SlideShare a Scribd company logo
1 of 7
Download to read offline
Miguel A. Rivera Barbosa, EIT
HC-06 BOX 14811 Corozal, Puerto Rico 00783
Mobile: (939) 645-3018
E-mail: mriverabar@gmail.com
Objectives
Looking for a position where my skills and knowledge will be challenged to
their utmost and where there are opportunities for personal and professional
development. Special interest in position requiring project management,
engineering and maintenance or Electrical engineering skills.
Education
Bachelor of Science in Electrical Engineering
Polytechnic University of Puerto Rico, Hato Rey
Master in Manufacturing Engineering (Instrumentation and Controls)
Polytechnic University of Puerto Rico, Hato Rey
I have over sixteen (16) years of experience in project management for the
pharmaceutical, biotechnology and chemical industries, as well as in the sports
& recreation and government facilities sectors. Responsible for managing
capital projects from the design phase through commissioning, start-up,
validation and turnkey. Accountable for permitting, project inspection,
evaluation of purchase orders and certifications, supervision, change controls
and coordination of capital projects. In addition, responsible for trades
management, procurement & expediting (SAP), inspection of control and
instrumentation equipment’s and installations.
Resume: Miguel A. Rivera Barbosa, EIT
Experience
Project Leader: Caribbean Project Management, CPM, Guaynabo, PR
March 2001 – Present
Project Manager: Bacardi Corporation, Cataño, PR
Local Capital Projects
Lead the efforts for all project assignment. He will be the principal contact
person between Bacardi, Designer, Contractors, CPM Home Office and CPM
Project Team and will be responsible for the project management and project
execution.
Project Manager: Lilly del Caribe, Carolina, PR
Local Capital Projects ($25MM/year)
Coordinate the management team in all construction activities and perform
daily inspections to assure compliance with capital plan and client
requirements. Develop and manage the detailed project schedule, identify
project milestones, and ensure the key deliverables are met on time. Evaluate
contractors’ change orders and certifications for payment. Perform project
progress meetings and distribute meeting minutes. Generate project status
reports and monthly project reports. Manage the projects’ Change Control
using the Trackwise System for the compliance with all regulatory agencies.
Work with SAP for the management and control of all aspects of the capital
program.
Roche Operations, Ltd., Ponce, PR
Provide engineering support services for the local capital investment plan.
Main projects:
Resume: Miguel A. Rivera Barbosa, EIT
Water Recovery Project ($175K)
Responsible for bid management process, design revision and value
engineering.
New RAHU 5 ($250K)
Responsible for all trades management and purchasing for the installation of a
new RAHU 5 dehumidifier Air Handling Unit while minimizing the impact on
operations.
New pH Neutralization System ($250K)
The project consisted of the construction and implementation of an automatic
system for the neutralization of water used for production by Roche. The
objective was to comply with the requirements of the appropriate government
agencies in order to discharge water through PRASA’s sanitary system.
Responsible for all trade management, including design, bids, purchasing,
installation and start-up.
New Fire Pump House ($250K)
Responsible of the daily inspection, project management, supervision and
coordination of activities as a contractor, designer, and owner representative of
the New Fire Pump House. Provide support to commissioning and start-up
operations.
CDM Caribbean Engineers, PSC
PRASA Water Treatment Plant Assessment Program
The program consists in performing assessments to the 80 Filtration Plants
owned by Puerto Rico Aqueduct and Sewer Authority (PRASA). Responsible for
physical and electromechanical inspection in order to incorporate on the
Preventive Maintenance Integrated Plan.
Resume: Miguel A. Rivera Barbosa, EIT
Puerto Rico Infrastructure Financing Authority
2010 Central American and Caribbean Games, Mayagüez, PR ($157MM)
Supervise construction activities and provide technical assistance to the
Construction Management and Inspection Team regarding electrical work to
assure compliance with codes and standards.
Warner Chilcott, Fajardo, PR
Various Capital Projects:
Installation of New Manufacturing Equipments
Remodeling of Existing Clean Rooms Areas
