SlideShare a Scribd company logo
1 of 4
M a h e s h N a i
4/1727 Logan rd maheshnai2000@gmail.com
Upper Mount Gravatt 4122 (M) 0430325509
Brisbane QLD
Personal Profile
I consider myself a totally committed individual, honest and reliable. I am able to work on own initiative or as part of a
team to achieve best results for both the company and myself. I have logical and problem solving skills. Very adaptable
and strive on responsibility as well as understanding of the importance of flexibility in a dynamic work environment. I
have learned values of team work, trust, excellence and responsibility.
QUALIFICATIONS AND CERTIFICATES
Senior First Aid
LVR, CPR,
Construction White Card
QLD Electrical Fitter -Mechanic Licence 122245
WA Electrical A Grade Licence
EWP C005077
Hazardous Area
QLD Electrical Contractor Licence 75205
Diploma Electrical Engineering (M.S. University) 2006
SA Electrical A Grade Licence PGE236155
NT electrical Licence
Santos 7.4 Gas detection and Permit training
Santos Pre commissioning and Commissioning Induction
Santos 7.4 Brownfield Induction Approval
Santos 4WD Driving Approval
Professional Summary
Santos FLUOR ABB at ROMA Gas Project commissioning 16April 2014
 Point to point testing and verification
 Santos GLNG Project) Roma Fairview Hub No.4 and 5, Roma Hub No.2
 Pre-commission and commission experience
 LV cables Install and meger testing
 Cable termination
 Cable pulling
 AVB 11kv HV Braker: Megger and Ductor testing
 Modification work: Installed relays, contactors and test control wiring
 Follow the STA, Permit works, JSA, ITR’s.
 Santos 7.4 Inducted.
 24v,110v Dc battery charger experience
 Pre-comm of 11kv Transformers at Hub 04 inclusive of motorised Tap Changers and Tx Control Cabinets,
Capacitor Banks and NER’s.
 Commissioning HV Switchroom, ABB Switchgear and Control Equipment
 HV Commissioning: 11kv VCB rack in, rack out, Trip/close test. Interlocking with Incomer bus-tie and
Earth switch.
 Motor Compressor Analog & Digital input testing.
 CPC 100: 2.2KV Hi Pot testing, 100 Amps Ducturing.
 Protection relay testing---REM960 (Motor)
 Protection relay testing---REF630 (Incomer)
 11kv Transformer control testing.
 GTA control and relay testing.
Rig Electrician: Weatherford Moomba GAS Project Jun 2013 to Feb 2014
 1880kw power generator operation. (Synchronization, VFD, VSD maintenance )
 Mud pump and rig lights. Camp light maintenance. Iron Ruff neck control
 Rig routing check and follow the maintenance schedule
 Air compressor Filter check and clean and repair
 Permit to work
 Santos Induction
 Co2 , O2 and LEL Gas detector repair and Installation
 Rotating Drilling machine motors and control repairs.
 Motors cooling and temperature system check
 Maintain parts and records
 Emergency Shut-down system check and repair
Universal Switchboard LTD Senior Electrician March 2011 to May 2013
 Design the circuit
 Testing the various ct’s , MCC Board and HV LV Panel.
 Cubicle and control and power wiring.
 Bus-bar work.
 AC 3phase 4 wire meter connection and testing
 Handling the Apprentice/Leading hand.
 Distribute the work task
 Testing the all boards once finalised
 Motor termination and cable crimping
 Check the safety procedure and awareness on production floor
 Hv, Lv systems maintenance
 PLC fault finding, Plc wiring (Siemens Simatic S7-1500,1200,400)
Incitec Pivot at Gibson Island with Nielsen LTD July 2010 to Jan 2011
 3.3KVA and 11KVA OCB and ACB Maintenance
 Sub-station MCC breakers servicing.
 Ductor testing and Magar testing.
 Plc based maintenance
 Commercial wiring
