1. Mamdouh_youssef_qc@yahoo.com 002 010 20 255 701
CURRICULUM VITAE
1) -PERSONAL DATA:-
• Name : Mamdouh Youssef Mohamed Youssef.
• Address : Om Khnan-Quessna-El Menofia-Egypt.
• Mobile No : 002 010 20 255 701.
• E-mail : mamdouh_youssef_qc@yahoo.com
• Marital Status : Married (Three children).
• Date of Birth : 17 Th Aug. 1976.
• Passport No : A02442657-Egypt.
• Driving license No : 149090 (Egypt) & 27681805582 (Qatar )
• RAS GAS Sap No : 99995788
2) -EDUCATIONAL DATA:-
• University : Suez Canal University.
• Faculty : Petroleum and Mining Engineering (May/2000).
• Department : Metallurgy Department.
3) -OBJECTIVE:-
• QC Welding Engineer.
• Senior Welding Inspector.
• NDT Engineer.
• Authorized Piping Inspector.
• Authorized Pressure Vessel Inspector.
4)-Place of Work:-
• I worked before at Syria ,Sudan, Libya, Qatar and Yemen.
• I am working now at Egypt with ENPPI (Engineering for Petroleum and Process
Industries).
5) -COMPUTER SKILLS:-
Up Dated 01 May 2015
2. Mamdouh_youssef_qc@yahoo.com 002 010 20 255 701
• (Ms Office-Word –Excel- AutoCAD 14)
6) –LANGAUGES:-
• Arabic : Mother Tongue.
• English : Very Good.
7) -TRANING COURSES:-
• CSWIP 3.2 Senior Welding Inspector (Success and waiting the certificate).
• CSWIP 3.1 Certified Welding Inspector (Certificate No 31224).
• API 510 Authorized Pressure Vessel Inspector(Certificate No 45461).
• API 570 Authorized Piping Inspector (Certificate No 33528).
• Radiographic Testing (RT). (LEVEL II-ASNT–TC-1A.).
• Ultrasonic Testing (UT). (LEVEL II-ASNT–TC-1A.).
• Liquid Penetrate Testing (PT). (LEVEL II-ASNT–TC-1A.).
• Magnetic Particle Testing (MT). (LEVEL II-ASNT–TC-1A.).
8)-Safety courses:-
• H2S course
• Breathing apparatuses course
• Sea survival course
• Helicopter under water escape
9 Codes, standards and specification:-
• ASME code sec II Part A, B, C and D sec V sec VIII Div 1 and 2, sec IX. …etc
• ASME B 31 Series such as ASME B31.1, 3, 4, 8. …etc
• ASME B 16 Series such as ASME B 16.1, 5, 10, 11, 20, 25, 36, 47. …etc
• ASME B 36 series such as ASME B 36.10M, 19M. …etc
• API standards and specification such as API 1104,API 650,API 570,API 574,API 578
,API 571,API 620, API 653,API 510,API 5L,API 572. …etc
• AWS D 1.1, AWS A 3.0, AWS A 4.2, AWS A 2.4…etc
• DNV codes and standards such as DNV-OS-F101. …etc
• British stander BS such as BS EN 287-1, 2 BS EN 288 BS EN 462…etc
• Shell standard, Qatar petroleum standard (QP Specs), AGIP Specs ,
• RAS GAS Spec and ENPPI Specs.
Up Dated 01 May 2015
3. Mamdouh_youssef_qc@yahoo.com 002 010 20 255 701
• BP AND GUPCO SPEC.
10) -WORK EXPERIENCE IN BRIEF:-
1) Preparing a list of the requirements needed for QA/QC Department in the project such as:
dark room, Gamma Camera (isotopes sources), X-Ray machines, NDT&QC , equipment
types and quantities of welding consumables …etc.
2) Review the contract requirements for the project execution ,organize the preparation of
the Technical Document Register
3) PreparationApproval of all QA/QC Documentations such as: QP, ITP, WPS.S&PQR.S,
NDT& Fabrication& Heat Treatment… ProceduresReports, welding map, as build
Drawings, quality control sheets…etc., needed for each Construction and erection activity
of the project e. g.: steel structure, tanks, Piping, vessels ….etc.
4) Review & approval and maintaining of the QA/QC certificates such as: Materials &
Welding Consumables certificates, QC & NDT Equipment & furnaces & quavers
Calibration certificates, Welder's qualification tests certificates…etc.
5) Review all documents according to project specifications (procedures, method of
statement, inspection test plane etc.)