Construction of New Packaging Room for Dispensing Dry Products and Semi-
Solids
Site and Utilities Improvement Projects
Accountable for managing the capital projects from the design phase through
commissioning and start-up. His responsibilities include the development and
management of design, cost estimates, capital funding request, project
schedule, and scope control to maintain compliance of budget and quality
during construction activities. Facilitate technical and business communication
between clients’ business units and engineering groups.
Roche Diagnostics, Ponce, PR
Various Capital Projects:
New Packaging Line ($9MM)
Responsible for all trades management for the installation of a new packaging
line while minimizing the impact on operations.
Single Strip Expansion
Resume: Miguel A. Rivera Barbosa, EIT
Responsible for all trade management regarding this expansion project of
45,000 sq. ft. Project includes utilities, parking facilities and installation of
specialized equipment ($48MM) as well as permitting, inspections, Factory
Acceptance Test, SAT (Site Acceptance Test), start-up and commissioning.
Electrical Engineer: Amgen Manufacturing, Juncos, PR
Site Development Project
Child Care Center Building Project
As owner’s representative, responsible for project inspection, purchase orders
and certifications’ evaluation. Responsible for the owner’s system coordination
for project system delivery.
Pfizer Global Manufacturing (formerly Pharmacia Corporation), Arecibo, PR
Eplenerone Registration & Commercial
Reactor Replacement SA-559 Chemical Plant ($0.6MM)
Refractory Replacement TOX
Responsible for coordination and inspection of mechanical, electrical and
instrumentation works for construction projects.
Pfizer Global Manufacturing (formerly Pharmacia Corp.), Arecibo, PR
Electrical Safety Upgrade Building 500
In charge of final drawings follow up and implementation for the classifications
of Hazardous areas and Chemical Plant.
Pfizer Global Manufacturing (formerly Pharmacia Corp.): Thermal Oxidizer Project
($30MM)
Resume: Miguel A. Rivera Barbosa, EIT
Responsible for coordination and inspection of electrical and instrumentation
construction projects. Procurement and expediting of instruments and safety
devices. Support to commissioning and start-up operations.
Government Development Bank of Puerto Rico, San Juan, PR
Responsible for the coordination and maintenance of a 500 KVA Generator to
supply power for all facilities.
University Professor: Caribbean University – Bayamon Campus, PR
August 2002 – Present
Develop and instruct undergraduate General Electrical Engineering courses.
Secure guest speakers, participate in departmental and college activities,
develop/integrate curriculum and mentor/advice students. Devise weekly
lessons that address current issues and perspectives in engineering science.
Project Engineer: Instrumentation System & Engineering, Barceloneta, PR
2000 - 2001
Pharmacia Corporation, Barceloneta, PR: Celecoxib Phase IV
Baxter Corp., Guayama, PR: Sevo Phase II
Responsible for project management, supervision, inspection and coordination
of activities as a contractor, designer, and owner representative. Procurement
and expediting of instruments and safety devices.
Project Engineer: AIREKO Construction, Ponce, PR
1999 - 2000
EcoElectrica Corp., Guayanilla, PR: Co-generation Plant
Responsible for coordination, construction and inspection of electrical
projects. In charge of quotations and estimates.
Resume: Miguel A. Rivera Barbosa, EIT
Skills
Responsible, strong leadership, initiative and supervisory skills. Enjoy
teamwork, fast learner, public speaking and communication skills, software
knowledge, Microsoft office (Word, Excel, Microsoft Project). Domain in
Spanish and English languages
CIAPR Member, EIT (2002)
IEEE Member
PMP Course
OSHA 30-Hour Training Course in Construction Safety & Health
OSHA 10-hour Training in Construction Safety & Health
Basic Concepts for Project Inspectors in the Area of Electricity and
Electromechanical Equipment’s - CIAPR
Intrinsic Safety & Surge Protection
Effective Management of Time and Priorities
Power - CIAPR
Project Management & Control using Primavera Project Planner 3.1
Construction Management -CIAPR
The Supervision and Leadership as Alternative to Business Success
Assertive Communication: Conflict Management, Negotiation and
Mediation
The accommodations, Modifications and Technological Assistance:
Integrating People with Special Needs to University, Work and Community
Life
References
Available upon request