 Control and power wiring test and re-wiring if require.
 Check the di-electric strength of the Oil.
 Up to 100sqmm cable joint.
Dismantling and refitting of Capital equipments such as: Mechanism of air break circuit breaker
and Vacuum circuit breaker, Motor Starters, Motors, Siemens Contactors, Bus bar at power and
motor control centre, Relays, PID Controllers, Emergency lights, lighting panels, Variable
frequency AC drives, Temperature and pressure switches and gauges etc…
Ramsay Engineering PTY LTD (Brisbane) Electrician Oct 2008 to March 2010
Testing of PLC control wiring, star-delta and DOL sartor
Work with Schematic diagram
Control and power wiring up to 0.5 sq mm to 240 sq mm.
Up date all check sheet, calibration certificate, Control & power Circuit diagram, maintenance logbook
and control copies. Keep handy the entire circuit diagram and parameters sheet at field locations and
maintenance records.
Repair and replace over heated cables, lugs, terminal blocks, Jumpers, Links Bus and bus bars. Check
and ensure earthing bonding, panel and junction box gaskets.
Follows blueprints, specifications, diagrams, and service manuals to repair or maintain equipments.
Install, Maintain, troubleshoot, repair and test operational equipment and facilities which includes,
repairs and maintains of electrical machines, equipment
Thorough check, investigate and inspects machines and equipment to locate causes of malfunctions;
apply specific tests and checks for the machines or equipment to gain access to problems.
Operate work equipment, power tools and specialized testing instruments.
Working as per the plan and work order received by setting up priority
Bombardier Transportation LTD (ABB) Sep2005 to May 2008
Test And Calibrate Extruder clutch pressure switch, Air compressor temperature and pressure gauges
and switches, single stage & multi stage Centrifugal pump power and control checks as well as other
equipments with the help of Multi meter, Standard Temperature Bath (Nagman make).
Feeler gauge, Ring and fix spanners, MV/MA portable calibrator, Forbes Marshal Comparator Gage
Calibrator, DC Voltage Source, Millie Ampere calibrator, Contact less digital tachometer, Thermometer,
Pointer Puller and other required instruments
Replacement of whole capital equipments, control panels, cables and cable glands at control/power
termination, Crimping and soldering lugs, Motor Starters panel, Contactors, relays, termination blocks,
motor Bearings, motor rotor, different type of motor spares mounting legs.
Fan, fan cover, bearing cover drive and non drive end, Motor junction Box, Remote and local push
button station, Circuit breakers jaw contact and mechanism spares, pneumatic cylinders, load cell, knife
gate valve, safety valve, water flow meter, Rota meter.
Pressure and temperature switches and gauges, Lighting panels, Emergency Lights, Local UPS units,
Window and split Air Conditioner units etc.
Servicing and maintenance of different types of Motors, Control panels, Starters, Local And remote push
button station, knife gate valves, Flow Meters, Pneumatic cylinders etc…
Electrical maintenance Workshop activities: Motor Overhauling and Body parts replacement, Bearing
replacement, Starter Overhauling, Contactor coil and contacts replacements and cleaning.
Over load relay calibration, pressure and temperature gauges and switches calibration, using equipments
Bearing puller, Multi meter, varnishing oven, hot air bower and vacuum blower, temperature bath,
Current source for relay calibration, Universal calibrator, pressure gauge comparator etc….
