A Roadmap to Success in Capacity Management
    or Why Real-time Monitors are a Waste of time!




                                     A White Paper
                                   Metron Technology Ltd
                                    Metron-Athene Inc
                                          © 2003




        This paper is based on the Author’s experiences in assisting many larger
        organizations in the establishment of formal Capacity Management (which
        incorporates the disciplines of Performance Management and Capacity
        Planning). The paper outlines the objectives of Capacity Management,
        tells you what you need and what you don’t need in order to move forward,
        describes things that will help and things that will get in your way, and
        concludes with a roadmap to success.
1 Introduction
             This paper outlines the steps that you will need to follow in order to establish
             formal Capacity Management in your organization. In this context I am using the
             term ‘Capacity Management’ to encompass the disciplines of both Performance
             Management and Capacity Planning.

             Section 2 proposes a simple definition of the objectives of the Capacity Management
             function. Section 3 lists the things that you will need and section 4 the things that
             (despite common use!) you don’t need. Section 5 describes the things that will make
             things worse for you, and section 6 those things that make things better. The paper
             concludes with a roadmap to success and some final thoughts and conclusions.




             2 Objectives
             Over the years there have been many alternative definitions for the objectives of the
             Capacity Management function within the organization. One of the oldest (and still
             the best in my humble opinion) is as follows: -

                          The continuing provision of consistent, acceptable service levels,
                                          at a known and controlled cost.

             Let’s look in more detail at some of the key phrases in what is seemingly a fairly
             simple and straightforward definition.

             (a) ‘Acceptable service levels’

                      •      Given a requirement to support a given workload at a given service
                             level, derive the resources required

                      •      Given a set of resources and a workload level, define the service levels
                             that will be provided

                      •      Given a set of resources and a service level requirement, define the
                             workload levels that can be supported

             (b) ‘Continuing provision’

             This means that it is not sufficient merely to ensure that current performance is
             satisfactory. A formal and rigorous approach to capacity planning will also be required
             in order to determine the useful life of the current configuration. This is defined by
             its ability to support the expected workload and achieve the required service levels.
             This, of course, requires a clear definition of the workload that the system will be
             required to support.

             (c) ‘At a known and controlled cost’

             This means that a mechanism must be provided which will define the resources
             required to support a given workload at a given service level.




1
    Workload and Server Consolidation
3 What you need
Embarking upon the road to formal Capacity Management can be a rather daunting
prospect, particularly since the discipline is as much about solving tomorrow’s
problems, as it is about solving today’s. Most senior managers, when they consider
the long-term benefits of Capacity Management agree that it is the Right Thing to do.
Nevertheless, there are always short-term demands on budgets (“We need to buy that
new SAN box right now.”) that address today’s problems, and will compete for budget
allocations. Only the confirmed commitment and support of senior management will
ensure that the longer-term issues are given sufficient weight.

Things that you will need to move towards a Capacity Management capability are: -

          •     A clear set of objectives
          •     Senior management commitment
          •     Process/flow definition
          •     A realistic plan
          •     The right people

This means that a definition of the required service level (defined in terms of the
response times) must be agreed and monitored. It should be borne in mind that such
a Service Level Agreement (SLA) is not a ‘stick to beat the IS department’ with. An
SLA defines the obligations both of the provider and of the consumer of information
services.     It is astonishing how many organizations, without informing their IT
department, expect to increase their workloads (often dramatically) and yet expect
their current systems to cope.

Capacity Management is all about managing the relationships between three inter-
connected variables - resources, workload and service levels, as shown in the
diagram below.



  Resources                         Workload




                    Service


Figure 1. System Variables

It is impossible to change any one of these elements without affecting at least one
of the other two. The Capacity Management team must be able to take any pair of
variables and derive the third i.e.: -

          •     The right toolset

The roadmap outlined in section seven of this paper will expand on these topics.




                                                                                                   2
                                                               Workload and Server Consolidation
4 What you don’t need
             “Capacity Managers don’t need pagers!”

             4.1 Threshold-based Alerting
             A lot of organizations these days are relying for their capacity management on
             threshold-based alerting systems. Many have sophisticated event-tracking systems
             and e-mail/pager based alerting. Relying upon event management means that you
             are told when you already have a problem. This is rather like having a device in your
             car that tells you when you are having an accident! (Important information of course
             – but the information is just a little too late.)

             Contrast this with mechanisms which track behaviour, provide linear extrapolation
             where such techniques are applicable, and provide performance prediction based
             on well-known mathematical principles which take into account the non-linear
             relationship between loading and response times (e.g. queuing network modelling
             tools). The use of such techniques means that potential problems can be identified
             and avoided in advance – being proactive rather than re-active.

             4.2 ‘Dashboards’
             A senior IS manager once told me that he needed “to know the CPU utilization at any
             moment in time”. When I told him that his request made no sense, things got quite
             heated! Utilization figures only make sense when considered over some period of
             time. The definition of Utilization for a device is its busy time divided by the elapsed
             time. At any one instant the CPU is either busy, or it isn’t. So, there could only be two
             possible answers to the manager’s question – either 0% or 100%!

             The elapsed time chosen will depend upon a variety of factors, including the degree
             of volatility of the required measure and the use to which the measurement will be
             put. CPU and other device utilizations can vary dramatically when viewed over very
             short (less than one minute) elapsed times. This is why the use of performance
             ‘dashboards’, which update their ‘dials’ every couple of seconds or so, does not
             provide any useful information to the Capacity Manager. (Such tools can also soak
             up very considerable resources on the target system.)

             The information required by the Capacity Manager will usually relate to the behaviour
             of the metric, observed over some period of time, characterized by the statistical
             distribution, including the mean and 95th percentile. The latter is becoming more and
             more important for response time analysis, since many service level agreements are
             now based on 95th percentiles rather than arithmetic means.

             The importance of this is illustrated in the graph at Figure 2 below, which shows
             the distribution of a workload’s end-to-end response time in a multi-tier client/server
             environment.




              Figure 2. Response Time Distribution


3
    Workload and Server Consolidation
Note the fact that this is nothing like a normal distribution, and the difference between
the mean (at 1.88 seconds) and the 95th Percentile (at 3.84 seconds).

This particular graph is taken from the baseline of a multi-tier planning model. Using
this sort of technique, the capacity planning team can derive not only the fact that
the workload will not meet the required service levels if expected (or current) growth
rates are maintained, they can indicate the ‘choke point’ i.e. the system or device
responsible.

We should bear in mind that the members of the Capacity Management team do
not (or, at least, should not) get involved in tuning, optimising, debugging, tracing, or
indeed any number of short-term ‘fire fighting’ activities. Unfortunately the Capacity
Management team is, all too often, expected to deal with day-to-day issues as well.
When this happens the short-term issues will usually predominate, to the detriment
of the Capacity Management process.

4.3 The ‘Red Adair’ Syndrome




Figure 3. A burning oil rig.

Over 40 years ago an oilman called Red Adair set up a company that specialised
in extinguishing oil rig fires. His organization could dispatch a well-equipped
team anywhere in the world, at a moment’s notice, to put out these dramatic fires.
Unfortunately many IS organizations adopt the same approach for managing their
systems.