More Related Content

What's hot

Erfan Farooqui CV- 17072016
Erfan Farooqui CV- 17072016Erfan Farooqui CV- 17072016
Erfan Farooqui CV- 17072016
Erfan Farooqui
 
LAM COVER & RESUME.
LAM COVER & RESUME.LAM COVER & RESUME.
LAM COVER & RESUME.
LUISINGPR
 
Mirasol Resume 10-14-14
Mirasol Resume 10-14-14Mirasol Resume 10-14-14
Mirasol Resume 10-14-14
Mirasol Villa
 
RESUME-FEDELINO, LEMUEL M
RESUME-FEDELINO, LEMUEL MRESUME-FEDELINO, LEMUEL M
RESUME-FEDELINO, LEMUEL M
lemuel fedelino
 
Chee Wong - CV DEC2016
Chee Wong - CV DEC2016Chee Wong - CV DEC2016
Chee Wong - CV DEC2016
Chee Wong
 
ANGELA LOPEZ - CV - Civil, Environmental & Sustainability Engineer
ANGELA LOPEZ - CV - Civil, Environmental  & Sustainability EngineerANGELA LOPEZ - CV - Civil, Environmental  & Sustainability Engineer
ANGELA LOPEZ - CV - Civil, Environmental & Sustainability Engineer
Angela Lopez
 
emf CV MEP Project-Construction Manager
emf CV MEP Project-Construction Manageremf CV MEP Project-Construction Manager
emf CV MEP Project-Construction Manager
Edwardo Figuracion
 

What's hot (20)

Erfan Farooqui CV- 17072016
Erfan Farooqui CV- 17072016Erfan Farooqui CV- 17072016
Erfan Farooqui CV- 17072016
 
ResUSAjobsEng
ResUSAjobsEngResUSAjobsEng
ResUSAjobsEng
 
Engr.J.Esplanada.CV
Engr.J.Esplanada.CVEngr.J.Esplanada.CV
Engr.J.Esplanada.CV
 
Nayer Resume March 2016
Nayer Resume March 2016Nayer Resume March 2016
Nayer Resume March 2016
 
Updated CV as of May 6, 2016
Updated CV as of May 6, 2016Updated CV as of May 6, 2016
Updated CV as of May 6, 2016
 
Erin Kingston - CV
Erin Kingston - CVErin Kingston - CV
Erin Kingston - CV
 
Joshua Ibbertson CV 2015
Joshua Ibbertson CV 2015Joshua Ibbertson CV 2015
Joshua Ibbertson CV 2015
 
Final_Resume Abdul Jameel
Final_Resume Abdul JameelFinal_Resume Abdul Jameel
Final_Resume Abdul Jameel
 
Abdelrazek Mustafa Korshom C V
Abdelrazek Mustafa Korshom C VAbdelrazek Mustafa Korshom C V
Abdelrazek Mustafa Korshom C V
 
Philip Kwiatkowski Resume
Philip Kwiatkowski ResumePhilip Kwiatkowski Resume
Philip Kwiatkowski Resume
 
LAM COVER & RESUME.
LAM COVER & RESUME.LAM COVER & RESUME.
LAM COVER & RESUME.
 
