Ltd SEOL KOREA for SABIC / SADARA GAS SUPPLY Equipment : Control Valve Agency : IPTS for TUV NORD-INCOK, Korea Location/Date : Emerson , Nilai Malaysia / August 2014 8
  • 9. SUMMARIZE ACTIVITY •To attend the Factory Acceptance Test as per assign NOI. •Expedite the documentation submission by vendor, client such as ITP and related procedures. •Witness the testing of painted valve covering the Hydrostatic shell test, Hydrostatic seat Test, functional test, valve failure system etc. •Visual and final dimension of the complete assemble valve against valve specification sheet and drawing. •Packing Inspection activity. •Review the MDR/CMTR contains material and test certificates. •Produce Inspection report and Inspection release Certificates (IRC). 8. Vendor/Sub Vendor : Emerson Process System Pte ltd / Emerson Manufacturing Owner /Project : SKEC for SAUDI ARAMCO OVERSEAS BV / WASIT INLET GAS PACKAGE #1 Equipment : Control Valve (QM 37) Agency : IPTS for TUV NORD-INCOK, Korea Location/Date : Emerson , Nilai Malaysia / July and August 2014 SUMMARIZE ACTIVITY •To attend the Factory Acceptance Test as per assign NOI. •Expedite the documentation submission by vendor, client such as ITP and related procedures. •Witness the testing of painted valve covering the Hydrostatic shell test, Hydrostatic seat Test, functional test, valve failure system etc. •Visual and final dimension of the complete assemble valve against valve specification sheet and drawing. •Packing Inspection activity. •Review the MDR/CMTR contains material and test certificates. •Produce Inspection report and Inspection release Certificates (IRC). •Inspection carried out together with AOC representative as a Monitoring Inspector (BV Malaysia). 9. Vendor/Sub Vendor : SHENZEN JUTAL MACINERY EQUIPMENT CO LTD / ZHUHAI JUTAL OFFSHORE OIL SERVCE LIMITED Owner /Project : SKEC for ARAMCO OVERSEAS / WASIT GAS PROCESSING PLANT Equipment : Pressure Vessel ( Filter ) - QM 30 Agency : Budiman Inspection for NDE Singapore Location/Date : Zhuhai, China / July 2014 SUMMARIZE ACTIVITY •To attend the Final Inspection as per assign NOI for 16 units of Vessel ( filter & separator) •Expedite the documentation submission by vendor for approval from Client and AOC including the ITP, related procedures and drawing. •Witness the final visual welding, dimensional as per approved drawing, hardness test, hydrostatic test , RT Film Review, NDE Report review- MT, PT, DPT and blasting activity during the visit. 9
  • 10. •To ensure that all the fabrication been doing as per client – AOC specification, SAMSS** •Review the MDR/CMTR contains material certificates, NDE report, test report – PWHT, HT, fabrication record and etc. •Inspection carried out together with AOC representative as a Monitoring Inspector (SGS China). •Produce Daily Inspection report and Inspection release Certificates (IRC). 10. Vendor/Sub Vendor : Emerson Process System Pte ltd / Emerson Manufacturing Owner /Project : DAEWOO / SADARA Project Equipment : Control Valve Agency : Budiman Inspection for Goodin Inspection, Korea Location/Date : Emerson , Nilai Malaysia / May 2014 SUMMARIZE ACTIVITY •To attend the Factory Acceptance Test as per assign NOI. •Expedite the documentation submission by vendor, client such as ITP and related procedures. •Witness the testing of painted valve covering the Hydrostatic shell test, Hydrostatic seat Test, functional test, valve failure system etc. •Visual and final dimension of the complete assemble valve against valve specification sheet and drawing. •Packing Inspection activity. •Review the MDR/CMTR contains material and test certificates. •Produce Inspection report and Inspection release Certificates (IRC). 