No doubt the individuals concerned are highly motivated and feel that rushing
around putting lids on things is a valuable contribution. Unfortunately this reactive
approach is a very expensive way of managing anything. Oil rig fires suddenly
start with immediate and cataclysmic consequences. By contrast, most computer-
related problems (particularly those related to performance and capacity) gradually
develop, and should therefore be spotted and fixed before end-user service levels
are affected.

     “If you are reacting to incoming user complaints about poor performance,
                            then you have already failed.”




                                                                                                      4
                                                                  Workload and Server Consolidation
5 Things that make things worse

             5.1 The e-commerce myth
             This can take a variety of forms, but a typical VP in charge of IT infrastructure when
             asked about his capacity management approach will respond with something like:

             “Well, we’re opening up a number of our key systems to web-based access. We have no
             idea what the traffic rate is going to be, or what our service levels are going to be. We
             will just have to see how it goes and monitor things carefully.”

             This is a recipe for disaster. There are well-documented instances throughout the e-
             commerce world of newly available systems being overwhelmed with requests and
             simply folding under the pressure. This is guaranteed to lose you customers, credibility
             and money, all of which are hard to win back!

             Capacity Management teams, who are equipped with the required monitoring and
             modelling tools, can define the workload that can be supported, at the required service
             levels, by the current resources. Routers and load balancers can be configured to limit
             the traffic passed on to the web and database servers. This approach maximises and
             maintains the system’s throughput, and enables potential workload tracking that will
             drive forward investment planning.

             5.2 Knee-jerk reactions
             Most organizations will willingly invest in IS resources, if they can do two things: -

                        (a)   Clearly justify the expenditure
                        (b)   Budget for it in advance

             Nothing is more likely to send the average CFO into orbit quicker than an unbudgeted-
             for emergency hardware upgrade. Such things can throw the financial planning of even
             quite large companies into chaos. No time is left for research into competitive offerings,
             or for sensible negotiation. Meanwhile service level targets are not being met, which will
             also damage the organization’s profitability.

             5.3 Hardware suppliers
             The quality of the capacity management advice provided by suppliers varies widely,
             both between and within manufacturers. I have seen everything from soundly-based
             accurate performance predictions, to pure guesswork, recommending whatever
             machine the hardware sales rep gets most commission on that week. Putting your
             investment decisions in the hands of your supplier is unlikely to be the most cost-
             effective approach!

             Beware also the “poor performance means you need more horsepower” approach.
             This may work, up to a point, in cars, but very often does not for computer systems. A
             common cause of poor performance is the delay contributed by an over-loaded disk I/O
             subsystem. Buying yourself a more powerful CPU simply gives you the ability to hit the
             I/O subsystem harder! Degraded service levels are often the result.

             As always, it is important to upgrade the right thing. Consider a (not unusual) system
             where 80% of your response times are I/O busy and queuing, and 20% are CPU busy
             and queuing. If you double the power of your CPU, your response times will not improve
             by much more than 10%. This fairly obvious result has recently resulted in several IS
             managers unexpectedly being able to spend more time with their families.

             5.4 Disconnected Users
             This occurs when there is inadequate (or, quite often, non-existent) communication
             between the suppliers and consumers of the IS service. I have seen a number of IS
             organizations who were in blissful ignorance, both of the fact that the users had a very


5
    Workload and Server Consolidation
low regard for the quality of the service, and that significant business changes were
about to dramatically change the workload that the IS systems would be required to
support.

There is a strong argument (backed up by successful implementation at a number of
very large organizations) that the Capacity Management function should contribute to,
or even be part of, the Quality Assurance function. Delivering systems that do what the
users want means looking after current and future performance as well as functionality.
A performance bug is just as much of a bug as any other sort! This, of course, implies
that the Capacity Management team becomes involved in new applications during the
design and development process, ensuring at each stage that production performance
targets will be met.

This process is sometimes referred to as Performance Engineering (PE) or Software
Performance Engineering (SPE) as originally advocated by Connie Smith. [Smith 1990]

Using SPE techniques, the cost of the resources required to support the application (at
the required service level) can be derived early in the development process, and refined
as that process continues. This allows swift termination of application developments if
the cost of their implementation would outweigh their business benefit.

5.5 Disconnected Modelling Gurus
Not so many years ago the typical capacity planning team was composed of frighteningly
clever people, often with impressive beards, who worked away in dark corners, muttering
incantations and using strange and complex mathematical modelling tools.




The team would occasionally emerge and pronounce on issues that they considered
important, and then retreat back to their ivory tower. Due to the speed with which modern
systems and workloads change, this traditional approach is increasingly irrelevant to
most organizations’ needs for management information.




                                                                                                      6
                                                                  Workload and Server Consolidation
6 Things that make things better
             6.1 Track Performance& Resource Consumption
             Make the best possible use of the historical information available to you. Historical
             information is only of value when it can tell you something about the future. Back to
             my car analogy. You have a great set of mirrors - so you know where you have been.
             You can look out of the side window – so you know where you are. But the only really
             important thing is to look out of the front window - so you can see where you are going!

             The Performance Database (PDB) will very quickly become a valuable resource,
             enabling you to build a clear picture of the relationships between business metrics (more
             of which in the next section) and resource consumption. The data can also be used for
             trend analysis, particularly in the area of workload growth and seasonality patterns. This
             can be fed through into capacity planning.

             The capacity planning team can then provide performance forecasts on the basis of workload
             volumes that, in the absence of any other information, can be expected to continue to follow
             established patterns. Clearly this will then have to be ‘overlaid’ with additional information
             on business changes that will cause the workload to deviate from the historical ‘norm’.

             6.2 Business Information
             Clearly the Capacity Management team cannot operate in a vacuum. Business
             information, on the ways in which the business will develop and require IS support,
             is vital if accurate capacity plans are to be produced. One significant problem occurs
             during this process, that of different units of measure.

             Business planners will describe future workloads in terms of Natural Forecast Units
             (NFUs). These will be numbers of cars, trucks, flight bookings, auction listings, invoices
             etc., etc. The business planners have no interest in (and couldn’t care less about) things
             like CPU utilization, disk service levels, hub throughput capabilities etc. All they are
             concerned about is that IS performance is adequate to perform the business function.

             The Capacity Management team must be able to translate these business metrics into IS
             equipment resources, and therefore into $ expenditure figures. Capacity Management
             teams are increasingly focused on the process of incorporating business statistics directly
             into performance databases, and using correlation analyses and other statistical techniques
             to understand the relationships between business volumes and resource consumption.

             6.3 User Feedback
             Whilst system monitors and logs are vital tools in the pursuit of Capacity Management,
             one of the best sources of information, particularly for users within your own organization,
             is to go and talk to them! One day spent in a user department watching the way in which
             the applications are actually being used, and how they perform in real life, is worth a
             week of poring over device utilization analyses.

             6.4 Relevant/Timely Modeling
             Modern monitoring and modeling tools are now available which enable the integration of
             capacity planning with the business planning function. Models and predictions can now
             be produced quickly enough to be part of the management decision-making process.