DaveGriffithsCV
DaveGriffithsCVDaveGriffithsCV
DaveGriffithsCV
 
Mirasol Resume 10-14-14
Mirasol Resume 10-14-14Mirasol Resume 10-14-14
Mirasol Resume 10-14-14
 
RESUME-FEDELINO, LEMUEL M
RESUME-FEDELINO, LEMUEL MRESUME-FEDELINO, LEMUEL M
RESUME-FEDELINO, LEMUEL M
 
Chee Wong - CV DEC2016
Chee Wong - CV DEC2016Chee Wong - CV DEC2016
Chee Wong - CV DEC2016
 
Cv copy. khedr-c
Cv   copy. khedr-cCv   copy. khedr-c
Cv copy. khedr-c
 
ANGELA LOPEZ - CV - Civil, Environmental & Sustainability Engineer
ANGELA LOPEZ - CV - Civil, Environmental  & Sustainability EngineerANGELA LOPEZ - CV - Civil, Environmental  & Sustainability Engineer
ANGELA LOPEZ - CV - Civil, Environmental & Sustainability Engineer
 
emf CV MEP Project-Construction Manager
emf CV MEP Project-Construction Manageremf CV MEP Project-Construction Manager
emf CV MEP Project-Construction Manager
 
Amulya Gupta CV
Amulya Gupta CVAmulya Gupta CV
Amulya Gupta CV
 
64482PSM
64482PSM64482PSM
64482PSM
 

Viewers also liked

GreenFin Application Forms
GreenFin Application FormsGreenFin Application Forms
GreenFin Application Forms
anna kasutina
 
Maria Rita Passos-Bueno - 30mai14 1º Congresso A&R SUS
Maria Rita Passos-Bueno - 30mai14 1º Congresso A&R SUSMaria Rita Passos-Bueno - 30mai14 1º Congresso A&R SUS
Maria Rita Passos-Bueno - 30mai14 1º Congresso A&R SUS
Autismo & Realidade
 

Viewers also liked (13)

Extra Life.PNM25
Extra Life.PNM25Extra Life.PNM25
Extra Life.PNM25
 
GreenFin Application Forms
GreenFin Application FormsGreenFin Application Forms
GreenFin Application Forms
 
Magazine proposal
Magazine proposal Magazine proposal
Magazine proposal
 
πανεπιστήμιο πατρών-παρουσιαση-τπε (3)
πανεπιστήμιο πατρών-παρουσιαση-τπε (3)πανεπιστήμιο πατρών-παρουσιαση-τπε (3)
πανεπιστήμιο πατρών-παρουσιαση-τπε (3)
 
Present Tenses
Present TensesPresent Tenses
Present Tenses
 
The experience of malone antegrade continence enema
The experience of malone antegrade continence enemaThe experience of malone antegrade continence enema
The experience of malone antegrade continence enema
 
Maria Rita Passos-Bueno - 30mai14 1º Congresso A&R SUS
Maria Rita Passos-Bueno - 30mai14 1º Congresso A&R SUSMaria Rita Passos-Bueno - 30mai14 1º Congresso A&R SUS
Maria Rita Passos-Bueno - 30mai14 1º Congresso A&R SUS
 
Candidate Experience: Elevate Your Employer Brand
Candidate Experience: Elevate Your Employer BrandCandidate Experience: Elevate Your Employer Brand
Candidate Experience: Elevate Your Employer Brand
 
Evaluation Q7: Looking back at your preliminary tasks, what do feel you have...
Evaluation Q7:  Looking back at your preliminary tasks, what do feel you have...Evaluation Q7:  Looking back at your preliminary tasks, what do feel you have...
Evaluation Q7: Looking back at your preliminary tasks, what do feel you have...
 
肝母細胞癌外科治療結果—臺北榮總兒童外科自1996的分析
肝母細胞癌外科治療結果—臺北榮總兒童外科自1996的分析肝母細胞癌外科治療結果—臺北榮總兒童外科自1996的分析
肝母細胞癌外科治療結果—臺北榮總兒童外科自1996的分析
 
Agent based car following model for heterogeneities of platoon driving with v...
Agent based car following model for heterogeneities of platoon driving with v...Agent based car following model for heterogeneities of platoon driving with v...
Agent based car following model for heterogeneities of platoon driving with v...
 
Links educativos
Links educativosLinks educativos
Links educativos
 
Het belang van herkomstlanden voor scholen en onderwijssucces van migrantenki...
Het belang van herkomstlanden voor scholen en onderwijssucces van migrantenki...Het belang van herkomstlanden voor scholen en onderwijssucces van migrantenki...
Het belang van herkomstlanden voor scholen en onderwijssucces van migrantenki...
 