11. Vendor/Sub Vendor : KNM-KEE Shah Alam Owner /Project : Lukoil Uzbekistan./ GISSAR Project Equipment : GAS EXCHANGER & VESSEL Agency : Velosi Malaysia. Location/Date : Shah Alam, Selangor Malaysia / May 2014 SUMMARIZE ACTIVITY •To attend the Final Inspection as per assign NOI. •Expedite the documentation submission by vendor, client such as ITP and related procedures. •Visual and final dimension of the exchanger refer to approved drawing. •Witness the Hydro testing for the Vessel and exchanger. •Review the MDR such as material, NDE report, PWHT and test certificates. •Produce Inspection report for every visit 12. Vendor/Sub Vendor : Tharphone Energy Services Asia Pacific / Vantage Eng.works S/B Owner /Project : Caracal Energy Inc./ Moundou Generation Project Equipment : E HOUSE STRUCTURE & WELDING WORKS Agency : Budiman Inspection for NDE, Singapore. Location/Date : Teluk Panglima Garang, Selangor Malaysia / May 2014 SUMMARIZE ACTIVITY 10
  • 11. •To attend the Final Inspection as per assign NOI. •Expedite the documentation submission by vendor, client such as ITP and related procedures. •Visual and final dimension of the E-HOUSE refer to approved drawing. •Painting inspection, DFT check and paint report review. •Review the MDR such as material, NDE report and test certificates. •Produce Inspection report and IRC (Inspection release Certificates) 13. Vendor/Sub Vendor : In Line Co Ltd / Paladon System Sdn Bhd Owner /Project : Darya Pala Engineering Co. / SHURIJEH “D” Gas Injection Project Equipment : Control Valve sizing 3” & 4” (30 units) Agency : IKA Eng. & Tech Co, Iran. Location/Date : Paladon System Sdn Bhd , Malaysia / April 2014 - Present SUMMARIZE ACTIVITY •To attend the Factory Acceptance Test as per assign NOI. •Expedite the documentation submission by vendor, client such as ITP and related procedures. •Witness the testing of Control Valve for valve and actuator integration covering the activity on functional test, valve failure system, joint leakage test, linearity, and hysteresis. •Visual and final dimension of the complete assemble valve against valve specification sheet and drawing. •Painting Inspection activity. •Review the MDR such as material and test certificates. •Produce Inspection report and Inspection release Certificates (IRC). 14.Vendor/Sub Vendor : Frames Separation Tech. BV / BKT Fraser Thermal Tech. Sdn Bhd Owner /Project : STONE FPSO-TOPSIDE OIL SEPARATOR Equipment : 4 Units of Vessel Test Separator Agency : Budiman Inspection for OGTECH Singapore. Location/Date : Rawang Integrated Industrial Estate Malaysia / April 2014 SUMMARIZE ACTIVITY •To attend the Final Inspection – Visual & Dimension, HT and Painting as per assign NOI. • Verified the traceability of heat no for all inspected items, review the mill certificates and endorsed. • Expedite the status of approved document such as ITP and related procedures. •MDR review activity, mill certificates and test report (NDE – MT, UT & RT) • Produce Inspection report and Inspection release Certificates (IRC). 15.Vendor/Sub Vendor : PHOCEENNE / KT Fittings Sdn Bhd Owner /Project : Saudi Aramco / SADARA Project Equipment : SS BW Fittings (QM 08) Agency : Budiman Inspection for NDE, Singapore. Location/Date : Klang, Malaysia / January 2014 SUMMARIZE ACTIVITY 11