             6.5 Intranet Publishing
             One of the criticisms that organizations have most frequently expressed about their
             Capacity Management teams was that their work, although generally acknowledged as
             beneficial, was not very ‘visible’. CM teams are now making very

             considerable use of Intranet reporting which, with the advent of entirely automated
             reporting mechanisms, means that comprehensive and accessible html-based reports
             can be disseminated with the minimum of effort.



7
    Workload and Server Consolidation
7 The Roadmap
This section is entitled ‘The Roadmap’ which implies that you start from somewhere,
follow the map, and end up at your destination. Whilst a number of steps do have to
be taken, the journey to effective Capacity Management is not a simple linear process,
rather a more iterative learning experience, where the work done at each step may well
cause enhancement, revision, or even replacement of previous work.

The recent ‘Roadmap’ process to promote peace and stability in the Middle East includes
a number of important milestones that are equally applicable here: -

       (a)   Mutual understanding - so that everyone involved appreciates the needs
             and views of all participants

       (b)   Boundary definition – defining who is going to be responsible for what, and
             how the various parties will integrate

       (c)   Process definition – defining the required steps and timetable.

Commercial organizations, National Governments, and international relations all react
badly to sudden and dramatic change. Revolution can only be justified if the evolutionary
process is unnaturally and unreasonably blocked in some way. [Machiavelli 1513] The
route towards full adoption of the Capacity Management principles outlined in this paper
is an evolutionary process, starting with a small application or service subset, and a
simple intranet reporting mechanism.

As the benefits of a formalised Capacity Management approach start to become
apparent, it will be increasingly easy to obtain commitment from the various participants
who provide data and use the CM team reports. After this initial phase, you can then start
to extend the range of services to include SLA management and capacity planning.

The sections below outline the Stairway to Heaven Success.


7.1 A clear set of objectives
A suggestion for an overall objective statement was given earlier: ‘The continuing
provision of consistent, acceptable service levels at a known and controlled cost.’ This
objective will need to be extended to incorporate the scope of the Capacity Management
team activities, in particular, the range of systems and business processes that they will
be required to cover.

7.2 Senior management commitment
This is an obvious, but vital step on the road. Without senior management commitment,
the required personnel and tool resources will not be provided, and the organizational
changes (particularly in terms of business information flow) will not be made.

7.3 Process/flow definition
This is a definition of the way in which the Capacity Management team will interface with
the rest of the organization. It must include a definition of:

       •     All the in-bound information flows that will be required

       •     The organizational impact and any required changes

       •     The ways in which the work done by the team will be directed by the
             organization’s needs

       •     The ways in which the team’s findings will be disseminated and used.



                                                                                                      8
                                                                  Workload and Server Consolidation
7.4 A realistic plan
             The key word here is ‘realistic’. Whilst it would be nice to have a completely
             comprehensive, fully integrated Capacity Management function from day one, it just is
             not going to happen. The required organizational changes may well take a considerable
             amount of time to define and implement

             7.5 Recruit or retrain the right people
             Despite the fact that mathematicians are amongst the most important and worthwhile
             people on the planet, capacity managers do not have to be mathematicians. Although
             a certain degree of numeric ability will be required, an ability to communicate with
             the business is equally important. Such abilities will be required not only to derive
             the required information from the organization, but also to communicate and present
             findings and recommendations effectively.

             An effective capacity management team member really needs to have a foot on both
             the business and the technical community. Remember that Capacity Management is a
             business discipline with technical implications – not the other way round!

             7.6 Acquire the right toolset
             The precise toolset will depend on individual organization’s circumstances, but a
             minimum starter set will include: -

                   •    Performance and resource consumption monitors for all system components
                        which contribute to the delivered service

                   •    A mechanism for storing that data in a central repository

                   •    A mechanism for importing business data, and any other data that would
                        provide further understanding of the relationship between the business
                        workload (measured in Natural Forecast Units) and IS workloads

                   •    A facility to generate regular reports automatically, across the complete range
                        of business and system data in the repository, and to distribute those reports
                        in an appropriate manner to the target audience (typically using html and the
                        corporate intranet)

                   •    A mechanism to produce ad-hoc reports and to ‘drill down’ into the data for
                        problem diagnosis

                   •    A trending facility for use on those aspects of the data for which linear
                        extrapolation is a valid technique

             A performance prediction facility that will allow the non-linear behaviour of systems
             experiencing resource contention to be taken into account. This will usually be based
             on some form of analytical modelling.

             7.7 Walk before you start to run
             Avoid the temptation to try and cover too many target systems or applications right from
             the outset. It will take some time for the organization to adapt to the additional disciplines
             required for Capacity Management and to start to benefit from its provision

             7.8 Iterative evolution
             As I mentioned earlier, Capacity Management is and evolving process. Activities and
             achievements must continually be monitored and checked against the objectives and
             the plan. This is an ongoing iterative process of refinement and improvement.




9
    Workload and Server Consolidation
8 Conclusion
In order to achieve consistent, acceptable service levels, at a known and controlled cost,
you need Capacity Management.

You DO NOT NEED threshold-based alerting, fire-fighters or dashboards, all of which
contribute to knee-jerk, event-driven ‘management’. Other things to avoid are the ‘wait
and see’ approach (particularly inappropriate for e-commerce systems) disconnected
users and modeling gurus, and purchasing decisions based on the recommendations of
hardware suppliers.

You DO NEED to track performance and resource consumption, correlate that against
business workload measurements, report to (and gain feed back from) your user
community through internet publishing of reports at the right level of detail, and relevant,
timely modeling to support purchasing decision-making.

No magic or divine intervention is required in order to achieve success in Capacity
Management. It is important to avoid the myriad distractions that some eager software
tool vendors can strew in your way. Follow the roadmap that I have described, and
concentrate on providing (and demonstrating!) your contribution to continuing quality
service levels, and to the organization’s bottom line.




Bibliography
[Smith 1990] Connie U. Smith, Performance Engineering of Software Systems, Reading,
MA, Addison Wesley, 1990.

[Machiavelli 1513] Nicolo Machiavelli, The Prince, 1513.




                                                                                                   10
                                                                    Workload and Server Consolidation
©2003 Metron Technology Ltd / Metron-Athene Inc
                        Metron and the Metron logo as well as Athene and other names of products referred to herein
                        are trade marks or registered trade marks of Metron Technology Limited. Other products and
                              company names mentioned herein may be trade marks of the respective owners.
                                            Any rights not expressly granted herein are reserved.