Similar to Miguel A. Rivera Barbosa, EIT

S Dasko Resume 28feb2015
S Dasko Resume 28feb2015S Dasko Resume 28feb2015
S Dasko Resume 28feb2015
Scott Dasko
 
R. Chapa. Resume May. 2015
R. Chapa. Resume May. 2015R. Chapa. Resume May. 2015
R. Chapa. Resume May. 2015
Ray Chapa
 
RESUME - Miguel Montalvo del Toro - February 2016
RESUME - Miguel Montalvo del Toro - February 2016RESUME - Miguel Montalvo del Toro - February 2016
RESUME - Miguel Montalvo del Toro - February 2016
Miguel Montalvo
 
Resume - RJ Roof_Rev1_21Oct16
Resume - RJ Roof_Rev1_21Oct16Resume - RJ Roof_Rev1_21Oct16
Resume - RJ Roof_Rev1_21Oct16
Ron Roof
 
Resume-Miguel Ramirez-March 2015
Resume-Miguel Ramirez-March 2015Resume-Miguel Ramirez-March 2015
Resume-Miguel Ramirez-March 2015
Miguel Ramirez
 
Chris Smith resume
Chris Smith resumeChris Smith resume
Chris Smith resume
Chris Smith
 

Similar to Miguel A. Rivera Barbosa, EIT (20)

2015 VEB Resume 7-1-2015
2015 VEB Resume 7-1-20152015 VEB Resume 7-1-2015
2015 VEB Resume 7-1-2015
 
S Dasko Resume 28feb2015
S Dasko Resume 28feb2015S Dasko Resume 28feb2015
S Dasko Resume 28feb2015
 
R. Chapa. Resume May. 2015
R. Chapa. Resume May. 2015R. Chapa. Resume May. 2015
R. Chapa. Resume May. 2015
 
RESUME - Miguel Montalvo del Toro - February 2016
RESUME - Miguel Montalvo del Toro - February 2016RESUME - Miguel Montalvo del Toro - February 2016
RESUME - Miguel Montalvo del Toro - February 2016
 
Allman Alexis Resume Copy
Allman Alexis Resume CopyAllman Alexis Resume Copy
Allman Alexis Resume Copy
 
Resume17july19
Resume17july19Resume17july19
Resume17july19
 
Franco Fernando Yanine_CV
Franco Fernando Yanine_CVFranco Fernando Yanine_CV
Franco Fernando Yanine_CV
 
Resume - RJ Roof_Rev1_21Oct16
Resume - RJ Roof_Rev1_21Oct16Resume - RJ Roof_Rev1_21Oct16
Resume - RJ Roof_Rev1_21Oct16
 
Resume-Miguel Ramirez-March 2015
Resume-Miguel Ramirez-March 2015Resume-Miguel Ramirez-March 2015
Resume-Miguel Ramirez-March 2015
 
Resume Gp
Resume GpResume Gp
Resume Gp
 
Kevin Talbot - resume
Kevin Talbot - resumeKevin Talbot - resume
Kevin Talbot - resume
 
Res414
Res414Res414
Res414
 
resume Diana Lourdes Santiago
resume Diana Lourdes Santiagoresume Diana Lourdes Santiago
resume Diana Lourdes Santiago
 
Resume Steven Padin-Aquino 2015
Resume Steven Padin-Aquino 2015Resume Steven Padin-Aquino 2015
Resume Steven Padin-Aquino 2015
 