  • 12. •To attend the Final Inspection as per assign NOI. • Final Inspection before Delivery, covering the dimensional, visual inspection, QTTY verification vs PO and packing for the SS fittings. • Verified the traceability of heat no for all inspected items, review the mill certificates and endorsed. • Expedite the status of approved document such as ITP and related procedures. • Produce Inspection report and Inspection release Certificates (IRC). 16. Vendor/Sub Vendor : PT. VME Process Owner /Project : Saudi Aramco / WASIT Gas Processing Project Equipment : Control Valve (QM 07) Agency : AMO & Partners Engineering, Jeddah KSA. Location/Date : Emerson , Nilai Malaysia / February 2014 - Present SUMMARIZE ACTIVITY •To attend the Factory Acceptance Test as per assign NOI. •Expedite the documentation submission by vendor, client such as ITP and related procedures. •Witness the testing of unpainted valve covering the Hydrostatic shell test, Hydrostatic seat Test, functional test, valve failure system etc. •Visual and final dimension of the complete assemble valve against valve specification sheet and drawing. •Packing Inspection activity. •Review the MDR such as material and test certificates. •Produce Inspection report and Inspection release Certificates (IRC). •Inspection carried out together with AOC representative as a Monitoring Inspector (ABS Malaysia). 17. Vendor/Sub Vendor : PT. VME Process Owner /Project : Saudi Aramco / WASIT Gas Processing Project Equipment : Structural Fabrication (QM 15) Agency : Cutech Solution Pte Ltd, Singapore. Location/Date : Batam Island, Indonesia / December 2013 – Present. SUMMARIZE ACTIVITY •To attend the Inspection as per assign NOI with references to ITP activity. •Activity covering the monitoring and surveillance of fabrication such as fit up, welding, consumable control, dimensional and welding visual inspection for structure (H-Beam). •MDR review activity, mill certificates and test report (NDE) •Expedite the documentation and procedures approval status •Produce Inspection report and Inspection release Certificates (IRC). 18. Vendor/Sub Vendor : JAG Flowcomponents LP / Mir Valve, Malaysia Owner /Project : Enbridge Pipeline Inc / South Edmonton Terminal Equipment : Ball Valve Agency : Budiman Inspection for NDE, Singapore. Location/Date : Shah Alam Selangor / December 2013 12
  • 13. SUMMARIZE ACTIVITY •To attend the Factory Acceptance Test as per assign NOI. •Testing activities covering the Hydrostatic shell test, Hydrostatic seat Test, Double isolation and bleed (DIB) test and low pressure air seat test for the unpainted valve. •All the testing was carried out as per FAT test procedures provide by Vendor/client. •Review the quality document such as Mill certificates, test report as per stated in project specification sheet. •Produce Inspection report and Inspection release Certificates (IRC). 19. Vendor/Sub Vendor : Technip - NPCC / Favelle Favco Crane (M) Sdn Bhd Owner /Project : ZAKUM Development Company /Upper ZAKUM Project Equipment : 5 units of pedestal Crane with inspected items - Pedestal, Turret, Powerpack, Winch and Boom. Agency : Velosi (M) Sdn Bhd Location/Date : Senawang, Negeri Sembilan, Malaysia / December 2013 - Present SUMMARIZE ACTIVITY • Attend the inspection as per given NOI with references by ITP inspection point. •The activity covering the in process of fabrication (visual on welding) for pedestal, turret, boom top & bottom, winch and power pack •Final inspection before delivery for pedestal on painting and all quality document such as painting report etc. •Review all the NDE report, Mill certificates and MDR for all the crane parts. • Pre-commissioning inspection on major part for winch, cabin, slew ring, slew drive, bolt torque inspection and associate work. • Witness the high pressure hydro test for hydraulic hose. • Involved in FAT & COMMISSIONING for pedestal crane such as functional test, load test and endurance test. •Produce Inspection report and Inspection release Certificates (IRC). 