© 2003 Metron Technology Ltd Osborne House, Trull Road, Taunton TA1 4PX      Tel: 01823 259231  Fax 01823 334502   info@metron.co.uk www.metron.co.uk
© 2003 Metron - Athene INC. 6320 Canoga Avenue, Suite 1500, Woodland Hills, CA 91367 Tel 818-227-5019 support@metron-athene.com www.metron-athene.com

Mais conteúdo relacionado

Mais procurados

Helpdesk Service Level Agreements
Helpdesk Service Level AgreementsHelpdesk Service Level Agreements
Helpdesk Service Level AgreementsChristopher Duffy
 
IMPACT OF RESOURCE MANAGEMENT AND SCALABILITY ON PERFORMANCE OF CLOUD APPLICA...
IMPACT OF RESOURCE MANAGEMENT AND SCALABILITY ON PERFORMANCE OF CLOUD APPLICA...IMPACT OF RESOURCE MANAGEMENT AND SCALABILITY ON PERFORMANCE OF CLOUD APPLICA...
IMPACT OF RESOURCE MANAGEMENT AND SCALABILITY ON PERFORMANCE OF CLOUD APPLICA...IJCSEA Journal
 
BUSINESS PROCESS REENGINNERING MODULE 4
BUSINESS PROCESS REENGINNERING MODULE 4BUSINESS PROCESS REENGINNERING MODULE 4
BUSINESS PROCESS REENGINNERING MODULE 4POOJA UDAYAN
 
IMPACT OF RESOURCE MANAGEMENT AND SCALABILITY ON PERFORMANCE OF CLOUD APPLICA...
IMPACT OF RESOURCE MANAGEMENT AND SCALABILITY ON PERFORMANCE OF CLOUD APPLICA...IMPACT OF RESOURCE MANAGEMENT AND SCALABILITY ON PERFORMANCE OF CLOUD APPLICA...
IMPACT OF RESOURCE MANAGEMENT AND SCALABILITY ON PERFORMANCE OF CLOUD APPLICA...IJCSEA Journal
 
Incident Management PowerPoint Presentation Slides
Incident Management PowerPoint Presentation SlidesIncident Management PowerPoint Presentation Slides
Incident Management PowerPoint Presentation SlidesSlideTeam
 
SIKKIM MANIPAL ASSIGNMENTS SECOND SEMESTER
SIKKIM MANIPAL ASSIGNMENTS SECOND SEMESTERSIKKIM MANIPAL ASSIGNMENTS SECOND SEMESTER
SIKKIM MANIPAL ASSIGNMENTS SECOND SEMESTERThom Delta
 
Template de acordo de nível de serviço
Template de acordo de nível de serviçoTemplate de acordo de nível de serviço
Template de acordo de nível de serviçoFernando Palma
 
Free help desk evaluation checklist
Free help desk evaluation checklistFree help desk evaluation checklist
Free help desk evaluation checklistIITSW Company
 
Lecture 2 - KNOWLEDGE MANAGEMENT SYSTEMS LIFE CYCLE
Lecture 2 - KNOWLEDGE MANAGEMENT SYSTEMS LIFE CYCLELecture 2 - KNOWLEDGE MANAGEMENT SYSTEMS LIFE CYCLE
Lecture 2 - KNOWLEDGE MANAGEMENT SYSTEMS LIFE CYCLEMobi Marketing
 
Incident Management Powerpoint Presentation Slides
Incident Management Powerpoint Presentation SlidesIncident Management Powerpoint Presentation Slides
Incident Management Powerpoint Presentation SlidesSlideTeam
 
Disaster Recovery planning within HIPAA framework
Disaster Recovery planning within HIPAA frameworkDisaster Recovery planning within HIPAA framework
Disaster Recovery planning within HIPAA frameworkDavid Sweigert
 
Business continuity planning and disaster recovery
Business continuity planning and disaster recoveryBusiness continuity planning and disaster recovery
Business continuity planning and disaster recoveryKrutiShah114
 
The DevOps promise: IT delivery that’s hot-off-the-catwalk and made-to-last
The DevOps promise:  IT delivery that’s hot-off-the-catwalk and made-to-lastThe DevOps promise:  IT delivery that’s hot-off-the-catwalk and made-to-last
The DevOps promise: IT delivery that’s hot-off-the-catwalk and made-to-lastPeter Shirley-Quirk
 

Mais procurados (17)

Itil glossary
Itil glossaryItil glossary
Itil glossary
 
Helpdesk Service Level Agreements
Helpdesk Service Level AgreementsHelpdesk Service Level Agreements
Helpdesk Service Level Agreements
 
IMPACT OF RESOURCE MANAGEMENT AND SCALABILITY ON PERFORMANCE OF CLOUD APPLICA...
IMPACT OF RESOURCE MANAGEMENT AND SCALABILITY ON PERFORMANCE OF CLOUD APPLICA...IMPACT OF RESOURCE MANAGEMENT AND SCALABILITY ON PERFORMANCE OF CLOUD APPLICA...
IMPACT OF RESOURCE MANAGEMENT AND SCALABILITY ON PERFORMANCE OF CLOUD APPLICA...
 
BUSINESS PROCESS REENGINNERING MODULE 4
BUSINESS PROCESS REENGINNERING MODULE 4BUSINESS PROCESS REENGINNERING MODULE 4
BUSINESS PROCESS REENGINNERING MODULE 4
 
IMPACT OF RESOURCE MANAGEMENT AND SCALABILITY ON PERFORMANCE OF CLOUD APPLICA...
IMPACT OF RESOURCE MANAGEMENT AND SCALABILITY ON PERFORMANCE OF CLOUD APPLICA...IMPACT OF RESOURCE MANAGEMENT AND SCALABILITY ON PERFORMANCE OF CLOUD APPLICA...
IMPACT OF RESOURCE MANAGEMENT AND SCALABILITY ON PERFORMANCE OF CLOUD APPLICA...
 
Incident Management PowerPoint Presentation Slides
Incident Management PowerPoint Presentation SlidesIncident Management PowerPoint Presentation Slides
Incident Management PowerPoint Presentation Slides
 
Dit yvol5iss4
Dit yvol5iss4Dit yvol5iss4
Dit yvol5iss4
 
SIKKIM MANIPAL ASSIGNMENTS SECOND SEMESTER
SIKKIM MANIPAL ASSIGNMENTS SECOND SEMESTERSIKKIM MANIPAL ASSIGNMENTS SECOND SEMESTER
SIKKIM MANIPAL ASSIGNMENTS SECOND SEMESTER
 
Template de acordo de nível de serviço
Template de acordo de nível de serviçoTemplate de acordo de nível de serviço
Template de acordo de nível de serviço
 
Free help desk evaluation checklist
Free help desk evaluation checklistFree help desk evaluation checklist
Free help desk evaluation checklist
 
Lecture 2 - KNOWLEDGE MANAGEMENT SYSTEMS LIFE CYCLE
Lecture 2 - KNOWLEDGE MANAGEMENT SYSTEMS LIFE CYCLELecture 2 - KNOWLEDGE MANAGEMENT SYSTEMS LIFE CYCLE
Lecture 2 - KNOWLEDGE MANAGEMENT SYSTEMS LIFE CYCLE
 
Incident Management Powerpoint Presentation Slides
Incident Management Powerpoint Presentation SlidesIncident Management Powerpoint Presentation Slides
Incident Management Powerpoint Presentation Slides
 
Disaster Recovery planning within HIPAA framework
Disaster Recovery planning within HIPAA frameworkDisaster Recovery planning within HIPAA framework
Disaster Recovery planning within HIPAA framework
 
Business continuity planning and disaster recovery
Business continuity planning and disaster recoveryBusiness continuity planning and disaster recovery
Business continuity planning and disaster recovery
 
