                           National Guard
                          Black Belt Training
                                Module 11

                         CPI Project Tracking Tool

                               Power Steering

                                 UNCLASSIFIED            UNCLASSIFIED / FOUO
                                                                               1
                                                     UNCLASSIFIED / FOUO
                                                             UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




CPI Roadmap – Define
                                                             8-STEP PROCESS
                                                                                                       6. See
   1.Validate          2. Identify           3. Set          4. Determine          5. Develop                           7. Confirm     8. Standardize
                                                                                                      Counter-
      the             Performance         Improvement            Root               Counter-                             Results         Successful
                                                                                                      Measures
    Problem               Gaps              Targets              Cause             Measures                             & Process         Processes
                                                                                                      Through

       Define                   Measure                       Analyze                           Improve                         Control



                                           ACTIVITIES                                TOOLS
                           •   Identify Problem                                  •Project Charter
                           •   Validate Problem Statement                        •Project Selection Tools
                           •   Establish Strategic Alignment                     •Value Stream Map
                           •   Gather Voice of the Customer & Business           •Various Financial Analysis
                           •   Create Goal Statement                             •Effective Meeting Skills
                           •   Validate Business Case                            •Stakeholder Analysis
                           •   Determine Project Scope                           •Communication Plan
                           •   Select and Launch Team                            •SIPOC Map
                           •   Develop Project Timeline                          •High-Level Process Map
                           •   Create Communication Plan                         •Project Management Tools
                           •   Prepare High-Level Process Map / SIPOC            •VOC and Kano Analysis
                           •   Complete Define Tollgate                          •RACI and Quad Charts
                                                                                 •Strategic Alignment
                                                                                                                                                        2
                       Note: Activities and tools vary by project. Lists provided here are not necessarily all-inclusive.   UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




Learning Objectives

      • Learn how to navigate through the Power
        Steering tool
      • Understand the Black Belt‟s responsibility
      • Understand how to use the tool to track
        projects progress




                                                                 3
                                           UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




Power Steering

   Power Steering is a knowledge management and
     project tracking tool used to:
   • Track DoD CPI projects
   • Access and store project tools and templates
   • Track project progress by phase
   • Manage gate approvals
   • Share project best practices and provide
     replication opportunities

               DEPMS – Defense Enterprise Project Management System

                                                                                   4
                                                             UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




Accessing Power Steering
     To get into PowerSteering, you need the following:
           1)         PowerSteering URL
           2)         User name and password


      • National Guard students who attend Black Belt training will have a PS
      account set up for them
      • You will receive an email with your PowerSteering URL and login
      information
           - User name: Your email address
           - Password: A temporary password will be sent in the email


                                   BLACK BELT ROLE:
                              Enter your project into Power Steering
                                    Keep your project updated
                                                                                             5
                                                                       UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




General Navigation




Power Steering Navigation Menu (blue bar)
• Home                Takes you back to Home page
• Inbox               View Questions, Alerts and Status Reports Due
• Browse              Various Power Steering functions that you can access
• Important Links Quick links to import areas on the site
• Last Visited        Tracks your most recent activities for quick reference
• Search              Simple keyword search
                                                                                      6
                                                                UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO



General Navigation




                                       The Help button provides
                                       additional training and Help
              Important Links          information and also is used
              provides easy access     for submitting Help Desk
              to Tools and             Requests.
              Templates, Reference
              Guides, Tutorials, and
              other important
              information.                                                         7
                                                             UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO



General Navigation




        Click on Browse to access various options as shown including
        updating your profile and customizing your PowerSteering views.

        Work Tree contains special information folders. You can also start a
        new project from here by clicking on “Create New Work”.



                                                                                       8
                                                                 UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO



General Navigation




      From the Home Page, use these Quick Links that provide shortcuts to
      common tasks.

      Note the option to Create New Work from here versus clicking “Browse”
      then “Create New Work”. They both get you to the same page for
      creating a new project.


                                                                                    9
                                                              UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO



General Navigation




   Under Browse, >My Settings, > Preferences you can customize your Home Page.

   You can display various formats on your home page. For instance, “Dashboard”
   provides an overview of all projects that you are involved with.

   This is informational - the default is already set to display basic home page                10
   information.                                                           UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO



Updating Your Power Steering Profile

                                            Access your profile at the top right
                                            corner or under “Browse”. Click on
                                            your name and select Edit Profile.




              Make sure all of your information is up-to-date, especially this
              section, which is used to give your organization credit for your
              training (for organizations who use Power Steering as their
              primary CPI data collection system).
                                                                                           11
                                                                     UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




Inviting A New Power Steering User
                                      From the “Browse” option, select
                                      “Invite/Create New User” under
                                      “People”
                                              Step 1: Red dot items are
                                              mandatory. As a basic user, you
                                              can only invite someone into
                                              Power Steering with “view only”
                                              privileges.
                                               (See your Deployment Director to assign
                                              someone editing privileges.)




    Step 2: Once you‟re finished        The individual can fill in this
    filling in the red dot items,       information when they log
    select “Invite”. The individual     into Power Steering.
    will receive an Outlook email
    invite to join Power Steering.
                                                                                          12
                                                                    UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




Locating An Existing Project




      Find existing projects easily using any of the following methods:

      (1) On your Home page - your projects should be listed per your User
          Preference setup.
      (2) Use the Search button.
      (3) Select Browse, Work Tree, find your organization, then select your
          project.
      (4) Use the Quick Link Find a project or idea and enter search words.

                                                                                        13
                                                                  UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




 Replication Check Define Template
    I confirm that:
     DEPMS (DoD Enterprise Performance Management System) has been
        searched for similar projects: Yes / No

     Replication: List relevant initiatives / potential replication projects found
      (if any):
      • Project 1: (DEPMS # or other tracking tool project number)
      • Project 2:

     Collaboration: Identify organizations that can/should be considered for
      working this project collaboratively:
      • Organization 1:
      • Organization 2:

                                                  Required Deliverable                         14
                                                                         UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO



Creating a DMAIC Project




                                   1) Click on Create New Work
                                   2) Select project work type
                                      from the pull-down menu
                                   3) Select Continue

                      Most common Project Work Types:
                      •Non-gated project (AKA “Just Do It”
                       or JDI)
                      •Rapid Improvement Event (RIE)
                      •DMAIC gated project                                15
                                                    UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




Creating a DMAIC Project

                           Fields with red dot are
                           required.