Nelson Resume
Nelson ResumeNelson Resume
Nelson Resume
 
Nelson Resume
Nelson ResumeNelson Resume
Nelson Resume
 
Job resume
Job resumeJob resume
Job resume
 
NM_CV1
NM_CV1NM_CV1
NM_CV1
 
Caro, Jose J 11 9
Caro, Jose J 11 9Caro, Jose J 11 9
Caro, Jose J 11 9
 
Chris Smith resume
Chris Smith resumeChris Smith resume
Chris Smith resume
 

Miguel A. Rivera Barbosa, EIT

  • 1. Miguel A. Rivera Barbosa, EIT HC-06 BOX 14811 Corozal, Puerto Rico 00783 Mobile: (939) 645-3018 E-mail: mriverabar@gmail.com Objectives Looking for a position where my skills and knowledge will be challenged to their utmost and where there are opportunities for personal and professional development. Special interest in position requiring project management, engineering and maintenance or Electrical engineering skills. Education Bachelor of Science in Electrical Engineering Polytechnic University of Puerto Rico, Hato Rey Master in Manufacturing Engineering (Instrumentation and Controls) Polytechnic University of Puerto Rico, Hato Rey I have over sixteen (16) years of experience in project management for the pharmaceutical, biotechnology and chemical industries, as well as in the sports & recreation and government facilities sectors. Responsible for managing capital projects from the design phase through commissioning, start-up, validation and turnkey. Accountable for permitting, project inspection, evaluation of purchase orders and certifications, supervision, change controls and coordination of capital projects. In addition, responsible for trades management, procurement & expediting (SAP), inspection of control and instrumentation equipment’s and installations.
  • 2. Resume: Miguel A. Rivera Barbosa, EIT Experience Project Leader: Caribbean Project Management, CPM, Guaynabo, PR March 2001 – Present Project Manager: Bacardi Corporation, Cataño, PR Local Capital Projects Lead the efforts for all project assignment. He will be the principal contact person between Bacardi, Designer, Contractors, CPM Home Office and CPM Project Team and will be responsible for the project management and project execution. Project Manager: Lilly del Caribe, Carolina, PR Local Capital Projects ($25MM/year) Coordinate the management team in all construction activities and perform daily inspections to assure compliance with capital plan and client requirements. Develop and manage the detailed project schedule, identify project milestones, and ensure the key deliverables are met on time. Evaluate contractors’ change orders and certifications for payment. Perform project progress meetings and distribute meeting minutes. Generate project status reports and monthly project reports. Manage the projects’ Change Control using the Trackwise System for the compliance with all regulatory agencies. Work with SAP for the management and control of all aspects of the capital program. Roche Operations, Ltd., Ponce, PR Provide engineering support services for the local capital investment plan. Main projects:
  • 3. Resume: Miguel A. Rivera Barbosa, EIT Water Recovery Project ($175K) Responsible for bid management process, design revision and value engineering. New RAHU 5 ($250K) Responsible for all trades management and purchasing for the installation of a new RAHU 5 dehumidifier Air Handling Unit while minimizing the impact on operations. New pH Neutralization System ($250K) The project consisted of the construction and implementation of an automatic system for the neutralization of water used for production by Roche. The objective was to comply with the requirements of the appropriate government agencies in order to discharge water through PRASA’s sanitary system. Responsible for all trade management, including design, bids, purchasing, installation and start-up. New Fire Pump House ($250K) Responsible of the daily inspection, project management, supervision and coordination of activities as a contractor, designer, and owner representative of the New Fire Pump House. Provide support to commissioning and start-up operations. CDM Caribbean Engineers, PSC PRASA Water Treatment Plant Assessment Program The program consists in performing assessments to the 80 Filtration Plants owned by Puerto Rico Aqueduct and Sewer Authority (PRASA). Responsible for physical and electromechanical inspection in order to incorporate on the Preventive Maintenance Integrated Plan.
