cKenney’s installed multiple
packaged air conditioning
units at an industrial plant
in Columbus, Georgia. The company
­manufactures refrigerated systems and
display cases for supermarkets and food
service organizations throughout the U.S.
The Challenge
The manufacturer—with two facilities and
a combined total of 442,000 square feet
of floor space—needed to replace its existing
A/C units, which were only partially opera-
tional. In order to maintain 100 percent
uptime on the manufacturing floor, McKenney’s
had to perform the installation without
shutting down the plant.
The Solution
The McKenney’s team provided multiple
system options to the manufacturer and
implemented a phased installation that would
not disrupt manufacturing operations. All
installation and construction activities were
conducted through the winter months to take
advantage of the cooler temperature outside.
The Results
The project—which included 18 new
packaged A/C units with a combined air
capacity of 875 tons—was completed in
four months from start of design to owner
acceptance of the work.
Cooling Down a Refrigeration Plant
Project Name
žž Refrigerated Systems &
Display Case Manufacturer
Project Location
žž Columbus, Georgia
Project Team
žž Owner: Refrigerated Systems
& Display Case Manufacturer
žž General Contractor:
­McKenney’s, Inc.
žž Engineer: McKenney’s, Inc.
Project Status
žž Completed
LEED®
Certification Level
žž N/A
The content of this document is not intended as an endorsement.
www.mckenneys.com
© 2013 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A.
McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners.
404-622-5000
info@mckenneys.com
1056 Moreland Industrial Boulevard
Atlanta, Georgia 30316
704-357-1200
info@mckenneys.com
3601 Performance Road
Charlotte, North Carolina 28214

More Related Content

What's hot

Precise Planning, Staged Installation
Precise Planning, Staged InstallationPrecise Planning, Staged Installation
Precise Planning, Staged InstallationMcKenney's Inc
 
Deploying Expertise and Skill - HVAC and Plumbing Systems Upgrade in Augusta, GA
Deploying Expertise and Skill - HVAC and Plumbing Systems Upgrade in Augusta, GADeploying Expertise and Skill - HVAC and Plumbing Systems Upgrade in Augusta, GA
Deploying Expertise and Skill - HVAC and Plumbing Systems Upgrade in Augusta, GAMcKenney's Inc
 
Chilled Water Coil Replacement Project
Chilled Water Coil Replacement ProjectChilled Water Coil Replacement Project
Chilled Water Coil Replacement ProjectMcKenney's Inc
 
Equilibrium-Air-Conditioning Macquarie Centre
Equilibrium-Air-Conditioning Macquarie CentreEquilibrium-Air-Conditioning Macquarie Centre
Equilibrium-Air-Conditioning Macquarie CentreRobert Pham
 
Cooperating on a Campus Modernization - HVAC and Plumbing Renovation
Cooperating on a Campus Modernization - HVAC and Plumbing RenovationCooperating on a Campus Modernization - HVAC and Plumbing Renovation
Cooperating on a Campus Modernization - HVAC and Plumbing RenovationMcKenney's Inc
 
Project Fact Sheet_Final Dec 2 2013PDF
Project Fact Sheet_Final Dec 2 2013PDFProject Fact Sheet_Final Dec 2 2013PDF
Project Fact Sheet_Final Dec 2 2013PDFMichael Slowik
 
Kimberly-Clark Case Study
Kimberly-Clark Case StudyKimberly-Clark Case Study
Kimberly-Clark Case StudyApril Rogers
 
Generating a Reliable Backup Plan - Data Center Retrofit Project
Generating a Reliable Backup Plan - Data Center Retrofit ProjectGenerating a Reliable Backup Plan - Data Center Retrofit Project
Generating a Reliable Backup Plan - Data Center Retrofit ProjectMcKenney's Inc
 
Shawn Witt Portfolio
Shawn Witt PortfolioShawn Witt Portfolio
Shawn Witt PortfolioShawn Witt
 
Arun Goyle resume
Arun Goyle resumeArun Goyle resume
Arun Goyle resumeArun Goyle
 
Palaka Now July Outage Issue 2007
Palaka Now July Outage Issue 2007 Palaka Now July Outage Issue 2007
Palaka Now July Outage Issue 2007 Adam DeMouy
 