6) Supervision and inspection of Materials and welding Consumables for suitability&
handling and storage according to Applicable quality procedureinstructions and
specifications.
7) Ensure strict compliance with : QAQC Procedures instructions & drawings(new
revisions) &applicable codestandards And specification for each phase of the various
mechanical construction activity of the project during all the stages and Progress of
fabrication and installation processes , such as : welders qualification tests (WQT) & Fit
up & tack welding & Welding & dimension check & NDT application and evaluation
&heat treatment & equipmentvessels erection & supports, Attachments, accessories &
Coating &insulation …etc.
8) Complete the inspection activitiesreports at the hold points to get the Release or Permits
for continue the next activities, Such as: release for erection of piping and equipment on
the Steel Structure.
Up Dated 01 May 2015
4. Mamdouh_youssef_qc@yahoo.com 002 010 20 255 701
9) Direct Technical Corrective and Preventive actions &Concessions &Inquiries and NCR, S
during all intervals of Fabrication and Installation activities during the project execution.
10) Supervision of lowering the underground pipe lines in trenches to ensure straightness of
the line (prevention of torsion)
11) Monitoring/Assessing the performance of QC group, to make improvements or take
corrective action.
12) SYSTEM PACKAGE PREPARATION : divide every individual system (e.g.: FG, Process,
CW, utility ,drains, FW…etc.) Of the project on the P&ID to individual loops separated
from each other at certain locations, and each loop is tested – Hydro- , pneumatic,
surface - according to line designation table specification applicable code to develop the
test map .
13)TEST PACKAGES (LOOPS) PREPARATION : collect and review the documents of every
individual test Package(loop) according to test map such as: Index of contents &
Isometrics, P&ID.S, NDT reports, Release reports ,
14) As-Build drawings ,Control sheet ,PWHT charts, Hardness test reports, Material
traceability reports …etc. , And ensure that no confliction Between the P&ID and Iso,
sAs-build for every individual test package.
15) PUNCH LIST WORKS : making a complete walk down to inspect each loop to insure
complete compliance with the Drawings(new revisions) ,and if any confliction or defect
-out of acceptance criteria -discovered repairing adjusting Must Be done to make the
loop clear from any reason that may prevent the loop from testing (to be clear punch
list) .
16) REINSTETMENT WORKS: supervision of the Reinstatement of the tested loops
-Systems- , and complete finishing The final punch list comments reported by the
OPERATION DEPARTMENT to make them ready for the pre-commissioning.
17) Attend the Client Senior Management weekly and monthly progress meeting
18) Preparation of hot tapping procedures & supervision and inspection of its related fit-up
and welding sequence.
19) Supervision of the destructive tests and evaluation according to applicable code.
Up Dated 01 May 2015
5. Mamdouh_youssef_qc@yahoo.com 002 010 20 255 701
20) Supervision and evaluation of hydro- & pneumatic &surface and leak testes.
21) Regular audits on all systems to ensure strict compliance with Company’s ISO Quality
procedures.
22) Providing with clarifications, guidance and technical support to construction teams.
23) Meet with clients, vendor representatives, project management and other engineering
discipline
24) Follow up and review the completed test package files for the finished works to submit to
operation.
25) Establishment and responsibility for project communications with client and sub-
contractors.
26) Complete the mechanical completion certificates to prepare for final handover of the
systems.
8) WORK HISTORY:-
12-From (June.2012) up to Now -Egypt
• Project : GUPCO Rehabilitation (Ramadan 6 & Morgan 36)
• Company : Engineering For The Petroleum and Process Industries
(ENPPI)
• Position : Senior QA/QC Welding / Piping Inspector (Client Rep)
11-From (Sep.2010) up to (May-2012) -YEMEN
• Project : ALIF CPU Gas Expansion Project
16 Inch Raydan CPU New Gas Pipeline Project (30 km)
6 Inch LPG Pipeline Project (6 km)
• Company : Safer Exploration & Production Operations Co. (SEPOC)
• Position : Welding, Piping QA/QC Manager.
10-From (May.2010) up (Jun.2010) -QATAR
Worked with Qatar Petroleum (QP) as a senior QA/AC Welding/Piping Inspector
through Germanicher Llyod ( GL DNV) Doha Qatar Branch.
