The following installation guide is based on engineering principles and standard
practice for installation of arch culverts. Stream crossings are highly regulated in
many regions. Check your regional regulating agencies prior to installation to en-
sure that the Enviro-Span is permitted for your individual stream crossing.
Guide for Installation
•	 Read this guide in its entirety before attempting an installation. Professional engineering
supervision is recommended.
•	 Complete a detailed site plan and specification drawings for the crossing based on initial
site assessments, stream hydrology, terrain stability considerations and/or other factors.
•	 Select crossing location so that the wetted perimeter of the stream will be entirely en-
compassed by the footing logs. For example, if a stream is normally 3-1/2 feet (1070 mm) wide,
a 7 foot (2150 mm) diameter Enviro-Span unit could be selected.
•	 Hydrological computations should be done to determine the peak design runoff from
the watershed above the crossing, to ensure the structure is adequately sized for each applica-
tion.
•	 Select two straight and sound logs of 11.75” (300mm) maximum diameter and approxi-
mately 48 inches (1200mm) longer than the proposed structure to use as footings. Heavy wall
plastic pipe, steel pipe or drill casings of maximum 11.75 inches (300mm) diameter can be
substituted for the log footing. Place these footings parallel to the streambed, with center to
center spacing to match the dimension of the Enviro-Span module. Footing locations should be
prepared by hand so the footing rests on mineral soil with no obstructions in between. Addi-
tional excavation and foundation compaction is not required due to the flexibility of the Enviro-
Span system.
•	 Lift each module into place. Starting 24 inches (600mm) from either end of the footing,
place the first module straddling the stream with the module’s footing arches centered on the
round footing.
•	 Place the second module tight against the first. Place the Enviro-Span connector over
the adjacent flanges… no bolts or tools are required. If your site plan requires riprap rock for
channel lining, it can be placed inside the modules, section by section, as assembly progresses.
Continue to add modules until the desired width is achieved per your site plan.
www.enviro-span.com
Trinity Composites, LLC
•	 When the last module is placed, we recommend covering the entire structure with a
single layer of geotech landscaping fabric material or per your site plan requirements.
•	 Have clean granular backfill on hand, sufficient to cover the entire structure with back-
fill and top-fill (see backfill amount listed on the table below for the Enviro-Span size you are
installing). To achieve load ratings, use a high quality granular backfill with a Standard Proctor
density between 90 and 95%.
•	 With the geotech material in place, loads of material should be backfilled, equally in
height between the two sides at any time. Care is required in placing the first bucket of backfill
against the module, so that the Enviro-Span connectors are not knocked out of position. Back-
fill is a critical operation, so care and attention spent at this stage of the operation will ensure a
satisfactory installation.
•	 USE THE AMOUNT OF TOP-FILL LISTED ON THE TABLE BELOW FOR THE SIZE ENVIRO-
SPAN YOU ARE INSTALLING. IMPROPER INSTALLATION, INADEQUATE BACKFILLING/ COMPAC-
TION OR VEHICLE OVERLOADING MAY RESULT IN FAILURE OF THE GOODS TO WITHSTAND
SPECIFIED LOAD.
•	 Refer to the sketch drawings for additional installation considerations and details.
Topfill / Backfill Table
2150mm (7 foot) Span Minimum of 3 feet of top fill required