                           Enter your project name.

                           Hint: Enter the full name of
                           the project - spelled out.
                           Also include acronyms - it
                           helps when searching for
                           your project.


                           Enter organization
                           information.
                                                            16
                                      UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




Creating a DMAIC Project
                           Under Parent, click the drop
                           down to select your project
                           location in the Work Tree; this
                           pop up window of the work tree
                           will appear.
                               Use the drop downs to select
                               your organization levels – this
                               is the organization who is the
                               lead and will get credit for the
                                          project.
                                 Go as low as you can go!
                               Important: This is the most
                               common error people tend to make.
                               Select exactly where you want the
                               project to reside under. Look to
                               find your sub-organization under
                               the parent org.                   17
                                                UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO



Creating a DMAIC Project

                           Mandatory fields to fill out:

                           • Your project‟s problem
                             statement

                           • The project‟s business
                             case – why is it important
                             to the organization?

                           • The project‟s goal
                             statement

                           • Team members

                           • Scope of the project

                                                               18
                                         UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO



Creating a DMAIC Project
           Step 1                                 To add Team Members:
                                                  1) Search by a person‟s name/partial name. If
                                                       the person‟s name doesn‟t appear, then
                                                       they are not registered in PowerSteering
                                                       and you cannot add them as part of the
                                                       team in this section. See your
                                                       Deployment Director or Master Black Belt
                                                       to determine if that person should be
                                                       registered in PowerSteering.
                      Step 2
                                                  2) Drag and drop the name under the
                                                       appropriate role:
                                                  a)   Project Lead: The person creating the
                                                       project is automatically set as Project
                                                       Lead. If the Lead drags & drops another
                                                       into the role (in this example, Anne-marie
                                                       is entered), that person will receive a
            Mandatory fields;                          notice to accept the role as Project Lead.
                                                       In the meantime, the project originator
            • Project Owner (Lead)                     remains as the Lead and Anne-marie will
                                                       be listed with an hour-glass beside her
            • Gate Approver (for gated                 name, indicating that she has not yet
              projects)                                accepted the role.

                                                  b)   Other roles- the members will be listed
                                                       with an hour-glass beside their name
            Optional field:                            until they accept the invite.
            • Project Mentors (your MBB)
            • NOTE: For National Guard            Select “Finish & Create”. We recommend this,
                                                       versus “Continue” to ensure you don‟t
              students, this field is mandatory        lose your work.
                                                                                                    19
                                                                     UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO



Creating a DMAIC Project




      Finally, select dates to indicate planned timeline for completion by phase

      Then select Finish & Create.
       (We recommend this, versus “Continue” to ensure you don’t lose your
       work.)



                                                                                        20
                                                                  UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




Adding Important Project Information
        After selecting “finish and create”, the screen will refresh to your project‟s
        Summary page. However, you still need to provide a few more pieces of
        information. Go into the Edit mode for the Project Details section.




                                                                                                  21
                                                                            UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




Setting Project Planned End Date
                                   Edit Project Details:

                                   • Under “Schedule”,
                                     select “Finish No Later
                                     Than”.

                                   This allows you to select
                                    an end date, which is
                                    how National Guard
                                    schedules projects.

                                   • Enter the planned end
                                     date. Typically 3-4
                                     months after the start
                                     date.

                                   Save the changes.
                                                                 22
                                           UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO



Updating Tollgate Status & Dates

                                   Use the “Update
                                   Status” button to
                                   change the status
                                   of the Tollgate or
                                   the Tollgate End
                                   Date




                                                                23
                                          UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO



Requesting Gate Approval




                      Before you request a tollgate approval, make
                      sure any required documents are attached to
                      the tollgate and that you‟ve met your
                      organization‟s requirements for tollgate
                      completion.

                                                                                       24
                                                                 UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO



Requesting Gate Approval
                      This is the view only seen by the Project Lead-
                      notice the “Request Approval” box

                      Once you are ready, click this box to send an
                      email to your Gate Approver.

         A box will then appear where
         you can type a message to
         your gate approver. Select
         “Request Approval”




                                                                                              25
                                                                        UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




Requesting Gate Approval




      The Gate Approver will receive an email and a link to a “question” in
      their PowerSteering “in box”. They will (hopefully) check “Approve” and
      submit the approval back to you.



                                                                                      26
                                                                UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




Requesting Gate Approval




     After the Gate Approver approves your gate, the project will automatically
        update by:
     1) Making your next gate active (notice the green color in the “Measure”
        tollgate bar)
     2) Marking the approved gate as “complete” (see the “Define” tollgate status)          27
                                                                      UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




DMAIC Project Summary Page




       Basic project information shows whether the project is on track, %
       complete, and which phase of the project you are in. In this case, the
       project is in the Control phase (notice the green color) and is on track.
       Green=on track, Yellow=needs attention, Red=off track, Grey=complete.

       Scroll further down to see the various stages and documentation.                 28
                                                                  UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




Project Status Reports
                                                                         Status Report: Click
                                                                         “add new” to add a
                                                                         status report. Status
                                                                         reports are used to
                                                                         update your team and
                                                                         your MBB regarding
                                                                         what‟s going on with
                                                                         the project. For
                                                                         example, this is the
                                                                         place where you can
                                                                         let everyone know
                                                                         when you are briefing
                                                                         the project champion.

                                                             Notice this project has two gate
                                                             approvers-one is the project
                                                             MBB and one is the project
                                                             champion. See your MBB or
                                                             your organization‟s DD to find
                                                             out who should be in the “Gate
          Click on a Phase to view the documentation and     Approver” box-each
          status, “Improve” is shown as an example. Note     organization has its own
          that there are currently no “required” documents   business rule.
          established for any of the phases.                                                      29
                                                                            UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




Adding Documents

                      Use the
                      “Add/Remove”
                      button to add
                      documents. You can
                      then specify the
                      document type and
                      the Gate to which the
                      document is
                      attached.