Petrochemical Corporation Limited Sep 2000 to July 2005
 IPCL is dealing with Petroleum product and gas supplier industries and my role was electrical
supervisor for installation maintenance and trouble shooting of industrial electrical
equipment/installation.
 sound technical knowledge
 Conduct team/toolbox meetings when required.
 Experience with working directly onto a schedule
 Shutdown management and planning
 Substation construction / commissioning and testing experience / knowledge
 Proven leadership skills
 HV Experience
 Co-ordinate maintenance activities ensuring delivery of all essential preventative and breakdown
production, safety and safety critical maintenance in a timely manner, providing a clear direction
with regards to priorities to Technicians
DC Motor 132 to 532 KW, DC Motor Cooling Blower Fan, Extruder oil pump (2.2 to 4KW), Tachometer
4000Rpm to 70ma out put & 5000rpm 180ma-Speed Feed back, Pencil - C & L type Heaters for barrel and die
head zone up to 12KW, Barrel Heat/Cool unit circulation pump
Centrifugal Pumps: Kirloskar – make. Model Kpd-100/40,Kpd – 40/25, db100/26, DB40/20,
DB32/26. Capacity – up to 47.5 L/S, for utility raw water transferring, Cooling tower pump
(40HPX4Nos), raw water pump (40HP X2Nos), Barrel Cooling pump (40HPX2Nos), Cooling tower
Fan 10HP X2nos, fire hydrant pump 75HP, fumes Blower 22 to 180 HP, Sprinkler
Pump 75HP
Power Control Centre (PCC) Panel: Larson Turbo make PCC panel with ACB CN-CS 3200Amp 415 Volts
main incoming, from transformer to main bus, out going has 30 feeders.
15 feeders are breaker feeders-capacity 800 to 1600amps and 15 Switch fuse units with 250to 630amps
capacity.
Breaker feeders are becoming incoming plant wide 7 MCC, Mega & super compo under extruder has direct
1000Amps feeder breaker feeder.
PCC switch fuse out going supply is leading to lighting main panel, capacitor panel Utility feeder and Fire
hydrant main supply. Breakers are of L&T and with Earth Fault and Over Load protection.
UPS: Installation and repairs of different makes ups APC, Emerson. 1kva to 10kva. Calibration, connection
of bulk batteries 1AH to 100AH. Replacement of PCB card, testing and repairs, quotation.
Motor Control Centre (MCC) Panel: Larson & Turbo, and ABB make capacity 1000 to 1600Amps 415
Volts, MCC has Motor Feeders and Switch fuse Units about 30No, Motor feeders has .5 to 30Hp direct on line
starters & 15 to 120Hp Star delta starters. Breaker Compartment, Relay Compartment, Protection CT and PT
compartment. Cable compartment.
Power Transformer: ABB Transformers 11KV/415 Volts 2000KVA 415 Volts 2 self cooled transformer
one is as stand by. Manual on load Tap Changer facility. Winding and oil temperature indication and
measurement, Silica jell, oil insulation annual testing for crackling and break down, breather-conservator and
explosion vent, HT bushing, Buchholz relay, Oil level gauge. HT and LT cable box
SAFETY AWARENESS AND RECORD
Over the years I have had extensive exposure to Safety and good Safe Working Practices and procedures and consider
my Safety record as exceptional.
I have always maintained a safe approach to all tasks using an assessment process involving one or more of the
following procedures SWMS (Safe Work Method Statement), JSA (Job Safety Analysis), STA, JHA, SLAM (Stop, Look,
Assess, Manage) or Risk assessments prior to and during all work.
REFEREES:
Aaron Doyle Daniel Petruzzella
Santos LV Electrical Team Leader Santos HV & LV Electrical Team Leader
M 0448 179208 Mob: 0406 170244
Spencer Nicholson
ABB Supervisor
Mob: 0402 359563