2 of 4
www.enviro-span.com
Trinity Composites, LLC
WARRANTY
•	 Trinity Composites, LLC (seller) agrees that the Goods are manufactured in accordance with the appli-
cable specifications (except as to items manufactured or supplied to the Buyer’s design and specifications), and
that the goods will be free of defects in material and workmanship for one (1) year after delivery (“Warranty
Period”); provided, however, that Seller’s obligation hereunder shall not cover or apply to any Goods or part
or attachment to the Goods not manufactured by Seller. To the extent available, and in accordance with the
terms thereof, Seller will provide to Buyer, upon Buyer’s written request, any warranty from the manufacturer
of the Goods or any part or attachment thereto not manufactured by Seller. Seller’s obligation under this war-
ranty with respect to Goods it manufactures shall be limited to repairing or replacing, at a location selected by
Seller, any of the Goods or part or parts thereof, which shall, within the Warranty Period, be returned to Seller
by Buyer with transportation charges prepaid and which Seller’s examination shall disclose to its satisfaction
to have been defective. This warranty does not apply to damages due to ordinary wear and tear, alteration,
improper installation or maintenance, accident, abuse, or misuse. In no event will Seller’s obligations under
this warranty exceed Seller’s costs of repair or replacement.
•	 THE WARRANTY SET FORTH HEREIN IS EXCLUSIVE AND IN LIEU OF ALL OTHER WARRANTIES EXPRESS
OR IMPLIED. SELLER DISCLAIMS ALL OTHER WARRANTIES, INCLUDING THE WARRANTIES OF MERCHANTABILITY
AND FITNESS FOR ANY PARTICULAR PURPOSE WHATSOEVER.
•	 BUYER ACKNOWLEDGES AND AGREES THAT: (a) BUYER OR IT’S CUSTOMER IS RESPONSIBLE FOR THE
LOCATION IN WHICH THE GOODS ARE INSTALLED; (b) BUYER OR IT’S CUSTOMER IS RESPONSIBLE TO INSURE
THAT THE GOODS ARE INSTALLED AND MAINTAINED IN ACCORDANCE WITH ALL SITE CONDITIONS, STATE AND
LOCAL CODES, SPECIFICATIONS, GUIDELINES, RECOMMENDATIONS AND OTHER APPLICABLE LAWS, INCLUDING
RECOMMENDED BACKFILL, OVERFILL AND COMPACTION; (c) ANY WARRANTY HEREIN SHALL BE VOID WITH-
OUT NOTICE OR ACTION OF ANY KIND REQUIRED BY SELLER IN THE EVENT OF IMROPER INSTALLATION OR
MAINTENANCE. BUYER AGREES TO DEFEND, HOLD HARMLESS AND INDEMNIFY SELLER, TRINITY INDUSTRIES,
INC. AND ITS AFFILIATED LEGAL ENTITIES AND THEIR RESPECTIVE OFFICERS, DIRECTORS, SHAREHOLDERS,
AGENTS AND EMPLOYEES FROM AND AGAINST ANY AND ALL CAUSES OF ACTION, SUITS, CLAIMS, LIABILITIES,
LOSSES, DAMAGES, COSTS, INCLUDING, BUT NOT LIMITED TO, ATTORNEYS’ FEES, COURT COSTS AND EXPENSES
OF WHATEVER NATURE OR KIND, ARISING OUT OF OR RESULTING FROM IMPROPER INSTALLATION OR MAIN-
TENANCE OF THE GOODS OR FOR BUYER’S FAILURE TO PROPERLY WARN IT’S CUSTOMER OF THE CONDITIONS
AND OBLIGATIONS OF THIS WARRANTY.
WARNING
IMPROPER INSTALLATION, INADEQUATE BACKFILLING/ COMPACTION OR VEHICAL OVERLOADING MAY
RESULT IN FAILURE OF THE GOODS TO WITHSTAND SPECIFIED LOADS
3 of 4
www.enviro-span.com
Trinity Composites, LLC
4 of 4
www.enviro-span.com
Trinity Composites, LLC
1. Place footing logs parallel to stream.
Space to match the width of the Enviro-Span
modules.
2. Place Enviro-Span modules on top of the
footings.
3. Slide the connectors over the adjacent
module flanges.
4. Cover the assembled Enviro-Span with
geotextile.
5. Build up backfill on both sides, compacting
the native material with the excavator bucket.
Cross over as soon as minimum fill cover is
achieved.
6. Place rip rap as required and start using the
crossing immediately.
1250 Gateway Drive
Gallatin, TN 37066
www.enviro-span.com
Trinity Composites, LLC
615.649.3700 • 615.442.1313 (fax)
7/13