The DevOps promise: IT delivery that’s hot-off-the-catwalk and made-to-last
The DevOps promise:  IT delivery that’s hot-off-the-catwalk and made-to-lastThe DevOps promise:  IT delivery that’s hot-off-the-catwalk and made-to-last
The DevOps promise: IT delivery that’s hot-off-the-catwalk and made-to-last
 
Agile EVMS
Agile EVMSAgile EVMS
Agile EVMS
 
Saurabh_Mahajan_CV
Saurabh_Mahajan_CVSaurabh_Mahajan_CV
Saurabh_Mahajan_CV
 

Semelhante a Roadmap to Success in Capacity Management Without Real-Time Monitors

7. Developing Case-Based Help-Desk Support Systems For Complex Technical Equi...
7. Developing Case-Based Help-Desk Support Systems For Complex Technical Equi...7. Developing Case-Based Help-Desk Support Systems For Complex Technical Equi...
7. Developing Case-Based Help-Desk Support Systems For Complex Technical Equi...Don Dooley
 
Continual Improvement with Status Enterprise
Continual Improvement with Status EnterpriseContinual Improvement with Status Enterprise
Continual Improvement with Status EnterpriseRich Hunzinger
 
Asset Management Proposal
Asset Management ProposalAsset Management Proposal
Asset Management ProposalLyle Villarta
 
Production Control for Financial Operation v4
Production Control for Financial Operation v4Production Control for Financial Operation v4
Production Control for Financial Operation v4Jon LaBerge
 
Network operations center best practices (3)
Network operations center best practices (3)Network operations center best practices (3)
Network operations center best practices (3)Gabby Nizri
 
Cost System Tuning in Today's Economy
Cost System Tuning in Today's EconomyCost System Tuning in Today's Economy
Cost System Tuning in Today's Economyqcllc
 
Yapp methodology anjo-kolk
Yapp methodology anjo-kolkYapp methodology anjo-kolk
Yapp methodology anjo-kolkToon Koppelaars
 
Reaching new levels of customer service and billing accuracies with advanced ...
Reaching new levels of customer service and billing accuracies with advanced ...Reaching new levels of customer service and billing accuracies with advanced ...
Reaching new levels of customer service and billing accuracies with advanced ...robgirvan
 
Quality management in projects
Quality management in projectsQuality management in projects
Quality management in projectsselinasimpson311
 
Towards a Software Framework for Automatic Business Process Redesign
Towards a Software Framework for Automatic Business Process RedesignTowards a Software Framework for Automatic Business Process Redesign
Towards a Software Framework for Automatic Business Process RedesignIDES Editor
 
Towards a Software Framework for Automatic Business Process Redesign
Towards a Software Framework for Automatic Business Process RedesignTowards a Software Framework for Automatic Business Process Redesign
Towards a Software Framework for Automatic Business Process RedesignIDES Editor
 
ITIL service design
ITIL service designITIL service design
ITIL service designRasha Ragab
 
BP Logix Whitepaper: Adding the Dimension of Time to BPM
BP Logix Whitepaper: Adding the Dimension of Time to BPMBP Logix Whitepaper: Adding the Dimension of Time to BPM
BP Logix Whitepaper: Adding the Dimension of Time to BPMBP Logix
 
Bisuness process management
Bisuness process managementBisuness process management
Bisuness process managementDigvijay Mahalle
 
EMPLOYEE PAYROLL MANAGEMENT SYSTEM.pdf
EMPLOYEE PAYROLL MANAGEMENT SYSTEM.pdfEMPLOYEE PAYROLL MANAGEMENT SYSTEM.pdf
EMPLOYEE PAYROLL MANAGEMENT SYSTEM.pdfShridharSurada
 

Semelhante a Roadmap to Success in Capacity Management Without Real-Time Monitors (20)

UNIT4.ppt
UNIT4.pptUNIT4.ppt
UNIT4.ppt
 
Dit yvol5iss21
Dit yvol5iss21Dit yvol5iss21
Dit yvol5iss21
 
7. Developing Case-Based Help-Desk Support Systems For Complex Technical Equi...
7. Developing Case-Based Help-Desk Support Systems For Complex Technical Equi...7. Developing Case-Based Help-Desk Support Systems For Complex Technical Equi...
7. Developing Case-Based Help-Desk Support Systems For Complex Technical Equi...
 
Continual Improvement with Status Enterprise
Continual Improvement with Status EnterpriseContinual Improvement with Status Enterprise
Continual Improvement with Status Enterprise
 
Asset Management Proposal
Asset Management ProposalAsset Management Proposal
Asset Management Proposal
 
Production Control for Financial Operation v4
Production Control for Financial Operation v4Production Control for Financial Operation v4
Production Control for Financial Operation v4
 
Network operations center best practices (3)
Network operations center best practices (3)Network operations center best practices (3)
Network operations center best practices (3)
 
Cost System Tuning in Today's Economy
Cost System Tuning in Today's EconomyCost System Tuning in Today's Economy
Cost System Tuning in Today's Economy
 
Yapp methodology anjo-kolk
Yapp methodology anjo-kolkYapp methodology anjo-kolk
Yapp methodology anjo-kolk
 
Reaching new levels of customer service and billing accuracies with advanced ...
Reaching new levels of customer service and billing accuracies with advanced ...Reaching new levels of customer service and billing accuracies with advanced ...
Reaching new levels of customer service and billing accuracies with advanced ...
 
Quality management in projects
Quality management in projectsQuality management in projects
Quality management in projects
 
Towards a Software Framework for Automatic Business Process Redesign
Towards a Software Framework for Automatic Business Process RedesignTowards a Software Framework for Automatic Business Process Redesign
Towards a Software Framework for Automatic Business Process Redesign
 
Towards a Software Framework for Automatic Business Process Redesign
Towards a Software Framework for Automatic Business Process RedesignTowards a Software Framework for Automatic Business Process Redesign
Towards a Software Framework for Automatic Business Process Redesign
 
Erp implementation lifecycle
Erp implementation lifecycleErp implementation lifecycle
Erp implementation lifecycle
 
ITIL service design
ITIL service designITIL service design
ITIL service design
 
BP Logix Whitepaper: Adding the Dimension of Time to BPM
BP Logix Whitepaper: Adding the Dimension of Time to BPMBP Logix Whitepaper: Adding the Dimension of Time to BPM
BP Logix Whitepaper: Adding the Dimension of Time to BPM
 
Analysis
AnalysisAnalysis
Analysis
 
Bisuness process management
Bisuness process managementBisuness process management
Bisuness process management
 
EMPLOYEE PAYROLL MANAGEMENT SYSTEM.pdf
EMPLOYEE PAYROLL MANAGEMENT SYSTEM.pdfEMPLOYEE PAYROLL MANAGEMENT SYSTEM.pdf
EMPLOYEE PAYROLL MANAGEMENT SYSTEM.pdf
 
Capacity planning
Capacity planningCapacity planning
Capacity planning
 

Último

The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxLoriGlavin3
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxLoriGlavin3
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfMounikaPolabathina
 
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesHow to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesThousandEyes
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .Alan Dix
 
Connecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdfConnecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdfNeo4j
 
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Mark Goldstein
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 
Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Hiroshi SHIBATA
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxLoriGlavin3
 
Manual 508 Accessibility Compliance Audit
Manual 508 Accessibility Compliance AuditManual 508 Accessibility Compliance Audit
Manual 508 Accessibility Compliance AuditSkynet Technologies
 
2024 April Patch Tuesday
2024 April Patch Tuesday2024 April Patch Tuesday
2024 April Patch TuesdayIvanti
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxLoriGlavin3
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.Curtis Poe
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteDianaGray10
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxLoriGlavin3
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024BookNet Canada
 
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentEmixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentPim van der Noll
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity PlanDatabarracks
 

Último (20)

The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdf
 
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesHow to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .
 
Connecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdfConnecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdf
 
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
Arizona Broadband Policy Past, Present, and Future Presentation 3/25/24
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 
Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024Long journey of Ruby standard library at RubyConf AU 2024
Long journey of Ruby standard library at RubyConf AU 2024
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
 
Manual 508 Accessibility Compliance Audit
Manual 508 Accessibility Compliance AuditManual 508 Accessibility Compliance Audit
Manual 508 Accessibility Compliance Audit
 
2024 April Patch Tuesday
2024 April Patch Tuesday2024 April Patch Tuesday
2024 April Patch Tuesday
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.
 
Take control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test SuiteTake control of your SAP testing with UiPath Test Suite
Take control of your SAP testing with UiPath Test Suite
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
 
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
New from BookNet Canada for 2024: Loan Stars - Tech Forum 2024
 
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native developmentEmixa Mendix Meetup 11 April 2024 about Mendix Native development
Emixa Mendix Meetup 11 April 2024 about Mendix Native development
 
How to write a Business Continuity Plan
How to write a Business Continuity PlanHow to write a Business Continuity Plan
How to write a Business Continuity Plan
 

Roadmap to Success in Capacity Management Without Real-Time Monitors

  • 1. A Roadmap to Success in Capacity Management or Why Real-time Monitors are a Waste of time! A White Paper Metron Technology Ltd Metron-Athene Inc © 2003 This paper is based on the Author’s experiences in assisting many larger organizations in the establishment of formal Capacity Management (which incorporates the disciplines of Performance Management and Capacity Planning). The paper outlines the objectives of Capacity Management, tells you what you need and what you don’t need in order to move forward, describes things that will help and things that will get in your way, and concludes with a roadmap to success.
  • 2. 1 Introduction This paper outlines the steps that you will need to follow in order to establish formal Capacity Management in your organization. In this context I am using the term ‘Capacity Management’ to encompass the disciplines of both Performance Management and Capacity Planning. Section 2 proposes a simple definition of the objectives of the Capacity Management function. Section 3 lists the things that you will need and section 4 the things that (despite common use!) you don’t need. Section 5 describes the things that will make things worse for you, and section 6 those things that make things better. The paper concludes with a roadmap to success and some final thoughts and conclusions. 2 Objectives Over the years there have been many alternative definitions for the objectives of the Capacity Management function within the organization. One of the oldest (and still the best in my humble opinion) is as follows: - The continuing provision of consistent, acceptable service levels, at a known and controlled cost. Let’s look in more detail at some of the key phrases in what is seemingly a fairly simple and straightforward definition. (a) ‘Acceptable service levels’ • Given a requirement to support a given workload at a given service level, derive the resources required • Given a set of resources and a workload level, define the service levels that will be provided • Given a set of resources and a service level requirement, define the workload levels that can be supported (b) ‘Continuing provision’ This means that it is not sufficient merely to ensure that current performance is satisfactory. A formal and rigorous approach to capacity planning will also be required in order to determine the useful life of the current configuration. This is defined by its ability to support the expected workload and achieve the required service levels. This, of course, requires a clear definition of the workload that the system will be required to support. (c) ‘At a known and controlled cost’ This means that a mechanism must be provided which will define the resources required to support a given workload at a given service level. 1 Workload and Server Consolidation
  • 3. 3 What you need Embarking upon the road to formal Capacity Management can be a rather daunting prospect, particularly since the discipline is as much about solving tomorrow’s problems, as it is about solving today’s. Most senior managers, when they consider the long-term benefits of Capacity Management agree that it is the Right Thing to do. Nevertheless, there are always short-term demands on budgets (“We need to buy that new SAN box right now.”) that address today’s problems, and will compete for budget allocations. Only the confirmed commitment and support of senior management will ensure that the longer-term issues are given sufficient weight. Things that you will need to move towards a Capacity Management capability are: - • A clear set of objectives • Senior management commitment • Process/flow definition • A realistic plan • The right people This means that a definition of the required service level (defined in terms of the response times) must be agreed and monitored. It should be borne in mind that such a Service Level Agreement (SLA) is not a ‘stick to beat the IS department’ with. An SLA defines the obligations both of the provider and of the consumer of information services. It is astonishing how many organizations, without informing their IT department, expect to increase their workloads (often dramatically) and yet expect their current systems to cope. Capacity Management is all about managing the relationships between three inter- connected variables - resources, workload and service levels, as shown in the diagram below. Resources Workload Service Figure 1. System Variables It is impossible to change any one of these elements without affecting at least one of the other two. The Capacity Management team must be able to take any pair of variables and derive the third i.e.: - • The right toolset The roadmap outlined in section seven of this paper will expand on these topics. 2 Workload and Server Consolidation
  • 4. 4 What you don’t need “Capacity Managers don’t need pagers!” 4.1 Threshold-based Alerting A lot of organizations these days are relying for their capacity management on threshold-based alerting systems. Many have sophisticated event-tracking systems and e-mail/pager based alerting. Relying upon event management means that you are told when you already have a problem. This is rather like having a device in your car that tells you when you are having an accident! (Important information of course – but the information is just a little too late.) Contrast this with mechanisms which track behaviour, provide linear extrapolation where such techniques are applicable, and provide performance prediction based on well-known mathematical principles which take into account the non-linear relationship between loading and response times (e.g. queuing network modelling tools). The use of such techniques means that potential problems can be identified and avoided in advance – being proactive rather than re-active. 4.2 ‘Dashboards’ A senior IS manager once told me that he needed “to know the CPU utilization at any moment in time”. When I told him that his request made no sense, things got quite heated! Utilization figures only make sense when considered over some period of time. The definition of Utilization for a device is its busy time divided by the elapsed time. At any one instant the CPU is either busy, or it isn’t. So, there could only be two possible answers to the manager’s question – either 0% or 100%! The elapsed time chosen will depend upon a variety of factors, including the degree of volatility of the required measure and the use to which the measurement will be put. CPU and other device utilizations can vary dramatically when viewed over very short (less than one minute) elapsed times. This is why the use of performance ‘dashboards’, which update their ‘dials’ every couple of seconds or so, does not provide any useful information to the Capacity Manager. (Such tools can also soak up very considerable resources on the target system.) The information required by the Capacity Manager will usually relate to the behaviour of the metric, observed over some period of time, characterized by the statistical distribution, including the mean and 95th percentile. The latter is becoming more and more important for response time analysis, since many service level agreements are now based on 95th percentiles rather than arithmetic means. The importance of this is illustrated in the graph at Figure 2 below, which shows the distribution of a workload’s end-to-end response time in a multi-tier client/server environment. Figure 2. Response Time Distribution 3 Workload and Server Consolidation
