SlideShare a Scribd company logo
1 of 4
Page 1 of 4
CURRICULAM VITAE
MOHAN KUMAR.B
3/211 PAKALPATTY (PO), OMALUR (TK),
SALEM – 636 304
TAMILNADU, INDIA.
Mobile: 91-7299075537, 91-9486252096
E-mail: bcmohankumar@gmail.com
PROFILE
To excel in my area of activity by taking up challenging assignments at the workplace, sharpen my skills by
maintaining a learning attitude and contribute to the growth of the organization by harnessing these skills,
experience and knowledge acquired over the time and thus contribute a part to the society
KEY QUALIFICATION
Have 9.0 years of experience in Project Execution, Project Management, Quantity surveying, Billing and Planning
of Port, Bulk Material Handling systems, High-rise Towers and Residential Township projects. Well experienced in
Site execution, quantity take-off & preparing estimates for on-shore structures such as piling, Diaphragm wall,
Anchor wall, In-situ & Precast beams, Deck also Conveyor foundations, Stacker cum Reclaimer Tracks, capital and
maintenance Dredging Tank Farm civil works, road layers like GSB, WMM, BM, DBM as well as structures like
retaining wall, Industrial buildings such as warehouses and High-rise Tower etc. Experienced in Pre-Contract and
Post-Contract activities such as Preparation of BOQ, Billing, progress monitoring, etc.
 Perceived good knowledge in Execution, project management, costing, scheduling and Billing.
 Familiar in execution of Piling,Diaphragm wall,pre-cast casting and Erection.
 Site execution as per Approved GFC drawing with standard Quality and cost.
 Coordination with client for executing the work and to close the RFI issues.
 Monitors and records site progress and keep records of day works.
 Timely Invoicing, Payment collection and coordinating with client & execution team.
 Coordinating with design department /consultants for BOQ & drawings.
 Preparing monthly & weekly schedule,tracking the same.
 Preparing extra and variation claims and availing certifications.
 Reconciliations & Project closeout activities.
 Investigating the project site and preparing Reports.
 Estimating cost for the material, labour, Plant & machinery and overheads.
 Arranging the resources requested from project sites.
FROM Aug-2015 to Till Date:
Employer : Chettinad International bulk terminal Pvt. Ltd
Designation : Dy. Manager Project.
Project : Construction of Multi cargo handling terminal at Kamarajar Port, Chennai
Project Value : 200 Crs
KEY RESPONSIBILITY
PROFESSIONAL EXPERIENCE
Page 2 of 4
Responsibility:
 Co-ordination with consigning authority
 Coordination with Design consultant ,PMC and contractor
 Preparing weekly& monthly progress report and submitting to consigning authority
 Reviewcontractor progress with schedule
 Preparing estimates / Bill of quantities.
 Involving Tender and obtaining quotes from vendors.
FROM SEP-2014to July-2015:
Employer : Karaikal Port Pvt. Ltd.,
Designation : Dy. Manager Project.
Project : Construction of all weather Port at karaikal involves
Responsibility:
 Preparing estimates / Bill of quantities.
 Involving Tender and obtaining quotes from vendors.
 Presenting the progress status, cost status against the plan & budget.
 Preparing and checking of RA Billsof all Marine and Civil works
 Supporting project sites in technical requirements and clarifications
 Preparation of program & Reviewwith MS PROJECT
 Calculating Price variation & Escalation,
 Reviewingthe reconciliation reports for billedvs paid quantities, wastages of bulk materials, contract
variations and claims.
 Involving in the Budget preparation.
FROM OCTOBER-2011to APRIL-2014:
Employer : IL&FS ENGINEERING AND CONSTRUCTION COMPANY LTD.
Designation : Sr. Engineer Projects
Project- 2
Project : Orchid Height Tower A & B (70 Stories),
Client : DB Reality, Mumbai.
Project cost : 600 Cr.
Responsibility:
 Site Execution of the structural element in Tower-A (Footing, Column, Floor slabs).
 Coordination with client for executing the work and to close the RFI issues.
 Preparation of BBS for all the structural element and get the approval from the client.
 Co-ordination with the team members periodically and review the progress.