More Related Content

What's hot

Engr. Ayaz Khan CV11 (1)
Engr.  Ayaz Khan CV11 (1)Engr.  Ayaz Khan CV11 (1)
Engr. Ayaz Khan CV11 (1)Engr.ayaz khan
 
RESUME_ ARULMANI-ELECTRICAL COMMISSIONING ENGINEER (1)
RESUME_ ARULMANI-ELECTRICAL COMMISSIONING ENGINEER (1)RESUME_ ARULMANI-ELECTRICAL COMMISSIONING ENGINEER (1)
RESUME_ ARULMANI-ELECTRICAL COMMISSIONING ENGINEER (1)Arulmani Dhandabani
 
DARIUS RODRIGUEZ ANGELES 2016 resume
DARIUS RODRIGUEZ ANGELES 2016 resumeDARIUS RODRIGUEZ ANGELES 2016 resume
DARIUS RODRIGUEZ ANGELES 2016 resumeDarius Angeles
 
Tahir Mahmood Butt
Tahir Mahmood ButtTahir Mahmood Butt
Tahir Mahmood ButtTahir Butt
 
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)asish jana
 
sivachandran resume
sivachandran resumesivachandran resume
sivachandran resumesiva karnan
 
C18808 elc tech
C18808 elc techC18808 elc tech
C18808 elc techEDWIN S
 
Craig Sparks. Resume April 2016 Electrician - Supervisor - Manager
Craig Sparks. Resume April 2016 Electrician - Supervisor - ManagerCraig Sparks. Resume April 2016 Electrician - Supervisor - Manager
Craig Sparks. Resume April 2016 Electrician - Supervisor - ManagerCraig Sparks
 
Osama Atef Abd El Aty (1) new
Osama Atef Abd El Aty (1) newOsama Atef Abd El Aty (1) new
Osama Atef Abd El Aty (1) newosama atef
 

What's hot (20)

Engr. Ayaz Khan CV11 (1)
Engr.  Ayaz Khan CV11 (1)Engr.  Ayaz Khan CV11 (1)
Engr. Ayaz Khan CV11 (1)
 
Engr kashif cv
Engr kashif cvEngr kashif cv
Engr kashif cv
 
New cv jithesh
New cv jitheshNew cv jithesh
New cv jithesh
 
QA/QC ENGINEER
QA/QC ENGINEERQA/QC ENGINEER
QA/QC ENGINEER
 
RESUME_ ARULMANI-ELECTRICAL COMMISSIONING ENGINEER (1)
RESUME_ ARULMANI-ELECTRICAL COMMISSIONING ENGINEER (1)RESUME_ ARULMANI-ELECTRICAL COMMISSIONING ENGINEER (1)
RESUME_ ARULMANI-ELECTRICAL COMMISSIONING ENGINEER (1)
 
DARIUS RODRIGUEZ ANGELES 2016 resume
DARIUS RODRIGUEZ ANGELES 2016 resumeDARIUS RODRIGUEZ ANGELES 2016 resume
DARIUS RODRIGUEZ ANGELES 2016 resume
 
Tahir Mahmood Butt
Tahir Mahmood ButtTahir Mahmood Butt
Tahir Mahmood Butt
 
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
Asish CV (electrical engineer testing and commissioning and maintenance 9 years)
 
bala.1
bala.1bala.1
bala.1
 
Vimal cv
Vimal cv Vimal cv
Vimal cv
 
sivachandran resume
sivachandran resumesivachandran resume
sivachandran resume
 
Tamil E&I Compex inspector
Tamil E&I Compex  inspectorTamil E&I Compex  inspector
Tamil E&I Compex inspector
 
FAZIL PASHA CV 3.6.2015
FAZIL PASHA CV 3.6.2015FAZIL PASHA CV 3.6.2015
FAZIL PASHA CV 3.6.2015
 
C18808 elc tech
C18808 elc techC18808 elc tech
C18808 elc tech
 
Craig Sparks. Resume April 2016 Electrician - Supervisor - Manager
Craig Sparks. Resume April 2016 Electrician - Supervisor - ManagerCraig Sparks. Resume April 2016 Electrician - Supervisor - Manager
Craig Sparks. Resume April 2016 Electrician - Supervisor - Manager
 
Osama Atef Abd El Aty (1) new
Osama Atef Abd El Aty (1) newOsama Atef Abd El Aty (1) new
Osama Atef Abd El Aty (1) new
 
Kumar RESUME
Kumar RESUMEKumar RESUME
Kumar RESUME
 
Cover letter
Cover letterCover letter
Cover letter
 
Engr uzair khan
Engr uzair khanEngr uzair khan
Engr uzair khan
 
update 1
update 1update 1
update 1
 

Similar to electrician

Similar to electrician (20)

yogesh Barvadiya (3)
yogesh Barvadiya (3)yogesh Barvadiya (3)
yogesh Barvadiya (3)
 
Curriculam vitae
Curriculam vitaeCurriculam vitae
Curriculam vitae
 
SRINIVASAN_RESUME_UPDATED__FINAL (2)
SRINIVASAN_RESUME_UPDATED__FINAL (2)SRINIVASAN_RESUME_UPDATED__FINAL (2)
SRINIVASAN_RESUME_UPDATED__FINAL (2)
 
resume krishna electrical engineer
resume krishna electrical engineerresume krishna electrical engineer
resume krishna electrical engineer
 
ANBARASAN R CV
ANBARASAN R CV ANBARASAN R CV
ANBARASAN R CV
 
A. A attch file industrial Electrician (good one)
A. A  attch file industrial Electrician (good one)A. A  attch file industrial Electrician (good one)
A. A attch file industrial Electrician (good one)
 
Ali-Ahmad Resume
Ali-Ahmad ResumeAli-Ahmad Resume
Ali-Ahmad Resume
 
Paulpandy CV.
Paulpandy  CV.Paulpandy  CV.
Paulpandy CV.
 