Gas Combustion Turbine System
Gas Combustion Turbine SystemGas Combustion Turbine System
Gas Combustion Turbine SystemPeter Bright
 
Resume Ed Johnson
Resume Ed JohnsonResume Ed Johnson
Resume Ed JohnsonEd Johnson
 
Expert Planning Overcomes Weather Delays
Expert Planning Overcomes Weather DelaysExpert Planning Overcomes Weather Delays
Expert Planning Overcomes Weather DelaysMcKenney's Inc
 
Jonathan woolley talk
Jonathan woolley talkJonathan woolley talk
Jonathan woolley talkPhucPhamThanh
 

What's hot (20)

Precise Planning, Staged Installation
Precise Planning, Staged InstallationPrecise Planning, Staged Installation
Precise Planning, Staged Installation
 
Deploying Expertise and Skill - HVAC and Plumbing Systems Upgrade in Augusta, GA
Deploying Expertise and Skill - HVAC and Plumbing Systems Upgrade in Augusta, GADeploying Expertise and Skill - HVAC and Plumbing Systems Upgrade in Augusta, GA
Deploying Expertise and Skill - HVAC and Plumbing Systems Upgrade in Augusta, GA
 
Chilled Water Coil Replacement Project
Chilled Water Coil Replacement ProjectChilled Water Coil Replacement Project
Chilled Water Coil Replacement Project
 
Shaun Davis, MB Refrigeration
Shaun Davis, MB RefrigerationShaun Davis, MB Refrigeration
Shaun Davis, MB Refrigeration
 
SR Johnson Resume
SR Johnson ResumeSR Johnson Resume
SR Johnson Resume
 
Equilibrium-Air-Conditioning Macquarie Centre
Equilibrium-Air-Conditioning Macquarie CentreEquilibrium-Air-Conditioning Macquarie Centre
Equilibrium-Air-Conditioning Macquarie Centre
 
Cooperating on a Campus Modernization - HVAC and Plumbing Renovation
Cooperating on a Campus Modernization - HVAC and Plumbing RenovationCooperating on a Campus Modernization - HVAC and Plumbing Renovation
Cooperating on a Campus Modernization - HVAC and Plumbing Renovation
 
Project Fact Sheet_Final Dec 2 2013PDF
Project Fact Sheet_Final Dec 2 2013PDFProject Fact Sheet_Final Dec 2 2013PDF
Project Fact Sheet_Final Dec 2 2013PDF
 
Terry Plaisted, Automatic Heating
Terry Plaisted, Automatic HeatingTerry Plaisted, Automatic Heating
Terry Plaisted, Automatic Heating
 
Kimberly-Clark Case Study
Kimberly-Clark Case StudyKimberly-Clark Case Study
Kimberly-Clark Case Study
 
Generating a Reliable Backup Plan - Data Center Retrofit Project
Generating a Reliable Backup Plan - Data Center Retrofit ProjectGenerating a Reliable Backup Plan - Data Center Retrofit Project
Generating a Reliable Backup Plan - Data Center Retrofit Project
 
Shawn Witt Portfolio
Shawn Witt PortfolioShawn Witt Portfolio
Shawn Witt Portfolio
 
What it Takes to Harness the Sun
What it Takes to Harness the SunWhat it Takes to Harness the Sun
What it Takes to Harness the Sun
 
Ateeq Ur Rehman
Ateeq Ur RehmanAteeq Ur Rehman
Ateeq Ur Rehman
 
Arun Goyle resume
Arun Goyle resumeArun Goyle resume
Arun Goyle resume
 
Palaka Now July Outage Issue 2007
Palaka Now July Outage Issue 2007 Palaka Now July Outage Issue 2007
Palaka Now July Outage Issue 2007
 
Gas Combustion Turbine System
Gas Combustion Turbine SystemGas Combustion Turbine System
Gas Combustion Turbine System
 
Resume Ed Johnson
Resume Ed JohnsonResume Ed Johnson
Resume Ed Johnson
 
Expert Planning Overcomes Weather Delays
Expert Planning Overcomes Weather DelaysExpert Planning Overcomes Weather Delays
Expert Planning Overcomes Weather Delays
 
Jonathan woolley talk
Jonathan woolley talkJonathan woolley talk
Jonathan woolley talk
 

Similar to Cooling Down a Refrigeration Plant - Columbus, Georgia

Coordination Overcomes Challenges - Heating and Air Conditioning System Insta...
Coordination Overcomes Challenges - Heating and Air Conditioning System Insta...Coordination Overcomes Challenges - Heating and Air Conditioning System Insta...
Coordination Overcomes Challenges - Heating and Air Conditioning System Insta...McKenney's Inc
 
Beating the Mid-Summer Heat - Air Handling Units Replacement
Beating the Mid-Summer Heat - Air Handling Units ReplacementBeating the Mid-Summer Heat - Air Handling Units Replacement
Beating the Mid-Summer Heat - Air Handling Units ReplacementMcKenney's Inc
 
Large Campus Reduces Carbon Footprint
Large Campus Reduces Carbon FootprintLarge Campus Reduces Carbon Footprint
Large Campus Reduces Carbon FootprintMcKenney's Inc
 
Putting Efficiency at the Top
Putting Efficiency at the TopPutting Efficiency at the Top
Putting Efficiency at the TopMcKenney's Inc
 
Programmed for Success - HVAC Energy Management System
Programmed for Success - HVAC Energy Management SystemProgrammed for Success - HVAC Energy Management System
Programmed for Success - HVAC Energy Management SystemMcKenney's Inc
 
Success Through Innovation - Build-to-Suit Call Center HVAC Installation
Success Through Innovation - Build-to-Suit Call Center HVAC InstallationSuccess Through Innovation - Build-to-Suit Call Center HVAC Installation
Success Through Innovation - Build-to-Suit Call Center HVAC InstallationMcKenney's Inc
 
Cooling Tower and Pump Retrofit | HVAC Installation
Cooling Tower and Pump Retrofit | HVAC Installation Cooling Tower and Pump Retrofit | HVAC Installation
Cooling Tower and Pump Retrofit | HVAC Installation McKenney's Inc
 
Derek Hendry WEC Biography
Derek Hendry WEC BiographyDerek Hendry WEC Biography
Derek Hendry WEC BiographyDerek Hendry
 
Efficiency in Repurposed Office Tower
Efficiency in Repurposed Office TowerEfficiency in Repurposed Office Tower
Efficiency in Repurposed Office TowerMcKenney's Inc
 
A Breakout Turnkey HVAC Conversion - Turnkey Design/Build
A Breakout Turnkey HVAC Conversion - Turnkey Design/BuildA Breakout Turnkey HVAC Conversion - Turnkey Design/Build
A Breakout Turnkey HVAC Conversion - Turnkey Design/BuildMcKenney's Inc
 
Gig Harbor High School Promotional Sheet
Gig Harbor High School Promotional SheetGig Harbor High School Promotional Sheet
Gig Harbor High School Promotional SheetLinda Burman
 
A Greener Hospital by Design
A Greener Hospital by DesignA Greener Hospital by Design
A Greener Hospital by DesignMcKenney's Inc
 
An Educated Approach to HVAC
An Educated Approach to HVACAn Educated Approach to HVAC
An Educated Approach to HVACMcKenney's Inc
 
Mastering a New System - IEC HVAC Installation
Mastering a New System - IEC HVAC InstallationMastering a New System - IEC HVAC Installation
Mastering a New System - IEC HVAC InstallationMcKenney's Inc
 
Navigating Safety Obstacles - Installation of Roof top Units
Navigating Safety Obstacles - Installation of Roof top UnitsNavigating Safety Obstacles - Installation of Roof top Units
Navigating Safety Obstacles - Installation of Roof top UnitsMcKenney's Inc
 
Bringing Atlanta into Plain View
Bringing Atlanta into Plain ViewBringing Atlanta into Plain View
Bringing Atlanta into Plain ViewMcKenney's Inc
 
Manufacturing Facility Hits the Floor Running - Process Piping and HVAC Syste...
Manufacturing Facility Hits the Floor Running - Process Piping and HVAC Syste...Manufacturing Facility Hits the Floor Running - Process Piping and HVAC Syste...
Manufacturing Facility Hits the Floor Running - Process Piping and HVAC Syste...McKenney's Inc
 
Fast Track for High Tech HVAC
Fast Track for High Tech HVACFast Track for High Tech HVAC
Fast Track for High Tech HVACMcKenney's Inc
 
Energy Services Contractors - A Case Study in Energy Efficiency
Energy Services Contractors - A Case Study in Energy EfficiencyEnergy Services Contractors - A Case Study in Energy Efficiency
Energy Services Contractors - A Case Study in Energy EfficiencyMcKenney's Inc
 

Similar to Cooling Down a Refrigeration Plant - Columbus, Georgia (20)

Coordination Overcomes Challenges - Heating and Air Conditioning System Insta...
Coordination Overcomes Challenges - Heating and Air Conditioning System Insta...Coordination Overcomes Challenges - Heating and Air Conditioning System Insta...
Coordination Overcomes Challenges - Heating and Air Conditioning System Insta...
 
Beating the Mid-Summer Heat - Air Handling Units Replacement
Beating the Mid-Summer Heat - Air Handling Units ReplacementBeating the Mid-Summer Heat - Air Handling Units Replacement
Beating the Mid-Summer Heat - Air Handling Units Replacement
 
Large Campus Reduces Carbon Footprint
Large Campus Reduces Carbon FootprintLarge Campus Reduces Carbon Footprint
Large Campus Reduces Carbon Footprint
 
Putting Efficiency at the Top
Putting Efficiency at the TopPutting Efficiency at the Top
Putting Efficiency at the Top
 
Programmed for Success - HVAC Energy Management System
Programmed for Success - HVAC Energy Management SystemProgrammed for Success - HVAC Energy Management System
Programmed for Success - HVAC Energy Management System
 
Success Through Innovation - Build-to-Suit Call Center HVAC Installation
Success Through Innovation - Build-to-Suit Call Center HVAC InstallationSuccess Through Innovation - Build-to-Suit Call Center HVAC Installation
Success Through Innovation - Build-to-Suit Call Center HVAC Installation
 
Cooling Tower and Pump Retrofit | HVAC Installation
Cooling Tower and Pump Retrofit | HVAC Installation Cooling Tower and Pump Retrofit | HVAC Installation
Cooling Tower and Pump Retrofit | HVAC Installation
 
Derek Hendry WEC Biography
Derek Hendry WEC BiographyDerek Hendry WEC Biography
Derek Hendry WEC Biography
 
Efficiency in Repurposed Office Tower
Efficiency in Repurposed Office TowerEfficiency in Repurposed Office Tower
Efficiency in Repurposed Office Tower
 
A Breakout Turnkey HVAC Conversion - Turnkey Design/Build
A Breakout Turnkey HVAC Conversion - Turnkey Design/BuildA Breakout Turnkey HVAC Conversion - Turnkey Design/Build
A Breakout Turnkey HVAC Conversion - Turnkey Design/Build
 
Gig Harbor High School Promotional Sheet
Gig Harbor High School Promotional SheetGig Harbor High School Promotional Sheet
Gig Harbor High School Promotional Sheet
 
A Greener Hospital by Design
A Greener Hospital by DesignA Greener Hospital by Design
A Greener Hospital by Design
 
An Educated Approach to HVAC
An Educated Approach to HVACAn Educated Approach to HVAC
An Educated Approach to HVAC
 
Mastering a New System - IEC HVAC Installation
Mastering a New System - IEC HVAC InstallationMastering a New System - IEC HVAC Installation
Mastering a New System - IEC HVAC Installation
 
Navigating Safety Obstacles - Installation of Roof top Units
Navigating Safety Obstacles - Installation of Roof top UnitsNavigating Safety Obstacles - Installation of Roof top Units
Navigating Safety Obstacles - Installation of Roof top Units
 
GC - Alder Hey
GC - Alder HeyGC - Alder Hey
GC - Alder Hey
 
Bringing Atlanta into Plain View
Bringing Atlanta into Plain ViewBringing Atlanta into Plain View
Bringing Atlanta into Plain View
 
Manufacturing Facility Hits the Floor Running - Process Piping and HVAC Syste...
Manufacturing Facility Hits the Floor Running - Process Piping and HVAC Syste...Manufacturing Facility Hits the Floor Running - Process Piping and HVAC Syste...
Manufacturing Facility Hits the Floor Running - Process Piping and HVAC Syste...
 
Fast Track for High Tech HVAC
Fast Track for High Tech HVACFast Track for High Tech HVAC
Fast Track for High Tech HVAC
 
Energy Services Contractors - A Case Study in Energy Efficiency
Energy Services Contractors - A Case Study in Energy EfficiencyEnergy Services Contractors - A Case Study in Energy Efficiency
Energy Services Contractors - A Case Study in Energy Efficiency
 

More from McKenney's Inc

CRAC Units Installation for a Data Center Project in Alpharetta, GA
CRAC Units Installation for a Data Center Project in Alpharetta, GACRAC Units Installation for a Data Center Project in Alpharetta, GA
CRAC Units Installation for a Data Center Project in Alpharetta, GAMcKenney's Inc
 
Mission Critical Data Center Retrofit Project - Catawaba County, NC
Mission Critical Data Center Retrofit Project - Catawaba County, NCMission Critical Data Center Retrofit Project - Catawaba County, NC
Mission Critical Data Center Retrofit Project - Catawaba County, NCMcKenney's Inc
 
Performing a Cooling Transplant in Braselton, Georgia
Performing a Cooling Transplant in Braselton, GeorgiaPerforming a Cooling Transplant in Braselton, Georgia
Performing a Cooling Transplant in Braselton, GeorgiaMcKenney's Inc
 
Lab Installation Cools Concerns - Federal Laboratory Renovation
Lab Installation Cools Concerns - Federal Laboratory RenovationLab Installation Cools Concerns - Federal Laboratory Renovation
Lab Installation Cools Concerns - Federal Laboratory RenovationMcKenney's Inc
 
Blowing the Lid Off City Hall - Energy Savings Performance Contracting
Blowing the Lid Off City Hall - Energy Savings Performance ContractingBlowing the Lid Off City Hall - Energy Savings Performance Contracting
Blowing the Lid Off City Hall - Energy Savings Performance ContractingMcKenney's Inc
 
Design/Build Mechanical Systems Projects - Atlanta, GA
Design/Build Mechanical Systems Projects - Atlanta, GADesign/Build Mechanical Systems Projects - Atlanta, GA
Design/Build Mechanical Systems Projects - Atlanta, GAMcKenney's Inc
 
Building Relationships on the Double - Design/Build Mechanical Systems Projects
Building Relationships on the Double - Design/Build Mechanical Systems ProjectsBuilding Relationships on the Double - Design/Build Mechanical Systems Projects
Building Relationships on the Double - Design/Build Mechanical Systems ProjectsMcKenney's Inc
 
Keeping the Fans Waving - Cooling Systems Replacement
Keeping the Fans Waving - Cooling Systems ReplacementKeeping the Fans Waving - Cooling Systems Replacement
Keeping the Fans Waving - Cooling Systems ReplacementMcKenney's Inc
 
Installation of Plumbing and HVAC systems - Hospitality Construction
Installation of Plumbing and HVAC systems - Hospitality ConstructionInstallation of Plumbing and HVAC systems - Hospitality Construction
Installation of Plumbing and HVAC systems - Hospitality ConstructionMcKenney's Inc
 
Covering All the Bases - Plumbing and HVAC Systems Installation
Covering All the Bases - Plumbing and HVAC Systems InstallationCovering All the Bases - Plumbing and HVAC Systems Installation
Covering All the Bases - Plumbing and HVAC Systems InstallationMcKenney's Inc
 
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)McKenney's Inc
 
Turnkey Solution for an ESPC (Energy Savings Performance Contract) Project
Turnkey Solution for an ESPC (Energy Savings Performance Contract) ProjectTurnkey Solution for an ESPC (Energy Savings Performance Contract) Project
Turnkey Solution for an ESPC (Energy Savings Performance Contract) ProjectMcKenney's Inc
 
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...McKenney's Inc
 
Efficient Solutions for Rainwater and Condensate Harvesting
Efficient Solutions for Rainwater and Condensate HarvestingEfficient Solutions for Rainwater and Condensate Harvesting
Efficient Solutions for Rainwater and Condensate HarvestingMcKenney's Inc
 
Plumbing Preventive Maintenance in Commercial Buildings
Plumbing Preventive Maintenance in Commercial BuildingsPlumbing Preventive Maintenance in Commercial Buildings
Plumbing Preventive Maintenance in Commercial BuildingsMcKenney's Inc
 
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...McKenney's Inc
 
Creating a Showstopper in Charlotte - Mechanical Systems Installation
Creating a Showstopper in Charlotte - Mechanical Systems InstallationCreating a Showstopper in Charlotte - Mechanical Systems Installation
Creating a Showstopper in Charlotte - Mechanical Systems InstallationMcKenney's Inc
 
Playing Multiple Roles - Hospitality Construction
Playing Multiple Roles - Hospitality ConstructionPlaying Multiple Roles - Hospitality Construction
Playing Multiple Roles - Hospitality ConstructionMcKenney's Inc
 
A High Rise Game Changer - Mixed-Use Construction
A High Rise Game Changer - Mixed-Use ConstructionA High Rise Game Changer - Mixed-Use Construction
A High Rise Game Changer - Mixed-Use ConstructionMcKenney's Inc
 
Timely Collaboration Covers All Bases | Mechanical Systems Installation
Timely Collaboration Covers All Bases | Mechanical Systems InstallationTimely Collaboration Covers All Bases | Mechanical Systems Installation
Timely Collaboration Covers All Bases | Mechanical Systems InstallationMcKenney's Inc
 

More from McKenney's Inc (20)

CRAC Units Installation for a Data Center Project in Alpharetta, GA
CRAC Units Installation for a Data Center Project in Alpharetta, GACRAC Units Installation for a Data Center Project in Alpharetta, GA
CRAC Units Installation for a Data Center Project in Alpharetta, GA
 
Mission Critical Data Center Retrofit Project - Catawaba County, NC
Mission Critical Data Center Retrofit Project - Catawaba County, NCMission Critical Data Center Retrofit Project - Catawaba County, NC
Mission Critical Data Center Retrofit Project - Catawaba County, NC
 
Performing a Cooling Transplant in Braselton, Georgia
Performing a Cooling Transplant in Braselton, GeorgiaPerforming a Cooling Transplant in Braselton, Georgia
Performing a Cooling Transplant in Braselton, Georgia
 
Lab Installation Cools Concerns - Federal Laboratory Renovation
Lab Installation Cools Concerns - Federal Laboratory RenovationLab Installation Cools Concerns - Federal Laboratory Renovation
Lab Installation Cools Concerns - Federal Laboratory Renovation
 
Blowing the Lid Off City Hall - Energy Savings Performance Contracting
Blowing the Lid Off City Hall - Energy Savings Performance ContractingBlowing the Lid Off City Hall - Energy Savings Performance Contracting
Blowing the Lid Off City Hall - Energy Savings Performance Contracting
 
Design/Build Mechanical Systems Projects - Atlanta, GA
Design/Build Mechanical Systems Projects - Atlanta, GADesign/Build Mechanical Systems Projects - Atlanta, GA
Design/Build Mechanical Systems Projects - Atlanta, GA
 
Building Relationships on the Double - Design/Build Mechanical Systems Projects
Building Relationships on the Double - Design/Build Mechanical Systems ProjectsBuilding Relationships on the Double - Design/Build Mechanical Systems Projects
Building Relationships on the Double - Design/Build Mechanical Systems Projects
 
Keeping the Fans Waving - Cooling Systems Replacement
Keeping the Fans Waving - Cooling Systems ReplacementKeeping the Fans Waving - Cooling Systems Replacement
Keeping the Fans Waving - Cooling Systems Replacement
 
Installation of Plumbing and HVAC systems - Hospitality Construction
Installation of Plumbing and HVAC systems - Hospitality ConstructionInstallation of Plumbing and HVAC systems - Hospitality Construction
Installation of Plumbing and HVAC systems - Hospitality Construction
 
Covering All the Bases - Plumbing and HVAC Systems Installation
Covering All the Bases - Plumbing and HVAC Systems InstallationCovering All the Bases - Plumbing and HVAC Systems Installation
Covering All the Bases - Plumbing and HVAC Systems Installation
 
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)
Reducing Building Energy Consumption in Zero Energy Buildings (ZEB)
 
Turnkey Solution for an ESPC (Energy Savings Performance Contract) Project
Turnkey Solution for an ESPC (Energy Savings Performance Contract) ProjectTurnkey Solution for an ESPC (Energy Savings Performance Contract) Project
Turnkey Solution for an ESPC (Energy Savings Performance Contract) Project
 
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...
McKenney’s, Inc. Critical Systems - High-Quality Mechanical Services for Miss...
 
Efficient Solutions for Rainwater and Condensate Harvesting
Efficient Solutions for Rainwater and Condensate HarvestingEfficient Solutions for Rainwater and Condensate Harvesting
Efficient Solutions for Rainwater and Condensate Harvesting
 
Plumbing Preventive Maintenance in Commercial Buildings
Plumbing Preventive Maintenance in Commercial BuildingsPlumbing Preventive Maintenance in Commercial Buildings
Plumbing Preventive Maintenance in Commercial Buildings
 
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...
McKenney’s, Inc. Interiors & Special Projects - Your Single Source for High-q...
 
Creating a Showstopper in Charlotte - Mechanical Systems Installation
Creating a Showstopper in Charlotte - Mechanical Systems InstallationCreating a Showstopper in Charlotte - Mechanical Systems Installation
Creating a Showstopper in Charlotte - Mechanical Systems Installation
 
Playing Multiple Roles - Hospitality Construction
Playing Multiple Roles - Hospitality ConstructionPlaying Multiple Roles - Hospitality Construction
Playing Multiple Roles - Hospitality Construction
 
A High Rise Game Changer - Mixed-Use Construction
A High Rise Game Changer - Mixed-Use ConstructionA High Rise Game Changer - Mixed-Use Construction
A High Rise Game Changer - Mixed-Use Construction
 
Timely Collaboration Covers All Bases | Mechanical Systems Installation
Timely Collaboration Covers All Bases | Mechanical Systems InstallationTimely Collaboration Covers All Bases | Mechanical Systems Installation
Timely Collaboration Covers All Bases | Mechanical Systems Installation
 

Recently uploaded

Pitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckPitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckHajeJanKamps
 
Driving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerDriving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerAggregage
 
Lessons from Shanavas M.P. (AKA SHAN) For The Mastering in Entrepreneurship
Lessons from Shanavas M.P. (AKA SHAN) For The Mastering in EntrepreneurshipLessons from Shanavas M.P. (AKA SHAN) For The Mastering in Entrepreneurship
Lessons from Shanavas M.P. (AKA SHAN) For The Mastering in EntrepreneurshipDoge Mining Website
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...ssuserf63bd7
 
Unveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesUnveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesDoe Paoro
 
Send Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSendBig4
 
Neha Jhalani Hiranandani: A Guide to Her Life and Career
Neha Jhalani Hiranandani: A Guide to Her Life and CareerNeha Jhalani Hiranandani: A Guide to Her Life and Career
Neha Jhalani Hiranandani: A Guide to Her Life and Careerr98588472
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdfChris Skinner
 
Onemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring CapabilitiesOnemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring CapabilitiesOne Monitar
 
MEP Plans in Construction of Building and Industrial Projects 2024
MEP Plans in Construction of Building and Industrial Projects 2024MEP Plans in Construction of Building and Industrial Projects 2024
MEP Plans in Construction of Building and Industrial Projects 2024Chandresh Chudasama
 
Implementing Exponential Accelerators.pptx
Implementing Exponential Accelerators.pptxImplementing Exponential Accelerators.pptx
Implementing Exponential Accelerators.pptxRich Reba
 
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...Operational Excellence Consulting
 
Data Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and TemplatesData Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and TemplatesAurelien Domont, MBA
 
Features of a Call Recorder Spy App for Android.pdf
Features of a Call Recorder Spy App for Android.pdfFeatures of a Call Recorder Spy App for Android.pdf
Features of a Call Recorder Spy App for Android.pdfOne Monitar
 
How to Conduct a Service Gap Analysis for Your Business
How to Conduct a Service Gap Analysis for Your BusinessHow to Conduct a Service Gap Analysis for Your Business
How to Conduct a Service Gap Analysis for Your BusinessHelp Desk Migration
 
WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfJamesConcepcion7
 
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfGUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfDanny Diep To
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Peter Ward
 
How do I Check My Health Issues in Astrology.pdf
How do I Check My Health Issues in Astrology.pdfHow do I Check My Health Issues in Astrology.pdf
How do I Check My Health Issues in Astrology.pdfshubhamaapkikismat
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 

Recently uploaded (20)

Pitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckPitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deck
 
Driving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerDriving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon Harmer
 