 Labour and material management at site.
 Conducting safety meeting for labour every week with safety team.
Project- 1
Project : Hill County Township,
Client : Maytas properties (ILFS Group)
Project cost : 350 Cr.
Responsibility:
 Site Execution of Road (Paver-2 Km, BT road-1.5Km), Stone pitching and path way works.
 15m, 8m, 6m height retaining walls.
Page 3 of 4
 Site Execution of Strom water Drain work 1 km length trench and 1 km pipe line,
 Preparation of quantities and get the approval from client, coordinating with client to close the RFI.
 Preparing monthly subcontractor bills for all external works (Roads, Retaining wall, Strom water drainage
& Play courts)
 Cost control and maintaining the quality and safety as per the standard.
FROM AUGEST-2009 to OCTOBER-2011:
Employer : MARG LTD (EPC)
Designation : Engineer Projects
Project : Extension of Berth no-1, Berth nos-3, 4 & 9,
Client : Karaikal port Pvt. Ltd.
Project -2
Project : Berth 3&4 for Mechanized coal handling (725m X35.1m)
Project cost : 195 Cr
Responsibility:
 Complete the preconstruction activity with all Survey works and handing over the site to the sub
contractor.
 Preparing BBS for all Marine and civil works,
 Piling work execution on onshore and offshore.
 Execution of Pre-cast casting & Erection (Pile Muff , Beam, slabs, fender blocks, Stone pitching)
 Conducting Pre survey works together with the sub contractor and transfer the benchmark to various
location in the project site.
 Fixing of Ship-un loader Rail Fixtures, Fender, Bollard, etc.
 Checking the Running account bills and Escalation bills submitted by the sub contractor.
Project- 1
Project : Construction of OSV/PSV Berth no-9 (220m X22m) and Extension of Berth no-1
(30mX21m)
Project cost : 30 Cr
Responsibility:
 Complete the preconstruction activity with Survey and handing over the site to the sub contractor,
 Substantiate the work execution by the sub contractor with approved GFC drawing,
 Substantiate quality of the work execution by the sub contractor to meet IS standard,
 Evaluating quantities of Berth and related works ,
 Execution of Dredging at rear side and below the berth and Rock filling from (-) 6.00 m CD to (+) 2.00 m
CD with back filling.
 Substantiate of all marine inserts and fixtures during the concreting and after the concrete respectively
by the sub contractor.
 Reconciliation of all materials like steel, MS Plate etc. supplied to the sub contractor at end of every
month and also the completion of project.
 Preparing and checking of RA bills for all marine and civil works.
FROM JULY- 2007 to JULY- 2009:
Employer : SIMPLEX INFRASTRUCTURES LTD.
Designation : Asst. Engineer Projects,
Project : Construction of Berth structures (460m X 21m),
Client : MARG Limited (Karaikal port.Pvt.Ltd).
Page 4 of 4
Project cost : 75 Cr
Responsibility:
 Execution of Piles,Diaphragm wall,Anchor wall,Pre-cast beams and Deck slab.
 Evaluating material quantities and rise the indent in appropriate time.
 Preparation and submission of RA billsperiodically to the client.
 Preparation of Daily progress report and labour report.
 Pre-cast yard preparation and casting of differenttypes of precast elements,
 Fixing Crane rails and crane bolts at the time of Deck slab concrete and other Inserts (Bolts, nosing Angles,
Hand rails & Ladders) and Erection of fenders and Bollards
EDUCATIONAL QUALIFICATION
U.G:
Bachelor of Civil Engineering in Karunya Insitute of Technology and Sciences affiliated to ANNA UNIVERSITY
Chennai. Year Passed – 2007
COMPUTER KNOWLEDGE
Packages : Ms-Office, AutoCAD, STAAD, Primavera V3
Project Planning Software : MS projects.
OTHER DETAILS
Date of Birth : 15/06/1986 Father’s Name : Balachandran. A
Sex : Male Nationality : Indian
Married Status : Married Languages Known : Tamil, English and Hindi
Passport : H3530990
Reference
Mr. Kumaraja, Sr. Manager, Chettinad Mangalore coal terminal Pvt Ltd.
Contact no: 09790927667
DECLARATION
I hereby declare that the above furnished information is true to the best of my knowledge and belief.
Yours truly
(Mohan Kumar. B)
Date:
Place:

More Related Content

Featured

How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
ThinkNow
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
Kurio // The Social Media Age(ncy)
 

Featured (20)

2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot2024 State of Marketing Report – by Hubspot
2024 State of Marketing Report – by Hubspot
 
Everything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPTEverything You Need To Know About ChatGPT
Everything You Need To Know About ChatGPT
 
Product Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage EngineeringsProduct Design Trends in 2024 | Teenage Engineerings
Product Design Trends in 2024 | Teenage Engineerings
 
How Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental HealthHow Race, Age and Gender Shape Attitudes Towards Mental Health
How Race, Age and Gender Shape Attitudes Towards Mental Health
 
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdfAI Trends in Creative Operations 2024 by Artwork Flow.pdf
AI Trends in Creative Operations 2024 by Artwork Flow.pdf
 
Skeleton Culture Code
Skeleton Culture CodeSkeleton Culture Code
Skeleton Culture Code
 
PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024PEPSICO Presentation to CAGNY Conference Feb 2024
PEPSICO Presentation to CAGNY Conference Feb 2024
 
Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)Content Methodology: A Best Practices Report (Webinar)
Content Methodology: A Best Practices Report (Webinar)
 
How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024How to Prepare For a Successful Job Search for 2024
How to Prepare For a Successful Job Search for 2024
 
Social Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie InsightsSocial Media Marketing Trends 2024 // The Global Indie Insights
Social Media Marketing Trends 2024 // The Global Indie Insights
 
Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024Trends In Paid Search: Navigating The Digital Landscape In 2024
Trends In Paid Search: Navigating The Digital Landscape In 2024
 
5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary5 Public speaking tips from TED - Visualized summary
5 Public speaking tips from TED - Visualized summary
 
ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd ChatGPT and the Future of Work - Clark Boyd
ChatGPT and the Future of Work - Clark Boyd
 
Getting into the tech field. what next
Getting into the tech field. what next Getting into the tech field. what next
Getting into the tech field. what next
 
Google's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search IntentGoogle's Just Not That Into You: Understanding Core Updates & Search Intent
Google's Just Not That Into You: Understanding Core Updates & Search Intent
 
How to have difficult conversations
How to have difficult conversations How to have difficult conversations
How to have difficult conversations
 
Introduction to Data Science
Introduction to Data ScienceIntroduction to Data Science
Introduction to Data Science
 
Time Management & Productivity - Best Practices
Time Management & Productivity -  Best PracticesTime Management & Productivity -  Best Practices
Time Management & Productivity - Best Practices
 
The six step guide to practical project management
The six step guide to practical project managementThe six step guide to practical project management
The six step guide to practical project management
 