More Related Content

Viewers also liked

journal-issue-16
journal-issue-16journal-issue-16
journal-issue-16Jonny Sharp
 
Chiara María Valdez Ayala
Chiara María Valdez AyalaChiara María Valdez Ayala
Chiara María Valdez AyalaChiara Valdez
 
Cyclizine 82-92-8-api-manufacturer-suppliers
Cyclizine 82-92-8-api-manufacturer-suppliersCyclizine 82-92-8-api-manufacturer-suppliers
Cyclizine 82-92-8-api-manufacturer-suppliersCyclizine-82-92-8-api
 
WIRLESS CLOUD NETWORK
WIRLESS CLOUD NETWORKWIRLESS CLOUD NETWORK
WIRLESS CLOUD NETWORKAashish Pande
 
Microsoft office 2013
Microsoft office 2013Microsoft office 2013
Microsoft office 2013300672
 
Excel functionssimplymeasured
Excel functionssimplymeasuredExcel functionssimplymeasured
Excel functionssimplymeasuredcentral.zone
 

Viewers also liked (11)

La Vallee presentation 2015
La Vallee presentation 2015La Vallee presentation 2015
La Vallee presentation 2015
 
Countystat Pilot
Countystat PilotCountystat Pilot
Countystat Pilot
 
journal-issue-16
journal-issue-16journal-issue-16
journal-issue-16
 
Chiara María Valdez Ayala
Chiara María Valdez AyalaChiara María Valdez Ayala
Chiara María Valdez Ayala
 
Trident Rocks
Trident RocksTrident Rocks
Trident Rocks
 
Cyclizine 82-92-8-api-manufacturer-suppliers
Cyclizine 82-92-8-api-manufacturer-suppliersCyclizine 82-92-8-api-manufacturer-suppliers
Cyclizine 82-92-8-api-manufacturer-suppliers
 
Localization proposal honyaku center
Localization proposal honyaku centerLocalization proposal honyaku center
Localization proposal honyaku center
 
WIRLESS CLOUD NETWORK
WIRLESS CLOUD NETWORKWIRLESS CLOUD NETWORK
WIRLESS CLOUD NETWORK
 
947 futurefact 2014
947 futurefact 2014947 futurefact 2014
947 futurefact 2014
 
Microsoft office 2013
Microsoft office 2013Microsoft office 2013
Microsoft office 2013
 
Excel functionssimplymeasured
Excel functionssimplymeasuredExcel functionssimplymeasured
Excel functionssimplymeasured
 

Similar to 1.Enviro Span Installation Guide

Compost Toilets Design & Access Statement
Compost Toilets Design & Access StatementCompost Toilets Design & Access Statement
Compost Toilets Design & Access StatementSusy Feltham
 
Foxwell NT630+ User Manual
Foxwell NT630+ User ManualFoxwell NT630+ User Manual
Foxwell NT630+ User ManualTim Miller
 
Foxwell NT624 Pro User Manual
Foxwell NT624 Pro User ManualFoxwell NT624 Pro User Manual
Foxwell NT624 Pro User ManualTim Miller
 
Foxwell NT614 User Manual
Foxwell NT614 User ManualFoxwell NT614 User Manual
Foxwell NT614 User ManualTim Miller
 
Foxwell NT644 User Manual
Foxwell NT644 User ManualFoxwell NT644 User Manual
Foxwell NT644 User ManualTim Miller
 
How to use foxwell nt510 multi system scanner
How to use foxwell nt510 multi system scannerHow to use foxwell nt510 multi system scanner
How to use foxwell nt510 multi system scannerBuyobdtoolShop
 
Foxwell NT650 User Manual
Foxwell NT650  User ManualFoxwell NT650  User Manual
Foxwell NT650 User ManualTim Miller
 
Foxwell Nt500 english v1.00 pdf
Foxwell Nt500 english v1.00 pdfFoxwell Nt500 english v1.00 pdf
Foxwell Nt500 english v1.00 pdfWORLD OBD2
 
Foxwell NT630 User Manual
Foxwell NT630 User ManualFoxwell NT630 User Manual
Foxwell NT630 User ManualTim Miller
 
Nt500 vag-scanner-user-manual-foxwellshop
Nt500 vag-scanner-user-manual-foxwellshopNt500 vag-scanner-user-manual-foxwellshop
Nt500 vag-scanner-user-manual-foxwellshopObdexpress.co.uk
 