Mohamed Saad Resume
Mohamed Saad ResumeMohamed Saad Resume
Mohamed Saad Resume
 
Resume Francis
Resume FrancisResume Francis
Resume Francis
 
Resume E&I Engineer
Resume E&I EngineerResume E&I Engineer
Resume E&I Engineer
 
Elmer Lainez
Elmer LainezElmer Lainez
Elmer Lainez
 
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
Testing & Commissioning Engineer | Power Supply Tech. | Traction Rail Power |...
 
SASIdharan p CV
SASIdharan p CVSASIdharan p CV
SASIdharan p CV
 
Vipul updated elec resume..
Vipul updated elec resume..Vipul updated elec resume..
Vipul updated elec resume..
 
Jose_Transmission_Engineer
Jose_Transmission_EngineerJose_Transmission_Engineer
Jose_Transmission_Engineer
 
Selva updated resume
Selva updated resumeSelva updated resume
Selva updated resume
 
Resume electrical
Resume electricalResume electrical
Resume electrical
 
muhammad Usman CV
muhammad Usman CVmuhammad Usman CV
muhammad Usman CV
 
UPDATED CV-1
UPDATED CV-1UPDATED CV-1
UPDATED CV-1
 

electrician

  • 1. M a h e s h N a i 4/1727 Logan rd maheshnai2000@gmail.com Upper Mount Gravatt 4122 (M) 0430325509 Brisbane QLD Personal Profile I consider myself a totally committed individual, honest and reliable. I am able to work on own initiative or as part of a team to achieve best results for both the company and myself. I have logical and problem solving skills. Very adaptable and strive on responsibility as well as understanding of the importance of flexibility in a dynamic work environment. I have learned values of team work, trust, excellence and responsibility. QUALIFICATIONS AND CERTIFICATES Senior First Aid LVR, CPR, Construction White Card QLD Electrical Fitter -Mechanic Licence 122245 WA Electrical A Grade Licence EWP C005077 Hazardous Area QLD Electrical Contractor Licence 75205 Diploma Electrical Engineering (M.S. University) 2006 SA Electrical A Grade Licence PGE236155 NT electrical Licence Santos 7.4 Gas detection and Permit training Santos Pre commissioning and Commissioning Induction Santos 7.4 Brownfield Induction Approval Santos 4WD Driving Approval Professional Summary Santos FLUOR ABB at ROMA Gas Project commissioning 16April 2014  Point to point testing and verification  Santos GLNG Project) Roma Fairview Hub No.4 and 5, Roma Hub No.2  Pre-commission and commission experience  LV cables Install and meger testing  Cable termination  Cable pulling  AVB 11kv HV Braker: Megger and Ductor testing  Modification work: Installed relays, contactors and test control wiring  Follow the STA, Permit works, JSA, ITR’s.  Santos 7.4 Inducted.  24v,110v Dc battery charger experience  Pre-comm of 11kv Transformers at Hub 04 inclusive of motorised Tap Changers and Tx Control Cabinets, Capacitor Banks and NER’s.  Commissioning HV Switchroom, ABB Switchgear and Control Equipment
  • 2.  HV Commissioning: 11kv VCB rack in, rack out, Trip/close test. Interlocking with Incomer bus-tie and Earth switch.  Motor Compressor Analog & Digital input testing.  CPC 100: 2.2KV Hi Pot testing, 100 Amps Ducturing.  Protection relay testing---REM960 (Motor)  Protection relay testing---REF630 (Incomer)  11kv Transformer control testing.  GTA control and relay testing. Rig Electrician: Weatherford Moomba GAS Project Jun 2013 to Feb 2014  1880kw power generator operation. (Synchronization, VFD, VSD maintenance )  Mud pump and rig lights. Camp light maintenance. Iron Ruff neck control  Rig routing check and follow the maintenance schedule  Air compressor Filter check and clean and repair  Permit to work  Santos Induction  Co2 , O2 and LEL Gas detector repair and Installation  Rotating Drilling machine motors and control repairs.  Motors cooling and temperature system check  Maintain parts and records  Emergency Shut-down system check and repair Universal Switchboard LTD Senior Electrician March 2011 to May 2013  Design the circuit  Testing the various ct’s , MCC Board and HV LV Panel.  