20. Vendor/Sub Vendor : Sterling Deaerator Company / VESSELTECH Engineering S/B Owner /Project : Technicas Reunidas for KEMYA / SAUDI ELASTOMERS Project Equipment : Thermal Dearator - Heater Tank (SS) and Storage Tank. Agency : Budiman Inspection for NDE, Singapore Location/Date : Balakong, Selangor Malaysia / December 2013 SUMMARIZE ACTIVITY •Attend the inspection as per given NOI with references by ITP inspection point. •Activity covering the monitoring and surveillance of fabrication such as fit up, welding, consumable control, dimensional and welding visual inspection. •Witness the Hydrostatics shell test, PWHT result report etc. •Review the NDE report, Mill certificates and MDR for the equipment’s. •Witness the painting visual inspection, review report and endorsed. •Attend the factory acceptance test, final inspection before delivery and packing. •Produce Inspection report and Inspection release Certificates (IRC). 13
  • 14. 21. Vendor/Sub Vendor : The Reynold’s Company / IME Cable support System Sdn Bhd Owner /Project : AMEC Oil&Gas Inc for Exxon Mobil USA / Angola Blck Kizomba Satellite Phase 2 Equipment : Cable Tray / ladder with Multiple Tag and Hardware. Agency : Budiman Inspection for NDE, Singapore Location / Date : Subang, Selangor Malaysia / November 2013 22. Vendor/Sub Vendor : Frame Separation Technology BV / Tepat Teknik SB Owner /Project : SBM OFFSHORE / Shell Stone FPSO Equipment : Chemical Injection Skid Module (Structure, Tank, Pressure Vessel and Pump Skid) Agency : Budiman Inspection for OGTECH, Singapore Location / Date : Shah Alam, Selangor, Malaysia/ October 2012 23. Vendor/Sub Vendor : KROHNE OIL & GAS - Malaysia / PeerMark Engineering Owner /Project : FLUOR Philippine for SANTOS Ltd / GLADSTONE Equipment : Metering Skid (Piping Fabrication as per B31.3 –Process Piping). Agency : Budiman Inspection for NDE, Singapore Location / Date : Telok Gong, Klang, Malaysia / April 2012 – October 2013 24. Vendor/Sub Vendor : OVIVO / Peer Mark Engineering SDN BHD Owner /Project : MALAKOFF Eng.SDN BHD / Tanjung Bin Power Plant Equipment : Skid Module (Structure and Piping SS and CS) Agency : Budiman Inspection Malaysia. Location / Date : Telok Gong, Klang, Malaysia / October & November 2013 25. Vendor/Sub Vendor : Hyundai Eng. Co. Ltd / Interstate M&E, Malaysia Owner /Project : Petronas Gas Berhad (PGB) / PRR2 Equipment : Junction Box, Cable Tray Agency : Budiman Inspection for Goodin Inspection, Korea Location / Date : Subang, Selangor, Malaysia / March 2013 26. Vendor/Sub Vendor : Emerson Process Management Sdn Bhd Owner /Project : FLUOR Aust. PTY LTD. / GLNG – Equipment : Pneumatic Control - Globe Valve Agency : Budiman Inspection for NDE, Singapore Location / Date : Nilai, Negeri Sembilan, Malaysia / October – December 2013 27. Vendor/Sub Vendor : Hyundai Eng. Co. Ltd / Mir Valve, Malaysia Owner /Project : Petronas Gas Berhad (PGB) / PRR2 Project Equipment : Ball Valve with Cryogenic Testing Agency : Budiman Inspection for Goodin Inspection, Korea Location / Date : Shah Alam, Selangor, Malaysia / March 2013 28. Vendor/Sub Vendor : Frame Separation Technology BV / Tepat Teknik SB Owner /Project : SBM OFFSHORE / FPSO N’GOMA Equipment : Chemical Injection Skid Module (Structure, Tank, Pressure Vessel and Pump Skid) Agency : Budiman Inspection for OGTECH, Singapore Location / Date : Shah Alam, Selangor, Malaysia / September 2013 14