  • 5. Note the fact that this is nothing like a normal distribution, and the difference between the mean (at 1.88 seconds) and the 95th Percentile (at 3.84 seconds). This particular graph is taken from the baseline of a multi-tier planning model. Using this sort of technique, the capacity planning team can derive not only the fact that the workload will not meet the required service levels if expected (or current) growth rates are maintained, they can indicate the ‘choke point’ i.e. the system or device responsible. We should bear in mind that the members of the Capacity Management team do not (or, at least, should not) get involved in tuning, optimising, debugging, tracing, or indeed any number of short-term ‘fire fighting’ activities. Unfortunately the Capacity Management team is, all too often, expected to deal with day-to-day issues as well. When this happens the short-term issues will usually predominate, to the detriment of the Capacity Management process. 4.3 The ‘Red Adair’ Syndrome Figure 3. A burning oil rig. Over 40 years ago an oilman called Red Adair set up a company that specialised in extinguishing oil rig fires. His organization could dispatch a well-equipped team anywhere in the world, at a moment’s notice, to put out these dramatic fires. Unfortunately many IS organizations adopt the same approach for managing their systems. No doubt the individuals concerned are highly motivated and feel that rushing around putting lids on things is a valuable contribution. Unfortunately this reactive approach is a very expensive way of managing anything. Oil rig fires suddenly start with immediate and cataclysmic consequences. By contrast, most computer- related problems (particularly those related to performance and capacity) gradually develop, and should therefore be spotted and fixed before end-user service levels are affected. “If you are reacting to incoming user complaints about poor performance, then you have already failed.” 4 Workload and Server Consolidation
  • 6. 5 Things that make things worse 5.1 The e-commerce myth This can take a variety of forms, but a typical VP in charge of IT infrastructure when asked about his capacity management approach will respond with something like: “Well, we’re opening up a number of our key systems to web-based access. We have no idea what the traffic rate is going to be, or what our service levels are going to be. We will just have to see how it goes and monitor things carefully.” This is a recipe for disaster. There are well-documented instances throughout the e- commerce world of newly available systems being overwhelmed with requests and simply folding under the pressure. This is guaranteed to lose you customers, credibility and money, all of which are hard to win back! Capacity Management teams, who are equipped with the required monitoring and modelling tools, can define the workload that can be supported, at the required service levels, by the current resources. Routers and load balancers can be configured to limit the traffic passed on to the web and database servers. This approach maximises and maintains the system’s throughput, and enables potential workload tracking that will drive forward investment planning. 5.2 Knee-jerk reactions Most organizations will willingly invest in IS resources, if they can do two things: - (a) Clearly justify the expenditure (b) Budget for it in advance Nothing is more likely to send the average CFO into orbit quicker than an unbudgeted- for emergency hardware upgrade. Such things can throw the financial planning of even quite large companies into chaos. No time is left for research into competitive offerings, or for sensible negotiation. Meanwhile service level targets are not being met, which will also damage the organization’s profitability. 5.3 Hardware suppliers The quality of the capacity management advice provided by suppliers varies widely, both between and within manufacturers. I have seen everything from soundly-based accurate performance predictions, to pure guesswork, recommending whatever machine the hardware sales rep gets most commission on that week. Putting your investment decisions in the hands of your supplier is unlikely to be the most cost- effective approach! Beware also the “poor performance means you need more horsepower” approach. This may work, up to a point, in cars, but very often does not for computer systems. A common cause of poor performance is the delay contributed by an over-loaded disk I/O subsystem. Buying yourself a more powerful CPU simply gives you the ability to hit the I/O subsystem harder! Degraded service levels are often the result. As always, it is important to upgrade the right thing. Consider a (not unusual) system where 80% of your response times are I/O busy and queuing, and 20% are CPU busy and queuing. If you double the power of your CPU, your response times will not improve by much more than 10%. This fairly obvious result has recently resulted in several IS managers unexpectedly being able to spend more time with their families. 5.4 Disconnected Users This occurs when there is inadequate (or, quite often, non-existent) communication between the suppliers and consumers of the IS service. I have seen a number of IS organizations who were in blissful ignorance, both of the fact that the users had a very 5 Workload and Server Consolidation
  • 7. low regard for the quality of the service, and that significant business changes were about to dramatically change the workload that the IS systems would be required to support. There is a strong argument (backed up by successful implementation at a number of very large organizations) that the Capacity Management function should contribute to, or even be part of, the Quality Assurance function. Delivering systems that do what the users want means looking after current and future performance as well as functionality. A performance bug is just as much of a bug as any other sort! This, of course, implies that the Capacity Management team becomes involved in new applications during the design and development process, ensuring at each stage that production performance targets will be met. This process is sometimes referred to as Performance Engineering (PE) or Software Performance Engineering (SPE) as originally advocated by Connie Smith. [Smith 1990] Using SPE techniques, the cost of the resources required to support the application (at the required service level) can be derived early in the development process, and refined as that process continues. This allows swift termination of application developments if the cost of their implementation would outweigh their business benefit. 5.5 Disconnected Modelling Gurus Not so many years ago the typical capacity planning team was composed of frighteningly clever people, often with impressive beards, who worked away in dark corners, muttering incantations and using strange and complex mathematical modelling tools. The team would occasionally emerge and pronounce on issues that they considered important, and then retreat back to their ivory tower. Due to the speed with which modern systems and workloads change, this traditional approach is increasingly irrelevant to most organizations’ needs for management information. 6 Workload and Server Consolidation
  • 8. 6 Things that make things better 6.1 Track Performance& Resource Consumption Make the best possible use of the historical information available to you. Historical information is only of value when it can tell you something about the future. Back to my car analogy. You have a great set of mirrors - so you know where you have been. You can look out of the side window – so you know where you are. But the only really important thing is to look out of the front window - so you can see where you are going! The Performance Database (PDB) will very quickly become a valuable resource, enabling you to build a clear picture of the relationships between business metrics (more of which in the next section) and resource consumption. The data can also be used for trend analysis, particularly in the area of workload growth and seasonality patterns. This can be fed through into capacity planning. The capacity planning team can then provide performance forecasts on the basis of workload volumes that, in the absence of any other information, can be expected to continue to follow established patterns. Clearly this will then have to be ‘overlaid’ with additional information on business changes that will cause the workload to deviate from the historical ‘norm’. 6.2 Business Information Clearly the Capacity Management team cannot operate in a vacuum. Business information, on the ways in which the business will develop and require IS support, is vital if accurate capacity plans are to be produced. One significant problem occurs during this process, that of different units of measure. Business planners will describe future workloads in terms of Natural Forecast Units (NFUs). These will be numbers of cars, trucks, flight bookings, auction listings, invoices etc., etc. The business planners have no interest in (and couldn’t care less about) things like CPU utilization, disk service levels, hub throughput capabilities etc. All they are concerned about is that IS performance is adequate to perform the business function. The Capacity Management team must be able to translate these business metrics into IS equipment resources, and therefore into $ expenditure figures. Capacity Management teams are increasingly focused on the process of incorporating business statistics directly into performance databases, and using correlation analyses and other statistical techniques to understand the relationships between business volumes and resource consumption. 