Cubicle and control and power wiring.  Bus-bar work.  AC 3phase 4 wire meter connection and testing  Handling the Apprentice/Leading hand.  Distribute the work task  Testing the all boards once finalised  Motor termination and cable crimping  Check the safety procedure and awareness on production floor  Hv, Lv systems maintenance  PLC fault finding, Plc wiring (Siemens Simatic S7-1500,1200,400) Incitec Pivot at Gibson Island with Nielsen LTD July 2010 to Jan 2011  3.3KVA and 11KVA OCB and ACB Maintenance  Sub-station MCC breakers servicing.  Ductor testing and Magar testing.  Plc based maintenance  Commercial wiring  Control and power wiring test and re-wiring if require.  Check the di-electric strength of the Oil.  Up to 100sqmm cable joint. Dismantling and refitting of Capital equipments such as: Mechanism of air break circuit breaker and Vacuum circuit breaker, Motor Starters, Motors, Siemens Contactors, Bus bar at power and motor control centre, Relays, PID Controllers, Emergency lights, lighting panels, Variable frequency AC drives, Temperature and pressure switches and gauges etc… Ramsay Engineering PTY LTD (Brisbane) Electrician Oct 2008 to March 2010 Testing of PLC control wiring, star-delta and DOL sartor Work with Schematic diagram Control and power wiring up to 0.5 sq mm to 240 sq mm. Up date all check sheet, calibration certificate, Control & power Circuit diagram, maintenance logbook and control copies. Keep handy the entire circuit diagram and parameters sheet at field locations and maintenance records.
  • 3. Repair and replace over heated cables, lugs, terminal blocks, Jumpers, Links Bus and bus bars. Check and ensure earthing bonding, panel and junction box gaskets. Follows blueprints, specifications, diagrams, and service manuals to repair or maintain equipments. Install, Maintain, troubleshoot, repair and test operational equipment and facilities which includes, repairs and maintains of electrical machines, equipment Thorough check, investigate and inspects machines and equipment to locate causes of malfunctions; apply specific tests and checks for the machines or equipment to gain access to problems. Operate work equipment, power tools and specialized testing instruments. Working as per the plan and work order received by setting up priority Bombardier Transportation LTD (ABB) Sep2005 to May 2008 Test And Calibrate Extruder clutch pressure switch, Air compressor temperature and pressure gauges and switches, single stage & multi stage Centrifugal pump power and control checks as well as other equipments with the help of Multi meter, Standard Temperature Bath (Nagman make). Feeler gauge, Ring and fix spanners, MV/MA portable calibrator, Forbes Marshal Comparator Gage Calibrator, DC Voltage Source, Millie Ampere calibrator, Contact less digital tachometer, Thermometer, Pointer Puller and other required instruments Replacement of whole capital equipments, control panels, cables and cable glands at control/power termination, Crimping and soldering lugs, Motor Starters panel, Contactors, relays, termination blocks, motor Bearings, motor rotor, different type of motor spares mounting legs. Fan, fan cover, bearing cover drive and non drive end, Motor junction Box, Remote and local push button station, Circuit breakers jaw contact and mechanism spares, pneumatic cylinders, load cell, knife gate valve, safety valve, water flow meter, Rota meter. Pressure and temperature switches and gauges, Lighting panels, Emergency Lights, Local UPS units, Window and split Air Conditioner units etc. Servicing and maintenance of different types of Motors, Control panels, Starters, Local And remote push button station, knife gate valves, Flow Meters, Pneumatic cylinders etc… Electrical maintenance Workshop activities: Motor Overhauling and Body parts replacement, Bearing replacement, Starter Overhauling, Contactor coil and