• Project : PS-4 (Plat form shut down)
Up Dated 01 May 2015
6. Mamdouh_youssef_qc@yahoo.com 002 010 20 255 701
• Company : Qatar Petroleum (QP)
• Contractor : DOPET Doha operation petroleum Engineering Technology
• Position : Senior QA/QC Welding / Piping Inspector (Client Rep)
9-FROM (Mar.2009) UP (Feb.2010) -QATAR
Worked with RAS GAS as a senior QA/AC Welding/Piping Inspector through
Germanicher Llyod Doha Qatar Branch
• Project : RasGas Onshore Expansion Project Phase-2 (RGX2)
• Company : RAS GAS (RG)
• Contractor : CHIYODA-TECHNIPJOINTS VENTURE (CTJV)
• Sub contra : CONSOLIDATED CONTRACTORS COMPANY W.L.L.
(CCIC).
• Position : CLIENT REP (Senior QA/QC Welding / Piping Inspector).
8-FROM (Dec.2008) TO (Feb.2009) - QATAR
Worked with CCIC Company as a test pack reviewer through Germanicher Lloyd
Doha Qatar Branch
• Project : Qatar gas new extension (QGX )
• Client : QATAR GAS (QG)
• Contractor : CHIYODA-TECHNIPJOINTS VENTURE
• Sub contra : CONSOLIDATED CONTRACTORS COMPANY W.L.L.
(CCIC).
• Position : Test pack reviewer
7-FROM (Oct.2007) TO (Nov.2008) - EGYPT
I worked at this period as Welding QC engineer and welding inspector part time at the
next company
1) REGISTRO ITALIANO NAVALE GROUP (RINA)
• Work as a third party at the next projects at barge PMS-11.
• 16” Sub sea pipeline from thekah plem-1 to thekah plem-2.
• 8'' Sub sea pipeline from thekah north monopod to thekah plem-1.
• 8''Sub sea pipeline from thekah -2 monopod to theka h plem-1.
Up Dated 01 May 2015
7. Mamdouh_youssef_qc@yahoo.com 002 010 20 255 701
2) BADR EL DEEN PETROLEUM COMPANY (BAPETCO)
• All BAPETCO Projects at BED-1, BED-2, BED-3, SITRA, AND
YUMNA NEW FACILITY STATION.
3) NEVRSEL COMPANY
• Work as QC Manager at Ethylene & VCM Spherical Tanks (4
SPHERS capacity of each one 5000 M3) that supplied to TCI
SANMAR CHEMICHALS at Port Said.
6-FROM (Apr.2006) TO (Sep.2007) - QATAR
• Company : Maritime Industrial Service CO.Inc.Ltd. (MIS)
• Project : Pipe Line and Piping for Heavy Oil (HFO) Bunkering
Facility for
WOQOD at Ras Laffan.
• Client : Qatar Petroleum (QP)
• Contractor : Maritime Industrial Services CO .LTD.INC (MIS).
• Position : Q.C. Engineer
5- FROM (Mar.2006) TO (Apr.2006) - EGYPT
• Project : New Talkha Power Station
• Client : PGESCO
• Contractor : ORASCOM.
• Position : Q.C. Engineer
4-FROM (Sep.2004) TO (Jun. 2006) - SUDAN
• Project : Melute Basin Oil Development (32`` P/L 200 km)
• Client : Petrodar Operating Co.
• Contractor : STG International & Stroytransgas.
• Position : Q.C. Engineer
3-FROM (Jul.2004) TO (AUG.2004) - LEBYA
Up Dated 01 May 2015
8. Mamdouh_youssef_qc@yahoo.com 002 010 20 255 701
• Project : Zliten Cement Plant)
• Client : AUCC
• Contractor : Cotrack Orascom J.V
• Position : N.D.T Engineer
2-FROM (Sep.2003) TO (May.2004) - SYRIA
• Project : Maintenance of L.P.G... Tanks (35 tanks)
• Client : Mahrokaht Syria
• Contractor : Nilcon
• Position : Q.C. & N.D.T Engineer
1-FROM (Aug.2001) TO (Sep.2003) – EGYPT
Work as QC and NDT welding inspector at the following projects through EGIT
(Engineering Group for Inspection and Technology)
• Project : Erection of Two Separators 102 & 103.
• Client : GUPCO.
•
• Project : Cairo North Power Station.
• Client : PGESCO.
• Contractor: Hassan Allam Sons.
• Project : Roseta Onshore Gas Compression Station.
• Client : DSD-Carlo Gavizzi-Bechtel
• Project : Heat Exchangers No. E5724, E5725 & E5726C Repair
• Client : Midor.
• Project : Ras El- Ush Hemispheroid #1 Repair.
• Client : GUPCO.
Up Dated 01 May 2015