  • 4. Resume: Miguel A. Rivera Barbosa, EIT Puerto Rico Infrastructure Financing Authority 2010 Central American and Caribbean Games, Mayagüez, PR ($157MM) Supervise construction activities and provide technical assistance to the Construction Management and Inspection Team regarding electrical work to assure compliance with codes and standards. Warner Chilcott, Fajardo, PR Various Capital Projects: Installation of New Manufacturing Equipments Remodeling of Existing Clean Rooms Areas Construction of New Packaging Room for Dispensing Dry Products and Semi- Solids Site and Utilities Improvement Projects Accountable for managing the capital projects from the design phase through commissioning and start-up. His responsibilities include the development and management of design, cost estimates, capital funding request, project schedule, and scope control to maintain compliance of budget and quality during construction activities. Facilitate technical and business communication between clients’ business units and engineering groups. Roche Diagnostics, Ponce, PR Various Capital Projects: New Packaging Line ($9MM) Responsible for all trades management for the installation of a new packaging line while minimizing the impact on operations. Single Strip Expansion
  • 5. Resume: Miguel A. Rivera Barbosa, EIT Responsible for all trade management regarding this expansion project of 45,000 sq. ft. Project includes utilities, parking facilities and installation of specialized equipment ($48MM) as well as permitting, inspections, Factory Acceptance Test, SAT (Site Acceptance Test), start-up and commissioning. Electrical Engineer: Amgen Manufacturing, Juncos, PR Site Development Project Child Care Center Building Project As owner’s representative, responsible for project inspection, purchase orders and certifications’ evaluation. Responsible for the owner’s system coordination for project system delivery. Pfizer Global Manufacturing (formerly Pharmacia Corporation), Arecibo, PR Eplenerone Registration & Commercial Reactor Replacement SA-559 Chemical Plant ($0.6MM) Refractory Replacement TOX Responsible for coordination and inspection of mechanical, electrical and instrumentation works for construction projects. Pfizer Global Manufacturing (formerly Pharmacia Corp.), Arecibo, PR Electrical Safety Upgrade Building 500 In charge of final drawings follow up and implementation for the classifications of Hazardous areas and Chemical Plant. Pfizer Global Manufacturing (formerly Pharmacia Corp.): Thermal Oxidizer Project ($30MM)
  • 6. Resume: Miguel A. Rivera Barbosa, EIT Responsible for coordination and inspection of electrical and instrumentation construction projects. Procurement and expediting of instruments and safety devices. Support to commissioning and start-up operations. Government Development Bank of Puerto Rico, San Juan, PR Responsible for the coordination and maintenance of a 500 KVA Generator to supply power for all facilities. University Professor: Caribbean University – Bayamon Campus, PR August 2002 – Present Develop and instruct undergraduate General Electrical Engineering courses. Secure guest speakers, participate in departmental and college activities, develop/integrate curriculum and mentor/advice students. Devise weekly lessons that address current issues and perspectives in engineering science. Project Engineer: Instrumentation System & Engineering, Barceloneta, PR 2000 - 2001 Pharmacia Corporation, Barceloneta, PR: Celecoxib Phase IV Baxter Corp., Guayama, PR: Sevo Phase II Responsible for project management, supervision, inspection and coordination of activities as a contractor, designer, and owner representative. Procurement and expediting of instruments and safety devices. Project Engineer: AIREKO Construction, Ponce, PR 1999 - 2000 EcoElectrica Corp., Guayanilla, PR: Co-generation Plant Responsible for coordination, construction and inspection of electrical projects. In charge of quotations and estimates.
  • 7. Resume: Miguel A. Rivera Barbosa, EIT Skills Responsible, strong leadership, initiative and supervisory skills. Enjoy teamwork, fast learner, public speaking and communication skills, software knowledge, Microsoft office (Word, Excel, Microsoft Project). Domain in Spanish and English languages CIAPR Member, EIT (2002) IEEE Member PMP Course OSHA 30-Hour Training Course in Construction Safety & Health OSHA 10-hour Training in Construction Safety & Health Basic Concepts for Project Inspectors in the Area of Electricity and Electromechanical Equipment’s - CIAPR Intrinsic Safety & Surge Protection Effective Management of Time and Priorities Power - CIAPR Project Management & Control using Primavera Project Planner 3.1 Construction Management -CIAPR The Supervision and Leadership as Alternative to Business Success Assertive Communication: Conflict Management, Negotiation and Mediation The accommodations, Modifications and Technological Assistance: Integrating People with Special Needs to University, Work and Community Life References Available upon request