  • 15. 29. Vendor/Sub Vendor : Frame Separation Technology BV / Petra Fabricator SB Owner /Project : BUMI ARMADA BHD / FPSO ARMADA CLAIRE Equipment : Pressure Vessel Agency : Budiman Inspection for OGTECH, Singapore Location / Date : Shah Alam, Selangor, Malaysia / February 2013 – April 2013 30. Vendor/Sub Vendor : Emerson Process Management Owner /Project : CB & I / PNG-LNG Equipment : Control Pneumatic Globe/Ball Valve Agency : Budiman Inspection for NDE, Singapore Location/Date : Nilai, Negeri Sembilan, Malaysia / May 2012 – July 2012 31. Vendor/Sub Vendor : Siemens Energy INC / Jord International PTY LTD Owner /Project : FLUOR US / Gas Turbine Alternator Equipment : Lube Oil Cooler Package Agency : Budiman Inspection for NDE, Singapore Location/ Date : Rawang, Selangor, Malaysia / July 2012 32. Vendor/Sub Vendor : Hyundai Eng Corp (HEC) / KNM Exotic Equipment SDN BHD Owner /Project : Petronas Gas Berhad / PRR2 Equipment : Heat Exchanger Agency : Budiman Inspection for Goodin Inspection, Korea Location /Date : Shah Alam, Selangor, Malaysia / July 2012 – August 2012 33. Vendor/Sub Vendor : Korea F.A. Co. Ltd / Emerson Process Management. Owner / Project : S K Eng. and Construction Co. Ltd / TAKREER RRE PROJECT Equipment : Globe Pneumatic Valve with Cryogenic Testing Agency : Budiman Inspection for NDE, Singapore Location / Date : Nilai, Negeri Sembilan, Malaysia / March 2012 – April 2014 34. Vendor/Sub Vendor : Hyundai Eng Corp (HEC) / Emerson Process Management. Owner /Project : Petronas Gas Berhad / PRR2 Equipment : Globe Pneumatic Valve Agency : Budiman Inspection for Goodin Inspection, Korea Location /Date : Nilai, Negeri Sembilan, Malaysia / April – May 2012 35. Vendor/Sub Vendor : Krohne Oil and Gas Sdn Bhd/Peer Mark Engineering Sdn Bhd Owner/Project : ORIGIN, Australia / Australia Pacific LNG Project Equipment : Metering Skids (Piping Fabrication as per B31.3 -Process Piping). Agency : Budiman Inspection for NDE, Singapore Location / Date : Telok Gong, Klang, Malaysia / March 2012 – April 2012 36. Vendor/Sub Vendor : Frame Separation Technology BV /Petra Fabricator SB Owner/Project : SIME DARBY/ B193 HP Gas Compression Module Equipment : Pressure Vessel (Separator) Agency : Budiman Inspection for OGTECH, Singapore Location / Date : Shah Alam, Selangor Malaysia / November 2011 – April 2012 15
  • 16. Project Involved with KNM – Year of 2008 Location - Kuantan Port Fabrication Yard 1. Project Name • Stainless Stell Vessel for Pluto Onshore LNG Project Australia (2st-st Flare KO Drum) Client • Foster Wheeler Woodside (FWUK) 2. Project Name • Propylene Fractionators for NCP Ethylene Plant, Al-Jubail Client • Saudi Chevron Philips / Contractor: JGC Corporation ( NIKKI ) 3. Project Name • C4 SPLITTER (FPT10) for SPT OLEFIN RECOVERY Owner /Client • Exxon Mobil Chemical Asia Pacific / Stone & Webster International Inc. Tuan Adnan Tuan Ali (Managing Director) Budiman Inspection Sdn Bhd (Malaysia) Tel: +6013 9821405 Rasidah Wagiman Technical Coordinator NDE Technical Services Singapore Pte Ltd (Singapore) Tel: +65 6425 0018 Nurul Adibah Hashim (Inspector Coordinator) Velosi (M) Sdn Bhd (Malaysia) Tel: O: 03 56337219, M: +6013 5947796 Krishnan Muthukumar (QA/QC Manager) Cutech Quality Solution Pte Ltd (Singapore) Tel: 68963556, 66650187 John Varghese (Section Head I&C) AMO & Partners Engineering Co. (Jeddah KSA) Ph:+9663 -8589403 Ext:250 Fax: + 9663 857 9132, Mob:+966-530705067 Emi Moriyama Assistant Project Engineer Cameron Japan Ltd (Japan) DD +81-3-6893-4270 16 R E F E R E N C E S
  • 17. Laveena Pinto Resource Coordinator – Asia and Far East Energy Engineering Oil & GAS Technical Service (Ajman – UAE) Ph : +971 6 7419328, Ext 217 7 Fax : +971 6 741932 17