1. CURRICULUMVITAE
POSITION SEEKING HSE MANAGER (EXP-16.5 YEARS)
(0091-8527232056)
PERSONAL DATA
NAME
DATE OF BIRTH
NATIONALITY
CIVIL STATUS
JOINING TIME
Mohammad Naushad Azam
02-01-1970
INDIAN
MARRIED
15 DAYS
EDUCATION
TECHNICAL QUALIFICATION S
MEMBERSHIPS
GEOGRAPHICAL EXPERIENCE
LANGUAGES KNOWN
PROFILE INTRODUCTION
Diploma in FIRE & SAFETY
Bachelor of Science (B.Sc.) from Magadha University,
Patna, Bihar, India.
Master Diploma in Fire & safety( waiting certificate)
Diploma in Industrial Safety, National Institute of Labor
Education & Management, NILEM, Chennai
Project Management Professional(PMP)(DUBAI)
LEED AP (USGBC)(Green Building)
NASP-National Association of Safety Professional
(DUBAI)
Occupational Safety & Health Administration (OSHA).
ID-600093711(DUBAI).
IOSH From Shield
NEBOSH, Health and Safety (DUBAI).
NEBOSH Environment Diploma(DUBAI)
Auditor OSHAS18001-2008(DUBAI)
Auditor EMS14001-2007(DUBAI)
Trained in Firefighting
Trained in First aid
ROSPA(U.K) ID-406501151
Middle East & India
English, Urdu, Hindi & Arabic
FIFTEEN (15.9) years of experience in the Field of Safety Management,
NAUSHAD’s CV
2. CURRICULUMVITAE
for various project pertaining to different industries like Oil & Gas Fields,
Petroleum refineries, Petrochemicals, LNG plant, Water plant. Provide
advice, information and instruction on local OHS issues, assist in the
application of OHS procedures ,help manage risks and hazards in their
area, report and investigate incidents, injuries and hazards, liaise with the
head of the unit or controlled entity, OHS Branch, and other safety
personnel, review and analyze injury and incident reports and data,
develop injury and incident prevention strategies for their area, monitor
local area compliance with OHS policy and procedures, audit local area
OHS compliance with regard to risk, emergency and hazardous waste
management, help promote OHS awareness assist in planning,
implementing, monitoring and reviewing the health and safety strategies of
an organization.
COMPETENCIES Movement of people and vehicles
Manual and mechanical handling
operate equipment
Prepare HSE documents
Electrical, chemical and biological, physical and psychological
skills
working at height, excavation work & confined spaces &
demolition
carry out audit(Internal & External)
Be able to carry out a safety inspection of the workplace
identifying hazards, recommending control measures and
preparing a management report.
Carry out Internal & External audit and prepare report for top
management with recommendation.
ACCOUNTABILITIES Make safety estimation for upcoming project
Use the safety plan checklist for airport.
Airport traffic management control
Develop H &S culture
Control the permit system to avoid overleaping the activity.
Arrange H&S coordination meeting biweekly or daily basis
according to work pressure
Arrange traffic routes and blinking lighting for night traffic
Make PSP and review risk assessment and JSA according to
activity.
Arrange safety meeting with client and prepare minutes of
meeting.
Doing Internal audit of contractor and sub-contractors and provide
written report with recommendation of safety management
system(SMS)
Performing daily site inspection to ensure safe system of work to
NAUSHAD’s CV
3. CURRICULUMVITAE
be met.
To ensure proactive and active monitoring system is working at
site.
To ensure that the company safety policy and project plane is
working at ground.
Reporting, Investigation and documentation of all near misses,
incidents and accidents.
Ensure that plant/machinery equipment safety usage instruction
are displayed and followed by users.
Ensure to provide suitable and sufficient PPE to work force
according to activity.
To ensure that all kind of permit system is implemented for
develop the safe system of work.
To arrange initiative and motivation program among workforce to
develop the HSE culture at site.
Prepare weekly/monthly performance statistics reports.
Conduct safety and first aid meeting with all supervisor and
foreman.
To arrange safety committee meeting and safety coordination
meeting at site.
To make emergency procedure and plan for the site.
To inspect fire extinguishers and make fire risk assessment.
To provide welfare facility with the help of management according
to local safety laws.
CAREER HIGHLIGHTS
1. TWO HORIZON CENTER (DLF)
15 JAN 2013 TO TILL DATE
HILL NTERNATIONAL(PMC) INDIA
HSE Manager
INDIA
2. DHCC,BUSINESS-BAY,
MAMMAN TOWERS, EMMAR
PROJECTS
JULY 2008 to August 2012
Arif & Bintoak Consultant
Engineers and Architect
Client : -DLF Developer (ICON of Indian Developer)
Project Value: INR 350 Crores
Two Horizon Center has been conceived as a high end commercial development
with a potential gross area of over 2.50 million sq.ft. (4B+G+23 floors). It sits in
the middle of DLF City, Phase –V, Golf Course Road, and Gurgaon
Carry out risk assessment & JSA, Doing HAZOP and HAZID,
Prepare internal audit and submit report with recommendation to Management as
well as assist in External audit.
Arranging HSE meeting with client and contactor as well as sub-contractors.
Prepare weekly and monthly HSE statistics report for client.
Providing in house and site base HSE Training for engineers and workforce.
Monitoring the site activity for the implementation of safe working procedure and
prepare daily HSE Observation report and issue NCR to Contractor &
Subcontractors, doing the EIA at project.