Lessons from Shanavas M.P. (AKA SHAN) For The Mastering in Entrepreneurship
Lessons from Shanavas M.P. (AKA SHAN) For The Mastering in EntrepreneurshipLessons from Shanavas M.P. (AKA SHAN) For The Mastering in Entrepreneurship
Lessons from Shanavas M.P. (AKA SHAN) For The Mastering in Entrepreneurship
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
 
Unveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic ExperiencesUnveiling the Soundscape Music for Psychedelic Experiences
Unveiling the Soundscape Music for Psychedelic Experiences
 
Send Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.comSend Files | Sendbig.com
Send Files | Sendbig.comSend Files | Sendbig.com
 
Neha Jhalani Hiranandani: A Guide to Her Life and Career
Neha Jhalani Hiranandani: A Guide to Her Life and CareerNeha Jhalani Hiranandani: A Guide to Her Life and Career
Neha Jhalani Hiranandani: A Guide to Her Life and Career
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf
 
Onemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring CapabilitiesOnemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
 
MEP Plans in Construction of Building and Industrial Projects 2024
MEP Plans in Construction of Building and Industrial Projects 2024MEP Plans in Construction of Building and Industrial Projects 2024
MEP Plans in Construction of Building and Industrial Projects 2024
 
Implementing Exponential Accelerators.pptx
Implementing Exponential Accelerators.pptxImplementing Exponential Accelerators.pptx
Implementing Exponential Accelerators.pptx
 
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
The McKinsey 7S Framework: A Holistic Approach to Harmonizing All Parts of th...
 
Data Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and TemplatesData Analytics Strategy Toolkit and Templates
Data Analytics Strategy Toolkit and Templates
 
Features of a Call Recorder Spy App for Android.pdf
Features of a Call Recorder Spy App for Android.pdfFeatures of a Call Recorder Spy App for Android.pdf
Features of a Call Recorder Spy App for Android.pdf
 
How to Conduct a Service Gap Analysis for Your Business
How to Conduct a Service Gap Analysis for Your BusinessHow to Conduct a Service Gap Analysis for Your Business
How to Conduct a Service Gap Analysis for Your Business
 
WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdf
 
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfGUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
 
Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...Fordham -How effective decision-making is within the IT department - Analysis...
Fordham -How effective decision-making is within the IT department - Analysis...
 
How do I Check My Health Issues in Astrology.pdf
How do I Check My Health Issues in Astrology.pdfHow do I Check My Health Issues in Astrology.pdf
How do I Check My Health Issues in Astrology.pdf
 
Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 

Cooling Down a Refrigeration Plant - Columbus, Georgia

  • 1. M cKenney’s installed multiple packaged air conditioning units at an industrial plant in Columbus, Georgia. The company ­manufactures refrigerated systems and display cases for supermarkets and food service organizations throughout the U.S. The Challenge The manufacturer—with two facilities and a combined total of 442,000 square feet of floor space—needed to replace its existing A/C units, which were only partially opera- tional. In order to maintain 100 percent uptime on the manufacturing floor, McKenney’s had to perform the installation without shutting down the plant. The Solution The McKenney’s team provided multiple system options to the manufacturer and implemented a phased installation that would not disrupt manufacturing operations. All installation and construction activities were conducted through the winter months to take advantage of the cooler temperature outside. The Results The project—which included 18 new packaged A/C units with a combined air capacity of 875 tons—was completed in four months from start of design to owner acceptance of the work. Cooling Down a Refrigeration Plant Project Name žž Refrigerated Systems & Display Case Manufacturer Project Location žž Columbus, Georgia Project Team žž Owner: Refrigerated Systems & Display Case Manufacturer žž General Contractor: ­McKenney’s, Inc. žž Engineer: McKenney’s, Inc. Project Status žž Completed LEED® Certification Level žž N/A The content of this document is not intended as an endorsement. www.mckenneys.com © 2013 McKenney’s, Inc., Atlanta, Georgia. All rights reserved. Printed in the U.S.A. McKenney’s, Inc. and the McKenney’s, Inc. logo are registered trademarks of McKenney’s, Inc. All other trademarks are the property of their respective owners. 404-622-5000 info@mckenneys.com 1056 Moreland Industrial Boulevard Atlanta, Georgia 30316 704-357-1200 info@mckenneys.com 3601 Performance Road Charlotte, North Carolina 28214