Prefabricated Vertical Drains (PVD) method statement
Prefabricated Vertical Drains  (PVD) method statementPrefabricated Vertical Drains  (PVD) method statement
Prefabricated Vertical Drains (PVD) method statementKhaza Ahmed Palash
 
Foxwell NT644E User’s Manual
Foxwell NT644E User’s ManualFoxwell NT644E User’s Manual
Foxwell NT644E User’s ManualTim Miller
 
Versico Live Roof System
Versico Live Roof SystemVersico Live Roof System
Versico Live Roof SystemFlanna489y
 
Foxwell NT630 Pro User Manual
Foxwell NT630 Pro User ManualFoxwell NT630 Pro User Manual
Foxwell NT630 Pro User ManualTim Miller
 
Installation Instructions for CULTEC Stormwater Management Systems
Installation Instructions for CULTEC Stormwater Management SystemsInstallation Instructions for CULTEC Stormwater Management Systems
Installation Instructions for CULTEC Stormwater Management SystemsGina Carolan
 

Similar to 1.Enviro Span Installation Guide (20)

Compost Toilets Design & Access Statement
Compost Toilets Design & Access StatementCompost Toilets Design & Access Statement
Compost Toilets Design & Access Statement
 
Foxwell NT630+ User Manual
Foxwell NT630+ User ManualFoxwell NT630+ User Manual
Foxwell NT630+ User Manual
 
Foxwell NT624 Pro User Manual
Foxwell NT624 Pro User ManualFoxwell NT624 Pro User Manual
Foxwell NT624 Pro User Manual
 
Foxwell NT614 User Manual
Foxwell NT614 User ManualFoxwell NT614 User Manual
Foxwell NT614 User Manual
 
Foxwell NT644 User Manual
Foxwell NT644 User ManualFoxwell NT644 User Manual
Foxwell NT644 User Manual
 
How to use foxwell nt510 multi system scanner
How to use foxwell nt510 multi system scannerHow to use foxwell nt510 multi system scanner
How to use foxwell nt510 multi system scanner
 
Foxwell NT650 User Manual
Foxwell NT650  User ManualFoxwell NT650  User Manual
Foxwell NT650 User Manual
 
Foxwell Nt500 english v1.00 pdf
Foxwell Nt500 english v1.00 pdfFoxwell Nt500 english v1.00 pdf
Foxwell Nt500 english v1.00 pdf
 
Foxwell NT630 User Manual
Foxwell NT630 User ManualFoxwell NT630 User Manual
Foxwell NT630 User Manual
 
Nt500 vag-scanner-user-manual-foxwellshop
Nt500 vag-scanner-user-manual-foxwellshopNt500 vag-scanner-user-manual-foxwellshop
Nt500 vag-scanner-user-manual-foxwellshop
 
Prefabricated Vertical Drains (PVD) method statement
Prefabricated Vertical Drains  (PVD) method statementPrefabricated Vertical Drains  (PVD) method statement
Prefabricated Vertical Drains (PVD) method statement
 
Foxwell NT644E User’s Manual
Foxwell NT644E User’s ManualFoxwell NT644E User’s Manual
Foxwell NT644E User’s Manual
 
Versico Live Roof System
Versico Live Roof SystemVersico Live Roof System
Versico Live Roof System
 
Rec product-warranty
Rec product-warrantyRec product-warranty
Rec product-warranty
 
Foxwell NT630 Pro User Manual
Foxwell NT630 Pro User ManualFoxwell NT630 Pro User Manual
Foxwell NT630 Pro User Manual
 
NDL FUEL STATION OPERATION
NDL FUEL STATION OPERATIONNDL FUEL STATION OPERATION
NDL FUEL STATION OPERATION
 
220-5T
220-5T220-5T
220-5T
 
Installation Instructions for CULTEC Stormwater Management Systems
Installation Instructions for CULTEC Stormwater Management SystemsInstallation Instructions for CULTEC Stormwater Management Systems
Installation Instructions for CULTEC Stormwater Management Systems
 