6.3 User Feedback Whilst system monitors and logs are vital tools in the pursuit of Capacity Management, one of the best sources of information, particularly for users within your own organization, is to go and talk to them! One day spent in a user department watching the way in which the applications are actually being used, and how they perform in real life, is worth a week of poring over device utilization analyses. 6.4 Relevant/Timely Modeling Modern monitoring and modeling tools are now available which enable the integration of capacity planning with the business planning function. Models and predictions can now be produced quickly enough to be part of the management decision-making process. 6.5 Intranet Publishing One of the criticisms that organizations have most frequently expressed about their Capacity Management teams was that their work, although generally acknowledged as beneficial, was not very ‘visible’. CM teams are now making very considerable use of Intranet reporting which, with the advent of entirely automated reporting mechanisms, means that comprehensive and accessible html-based reports can be disseminated with the minimum of effort. 7 Workload and Server Consolidation
  • 9. 7 The Roadmap This section is entitled ‘The Roadmap’ which implies that you start from somewhere, follow the map, and end up at your destination. Whilst a number of steps do have to be taken, the journey to effective Capacity Management is not a simple linear process, rather a more iterative learning experience, where the work done at each step may well cause enhancement, revision, or even replacement of previous work. The recent ‘Roadmap’ process to promote peace and stability in the Middle East includes a number of important milestones that are equally applicable here: - (a) Mutual understanding - so that everyone involved appreciates the needs and views of all participants (b) Boundary definition – defining who is going to be responsible for what, and how the various parties will integrate (c) Process definition – defining the required steps and timetable. Commercial organizations, National Governments, and international relations all react badly to sudden and dramatic change. Revolution can only be justified if the evolutionary process is unnaturally and unreasonably blocked in some way. [Machiavelli 1513] The route towards full adoption of the Capacity Management principles outlined in this paper is an evolutionary process, starting with a small application or service subset, and a simple intranet reporting mechanism. As the benefits of a formalised Capacity Management approach start to become apparent, it will be increasingly easy to obtain commitment from the various participants who provide data and use the CM team reports. After this initial phase, you can then start to extend the range of services to include SLA management and capacity planning. The sections below outline the Stairway to Heaven Success. 7.1 A clear set of objectives A suggestion for an overall objective statement was given earlier: ‘The continuing provision of consistent, acceptable service levels at a known and controlled cost.’ This objective will need to be extended to incorporate the scope of the Capacity Management team activities, in particular, the range of systems and business processes that they will be required to cover. 7.2 Senior management commitment This is an obvious, but vital step on the road. Without senior management commitment, the required personnel and tool resources will not be provided, and the organizational changes (particularly in terms of business information flow) will not be made. 7.3 Process/flow definition This is a definition of the way in which the Capacity Management team will interface with the rest of the organization. It must include a definition of: • All the in-bound information flows that will be required • The organizational impact and any required changes • The ways in which the work done by the team will be directed by the organization’s needs • The ways in which the team’s findings will be disseminated and used. 8 Workload and Server Consolidation
  • 10. 7.4 A realistic plan The key word here is ‘realistic’. Whilst it would be nice to have a completely comprehensive, fully integrated Capacity Management function from day one, it just is not going to happen. The required organizational changes may well take a considerable amount of time to define and implement 7.5 Recruit or retrain the right people Despite the fact that mathematicians are amongst the most important and worthwhile people on the planet, capacity managers do not have to be mathematicians. Although a certain degree of numeric ability will be required, an ability to communicate with the business is equally important. Such abilities will be required not only to derive the required information from the organization, but also to communicate and present findings and recommendations effectively. An effective capacity management team member really needs to have a foot on both the business and the technical community. Remember that Capacity Management is a business discipline with technical implications – not the other way round! 7.6 Acquire the right toolset The precise toolset will depend on individual organization’s circumstances, but a minimum starter set will include: - • Performance and resource consumption monitors for all system components which contribute to the delivered service • A mechanism for storing that data in a central repository • A mechanism for importing business data, and any other data that would provide further understanding of the relationship between the business workload (measured in Natural Forecast Units) and IS workloads • A facility to generate regular reports automatically, across the complete range of business and system data in the repository, and to distribute those reports in an appropriate manner to the target audience (typically using html and the corporate intranet) • A mechanism to produce ad-hoc reports and to ‘drill down’ into the data for problem diagnosis • A trending facility for use on those aspects of the data for which linear extrapolation is a valid technique A performance prediction facility that will allow the non-linear behaviour of systems experiencing resource contention to be taken into account. This will usually be based on some form of analytical modelling. 7.7 Walk before you start to run Avoid the temptation to try and cover too many target systems or applications right from the outset. It will take some time for the organization to adapt to the additional disciplines required for Capacity Management and to start to benefit from its provision 7.8 Iterative evolution As I mentioned earlier, Capacity Management is and evolving process. Activities and achievements must continually be monitored and checked against the objectives and the plan. This is an ongoing iterative process of refinement and improvement. 9 Workload and Server Consolidation
  • 11. 8 Conclusion In order to achieve consistent, acceptable service levels, at a known and controlled cost, you need Capacity Management. You DO NOT NEED threshold-based alerting, fire-fighters or dashboards, all of which contribute to knee-jerk, event-driven ‘management’. Other things to avoid are the ‘wait and see’ approach (particularly inappropriate for e-commerce systems) disconnected users and modeling gurus, and purchasing decisions based on the recommendations of hardware suppliers. You DO NEED to track performance and resource consumption, correlate that against business workload measurements, report to (and gain feed back from) your user community through internet publishing of reports at the right level of detail, and relevant, timely modeling to support purchasing decision-making. No magic or divine intervention is required in order to achieve success in Capacity Management. It is important to avoid the myriad distractions that some eager software tool vendors can strew in your way. Follow the roadmap that I have described, and concentrate on providing (and demonstrating!) your contribution to continuing quality service levels, and to the organization’s bottom line. Bibliography [Smith 1990] Connie U. Smith, Performance Engineering of Software Systems, Reading, MA, Addison Wesley, 1990. [Machiavelli 1513] Nicolo Machiavelli, The Prince, 1513. 10 Workload and Server Consolidation
  • 12. ©2003 Metron Technology Ltd / Metron-Athene Inc Metron and the Metron logo as well as Athene and other names of products referred to herein are trade marks or registered trade marks of Metron Technology Limited. Other products and company names mentioned herein may be trade marks of the respective owners. Any rights not expressly granted herein are reserved. © 2003 Metron Technology Ltd Osborne House, Trull Road, Taunton TA1 4PX Tel: 01823 259231 Fax 01823 334502 info@metron.co.uk www.metron.co.uk © 2003 Metron - Athene INC. 6320 Canoga Avenue, Suite 1500, Woodland Hills, CA 91367 Tel 818-227-5019 support@metron-athene.com www.metron-athene.com