                                              30
                        UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




Deployment Director Options
    • Deployment Directors have additional capabilities that basic
      users do not have. Deployment Directors can:
          –   Delete projects
          –   Move a project from one organization to another
          –   Create a completed project
          –   Invite “no access” users (user will not receive any email notification)
          –   Assign a user license (basic users can invite someone, but with
              view-only capability)

    • Deployment Directors cannot delete people profiles-contact
      the NGB Program Office to delete a profile



                                                                                            31
                                                                      UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




      Takeaways

      • Power Steering tracks projects through the
        cycle
      • Power Steering is not an „Optional‟ tool
      • It is the Black Belt‟s responsibility to
        update and keep record current




                                                                32
                                          UNCLASSIFIED / FOUO
UNCLASSIFIED / FOUO




         What other comments or questions
                   do you have?




                                                         33
                                   UNCLASSIFIED / FOUO

Mais conteúdo relacionado

Mais procurados

NG BB 05 Roles and Responsibilities
NG BB 05 Roles and ResponsibilitiesNG BB 05 Roles and Responsibilities
NG BB 05 Roles and ResponsibilitiesLeanleaders.org
 
NG BB 06 Project Charter
NG BB 06 Project CharterNG BB 06 Project Charter
NG BB 06 Project CharterLeanleaders.org
 
NG BB 07 Multi-Generation Project Planning
NG BB 07 Multi-Generation Project PlanningNG BB 07 Multi-Generation Project Planning
NG BB 07 Multi-Generation Project PlanningLeanleaders.org
 
NG BB 49 Risk Assessment
NG BB 49 Risk AssessmentNG BB 49 Risk Assessment
NG BB 49 Risk AssessmentLeanleaders.org
 
NG BB 54 Sustain the Gain
NG BB 54 Sustain the GainNG BB 54 Sustain the Gain
NG BB 54 Sustain the GainLeanleaders.org
 
NG BB 38 ANALYZE Tollgate
NG BB 38 ANALYZE TollgateNG BB 38 ANALYZE Tollgate
NG BB 38 ANALYZE TollgateLeanleaders.org
 
NG BB 02 Table of Contents
NG BB 02 Table of ContentsNG BB 02 Table of Contents
NG BB 02 Table of ContentsLeanleaders.org
 
NG BB 47 Basic Design of Experiments
NG BB 47 Basic Design of ExperimentsNG BB 47 Basic Design of Experiments
NG BB 47 Basic Design of ExperimentsLeanleaders.org
 
NG BB 08 Change Management
NG BB 08 Change ManagementNG BB 08 Change Management
NG BB 08 Change ManagementLeanleaders.org
 
NG BB 45 Quick Change Over
NG BB 45 Quick Change OverNG BB 45 Quick Change Over
NG BB 45 Quick Change OverLeanleaders.org
 
NG BB 40 Solution Selection
NG BB 40 Solution SelectionNG BB 40 Solution Selection
NG BB 40 Solution SelectionLeanleaders.org
 
NG BB 22 Process Measurement
NG BB 22 Process MeasurementNG BB 22 Process Measurement
NG BB 22 Process MeasurementLeanleaders.org
 
NG BB 15 MEASURE Roadmap
NG BB 15 MEASURE RoadmapNG BB 15 MEASURE Roadmap
NG BB 15 MEASURE RoadmapLeanleaders.org
 
NG BB 09 Project Management
NG BB 09 Project ManagementNG BB 09 Project Management
NG BB 09 Project ManagementLeanleaders.org
 
NG BB 20 Data Collection
NG BB 20 Data CollectionNG BB 20 Data Collection
NG BB 20 Data CollectionLeanleaders.org
 
NG BB 18 Theory of Constraints
NG BB 18 Theory of ConstraintsNG BB 18 Theory of Constraints
NG BB 18 Theory of ConstraintsLeanleaders.org
 
NG BB 21 Intro to Minitab
NG BB 21 Intro to MinitabNG BB 21 Intro to Minitab
NG BB 21 Intro to MinitabLeanleaders.org
 
NG BB 37 Multiple Regression
NG BB 37 Multiple RegressionNG BB 37 Multiple Regression
NG BB 37 Multiple RegressionLeanleaders.org
 

Mais procurados (20)

NG BB 05 Roles and Responsibilities
NG BB 05 Roles and ResponsibilitiesNG BB 05 Roles and Responsibilities
NG BB 05 Roles and Responsibilities
 
NG BB 06 Project Charter
NG BB 06 Project CharterNG BB 06 Project Charter
NG BB 06 Project Charter
 
NG BB 04 DEFINE Roadmap
NG BB 04 DEFINE RoadmapNG BB 04 DEFINE Roadmap
NG BB 04 DEFINE Roadmap
 
NG BB 07 Multi-Generation Project Planning
NG BB 07 Multi-Generation Project PlanningNG BB 07 Multi-Generation Project Planning
NG BB 07 Multi-Generation Project Planning
 
NG BB 49 Risk Assessment
NG BB 49 Risk AssessmentNG BB 49 Risk Assessment
NG BB 49 Risk Assessment
 
NG BB 54 Sustain the Gain
NG BB 54 Sustain the GainNG BB 54 Sustain the Gain
NG BB 54 Sustain the Gain
 
NG BB 38 ANALYZE Tollgate
NG BB 38 ANALYZE TollgateNG BB 38 ANALYZE Tollgate
NG BB 38 ANALYZE Tollgate
 
NG BB 02 Table of Contents
NG BB 02 Table of ContentsNG BB 02 Table of Contents
NG BB 02 Table of Contents
 
NG BB 47 Basic Design of Experiments
NG BB 47 Basic Design of ExperimentsNG BB 47 Basic Design of Experiments
NG BB 47 Basic Design of Experiments
 
NG BB 08 Change Management
NG BB 08 Change ManagementNG BB 08 Change Management
NG BB 08 Change Management
 