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
 

Mohankumar V2

  • 1. Page 1 of 4 CURRICULAM VITAE MOHAN KUMAR.B 3/211 PAKALPATTY (PO), OMALUR (TK), SALEM – 636 304 TAMILNADU, INDIA. Mobile: 91-7299075537, 91-9486252096 E-mail: bcmohankumar@gmail.com PROFILE To excel in my area of activity by taking up challenging assignments at the workplace, sharpen my skills by maintaining a learning attitude and contribute to the growth of the organization by harnessing these skills, experience and knowledge acquired over the time and thus contribute a part to the society KEY QUALIFICATION Have 9.0 years of experience in Project Execution, Project Management, Quantity surveying, Billing and Planning of Port, Bulk Material Handling systems, High-rise Towers and Residential Township projects. Well experienced in Site execution, quantity take-off & preparing estimates for on-shore structures such as piling, Diaphragm wall, Anchor wall, In-situ & Precast beams, Deck also Conveyor foundations, Stacker cum Reclaimer Tracks, capital and maintenance Dredging Tank Farm civil works, road layers like GSB, WMM, BM, DBM as well as structures like retaining wall, Industrial buildings such as warehouses and High-rise Tower etc. Experienced in Pre-Contract and Post-Contract activities such as Preparation of BOQ, Billing, progress monitoring, etc.  Perceived good knowledge in Execution, project management, costing, scheduling and Billing.  Familiar in execution of Piling,Diaphragm wall,pre-cast casting and Erection.  Site execution as per Approved GFC drawing with standard Quality and cost.  Coordination with client for executing the work and to close the RFI issues.  Monitors and records site progress and keep records of day works.  Timely Invoicing, Payment collection and coordinating with client & execution team.  Coordinating with design department /consultants for BOQ & drawings.  Preparing monthly & weekly schedule,tracking the same.  Preparing extra and variation claims and availing certifications.  Reconciliations & Project closeout activities.  Investigating the project site and preparing Reports.  Estimating cost for the material, labour, Plant & machinery and overheads.  Arranging the resources requested from project sites. FROM Aug-2015 to Till Date: Employer : Chettinad International bulk terminal Pvt. Ltd Designation : Dy. Manager Project. Project : Construction of Multi cargo handling terminal at Kamarajar Port, Chennai Project Value : 200 Crs KEY RESPONSIBILITY PROFESSIONAL EXPERIENCE
  • 2. Page 2 of 4 Responsibility:  Co-ordination with consigning authority  Coordination with Design consultant ,PMC and contractor  Preparing weekly& monthly progress report and submitting to consigning authority  Reviewcontractor progress with schedule  Preparing estimates / Bill of quantities.  Involving Tender and obtaining quotes from vendors. FROM SEP-2014to July-2015: Employer : Karaikal Port Pvt. Ltd., Designation : Dy. Manager Project. Project : Construction of all weather Port at karaikal involves Responsibility:  Preparing estimates / Bill of quantities.  Involving Tender and obtaining quotes from vendors.  Presenting the progress status, cost status against the plan & budget.  Preparing and checking of RA Billsof all Marine and Civil works  Supporting project sites in technical requirements and clarifications  Preparation of program & Reviewwith MS PROJECT  Calculating Price variation & Escalation,  Reviewingthe reconciliation reports for billedvs paid quantities, wastages of bulk materials, contract variations and claims.  Involving in the Budget preparation. FROM OCTOBER-2011to APRIL-2014: Employer : IL&FS ENGINEERING AND CONSTRUCTION COMPANY LTD. Designation : Sr. Engineer Projects Project- 2 Project : Orchid Height Tower A & B (70 Stories), Client : DB Reality, Mumbai. Project cost : 600 Cr. Responsibility:  Site Execution of the structural element in Tower-A (Footing, Column, Floor slabs).  Coordination with client for executing the work and to close the RFI issues.  Preparation of BBS for all the structural element and get the approval from the client.  Co-ordination with the team members periodically and review the progress.  Labour and material management at site.  Conducting safety meeting for labour every week with safety team. Project- 1 Project : Hill County Township, Client : Maytas properties (ILFS Group) Project cost : 350 Cr. Responsibility:  Site Execution of Road (Paver-2 Km, BT road-1.5Km), Stone pitching and path way works.  15m, 8m, 6m height retaining walls.
  • 3. Page 3 of 4  Site Execution of Strom water Drain work 1 km length trench and 1 km pipe line,  Preparation of quantities and get the approval from client, coordinating with client to close the RFI.  Preparing monthly subcontractor bills for all external works (Roads, Retaining wall, Strom water drainage & Play courts)  Cost control and maintaining the quality and safety as per the standard. FROM AUGEST-2009 to OCTOBER-2011: Employer : MARG LTD (EPC) Designation : Engineer Projects Project : Extension of Berth no-1, Berth nos-3, 4 & 9, Client : Karaikal port Pvt. Ltd. Project -2 Project : Berth 3&4 for Mechanized coal handling (725m X35.1m) Project cost : 195 Cr Responsibility:  Complete the preconstruction activity with all Survey works and handing over the site to the sub contractor.  Preparing BBS for all Marine and civil works,  Piling work execution on onshore and offshore.  Execution of Pre-cast casting & Erection (Pile Muff , Beam, slabs, fender blocks, Stone pitching)  Conducting Pre survey works together with the sub contractor and transfer the benchmark to various location in the project site.  Fixing of Ship-un loader Rail Fixtures, Fender, Bollard, etc.  Checking the Running account bills and Escalation bills submitted by the sub contractor. Project- 1 Project : Construction of OSV/PSV Berth no-9 (220m X22m) and Extension of Berth no-1 (30mX21m) Project cost : 30 Cr Responsibility:  Complete the preconstruction activity with Survey and handing over the site to the sub contractor,  Substantiate the work execution by the sub contractor with approved GFC drawing,  Substantiate quality of the work execution by the sub contractor to meet IS standard,  Evaluating quantities of Berth and related works ,  Execution of Dredging at rear side and below the berth and Rock filling from (-) 6.00 m CD to (+) 2.00 m CD with back filling.  Substantiate of all marine inserts and fixtures during the concreting and after the concrete respectively by the sub contractor.  Reconciliation of all materials like steel, MS Plate etc. supplied to the sub contractor at end of every month and also the completion of project.  Preparing and checking of RA bills for all marine and civil works. FROM JULY- 2007 to JULY- 2009: Employer : SIMPLEX INFRASTRUCTURES LTD. Designation : Asst. Engineer Projects, Project : Construction of Berth structures (460m X 21m), Client : MARG Limited (Karaikal port.Pvt.Ltd).
  • 4. Page 4 of 4 Project cost : 75 Cr Responsibility:  Execution of Piles,Diaphragm wall,Anchor wall,Pre-cast beams and Deck slab.  Evaluating material quantities and rise the indent in appropriate time.  Preparation and submission of RA billsperiodically to the client.  Preparation of Daily progress report and labour report.  Pre-cast yard preparation and casting of differenttypes of precast elements,  Fixing Crane rails and crane bolts at the time of Deck slab concrete and other Inserts (Bolts, nosing Angles, Hand rails & Ladders) and Erection of fenders and Bollards EDUCATIONAL QUALIFICATION U.G: Bachelor of Civil Engineering in Karunya Insitute of Technology and Sciences affiliated to ANNA UNIVERSITY Chennai. Year Passed – 2007 COMPUTER KNOWLEDGE Packages : Ms-Office, AutoCAD, STAAD, Primavera V3 Project Planning Software : MS projects. OTHER DETAILS Date of Birth : 15/06/1986 Father’s Name : Balachandran. A Sex : Male Nationality : Indian Married Status : Married Languages Known : Tamil, English and Hindi Passport : H3530990 Reference Mr. Kumaraja, Sr. Manager, Chettinad Mangalore coal terminal Pvt Ltd. Contact no: 09790927667 DECLARATION I hereby declare that the above furnished information is true to the best of my knowledge and belief. Yours truly (Mohan Kumar. B) Date: Place: