Man Singh, P. Eng 123, Hampshire Grove, NW, Calgary, AB T3A 5A5
mansingh99@yahoo.com Tel. No. (403) 619 -1833
Special Achievements through creative design in real life engineering
 Saved around 20 Million dollars’ worth of earthwork just by rotating the whole plant by 180
degrees. 500,000 m3 cut and fill was reduced by simple decision.
 Implemented large scale soil stabilization program leading to an overall cost casing of around 10
million dollars in overall construction man hours for Jackfish 3 Project of Devon. Savings in terms
of schedule is unaccounted.
 Saved around 30 weeks in construction schedule in construction of Tank foundations by
incorporating Cemtarix Bas and soil stabilization. (Jackfish 3). Jackfish 2 it took around one whole
year and in jackfish 3 same tank pads were build within 4 months.
 Saved around $5 million by challenging decision of EPC to go for stone column tank bases (Tank
terminal Project) just by spending around $15000 extra by seeking second opinion from some
independent Geotechnical consultant.
 Reduced Tank pad height by proposing bigger horse power pumps and saved 1.5 m depth of
pad. (Ferrier)
 Vendor (KAWASAKI) was technically convinced to increase Allowable Vibration Amplitude to 30
Micron from a very stringent initial value of 5 Micron for Foundation for Compressor in ZIRKU
(Abu Dhabi, UAE) based Satah Oil Processing Plant. A net saving of $ 55000.00.
 Simply tapering of Solar Panel foundations in the zone where anchor bolts were not required and
saved around 1 m^3 concrete in each foundation causing a net saving of around $ 560,000.00
to company. (Project for Catholic Protection of ADCO Wells casings - around 1072 wells.)
 In the same project, proposal of using a common foundation for RTU and Junction Box caused
100 % reduction in Number of foundation & Steel supports and a drastic reduction in Cable and
its trench lengths. It led to an overall saving of more than a million dollar.
Projects worked on
AT CH2M Hill, Canada
 JKC, Australia: Ichthys LNG project Power Plant
Reporting to Deputy Project Director, My role as a package Project Manager is to take the lead
and focal point position for the commercial and technical management of fabrication of around
6000 T of modularized steel pipe racks with piping and insulation at Hyundai workshops in South
Korea. It is US$ 700 Million - 800MW Combined Cycle power plant (5 GTG’s and 3STG’s) for an
LNG project in Darwin Australia. It included commercial performance, quality, schedule
compliance, technical compliance, innovation, site support, and delivery to site. I was a focal point
between vendor and the design, procurement, transportation / shipping and construction functions
of the project. , my role was to sort out all technical and logistics issues to ensure timely
shipment of modules to site in Darwin from South Korea. It was aimed at management of delivery
project management services related to project engineering and procurement. Conducted home
office constructability reviews prior to mobilizing to the field and assisted home office Engineering
manager from time to time to conduct pre-IFC module readiness assessments. Coordinated with
Home Office Engineering team to collaboratively resolve design queries.
Suncor EnergyCanada : Fort Hills Project: Water Treatment Plant Building
 Reporting to project engineer/manager, my role was to carry out structural design of all post
construction modification / field support works including underground pipe supports, manhole
covers etc.
City of Calgary
 Bonny brook WWTP Upgradation: Reporting to project manager/Engineer my role was to carry
out all aspects of Civil/ Structural design and vibration free demolition and installations of 2000
HP Blower foundations and other associated structures.
 Spy Hill SVE Blower Upgradation: C/S support for various post construction issues.
Trans Canada Pipelines : Proposals for Compressor Station for TCPL
Husky Energy : Construction support for Husky Sunrise Project
Statoil : Construction support for Statoil Oil processing facility
Devon Corporation: Alliance projects for Devon Corporation’s Jackfish 1, Jackfish 2 and
Jackfish 3 Oil processing SAGD plants including associated pipelines.
 At Devon Corporation, Canada
 Jackfish 3 Project: 1.2 Billion US$ SAGD project in Christina Lake: Project includes a
central processing facility 5 pads and associated pipelines.
 Ferrier Project :
330 Million $ project for Oil and Gas processing plant in Ferrier near Rocky Mountain House
containing shallow Cut, Deep Cut and processing areas. Ambitious Pilot plan for Devon to
transport the product to transport gas to West coast.
 Jackfish Tank Terminal
 $220 million plant to build 1 Million barrel capacity storage tank farm facility to pool the oil from
various Devon jackfish plants.
 Other Alliance projects
 Installation of SRU units at all Jackfish facilities to meet regulatory requirement on sulfur
emissions along with other debottlenecking projects for Jackfish 1 and jackfish 2 projects.

At CH2M Hill, Canada
 Vankor Oil Field Development , Russia: Total $3.3 Billion Development in Permafrost
Siberia region: Project includes a central processing facility 5 pumping stations and a 550 KM
long pipeline along with 22 well pads (Total 321 Well).
 This portion is 330 Million $ component of the above project. Major activities being performed
by me are: Review of FEED, Estimation of man-hours, and preparation of DBM, Detailed
engineering design for in place, lifting and transportation loads. Dynamic analysis and design
for dynamic loads originating out of high speed Rotating machines, wind Vortex shedding and
earthquake (Seismic activities). Over all engineering coordination between Client Roseneft,
Russian National Design Company NTC, other consultant SNC Lavalin (UK) and Kluster
Consultants of Moscow.
 Johns Manville Expansion Project, Innisfail, Alberta (70 Million US$): Estimation of Man-hours,
List of deliverables, Scope of the work for Geotechnical Investigation and Topographical
survey, Specifications, and Detailed design of Steel Structures, Piling and other Reinforced
Concrete foundations, Review of Shop Drawings, construction Engineering etc. were my
responsibilities. Project completed within estimates and budgeted man-hours which is a very
rare in current labor and material scenario in Alberta.
 Trans Canada Pipeline Ltd. - Edson Gas Storage Facilities: My involvement was to carry out
detailed design of Equipment Foundations, Design Audit and troubleshooting during
construction phase.
 Miscellaneous Modification/Expansion projects from Duke Energy, Conoco Phillips etc.:
Installation of Compressor stations etc.: My involvement so far is limited to preparation of civil
package of the proposal to the client.
 Shell Canada AOSP Downstream Expansion Project (Methane Reformer Building): Carried
out Estimation, Provided Basic Engineering Support and 3-D modeling for UHDE Germany.
 ZADCO, UAE: Satah Full Field Development Project FEED: Estimated Man-hours and other
civil engineering inputs for the proposal
 ADCO: SAS Full Field Development Project, Abu Dhabi, UAE: Estimated Man-hours and other
civil engineering inputs for the proposal
At NPCC Abu Dhabi
 Prepared a Civil/Structural package of Tender (latest for OGDIII project of US$ 360 Million),
Carried out Design of Pipe Racks, Control buildings, foundations for compressor, pumps,
exchangers, columns, tanks and other pressure vessels, chimneys, platforms etc. as required in
Oil & Gas and petrochemical plants for the following projects.
 Satah Plant Modifications (ZADCO): Lead Civil / Structural Engineer (Tender Package –
Detailed Engineering – Construction Engineering). The project contained two packages:
 Work Package 1: Satah Dehydration/Desalting and Sour Water Treatment facilities in which
work involved was Structural design of foundations of Desalter Skids, Vertical Desalter FEED
Pumps, Sour Water Stripper Column, Stripper FEED Filters along with other general Civil
Structural works like Pipe racks, T- Post Pipe Supports etc. Total Package cost was $ 80
Million.
 Work Package 2: This $70 Million Package consisted of installation of a Stand By/ by pass
Export Gas Compressor unit and included a 4.6 MW Compressor, Knock out Drums, Suction
Scrubbers, Discharge Gas Cooler (Air Fin Cooler) and Trim Cooler along with other
associated accessories.
 Unleaded Gasoline/Low Sulphur Gas Oil (ULG/LSGO) project for Umm Al Nar Refinery Abu
Dhabi, UAE (TAKREER):Discipline Engineer specifically to Design its Blast Resistant Control
Room Building.
 Cathodic Protection of ADCO Well Casings (ADCO): Lead Civil/Structural Engineer
 (Tender Package – Detailed Engineering – Construction Engineering)
 Onshore Facilities at Juyamah: for Saudi Aramco: Lead Civil Engineer (Tender Package –
Construction Engineering)
 Replacement of 5 Nos. 20” water Injection Trunk lines for ADMA OPCO: Lead Civil/Structural
Engineer ( Tender Package – Detailed Engineering – Construction Engineering )
 ADCO on Shore Gas Development Project (OGD III): Lead Engineer for preparation of
Civil/Structural Inputs for Tender package of $ 360 Million: Company won the contract. It
involved development of 50 No. of Production well heads , 30 number of Re-Injection
Wellheads, 6 Number of Remote Manifold Stations(RMS) , re-injection Launcher and receiver
stations for 5 trunk lines, Burn Pits, Flare areas.
My role as Lead Civil/Structural Engineer included detailed Design of Compressor
Foundation, Extension of Blast Resistant Local Equipment Room, Substation design,
Equipment foundations, Valve Manifold Platforms, Pipe Racks and Modifications to existing
Structures and under Ground facilities along with general civil structural works described in
the summery of experience on the first page. I acted as overall Engineering Coordinator in
absence of Project Engineering Manager and successfully coordinated between client,
consultant and sub-contractors.
AT TECHNIP Malaysia
 Kuantan Waste Water Treatment and Debottleneck Plant for BP – AMOCO: A $70 Million
project in which I carried out Detailed design of Compressor Foundation, RC Foundation
and Steel super structure for Filter Press, Sludge Silo, Storage Tanks, Substation, Pump
Foundations, Pipe racks, Access platforms, RCC & Steel Staircases.
 Petronas Second Refinery Modifications (PSR2) Melaka for Petronas. : A $ 20 Million
Project to install fire water Line, Foam water line, Remote Elevated Monitors, Fire walls,
Sprinkler system on Tanks, Pumps etc. My role was to prepare a tender package, Detailed
engineering of all associated civil/structural works.
 Petlin Low Density Poly Ethylene (LDPE) Project Kerteh: My role as a discipline Engineer
was to carry out detailed engineering design of Administrative Office, Control Room Building,
Pipe Racks, Administrative Building, and Storage warehouse. I was deputed to Vantage
Fabrication yard to coordinate between design office and mod yard to
troubleshoot/supervise/inspect the steel fabrication work also.
 Goro Nickel Project : New Caledonia
 Asia Silicon Ltd Thailand. – Tender package
 Betara Gas Field Development Project Indonesia – Tender Package
 Asia THF/POLY THF Project Kaojing China for BASF – Tender package
AT Maunsell Malaysia (AECOM)
 Design of Pahang Cement Plant, Bukit Sagu, Malaysia .( on deputation to YTL Malaysia)
 Design/coordination of Vima Flour Mill, Vietnam.
 Design of Sutera Harbor Business & Resort Hotel Kota Kina Balu , Malaysia (13 story building
for Nishimatsu-Corpro)
 Design of Sarawak security building (a 33 story building with Barret piles by Bachey & unique
upside –down construction. Design of Turbo Generator Foundations of Sonipat Thermal
Power Plant and monitoring of its post construction behavior.
AT SERC INDIA
 Structural analysis of Tajmahal the world famous monument, with a 3-D FEM modeling
including fracture mechanics studies on cracks Propagation. COSMOS/M FEM software was
used.
 Strength assessmentand rehabilitation of fire ruined Turbine Foundations of Narora Atomic
Power Plant including its static and dynamic analysis.
AT Gherzi India
 Expansion of Mathura Petroleum Refinery, India
 Guyed Tower Platform under random sea: Oil and Natural Gas Commission India.
 Design of Rajghat Thermal Power plant , New Delhi.(Parts)
 Dynamic analysis of Park Royal Hotel in New Delhi for Earthquake loads.
 Design of `The Statesman House’: a peculiar 17 story circular building with ring beams
carrying floating columns of 17 floors.

More Related Content

What's hot (20)

Structural Engineer_Duong Quoc Huan_2015
Structural Engineer_Duong Quoc Huan_2015Structural Engineer_Duong Quoc Huan_2015
Structural Engineer_Duong Quoc Huan_2015
 
Resume_Basavarajappa. L N
Resume_Basavarajappa. L NResume_Basavarajappa. L N
Resume_Basavarajappa. L N
 
Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16
 
Satyavir-Resume_01
Satyavir-Resume_01Satyavir-Resume_01
Satyavir-Resume_01
 
Marchiori jobs list_r2
Marchiori jobs list_r2Marchiori jobs list_r2
Marchiori jobs list_r2
 
Sripadasagar project
Sripadasagar projectSripadasagar project
Sripadasagar project
 
CV TO DATE 25062015
CV TO DATE 25062015CV TO DATE 25062015
CV TO DATE 25062015
 
Scott Smith-complete-employment-history
Scott Smith-complete-employment-historyScott Smith-complete-employment-history
Scott Smith-complete-employment-history
 
Yasser Hatem CV
Yasser Hatem CVYasser Hatem CV
Yasser Hatem CV
 
Clough CH-IV Brochure
Clough CH-IV BrochureClough CH-IV Brochure
Clough CH-IV Brochure
 
Ibrahim Nabawy CV 3 .2017
Ibrahim Nabawy CV 3 .2017Ibrahim Nabawy CV 3 .2017
Ibrahim Nabawy CV 3 .2017
 
Muhammad Aamir Javed
Muhammad Aamir JavedMuhammad Aamir Javed
Muhammad Aamir Javed
 
MCS Presentation
MCS PresentationMCS Presentation
MCS Presentation
 
78-83-NovDec12
78-83-NovDec1278-83-NovDec12
78-83-NovDec12
 
CV PMG
CV PMGCV PMG
CV PMG
 
CV_AKSHAY RAJPUT
CV_AKSHAY RAJPUTCV_AKSHAY RAJPUT
CV_AKSHAY RAJPUT
 
Javed Sultan
Javed SultanJaved Sultan
Javed Sultan
 
CV Bernard Graves
CV Bernard GravesCV Bernard Graves
CV Bernard Graves
 
JA CV 050915 (1) (1)
JA CV 050915 (1) (1)JA CV 050915 (1) (1)
JA CV 050915 (1) (1)
 
KallalArunCV_TCS
KallalArunCV_TCSKallalArunCV_TCS
KallalArunCV_TCS
 

Viewers also liked (6)

Senthilraj_Civil & Structural Engineer
Senthilraj_Civil & Structural EngineerSenthilraj_Civil & Structural Engineer
Senthilraj_Civil & Structural Engineer
 
Paryavaran bhawan
Paryavaran bhawanParyavaran bhawan
Paryavaran bhawan
 
The statesman
The statesmanThe statesman
The statesman
 
Indira paryavaran bhawan and griha
Indira paryavaran bhawan and grihaIndira paryavaran bhawan and griha
Indira paryavaran bhawan and griha
 
Architectural design
Architectural designArchitectural design
Architectural design
 
Presentation on lic of india
Presentation on lic of indiaPresentation on lic of india
Presentation on lic of india
 

Similar to projects

Robert Zachowski Mechanical Engineer Resume 10-25-16
Robert Zachowski Mechanical Engineer Resume 10-25-16Robert Zachowski Mechanical Engineer Resume 10-25-16
Robert Zachowski Mechanical Engineer Resume 10-25-16
Robert Zachowski
 
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
amr mahrous
 
CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1
Dan Caouette
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017
R S Rajaram
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017
R S Rajaram
 
Sr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
Sr Cost Estimator-Resume (July 2016)-Pankaj KisnadwalaSr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
Sr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
Pankaj Kisnadwala
 
Pic booklet screen view 2
Pic booklet   screen view 2Pic booklet   screen view 2
Pic booklet screen view 2
Amin Hadjaran
 
JNJ CV _OilAndGas rev02
JNJ CV _OilAndGas rev02JNJ CV _OilAndGas rev02
JNJ CV _OilAndGas rev02
Jamal Jamil
 
Engineer and Project management CV 'Ali Al Obaidy
Engineer and Project management  CV 'Ali Al ObaidyEngineer and Project management  CV 'Ali Al Obaidy
Engineer and Project management CV 'Ali Al Obaidy
Ali Alobaidy
 
Rusty Adkins Resume
Rusty Adkins ResumeRusty Adkins Resume
Rusty Adkins Resume
Rusty Adkins
 
EdwardRueblingResume-7-20-16
EdwardRueblingResume-7-20-16EdwardRueblingResume-7-20-16
EdwardRueblingResume-7-20-16
Edward Ruebling
 
Resume_Krishna Kumar_Btech_EL
Resume_Krishna Kumar_Btech_ELResume_Krishna Kumar_Btech_EL
Resume_Krishna Kumar_Btech_EL
krishna kumar
 
CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016
Rolando Garcia
 

Similar to projects (20)

Robert Zachowski Mechanical Engineer Resume 10-25-16
Robert Zachowski Mechanical Engineer Resume 10-25-16Robert Zachowski Mechanical Engineer Resume 10-25-16
Robert Zachowski Mechanical Engineer Resume 10-25-16
 
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
 
CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1CARGILLPROJOVERVIEW_rev1
CARGILLPROJOVERVIEW_rev1
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017
 
R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017R_S_Rajaram_CV_Feb_2017
R_S_Rajaram_CV_Feb_2017
 
Sr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
Sr Cost Estimator-Resume (July 2016)-Pankaj KisnadwalaSr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
Sr Cost Estimator-Resume (July 2016)-Pankaj Kisnadwala
 
Pic booklet screen view 2
Pic booklet   screen view 2Pic booklet   screen view 2
Pic booklet screen view 2
 
Work Experience
Work ExperienceWork Experience
Work Experience
 
Aac booklet
Aac bookletAac booklet
Aac booklet
 
CVAQ5
CVAQ5CVAQ5
CVAQ5
 
JNJ CV _OilAndGas rev02
JNJ CV _OilAndGas rev02JNJ CV _OilAndGas rev02
JNJ CV _OilAndGas rev02
 
Robin dargavel consutant mechanical - facilities engineer
Robin dargavel   consutant mechanical - facilities engineerRobin dargavel   consutant mechanical - facilities engineer
Robin dargavel consutant mechanical - facilities engineer
 
Engineer and Project management CV 'Ali Al Obaidy
Engineer and Project management  CV 'Ali Al ObaidyEngineer and Project management  CV 'Ali Al Obaidy
Engineer and Project management CV 'Ali Al Obaidy
 
Linkedin
LinkedinLinkedin
Linkedin
 
Rusty Adkins Resume
Rusty Adkins ResumeRusty Adkins Resume
Rusty Adkins Resume
 
Linked In Pres R Toet Rev1
Linked In Pres R Toet Rev1Linked In Pres R Toet Rev1
Linked In Pres R Toet Rev1
 
EdwardRueblingResume-7-20-16
EdwardRueblingResume-7-20-16EdwardRueblingResume-7-20-16
EdwardRueblingResume-7-20-16
 
Resume_Krishna Kumar_Btech_EL
Resume_Krishna Kumar_Btech_ELResume_Krishna Kumar_Btech_EL
Resume_Krishna Kumar_Btech_EL
 
CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016CV_Rolando M. Garcia_Feb 2016
CV_Rolando M. Garcia_Feb 2016
 
7th study meeting Tokyo - Holger Bietz
7th study meeting Tokyo - Holger Bietz7th study meeting Tokyo - Holger Bietz
7th study meeting Tokyo - Holger Bietz
 

projects

  • 1. Man Singh, P. Eng 123, Hampshire Grove, NW, Calgary, AB T3A 5A5 mansingh99@yahoo.com Tel. No. (403) 619 -1833 Special Achievements through creative design in real life engineering  Saved around 20 Million dollars’ worth of earthwork just by rotating the whole plant by 180 degrees. 500,000 m3 cut and fill was reduced by simple decision.  Implemented large scale soil stabilization program leading to an overall cost casing of around 10 million dollars in overall construction man hours for Jackfish 3 Project of Devon. Savings in terms of schedule is unaccounted.  Saved around 30 weeks in construction schedule in construction of Tank foundations by incorporating Cemtarix Bas and soil stabilization. (Jackfish 3). Jackfish 2 it took around one whole year and in jackfish 3 same tank pads were build within 4 months.  Saved around $5 million by challenging decision of EPC to go for stone column tank bases (Tank terminal Project) just by spending around $15000 extra by seeking second opinion from some independent Geotechnical consultant.  Reduced Tank pad height by proposing bigger horse power pumps and saved 1.5 m depth of pad. (Ferrier)  Vendor (KAWASAKI) was technically convinced to increase Allowable Vibration Amplitude to 30 Micron from a very stringent initial value of 5 Micron for Foundation for Compressor in ZIRKU (Abu Dhabi, UAE) based Satah Oil Processing Plant. A net saving of $ 55000.00.  Simply tapering of Solar Panel foundations in the zone where anchor bolts were not required and saved around 1 m^3 concrete in each foundation causing a net saving of around $ 560,000.00 to company. (Project for Catholic Protection of ADCO Wells casings - around 1072 wells.)  In the same project, proposal of using a common foundation for RTU and Junction Box caused 100 % reduction in Number of foundation & Steel supports and a drastic reduction in Cable and its trench lengths. It led to an overall saving of more than a million dollar.
  • 2. Projects worked on AT CH2M Hill, Canada  JKC, Australia: Ichthys LNG project Power Plant Reporting to Deputy Project Director, My role as a package Project Manager is to take the lead and focal point position for the commercial and technical management of fabrication of around 6000 T of modularized steel pipe racks with piping and insulation at Hyundai workshops in South Korea. It is US$ 700 Million - 800MW Combined Cycle power plant (5 GTG’s and 3STG’s) for an LNG project in Darwin Australia. It included commercial performance, quality, schedule compliance, technical compliance, innovation, site support, and delivery to site. I was a focal point between vendor and the design, procurement, transportation / shipping and construction functions of the project. , my role was to sort out all technical and logistics issues to ensure timely shipment of modules to site in Darwin from South Korea. It was aimed at management of delivery project management services related to project engineering and procurement. Conducted home office constructability reviews prior to mobilizing to the field and assisted home office Engineering manager from time to time to conduct pre-IFC module readiness assessments. Coordinated with Home Office Engineering team to collaboratively resolve design queries. Suncor EnergyCanada : Fort Hills Project: Water Treatment Plant Building  Reporting to project engineer/manager, my role was to carry out structural design of all post construction modification / field support works including underground pipe supports, manhole covers etc. City of Calgary  Bonny brook WWTP Upgradation: Reporting to project manager/Engineer my role was to carry out all aspects of Civil/ Structural design and vibration free demolition and installations of 2000 HP Blower foundations and other associated structures.  Spy Hill SVE Blower Upgradation: C/S support for various post construction issues. Trans Canada Pipelines : Proposals for Compressor Station for TCPL Husky Energy : Construction support for Husky Sunrise Project Statoil : Construction support for Statoil Oil processing facility Devon Corporation: Alliance projects for Devon Corporation’s Jackfish 1, Jackfish 2 and Jackfish 3 Oil processing SAGD plants including associated pipelines.  At Devon Corporation, Canada  Jackfish 3 Project: 1.2 Billion US$ SAGD project in Christina Lake: Project includes a central processing facility 5 pads and associated pipelines.  Ferrier Project : 330 Million $ project for Oil and Gas processing plant in Ferrier near Rocky Mountain House containing shallow Cut, Deep Cut and processing areas. Ambitious Pilot plan for Devon to transport the product to transport gas to West coast.  Jackfish Tank Terminal  $220 million plant to build 1 Million barrel capacity storage tank farm facility to pool the oil from various Devon jackfish plants.  Other Alliance projects  Installation of SRU units at all Jackfish facilities to meet regulatory requirement on sulfur emissions along with other debottlenecking projects for Jackfish 1 and jackfish 2 projects. 
  • 3. At CH2M Hill, Canada  Vankor Oil Field Development , Russia: Total $3.3 Billion Development in Permafrost Siberia region: Project includes a central processing facility 5 pumping stations and a 550 KM long pipeline along with 22 well pads (Total 321 Well).  This portion is 330 Million $ component of the above project. Major activities being performed by me are: Review of FEED, Estimation of man-hours, and preparation of DBM, Detailed engineering design for in place, lifting and transportation loads. Dynamic analysis and design for dynamic loads originating out of high speed Rotating machines, wind Vortex shedding and earthquake (Seismic activities). Over all engineering coordination between Client Roseneft, Russian National Design Company NTC, other consultant SNC Lavalin (UK) and Kluster Consultants of Moscow.  Johns Manville Expansion Project, Innisfail, Alberta (70 Million US$): Estimation of Man-hours, List of deliverables, Scope of the work for Geotechnical Investigation and Topographical survey, Specifications, and Detailed design of Steel Structures, Piling and other Reinforced Concrete foundations, Review of Shop Drawings, construction Engineering etc. were my responsibilities. Project completed within estimates and budgeted man-hours which is a very rare in current labor and material scenario in Alberta.  Trans Canada Pipeline Ltd. - Edson Gas Storage Facilities: My involvement was to carry out detailed design of Equipment Foundations, Design Audit and troubleshooting during construction phase.  Miscellaneous Modification/Expansion projects from Duke Energy, Conoco Phillips etc.: Installation of Compressor stations etc.: My involvement so far is limited to preparation of civil package of the proposal to the client.  Shell Canada AOSP Downstream Expansion Project (Methane Reformer Building): Carried out Estimation, Provided Basic Engineering Support and 3-D modeling for UHDE Germany.  ZADCO, UAE: Satah Full Field Development Project FEED: Estimated Man-hours and other civil engineering inputs for the proposal  ADCO: SAS Full Field Development Project, Abu Dhabi, UAE: Estimated Man-hours and other civil engineering inputs for the proposal At NPCC Abu Dhabi  Prepared a Civil/Structural package of Tender (latest for OGDIII project of US$ 360 Million), Carried out Design of Pipe Racks, Control buildings, foundations for compressor, pumps, exchangers, columns, tanks and other pressure vessels, chimneys, platforms etc. as required in Oil & Gas and petrochemical plants for the following projects.  Satah Plant Modifications (ZADCO): Lead Civil / Structural Engineer (Tender Package – Detailed Engineering – Construction Engineering). The project contained two packages:  Work Package 1: Satah Dehydration/Desalting and Sour Water Treatment facilities in which work involved was Structural design of foundations of Desalter Skids, Vertical Desalter FEED Pumps, Sour Water Stripper Column, Stripper FEED Filters along with other general Civil Structural works like Pipe racks, T- Post Pipe Supports etc. Total Package cost was $ 80 Million.  Work Package 2: This $70 Million Package consisted of installation of a Stand By/ by pass Export Gas Compressor unit and included a 4.6 MW Compressor, Knock out Drums, Suction Scrubbers, Discharge Gas Cooler (Air Fin Cooler) and Trim Cooler along with other associated accessories.  Unleaded Gasoline/Low Sulphur Gas Oil (ULG/LSGO) project for Umm Al Nar Refinery Abu Dhabi, UAE (TAKREER):Discipline Engineer specifically to Design its Blast Resistant Control Room Building.  Cathodic Protection of ADCO Well Casings (ADCO): Lead Civil/Structural Engineer  (Tender Package – Detailed Engineering – Construction Engineering)  Onshore Facilities at Juyamah: for Saudi Aramco: Lead Civil Engineer (Tender Package – Construction Engineering)  Replacement of 5 Nos. 20” water Injection Trunk lines for ADMA OPCO: Lead Civil/Structural Engineer ( Tender Package – Detailed Engineering – Construction Engineering )  ADCO on Shore Gas Development Project (OGD III): Lead Engineer for preparation of Civil/Structural Inputs for Tender package of $ 360 Million: Company won the contract. It involved development of 50 No. of Production well heads , 30 number of Re-Injection
  • 4. Wellheads, 6 Number of Remote Manifold Stations(RMS) , re-injection Launcher and receiver stations for 5 trunk lines, Burn Pits, Flare areas. My role as Lead Civil/Structural Engineer included detailed Design of Compressor Foundation, Extension of Blast Resistant Local Equipment Room, Substation design, Equipment foundations, Valve Manifold Platforms, Pipe Racks and Modifications to existing Structures and under Ground facilities along with general civil structural works described in the summery of experience on the first page. I acted as overall Engineering Coordinator in absence of Project Engineering Manager and successfully coordinated between client, consultant and sub-contractors. AT TECHNIP Malaysia  Kuantan Waste Water Treatment and Debottleneck Plant for BP – AMOCO: A $70 Million project in which I carried out Detailed design of Compressor Foundation, RC Foundation and Steel super structure for Filter Press, Sludge Silo, Storage Tanks, Substation, Pump Foundations, Pipe racks, Access platforms, RCC & Steel Staircases.  Petronas Second Refinery Modifications (PSR2) Melaka for Petronas. : A $ 20 Million Project to install fire water Line, Foam water line, Remote Elevated Monitors, Fire walls, Sprinkler system on Tanks, Pumps etc. My role was to prepare a tender package, Detailed engineering of all associated civil/structural works.  Petlin Low Density Poly Ethylene (LDPE) Project Kerteh: My role as a discipline Engineer was to carry out detailed engineering design of Administrative Office, Control Room Building, Pipe Racks, Administrative Building, and Storage warehouse. I was deputed to Vantage Fabrication yard to coordinate between design office and mod yard to troubleshoot/supervise/inspect the steel fabrication work also.  Goro Nickel Project : New Caledonia  Asia Silicon Ltd Thailand. – Tender package  Betara Gas Field Development Project Indonesia – Tender Package  Asia THF/POLY THF Project Kaojing China for BASF – Tender package AT Maunsell Malaysia (AECOM)  Design of Pahang Cement Plant, Bukit Sagu, Malaysia .( on deputation to YTL Malaysia)  Design/coordination of Vima Flour Mill, Vietnam.  Design of Sutera Harbor Business & Resort Hotel Kota Kina Balu , Malaysia (13 story building for Nishimatsu-Corpro)  Design of Sarawak security building (a 33 story building with Barret piles by Bachey & unique upside –down construction. Design of Turbo Generator Foundations of Sonipat Thermal Power Plant and monitoring of its post construction behavior. AT SERC INDIA  Structural analysis of Tajmahal the world famous monument, with a 3-D FEM modeling including fracture mechanics studies on cracks Propagation. COSMOS/M FEM software was used.  Strength assessmentand rehabilitation of fire ruined Turbine Foundations of Narora Atomic Power Plant including its static and dynamic analysis. AT Gherzi India  Expansion of Mathura Petroleum Refinery, India  Guyed Tower Platform under random sea: Oil and Natural Gas Commission India.  Design of Rajghat Thermal Power plant , New Delhi.(Parts)  Dynamic analysis of Park Royal Hotel in New Delhi for Earthquake loads.
  • 5.  Design of `The Statesman House’: a peculiar 17 story circular building with ring beams carrying floating columns of 17 floors.