contacts replacements and cleaning. Over load relay calibration, pressure and temperature gauges and switches calibration, using equipments Bearing puller, Multi meter, varnishing oven, hot air bower and vacuum blower, temperature bath, Current source for relay calibration, Universal calibrator, pressure gauge comparator etc…. Petrochemical Corporation Limited Sep 2000 to July 2005  IPCL is dealing with Petroleum product and gas supplier industries and my role was electrical supervisor for installation maintenance and trouble shooting of industrial electrical equipment/installation.  sound technical knowledge  Conduct team/toolbox meetings when required.  Experience with working directly onto a schedule  Shutdown management and planning  Substation construction / commissioning and testing experience / knowledge  Proven leadership skills  HV Experience  Co-ordinate maintenance activities ensuring delivery of all essential preventative and breakdown production, safety and safety critical maintenance in a timely manner, providing a clear direction with regards to priorities to Technicians
  • 4. DC Motor 132 to 532 KW, DC Motor Cooling Blower Fan, Extruder oil pump (2.2 to 4KW), Tachometer 4000Rpm to 70ma out put & 5000rpm 180ma-Speed Feed back, Pencil - C & L type Heaters for barrel and die head zone up to 12KW, Barrel Heat/Cool unit circulation pump Centrifugal Pumps: Kirloskar – make. Model Kpd-100/40,Kpd – 40/25, db100/26, DB40/20, DB32/26. Capacity – up to 47.5 L/S, for utility raw water transferring, Cooling tower pump (40HPX4Nos), raw water pump (40HP X2Nos), Barrel Cooling pump (40HPX2Nos), Cooling tower Fan 10HP X2nos, fire hydrant pump 75HP, fumes Blower 22 to 180 HP, Sprinkler Pump 75HP Power Control Centre (PCC) Panel: Larson Turbo make PCC panel with ACB CN-CS 3200Amp 415 Volts main incoming, from transformer to main bus, out going has 30 feeders. 15 feeders are breaker feeders-capacity 800 to 1600amps and 15 Switch fuse units with 250to 630amps capacity. Breaker feeders are becoming incoming plant wide 7 MCC, Mega & super compo under extruder has direct 1000Amps feeder breaker feeder. PCC switch fuse out going supply is leading to lighting main panel, capacitor panel Utility feeder and Fire hydrant main supply. Breakers are of L&T and with Earth Fault and Over Load protection. UPS: Installation and repairs of different makes ups APC, Emerson. 1kva to 10kva. Calibration, connection of bulk batteries 1AH to 100AH. Replacement of PCB card, testing and repairs, quotation. Motor Control Centre (MCC) Panel: Larson & Turbo, and ABB make capacity 1000 to 1600Amps 415 Volts, MCC has Motor Feeders and Switch fuse Units about 30No, Motor feeders has .5 to 30Hp direct on line starters & 15 to 120Hp Star delta starters. Breaker Compartment, Relay Compartment, Protection CT and PT compartment. Cable compartment. Power Transformer: ABB Transformers 11KV/415 Volts 2000KVA 415 Volts 2 self cooled transformer one is as stand by. Manual on load Tap Changer facility. Winding and oil temperature indication and measurement, Silica jell, oil insulation annual testing for crackling and break down, breather-conservator and explosion vent, HT bushing, Buchholz relay, Oil level gauge. HT and LT cable box SAFETY AWARENESS AND RECORD Over the years I have had extensive exposure to Safety and good Safe Working Practices and procedures and consider my Safety record as exceptional. I have always maintained a safe approach to all tasks using an assessment process involving one or more of the following procedures SWMS (Safe Work Method Statement), JSA (Job Safety Analysis), STA, JHA, SLAM (Stop, Look, Assess, Manage) or Risk assessments prior to and during all work. REFEREES: Aaron Doyle Daniel Petruzzella Santos LV Electrical Team Leader Santos HV & LV Electrical Team Leader M 0448 179208 Mob: 0406 170244 Spencer Nicholson ABB Supervisor Mob: 0402 359563