220-10T WEIGHBRIDGE MOUNT
220-10T WEIGHBRIDGE MOUNT220-10T WEIGHBRIDGE MOUNT
220-10T WEIGHBRIDGE MOUNT
 
Easy Carry
Easy CarryEasy Carry
Easy Carry
 

1.Enviro Span Installation Guide

  • 1. Installation Guidelines for the Enviro-Span Culvert Systems 1250 Gateway Drive Gallatin, TN 37066 www.enviro-span.com 615.649.3700 • 615.442.1313 (fax) Enviro-Span is a product line within Trinity Composites, LLC. TRINITY COMPOSITES, LLC
  • 2.
  • 3. 1 of 4 The following installation guide is based on engineering principles and standard practice for installation of arch culverts. Stream crossings are highly regulated in many regions. Check your regional regulating agencies prior to installation to en- sure that the Enviro-Span is permitted for your individual stream crossing. Guide for Installation • Read this guide in its entirety before attempting an installation. Professional engineering supervision is recommended. • Complete a detailed site plan and specification drawings for the crossing based on initial site assessments, stream hydrology, terrain stability considerations and/or other factors. • Select crossing location so that the wetted perimeter of the stream will be entirely en- compassed by the footing logs. For example, if a stream is normally 3-1/2 feet (1070 mm) wide, a 7 foot (2150 mm) diameter Enviro-Span unit could be selected. • Hydrological computations should be done to determine the peak design runoff from the watershed above the crossing, to ensure the structure is adequately sized for each applica- tion. • Select two straight and sound logs of 11.75” (300mm) maximum diameter and approxi- mately 48 inches (1200mm) longer than the proposed structure to use as footings. Heavy wall plastic pipe, steel pipe or drill casings of maximum 11.75 inches (300mm) diameter can be substituted for the log footing. Place these footings parallel to the streambed, with center to center spacing to match the dimension of the Enviro-Span module. Footing locations should be prepared by hand so the footing rests on mineral soil with no obstructions in between. Addi- tional excavation and foundation compaction is not required due to the flexibility of the Enviro- Span system. • Lift each module into place. Starting 24 inches (600mm) from either end of the footing, place the first module straddling the stream with the module’s footing arches centered on the round footing. • Place the second module tight against the first. Place the Enviro-Span connector over the adjacent flanges… no bolts or tools are required. If your site plan requires riprap rock for channel lining, it can be placed inside the modules, section by section, as assembly progresses. Continue to add modules until the desired width is achieved per your site plan. www.enviro-span.com Trinity Composites, LLC
  • 4. • When the last module is placed, we recommend covering the entire structure with a single layer of geotech landscaping fabric material or per your site plan requirements. • Have clean granular backfill on hand, sufficient to cover the entire structure with back- fill and top-fill (see backfill amount listed on the table below for the Enviro-Span size you are installing). To achieve load ratings, use a high quality granular backfill with a Standard Proctor density between 90 and 95%. • With the geotech material in place, loads of material should be backfilled, equally in height between the two sides at any time. Care is required in placing the first bucket of backfill against the module, so that the Enviro-Span connectors are not knocked out of position. Back- fill is a critical operation, so care and attention spent at this stage of the operation will ensure a satisfactory installation. • USE THE AMOUNT OF TOP-FILL LISTED ON THE TABLE BELOW FOR THE SIZE ENVIRO- SPAN YOU ARE INSTALLING. IMPROPER INSTALLATION, INADEQUATE BACKFILLING/ COMPAC- TION OR VEHICLE OVERLOADING MAY RESULT IN FAILURE OF THE GOODS TO WITHSTAND SPECIFIED LOAD. • Refer to the sketch drawings for additional installation considerations and details. Topfill / Backfill Table 2150mm (7 foot) Span Minimum of 3 feet of top fill required 2 of 4 www.enviro-span.com Trinity Composites, LLC