NG BB 45 Quick Change Over
NG BB 45 Quick Change OverNG BB 45 Quick Change Over
NG BB 45 Quick Change Over
 
NG BB 40 Solution Selection
NG BB 40 Solution SelectionNG BB 40 Solution Selection
NG BB 40 Solution Selection
 
NG BB 22 Process Measurement
NG BB 22 Process MeasurementNG BB 22 Process Measurement
NG BB 22 Process Measurement
 
NG BB 17 Takt Time
NG BB 17 Takt TimeNG BB 17 Takt Time
NG BB 17 Takt Time
 
NG BB 15 MEASURE Roadmap
NG BB 15 MEASURE RoadmapNG BB 15 MEASURE Roadmap
NG BB 15 MEASURE Roadmap
 
NG BB 09 Project Management
NG BB 09 Project ManagementNG BB 09 Project Management
NG BB 09 Project Management
 
NG BB 20 Data Collection
NG BB 20 Data CollectionNG BB 20 Data Collection
NG BB 20 Data Collection
 
NG BB 18 Theory of Constraints
NG BB 18 Theory of ConstraintsNG BB 18 Theory of Constraints
NG BB 18 Theory of Constraints
 
NG BB 21 Intro to Minitab
NG BB 21 Intro to MinitabNG BB 21 Intro to Minitab
NG BB 21 Intro to Minitab
 
NG BB 37 Multiple Regression
NG BB 37 Multiple RegressionNG BB 37 Multiple Regression
NG BB 37 Multiple Regression
 

Destaque

Variation and mistake proofing
Variation and mistake proofingVariation and mistake proofing
Variation and mistake proofingLeanleaders.org
 
NG BB 42 Visual Management
NG BB 42 Visual ManagementNG BB 42 Visual Management
NG BB 42 Visual ManagementLeanleaders.org
 
NG BB 32 Failure Modes and Effects Analysis
NG BB 32 Failure Modes and Effects AnalysisNG BB 32 Failure Modes and Effects Analysis
NG BB 32 Failure Modes and Effects AnalysisLeanleaders.org
 
NG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE RoadmapNG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE RoadmapLeanleaders.org
 
NG BB 27 Process Capability
NG BB 27 Process CapabilityNG BB 27 Process Capability
NG BB 27 Process CapabilityLeanleaders.org
 
NG BB 43 Standardized Work
NG BB 43 Standardized WorkNG BB 43 Standardized Work
NG BB 43 Standardized WorkLeanleaders.org
 

Destaque (8)

NG BB 30 Basic Tools
NG BB 30 Basic ToolsNG BB 30 Basic Tools
NG BB 30 Basic Tools
 
Variation and mistake proofing
Variation and mistake proofingVariation and mistake proofing
Variation and mistake proofing
 
NG BB 42 Visual Management
NG BB 42 Visual ManagementNG BB 42 Visual Management
NG BB 42 Visual Management
 
NG BB 32 Failure Modes and Effects Analysis
NG BB 32 Failure Modes and Effects AnalysisNG BB 32 Failure Modes and Effects Analysis
NG BB 32 Failure Modes and Effects Analysis
 
NG BB 01 Introduction
NG BB 01 IntroductionNG BB 01 Introduction
NG BB 01 Introduction
 
NG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE RoadmapNG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE Roadmap
 
NG BB 27 Process Capability
NG BB 27 Process CapabilityNG BB 27 Process Capability
NG BB 27 Process Capability
 
NG BB 43 Standardized Work
NG BB 43 Standardized WorkNG BB 43 Standardized Work
NG BB 43 Standardized Work
 

Semelhante a NG BB 11 Power Steering

NG BB 46 Mistake Proofing
NG BB 46 Mistake ProofingNG BB 46 Mistake Proofing
NG BB 46 Mistake ProofingLeanleaders.org
 
Key Considerations for a Successful Hyperion Planning Implementation
Key Considerations for a Successful Hyperion Planning ImplementationKey Considerations for a Successful Hyperion Planning Implementation
Key Considerations for a Successful Hyperion Planning ImplementationAlithya
 
NG BB 45 Quick Change Over
NG BB 45 Quick Change OverNG BB 45 Quick Change Over
NG BB 45 Quick Change OverLeanleaders.org
 
NG BB 50 Rapid Improvement Event
NG BB 50 Rapid Improvement EventNG BB 50 Rapid Improvement Event
NG BB 50 Rapid Improvement EventLeanleaders.org
 
NG BB 15 MEASURE Roadmap
NG BB 15 MEASURE RoadmapNG BB 15 MEASURE Roadmap
NG BB 15 MEASURE RoadmapLeanleaders.org
 
NG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE RoadmapNG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE RoadmapLeanleaders.org
 
HITSC 2010 06-30 slides
HITSC 2010 06-30 slidesHITSC 2010 06-30 slides
HITSC 2010 06-30 slidesBrian Ahier
 
It's the organisation, Stupid
It's the organisation, StupidIt's the organisation, Stupid
It's the organisation, StupidJohn M Walsh
 
project managment - wang jing yuan (Eric Wang)
project managment - wang jing yuan (Eric Wang)project managment - wang jing yuan (Eric Wang)
project managment - wang jing yuan (Eric Wang)Eric Wang
 
NG BB 36 Simple Linear Regression
NG BB 36 Simple Linear RegressionNG BB 36 Simple Linear Regression
NG BB 36 Simple Linear RegressionLeanleaders.org
 
NG BB 36 Simple Linear Regression
NG BB 36 Simple Linear RegressionNG BB 36 Simple Linear Regression
NG BB 36 Simple Linear RegressionLeanleaders.org
 

Semelhante a NG BB 11 Power Steering (15)

NG BB 46 Mistake Proofing
NG BB 46 Mistake ProofingNG BB 46 Mistake Proofing
NG BB 46 Mistake Proofing
 
Key Considerations for a Successful Hyperion Planning Implementation
Key Considerations for a Successful Hyperion Planning ImplementationKey Considerations for a Successful Hyperion Planning Implementation
Key Considerations for a Successful Hyperion Planning Implementation
 
NG BB 45 Quick Change Over
NG BB 45 Quick Change OverNG BB 45 Quick Change Over
NG BB 45 Quick Change Over
 
NG BB 50 Rapid Improvement Event
NG BB 50 Rapid Improvement EventNG BB 50 Rapid Improvement Event
NG BB 50 Rapid Improvement Event
 
NG BB 15 MEASURE Roadmap
NG BB 15 MEASURE RoadmapNG BB 15 MEASURE Roadmap
NG BB 15 MEASURE Roadmap
 
NG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE RoadmapNG BB 39 IMPROVE Roadmap
NG BB 39 IMPROVE Roadmap
 
HITSC 2010 06-30 slides
HITSC 2010 06-30 slidesHITSC 2010 06-30 slides
HITSC 2010 06-30 slides
 
It's the organisation, Stupid
It's the organisation, StupidIt's the organisation, Stupid
It's the organisation, Stupid
 
project managment - wang jing yuan (Eric Wang)
project managment - wang jing yuan (Eric Wang)project managment - wang jing yuan (Eric Wang)
project managment - wang jing yuan (Eric Wang)
 
Pir
PirPir
Pir
 
Pir
PirPir
Pir
 
Pir
PirPir
Pir
 
NG BB 30 Basic Tools
NG BB 30 Basic ToolsNG BB 30 Basic Tools
NG BB 30 Basic Tools
 
NG BB 36 Simple Linear Regression
NG BB 36 Simple Linear RegressionNG BB 36 Simple Linear Regression
NG BB 36 Simple Linear Regression
 
NG BB 36 Simple Linear Regression
NG BB 36 Simple Linear RegressionNG BB 36 Simple Linear Regression
NG BB 36 Simple Linear Regression
 

Mais de Leanleaders.org

Mais de Leanleaders.org (20)

D11 Define Review
D11 Define ReviewD11 Define Review
D11 Define Review
 
Blankgage.MTW
Blankgage.MTWBlankgage.MTW
Blankgage.MTW
 
Chi-sq GOF Calculator.xls
Chi-sq GOF Calculator.xlsChi-sq GOF Calculator.xls
Chi-sq GOF Calculator.xls
 
D04 Why6Sigma
D04 Why6SigmaD04 Why6Sigma
D04 Why6Sigma
 
D10 Project Management
D10 Project ManagementD10 Project Management
D10 Project Management
 
Attrib R&R.xls
Attrib R&R.xlsAttrib R&R.xls
Attrib R&R.xls
 
Blank Logo LEAN template
Blank Logo LEAN templateBlank Logo LEAN template
Blank Logo LEAN template
 
D07 Project Charter
D07 Project CharterD07 Project Charter
D07 Project Charter
 
ANG_AFSO21_Awareness_Training_(DULUTH)
ANG_AFSO21_Awareness_Training_(DULUTH)ANG_AFSO21_Awareness_Training_(DULUTH)
ANG_AFSO21_Awareness_Training_(DULUTH)
 
Cause and Effect Tree.vst
Cause and Effect Tree.vstCause and Effect Tree.vst
Cause and Effect Tree.vst
 
LEAN template
LEAN templateLEAN template
LEAN template
 
I07 Simulation
I07 SimulationI07 Simulation
I07 Simulation
 
D01 Define Spacer
D01 Define SpacerD01 Define Spacer
D01 Define Spacer
 
Attribute Process Capability Calculator.xls
Attribute Process Capability Calculator.xlsAttribute Process Capability Calculator.xls
Attribute Process Capability Calculator.xls
 
A05 Continuous One Variable Stat Tests
A05 Continuous One Variable Stat TestsA05 Continuous One Variable Stat Tests
A05 Continuous One Variable Stat Tests
 
XY Matrix.xls
XY Matrix.xlsXY Matrix.xls
XY Matrix.xls
 
NG BB 11 Power Steering
NG BB 11 Power SteeringNG BB 11 Power Steering
NG BB 11 Power Steering
 
D06 Project Selection
D06 Project SelectionD06 Project Selection
D06 Project Selection
 
G04 Root Cause Relationships
G04 Root Cause RelationshipsG04 Root Cause Relationships
G04 Root Cause Relationships
 
15 Deliv template
15 Deliv template15 Deliv template
15 Deliv template
 

Último

Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
Unraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptxUnraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptx
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptxDhatriParmar
 
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...DhatriParmar
 
An Overview of the Calendar App in Odoo 17 ERP
An Overview of the Calendar App in Odoo 17 ERPAn Overview of the Calendar App in Odoo 17 ERP
An Overview of the Calendar App in Odoo 17 ERPCeline George
 
How to Uninstall a Module in Odoo 17 Using Command Line
How to Uninstall a Module in Odoo 17 Using Command LineHow to Uninstall a Module in Odoo 17 Using Command Line
How to Uninstall a Module in Odoo 17 Using Command LineCeline George
 
CLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptxCLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptxAnupam32727
 
Objectives n learning outcoms - MD 20240404.pptx
Objectives n learning outcoms - MD 20240404.pptxObjectives n learning outcoms - MD 20240404.pptx
Objectives n learning outcoms - MD 20240404.pptxMadhavi Dharankar
 
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...Nguyen Thanh Tu Collection
 
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITWQ-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITWQuiz Club NITW
 
PART 1 - CHAPTER 1 - CELL THE FUNDAMENTAL UNIT OF LIFE
PART 1 - CHAPTER 1 - CELL THE FUNDAMENTAL UNIT OF LIFEPART 1 - CHAPTER 1 - CELL THE FUNDAMENTAL UNIT OF LIFE
PART 1 - CHAPTER 1 - CELL THE FUNDAMENTAL UNIT OF LIFEMISSRITIMABIOLOGYEXP
 
DiskStorage_BasicFileStructuresandHashing.pdf
DiskStorage_BasicFileStructuresandHashing.pdfDiskStorage_BasicFileStructuresandHashing.pdf
DiskStorage_BasicFileStructuresandHashing.pdfChristalin Nelson
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Projectjordimapav
 
6 ways Samsung’s Interactive Display powered by Android changes the classroom
6 ways Samsung’s Interactive Display powered by Android changes the classroom6 ways Samsung’s Interactive Display powered by Android changes the classroom
6 ways Samsung’s Interactive Display powered by Android changes the classroomSamsung Business USA
 
Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfPrerana Jadhav
 
CHUYÊN ĐỀ ÔN THEO CÂU CHO HỌC SINH LỚP 12 ĐỂ ĐẠT ĐIỂM 5+ THI TỐT NGHIỆP THPT ...
CHUYÊN ĐỀ ÔN THEO CÂU CHO HỌC SINH LỚP 12 ĐỂ ĐẠT ĐIỂM 5+ THI TỐT NGHIỆP THPT ...CHUYÊN ĐỀ ÔN THEO CÂU CHO HỌC SINH LỚP 12 ĐỂ ĐẠT ĐIỂM 5+ THI TỐT NGHIỆP THPT ...
CHUYÊN ĐỀ ÔN THEO CÂU CHO HỌC SINH LỚP 12 ĐỂ ĐẠT ĐIỂM 5+ THI TỐT NGHIỆP THPT ...Nguyen Thanh Tu Collection
 
Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...
Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...
Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...Osopher
 
ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6Vanessa Camilleri
 
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxBIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxSayali Powar
 
4.9.24 Social Capital and Social Exclusion.pptx
4.9.24 Social Capital and Social Exclusion.pptx4.9.24 Social Capital and Social Exclusion.pptx
4.9.24 Social Capital and Social Exclusion.pptxmary850239
 

Último (20)

Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
Unraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptxUnraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptx
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
 
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
 
An Overview of the Calendar App in Odoo 17 ERP
An Overview of the Calendar App in Odoo 17 ERPAn Overview of the Calendar App in Odoo 17 ERP
An Overview of the Calendar App in Odoo 17 ERP
 
Chi-Square Test Non Parametric Test Categorical Variable
Chi-Square Test Non Parametric Test Categorical VariableChi-Square Test Non Parametric Test Categorical Variable
Chi-Square Test Non Parametric Test Categorical Variable
 
How to Uninstall a Module in Odoo 17 Using Command Line
How to Uninstall a Module in Odoo 17 Using Command LineHow to Uninstall a Module in Odoo 17 Using Command Line
How to Uninstall a Module in Odoo 17 Using Command Line
 
CLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptxCLASSIFICATION OF ANTI - CANCER DRUGS.pptx
CLASSIFICATION OF ANTI - CANCER DRUGS.pptx
 
Objectives n learning outcoms - MD 20240404.pptx
Objectives n learning outcoms - MD 20240404.pptxObjectives n learning outcoms - MD 20240404.pptx
Objectives n learning outcoms - MD 20240404.pptx
 
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
 
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITWQ-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
Q-Factor HISPOL Quiz-6th April 2024, Quiz Club NITW
 
PART 1 - CHAPTER 1 - CELL THE FUNDAMENTAL UNIT OF LIFE
PART 1 - CHAPTER 1 - CELL THE FUNDAMENTAL UNIT OF LIFEPART 1 - CHAPTER 1 - CELL THE FUNDAMENTAL UNIT OF LIFE
PART 1 - CHAPTER 1 - CELL THE FUNDAMENTAL UNIT OF LIFE
 
DiskStorage_BasicFileStructuresandHashing.pdf
DiskStorage_BasicFileStructuresandHashing.pdfDiskStorage_BasicFileStructuresandHashing.pdf
DiskStorage_BasicFileStructuresandHashing.pdf
 
Paradigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTAParadigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTA
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Project
 
6 ways Samsung’s Interactive Display powered by Android changes the classroom
6 ways Samsung’s Interactive Display powered by Android changes the classroom6 ways Samsung’s Interactive Display powered by Android changes the classroom
6 ways Samsung’s Interactive Display powered by Android changes the classroom
 
Narcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdfNarcotic and Non Narcotic Analgesic..pdf
Narcotic and Non Narcotic Analgesic..pdf
 
CHUYÊN ĐỀ ÔN THEO CÂU CHO HỌC SINH LỚP 12 ĐỂ ĐẠT ĐIỂM 5+ THI TỐT NGHIỆP THPT ...
CHUYÊN ĐỀ ÔN THEO CÂU CHO HỌC SINH LỚP 12 ĐỂ ĐẠT ĐIỂM 5+ THI TỐT NGHIỆP THPT ...CHUYÊN ĐỀ ÔN THEO CÂU CHO HỌC SINH LỚP 12 ĐỂ ĐẠT ĐIỂM 5+ THI TỐT NGHIỆP THPT ...
CHUYÊN ĐỀ ÔN THEO CÂU CHO HỌC SINH LỚP 12 ĐỂ ĐẠT ĐIỂM 5+ THI TỐT NGHIỆP THPT ...
 
Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...
Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...
Healthy Minds, Flourishing Lives: A Philosophical Approach to Mental Health a...
 
ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6ICS 2208 Lecture Slide Notes for Topic 6
ICS 2208 Lecture Slide Notes for Topic 6
 
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptxBIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
BIOCHEMISTRY-CARBOHYDRATE METABOLISM CHAPTER 2.pptx
 
4.9.24 Social Capital and Social Exclusion.pptx
4.9.24 Social Capital and Social Exclusion.pptx4.9.24 Social Capital and Social Exclusion.pptx
4.9.24 Social Capital and Social Exclusion.pptx
 

NG BB 11 Power Steering

  • 1. UNCLASSIFIED //FOUO UNCLASSIFIED FOUO UNCLASSIFIED / FOUO National Guard Black Belt Training Module 11 CPI Project Tracking Tool Power Steering UNCLASSIFIED UNCLASSIFIED / FOUO 1 UNCLASSIFIED / FOUO UNCLASSIFIED / FOUO
  • 2. UNCLASSIFIED / FOUO CPI Roadmap – Define 8-STEP PROCESS 6. See 1.Validate 2. Identify 3. Set 4. Determine 5. Develop 7. Confirm 8. Standardize Counter- the Performance Improvement Root Counter- Results Successful Measures Problem Gaps Targets Cause Measures & Process Processes Through Define Measure Analyze Improve Control ACTIVITIES TOOLS • Identify Problem •Project Charter • Validate Problem Statement •Project Selection Tools • Establish Strategic Alignment •Value Stream Map • Gather Voice of the Customer & Business •Various Financial Analysis • Create Goal Statement •Effective Meeting Skills • Validate Business Case •Stakeholder Analysis • Determine Project Scope •Communication Plan • Select and Launch Team •SIPOC Map • Develop Project Timeline •High-Level Process Map • Create Communication Plan •Project Management Tools • Prepare High-Level Process Map / SIPOC •VOC and Kano Analysis • Complete Define Tollgate •RACI and Quad Charts •Strategic Alignment 2 Note: Activities and tools vary by project. Lists provided here are not necessarily all-inclusive. UNCLASSIFIED / FOUO
  • 3. UNCLASSIFIED / FOUO Learning Objectives • Learn how to navigate through the Power Steering tool • Understand the Black Belt‟s responsibility • Understand how to use the tool to track projects progress 3 UNCLASSIFIED / FOUO
  • 4. UNCLASSIFIED / FOUO Power Steering Power Steering is a knowledge management and project tracking tool used to: • Track DoD CPI projects • Access and store project tools and templates • Track project progress by phase • Manage gate approvals • Share project best practices and provide replication opportunities DEPMS – Defense Enterprise Project Management System 4 UNCLASSIFIED / FOUO
  • 5. UNCLASSIFIED / FOUO Accessing Power Steering To get into PowerSteering, you need the following: 1) PowerSteering URL 2) User name and password • National Guard students who attend Black Belt training will have a PS account set up for them • You will receive an email with your PowerSteering URL and login information - User name: Your email address - Password: A temporary password will be sent in the email BLACK BELT ROLE: Enter your project into Power Steering Keep your project updated 5 UNCLASSIFIED / FOUO
  • 6. UNCLASSIFIED / FOUO General Navigation Power Steering Navigation Menu (blue bar) • Home Takes you back to Home page • Inbox View Questions, Alerts and Status Reports Due • Browse Various Power Steering functions that you can access • Important Links Quick links to import areas on the site • Last Visited Tracks your most recent activities for quick reference • Search Simple keyword search 6 UNCLASSIFIED / FOUO
  • 7. UNCLASSIFIED / FOUO General Navigation The Help button provides additional training and Help Important Links information and also is used provides easy access for submitting Help Desk to Tools and Requests. Templates, Reference Guides, Tutorials, and other important information. 7 UNCLASSIFIED / FOUO
  • 8. UNCLASSIFIED / FOUO General Navigation Click on Browse to access various options as shown including updating your profile and customizing your PowerSteering views. Work Tree contains special information folders. You can also start a new project from here by clicking on “Create New Work”. 8 UNCLASSIFIED / FOUO
  • 9. UNCLASSIFIED / FOUO General Navigation From the Home Page, use these Quick Links that provide shortcuts to common tasks. Note the option to Create New Work from here versus clicking “Browse” then “Create New Work”. They both get you to the same page for creating a new project. 9 UNCLASSIFIED / FOUO
  • 10. UNCLASSIFIED / FOUO General Navigation Under Browse, >My Settings, > Preferences you can customize your Home Page. You can display various formats on your home page. For instance, “Dashboard” provides an overview of all projects that you are involved with. This is informational - the default is already set to display basic home page 10 information. UNCLASSIFIED / FOUO
  • 11. UNCLASSIFIED / FOUO Updating Your Power Steering Profile Access your profile at the top right corner or under “Browse”. Click on your name and select Edit Profile. Make sure all of your information is up-to-date, especially this section, which is used to give your organization credit for your training (for organizations who use Power Steering as their primary CPI data collection system). 11 UNCLASSIFIED / FOUO
  • 12. UNCLASSIFIED / FOUO Inviting A New Power Steering User From the “Browse” option, select “Invite/Create New User” under “People” Step 1: Red dot items are mandatory. As a basic user, you can only invite someone into Power Steering with “view only” privileges. (See your Deployment Director to assign someone editing privileges.) Step 2: Once you‟re finished The individual can fill in this filling in the red dot items, information when they log select “Invite”. The individual into Power Steering. will receive an Outlook email invite to join Power Steering. 12 UNCLASSIFIED / FOUO
  • 13. UNCLASSIFIED / FOUO Locating An Existing Project Find existing projects easily using any of the following methods: (1) On your Home page - your projects should be listed per your User Preference setup. (2) Use the Search button. (3) Select Browse, Work Tree, find your organization, then select your project. (4) Use the Quick Link Find a project or idea and enter search words. 13 UNCLASSIFIED / FOUO
  • 14. UNCLASSIFIED / FOUO Replication Check Define Template I confirm that:  DEPMS (DoD Enterprise Performance Management System) has been searched for similar projects: Yes / No  Replication: List relevant initiatives / potential replication projects found (if any): • Project 1: (DEPMS # or other tracking tool project number) • Project 2:  Collaboration: Identify organizations that can/should be considered for working this project collaboratively: • Organization 1: • Organization 2: Required Deliverable 14 UNCLASSIFIED / FOUO
  • 15. UNCLASSIFIED / FOUO Creating a DMAIC Project 1) Click on Create New Work 2) Select project work type from the pull-down menu 3) Select Continue Most common Project Work Types: •Non-gated project (AKA “Just Do It” or JDI) •Rapid Improvement Event (RIE) •DMAIC gated project 15 UNCLASSIFIED / FOUO
  • 16. UNCLASSIFIED / FOUO Creating a DMAIC Project Fields with red dot are required. Enter your project name. Hint: Enter the full name of the project - spelled out. Also include acronyms - it helps when searching for your project. Enter organization information. 16 UNCLASSIFIED / FOUO
