Project Manager & Superintendent, West Rock Builders, LLC, Apex, NC 2015-2016
Bldg. 2525 New Lobby Addition and Renovation, RTP, NC. Removed and replaced the
lobby area with new modern curtainwall enclosed conference rooms, break room and
entrance. Contract value $2.8 million.
Project Manager, Resolute Building Co., Inc., Chapel Hill, NC 2013-2015
East 54-Building 5000, Chapel Hill, NC. Constructed a 110,000 SF, 5-story, 58-unit multi-family
building. Contract value $7.9 million.
Piedmont Access to Health Services, Danville, VA. Built a 14,000 SF addition to and renovation of
an existing medical office building. Contract value $2.2 million.
Project Manager, John S. Clark Company, LLC, Mt. Airy, NC 2012-2013
Completed the project closeout and the punch list on several projects throughout North Carolina
and Virginia including; Primland Resort, ASU Student Dormitory, Newton-Conover MS, Lucas MS,
NC Veterans Home, Walmart and a Target store.
Project Manager, D.H. Griffin Construction Co., Raleigh, NC 2009-2011
High Point University Summer Dorm Renovations, High Point, NC. Cleaned, repaired and painted
400 dorm rooms to the very high standards of HPU in nine weeks.
NC A&T State University, New General Classroom & Lecture Hall, Greensboro, NC: Completed an
88,000 SF, 3-story, state of the art teaching facility with an open 3-story atrium and multi-story
lecture hall. Contract value $20.9 million.
Mills Park Middle School, Cary, NC: Completed a 196,000 SF, 3-story, energy efficient school with
athletic fields/track, parking lot and roadway improvements 3-weeks early. Contract value $39.1
million.
Project Manager, Shelco, Inc., Raleigh, North Carolina 2003-2009
Windsor Manor Parking Deck, Raleigh, NC: Constructed a 490 space, six level precast concrete
parking deck. Contract value $6.2 million.
JDL Castle/GSA Data Center, Durham, NC: Completed the foundations and structural steel for a
105,000 SF primary data center for the federal government. Contract value $47.5 million.
Targacept Laboratory Renovation, Winston-Salem, NC: Converted 10,000 SF of office space to a
clean barrier biotech research laboratory. Contract value $3.3 million.
REX Healthcare Wound Clinic, Raleigh, NC: Convert 5,200 SF of office space into a medical
procedures facility operating four hyperbaric chambers. Contract value $300,000.
MARK D. SHAW
105 Catchpenny Ct. mdshaw2009@gmail.com M: (919) 621-7909
Cary, NC 27519-5113 www.linkedin/in/mdshaw2009
Richard H. Dean Biomedical Research Building, Winston-Salem, NC: Construction of a five
story, 180,434 SF Class A biotechnology research laboratory with 453 space precast concrete
parking deck. Contract value $72.6 million.
Partners III Research Center and Parking Deck, Raleigh, NC: Construction of a three story, 80,000
SF research center with 640 space precast concrete parking deck. Contract value $17 million.
Project Manager, J.W. Grand Inc., Raleigh, North Carolina 2002-2003
Selma Elementary School, Selma, NC: Construction of new elementary school including
classrooms, kitchen, restrooms, auditorium, media center and administration area. Contract
value $5.7 million.
Brookes Avenue Church of Christ, Raleigh, NC: Renovations to the auditorium, balcony, restrooms
and Lobby area. Contract value $365,790.
Sterling Montessori Academy – Building C-2, Morrisville, NC: Addition to an existing building
consisting of four classrooms, restrooms and offices. Contract value $786,604.
Project Manager, Archer Western Contractors LTD, Raleigh, North Carolina 2001-2002
RDU Airport, Parking Garage 4, Raleigh, NC: Construction of new 2.1 million SF post-tensioned
cast-in-place concrete parking structure. Contract value of garage: $71.8 million.
Project Manager, S.B. Ballard Construction Company, Norfolk, Virginia 2000-2001
Norfolk International Airport Parking Garage A, Norfolk, VA: Construction of new 1.5 million SF, 9-
level, post-tensioned cast-in-place concrete parking structure. Contract value $30.8 million.
Project Manager – Civil, Pizzagalli Construction Company, S. Burlington, Vermont 1998-2000
Seneca WWTP Expansion, Germantown, MD: Coordinated all work and documentation associated
with civil work activities. Contract value $47.3 million.
Seneca WWTP Upgrade, Germantown, MD: Supervised completion of punch list activities involving
the coordination of sixteen subcontractors and vendors. Original contract value $24.5 million.
Assistant Project Manager, Pizzagalli Construction Company 1995-1998
Culinary Institute of America Facility Renovations, Hyde Park, NY: Prepared bid documents,
conducted pre-bid conferences, accepted and reviewed bid proposals for several renovation
projects at the Culinary Institute. Contract value $3.1 million.
Moores Bridges Water Treatment Plant Upgrade, Norfolk, VA: Expanded capacity of an existing
plant from 78 MGD to 108 MGD with additional modifications to provide the required process
improvements to handle the added capacity. Contract value $108.9 million.
MARK D. SHAW
105 Catchpenny Ct. mdshaw2009@gmail.com M: (919) 621-7909
Cary, NC 27519-5113 www.linkedin/in/mdshaw2009
Project Engineer, The Hardaway Company, Columbus, Georgia 1986-1995
U.S. Route 13 Bridge over Duck Creek, Smyrna, DE: Demolition and construction of a four-lane
bridge replacing an existing seventy-year old structure. Contract value $1.4 million.
DE Route 1 - Korean War Veterans Highway, Bear, DE: Constructed 3.04 miles of six lane concrete
highway with twelve bridges over tidal wetlands and new and existing roadways. Contract value
$32.6 million.
DE Route 1 - Korean War Veterans Highway, Smyrna, DE: Constructed 5.64 miles of four lane
concrete highway with nine bridges over tidal wetlands and new and existing roadways. Contract
value $40.9 million.
U.S. Route 50 Improvements at Cape St. Claire Road, Annapolis, MD: Constructed a cloverleaf
intersection with a steel girder bridge over an existing six-lane highway. Contract value $19.0
million.
U.S. Route 50 Vienna Bypass, Vienna, MD: Constructed 3.5 miles of four-lane highway with a one-
mile long high-rise bridge over the Nanticoke River. Contract value $51.2 million.
Land Level Ship Construction Facility, Newport News, VA: Construction of cast-in-place concrete
dry-dock and berthing facility for nuclear submarines. Contract value $22.6 million. H

Mais conteúdo relacionado

Mais procurados

KBE Shaping Futures K -12
KBE Shaping Futures K -12KBE Shaping Futures K -12
KBE Shaping Futures K -12charkins
 
McKenney resume March 2015
McKenney resume March 2015McKenney resume March 2015
McKenney resume March 2015Tom McKenney
 
BH - Consolidated List
BH - Consolidated ListBH - Consolidated List
BH - Consolidated ListBarry Haupt
 
haney resume 2017
haney resume 2017haney resume 2017
haney resume 2017Kevin Haney
 
Civil_Structural Engineer, Graham Chambers, December 2015
Civil_Structural Engineer, Graham Chambers, December 2015Civil_Structural Engineer, Graham Chambers, December 2015
Civil_Structural Engineer, Graham Chambers, December 2015Graham Chambers
 
Jeff Jvancich Resume 2016
Jeff Jvancich Resume 2016Jeff Jvancich Resume 2016
Jeff Jvancich Resume 2016Jeff Jvancich
 
Carlos Betts_Resume
Carlos Betts_ResumeCarlos Betts_Resume
Carlos Betts_Resumecarlos betts
 
CV 160105 Paul Magee
CV 160105 Paul MageeCV 160105 Paul Magee
CV 160105 Paul MageePaul Magee
 
AGC Corporate Fact Sheet 151026
AGC Corporate Fact Sheet 151026AGC Corporate Fact Sheet 151026
AGC Corporate Fact Sheet 151026Ann-Marie Pamplin
 
2009 Presentaton For Web
2009  Presentaton For  Web2009  Presentaton For  Web
2009 Presentaton For WebACECSDES
 
City of Salina-9th Street Curb & Gutter Project
City of Salina-9th Street Curb & Gutter ProjectCity of Salina-9th Street Curb & Gutter Project
City of Salina-9th Street Curb & Gutter ProjectCity of Salina
 

Mais procurados (18)

Resume.Brian Murphree
Resume.Brian MurphreeResume.Brian Murphree
Resume.Brian Murphree
 
KBE Shaping Futures K -12
KBE Shaping Futures K -12KBE Shaping Futures K -12
KBE Shaping Futures K -12
 
McKenney resume March 2015
McKenney resume March 2015McKenney resume March 2015
McKenney resume March 2015
 
BH - Consolidated List
BH - Consolidated ListBH - Consolidated List
BH - Consolidated List
 
haney resume 2017
haney resume 2017haney resume 2017
haney resume 2017
 
Civil_Structural Engineer, Graham Chambers, December 2015
Civil_Structural Engineer, Graham Chambers, December 2015Civil_Structural Engineer, Graham Chambers, December 2015
Civil_Structural Engineer, Graham Chambers, December 2015
 
Selected Projects Pg 2 PDF
Selected Projects Pg 2 PDFSelected Projects Pg 2 PDF
Selected Projects Pg 2 PDF
 
Jeff Jvancich Resume 2016
Jeff Jvancich Resume 2016Jeff Jvancich Resume 2016
Jeff Jvancich Resume 2016
 
ESV CV-764 (new)
ESV CV-764 (new)ESV CV-764 (new)
ESV CV-764 (new)
 
resume
resumeresume
resume
 
Resume APT
Resume APTResume APT
Resume APT
 
Carlos Betts_Resume
Carlos Betts_ResumeCarlos Betts_Resume
Carlos Betts_Resume
 
CV 160105 Paul Magee
CV 160105 Paul MageeCV 160105 Paul Magee
CV 160105 Paul Magee
 
AGC Corporate Fact Sheet 151026
AGC Corporate Fact Sheet 151026AGC Corporate Fact Sheet 151026
AGC Corporate Fact Sheet 151026
 
resume
resumeresume
resume
 
2009 Presentaton For Web
2009  Presentaton For  Web2009  Presentaton For  Web
2009 Presentaton For Web
 
City of Salina-9th Street Curb & Gutter Project
City of Salina-9th Street Curb & Gutter ProjectCity of Salina-9th Street Curb & Gutter Project
City of Salina-9th Street Curb & Gutter Project
 
BPA Commercial
BPA CommercialBPA Commercial
BPA Commercial
 

Destaque

Prosecution history analysis
Prosecution history analysisProsecution history analysis
Prosecution history analysisSmriti Jain
 
2010上海自由行+世博會
2010上海自由行+世博會2010上海自由行+世博會
2010上海自由行+世博會ten1985
 
Amali Pengeringan Susu
Amali Pengeringan SusuAmali Pengeringan Susu
Amali Pengeringan SusuAdlisensei Ivm
 
กล ม Electron ภาระก_จท__ 2
กล  ม Electron ภาระก_จท__ 2กล  ม Electron ภาระก_จท__ 2
กล ม Electron ภาระก_จท__ 2Kung Kaenchan
 
Konsep-pendekatan-scientific-rev-final-1
 Konsep-pendekatan-scientific-rev-final-1 Konsep-pendekatan-scientific-rev-final-1
Konsep-pendekatan-scientific-rev-final-1Yosti Saban
 
Feedbac: A Slide Deck About Me, Video Production, and Project Collaboration
Feedbac: A Slide Deck About Me, Video Production, and Project CollaborationFeedbac: A Slide Deck About Me, Video Production, and Project Collaboration
Feedbac: A Slide Deck About Me, Video Production, and Project CollaborationFeedbac
 
ผลกระทบเชิงลบ
ผลกระทบเชิงลบผลกระทบเชิงลบ
ผลกระทบเชิงลบKung Kaenchan
 
2010 Shanghai Day3
2010 Shanghai Day32010 Shanghai Day3
2010 Shanghai Day3ten1985
 
Smoking - The Thin Life Line
Smoking - The Thin Life LineSmoking - The Thin Life Line
Smoking - The Thin Life LineShehabKhan
 
2010 Shaighai Day4
2010 Shaighai Day42010 Shaighai Day4
2010 Shaighai Day4ten1985
 
2.2.1 project based learning
2.2.1 project based learning2.2.1 project based learning
2.2.1 project based learningYosti Saban
 
Cork EUDC Bid Document Revised 10/08/2014
Cork EUDC Bid Document Revised 10/08/2014Cork EUDC Bid Document Revised 10/08/2014
Cork EUDC Bid Document Revised 10/08/2014CorkEUDC
 
กลุ่ม Electron
กลุ่ม Electronกลุ่ม Electron
กลุ่ม ElectronKung Kaenchan
 

Destaque (20)

Prosecution history analysis
Prosecution history analysisProsecution history analysis
Prosecution history analysis
 
Umrah
UmrahUmrah
Umrah
 
2010上海自由行+世博會
2010上海自由行+世博會2010上海自由行+世博會
2010上海自由行+世博會
 
Amali Pengeringan Susu
Amali Pengeringan SusuAmali Pengeringan Susu
Amali Pengeringan Susu
 
Misirlou. Novembre 2013
Misirlou. Novembre 2013Misirlou. Novembre 2013
Misirlou. Novembre 2013
 
กล ม Electron ภาระก_จท__ 2
กล  ม Electron ภาระก_จท__ 2กล  ม Electron ภาระก_จท__ 2
กล ม Electron ภาระก_จท__ 2
 
Konsep-pendekatan-scientific-rev-final-1
 Konsep-pendekatan-scientific-rev-final-1 Konsep-pendekatan-scientific-rev-final-1
Konsep-pendekatan-scientific-rev-final-1
 
Feedbac: A Slide Deck About Me, Video Production, and Project Collaboration
Feedbac: A Slide Deck About Me, Video Production, and Project CollaborationFeedbac: A Slide Deck About Me, Video Production, and Project Collaboration
Feedbac: A Slide Deck About Me, Video Production, and Project Collaboration
 
Portfolio 2012
Portfolio 2012Portfolio 2012
Portfolio 2012
 
ผลกระทบเชิงลบ
ผลกระทบเชิงลบผลกระทบเชิงลบ
ผลกระทบเชิงลบ
 
Zakaat issues
Zakaat issuesZakaat issues
Zakaat issues
 
2010 Shanghai Day3
2010 Shanghai Day32010 Shanghai Day3
2010 Shanghai Day3
 
Smoking - The Thin Life Line
Smoking - The Thin Life LineSmoking - The Thin Life Line
Smoking - The Thin Life Line
 
TRBAJO
TRBAJOTRBAJO
TRBAJO
 
2010 Shaighai Day4
2010 Shaighai Day42010 Shaighai Day4
2010 Shaighai Day4
 
2.2.1 project based learning
2.2.1 project based learning2.2.1 project based learning
2.2.1 project based learning
 
Cork EUDC Bid Document Revised 10/08/2014
Cork EUDC Bid Document Revised 10/08/2014Cork EUDC Bid Document Revised 10/08/2014
Cork EUDC Bid Document Revised 10/08/2014
 
Licy lesson plan final
Licy lesson plan finalLicy lesson plan final
Licy lesson plan final
 
กลุ่ม Electron
กลุ่ม Electronกลุ่ม Electron
กลุ่ม Electron
 
Raise children
Raise childrenRaise children
Raise children
 

Semelhante a Completed project list for mark shaw 160614

Semelhante a Completed project list for mark shaw 160614 (20)

Dudley 2-7-2017
Dudley 2-7-2017Dudley 2-7-2017
Dudley 2-7-2017
 
Biron Resume 3
Biron Resume 3Biron Resume 3
Biron Resume 3
 
Doug's Resume 10-18-14
Doug's Resume 10-18-14Doug's Resume 10-18-14
Doug's Resume 10-18-14
 
Al's_Resume - Job Captain - Commercial
Al's_Resume - Job Captain - CommercialAl's_Resume - Job Captain - Commercial
Al's_Resume - Job Captain - Commercial
 
Optimum CM presentation
Optimum CM presentationOptimum CM presentation
Optimum CM presentation
 
Project List 1
Project List 1Project List 1
Project List 1
 
Lou Houlemarde
Lou HoulemardeLou Houlemarde
Lou Houlemarde
 
Master_Resume__Ron_White_9
Master_Resume__Ron_White_9Master_Resume__Ron_White_9
Master_Resume__Ron_White_9
 
Steve Binger - Resume & Project List
Steve Binger - Resume & Project ListSteve Binger - Resume & Project List
Steve Binger - Resume & Project List
 
Edward E calder CV 2014
Edward E calder CV 2014Edward E calder CV 2014
Edward E calder CV 2014
 
Project List 10-31-2016
Project List 10-31-2016Project List 10-31-2016
Project List 10-31-2016
 
STC Projects
STC ProjectsSTC Projects
STC Projects
 
Kbe parking structures
Kbe parking structuresKbe parking structures
Kbe parking structures
 
Eschenburg Resume 1
Eschenburg  Resume 1Eschenburg  Resume 1
Eschenburg Resume 1
 
Robin resume pub works
Robin resume pub worksRobin resume pub works
Robin resume pub works
 
Jabez Corp Flyer
Jabez Corp FlyerJabez Corp Flyer
Jabez Corp Flyer
 
Carlos Yibirin - CAY Group International 2014
Carlos Yibirin - CAY Group International 2014Carlos Yibirin - CAY Group International 2014
Carlos Yibirin - CAY Group International 2014
 
Martin L Reetz Resume 092215
Martin L Reetz Resume 092215Martin L Reetz Resume 092215
Martin L Reetz Resume 092215
 
New Jersey Projects
New Jersey ProjectsNew Jersey Projects
New Jersey Projects
 
Lab Photo Resume 2008
Lab Photo  Resume 2008Lab Photo  Resume 2008
Lab Photo Resume 2008
 

Último

Hajra Karrim: Transformative Leadership Driving Innovation and Efficiency in ...
Hajra Karrim: Transformative Leadership Driving Innovation and Efficiency in ...Hajra Karrim: Transformative Leadership Driving Innovation and Efficiency in ...
Hajra Karrim: Transformative Leadership Driving Innovation and Efficiency in ...dsnow9802
 
Management 11th Edition - Chapter 13 - Managing Teams
Management 11th Edition - Chapter 13 - Managing TeamsManagement 11th Edition - Chapter 13 - Managing Teams
Management 11th Edition - Chapter 13 - Managing Teamsshakkardaddy
 
HOTEL MANAGEMENT SYSTEM PPT PRESENTATION
HOTEL MANAGEMENT SYSTEM PPT PRESENTATIONHOTEL MANAGEMENT SYSTEM PPT PRESENTATION
HOTEL MANAGEMENT SYSTEM PPT PRESENTATIONsivani14565220
 
How Technologies will change the relationship with Human Resources
How Technologies will change the relationship with Human ResourcesHow Technologies will change the relationship with Human Resources
How Technologies will change the relationship with Human ResourcesMassimo Canducci
 
Operations Management -- Sustainability and Supply Chain Management.pdf
Operations Management -- Sustainability and Supply Chain Management.pdfOperations Management -- Sustainability and Supply Chain Management.pdf
Operations Management -- Sustainability and Supply Chain Management.pdfcoolsnoopy1
 
Overview PMI Infinity - UK Chapter presentation
Overview PMI Infinity - UK Chapter presentationOverview PMI Infinity - UK Chapter presentation
Overview PMI Infinity - UK Chapter presentationPMIUKChapter
 
BoSUSA23 | Chris Spiek & Justin Dickow | Autobooks Product & Engineering
BoSUSA23 | Chris Spiek & Justin Dickow | Autobooks Product & EngineeringBoSUSA23 | Chris Spiek & Justin Dickow | Autobooks Product & Engineering
BoSUSA23 | Chris Spiek & Justin Dickow | Autobooks Product & EngineeringBusiness of Software Conference
 
Management 11th Edition - Chapter 9 - Strategic Management
Management 11th Edition - Chapter 9 - Strategic ManagementManagement 11th Edition - Chapter 9 - Strategic Management
Management 11th Edition - Chapter 9 - Strategic Managementshakkardaddy
 
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...CIToolkit
 
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentFrom Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentCIToolkit
 
Management 11th Edition - Chapter 11 - Adaptive Organizational Design
Management 11th Edition - Chapter 11 - Adaptive Organizational DesignManagement 11th Edition - Chapter 11 - Adaptive Organizational Design
Management 11th Edition - Chapter 11 - Adaptive Organizational Designshakkardaddy
 
Exploring Variable Relationships with Scatter Diagram Analysis
Exploring Variable Relationships with Scatter Diagram AnalysisExploring Variable Relationships with Scatter Diagram Analysis
Exploring Variable Relationships with Scatter Diagram AnalysisCIToolkit
 
The Role of Histograms in Exploring Data Insights
The Role of Histograms in Exploring Data InsightsThe Role of Histograms in Exploring Data Insights
The Role of Histograms in Exploring Data InsightsCIToolkit
 
Better SAFe than sorry - Why scaled agile frameworks do not necessarily impro...
Better SAFe than sorry - Why scaled agile frameworks do not necessarily impro...Better SAFe than sorry - Why scaled agile frameworks do not necessarily impro...
Better SAFe than sorry - Why scaled agile frameworks do not necessarily impro...Conny Dethloff
 
Advancing Enterprise Risk Management Practices- A Strategic Framework by Naga...
Advancing Enterprise Risk Management Practices- A Strategic Framework by Naga...Advancing Enterprise Risk Management Practices- A Strategic Framework by Naga...
Advancing Enterprise Risk Management Practices- A Strategic Framework by Naga...Nagarjuna Reddy Aturi
 
Adapting to Change: Using PEST Analysis for Better Decision-Making
Adapting to Change: Using PEST Analysis for Better Decision-MakingAdapting to Change: Using PEST Analysis for Better Decision-Making
Adapting to Change: Using PEST Analysis for Better Decision-MakingCIToolkit
 
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic TraitsDigital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic TraitsHannah Smith
 
The Role of Box Plots in Comparing Multiple Data Sets
The Role of Box Plots in Comparing Multiple Data SetsThe Role of Box Plots in Comparing Multiple Data Sets
The Role of Box Plots in Comparing Multiple Data SetsCIToolkit
 
Mind Mapping: A Visual Approach to Organize Ideas and Thoughts
Mind Mapping: A Visual Approach to Organize Ideas and ThoughtsMind Mapping: A Visual Approach to Organize Ideas and Thoughts
Mind Mapping: A Visual Approach to Organize Ideas and ThoughtsCIToolkit
 
The Final Activity in Project Management
The Final Activity in Project ManagementThe Final Activity in Project Management
The Final Activity in Project ManagementCIToolkit
 

Último (20)

Hajra Karrim: Transformative Leadership Driving Innovation and Efficiency in ...
Hajra Karrim: Transformative Leadership Driving Innovation and Efficiency in ...Hajra Karrim: Transformative Leadership Driving Innovation and Efficiency in ...
Hajra Karrim: Transformative Leadership Driving Innovation and Efficiency in ...
 
Management 11th Edition - Chapter 13 - Managing Teams
Management 11th Edition - Chapter 13 - Managing TeamsManagement 11th Edition - Chapter 13 - Managing Teams
Management 11th Edition - Chapter 13 - Managing Teams
 
HOTEL MANAGEMENT SYSTEM PPT PRESENTATION
HOTEL MANAGEMENT SYSTEM PPT PRESENTATIONHOTEL MANAGEMENT SYSTEM PPT PRESENTATION
HOTEL MANAGEMENT SYSTEM PPT PRESENTATION
 
How Technologies will change the relationship with Human Resources
How Technologies will change the relationship with Human ResourcesHow Technologies will change the relationship with Human Resources
How Technologies will change the relationship with Human Resources
 
Operations Management -- Sustainability and Supply Chain Management.pdf
Operations Management -- Sustainability and Supply Chain Management.pdfOperations Management -- Sustainability and Supply Chain Management.pdf
Operations Management -- Sustainability and Supply Chain Management.pdf
 
Overview PMI Infinity - UK Chapter presentation
Overview PMI Infinity - UK Chapter presentationOverview PMI Infinity - UK Chapter presentation
Overview PMI Infinity - UK Chapter presentation
 
BoSUSA23 | Chris Spiek & Justin Dickow | Autobooks Product & Engineering
BoSUSA23 | Chris Spiek & Justin Dickow | Autobooks Product & EngineeringBoSUSA23 | Chris Spiek & Justin Dickow | Autobooks Product & Engineering
BoSUSA23 | Chris Spiek & Justin Dickow | Autobooks Product & Engineering
 
Management 11th Edition - Chapter 9 - Strategic Management
Management 11th Edition - Chapter 9 - Strategic ManagementManagement 11th Edition - Chapter 9 - Strategic Management
Management 11th Edition - Chapter 9 - Strategic Management
 
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
Paired Comparison Analysis: A Practical Tool for Evaluating Options and Prior...
 
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light AssessmentFrom Red to Green: Enhancing Decision-Making with Traffic Light Assessment
From Red to Green: Enhancing Decision-Making with Traffic Light Assessment
 
Management 11th Edition - Chapter 11 - Adaptive Organizational Design
Management 11th Edition - Chapter 11 - Adaptive Organizational DesignManagement 11th Edition - Chapter 11 - Adaptive Organizational Design
Management 11th Edition - Chapter 11 - Adaptive Organizational Design
 
Exploring Variable Relationships with Scatter Diagram Analysis
Exploring Variable Relationships with Scatter Diagram AnalysisExploring Variable Relationships with Scatter Diagram Analysis
Exploring Variable Relationships with Scatter Diagram Analysis
 
The Role of Histograms in Exploring Data Insights
The Role of Histograms in Exploring Data InsightsThe Role of Histograms in Exploring Data Insights
The Role of Histograms in Exploring Data Insights
 
Better SAFe than sorry - Why scaled agile frameworks do not necessarily impro...
Better SAFe than sorry - Why scaled agile frameworks do not necessarily impro...Better SAFe than sorry - Why scaled agile frameworks do not necessarily impro...
Better SAFe than sorry - Why scaled agile frameworks do not necessarily impro...
 
Advancing Enterprise Risk Management Practices- A Strategic Framework by Naga...
Advancing Enterprise Risk Management Practices- A Strategic Framework by Naga...Advancing Enterprise Risk Management Practices- A Strategic Framework by Naga...
Advancing Enterprise Risk Management Practices- A Strategic Framework by Naga...
 
Adapting to Change: Using PEST Analysis for Better Decision-Making
Adapting to Change: Using PEST Analysis for Better Decision-MakingAdapting to Change: Using PEST Analysis for Better Decision-Making
Adapting to Change: Using PEST Analysis for Better Decision-Making
 
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic TraitsDigital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
Digital PR Summit - Leadership Lessons: Myths, Mistakes, & Toxic Traits
 
The Role of Box Plots in Comparing Multiple Data Sets
The Role of Box Plots in Comparing Multiple Data SetsThe Role of Box Plots in Comparing Multiple Data Sets
The Role of Box Plots in Comparing Multiple Data Sets
 
Mind Mapping: A Visual Approach to Organize Ideas and Thoughts
Mind Mapping: A Visual Approach to Organize Ideas and ThoughtsMind Mapping: A Visual Approach to Organize Ideas and Thoughts
Mind Mapping: A Visual Approach to Organize Ideas and Thoughts
 
The Final Activity in Project Management
The Final Activity in Project ManagementThe Final Activity in Project Management
The Final Activity in Project Management
 

Completed project list for mark shaw 160614

  • 1. MARK D. SHAW 105 Catchpenny Ct. mdshaw2009@gmail.com M: (919) 621-7909 Cary, NC 27519-5113 www.linkedin/in/mdshaw2009 TECHNICAL ADDENDUM COMPLETED PROJECTS Project Manager & Superintendent, West Rock Builders, LLC, Apex, NC 2015-2016 Bldg. 2525 New Lobby Addition and Renovation, RTP, NC. Removed and replaced the lobby area with new modern curtainwall enclosed conference rooms, break room and entrance. Contract value $2.8 million. Project Manager, Resolute Building Co., Inc., Chapel Hill, NC 2013-2015 East 54-Building 5000, Chapel Hill, NC. Constructed a 110,000 SF, 5-story, 58-unit multi-family building. Contract value $7.9 million. Piedmont Access to Health Services, Danville, VA. Built a 14,000 SF addition to and renovation of an existing medical office building. Contract value $2.2 million. Project Manager, John S. Clark Company, LLC, Mt. Airy, NC 2012-2013 Completed the project closeout and the punch list on several projects throughout North Carolina and Virginia including; Primland Resort, ASU Student Dormitory, Newton-Conover MS, Lucas MS, NC Veterans Home, Walmart and a Target store. Project Manager, D.H. Griffin Construction Co., Raleigh, NC 2009-2011 High Point University Summer Dorm Renovations, High Point, NC. Cleaned, repaired and painted 400 dorm rooms to the very high standards of HPU in nine weeks. NC A&T State University, New General Classroom & Lecture Hall, Greensboro, NC: Completed an 88,000 SF, 3-story, state of the art teaching facility with an open 3-story atrium and multi-story lecture hall. Contract value $20.9 million. Mills Park Middle School, Cary, NC: Completed a 196,000 SF, 3-story, energy efficient school with athletic fields/track, parking lot and roadway improvements 3-weeks early. Contract value $39.1 million. Project Manager, Shelco, Inc., Raleigh, North Carolina 2003-2009 Windsor Manor Parking Deck, Raleigh, NC: Constructed a 490 space, six level precast concrete parking deck. Contract value $6.2 million. JDL Castle/GSA Data Center, Durham, NC: Completed the foundations and structural steel for a 105,000 SF primary data center for the federal government. Contract value $47.5 million. Targacept Laboratory Renovation, Winston-Salem, NC: Converted 10,000 SF of office space to a clean barrier biotech research laboratory. Contract value $3.3 million. REX Healthcare Wound Clinic, Raleigh, NC: Convert 5,200 SF of office space into a medical procedures facility operating four hyperbaric chambers. Contract value $300,000.
  • 2. MARK D. SHAW 105 Catchpenny Ct. mdshaw2009@gmail.com M: (919) 621-7909 Cary, NC 27519-5113 www.linkedin/in/mdshaw2009 Richard H. Dean Biomedical Research Building, Winston-Salem, NC: Construction of a five story, 180,434 SF Class A biotechnology research laboratory with 453 space precast concrete parking deck. Contract value $72.6 million. Partners III Research Center and Parking Deck, Raleigh, NC: Construction of a three story, 80,000 SF research center with 640 space precast concrete parking deck. Contract value $17 million. Project Manager, J.W. Grand Inc., Raleigh, North Carolina 2002-2003 Selma Elementary School, Selma, NC: Construction of new elementary school including classrooms, kitchen, restrooms, auditorium, media center and administration area. Contract value $5.7 million. Brookes Avenue Church of Christ, Raleigh, NC: Renovations to the auditorium, balcony, restrooms and Lobby area. Contract value $365,790. Sterling Montessori Academy – Building C-2, Morrisville, NC: Addition to an existing building consisting of four classrooms, restrooms and offices. Contract value $786,604. Project Manager, Archer Western Contractors LTD, Raleigh, North Carolina 2001-2002 RDU Airport, Parking Garage 4, Raleigh, NC: Construction of new 2.1 million SF post-tensioned cast-in-place concrete parking structure. Contract value of garage: $71.8 million. Project Manager, S.B. Ballard Construction Company, Norfolk, Virginia 2000-2001 Norfolk International Airport Parking Garage A, Norfolk, VA: Construction of new 1.5 million SF, 9- level, post-tensioned cast-in-place concrete parking structure. Contract value $30.8 million. Project Manager – Civil, Pizzagalli Construction Company, S. Burlington, Vermont 1998-2000 Seneca WWTP Expansion, Germantown, MD: Coordinated all work and documentation associated with civil work activities. Contract value $47.3 million. Seneca WWTP Upgrade, Germantown, MD: Supervised completion of punch list activities involving the coordination of sixteen subcontractors and vendors. Original contract value $24.5 million. Assistant Project Manager, Pizzagalli Construction Company 1995-1998 Culinary Institute of America Facility Renovations, Hyde Park, NY: Prepared bid documents, conducted pre-bid conferences, accepted and reviewed bid proposals for several renovation projects at the Culinary Institute. Contract value $3.1 million. Moores Bridges Water Treatment Plant Upgrade, Norfolk, VA: Expanded capacity of an existing plant from 78 MGD to 108 MGD with additional modifications to provide the required process improvements to handle the added capacity. Contract value $108.9 million.
  • 3. MARK D. SHAW 105 Catchpenny Ct. mdshaw2009@gmail.com M: (919) 621-7909 Cary, NC 27519-5113 www.linkedin/in/mdshaw2009 Project Engineer, The Hardaway Company, Columbus, Georgia 1986-1995 U.S. Route 13 Bridge over Duck Creek, Smyrna, DE: Demolition and construction of a four-lane bridge replacing an existing seventy-year old structure. Contract value $1.4 million. DE Route 1 - Korean War Veterans Highway, Bear, DE: Constructed 3.04 miles of six lane concrete highway with twelve bridges over tidal wetlands and new and existing roadways. Contract value $32.6 million. DE Route 1 - Korean War Veterans Highway, Smyrna, DE: Constructed 5.64 miles of four lane concrete highway with nine bridges over tidal wetlands and new and existing roadways. Contract value $40.9 million. U.S. Route 50 Improvements at Cape St. Claire Road, Annapolis, MD: Constructed a cloverleaf intersection with a steel girder bridge over an existing six-lane highway. Contract value $19.0 million. U.S. Route 50 Vienna Bypass, Vienna, MD: Constructed 3.5 miles of four-lane highway with a one- mile long high-rise bridge over the Nanticoke River. Contract value $51.2 million. Land Level Ship Construction Facility, Newport News, VA: Construction of cast-in-place concrete dry-dock and berthing facility for nuclear submarines. Contract value $22.6 million. H