  • 5. WARRANTY • Trinity Composites, LLC (seller) agrees that the Goods are manufactured in accordance with the appli- cable specifications (except as to items manufactured or supplied to the Buyer’s design and specifications), and that the goods will be free of defects in material and workmanship for one (1) year after delivery (“Warranty Period”); provided, however, that Seller’s obligation hereunder shall not cover or apply to any Goods or part or attachment to the Goods not manufactured by Seller. To the extent available, and in accordance with the terms thereof, Seller will provide to Buyer, upon Buyer’s written request, any warranty from the manufacturer of the Goods or any part or attachment thereto not manufactured by Seller. Seller’s obligation under this war- ranty with respect to Goods it manufactures shall be limited to repairing or replacing, at a location selected by Seller, any of the Goods or part or parts thereof, which shall, within the Warranty Period, be returned to Seller by Buyer with transportation charges prepaid and which Seller’s examination shall disclose to its satisfaction to have been defective. This warranty does not apply to damages due to ordinary wear and tear, alteration, improper installation or maintenance, accident, abuse, or misuse. In no event will Seller’s obligations under this warranty exceed Seller’s costs of repair or replacement. • THE WARRANTY SET FORTH HEREIN IS EXCLUSIVE AND IN LIEU OF ALL OTHER WARRANTIES EXPRESS OR IMPLIED. SELLER DISCLAIMS ALL OTHER WARRANTIES, INCLUDING THE WARRANTIES OF MERCHANTABILITY AND FITNESS FOR ANY PARTICULAR PURPOSE WHATSOEVER. • BUYER ACKNOWLEDGES AND AGREES THAT: (a) BUYER OR IT’S CUSTOMER IS RESPONSIBLE FOR THE LOCATION IN WHICH THE GOODS ARE INSTALLED; (b) BUYER OR IT’S CUSTOMER IS RESPONSIBLE TO INSURE THAT THE GOODS ARE INSTALLED AND MAINTAINED IN ACCORDANCE WITH ALL SITE CONDITIONS, STATE AND LOCAL CODES, SPECIFICATIONS, GUIDELINES, RECOMMENDATIONS AND OTHER APPLICABLE LAWS, INCLUDING RECOMMENDED BACKFILL, OVERFILL AND COMPACTION; (c) ANY WARRANTY HEREIN SHALL BE VOID WITH- OUT NOTICE OR ACTION OF ANY KIND REQUIRED BY SELLER IN THE EVENT OF IMROPER INSTALLATION OR MAINTENANCE. BUYER AGREES TO DEFEND, HOLD HARMLESS AND INDEMNIFY SELLER, TRINITY INDUSTRIES, INC. AND ITS AFFILIATED LEGAL ENTITIES AND THEIR RESPECTIVE OFFICERS, DIRECTORS, SHAREHOLDERS, AGENTS AND EMPLOYEES FROM AND AGAINST ANY AND ALL CAUSES OF ACTION, SUITS, CLAIMS, LIABILITIES, LOSSES, DAMAGES, COSTS, INCLUDING, BUT NOT LIMITED TO, ATTORNEYS’ FEES, COURT COSTS AND EXPENSES OF WHATEVER NATURE OR KIND, ARISING OUT OF OR RESULTING FROM IMPROPER INSTALLATION OR MAIN- TENANCE OF THE GOODS OR FOR BUYER’S FAILURE TO PROPERLY WARN IT’S CUSTOMER OF THE CONDITIONS AND OBLIGATIONS OF THIS WARRANTY. WARNING IMPROPER INSTALLATION, INADEQUATE BACKFILLING/ COMPACTION OR VEHICAL OVERLOADING MAY RESULT IN FAILURE OF THE GOODS TO WITHSTAND SPECIFIED LOADS 3 of 4 www.enviro-span.com Trinity Composites, LLC
  • 6. 4 of 4 www.enviro-span.com Trinity Composites, LLC 1. Place footing logs parallel to stream. Space to match the width of the Enviro-Span modules. 2. Place Enviro-Span modules on top of the footings. 3. Slide the connectors over the adjacent module flanges. 4. Cover the assembled Enviro-Span with geotextile. 5. Build up backfill on both sides, compacting the native material with the excavator bucket. Cross over as soon as minimum fill cover is achieved. 6. Place rip rap as required and start using the crossing immediately.
  • 7.
  • 8. 1250 Gateway Drive Gallatin, TN 37066 www.enviro-span.com Trinity Composites, LLC 615.649.3700 • 615.442.1313 (fax) 7/13