Presentation of Yasir Javed and Tony Norris on the topic "Computerized System to Enhance Situation Awareness: Key Challenges Associated with the Design, Evaluation, and Extension of a Prototype" at ISCRAM2013
Measurement Strategy for Software Companiesnazlitemu
Semelhante a Computerized System to Enhance Situation Awareness: Key Challenges Associated with the Design, Evaluation, and Extension of a Prototype (20)
Computerized System to Enhance Situation Awareness: Key Challenges Associated with the Design, Evaluation, and Extension of a Prototype
1. Computerized System to Enhance Situation
Awareness: Key Challenges Associated with the
Design, Evaluation, and Extension of a Prototype
Yasir Javed* & Tony Norris**
*COMSATS Institute of Information Technology, Abbottabad, Pakistan
**School of Engineering and Advanced Technology, Massey University, Auckland, New Zealand
2. Overview
• Situation Awareness in Emergency Management
• SAVER Prototype
o Design and Implementation Challenges
o Evaluation Challenges
• Extending SAVER as a Production System
o Design and Implementation Challenges
Slide 2 from 14
3. Situation Awareness in
Emergency Management
• Situation Awareness (SA)
o Result of understanding the situation (Situation assessment)
o Provide basis to decide the actions needed to normalise the situation
o Perception, Comprehension and Projection
• Shared Situation Awareness (SSA)
o Overlap (commonality) in the SA of team members
• Team Situation Awareness (TSA)
o SA required for own / team responsibilities in relation to the team goal
o Total (combined) SA of team members
o Belief about own and team members’ SA
Slide 3 from 14
6. SAVER Functionality
• Goal Directed to Improve Decision Making
• Displays Information to Reduce User Processing
• Proactive Sharing of Information to Enhance SA
• Enhances all Types and Levels of SA
• Uses Ontology to Infer Future Situations
Slide 6 from 14
8. SAVER Evaluation
Construct Measured
Mean %
situation
awareness
using SAVER
Mean %
situation
awareness not
using SAVER
t-value p-Value
Individual SA 82.6 73.0 2.84 p = 0.008
Shared SA (SSA) 78.5 67.3 5.95 p < 0.001
Team SA (TSA) 81.9 59.5 4.50 p = 0.003
Combined SA (TSA) 91.8 83.4 4.42 p = 0.003
Slide 8 from 14
9. Extending the SAVER Prototype
• Trust Development
• Testing with Actual (Large)Data Sets
• Human Computer Interface Requirements Analysis
• Challenges
o Organizational
o Architectural
o Functionality
o Display and interaction
Slide 9 from 14
10. Organizational Changes
• Multi-organization Integration
• Level of Information sharing – New policies
• Process Re-Engineering (Change Management)
• Emergency Managers and Training
• In-depth Information requirements for organizations
Slide 10 from 14