Client: TATWEER,EMMAR,SAUDI SHAIKH
Project Value: AED 2B,4.2B,1.5B,3B(Billion)
The projects were multipurpose construction, residential and as well as
commercials, shopping malls etc.
NAUSHAD’s CV
4. CURRICULUMVITAE
EHS Advisor
DUBAI
3. JUMAIRAH BEACH
RESIDENCE -04
MAY 2004 TO JUNE 2008
Al-Habtoor Leighton group
HSE Engineer
DUBAI(UAE)
Arrange meeting with client representative and directors regarding
EHS issues, Formulate weekly improvement environment plan, Doing
Internal audit to contractors & Subcontractors of safety management
system and environment management system and provide written
report with recommendation. performance records by half yearly,
Provide the structure for EMS and aspects and impacts, Review
safety plan, method of statement and risk assessment for approval,
Investigate accident (root cause and immediate cause) and provide
report to top management, Provide training and induction regarding
ergonomics, safety culture and environment awareness training,
Arrange emergency evacuation drill and emergency evacuation plan,
Implement security and safety procedure during the maintenance
work, Environment and safety implementations through ITIS (inform.
trained. instruct and supervise),Carry out environmental audit of
principle contractor environment management system, Carry out the
main contractor health and safety audit on half yearly basis, Supervise
the contractor safety level and issue the engineer instruction and NCR
Jumairah Beach Residence-04
Client: Dubai Properties
Project Management: MACE
Project Value: 2billion (USD)
The project was nine (9) residential towers of 85 stories and a Hotel near
beach of 25 stories.
To comply with safety laws. Norms and standard, To implementation of
organization safety policy, procedure and project safety plan, Make
inattentive to develop health and safety culture at site, To comply
reactive and proactive monitoring system at site, Arrange tool box
talk and safety committee meeting, To give induction training
along with key personal; emergency procedure and assembly point,
To implementation of permit system (hot work; cold work; confined
space; hazardous environment flammable atmosphere), Ensure
reporting system of un safe condition; near miss; incident is
implemented, To promptly investigate regarding the caused and
nature of accidents as well as to identify accident prone works,
Reporting of accident and investigation; benches of law and legislation
of accident; take lesson, Ensure risk assessment of each and
every activity is make and safety measure is provide, To arrange fire
evacuation drill, emergency plane and firefighting training among
workforce.
Doing internal audit to help the management for compliance of HSE
norms accordingly.
Ensure all loose lifting gear is certified by third party; machineries
collaboration certificate is present, To inspect all type of scaffold and
tagged, To arrange health surveillance of workforce yearly or half
yearly, To arrange welfare facility for workforce (according to local
laws), To inculcate the spirit of safety among works by lunching
safety campaigns in the form of observing safety weeks, To make
risk assessment for installation of precast and provides safety measure
(Working with Al-Maraiki precast co),To arrange traffic safety measure
NAUSHAD’s CV
5. CURRICULUMVITAE
4. SALAM TOWER
24June 2000 to 25July
2003
DUBAI CONTRACTING
COMPANY
HSE Officer
DUBAI (UAE)
5. 205 G(Oil & Gas)
JUNE 1997 to JULY 2000
Al-KULAIB INTERNATIONAL
HSE OFFICER
KUWAIT
EMPOYEERS
PASSPORT Detail
and rout diversion, To provide safe guards against slipping and tripping
hazards during pilling (With STFA-HABTOOR, JBR-04),To provide safe
cable management during piling operation to avoid electrical hazard, To
provide pile cover and barricading, signage to identify the designated pile
areas, To provide safe system and training to workforce to enter into the
confined space and drainage, Inspect and monitor the permit system for
the confined space.
Client: - Sheikh Salam
Project Value:-2 Billion (USD)
The project was 105 stories tower on Shaikh zaiyd Road which was totally
commercial purpose.
Arrange induction for young workers and visitors, Give tool box
training to work force and supervisors before commence the work, To
ensure the implementation of company safety policy and procedure is
working on ground, To comply reactive and proactive monitoring
system at site, Make inattentive to develop health and safety culture
at site, Reporting of accident and investigation; benches of law and
legislation of accident; take lesson, Ensure all loose lifting gear is
certified by third party; machinery collaboration certificate is present,
To arrange health surveillance of workforce yearly or half yearly, TO
arrange welfare facility for workforce (according to local
laws),To inculcate the spirit of safety among works by lunching
safety campaigns in the form of observing safety weeks, To
arrange pilling safety and covering and cable management, To
comply reactive and proactive monitoring system at site, To make
inattentive to develop HSE culture at site,
Client: AL-ZAUR
Project Value: - 2 Billion (USD)
The project was for the purpose of oil & gas pipe line.
To give induction and tool box among workforce, To issue hot work permit
and confined space permit, To monitoring the task performance regarding
HSE, To inspect hazardous gas (H2S,CO,O2) level in confined working
place, Ensure the work force is trained to use self-breathing apparatus, To
arrange weekly safety meeting to implementation and improvement of
HSE safe system, To provide proactive measure to prevent accidents or
incident, To arrange security system to avoiding stealing or damaging
materials, To inspect moving machinery has third party certification and
updated, To ensure electric permit is at hand and all key element is full fill
and follow the LOG-OUT and TAG-OUT procedure.
Hill international(PMC) INDIA
Arif & Bintoak Consultant Engineers and Architect (DUBAI)
Al-Habtoor Leighton Group, UAE
Dubai Contracting Company, DUBAI
Al-KULAIB INTERNATIONAL ,KUWAIT
NAUSHAD’s CV