  • 17. UNCLASSIFIED / FOUO Creating a DMAIC Project Under Parent, click the drop down to select your project location in the Work Tree; this pop up window of the work tree will appear. Use the drop downs to select your organization levels – this is the organization who is the lead and will get credit for the project. Go as low as you can go! Important: This is the most common error people tend to make. Select exactly where you want the project to reside under. Look to find your sub-organization under the parent org. 17 UNCLASSIFIED / FOUO
  • 18. UNCLASSIFIED / FOUO Creating a DMAIC Project Mandatory fields to fill out: • Your project‟s problem statement • The project‟s business case – why is it important to the organization? • The project‟s goal statement • Team members • Scope of the project 18 UNCLASSIFIED / FOUO
  • 19. UNCLASSIFIED / FOUO Creating a DMAIC Project Step 1 To add Team Members: 1) Search by a person‟s name/partial name. If the person‟s name doesn‟t appear, then they are not registered in PowerSteering and you cannot add them as part of the team in this section. See your Deployment Director or Master Black Belt to determine if that person should be registered in PowerSteering. Step 2 2) Drag and drop the name under the appropriate role: a) Project Lead: The person creating the project is automatically set as Project Lead. If the Lead drags & drops another into the role (in this example, Anne-marie is entered), that person will receive a Mandatory fields; notice to accept the role as Project Lead. In the meantime, the project originator • Project Owner (Lead) remains as the Lead and Anne-marie will be listed with an hour-glass beside her • Gate Approver (for gated name, indicating that she has not yet projects) accepted the role. b) Other roles- the members will be listed with an hour-glass beside their name Optional field: until they accept the invite. • Project Mentors (your MBB) • NOTE: For National Guard Select “Finish & Create”. We recommend this, versus “Continue” to ensure you don‟t students, this field is mandatory lose your work. 19 UNCLASSIFIED / FOUO
  • 20. UNCLASSIFIED / FOUO Creating a DMAIC Project Finally, select dates to indicate planned timeline for completion by phase Then select Finish & Create. (We recommend this, versus “Continue” to ensure you don’t lose your work.) 20 UNCLASSIFIED / FOUO
  • 21. UNCLASSIFIED / FOUO Adding Important Project Information After selecting “finish and create”, the screen will refresh to your project‟s Summary page. However, you still need to provide a few more pieces of information. Go into the Edit mode for the Project Details section. 21 UNCLASSIFIED / FOUO
  • 22. UNCLASSIFIED / FOUO Setting Project Planned End Date Edit Project Details: • Under “Schedule”, select “Finish No Later Than”. This allows you to select an end date, which is how National Guard schedules projects. • Enter the planned end date. Typically 3-4 months after the start date. Save the changes. 22 UNCLASSIFIED / FOUO
  • 23. UNCLASSIFIED / FOUO Updating Tollgate Status & Dates Use the “Update Status” button to change the status of the Tollgate or the Tollgate End Date 23 UNCLASSIFIED / FOUO
  • 24. UNCLASSIFIED / FOUO Requesting Gate Approval Before you request a tollgate approval, make sure any required documents are attached to the tollgate and that you‟ve met your organization‟s requirements for tollgate completion. 24 UNCLASSIFIED / FOUO
  • 25. UNCLASSIFIED / FOUO Requesting Gate Approval This is the view only seen by the Project Lead- notice the “Request Approval” box Once you are ready, click this box to send an email to your Gate Approver. A box will then appear where you can type a message to your gate approver. Select “Request Approval” 25 UNCLASSIFIED / FOUO
  • 26. UNCLASSIFIED / FOUO Requesting Gate Approval The Gate Approver will receive an email and a link to a “question” in their PowerSteering “in box”. They will (hopefully) check “Approve” and submit the approval back to you. 26 UNCLASSIFIED / FOUO
  • 27. UNCLASSIFIED / FOUO Requesting Gate Approval After the Gate Approver approves your gate, the project will automatically update by: 1) Making your next gate active (notice the green color in the “Measure” tollgate bar) 2) Marking the approved gate as “complete” (see the “Define” tollgate status) 27 UNCLASSIFIED / FOUO
  • 28. UNCLASSIFIED / FOUO DMAIC Project Summary Page Basic project information shows whether the project is on track, % complete, and which phase of the project you are in. In this case, the project is in the Control phase (notice the green color) and is on track. Green=on track, Yellow=needs attention, Red=off track, Grey=complete. Scroll further down to see the various stages and documentation. 28 UNCLASSIFIED / FOUO
  • 29. UNCLASSIFIED / FOUO Project Status Reports Status Report: Click “add new” to add a status report. Status reports are used to update your team and your MBB regarding what‟s going on with the project. For example, this is the place where you can let everyone know when you are briefing the project champion. Notice this project has two gate approvers-one is the project MBB and one is the project champion. See your MBB or your organization‟s DD to find out who should be in the “Gate Click on a Phase to view the documentation and Approver” box-each status, “Improve” is shown as an example. Note organization has its own that there are currently no “required” documents business rule. established for any of the phases. 29 UNCLASSIFIED / FOUO
  • 30. UNCLASSIFIED / FOUO Adding Documents Use the “Add/Remove” button to add documents. You can then specify the document type and the Gate to which the document is attached. 30 UNCLASSIFIED / FOUO
  • 31. UNCLASSIFIED / FOUO Deployment Director Options • Deployment Directors have additional capabilities that basic users do not have. Deployment Directors can: – Delete projects – Move a project from one organization to another – Create a completed project – Invite “no access” users (user will not receive any email notification) – Assign a user license (basic users can invite someone, but with view-only capability) • Deployment Directors cannot delete people profiles-contact the NGB Program Office to delete a profile 31 UNCLASSIFIED / FOUO
  • 32. UNCLASSIFIED / FOUO Takeaways • Power Steering tracks projects through the cycle • Power Steering is not an „Optional‟ tool • It is the Black Belt‟s responsibility to update and keep record current 32 UNCLASSIFIED / FOUO
  • 33. UNCLASSIFIED / FOUO What other comments or questions do you have? 33 UNCLASSIFIED / FOUO